63/1B, Velampalayam Village, Palladam Taluk, Tiruppur District, Tamil Nadu
Total Page:16
File Type:pdf, Size:1020Kb
Form-1 (As per EIA Notification 2006) For the Proposed Rough Stone and Gravel Quarry Project- 1.29.0Ha S.F.No: 63/1B, Velampalayam Village, Palladam Taluk, Tiruppur District, Tamil Nadu Proposed by Tmt.R.Saraswathi, W/o.M.Rathinasamy, Pallakadu Thottam, Moonumadai, 63, Velampalayam Village, Palladam Taluk, Tiruppur District – 641 663. Application Form for Obtaining Environment Clearance from State Environmental Impact Assessment Authority (SEIAA), Government of Tamil Nadu, 6 [Appendix - I] (See Paragraph - 6) FORM 1 (I) BASIC INFORMATION S. No Item Details Name of the project/s Velampalayam Rough stone and Gravel quarry project 1 belongs to Tmt.R.Saraswathi 2 S. No. in the schedule 1(a) 3 Proposed capacity/ Capacity area/length/tonnage to be 1,15,140m3 of Rough stone, 2,158m3 of Gravel handled/command area/lease formation Five years area/number of wells to be drilled Lease applied Area 1.29.5ha. The command area 0.89.0ha (Effective quarrying area proposed). It is an open cast mechanized method of quarry. The area is covered by the Gravel formation. The Gravel formation is about 2.0m. Massive charnockite is found after 2.0m (Gravel formation) which is clearly inferred from the nearby existing quarrying pits. Hence no wells are proposed or not drilled. It is a fresh application, (the area has been quarrying in 4 New/Expansion/ Modernization earlier) in Velampalayam Village. Existing capacity/Area etc. Total quantity of Rough Stone is proposed for the five years 1,15,140m3 ie., 19,190 Lorry Loads of Rough stone & 2,158m3 of Gravel ie., 360 Lorry loads. Proposed depth is 42m for a period of Five years only. 5 Rough Gravel Description stone Formation in m3 in m3 Geological Resources 5,13,320 25,666 Available Mineable reserves 1,15,140 2158 Five years plan period As in the 1,15,140 2158 approved mining plan 6 Category of project i.e. `A’ or ‘B’ Category – B2 Does it attract the general condition? If The total project area is 1.29.0ha ie., up to 25ha hence 7 yes, please specify. the General conditions will not attract this project. Does it attract the specify condition? If The project is not attracting any specific conditions. 8 yes, please specify. The total extent of the existing, applied and Proposed Quarries within the radius of 500m is 11.37.5Ha. The project falls under cluster situation. 7 Location Topo Sheet No. 58 - E/08 9 11°03'25.68"N to 11°03'30.30"N 77°16'45.23"E to 77°16'49.06"E Plot/ Survey/ Khasra No. 63/1B Village Velampalayam Taluk Palladam District Tiruppur State Tamil Nadu Nearest railway station/ airport along Vanjipalayam Railway station - 7.0km - NW 10 with distance in kms Coimbatore Airport - 26.0km - SW Nearest Town, city, District Town - Palladam - 6.5kms - S 11 Headquarters along with distance in Nearest City - Tiruppur - 8.5kms - NE kms District - Tiruppur - 8.5kms - NE Village Panchayats, ZilaParishad, Village – Velampalayam Municipal Corporation, Local body Panchayat union – Palladam 12 (complete postal addresses with Taluk – Palladam telephone nos. to be given) District – Tiruppur 13 Name of the applicant Tmt.R.Saraswathi, W/o.M.Rathinasamy, Registered Address Pallakadu Thottam, 14 Moonumadai, 63, Velampalayam Village, Palladam Taluk, Tiruppur District-641 663. Mobile No: 98431 44809 Address for correspondence: Name Tmt.R.Saraswathi, Designation (Owner/Partner/CEO) Proprietor/Owner, W/o.M.Rathinasamy, Pallakadu Thottam, Address Moonumadai, 63, Velampalayam Village, Palladam Taluk, Tiruppur District-641 663. 15 Mobile No: 98431 44809 Pin code No 641 663 E-mail [email protected] Mobile No. 98431 44809 Fax No. - Aadhaar No. 8043 3488 3809 Details of Alternative Sites examined, if There is no alternative sites are examined. The project is 16 any. Location of these sites should be site specific. shown on a Topo sheet. 17 Interlinked Projects There is no interlinked project. 8 Whether separate application of As there is no interlinked project, no application has 18 interlinked project has been submitted? been submitted. As there is no interlinked project, no application has 19 If yes, date of submission been submitted. The project involves Rough stone and Gravel Quarry 20 If no, reason only. Whether the proposal involves (a) The project does not attract the Forest approval/ clearance under: if yes, details (Conservation) Act 1980. of the same and their status to be given. (a) The Forest (Conservation) Act, (b) There is no wild life in the project site area under the 21 1980? Wildlife (protection) Act 1972. (b) The Wildlife (Protection) Act, 1972? (C) The project area does not fall the C.R.Z (c) The C. R. Z. Notification, 1991? Notification, 1991. The precise area Communication letter was received from the District Collector, Tiruppur vide Rc.No.28/Mines/ 2016, Dated: 02.07.2019. Whether there is any Government 22 Order/ Policy relevant/ relating to the The Mining Plan was got approved by the Assistant site? Director, Department of Geology and Mining, Tiruppur vide Rc.No.28/Mines/ 2016, Dated: 01.08.2019. 23 Forest land involved (hectares) No forest land is involved lease applied area. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? There is no court case pending, litigations relating to the (a) Name of the Court project directly and indirectly. 24 (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. 9 (II) Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use changes in water bodies, etc.) Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with sources confirmation of information data The lease applied area is exhibits plain terrain topography The altitude of the area is 356m (Max) above Mean sea level the land use pattern will be changed after the quarrying of Rough stone and Gravel as per the Mining plan, Conventional Open cast Mechanized Mining with 5.0 meter vertical bench with a bench width of 5.0 meter is being proposed. Topography will change in respect to Permanent or temporary change in overburden excavation. However, measures will be land use, land cover or topography implemented as per mining Plan. 1.1 including increase in intensity of Yes As the area of the quarry remains the same, land use (with respect to local land there will not be any increase in intensity of local use plan) land use. Present Area at the end Description area in of lease period (ha) (ha) Quarrying Pit 0.74.0 0.89.0 Infrastructure Nil 0.01.0 Roads 0.02.0 0.02.0 Green Belt Nil 0.37.0 Unutilized Area 0.53.0 Nil Grand Total 1.29.0 1.29.0 Clearance of existing land, There is no vegetation and building in this project 1.2 vegetation and building? No area, hence there is no requirement of clearing the vegetation and building. The total quarrying activity is proposed to carry out within the quarry lease area. Hence, there is no proposal for creating of new land uses. Temporary approach road within the project area will be form 1.3 Creation of new land uses? No for the easy access of men and machinery which will be well maintained. The tippers will transport the Rough stone to the needy crushers by existing road. 10 Pre-construction investigations e.g. Hence pre-construction investigation and soil 1.4 No bore houses, soil testing? testing is not proposed before quarrying operation. There will be no major civil works, other than the following infrastructure: office building, storeroom, 1.5 Construction works? Yes toilet and first aid room will be provided on permanent structures within the quarry lease area in the safety barrier. After the grant of lease. There are no existing building within the project 1.6 Demolition works? No area hence no demolition work is involved. Temporary sites used for No temporary sites are utilized for this project. 1.7 construction works or housing of No Sites service on semi-permanent structure will be constructed only after grant of quarry lease within construction workers? the safety barrier. Above ground buildings, structures There are no tall buildings or linear structure found or earth works including linear 1.8 No within the quarry site. There is no requirement of structures, cut and fill or cutting and filling in the site. excavations Conventional Open Cast Mechanized method of Underground works including 1.9 No quarrying will be adopted. No underground mining mining or tunneling? or tunneling is required. There is no reclamation works is proposed. In the proposed mining plan only 42m below ground level. Depth has been envisaged as workable depth for safe & economic mining during the period of Five years. Hence, after quarry reaches ultimate pit 1.10 Reclamation works? No limit (for this lease period) of 42m depth fencing will be constructed around the quarried pits to prevent inherent entry of the public and cattle. The quarried out pit will be act as a temporary recharge pond. There is no such type of activities involved in this 1.11 Dredging? No opencast quarrying operation. There is no such type of activities involved; It is an 1.12 Offshore structures? No inland quarrying project. 11 No production or manufacturing is involved in this Production and manufacturing Rough stone and Gravel quarrying. The Rough 1.13 No processes? stone is liberated from the parent rock and transported to the needy crushing units.