Kalamazoo River Oil Spill Restoration

Total Page:16

File Type:pdf, Size:1020Kb

Kalamazoo River Oil Spill Restoration U.S Fish & Wildlife Service NATURAL RESOURCE TRUSTEES Kalamazoo River Oil Spill Restoration Match-E-Be-Nash-She-Wish Fish passage project in tributary of the Kalamazoo River Band of the Pottawatomi Tribe first project implemented from oil spill restoration plan National Oceanic and On July 25, 2010, Enbridge’s Lakehead Wildlife Service, the National Oceanic Atmospheric Administration Line 6B, a 30-inch diameter pipeline, and Atmospheric Administration, Match ruptured near Marshall, Michigan, and -E-Be-Nash-She-Wish Band of the Pot- discharged crude oil into a wetland adja- tawatomi Tribe, and the Nottawaseppi cent to Talmadge Creek in Calhoun Huron Band of the Potawatomi Tribe. County, Michigan. The oil flowed down The Trustees completed the Damage Talmadge Creek and into the Kalamazoo Assessment and Restoration Plan in Oc- River which was in floodstage at the tober, 2015. The Natural Resource Trus- State of Michigan Department of Natural Resources time (Figure 1). Oil flowed down the tees recently announced the completion Kalamazoo River and through the river of a fish passage project on Pigeon floodplain for approximately 38 miles to Creek, a tributary of the Kalamazoo Riv- Morrow Lake. Numerous species of er, in Calhoun County, Michigan. wildlife and their habitats, and their re- State of Michigan Department of Environmental Quality lated services, were injured as a result of this spill which remains the Nation’s largest inland oil spill. State of Michigan Department of the Attorney General Figure 2. The culvert system at E Drive on Pigeon Creek, a tributary of the Kalamazoo River, prior to restoration of fish passage. Figure 1. Talmadge Creek in August, 2010 Nottawaseppi Huron depicting the on-going cleanup. This aquatic passage project represents Band of the Pottawatomi Tribe the first implemented project from the The Natural Resource Trustees working restoration plan for the 2010 Enbridge to restore the Kalamazoo River following Oil Spill on the Kalamazoo River. Prior the 2010 Enbridge Oil Spill include the to replacement, the stacked five-culvert Michigan Department of Environmental system inhibited the passage of aquatic Quality, Michigan Department of Natu- organisms and did not adequately ac- U.S. ral Resources, and the Michigan Depart commodate seasonal floods associated Department of the Interior of the Attorney General, U.S. Fish & with storm events (Figure 2). Trustees and the public over the next two years. This includes re- placement of an additional under- sized culvert to improve sediment transport in Rice Creek, another tributary to the Kalamazoo River. The Conservation District will also lower a berm along Rice Creek to reconnect the creek to its historic floodplain. This will improve habi- tats in an area of bottomland hard- wood forest, one of the natural re- sources substantially injured as a result of the 2010 Enbridge Kala- mazoo River Oil Spill. Documentation related to the 2010 Enbridge Oil Spill on the Kalama- zoo River, additional information Figure 3. New culvert installation on Pigeon Creek, Calhoun County, Michigan. on the Damage Assessment and Restoration Plan, and the progress The Calhoun Conservation Dis- begin monitoring to compare the of implementation, may be found at trict, led by Director Tracy Bron- fish community above and below https://www.fws.gov/midwest/es/ son and Project Manager Brett the culvert following installation. ec/nrda/MichiganEnbridge/. Riser, directed the replacement of the inadequate structure with a single bottomless culvert (Figures 3 and 4). The Conservation Dis- trict partnered locally with the Calhoun County Road Depart- ment, Civil Engineers, Inc. of Bat- tle Creek, Michigan, and Sebas- tian Trucking and Excavating, Inc. of Springport, Michigan to plan, design, and install the new culvert. To facilitate fish passage and use by other aquatic organisms, the new culvert was designed to use a bottom of natural cobble. To fur- ther improve fish passage, an in- stream rock ramp (Figure 4) was incorporated to dissipate the force Figure 4. Rock ramp structure below the new culvert on Pigeon Creek. of water flowing through the cul- vert. Within a week of comple- In addition to improving habitat, tion, fish were observed moving For more information contact: the new culvert is sized to accom- U.S. Fish and Wildlife Service through the new culvert system. modate seasonal flooding. The Conservation District has East Lansing Field Office 2651 Coolidge Road, Suite 101 already collected several years of The Calhoun Conservation Dis- East Lansing, MI 48823 data to characterize the fish com- trict will implement two addition- 517-351-2555 munities above and below the E al aquatic restoration projects on September 2016 drive crossing. They will now behalf of the Natural Resource .
Recommended publications
  • Kalamazoo River Assessment
    ATUR F N AL O R T E N S E O U M R T C R E A S STATE OF MICHIGAN P E DNR D M ICHIGAN DEPARTMENT OF NATURAL RESOURCES Number 35 September 2005 Kalamazoo River Assessment Jay K. Wesley www.michigan.gov/dnr/ FISHERIES DIVISION SPECIAL REPORT MICHIGAN DEPARTMENT OF NATURAL RESOURCES FISHERIES DIVISION Special Report 35 September 2005 Kalamazoo River Assessment Jay K. Wesley MICHIGAN DEPARTMENT OF NATURAL RESOURCES (DNR) MISSION STATEMENT “The Michigan Department of Natural Resources is committed to the conservation, protection, management, use and enjoyment of the State’s natural resources for current and future generations.” NATURAL RESOURCES COMMISSION (NRC) STATEMENT The Natural Resources Commission, as the governing body for the Michigan Department of Natural Resources, provides a strategic framework for the DNR to effectively manage your resources. The NRC holds monthly, public meetings throughout Michigan, working closely with its constituencies in establishing and improving natural resources management policy. MICHIGAN DEPARTMENT OF NATURAL RESOURCES NON DISCRIMINATION STATEMENT The Michigan Department of Natural Resources (MDNR) provides equal opportunities for employment and access to Michigan’s natural resources. Both State and Federal laws prohibit discrimination on the basis of race, color, national origin, religion, disability, age, sex, height, weight or marital status under the Civil Rights Acts of 1964 as amended (MI PA 453 and MI PA 220, Title V of the Rehabilitation Act of 1973 as amended, and the Americans with Disabilities Act). If you believe that you have been discriminated against in any program, activity, or facility, or if you desire additional information, please write: HUMAN RESOURCES Or MICHIGAN DEPARTMENT OF CIVIL RIGHTS Or OFFICE FOR DIVERSITY AND CIVIL RIGHTS MICHIGAN DEPARTMENT OF NATURAL RESOURCES CADILLAC PLACE US FISH AND WILDLIFE SERVICE PO BOX 30028 3054 W.
    [Show full text]
  • Exhibit H: Amended Work Plan for Talmadge Creek & Source Area
    Approved Enbridge Line 6B MP 608 Marshall, MI Pipeline Release Work Plan for Monitoring, Restoration, and Invasive Species Control in Wetlands along Talmadge Creek and the Source Area Prepared for Michigan Department of Environmental Quality Enbridge Energy, Limited Partnership Approved: January 29, 2014 Approved: September 19, 2014 (MDEQ Approval: September 12, 2014) Document ID 4645 Approved 1.0 INTRODUCTION ............................................................................................................ 1 1.1 Annual Reporting ................................................................................................ 3 1.1.1 Invasive Species Reporting ...................................................................... 5 2.0 VEGETATION AND INVASIVE SPECIES SAMPLING AND DATA PROCESSING ...... 6 2.1 General Approach ............................................................................................... 6 2.1.1 Direct Measurements of Species Present ............................................... 6 2.1.2 Base Vegetation Analyses and Metrics ................................................... 7 2.2 Sampling Plan Detail ........................................................................................... 7 2.2.1 Meander Survey ........................................................................................ 7 2.2.2 Areas Dominated by Non-wetland Vegetation or Bare Ground ............. 8 2.2.3 Data Sample Locations ............................................................................. 8 2.2.4
    [Show full text]
  • Kalamazoo River Draft Supplemental Restoration Plan and Environmental Assessment
    Kalamazoo River Draft Supplemental Restoration Plan and Environmental Assessment Prepared by U.S. Fish and Wildlife Service National Oceanic and Atmospheric Administration Michigan Department of Environment, Great Lakes, and Energy Michigan Department of Natural Resources Michigan Department of Attorney General April 2021 Regulatory Notes An Environmental Assessment is prepared to comply with the National Environmental Policy Act of 1969 (NEPA). The NEPA is the Nation’s premier environmental law that guarantees every American the right to review, comment, and participate in planning of federal decisions that may affect the human environment. The Council on Environmental Quality (CEQ) on July 16, 2020 issued in the Federal Register a final rule updating its regulations for the NEPA (85 Fed. Reg. 43304, July 16, 2020). On January 20, 2021, President Joseph R. Biden issued an Executive Order entitled “Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis” that requires agencies to immediately review promulgation of Federal regulations and other actions during the previous four years to determine consistency with Section 1 of the Executive Order. This may include the CEQ reviewing the July 16, 2020 update to the NEPA regulations. The goals of the July 2020 amendments to the NEPA regulations were to reduce paperwork and delays and to promote better decisions consistent with the policy set forth in section 101 of the NEPA. The effective date of these amended regulations was September 14, 2020. However, for actions that began before September 14th, such as this one, agencies may continue with the regulations in effect before September 14th because applying the amended regulations would cause delays to the ongoing process.
    [Show full text]
  • Reasons to Fight the Enbridge Pipeline
    Reasons to fght the Enbridge Pipeline — Their history of irresponsibility Kalamazoo River Disaster. In 2010, a tar sands pipeline owned and operated by En- bridge, Inc, ruptured near Marshall, Michigan, spilling over one million gallons of oil into a tributary of the Kalamazoo River. Kalamazoo River oil spill Oil sheen near Ceresco Dam Wikimedia | © OpenStreetMap Location Talmadge Creek and Kalamazoo River, Calhoun County, near Marshall, Michigan Coordinates 42.25743 ° N 84.99307 ° W Coordinates: 42.25743 ° N 84.99307 ° W Date July 26, 2010 Cause Cause Ruptured pipeline Operator Enbridge Energy Spill characteristics Volume 877,000 to 1,000,000 US gal (3,320 to 3,790 m3) Shoreline impacted approx. 25 mi (40 km) The Kalamazoo River oil spill occurred in July 2010 when a pipeline operated by En- bridge (Line 6B) burst and flowed into Talmadge Creek, a tributary of the Kalamazoo River. A 6-foot (1.8 m) break in the pipeline resulted in one of the largest inland oil spills in U.S. history (the largest was the 1991 spill near Grand Rapids, Minnesota). The pipe- line carries diluted bitumen (dilbit), a heavy crude oil from Canada's Athabasca oil sands to the United States.[1] Cleanup took five years.[2] Following the spill, the volatile hydro- carbon diluents evaporated, leaving the heavier bitumen to sink in the water column. Thirty-five miles (56 km) of the Kalamazoo River were closed for clean-up until June 2012, when portions of the river were re-opened. On March 14, 2013, the Environmen- tal Protection Agency (EPA) ordered Enbridge to return to dredge portions of the river to remove submerged oil and oil-contaminated sediment.
    [Show full text]
  • Enbridge Over Troubled Water the Enbridge Gxl System’S Threat to the Great Lakes
    ENBRIDGE OVER TROUBLED WATER THE ENBRIDGE GXL SYSTEM’S THREAT TO THE GREAT LAKES WRITING TEAM: KENNY BRUNO, CATHY COLLENTINE, DOUG HAYES, JIM MURPHY, PAUL BLACKBURN, ANDY PEARSON, ANTHONY SWIFT, WINONA LADUKE, ELIZABETH WARD, CARL WHITING PHOTO CREDIT: SEAWIFS PROJECT, NASA/GODDARD SPACE FLIGHT CENTER, AND ORBIMAGE ENBRIDGE OVER TROUBLED WATER The Enbridge GXL System’s Threat to the Great Lakes A B ENBRIDGE OVER TROUBLED WATER The Enbridge GXL System’s Threat to the Great Lakes ENBRIDGE OVER TROUBLED WATER THE ENBRIDGE GXL SYSTEM’S THREAT TO THE GREAT LAKES TABLE OF CONTENTS PREFACE . 2 EXECUTIVE SUMMARY . 4 DOUBLE CROSS — ­ENBRIDGE’S SCHEME TO EXPAND TRANSBORDER TAR SANDS OIL FLOW WITHOUT PUBLIC OVERSIGHT . 6 CASE STUDY IN SEGMENTATION: FLANAGAN SOUTH . 8 THREAT TO THE HEARTLAND: WISCONSIN THE TAR SANDS ARTERY . 9 ENBRIDGE’S “KEYSTONE KOPS” FOUL THE KALAMAZOO . 11 TAR SANDS INVASION OF THE EAST . 1 3 “THE WORST POSSIBLE PLACE” — LINE 5 AND THE STRAITS OF MACKINAC . 1 4 OF WILD RICE AND FRACKED OIL — THE SANDPIPER PIPELINE . 18 ABANDONMENT: ENBRIDGE LINE 3 MACHINATIONS . 21 NORTHERN GATEWAY . 23 CONCLUSIONS . 24 TAR SANDS MINING IN ALBERTA CANADA. PHOTO CREDIT: NIKO TAVERNISE PREFACE If you drive a car in Minnesota, Wisconsin, Illinois or Michigan, chances are there’s tar sands in your tank. That fuel probably comes to you courtesy of Canada’s largest pipeline company, Enbridge. This report tells the story of that company and its system of oil pipelines in the Great Lakes region. TAR SANDS OIL refers to a class of crude oils that Before there was Keystone, there was the Lakehead System.
    [Show full text]
  • Kalamazoo River Watershed Management Plan
    Kalamazoo River Watershed Management Plan Prepared by the Kalamazoo River Watershed Council March 2011 (updated August 2015) This Nonpoint Source Pollution Control project has been funded in part through the Michigan Nonpoint Source Program by the United States Environmental Protection Agency under assistance agreement #2006-0148 to the Kalamazoo River Watershed Council for the Kalamazoo River Watershed Management Plan. The contents of the document do not necessarily reflect the views and policies of the EPA, nor does the mention of trade names or commercial products constitute endorsement or recommendation for use. Recommended Citation: Kalamazoo River Watershed Council. 2011. Kalamazoo River Watershed Management Plan. Prepared for the Michigan Nonpoint Source Program (Michigan Department of Environmental Quality and the United States Environmental Protection Agency). ii Acknowledgments This Watershed Management Plan is the culmination of several years of work on the part of the Kalamazoo River Watershed Council and particularly our Coordinator and the lead author of this report, Jeffrey A. Spoelstra. Jeff attended innumerable meetings in the community, studied dozens of reports, and assimilated and compiled the information presented here. The Plan was greatly enhanced by the technical and scientific support of Kieser & Associates, LLC, who contributed with spatial data analysis, map production, and modeling. We would also like to acknowledge our many partners in the quest to improve watershed protection and management in the Kalamazoo River watershed. Funding to prepare this Plan was provided primarily through a U.S. Environmental Protection Agency Section 319 grant administered by the Michigan Department of Environmental Quality (MDEQ; also known as MDNRE during the report preparation).
    [Show full text]
  • Appendix I: Mussel Shell Survey Report Mussel Shell Survey Report: Kalamazoo River Unionid Mussel Shell Survey in the Marshall and Battle Creek Area October 2010
    Appendix I: Mussel Shell Survey Report Mussel Shell Survey Report: Kalamazoo River Unionid Mussel Shell Survey in the Marshall and Battle Creek Area October 2010 Prepared for: Stephanie Millsap, U.S. Fish & Wildlife Service and Kalamazoo River Enbridge Line 6B Oil Spill Trustee Council Prepared by: Pete Badra, Michigan Natural Features Inventory with assistance from Stratus Consulting Inc. July 20, 2011 1. Introduction On July 26, 2010, an oil release from Enbridge Energy Partners, L.P. (Enbridge) line 6B was discovered. The line, located in Marshall, Calhoun County, Michigan, is a 30-inch, 283,000-barrels per day line that transports light synthetics and heavy and medium crude oil. The release occurred in an undeveloped area on the outskirts of town with coordinates of approximately North ½ Section 2, T3S, R6W, Latitude: 42.2395273, Longitude: -84.9662018. Upon discovery of the release, the pipeline was shut down and isolation valves closed, stopping the flow of the oil. The exact amount of oil released prior to the shutdown is unknown. However, it is estimated that at least 1 million gallons of crude oil was released to nearby Talmadge Creek and to the Kalamazoo River (U.S. EPA, 2010; Enbridge Energy, 2011). Soon after the spill, the Trustees for the Natural Resource Damage Assessment (NRDA), in coordination with Enbridge, began to collect ephemeral data on potentially injured natural resources in Talmadge Creek and the Kalamazoo River and their watersheds. The Trustees include the U.S. Department of the Interior, represented by the U.S. Fish and Wildlife Service and the Bureau of Indian Affairs; the State of Michigan, represented by the Michigan Department of Natural Resources (MDNR), the Michigan Department of Environmental Quality (MDEQ), and the Michigan Attorney General; the U.S.
    [Show full text]
  • Annotated Bibliography of Selected References on PCB and the Kalamazoo River Superfund Site, Michigan, 1982-2002
    U.S. Department of the Interior U.S. Geological Survey Annotated Bibliography of Selected References on PCB and the Kalamazoo River Superfund Site, Michigan, 1982-2002 Open-File Report 03-338 In cooperation with Michigan Department of Environmental Quality Cover photo: Health advisory sign warning of the dangers of eating fish contaminated by PCBs at the Plainwell dam foundation, Kalamazoo, Mich. Photo by S.J. Rheaume, U.S. Geological Survey, Lansing, Mich. Annotated Bibliography of Selected References on PCB and the Kalamazoo River Superfund Site, Michigan, 1982-2002 By Andreanne Simard Open-File Report 03-338 Lansing, Michigan 2003 U.S. DEPARTMENT OF THE INTERIOR GALE A. NORTON, Secretary U.S. GEOLOGICAL SURVEY CHARLES G. GROAT, Director Any use of firm, brand, or trade names in this publication is for descriptive purposes only and does not constitute endorsement by the U.S. Government. For additional information write to: Copies of this report can be purchased from: District Chief U.S. Geological Survey U.S. Geological Survey Branch of Information Services 6520 Mercantile Way, Suite 5 Box 25286 Lansing, MI 48911-5991 Denver, CO 80225-0286 CONTENTS page Abstract . 1 Introduction . .1 Purpose and scope . .1 Acknowledgments . .9 References describing PCB releases . .9 References describing PCB remediation. 11 References describing PCB safety . 14 References describing PCB testing and cleanup. .14 References cited . .22 FIGURE 1. Map showing the location of the Kalamazoo River watershed and study area in Michigan . .2 TABLE 1. Summary of subjects contained in selected references for the Kalamazoo River Superfund Site . .3 iii CONVERSION FACTORS AND ABBREVIATIONS Multiply By To obtain Mass milligram (mg) 0.00003527 ounce kilogram (kg) 2.205 pound Abbreviated water-quality units used in this report: Chemical concentrations for bed sediment are given in milligrams per kilogram (mg/kg), a unit expressing the concentration of chemical constituents in bed sediment (dry weight) for synthetic organic compounds and trace elements.
    [Show full text]
  • G. the KALAMAZOO RIVER a Local" History up to the Civil War Owen
    - ~ ....._..~-:-"- --- ~~~- -_._---­ ", ~. ..' i• ~.~ , ;.~ PAPERS FROM THE "HISTORY SEMINAR OF KAlJJdAZOO COLLEGE lP No. -g. THE KALAMAZOO RIVER A local" history up to the CiVil War by -~.-J Owen Williams January t 1948' TABLE···· OF CONTENTS CHAPTER I NAME, SOURCE AND RIVER DESCRIPTION . Page 1 - Franquelin's Maramee - Father de Charlevoix' Maromek - De la Potherieverifies de Charlevoix' name - Recanamazoo or "Iron Mine River" - Page 2 - Legend of :the "Boiling Kettle River" - source of the Kalamazoo River .- Page.3 - Descr~ption of the River - hydraulic power. CHAPTER II RIVER IMPROVEMENTS' Page 4 - First ideas of ~provement - Page 5 - The Kalamazoo .and Clinton Canal - First appropriations ­ Page 6 - StevensT. Mason's report - survey report of James Hurd in 1838 - William Woodbridge's report - Page 7 - John S. Barry's report - end of the Kalamazoo and Clinton Canal -. Page 8 - Senator'Wa1bridge's bill in 1848 ­ Page 9 - End of River improvements. CHAPTER III RIVER NAVIGATION AND TRADE Page 10-- Louis Herbin's instructions to Charles Langlade ­ Chicago treaty of 1821 - Oka Town and Abijah Chinchester ­ Page 11 - The "Pioneer" - The I1Tip" - "C. C. Trowbridge" - Page 12 - Description of River trips - freight rates - The "Dropp" - The "Tippecanoe" - The Michigan Central Railroad arrives ­ Tragedy of the Milwaukee - Page. 13 - The "Massabhusetts" - "Adelaide" - "Helen Marti ­ barges "Adam". and "Ever. - End of the Era. CHAPTER IV DAVID S. WALBRIDGE, KING OF THE KALAMAZOO Page 14 - Arrival from Buffalo - his activities. CHAPTER I NAME, SOURCE AND RIVER DESCRIP!'ION ",Towards Michigan's waters so broad and so blue' Flows the bright bubbling River - The Kalamazoo."l These anonymous lines could not have been written too long ago, as the Kalamazoo has not alwa"s been known by its present name.
    [Show full text]
  • December 9, 2004
    Letter Health Consultation KALAMAZOO RIVER/ENBRIDGE OIL SPILL- PLAY CARE LEARNING CENTER MARSHALL, MICHIGAN Prepared by: Michigan Department of Community Health OCTOBER 27, 2010 Prepared under a Cooperative Agreement with the U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES Agency for Toxic Substances and Disease Registry Division of Health Assessment and Consultation Atlanta, Georgia 30333 Health Consultation: A Note of Explanation A health consultation is a verbal or written response from ATSDR or ATSDR’s Cooperative Agreement Partners to a specific request for information about health risks related to a specific site, a chemical release, or the presence of hazardous material. In order to prevent or mitigate exposures, a consultation may lead to specific actions, such as restricting use of or replacing water supplies; intensifying environmental sampling; restricting site access; or removing the contaminated material. In addition, consultations may recommend additional public health actions, such as conducting health surveillance activities to evaluate exposure or trends in adverse health outcomes; conducting biological indicators of exposure studies to assess exposure; and providing health education for health care providers and community members. This concludes the health consultation process for this site, unless additional information is obtained by ATSDR or ATSDR’s Cooperative Agreement Partner which, in the Agency’s opinion, indicates a need to revise or append the conclusions previously issued. You May Contact ATSDR Toll Free at 1-800-CDC-INFO or Visit our Home Page at: http://www.atsdr.cdc.gov LETTER HEALTH CONSULTATION KALAMAZOO RIVER/ENBRIDGE OIL SPILL- PLAY CARE LEARNING CENTER MARSHALL, MICHIGAN Prepared By: Michigan Department of Community Health Under Cooperative Agreement with U.S.
    [Show full text]
  • Kalamazoo River Cleanup Sheet March 2002
    U.S. Environmental Protection Agency Region 5 Office of Public Affairs Kalamazoo River Superfund Project Fact The Kalamazoo River Cleanup Sheet March 2002 EPA has assumed responsibility for a Superfund cleanup on the Kalamazoo River. The Allied Paper Inc./Portage Creek/Kalamazoo River Superfund Site, referred to here as the Kalamazoo River Kalamazoo River Superfund Project, stretches 80-miles from Saugatuck on the west Superfund Project to about 10 miles east of Battle Creek, near Sunrise Heights. Community In July 2001, EPA took over as lead agency for the project at the Involvement Team request of the Michigan Department of Environmental Quality, which will continue to have a significant role in the appropriate cleanup. The Kalamazoo River Superfund Project runs through two counties in southwestern Michigan: Allegan and Kalamazoo (see the map on page 4). The site includes five disposal areas, six paper mill properties, the Kalamazoo River, a tributary of Lake Michigan that flows northwest, and Portage Creek, a tributary of the Kalamazoo River that flows north. The project includes three miles of Portage Creek from Cork Street to where it joins with the Kalamazoo River; and from this confluence Tea m m em bers may be reached directly by E-mail, by phone at the numbers below, downstream to the Allegan City Dam. Because PCBs have migrated or by calling toll-free (800) 621-8431. downstream, the Superfund remedial investigation includes the area For toll-free calls, to the mouth of the Kalamazoo River at Lake Michigan, about 80 enter the approp riate exten sion at the prom pt.
    [Show full text]
  • 2017 Kzoo Biosurvey Report 30Nov17
    MI/DEQ/WRD-18/006 MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY WATER RESOURCES DIVISION MARCH 2018 STAFF REPORT A BIOLOGICAL SURVEY OF SITES ON TALMADGE CREEK NEAR THE ENBRIDGE OIL SPILL IN MARSHALL CALHOUN COUNTY, MICHIGAN 2016-2017 INTRODUCTION On July 26, 2010, a 30-inch diameter pipeline ruptured and discharged heavy crude oil into Talmadge Creek, a tributary to the Kalamazoo River, which drains into Lake Michigan. The amount of oil discharged is estimated at 819,000 to 1,000,000 gallons. The oil flowed into a wetland and ultimately down 2.2 miles of Talmadge Creek, a small warmwater stream, before entering the Kalamazoo River downstream of Marshall, Michigan. The oil impacted approximately 35 miles of river downstream to Morrow pond where it was contained by the dam. The Kalamazoo River is also a warmwater stream that is bordered by wetland, forest, residential properties, farm land, and commercial properties in Calhoun and Kalamazoo Counties between Marshall and Morrow Lake. In September 2010, staff of the Michigan Department of Environmental Quality (MDEQ), Water Resources Division (WRD), Surface Water Assessment Section (SWAS), with assistance from Entrix (currently Cardno ENTRIX), conducted qualitative macroinvertebrate community and stream habitat surveys on the Kalamazoo River and Talmadge Creek. The surveys documented that macroinvertebrate abundance and diversity were drastically reduced in both water bodies because of the oil spill and associated cleanup activities (Walterhouse, 2011). The SWAS and Entrix also assisted the Michigan Department of Natural Resources (MDNR), Fisheries Division, with fish collection efforts and quantitative stream habitat assessments. The MDNR, Fisheries Division, reported reduced fish abundance and diversity along with impacts to stream habitat in Talmadge Creek (Wesley & Walterhouse, 2010a).
    [Show full text]