Pipeline Safety Absorbed Through the Skin

Total Page:16

File Type:pdf, Size:1020Kb

Pipeline Safety Absorbed Through the Skin ALBERTA ONE-CALL 1-800-242-3447 ONE-CALL ALBERTA clickbeforeyoudig.com clickbeforeyoudig.com arranged by visiting/calling the following: the visiting/calling by arranged be can service This charge. of free hours, 48 within you for Right of Way, you can arrange to have the pipeline located pipeline the have to arrange can you Way, of Right pipeline the of metres 30 within done be to needs work When CLICK OR CALL BEFORE YOU DIG YOU BEFORE CALL OR CLICK evacuation was not practical. not was evacuation release at the pipeline, facility or terminal. Ignition of the gas source would ensure your safety if if safety your ensure would source gas the of Ignition terminal. or facility pipeline, the at release the ignite to authorized fully is Commander Incident the required, is ignition that determined is it If 1-866-875-2554 Ignition Procedures Ignition 24-hour emergency number emergency 24-hour During this time the air outside may be fresher. be may outside air the time this During Canada’s Midstream Plains Turning up thermostats up Turning • dispatched to the area to safely manage the emergency. the manage safely to area the to dispatched • Turning on fans on Turning • Additional emergency response personnel will be notified and and notified be will personnel response emergency Additional Opening all windows and doors and windows all Opening • public and environment. environment. and public building by: building crews will take immediate steps to minimize the risk to the the to risk the minimize to steps immediate take will crews Plains emergency response personnel. You may also receive, if required, instructions to ventilate your your ventilate to instructions required, if receive, also may You personnel. response emergency Plains place to ensure your safety. If a leak should occur, emergency emergency occur, should leak a If safety. your ensure to place After the hazardous substance has passed through the area you will receive an “all-clear” message from from message “all-clear” an receive will you area the through passed has substance hazardous the After the Plains Emergency Response Plan (ERP) for this area is in in is area this for (ERP) Plan Response Emergency Plains the • If you are unable to follow these instructions, please notify Plains emergency response personnel. response emergency Plains notify please instructions, these follow to unable are you If • While the chance of an uncontrolled spill or problem is remote, remote, is problem or spill uncontrolled an of chance the While • Even if you see people outside, do not leave until told to do so. do to told until leave not do outside, people see you if Even • number if you suspect a problem. (1-866-875-2554) (1-866-875-2554) problem. a suspect you if number • Stay tuned to local radio and television for possible information updates. information possible for television and radio local to tuned Stay • Please call Plains Midstream Canada’s 24-hour emergency emergency 24-hour Canada’s Midstream Plains call Please agencies (so the response can be coordinated). be can response the (so agencies If You Suspect a Problem a Suspect You If • Call the company if you are experiencing symptoms, smelling odours or have contacted government government contacted have or odours smelling symptoms, experiencing are you if company the Call • Plains emergency response personnel. response emergency Plains ground level ground • Avoid using the telephone, except for emergencies, so that you can be contacted by by contacted be can you that so emergencies, for except telephone, the using Avoid • at air displaces plume or cloud gas expanding • Wait in an interior room upstairs for further instruction. further for upstairs room interior an in Wait • • Critical hazard because of oxygen deficiency as as deficiency oxygen of because hazard Critical • • Leave all inside doors open. doors inside all Leave • • Fire hazard from burning gas and radiant heat radiant and gas burning from hazard Fire • • Ventilators • fireplaces Gas • fans Bathroom • of drifting vapour cloud cloud vapour drifting of • Air conditioning Air • dryers Clothes • fans Kitchen • ignition delaying from hazards explosion Potential • • Gas stoves Gas • systems vacuum Built-in • Furnaces • Main Hazards: Main • Turn off anything that circulates air, such as: such air, circulates that anything off Turn • faster. • Extinguish indoor wood-burning fires and close flue dampers if possible. if dampers flue close and fires wood-burning indoor Extinguish • higher wind speed conditions, the vapour would dissipate dissipate would vapour the conditions, speed wind higher • Close and lock all windows and outside doors, if possible, tape any gaps around exterior door frames. door exterior around gaps any tape possible, if doors, outside and windows all lock and Close • the source under moderate wind speed conditions. Under Under conditions. speed wind moderate under source the • Immediately gather everyone indoors and stay there. stay and indoors everyone gather Immediately • times) and can form a plume, which may drift downwind from from downwind drift may which plume, a form can and times) be taken if “Shelter-In-Place” procedures have been implemented: been have procedures “Shelter-In-Place” if taken be form. When HVP products vapourize, they expand (70 to 300 300 to (70 expand they vapourize, products HVP When form. Plains representative advises you that it is safe to do so. The following steps should should steps following The so. do to safe is it that you advises representative Plains extreme conditions, pools of super-cooled liquid may briefly briefly may liquid super-cooled of pools conditions, extreme a until vehicles any start to attempt or house your leave not do sheltered, stay to advised are you If cloud of cold vapour considerably heavier than air. Under Under air. than heavier considerably vapour cold of cloud Shelter-in-Place Procedures Shelter-in-Place humid air, a leak of an HVP product may form a visible white white visible a form may product HVP an of leak a air, humid gases. Under pressure, HVP products exist in a liquid state. In In state. liquid a in exist products HVP pressure, Under gases. • Wait for further instruction. further for Wait • gas liquids (NGL). At atmospheric pressure, HVP products are are products HVP pressure, atmospheric At (NGL). liquids gas with the representative. the with HVP products include propane, butane, pentane, and natural natural and pentane, butane, propane, include products HVP in check and centre evacuation the to directly proceed and provided route the on safely Drive • • Turn down thermostat and shut off any air exchange fans to outside. to fans exchange air any off shut and thermostat down Turn • High Vapour Pressure (HVP) Products (HVP) Pressure Vapour High • Lock all windows and doors. and windows all Lock • for more details. more for • Gather all residents and bring any medicines required. medicines any bring and residents all Gather • Pipeline System. Refer to the map on the back of this brochure brochure this of back the on map the to Refer System. Pipeline be taken if “Evacuation” procedures have been implemented: implemented: been have procedures “Evacuation” if taken be Planning Zones (EPZs) are 250 to 900 metres for the Co-Ed Co-Ed the for metres 900 to 250 are (EPZs) Zones Planning our calls, we will proceed to your residence to inform you of the situation. The following steps should should steps following The situation. the of you inform to residence your to proceed will we calls, our Canada’s Alberta pipeline network. The respective Emergency Emergency respective The network. pipeline Alberta Canada’s If it is necessary to evacuate, you will be contacted by telephone immediately. If there is no answer to to answer no is there If immediately. telephone by contacted be will you evacuate, to necessary is it If Vapour Pressure (HVP) and forms part of Plains Midstream Midstream Plains of part forms and (HVP) Pressure Vapour Evacuation Procedures Evacuation Co-Ed Pipeline system. These pipelines are licensed as High High as licensed are pipelines These system. Pipeline Co-Ed Evacuation, Shelter & Ignition Procedures Ignition & Shelter Evacuation, Plains Midstream Canada ULC (Plains) is the operator of the the of operator the is (Plains) ULC Canada Midstream Plains Measures Protection Public Our Operations in your Area your in Operations Our Potential Health Effects from HVP Products Exposure Notification If you are contacted by Plains Midstream Canada to advise you of SKIN Irritation of skin may occur and progress to an emergency situation, the caller will: dermatitis. One component, benzene, may be • Identify themselves by name. Pipeline Safety absorbed through the skin. • Announce that they are a Plains Midstream Canada EYES Irritation of eyes may occur. representative. Keeping Pipelines Safe and Reliable BREATHING Breathing mists or vapours may cause accumulation • Describe the problem and what is being done. in the lungs and/or central nervous system depression, • Give you instructions to protect your safety dizziness, headaches, giddiness, drowsiness, fatigue, (shelter / evacuation). nausea, unconsciousness or death. • Verify the information you have provided. SWALLOWING Swallowing mists or vapours may cause accumulation • Address any concerns which you may have. in the lungs and/or central nervous system depression, • Provide a telephone number which you can call to get dizziness, headaches, giddiness, drowsiness, fatigue, additional information. nausea, unconsciousness or death. LONG-TERM Defatting and drying of skin may occur and cause HAZARDS dermatitis. Inhalation of one component, benzene, Emergency Contacts has been associated with blood disorders including If you suspect a problem at a Plains facility in your area, please call anemia and leukemia. Repeated exposure to high Plains Midstream Canada’s 24-hour Emergency Response number: vapour concentrations may cause eye and respiratory irritation, giddiness, staggered gait, nausea, abdominal 1-866-875-2554 pain, loss of appetite, liver damage, kidney damage, and damage to the bone marrow including cancer.
Recommended publications
  • Alberta Custom Rates Survey : Crop and Pastureland Lease and Rental 2016
    Alberta Custom Rates Survey Crop and Pastureland Lease and Rental 2016 Economics and Competitiveness Branch INTRODUCTION This Custom Rate Survey was conducted by Alberta Agriculture and Forestry, Economics and Competitiveness Branch, Statistics and Data Development Section. The data presented in this report was obtained by contacting producers and custom operators and thus represent actual charges. Please note that some instances may be “good neighbor rates” as opposed to commercial rates. The reader should be aware that varying lease and rental arrangements in different areas of the province could significantly affect the rates charged from year to year. The intent of the survey is to provide producers with additional information to help with their farm management decisions. The quality of data is dependent on the cooperation received by producers as well as commercial custom operators. We would like to thank all the survey participants who willingly provided the information for this report. If you are aware of anyone who is a custom operator that has not been contacted, but wish to participate in the survey, please do not hesitate to refer them to me. The assistance of Reynold Jaipaul, Roy Larsen, Guangzhi Liu, Melodie Mynzak, Marian Elson and Pamela Triska of Alberta Agriculture and Forestry is greatly appreciated. For further information, please contact: Ashan Shooshtarian Alberta Agriculture and Forestry Economics and Competitiveness Branch Statistics and Data Development Section 302, 7000 ‐113 Street Edmonton, Alberta T6H 5T6 Phone: 780‐422‐2887 Fax: 780‐427‐5220 Email: [email protected] To view the custom rates reports on Ropin the Web, please go to: http://www.agric.gov.ab.ca/app21/infopage?cat1=Statistics&cat2=Farm%20Financial Note to Users: The contents of this document may not be used or reproduced without properly accrediting Alberta Agriculture and Forestry, Economics and Competitiveness Branch, Statistics and Data Development Section.
    [Show full text]
  • Information Document Keephills Ellerslie Genesee Area Transmission Constraint Management ID #2013-004R
    Information Document Keephills Ellerslie Genesee Area Transmission Constraint Management ID #2013-004R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document and any Authoritative Document(s)1 in effect, the Authoritative Document(s) governs. 1 Purpose This Information Document relates to the following Authoritative Document: Section 302.1 of the ISO rules, Real Time Transmission Constraint Management (“Section 302.1”). The purpose of this Information Document is to provide additional information regarding the unique operating characteristics and resulting constraint conditions and limits on the Keephills Ellerslie Genesee cutplane of the Alberta interconnected electric system. Section 302.1 sets out the general transmission constraint management protocol steps the AESO uses to manage transmission constraints in real time on the Alberta interconnected electric system. These steps are referenced in Table 1 of this Information Document as they are applied to the Keephills Ellerslie Genesee area. 2 General The Keephills Ellerslie Genesee cutplane is defined as the flows across the Keephills 240/138 kV transformer and all transmission lines connecting the Keephills and Genesee substations to the Alberta interconnected electric system. To ensure the safe and reliable operation of the Alberta interconnected electric system, the AESO has established operating limits for the Keephills Ellerslie Genesee cutplane, and has developed policies and procedures to manage Keephills Ellerslie Genesee cutplane transmission constraints. The AESO has provided a geographical map of the Keephills Ellerslie Genesee area indicating bulk transmission lines in Appendix 2 of this Information Document.
    [Show full text]
  • Woodlands County 11
    Woodlands County 11 Points of Interest & Facilities 1 E.S. Huestis Demonstration Forest 2 Eagle River Casino 16 3 Whitecourt Airport 4 Forest Interpretive Centre 5 Fort Assiniboine Museum 15 12 6 World’s Largest Wagon Wheel and Pick 8 14 18 9 10 13 17 Parks, Campgrounds and Day Use Areas 1 Groat Creek Day Use Area and Group Campground 2 Eagle Creek Campground 3 Hard Luck Canyon 4 Little McLeod Lake (Carson Pegasus Provincial Park) 5 McLeod Lake (Carson Pegasus Provincial Park) 7 6 Blue Ridge Spray Park 7 Blue Ridge Recreation Area Community Halls Lookout Points 8 Goose Lake Campground 1 Westward Community Centre 1 Athabasca River Lookout 9 Goose Lake Day Use Area 2 Anselmo Community Centre 2 Coal Mine Hill Lookout 3 Blue Ridge Community Hall 10 Schuman Lake Campground and Day Use Area 4 Goose Lake Community Hall 5 Topland Community Hall Recreation Areas 11 Centre of Alberta 4 6 Fort Assiniboine Legion 1 Tubing Access (Start) 12 Freeman River RV Park 7 Timeu Community Hall 2 Tubing Take Out (Finish) 13 Mouth of the Freeman River 3 Allan & Jean Millar Centre Day Use Area 14 Woodlands RV Park 4 Blue Ridge Skating Rink Off-Highway Vehicle Areas and River Marina and Playground 1 Eagle River 15 Horse Creek Ranch Snowmobile Staging Area 5 Anselmo Skating Rink, Playground & Ball Diamond 16 Fort Assiniboine Sandhills 2 Whiteridge MX Park Wildland Provincial Park 3 Timeu Off-Highway Vehicle 6 Fort Assiniboine Skating Rink 17 Fort Assiniboine Park and Recreation Area Garter Snake Hibernaculum 4 Goat Creek Snowmoblie Staging Area 18 Fort Assiniboine Boat Launch Find out more at www.woodlands.ab.ca.
    [Show full text]
  • Download Dust Control Application Here
    DUST CONTROL APPLICATION Name: Phone #: Mailing Address: Legal Land Description: Rural Address: (Office Use Only) Maintenance Area: THE APPLICANT AGREES TO THE FOLLOWING: 1. Only one application per occupied dwelling is permitted at the subsidized rate. 2. An application fee of $398.00 must accompany the application form. This fee covers one spring application and one fall application and represents approximately 33% of the cost of purchasing and applying the Dust Control Suppressant. The fee for one application would be half of the fee charged for two applications. 3. The Dust Control Suppressant to be used is Calcium Chloride. 4. That a 200 metre section of road in front of the residence or at a location determined by the applicant will be treated with the dust control suppressant. 5. That the applicant may choose either: Spring Only Fall Only Spring & Fall 6. The County will not guarantee the effectiveness of the dust control suppressant. 7. The County reserves the right to maintain treated sections of roadway as deemed appropriate by administration. 8. Dust suppression may not be applied on roads scheduled for rebuilding or upgrading within the year. 9. The information given on this form is full and complete and is, to the best of my knowledge, a true statement of the facts relating to this application for dust control. Signature of Applicant Date OFFICE USE ONLY – DO N O T F I L L - I N P L E A S E Standard Applications & Fees Over 200 m Applications & Fees SPRING: 200 m $199.00 _________ m $_____________ FALL: 200 m $199.00 _________ m $_____________ SPRING & FALL: 200 m $398.00 _________ m $_____________ POST-DATED CHEQUE FOR FALL APPLICATIONS – YES APPROVED: Director of Infrastructure Services Date This personal information is being collected under the authority of the Freedom of Information and Protection of Privacy Act, R.S.A., 2000, and will be used for applying Dust Control.
    [Show full text]
  • Westlock County Fire District
    TO SLAVE LAKE TO HONDO Municipal District of Lesser Slave River No, 124 TO HWY. NCl.2 TO CROSS LAKE PROVI\ICIAL PARK :r: ~ RGE.2 ♦ t;: 0 RGE . 27 RGE. 26 RGE . 25 u::: cc ... w [;~ ~ l~ ~ ~~ ~~ ~ ~~ ~~ [~~I "il~.1 [iii I:~1 i;l;I i;;j ~~ r:i r:~1 " ·',," ---" ,,;, 1--~-ac,·--~"---=--~ "---~'-·"---" "----'".C...--....-~"" "---'' ··- --' ·c..-..c· ••;,"--"' ---'"s.--. ~-.--' __ _ SCHRA­ a:ia- DAI-Ill DER ' M"'N FARMS ;s ,b1R1! .:Arr ' BRATT CATTLE I ib, 1 CATTLE ~~~ i ~~ss O&P I DH COLIU' --36--- --31-- --:12-- --33-- :.i, _~ 00 Lm ---32-- ' --31--'" 32 -,-36- --aa- 1 1 ~lf't3 1 ! MUAR.o.YI DIRKS "l~':,'~ □ZE uss • ' "I V ' P & L • i BORLE DIRKS SHEE7A BORLE GALLI T&R i 0&1< "' ~~'Ii-Er FORD I ; " BU\CK --:m-- --29-- --21-- ---25-­"" 27-- -'t-29 • 28 • ~ t a'r?'"'ln~HAN f'1E~IIAN ~1-11\NT 1 DIRKS t~~OC< MYI:R5 ,PIHI LTD D&S J l I! • .t. (, -•.~o ;c, , I I HAIICKI i i • • ~~ +'~:~~-:.•, I '"I "I 1WP. 64 TWP. 64 i --18-- ---17-- .18-­ 1 \,t ( I~~ s,: \I I :, 1.--T','/r,~[: I t-42 ~ ,, ~I Si 2 i COUNTY __ --7-- --• ---8-- , I Al.LEN- S . ... ~g),YJl; I --6--- v-5-- 1J -2---"" -2-- --5---- -4-- ! ... ,3 rl\JHST- DE- 1 Ll~0 Ct lb lNE. 1 growing opportunity G A.I.I' Woodlands County IERENGA 6TRYU- CL.EGG VAN DE LETTS County of Barrhead No. 11 'tl.□.t i ~~LF~ '"FARMS - OOR9T G KRYGER LIGT s,w ,., S~G r.!.R "" ---35 -- ...- 31 • --34- --35--- " HOOD "I ALI FN ' " ""'MClt<V SIBYD­ YAN DE ;,w .
    [Show full text]
  • WAM Industrial Park Local Area Structure Plan with Amendments
    (Consolidation including Bylaw 04-16 March 22, 2016) WAM Development Group WAM Industrial Park Local Area Structure Plan Prepared by: UMA Engineering Ltd. 17007 - 107 Avenue Edmonton, AB T 780-486-7000 F 780-486-7070 www.uma.aecom.com E527-003-00-01-4.6.1 January 2008 WAM Industrial Park - Local Area Structure Plan Office Consolidation – March 22, 2016 Bylaws Amending WAM Industrial Park - LASP Bylaw No. Date 04-16 March 22, 2016 Maps 5 – 10 Replaced with Dec. 17, 2015 Version of Maps 5 - 10 NOTE: Anyone using this consolidation is advised that the amendment has been included for convenience only and that the original WAM Industrial Park LASP and the original amending Bylaws should be consulted for all purposes of interpreting and applying the Bylaws. BY-LAW NO. 40-07 OF LEDUC COUNTY IN THE PROVINCE OF ALBERTA A BYLAW OF LEDUC COUNTY TO ADOPT THE WAM INDUSTRIAL PARK LOCAL AREA STRUCTURE PLAN. WHEREAS The Council of Leduc County deems it to be in the public interest to adopt the WAM Industrial Park Local Area Structure Plan; NOW THEREFORE, THE COUNCIL OF LEDUC COUNTY, DULY ASSEMBLED, ENACTS AS FOLLOWS: That the WAM Industrial Park Local Area Structure Plan, being Schedule "An attached and forming part of this Bylaw, be adopted. This Bylaw shall take effect on the date of the third reading. Read a first time this 28th day of August, A.D., 2007. SEAL COUNTY MANAGER Read a second time this 29th day of January, A.D., 2008. Read a third time this 29th day of January, A.D., 2008.
    [Show full text]
  • Demographic Report
    Yellowhead County 2716 - 1 Avenue, Edson, AB. T7E 1N9 Phone: 780-723-4800 Toll Free: 1-800-665-6030 DEMOGRAPHIC REPORT A Community Profile of Yellowhead County October 2019 Demographic Report Contents Introduction 4 Purpose 6 Population 8 Age Analysis 11 Location 12 Households 14 Family Composition 17 Housing 18 Housing Tenure 20 Shelter Costs 23 Income 24 Income Cohorts 26 Education 28 Occupation 30 Employment 32 Industry 34 Labor and Gender 36 Immigration 38 Low Income 39 Issue Summary 40 Measurement Summary 41 Demographic Report Demographic Introduction p. 4 Definitions p. 5 Where necessary the report will define the specific data category using Stats Canada definitions. Recommendations Connecting cross-categorical data presents the possibility of interpretive error. Issues will be described using commonly accepted indicator metrics. Context Given that the issues affecting Yellowhead County are similar to issues faced by many rural This report exclusively examines the population of communities in North America, they can be contextualized by Yellowhead County’s municipal boundaries as obtained existing research. This report through Statistics Canada community profiles from utilizes this research to place the provided information into 1996 to 2016. context. Covering a wide geographical area between the Pembina River and the gates of Jasper National Park, Yellowhead County encompasses the two towns of Edson and Hinton. Given their status as major service and population centers within the County, achieving a complete understanding of regional social and economic conditions would require integrating the town’s data into this analysis. This report was prepared by the Yellowhead County Planning and Development Department in order to develop a stronger understanding of Yellowhead County residents and their unique social and economic circumstances.
    [Show full text]
  • Municipal District
    BRAZEAU COUNTY COUNCIL MEETING June 2, 2020 VISION: Brazeau County fosters RURAL VALUES, INNOVATION, CREATIVITY, LEADERSHIP and is a place where a DIVERSE ECONOMY offers QUALITY OF LIFE for our citizens. MISSION: A spirit of community created through INNOVATION and OPPORTUNITIES GOALS 1) Brazeau County collaboration with Canadians has created economic opportunity and prosperity for our community. That we intentionally, proactively network with Canadians to bring ideas and initiative back to our citizens. 2) Brazeau County has promoted and invested in innovation offering incentives diversifying our local economy, rural values and through opportunities reducing our environmental impact. Invest in green energy programs, water and waste water upgrades, encourage, support, innovation and economic growth through complied LUB, promoting sustaining small farms, hamlet investment/redevelopment. 3) Brazeau County is strategically assigning financial and physical resources to meet ongoing service delivery to ensure the success of our greater community. Rigorous budget and restrictive surplus process, petition for government funding, balance budget with department goals and objectives. 4) Brazeau County has a land use bylaw and framework that consistently guides development and promotes growth. Promotes development of business that is consistent for all “open for business.” Attract and retain businesses because we have flexibility within our planning documents. 5) Come to Brazeau County to work, rest and play. This encompasses all families. We have the diversity to attract people for the work opportunities. We have recreation which promotes rest and play possibilities that are endless. 6) Brazeau County is responsive to its citizenship needs and our citizens are engaged in initiatives. Engage in various levels - website, Facebook, newspapers, open houses.
    [Show full text]
  • PONOKA COUNTY COUNTY COUNCIL AGENDA February 12
    PONOKA COUNTY COUNTY COUNCIL AGENDA February 12, 2013 10:00 a.m. 1. CONSIDERATION/ADOPTION OF THE AGENDA 2. MINUTES 2.1. Adoption of the minutes of the January 8, 2013 Regular Council meeting 2.2. Adoption of the minutes of the January 8, 2013 Public Hearing 3. BUSINESS ARISING FROM THE MINUTES 3.1. Central Alberta Raceways, pavement 3.2. Central Alberta Economic Partnership - membership 3.3. Ponoka Ag Event Centre - appointment of alternate member 3.4. Johnson land purchase, Rimbey 3.5. Unsightly premises, Elkhorn Road/Usona area 4. DELEGATIONS/PUBLIC HEARINGS 10:15 am 4.1. 2012 Peace Officer Program Annual Report 10:30 am 4.2. Request for contribution - Rimbey Historical Society 11:00 am 4.3. Rimbey Fish & Game Association 5. DEVELOPMENT/UTILITIES 5.1. Development and subdivision report 6. FINANCIAL 6.1. Payment of accounts 6.2. Monthly financial statements 7. COUNCILLOR REPORTS 7.1. Individual Councillor Reports 8. CHIEF ADMINISTRATIVE OFFICER'S REPORT 8.1. Road allowance lease renewal requests: .1 Barry & Robin Hok, E NE 3-44-1-W5 & N & E NE 34-43-1-W5 .2 Wouter Beekman, W NW 5-43-3-W5 8.2. Proposed policy 05-010, CPO access to CPIC 8.3. Bluffton landfill, donation of aluminum to kids park fund 1:00 pm 8.4. 2013 preliminary budget 9. UPCOMING MEETINGS/EVENTS Page 1 of 50 County Council Agenda February 12, 2013 9. UPCOMING MEETINGS/EVENTS 9.1. Next regular Council meetings 1. March 12 - Development/Delegations 2. March 26 - Regular business 3. April 9 - Development/Delegations 4.
    [Show full text]
  • GOVERNANCE and PRIORITIES COMMITTEE AGENDA Tuesday, October 15, 2019 9:30 AM
    YELLOWHEAD COUNTY GOVERNANCE AND PRIORITIES COMMITTEE AGENDA Tuesday, October 15, 2019 9:30 AM Our Mission Statement Building a better community for present and future generations. Vision Statement Recognized as a place of choice for those who want to be where great things happen. Page 1 of 51 GOVERNANCE AND PRIORITIES COMMITTEE AGENDA COUNCIL CHAMBERS YELLOWHEAD COUNTY ADMINISTRATION BUILDING, EDSON, ALBERTA OCTOBER 15, 2019 Page 1.0 AGENDA 1.01 Adoption of the Governance and Priorities Committee Agenda That Council for Yellowhead County adopts the agenda for October 15, 2019 Governance and Priorities Committee Meeting as presented. 2.0 GOVERNANCE AND PRIORITIES ISSUES 2.01 Intermunicipal Collaboration Framework - 4 - 15 Brazeau/Yellowhead County's 2.02 Council Request from Strategic Planning meeting for 16 - 19 Protective Services Vehicle Replacement Schedule 2.03 Review of Donation Policy 1100.11 20 - 22 2.04 Cadomin Hall Project Discussions and Update 23 - 24 2.05 Yellowhead Agriculture Society Facility Update 25 - 31 3.0 STATEGIC PLAN REVIEW 4.0 MAYOR AND COUNCILLOR REPORTS 4.01 Division 1 - Mayor Cherniawsky 32 - 38 4.02 Division 2 - Councillor Giezen 39 - 43 4.03 Division 3 - Councillor Lowe 4.04 Division 4 - Councillor Russell 4.05 Division 5 - Councillor Berry 44 4.06 Division 6 - Councillor Williams 45 4.07 Division 7 - Councillor Mitchell 46 - 47 4.08 Division 8 - Councillor Olson 48 - 51 Yellowhead County Governance and Priorities Committee Agenda October 15, 2019 Page 2 of 51 5.0 CLOSED SESSION 5.01 Closed Session That Council for Yellowhead County enter into a Closed Session according to the Freedom of Information Protection of Privacy Act Section 17.
    [Show full text]
  • Olivia Colic
    Olivia Colic Managing Partner, Alberta A seasoned and trusted real estate lawyer, clients Region turn to Olivia for her practical and timely solutions Partner to help them overcome obstacles facing the real Calgary estate industry [email protected] Olivia is McCarthy Tétrault’s Regional Managing Partner for Alberta and t. +1 403-260-3661 is a partner in the firm’s Real Property & Planning Group in Calgary. Her practice encompasses all areas of commercial real estate including acquisition and sale transactions, domestic and cross-border financing, development and leasing. With more than 25 years’ experience acting as a trusted real estate advisor to property owners, lenders and borrowers, landlords, managers and tenants, Olivia’s solutions- Olivia Colic orientated approach ensures clients are successful in mitigating any multi-faceted contractual, operational and financial issues they may Managing Partner, Alberta Region face throughout Canada and abroad. Partner Calgary She’s good to deal with and knows her stuff. She takes reasonable positions on matters and her work is of a high quality. [email protected] t. +1 403-260-3661 — CHAMBERS CANADA, REAL ESTATE - ALBERTA, CLIENT INTERVIEW Bar Admission Having acted for several major property developers, pension funds, Alberta 1995 REIT’s as well as other private investors on the acquisition and disposition of office and industrial properties, hotels and shopping Law School centres, clients benefit from Olivia’s wide-range of experience on many University of Alberta commercial property financings ranging from single property loans to large financings involving complex ownership structures and properties Practices across multiple jurisdictions. She is also one of only a few lawyers in Real Estate Canada to have been invited to become a Fellow of the American Real Property Acquisitions & College of Mortgage Attorneys.
    [Show full text]
  • Clearwater County Highlights
    CLEARWATER COUNTY HIGHLIGHTS April | May 2020 A Newsletter for Residents of Clearwater County Council Highlights | 4-8 2020 Property Taxes | 10 Spring Road | 12-13 Conditions Drone Pilot | 21 Project Nordegg | 22 Discovery Centre Greeting from the Reeve Hello everyone, Access Technologies Inc. and partners (IBI Spring arrived later this year, many of you are Group and O-NET/OLDS Fiber Limited) for the likely finishing up calving, or preparing equip- Design Build/Network Operation Request for ment for a busy harvest season. The County is Proposal (RFP) - Broadband Service Delivery also preparing for a busy time of year as new Near Ferrier Acres. Eight firms responded to seasonal crews and contractors have begun to the RFP issued on March 12, 2020, with the help with road maintenance and construction purpose to complete a pilot project to support projects, in an effort to maintain and improve the Connect to Innovate (CTI) grant for a fibre- the County’s road network. When you are Timothy Hoven optic backbone build of approximately 13 km travelling on the roads, please watch out for Reeve segment starting from Supernet POP (vicin- road crews working throughout the County this ity of 4703 - 49th Avenue) in Rocky Mountain summer. House and extending to Ferrier Acres. The project is Due to mass gathering restrictions of COVID-19, estimated to cost under $1M which includes the CTI on May 12, Council held an audio only public hear- funding of $371,288. Council is eagerly awaiting this ing regarding Land Use Bylaw 1083/20, to rescind and connection to be lit by the end of this year.
    [Show full text]