Projects Executed During Financial Year 2015-16

Total Page:16

File Type:pdf, Size:1020Kb

Projects Executed During Financial Year 2015-16 PROJECTS EXECUTED DURING FINANCIAL YEAR 2015-16 A. Consultancy Projects carried forward from Previous Years: Sl. Consultancy Project Title of the Consultancy Project Consultant In- Consultant Sponsoring No. Number Charge In-Charge in Organization the Deptt. 1. 0023 Mine air Analysis of CCL Prof. D. D. Pathak AC CCL 2. 0028 Mine air Analysis of CCL, Karo Special Project Bokaro Thermal. Prof. D. D. Pathak AC CCL 3. 0035 Mine air Analysis of CCL Prof. D. D. Pathak AC CCL Mine Air analysis of CCL, Hazaribag Area (Kedla Underground 4. 0056 Prof. D. D. Pathak AC CCL Project. Modeling and simulation studies for designing the ventilation system 5. 0062 of Peddampetta Shaft Project. Prof. D. C. Panigrahi ME SCCL Modeling and simulation studies for designing the ventilation system 6. 0064 of Shantikhani Longwall Project Prof. D. C. Panigrahi ME SCCL Modilling and Simulation studies for designing the ventilation 7. 0066 system of Jallaram Shaft Project. Prof. D. C. Panigrahi ME SCCL Mine Air Analysis of BCCL, Maheshpur Colliery, Area-III, 8. 0069 Prof. D. D. Pathak AC BCCL Gobindpur. Mine Air Analysis of CCL, Kargali (UG) Mine (BSI) B & KK Area, 9. 0073 Bokaro. Prof. D. D. Pathak AC CCL 10. 0078 Mine Air analysis of Shaft Mine, Sudamdih, E.J. Area, BCCL Prof. D. D. Pathak AC BCCL Mine Air Analysis of Kedla U/G Project 11. 0098 Prof. G. Udayabhanu AC CCL A study of ventilation network of the existing mine (GDK011A) and 12. 0131 establishing an integrated ventilation network for designing the Prof. D. C. Panigrahi ME SCCL ventilation system of peddampetta shaft Block Project. Analysis and interpretation of mine air samples for assessing the 13. 0325 states of fire and general environment in Ghusik ® Colliery, ECL Prof. D. C. Panigrahi ME ECL P a g e 1 of 53 Sl. Consultancy Project Title of the Consultancy Project Consultant In- Consultant Sponsoring No. Number Charge In-Charge in Organization the Deptt. Modeling of 5 inch stub cyclone treating Iron Ore Fines. 14. 0433 Prof. N. Suresh ESE TIPL Insitu test of Toe-wall side of Katri River near Ramkanali Colliery, 15. 0476 Shri P. K. Behera ME BCCL Evaluation of performance and behaviour of gas detectors, and 16. 0704 analysis and interpretation of mine air sample of Lodna Colliery, Prof. D. C. Panigrahi ME BCCL BCCL Analysis of Coal, Jhama, Rangi Jhama, 17. 0770 Prof. V. K. Saxena FME SAIL 18. 0777 Mine Air analysis of Kedla U/G Project, CCL Hazaribag. Dr. M. Yadav Chemistry CCL Representation of EMPs for NCPH UG and Kuracia OC Mines of 19. 0778 Chirimiri Area of SECL as per EIA Notification – 2006 Prof. Gurdeep Singh ESE SECL Determination of crossing point temperature, ignition point 20. 0881 temperature and moisture content of four samples of Shankarpur Prof. D. C.Panigrahi ME ECL Colliery, ECL Evaluation of performance and behaviour of gas detectors of 21. 0898 Murlidih 20/21 pits colliery, BCCL Prof. D. C. Panigrahi ME BCCL Mine Air Analysis of Karo Special Project Ph-II, CCL. Bokaro 22. 0922 Thermal Bokaro. Dr. M. Yadav Chemistry CCL Rehabilitation of Jharia - Mine Survey in the area of Fire Zone area 23. 0925 of Jharia Coalfields Prof. Gurdeep Singh ESE JRD Building Institutional Capacity for Sustainable Environment and 24. 0962 Social Management in Mining Sector in Afghanistan Prof. Gurdeep Singh ESE MM Evaluation of performance and behaviour of gas detectors of 25. 0969 Sudamdih Incline Mine, E.J. Area, BCCL Prof. D. C. Panigrahi ME BCCL Documentation of the Thematic Cluster of Mining As per CSD 26. 0975 Guidelines. Prof. Gurdeep Singh ESE MOEF Evaluation of Performance and behaviour of gas detectors of 27. 1034 Madhuban Colliery, BCCL Prof. D. C. Panigrahi ME BCCL Evaluation of performance and behaviour of gas detectors of 28. 1061 Amlabad Project, BCCL Prof. D. C. Panigrahi ME BCCL P a g e 2 of 53 Sl. Consultancy Project Title of the Consultancy Project Consultant In- Consultant Sponsoring No. Number Charge In-Charge in Organization the Deptt. Evaluation of performance and behaviour of gas detectors of East 29. 1077 Basseria Colliery, BCCL Prof. D. C. Panigrahi ME BCCL Evaluation of performance and behaviour of gas detectors of Kuja 30. 1086 Colliery, BCCL Prof. D. C. Panigrahi ME BCCL Evaluation of performance and behaviour of gas detectors 31. 1104 Prof. D. C. Panigrahi ME BCCL Scientific study to design the construction of dam in the U/G Mine 32. 1245 Shri P. K. Behera ME BCCL Evaluation of Performance and Behavior of gas detectors of 33. 1253 Bastacola Colliery, BCCL Prof. D. C. Panigrahi ME BCCL Evaluation of Performance and Behavior of gas detectors of Kuju 34. 1279 Colliery, CCL Prof. D. C. Panigrahi ME ECL Evaluation of Performance and Behavior of gas detectors of 35. 1284 Barmonditia (A) Colliery, ECL Prof. D. C. Panigrahi ME ECL Field Investigations, Modeling and Simulation Studies for 36. 1309 Reorganizing the ventilation system to improve workplace Prof. D. C. Panigrahi ME BCCL environment in Bansdeopur Colliery, BCCL Field Investigations, Modeling and Simulation Studies for 37. 1310 Reorganizing the ventilation system to improve workplace Prof. D. C. Panigrahi ME BCCL environment in Bagdigi Colliery, BCCL Field Investigations, Modeling and Simulation Studies for 38. 1311 Reorganizing the ventilation system to improve workplace Prof. D. C. Panigrahi ME BCCL environment in Mudidih Colliery, BCCL Field Investigations, Modeling and Simulation Studies for 39. 1312 Reorganizing the ventilation system to improve workplace Prof. D. C. Panigrahi ME BCCL environment in Kharkharee Colliery, BCCL Field Investigations, Modeling and Simulation Studies for 40. 1313 Reorganizing the ventilation system to improve workplace Prof. D. C. Panigrahi ME BCCL environment in Dhansar Colliery, BCCL Investigation into the parameters for development of high capacity 41. 1331 and high pressure main and auxiliary fans for mines Prof. D. C. Panigrahi ME VL Preparation of pre-feasibility from I Report for Coal washery of 42. 1333 Kaphila Industries Prof. Gurdeep Singh ESE KI P a g e 3 of 53 Sl. Consultancy Project Title of the Consultancy Project Consultant In- Consultant Sponsoring No. Number Charge In-Charge in Organization the Deptt. Evaluation of Performance and Behaviours of gas detectors of 43. 1394 Katras Area Prof. D.C. Panigrahi ME BCCL Determination of Compressive Strength and Anchorage Strength of 44. 1418 Cement Capsules. Shri P K Behra ME BCCL Determination of Compressive and Anchorage Strength of quick 45. 1467 Setting Cement Capsules of ECL Shri P.K. Behera ME ECL Pressure-Quantity Survey of Argada Colliery 46. 1483 Prof. D.C. Panigrahi ME CCL Pressure-Quantity Survey of Roy Bachra Colliery 47. 1484 Prof. D. C. Panigrahi ME CCL Pressure-Quantity Survey of Roy Bachra Colliery 48. 1485 Prof. D. C. Panigrahi ME CCL Pressure-Quantity Survey of Roy Bachra Colliery 49. 1486 Prof. D. C. Panigrahi ME CCL Evaluation of Performance and Behaviour of gas detectors of 50. 1497 Pathekhera Colliery Prof. D. C. Panigrahi ME WCL Determination of Compressive and Anchorage Strength of quick 51. 1504 setting cement capsule of Bera Colliery Shri P. K. Behera ME BCCL Evaluation of Performance and Behaviour of gas detectors of 52. 1565 Rampur Sub Area. Prof. D C Panigrahi ME MCL Evaluation of Performance and Behaviour of gas detectors of Topa 53. 1575 Colliery Prof. D C Panigrahi ME CCL Determination of Some Physical and Chemical Properties of quick 54. 1627 Setting Cement Capsules of Phularitand Colliery Prof. D. C. Panigrahi ME BCCL Socio-Economic Survey of Fire and Land Subsidence Affected 55. 1647 Areas of Jharia Coalfield. Prof. Chandan Bhar MS BCCL 56. 1673 Analysis and Interpretation of Mine air Samples Prof. D. C. Panigrahi ME CIMFR Evaluation of Performance and Behavior of gas detectors of Dabor 57. 1697 Colliery ECL Prof. D. C. Panigrahi ME ECL Evaluation of performance and Behaviour of gas detectors, 58. 1731 Anemometers Airborne Respirable dust sampling, Noise Monitoring Prof. D. C. Panigrahi ME SAI and Analysis of air Samples P a g e 4 of 53 Sl. Consultancy Project Title of the Consultancy Project Consultant In- Consultant Sponsoring No. Number Charge In-Charge in Organization the Deptt. 59. 1734 Analysis and Interpretation of air samples of Kunustoria Area ECL. Prof. D. C. Panigrahi ME ECL Evaluation of performance and Behaviour of gas detectors Pench 60. 1737 Area, WCL Prof. D. C. Panigrahi ME WCL Analysis and Interpretation of air samples of swati safe services Pvt. 61. 1741 Ltd. Prof. D. C. Panigrahi ME SSSEPL Evaluation of performance and behavior of gas detectors Bejdih 62. 1747 Colliery ECL Prof. D. C. Panigrahi ME ECL Evaluation of Performance and Behavior of gas detectors of 63. 1767 Khottadih Colliery Prof. D. C. Panigrahi ME ECL Evaluation of Perfrormance and Behaviour of gas detectors of 64. 1779 Hirakhand Bundia Mine MCL Prof. D. C. Panigrahi ME MCL Determination of Cerchar Hardness Index and Cerchar Abrasibity 65. 1795 Index of Some rock Samples. Prof. VMSR Murthy ME CIMFR Evaluation of Performance and Behavior of gas detectors of 66. 1806 Ramnagar Sub Area SECL Prof. D. C. Panigrahi ME SECL Rapid EIA/EMP for Dungri-Petia Sand Leases, Tata Steel 67. 1815 Dr. Biswajit Paul ESE TSL Rapid EIA/EMP for Tetangabad Sand Leases, Tata Steel 68. 1816 Dr. Biswajit Paul ESE TSL Evaluation of Performance and Behaviors of gas detectors of 69. 1822 Bhelatand A Colliery Prof. D. C. Panigrahi ME TSL A study into delineation of fire in 11 and 12 seams at New 70. 1831 Akashkinaree Colliery in North Side of DC Railway Line Govindpur Prof. D. C. Panigrahi ME BCCL Area BCCL Evaluation of Performance and Behavior of gas detectors of Roy 71.
Recommended publications
  • BHARAT COKING COAL LIMITED ( a Subsidiary of Coal India Limited )
    BHARAT COKING COAL LIMITED ( A Subsidiary of Coal India Limited ) Office of the Dy.General Manager WWZ, Mahuda Pin - 828305 Phone No.0326-2271111 Notice.No.BCCL:WWZ:Tptn:Mnd:2014:855 Dated:- 13.02.2015 NOTICE INVITING DISCOUNT BIDS Sealed discount bids is/are invited from eligible SOR registered contractors of BCCL for transportation of coal by mechanical means including allied jobs for the following works: Sl. Job description Estimated Estimated Execution Location of No. Amount(Rs.) Quantity period work excluding (MT) service tax. Transportation of Coal from Gajlitand colliery Moonidih Coal coal dump no-2 of 01(one) Washery Katras area to months Moonidih coal 16,86750.00 15,000 MT Washery ROM dump hopper,at lead slab 11-12 KM. Availability of bid documents : Bid documents comprising of this notice along- with respective bill of quantities for the above may be collected from the office of the Chief Manager(CP)-1, Western Washery Zone, Mahuda during working hours on any working day free of cost from 13.02.2015 to 21.02.2015, except Sunday and holiday. Bids document is also available on the website of BCCL at http.//www.bccl.gov.in. Last date of receipt of discount bid:- Upto 23.02.2015 at 11.30 a.m. Place of submission of bid documents:- Office of the Chief Manager(CP)-I , W.W.Z, Mahuda. Date of opening of discount bids:- The discount bids shall be opened at 12.00 pm on 23.02.2015 in the office of the Chief Manager(CP)-I , Western Washery Zone, Mahuda.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID
    List of Nodal Officers of Public Grievances in BCCL Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID. 1 Koyla Bhawan HQ S K Singh GM(P)VIP/CPGRAM/Legal 90183591 7547835164 [email protected] 2 Koyla Bhawan HQ B K Das Dy Manager(P)VIP/CPGRAM 90295379 6287695458 [email protected] 3 Sijua SIJUA AREA SUNIL KUMAR CHIEF MGR (PERS.)/APM 90077751 6287697496 [email protected] 4 LOYABAD COLLIERY RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 5 REGIONAL HOSPITAL LOYABAD RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 6 SIJUA AREA CHANDAN KR SRIVASTAVA DY.MGR (PERS.) 90293994 9438877160 [email protected] 7 SENDRA BANSJRA COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 8 BASDEOPUR COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 9 NICHTPUR COLLIERY MUKESH KUMAR ASSTT.MGER (PERS.) 90311762 6287698708 [email protected] 10 MUDIDIH COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 11 KANKANEE COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 12 TETULMARI COLLIERY JOHN SINGH ASSTT.MGER (PERS.) 90294950 6287695898 [email protected] 13 Govindpur Area Office Manoj Kumar Saha CM(P)/APM 90042060 6287696411 [email protected] 14 Area Office O P Singh Dy Manager(P) 90292491 6287695891 [email protected] 15 New Akashkinree Colliery Rajesh Kumar Kar Manager(P) 90216466 6287696885 [email protected] 16 Area Office (Legal) Anant mishra Dy Manager(P) 90267659
    [Show full text]
  • Tender Document# YES Corrigendum Document# Bid Document
    Free tenders for Drain Construction by Bharat Coking Coal Limited-6006034547 Format for Tender Uploading at www.tenders.gov.in Organization Name Bharat Coking Coal Limited Organization Type Public Sector Undertaking Ministry Ministry of Coal Tender Title* Construction of monsoon drain for KPC behind pond near sub-station of KPC under Katras Area. Tender Ref. No.* BCCL/GM/IV/Civil/Tender/12-13/7314 Dated: 12/14.11.2012 Product Category* Construction Works Sub-Category Construction of monsoon drain Tender Value (INR)* 4,54,423.97 EMD: 4,545.00 Document Cost*: 250.00 Tender Type* Open Tender Type of Bidding* Single Bid Two Bid YES Three Bid Four Bid Location* near sub-station of KPC under Katras Area First Announcement Date* 12/14.11.2012 Publication date on Portal Automatic from system At Last date of document collection 01.12.2012 Up to 11:30 A.M Last date for submission 03.12.2012 Up to 03:00 P.M Opening Date 05.12.2012 At 04:00 A.M Work Description* Construction of monsoon drain Pre-Qualification As per NIT Pre-Bid Meet Date Tender Document# YES Corrigendum Document# Bid Document# Tech. Document# Sector Coal State Jharkhand Note: * indicates mandatory fields. # indicates that the file name should be given. It should match with the file name sent by e-mail. This is to confirm that the softcopy of tender document has been forwarded to EDP Department through email: [email protected] Signature of Tendering Authority Free tenders for Drain Construction by Bharat Coking Coal Limited-6006034547 BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) Office of the General Manager, Katras Area P.O.
    [Show full text]
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Scanned with Camscanner Scanned with Camscanner for Early Action
    Scanned with CamScanner Scanned with CamScanner for early action. Pot holes detected near Muchi Basti have been filled up by incombustible materials (sand & quarry OB). Fiery coal is being dugged out by OC method to control fire as well as environmental pollution. v All old dumps will be filled back in mine voids. At It shall be complied. Action is being taken as specified the end of mining there should not be any OBD in EMP. and should be only one void which shall not exceed 30 m deep. vi An increase in the CSR BCCL is taking up activities from the HQ level and through its administrative areas for the implementation of CSR activities. For this purpose a CSR cell is functioning which is headed by General Manger(CSR) under the direct control of Director(Personnel) of the company. A details of CSR activities at Kusunda Area is given in the CSR Booklet. vii Dhanbad Action Plan, as CEPI, be implanted where Dhanbad Action Plan has been prepared in ever is applicable. consultation with Jharkhand State Pollution Control Board for entire BCCL and not clusterwise. It is being implemented comprehensively for all the mines of BCCL including mines of Kusunda Area. Some of the salient actions of this cluster are enclosed as Annexure-D. viii Since the cluster is situated close to Dhanbad, It is being complied. Plantation at decoaled OB dump thick green belt and residential areas should be area is already being executed for development of done along the periphery of ML area. Avenue- green belts as directed in EC.
    [Show full text]
  • Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2Ggststs
    F. No.: 41912015- PMU(DASI Ministry of Informatlon and Broadeasting Shastri Bhawan, New Delhi **** Date: 2td November, 2015 hrblic Notice Reference list of urban areas to be covered in phase III of cable TV digitisation, which was issued by the Ministry on 30.4.2015. The updated list of urban areas for 16 States/UTs has been notified vide Rrblic Notice dated 16. 10.2015 Now, based on comments/data received from the State/UT Governments, the list of the following States/UTs has been updated; 1. Andhra Pradesh 2. Chhattisgarh 3. Jammu & Kashmir 4. Kerala 5. Madhya Pradesh 6. Manipur 7. Telengana 8. Daman & Diu 2. A copy of the updated list of these States/UTs is attached. Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2ggSTSTs 2ND UPDATED URBAN AREAS LIST FOR PHASE III OF CABLE TV DIGITISATION Andhra Pradesh S.No. Districts Urban Areas TV Households Remarks 1 Srikakulam Srikakulam (M + OG) 28,149 Palasa Kasibugga (M) 9,706 Ichchapuram (M) 6,242 Sompeta (CT) *Deleted Hiramandalam (CT) *Deleted Upgraded Palakonda 3,349 Tekkali (CT) *Deleted Rajam (NP) 7,367 Amadalavalasa (M) 6,844 Narasannapeta (CT) *Deleted Balaga (CT) *Deleted Ponduru (CT) *Deleted 2 Vizianagaram Parvathipuram (M) 9,382 Bobbili (M) 10,337 Salur (M) 8,644 Gajapathinagaram (CT) *Deleted Sriramnagar (CT) *Deleted Cheepurupalle (CT) *Deleted Tummikapalle (CT) *Deleted Kothavalasa (CT) *Deleted Vizianagaram (M + OG) 44,379 Kanapaka (CT) *Deleted Malicherla (CT) *Deleted Jarjapupeta (CT) *Deleted Upgraded Nellimarla 3,402 Chintalavalasa (CT) *Deleted Visakhapatnm All areas except Visakhapatnam 3 Greater Visakhapatnam (M. (MC)covered in Corp) ? Phase II Yelamanchali ? **Added Narsipatnam ? **Added 4 East Godavari Kakinada (M Corp.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]
  • Pre-Feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for Production of 3.0MTPA Hot Metal with Blast
    2019 PRE-FEASIBILITY REPORT FOR INTEGRATED STEEL PLANT OF ELECTROSTEEL STEELS LIMITED FOR PRODUCTION OF 3.0 MTPA HOT METAL WITH BLAST FURNACE (1×1050 m3, 1×350 m3, 1×1700 m3) ALONG WITH CPP OF CAPACITY 160 MW M/s ELECTROSTEEL STEELS LIMITED (an enterprise of Vedanta Limited) at Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar , Dist Bokaro, Jharkhand -827013 Pre-feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for production of 3.0MTPA Hot Metal with Blast Furnace (1×1050 m3, 1×350 m3, 1×1700 m3) along with CPP of Capacity 160 MW located at village Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar, Dist Bokaro, Jharkhand-827013 Table of Contents CHAPTER-1............................................................................................................ 7 EXECUTIVE SUMMARY........................................................................................... 7 CHAPTER-2.......................................................................................................... 11 INTRODUCTION OF THE PROJECT......................................................................... 11 2.0 INTRODUCTION ..........................................................................................................11 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT.......................................12 2.2 BRIEF DESCRIPTION AND NATURE OF THE PROJECT...................................................13 2.2.1 Chronology of the Project Implementation..........................................................13
    [Show full text]
  • 1 BCCL Bharat Coking Coal Limited (A Subsidiary of Coal India Ltd) Contract Management Cell Koyla Bhawan:Koyla Nagar Dhanbad-826
    BCCL Bharat Coking Coal Limited (A Subsidiary of Coal India Ltd) Contract Management Cell Koyla Bhawan:Koyla Nagar Dhanbad-826 005 (India) Tele-Fax: 0326-2230206 e-mail: [email protected] Tender Notice No. BCCL/ CGM(CMC)/Global/ Amlabad/ 2013/117 Date: 29.01.2013 COMPANY TENDER NOTICE NO. & DATE PROJECT / AREA Amlabad Bharat Coking Coal Limited underground mine, BCCL/ CGM(CMC)/ Global/ EJ Area, BCCL. Amlabad/ 2013/ 117. Date: 29.01.2013 Sealed turn-key tenders are invited for the following work: Name and Description of Work Location Contract period Development of Amlabad under ground mines and Amlabad under The contract period extraction of coal from vergin and remnant area ground mine, EJ start from the date of through existing entries and/or additional drifts, Area, BCCL. signing of the exploitation of the virgin/ developed seams by Mass contract. Period of Production Technology package for a minimum contract shall consist guaranteed production of 3.6 million tonne of coal of Pre-Commercial during commercial production of 9 (nine) years on Production Period turnkey basis. Work includes additional exploration (if and Commercial desired so by the contractor), preparation of Mining production period. Plan, Detailed Project Report & EMP (Environment The Commercial Clearance), obtaining all necessary approvals from Production Period concerned authorities and restoring shaft entries, shall be 9 (Nine) additional drifts/ shafts deepening & widening etc. in production years. order to meet the guaranteed production. 1.1 EARNEST MONEY Rs. 25,00,000 (Twenty five lacs) or equivalent USD as Earnest Money / Bid Security is to be deposited in the form of irrevocable Bank guarantee from any Scheduled Bank payable at its branch at Dhanbad / Kolkata with validity of 28 (Twenty eight) days beyond the validity of the Bid in the format given in the Bid Document.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1St JANUARY, 2016 to MARCH, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO MARCH, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Bharat Coking Coal Limited Sijua Area Ref
    Bharat Coking Coal Limited Sijua Area Ref. No. GM/SA/CIVIL/ 397/2013 Dated 31.01/01.02 .2013 OPEN TENDER NOTICE Sealed tenders on percentage basis in two bids system (Tech./Com.Bid and Price Bid) are hereby invited from bonafide experienced eligible contractors for the under mentioned works:- ---------------------------------------------------------------------------------------------------------------------------------- Sl. Name of work & Estimated Earnest Cost of Time of No. Location cost money tender paper completion 1. Repair & maintenance of Qtr. no.121 to 124 occupied by Ramgopal Singh Shifting from Tetulmari fire area to Nichitpur township. `33,868=23 `339=00 `100=00 15 Days 2. Distempering w/washing, painting ‘D’ type bunglow newly allotted to Project Officer Nichitpur colliery. `45,569=40 `456=00 `100=00 20 Days 3. Repair & maintenance Qtr. no. B-40,44 & 47 at ‘B’ type campus of Nichitpur townmship. `34,563=10 `346=00 `100=00 15 Days 4. Repair & maintenance of Qtr. no. A/269,B/4,2,2/5 total 4 units Qtr. of Nichitpur colliery employee. `71,191=83 `722=00 `100=00 20 Days 5. Repair & maintenance of Qtr. no. SQ-86 at Sijua Area (Shifting of CISF company commander of area-V) under Sijua Area. `31,595=45 `316=00 `100=00 15 Days 6. White washing, colour washing & misc. work of Tetulmari OCP, store room, boundary wall etc. `71,080=75 `711=00 `100=00 20 Days 7. Repairing of drain for Qtr. of Sri Pramod Battra to Basudew Chouhan centre at ‘O’ seam of Tetulmari colliery. `69,068=85 `691=00 `100=00 -do- 8.
    [Show full text]