Passaic Flood Commission Report to the Governor
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Slides for ICMSSR Meeting 2018-03
Interdepartmental Committee for Meteorological Services and Supporting Research (ICMSSR) Meeting 2018-3 August 14, 2018 Office of the Federal Coordinator for Meteorology Services and Supporting Research 1 Opening Remarks Interdepartmental Committee for Meteorological Services and Supporting Research (ICMSSR) Dr. Jack Kaye (NASA) Chair, ICMSSR • Welcome • Roll Call • Approve Agenda & Record of Action. • Meeting will be recorded Office of the Federal Coordinator for Meteorology Services and Supporting Research 2 Today’s Agenda • OPENING REMARKS: Jack Kaye (NASA) • ADMIN REMARKS: Michael Bonadonna (OFCM) • FEDERAL COORDINATOR’S UPDATE: William Schulz (OFCM) • COMMITTEE FOR OPERATIONAL ENVIRONEMENTAL SATELLITES UPDATE: Ajay Mehta (NOAA-NESDIS) • RECAP OF THE ATMOSPHERIC TRANSPORT AND DISPERSION WORKING GROUP - Dave Chorney (OFCM) • SPACE WEATHER ENTERPRISE FORUM: Michael Bonadonna • HAZARD SIMPLIFICATION PROJECT UPDATE: Eli Jacks (NOAA-NWS) • EARTH SYSTEM PREDICTION CAPABILITY (ESPC): Dave McCarren (USN) • OPEN DISCUSSION • ACTION ITEM REVIEW: Michael Bonadonna (OFCM) • CLOSING COMMENTS / ADJOURN Office of the Federal Coordinator for Meteorology Services and Supporting Research 3 Administrative Info • Facilities • Telecon / GoToMeeting – Dial-in 1-888-680-9581, passcode 535430# • GoToMeeting: https://global.gotomeeting.com/join/293418653 • Slides posted at: http://www.ofcm.gov/icmssr/meetings.htm – Please advise us of any sensitivities Office of the Federal Coordinator for Meteorology Services and Supporting Research 4 FEDERAL COORDINATOR’S -
Passaic River Navigation Update Outline
LOWER PASSAIC RIVER COMMERCIAL NAVIGATION ANALYSIS United States Army Corps of Engineers New York District Original: March, 2007 Revision 1: December, 2008 Revision 2: July, 2010 ® US Army Corps of Engineers LOWER PASSAIC RIVER RESTORATION PROJECT COMMERCIAL NAVIGATION ANALYSIS TABLE OF CONTENTS 1.0 Study Background and Authority…………………………………………………1 2.0 Study Purpose……………..………………………………………………………1 3.0 Location and Study Area Description……………………………………………..4 4.0 Navigation & Maintenance Dredging History…………………………………….5 5.0 Physical Constraints including Bridges…………………………………………...9 6.0 Operational Information………………………………………………………….11 6.1 Summary Data for Commodity Flow, Trips and Drafts (1980-2006)…..12 6.2 Berth-by-Berth Analysis (1997-2006)…………………………………...13 7.0 Conclusions………………………………………………………………………26 8.0 References………………………………………………………………………..29 LIST OF TABLES Table 1: Dredging History………………………………………………………………...6 Table 2. Bridges on the Lower Passaic River……………………………………………..9 Table 3. Channel Reaches and Active Berths of the Lower Passaic River………………18 Table 4: Most Active Berths, by Volume (tons) Transported on Lower Passaic River 1997-2006………………………………………………………………………..19 Table 5: Summary of Berth-by-Berth Analysis, below RM 2.0, 1997-2006.....................27 LIST OF FIGURES Figure 1a. Federal Navigation Channel (RMs 0.0 – 8.0)………………………………….2 Figure 1b. Federal Navigation Channel (RMs 8.0 – 15.4)………………………………...3 Figure 2. Downstream View of Jackson Street Bridge and the City of Newark, May 2007………………………………………………………………………………..5 Figure 3. View Upstream to the Lincoln Highway Bridge and the Pulaski Skyway, May 2007………………………………………………………………………………..8 Figure 4. View Upstream to the Point-No-Point Conrail Bridge and the NJ Turnpike Bridge, May 2007……………………………………………………………......10 Figure 5. Commodities Transported, Lower Passaic River, 1997-2006…………………12 Figure 6. -
Unit, District, and Council General and Contingency Planning Guide for Boy Scouts of America©
Doctorial Project for Completion of the Degree Doctorate, Commissioner’s Science Boy Scouts of America University of Scouting Commissioner’s College Unit, District, and Council General and Contingency Planning Guide for Boy Scouts of America© Version 0.99b 4 February 2010 By Larry D. Hahn, Lt Col, USAF Ret Unit Commissioner Chesapeake Bay District Colonial Virginia Council 2010 - BSA General n Contingency Planning Guide - L. Hahn.docx Approval Letter Advisor Memorandum for Record To: Larry D. Hahn, Unit Commissioner (Doctorial Candidate) From: Ronald Davis, District Commissioner (Candidate’s Advisor) CC: Lloyd Dunnavant, Dean, Commissioners College Date: January 10, 2019 Re: Approval of BSA Scout University Doctorial Project After careful review of the submitted project from Larry D. Hahn for completion of his Commissioner’s College doctorial degree, I grant my approved and acceptance for the degree of Doctorate (PhD) in Commissioner’s Science through the Boy Scouts of America, University of Scouting. As of this date, and as his advisor, I submit this signed letter as official documentation of approval. Ronald Davis Advisor Chesapeake Bay District Commissioner Approval Letter Council Commissioner Memorandum for Record To: Larry D. Hahn, Unit Commissioner (Doctorial Candidate) From: Mike Fry, Council Commissioner CC: Ronald Davis, District Commissioner (Candidate’s Advisor) Date: January 10, 2019 Re: Approval of BSA Scout University Doctorial Project After careful review of the submitted project from Larry D. Hahn for completion of his Commissioner’s College doctorial degree, I grant my approved and acceptance for the degree of Doctorate (PhD) in Commissioner’s Science through the Boy Scouts of America, University of Scouting. -
Great Falls Hydroelectric Project FERC Project No
ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER LICENSE Great Falls Hydroelectric Project FERC Project No. 2814-025 New Jersey Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, D.C. 20426 February 2021 TABLE OF CONTENTS TABLE OF CONTENTS .................................................................................................. I LIST OF FIGURES ........................................................................................................ III LIST OF TABLES ...........................................................................................................IV ACRONYMS AND ABBREVIATIONS ........................................................................ V 1.0 INTRODUCTION ....................................................................................... 1 1.1 APPLICATION ............................................................................................. 1 1.2 PURPOSE OF ACTION AND NEED FOR POWER .................................. 1 1.2.1 Purpose of Action .............................................................................. 1 1.2.2 Need for Power .................................................................................. 3 1.3 STATUTORY AND REGULATORY REQUIREMENTS ......................... 4 1.4 PUBLIC REVIEW AND COMMENT ......................................................... 4 1.4.1 Scoping .............................................................................................. 4 1.4.2 Interventions -
Passaic County, New Jersey (All Jurisdictions)
VOLUME 1 OF 5 PASSAIC COUNTY, NEW JERSEY (ALL JURISDICTIONS) COMMUNITY NAME COMMUNITY NUMBER BLOOMINGDALE, BOROUGH OF 345284 CLIFTON, CITY OF 340398 HALEDON, BOROUGH OF 340399 HAWTHORNE, BOROUGH OF 340400 LITTLE FALLS, TOWNSHIP OF 340401 NORTH HALEDON, BOROUGH OF 340402 PASSAIC, CITY OF 340403 PATERSON, CITY OF 340404 POMPTON LAKES, BOROUGH OF 345528 PROSPECT PARK, BOROUGH OF 340406 RINGWOOD, BOROUGH OF 340407 TOTOWA, BOROUGH OF 340408 WANAQUE, BOROUGH OF 340409 WAYNE, TOWNSHIP OF 345327 WEST MILFORD, TOWNSHIP OF 340411 WOODLAND PARK, BOROUGH OF 340412 Preliminary: January 9, 2015 FLOOD INSURANCE STUDY NUMBER 34031CV001B Version Number 2.1.1.1 The Borough of Woodland Park was formerly known as the Borough of West Paterson. NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Part or all of this FIS may be revised and republished at any time. In addition, part of this FIS may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the FIS. It is, therefore, the responsibility of the user to consult with community officials and to check the community repository to obtain the most current FIS components. Initial Countywide FIS Effective Date: September 28, 2007 Revised Countywide FIS Date: This preliminary FIS report does not include unrevised Floodway Data Tables or unrevised Flood Profiles. -
Passaic River Basin Re-Evaluation Study
History of Passaic Flooding Collaboration is Key Flooding has long been a problem in the In the past, the Corps of Engineers has Passaic River Basin. Since colonial times, partnered with the state of New Jersey m floods have claimed lives and damaged to study chronic flooding issues in the US Army Corps property. The growth of residential and Passaic River Basin but those studies of Engineers ® industrial development in recent years has have not resulted in construction of a multiplied the threat of serious damages comprehensive flood risk management and loss of life from flooding. More than solution. There have been many reasons 2.5 million people live in the basin (2000 for this, from discord between various census), and about 20,000 homes and governing bodies to real estate issues to places of business lie in the Passaic River environmental issues to cost concerns, floodplain. but the end result is always the same - a stalled project resulting in no solution. The most severe flood , the "flood of record ," occurred in 1903, and more recent floods We need a collaborative effort with in 1968, 1971 , 1972, 1973, two in 1975, complete support from local , state and 1984, 1992, 1999, 2005, 2007, 2010 and federal stakeholders.That means towns 2011 were sufficiently devastating to warrant within the basin that may have competing Federal Disaster declarations. interests must work together as partners. The U.S. Army Corps of Engineers has Public officials must understand the proposed flood risk management projects process, especially if a project is in the basin several times over the years, authorized for construction , is a long one including in 1939, 1948, 1962, 1969, 1972, and that as my colleague New Jersey 1973 and following the completion of the Department of Environmental Protection Corps' most recent study in the 1980s. -
Army Corps of Engineers Response Document Draft
3.0 ORANGE COUNTY Orange County has experienced numerous water resource problems along the main stem and the associated tributaries of the Moodna Creek and the Ramapo River that are typically affected by flooding during heavy rain events over the past several years including streambank erosion, agradation, sedimentation, deposition, blockages, environmental degradation, water quality and especially flooding. However, since October 2005, the flooding issues have severely increased and flooding continues during storm events that may or may not be considered significant. Areas affected as a result of creek flows are documented in the attached trip reports (Appendix D). Throughout the Orange County watershed, site visits confirmed opportunities to stabilize the eroding or threatened banks restore the riparian habitat while controlling sediment transport and improving water quality, and balance the flow regime. If the local municipalities choose to request Federal involvement, there are several options, depending on their budget, desired timeframe and intended results. The most viable options include a specifically authorized watershed study or program, or an emergency streambank protection project (Section 14 of the Continuing Authorities Program), or pursing a Continuing Authorities Program study for Flood Risk Management or Aquatic Ecosystem Restoration (Section 205 and Section 206 of the Continuing Authorities Program, respectively). Limited Federal involvement could also be provided in the form of the Planning Assistance to States or Support for Others programs provide assistance and limited funds outside of traditional Corps authorities. A watershed study focusing on restoration of the Moodna Creek, Otter Creek, Ramapo River and their associated tributaries could address various problems using a systematic approach. -
Total Maximum Daily Load Report for the Non-Tidal Passaic River Basin Addressing Phosphorus Impairments
Amendment to the Northeast, Upper Raritan, Sussex County and Upper Delaware Water Quality Management Plans Total Maximum Daily Load Report For the Non-Tidal Passaic River Basin Addressing Phosphorus Impairments Watershed Management Areas 3, 4 and 6 Proposed: May 7, 2007 Adopted: April 24, 2008 New Jersey Department of Environmental Protection Division of Watershed Management P.O. Box 418 Trenton, New Jersey 08625-0418 Table of Contents 1.0 Executive Summary……………………………………………………..…………….. 4 2.0 Introduction……………………………………………………………………….…... 13 3.0 Pollutant of Concern and Area of Interest…………………………………….……. 14 4.0 Source Assessment………………………………………………………………..….. 29 5.0 Analytical Approach and TMDL Calculation …………………………………..… 36 6.0 Follow-up Monitoring…………………………………………………………..…….47 7.0 Implementation Plan……………………………………………………………..……48 8.0 Reasonable Assurance…………………………………………………………….…..58 9.0 Public Participation…………………………………………………………………... 61 Appendix A: Cited References………………………………………………………..... 67 Appendix B: Municipalities and MS4 Designation in the Passaic River Basin ….… 71 Appendix C: Additional Impairments within TMDL Area ………………………….. 73 Appendix D: TMDLs completed in the Passaic River Basin ……………………...….. 75 Appendix E: Rationale for Establishing Chlorophyll-a as Watershed Criteria to Protect Designated Uses of the Wanaque Reservoir and Dundee Lake……… 78 Appendix F: Response to Comments…………………………………………………… 92 Tables Table 1. Stream segments identified on Sublists 3 and 5 of the 2004 Integrated List assessed for phosphorus impairment………………………………………6 Table 2. Assessment Units Analyzed from the 2006 Integrated List………………….....7 Table 3. Sublist 5 and Sublist 3 stream segments in spatial extent of non-tidal Passaic River basin TMDL study……………………………….. 20 Table 4. HUC 14 Assessment Units from 2006 Integrated List addressed in this and related TMDL studies………………………………………………………….. 21 Table 5. Description of Reservoirs……………………………………………………… 25 Table 6. -
126 Passaic River Basin 01387811 Ramapo River at Lenape Lane, at Oakland, Nj
126 PASSAIC RIVER BASIN 01387811 RAMAPO RIVER AT LENAPE LANE, AT OAKLAND, NJ LOCATION.--Lat 41°02'12", long 74°14'29", Bergen County, Hydrologic Unit 02030103, at bridge on Lenape Lane, 500 ft northwest of Crystal Lake, 0.7 mi north of Oakland, and 0.9 mi east of Ramapo Lake. DRAINAGE AREA.--135 mi2. PERIOD OF RECORD.--October 2004 to August 2005. REMARKS.--Total nitrogen (00600) equals the sum of dissolved ammonia plus organic nitrogen (00623), dissolved nitrite plus nitrate nitrogen (00631), and total particulate nitrogen (49570). COOPERATION.--Field data and samples for laboratory analyses were provided by the New Jersey Department of Environmental Protection. Concentrations of ammonia in samples collected during November to December and August to September; orthophosphate in every sampling period except February to March; and nitrite, biochemical oxygen demand, total suspended residue, fecal coliform, E. coli, and enterococcus bacteria were determined by the New Jersey Department of Health and Senior Services, Public Health and Environmental Laboratories, Environmental and Chemical Laboratory Services. COOPERATIVE NETWORK SITE DESCRIPTOR.--Statewide Status, New Jersey Department of Environmental Protection Watershed Management Area 3. WATER-QUALITY DATA, WATER YEAR OCTOBER 2004 TO SEPTEMBER 2005 Turbdty UV UV white absorb- absorb- Dis- pH, Specif. light, ance, ance, Baro- solved water, conduc- Hard- det ang 254 nm, 280 nm, metric Dis- oxygen, unfltrd tance, Temper- Temper- ness, Calcium 90+/-30 wat flt wat flt pres- solved percent field, wat unf ature, ature, water, water, corrctd units units sure, oxygen, of sat- std uS/cm air, water, mg/L as fltrd, Date Time NTRU /cm /cm mm Hg mg/L uration units 25 degC deg C deg C CaCO3 mg/L (63676) (50624) (61726) (00025) (00300) (00301) (00400) (00095) (00020) (00010) (00900) (00915) OCT 28.. -
Water Resources of the New Jersey Part of the Ramapo River Basin
Water Resources of the New Jersey Part of the Ramapo River Basin GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1974 Prepared in cooperation with the New Jersey Department of Conservation and Economic Development, Division of Water Policy and Supply Water Resources of the New Jersey Part of the Ramapo River Basin By JOHN VECCHIOLI and E. G. MILLER GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1974 Prepared in cooperation with the New Jersey Department of Conservation and Economic Development, Division of Water Policy and Supply UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1973 UNITED STATES DEPARTMENT OF THE INTERIOR ROGERS C. B. MORTON, Secretary GEOLOGICAL SURVEY V. E. McKelvey, Director Library of Congress catalog-card No. 72-600358 For sale bv the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402 - Price $2.20 Stock Number 2401-02417 CONTENTS Page Abstract.................................................................................................................. 1 Introduction............................................................................................ ............ 2 Purpose and scope of report.............................................................. 2 Acknowledgments.......................................................................................... 3 Previous studies............................................................................................. 3 Geography...................................................................................................... 4 Geology -
The Paterson Great Falls
The Paterson Great Falls - A National Historic Park: Fast Facts From natural wonder to the birthplace of the American industrial revolution, the Great Falls remains a jewel of New Jersey and the nation. The Passaic River flows in a highly circuitous route, meandering through northern parts of New Jersey. In Paterson, it drops over the Great Falls. The Great Falls are 77 feet high and 260 feet wide. More than 2 billion gallons of water rush over it daily. It is the 2nd largest waterfall, by volume, east of the Mississippi River, behind only Niagara Falls. The Great Falls were carved by glaciers that receded 13,000 years ago at the end of the last Ice Age. The immediate vicinity surrounding the Great Falls was first inhabited by the Lenape Indians and later Dutch Settlers. During the American Revolution, Alexander Hamilton visited the falls with George Washington. Hamilton returned in 1791 to plan America’s first industrial city — Paterson. In the next 200-plus years, the falls powered manufacturing plants in Paterson and played a major role in the industrial development of New Jersey. The Great Falls was designated a National Historic Landmark in 1976. President Gerald Ford attended the ceremony. In 2009, the falls were designated a National Historic Park. In 2016, more than 177,000 people visited the falls. Since its creation in 1998, PVSC’s award-winning River Restoration Program has been charged with preserving and protecting over 100 miles of area waterways. The signature effort consists of at least two cleanups per year of the Great Falls. -
New Jersey's Central Passaic Basin
U.S. Fish & Wildlife Service New Jersey’s Central Passaic Basin Prehistoric Glacial Lake, Present-Day Wetland Treasure Prehistoric Glacial Lake Passaic “During the flood of 1903 the water fell so quickly all over this basin, and was collected so rapidly by the small tributaries, that a lake was formed at once which served as a cushion against which the raging torrent of the highland tributaries spent itself without doing extraordinary damage in that immediate region. The conditions here outlined illustrate the rapidity with which flood waters are discharged from the Pompton drainage area, and the deterring effect of Great Piece Meadows upon the flood.” Marshall Ora Leighton, U.S. Geologic Survey, 1904 Panoramic view of Troy Meadows, Morris County, New Jersey. Photo: Wendy Walsh / USFWS Origins Drinking Water During the last ice age, the massive About 40 percent of New Jersey’s Wisconsin glacier encountered a large Highlands, renowned for clean water, drain oval basin in northern New Jersey. About to the Central Passaic Basin through the 30 miles long and 5 to 10 miles wide, this Ramapo, Pompton, Pequannock, Rockaway, distinctive basin dates back about 180 and Whippany Rivers. The Basin’s five million years and consists of a sedimentary reservoirs provide drinking water to people Photo: Dave Menke / USFWS Piedmont plain enclosed by hard volcanic as far as Jersey City. A prolific glacial Wood duck (Aix sponsa) rocks—the Watchung Mountains to the aquifer beneath the Central Passaic is east and the ancient Highlands ridges to tapped by over 100 wells that supply water the west. Ice and debris from the glacier to most of the Basin’s half-million local blocked gaps in the Watchung Mountains, residents.