Long Lake and Ogoki River Water Diversion Projects

Total Page:16

File Type:pdf, Size:1020Kb

Long Lake and Ogoki River Water Diversion Projects 14 Wawatay News NOVEMBER 20, 2020 ᐧᐊᐧᐊᑌ ᐊᒋᒧᐧᐃᓇᐣ Community Regional Assessment in the Ring of Fire Area Engagement Activities and Participant Funding Available November 12, 2020 — The Minister of Environment and Climate Change has determined that a regional assessment will be conducted in an area centred on the Ring of Fire mineral deposits in northern Ontario. The Impact Assessment Agency of Canada (the Agency) is inviting the public, Indigenous communities, and organizations to provide input to support the planning of the Regional Assessment in the Ring of Fire area. Participants may provide their input to the Agency in either official Rick Garrick/Wawatay language until January 21, 2021. Participants are encouraged to refer to The impacts of waterway diversions in the Matawa region were raised during Treaties Recognition Week the Ring of Fire regional assessment planning information sheet for on the Matawa First Nations Facebook page. additional details. Participants can visit the project home page on the Canadian Impact Assessment Registry (reference number 80468) for more options to submit Waterway diversion information. All input received will be published to the Registry as part of the regional assessment file. The Agency recognizes that it is more challenging to undertake meaningful public engagement and Indigenous consultation in light of the education important circumstances arising from COVID-19. The Agency continues to assess the situation with key stakeholders, make adjustments to engagement activities, and is providing flexibility as needed in order to prioritize the health and safety of all Canadians, while maintaining its duty to conduct meaningful for youth engagement with interested groups and individuals. Virtual Information Sessions Rick Garrick and for our young people to The Kenogami and Ogoki Riv- Wawatay News learn it.” ers are tributaries of the Albany The Agency will host virtual information sessions to provide background Achneepineskum says many River. The Lake St. Joseph information on the regional assessment and to help participants understand Marten Falls Councillor of the communities have done diversion project was built in Sam Achneepineskum recently research and completed land- the late 1950s to divert water how to provide information that will contribute to the design of the process stressed the importance of use plans over the years. from Lake St. Joseph, which and development of the terms of reference for the assessment. The virtual sharing information about the “A lot of them have their drains into the Albany River, to sessions will consist of a presentation on the anticipated regional impacts of waterway diversions sacred sites and names of riv- Lac Seul, which drains through from the Albany River system ers,” Achneepineskum says. the English River system into assessment process, information on future opportunities for participation, with upcoming generations of “The Elders are disappearing, Lake Winnipeg. and an opportunity to ask questions to Agency staff. youth. those people that lived on those “When they built the (Ogoki “It’s important for our young rivers. Their whole life was liv- River diversion project), they people to learn their history,” ing on the river and the land.” told people it would help the The virtual information sessions will take place at 2 p.m. and 7 p.m. (EST) Achneepineskum says. “I think The waterway diversions industry and that was our con- on November 24, 2020 and November 26, 2020. For information on how they should look at their history involved three projects, one tribution to the war effort,” to attend these sessions, please contact the Agency at and how they were impacted by from the Kenogami River, one Achneepineskum says. [email protected]. the coming of the fur trade and from the Ogoki River and one Achneepineskum says the the people who are encroaching from Lake St. Joseph. The Long waterway diversions have since ever so closer all the time.” Lake diversion project was built impacted the environment in Participant Funding Available Achneepineskum says every- in the late 1930s with the con- the rivers as well as travel dur- thing on the land had a name struction of the Kenogami Lake ing certain seasons. and a story about it. Dam and Long Lake Diversion “In the summertime the The Agency is making funding available through its Participant Funding “We don’t want to forget Dam to divert water through water would be really dry,” Program to assist the public, Indigenous communities, and organizations that,” Achneepineskum says. Long Lake and the Aguasabon Achneepineskum says. “It made with their participation in the regional assessment. Funding will assist “If we have our history and our River to Lake Superior. The it difficult to travel, especially stories for these rivers and the Ogoki River diversion project when people started using out- recipients in providing input related to the planning of the regional land, then they remain ours, was built in the early 1940s board (motors).” assessment, reviewing and providing comments on the terms of reference they remain a part of us, but if with the construction of the and potential draft agreement for the Regional Assessment Committee, and we lose that we don’t have any- Waboose Dam and Summit participating in early engagement activities of the Committee. Additional thing. That’s why it is important Dam to divert water through con’t on next page to learn that and to keep it alive Lake Nipigon to Lake Superior. participant funding will be offered at a later date to support recipients in activities throughout the conduct of the assessment. Applications received by December 14, 2020 will be considered. To apply for funding, complete the Regional Assessment Participant Funding Application Form available on the Agency's website at canada.ca/iaac under Funding Programs. For more information, contact the Participant Funding Program by writing to [email protected], or by calling 1-866-582-1884. Follow us on Twitter: @IAAC_AEIC #RingofFireRA What is the Regional Assessment? Regional assessments are studies conducted in areas of existing projects or anticipated development to inform planning and management of cumulative effects and inform future project impact assessments. The regional assessment will be conducted in the area centered on the Ring of Fire mineral deposits in northern Ontario, approximately 540 kilometres northeast of Thunder Bay and 1,000 kilometres north of Toronto. In planning the regional assessment, the Impact Assessment Agency of Canada will work with the Province of Ontario, Indigenous groups, federal authorities, non-government organizations and the public to determine the appropriate activities, outcomes and boundaries of the regional assessment. The Minister of Environment and Climate Change will consider these factors in setting the terms of reference for the conduct of the regional assessment. Wawatay News NOVEMBER 20, 2020 ᐧᐊᐧᐊᑌ ᐊᒋᒧᐧᐃᓇᐣ 15 Community Waterways a part of history graphic from Matawa Facebook page from page 13 near the Albany Forks and they together and they started to had one at Mammamattawa, push back on trying to kill that Achneepineskum says the English River Post.” project. It was called Damn the researchers looked at how sup- Achneepineskum says gov- Dams.” plies used to be transported on ernment officials also looked The Long Lake and Ogoki the rivers by York boats while at developing more waterway River water diversion projects looking into the height of water diversion projects in the 1960s increased the water levels and levels before the water diver- on the rivers across northern hydroelectricity output on the sions. Ontario. Great Lakes. “They would ship stuff from “Our community would have “What’s kind of ironic about Fort Albany — they would go been a lake where it is now — it is now that they’ve diverted up the Albany River to Lake St. we would have been underwa- all our water south, now they’re Joseph,” Achneepineskum says. ter,” Achneepineskum says. “I sending us water bottles up “They had a post at Marten think that is part of the reason north,” Achneepineskum says. Falls, they had a post at Lake St. why Nishnawbe Aski Nation Joseph and they had a post just came to be, all the chiefs got Collaboratively implementing Canada’s plan for the safe, long-term management of used nuclear fuel We invite you to learn more. Please visit our website: www.nwmo.ca Find us on @nwmocanada /company/nwmocanada.
Recommended publications
  • Webequie Supply Road DETAILED PROJECT DESCRIPTION
    Webequie Supply Road DETAILED PROJECT DESCRIPTION Webequie First Nation The Picture is a Placeholder Only Prepared by: Prepared for: Submitted to: SNC-Lavalin Inc. Webequie First Nation Impact Assessment Agency of Canada 195 The West Mall Toronto, Ontario, M9C 5K1 www.snclavalin.com November 2019 661910 Webequie Supply Road Detailed Project Description PREFACE This Detailed Project Description for the Webequie Supply Road Project (“the Project”) has been prepared in accordance with subsection 15(1) of the Impact Assessment Act (“IAA”) and Schedule 2 of the Act’s Information and Management of Time Limits Regulations (“the Regulations”) of the Impact Assessment Act - Information Required in Detailed Description of Designated Project. In addition, the Detailed Project Description reflects the Webequie Supply Road Project Team’s recognition of issues identified in the Summary of Issues prepared by the Impact Assessment Agency of Canada (the Agency) as a result of the Agency’s invitation to Indigenous groups, federal and provincial authorities, the public and other participants to provide their perspective on any issues that they consider relevant in relation to the Project. Information provided by the Agency (posted on the Canadian Impact Assessment Registry) for this purpose included the Initial Project Description. The document that was accepted by the Agency to serve as the Initial Project Description was prepared to comply with the requirements of the Canadian Environmental Assessment Act, 2012 and was initially released for public review under the CEAA, 2012 process in July 2019, during the period when the Government of Canada was preparing to bring into force and transition to the new Impact Assessment Act.
    [Show full text]
  • River Studies: Part III
    River Studies: Part III River channel dynamics: retrospect and prospect by Edward J. Hickin Dec( nber, 19 81 Discussion Paper No. 11 Disclaimer: Simon Fraser University, Department of Geography. Discussion Papers are prepared or edited by Depart­ ment members for private circulation to interested individuals. Since these papers may represent preliminary work in progress, their contents should neither be quoted nor referre to in published work without written consent of author. Comments are invited. Preface and Acknowledgements This paper is the final part of a series on the basic principles theories of river behaviour. Part I (Di sion Paper No. 9) topics of drainage basin morphometry river network cussion Paper No. 10) reviewed lements of drainage This paper attempts to define the state of the art in the 1 dynamics, to identify critical problem areas, and to suggest the research. What fallows is a personal view of recent developments in fluvial morphology. Although I am responsible for its inadequacies, its owe much to the stimulation provided by my students and colleagues of 15 . Although the manner in which rivers change the form and pattern of their channels in response to environmental change has been a recurring theme in river studies, it recently has enjoyed considerably increased attention from earth scientists. Perhaps the most sign~ficant recent evidence of this interest appearance of several collected works and reviews of studies of ·channel changes example, see Gregory, 1977; Gregory and Walling, 1979; Kuprianov and Kopaliani, Park, 1981), and the fact that a Session has been devoted to the topic here Second International Conference on Fluvial Sediments at Keele, England, in , 198 .
    [Show full text]
  • Revised Draft Experiences with Inter Basin Water
    REVISED DRAFT EXPERIENCES WITH INTER BASIN WATER TRANSFERS FOR IRRIGATION, DRAINAGE AND FLOOD MANAGEMENT ICID TASK FORCE ON INTER BASIN WATER TRANSFERS Edited by Jancy Vijayan and Bart Schultz August 2007 International Commission on Irrigation and Drainage (ICID) 48 Nyaya Marg, Chanakyapuri New Delhi 110 021 INDIA Tel: (91-11) 26116837; 26115679; 24679532; Fax: (91-11) 26115962 E-mail: [email protected] Website: http://www.icid.org 1 Foreword FOREWORD Inter Basin Water Transfers (IBWT) are in operation at a quite substantial scale, especially in several developed and emerging countries. In these countries and to a certain extent in some least developed countries there is a substantial interest to develop new IBWTs. IBWTs are being applied or developed not only for irrigated agriculture and hydropower, but also for municipal and industrial water supply, flood management, flow augmentation (increasing flow within a certain river reach or canal for a certain purpose), and in a few cases for navigation, mining, recreation, drainage, wildlife, pollution control, log transport, or estuary improvement. Debates on the pros and cons of such transfers are on going at National and International level. New ideas and concepts on the viabilities and constraints of IBWTs are being presented and deliberated in various fora. In light of this the Central Office of the International Commission on Irrigation and Drainage (ICID) has attempted a compilation covering the existing and proposed IBWT schemes all over the world, to the extent of data availability. The first version of the compilation was presented on the occasion of the 54th International Executive Council Meeting of ICID in Montpellier, France, 14 - 19 September 2003.
    [Show full text]
  • The English-Wabigoon River System: 11. Suppression of Mercury and Selenium Bioaccumulation by Suspended and Bottom Sediments
    The English-Wabigoon River System: 11. Suppression of Mercury and Selenium Bioaccumulation by Suspended and Bottom Sediments JOHNB%i'. M. RUDDAND MICHAELA. TURNER Freshwater Institute, Department c.f FisBzeries and Oceans, 581 Unbversi~g'Crescent, Wblznigeg, Mata. R3T 21V$ Rum, 9. W. AND M. A. TURNER.1983. The English-Wabigr~sn River system: II. Suppression of mercury and selenium bioaccumulation by suspended and bottom sediments. Can. 9. Fish. Aquat. Sci. 40: 2218-2227. Bioaccumulation of "3Wg and 75Seby several members of the food chain, including fish, was followed in large in situ enclosures in the presence and absence of organic-poor sediment. When the sediment was absent. 203Hgwas bioaccumulated 8- to 16-fold faster than when it was either suspended in the water or present on the bottom of the enclosures. Mercury- contaminated and uncontaminated sediments were equally effective at reducing the rate of radiolabeled mercury biasaccurnanlation, apparently by binding the mercury to fine particulates making it less available for methylation and/or bioaccumulation. Based on these results, a mercury ameliorating procedure involving senlicdpntinuous resuspension of organic-poor sediments with downstream deposition onto surface sediments is suggested. The presence of sediments, in the water or on the bottom of enclosures, also reduced radiolabeled selenium bisaccumulation. The degree of inhibition (2- to IO-fold) may have been related to the concentration of organic material in the predominantly inorganic sediments. Implications of this research with respect to mercury-selenium interactions in aquatic ecosystems are discussed. RUDD, J. W. M., AND M. A. TURNER.1983. The English- Wabigoon River system: HI. Suppression of mercury and selenium bioaccurnulation by suspended and bottom sediments.
    [Show full text]
  • An Overview of the Hudson Bay Marine Ecosystem
    15–1 15.0 ECONOMIC DEVELOPMENT Chapter Contents 15.1 HYDROELECTRICITY..........................................................................................................................................15–2 15.2 MINERALS AND HYDROCARBONS .................................................................................................................15–12 15.3 TRANSPORTATION...........................................................................................................................................15–17 15.4 TOURISM............................................................................................................................................................15–22 15.5 MUNICIPAL ACTIVITIES....................................................................................................................................15–22 15.6 GRAND CANAL SCHEME..................................................................................................................................15–23 15.7 SUMMARY ..........................................................................................................................................................15–23 Chapter Figures Figure 15-1. La Grande hydroelectric complex..........................................................................................................15–4 Figure 15-2. Proposed diversion of water from the Rupert River watershed into the Eastmain watershed, and location of the proposed Eastmain-1-A hydroelectric generating station ...............................................15–5
    [Show full text]
  • An Assessment of the Groundwater Resources of Northern Ontario
    Hydrogeology of Ontario Series (Report 2) AN ASSESSMENT OF THE GROUNDWATER RESOURCES OF NORTHERN ONTARIO AREAS DRAINING INTO HUDSON BAY, JAMES BAY AND UPPER OTTAWA RIVER BY S. N. SINGER AND C. K. CHENG ENVIRONMENTAL MONITORING AND REPORTING BRANCH MINISTRY OF THE ENVIRONMENT TORONTO ONTARIO 2002 KK PREFACE This report provides a regional assessment of the groundwater resources of areas draining into Hudson Bay, James Bay, and the Upper Ottawa River in northern Ontario in terms of the geologic conditions under which the groundwater flow systems operate. A hydrologic budget approach was used to assess precipitation, streamflow, baseflow, and potential and actual evapotranspiration in seven major basins in the study area on a monthly, annual and long-term basis. The report is intended to provide basic information that can be used for the wise management of the groundwater resources in the study area. Toronto, July 2002. DISCLAIMER The Ontario Ministry of the Environment does not make any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed in this report. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply endorsement, recommendation, or favoring by the ministry. KKK TABLE OF CONTENTS Page 1. EXECUTIVE SUMMARY 1 2. INTRODUCTION 7 2.1 LOCATION OF THE STUDY AREA 7 2.2 IMPORTANCE OF SCALE IN HYDROGEOLOGIC STUDIES 7 2.3 PURPOSE AND SCOPE OF THE STUDY 8 2.4 THE SIGNIFICANCE OF THE GROUNDWATER RESOURCES 8 2.5 PREVIOUS INVESTIGATIONS 9 2.6 ACKNOWLEDGEMENTS 13 3.
    [Show full text]
  • Evaluation of Techniques for Flood Quantile Estimation in Canada
    Evaluation of Techniques for Flood Quantile Estimation in Canada by Shabnam Mostofi Zadeh A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of Doctor of Philosophy in Civil Engineering Waterloo, Ontario, Canada, 2019 ©Shabnam Mostofi Zadeh 2019 Examining Committee Membership The following are the members who served on the Examining Committee for this thesis. The decision of the Examining Committee is by majority vote. External Examiner Veronica Webster Associate Professor Supervisor Donald H. Burn Professor Internal Member William K. Annable Associate Professor Internal Member Liping Fu Professor Internal-External Member Kumaraswamy Ponnambalam Professor ii Author’s Declaration This thesis consists of material all of which I authored or co-authored: see Statement of Contributions included in the thesis. This is a true copy of the thesis, including any required final revisions, as accepted by my examiners. I understand that my thesis may be made electronically available to the public. iii Statement of Contributions Chapter 2 was produced by Shabnam Mostofi Zadeh in collaboration with Donald Burn. Shabnam Mostofi Zadeh conceived of the presented idea, developed the models, carried out the experiments, and performed the computations under the supervision of Donald Burn. Donald Burn contributed to the interpretation of the results and provided input on the written manuscript. Chapter 3 was completed in collaboration with Martin Durocher, Postdoctoral Fellow of the Department of Civil and Environmental Engineering, University of Waterloo, Donald Burn of the Department of Civil and Environmental Engineering, University of Waterloo, and Fahim Ashkar, of University of Moncton. The original ideas in this work were jointly conceived by the group.
    [Show full text]
  • Water Levels and Hazard Lands
    LWCB Lake of the Woods Control Board Before You Build - Docks, Boathouses, Cottages Are you thinking of shoreline work or construction on your property? Then it is important to consider water levels. Find out more in the following sections: • Water Levels and Hazard Lands • Recommended Hazard Land Levels • How to Determine Levels on your Shoreline • Another Consideration; Erosion • Docks • Lake of the Woods • Winnipeg River (Ontario) • Nutimik Lake, Winnipeg River (Manitoba) • Lac Seul • English River Below Ear Falls / Pakwash Lake • References Water Levels and Hazard Lands Water levels typically move up and down seasonally and can also be quite different from one year to another. In particular, it is important to be aware that water levels can vary considerably over relatively short time periods in response to heavy rainfall or dry periods. On Lake of the Woods, while the "normal" annual variation in water level is only 0.6-0.9 m (2-3 ft) or less, levels through the years have varied over a 2.5 m (8.3 ft) range. On the Winnipeg River, water levels at some locations may vary up to 1.5 m (5 ft) fairly often and can rise 3.5 m (11.5 ft) or more when the dam at Kenora is fully opened. When building or developing, it is important to allow for water level fluctuations, recognizing that while the water level may normally be in a certain range, it can and will periodically rise much higher. Development in areas that are subject to periodic flooding will ultimately result in personal anxiety and property damage that could have easily been avoided.
    [Show full text]
  • Archaeological Investigations at the Site of the Longlac Historic Trading
    DAWSON: LONGLAC TRADING POST 3 KENNETHC.A.DAWSON (ACCEPTED DECEMBER 1967) ARCHAEOLOGICAL INVESTIGATIONS AT THESITEOF THE LONGLAC HISTORIC TRADING POST THUNDER BAY DISTRICT, ONTARIO INTRODUCTION The purpose of this report is to present the evidence from an archaeological excavation of the historic longlac trading post site, carried out in 1964. Longlac was evidently an early French trading post, built at the north end of Long Lake, and the predecessor of a North West Company post and of a later Hudson's Bay Company post at that place. It received but brief mention in contemporary literature. Although Long Lake was an important area in the westward expansion of the fur trade, no detailed critical history of it has been written. For this reason, the historical facts have been sketched here in order to provide some background to the fur trading activities in the area between Lake Superior and James Bay along the Albany River route, and hence to an understanding of the archaeological record. No claim is made, however, to a critical evaluation of these facts. The report describes the site and the artifacts, and summarizes the archaeological field work. Since the artifacts relate apparently to three traditions at the site, they are of inestimable importance, and since it was not easy to arrange those of European origin, a functional classification was made, following closely that used in the River Basin Surveys. (Woolworth and Wood, 1960). HISTORICAL BACKGROUND The historical records, (Thwaites, 1901; Crouse, 1930), suggest that the area was well known to the French from the middle of the seventeenth century.
    [Show full text]
  • Task 3 Neil Fulton
    REPORT ON POTENTIAL MEASURES TO ALLEVIATE PROBLEMS CREATED BY CtIFWNT HIGH LAKE LEVELS TASK 3 DIVERSIONS MANAGEMENT ,.l -. TO THE INTERNATIONAL JOINT CCXMISSICPJ FROM TASK GROUP MEMBERS GERALD MACMILLXY DON LEONARD RM; GOLDING BILL DALEY MAC ODELL BILL ERDLE PETER YEE . NEIL FULTON SEPTEMBER 1987 EXExmTIVE SUMMARY The Governments of Canada and the United States requested, in August 1986, that the International Joint 'Commission study methods of alleviating the adverse consequences of fluctuating Great Lakes water levels. Part of this study entailed an immediate short-term investigation of methods of alleviating the present high water level crisis. One of the elements of the short-term investigation was a study of diversions management and the results are contained herein. The theoretical maximum flow through the Welland Canal in an extreme crisis situation was estimated to be 12,000 cubic feet per second (cfs). The most significant physical impacts of this maximum flow would be the complete disruption of navigation between Lake Ontario and the upper lakes and the possibility of major damage to the canal itself. A reduction in Lake Erie levels of 1.3 inches would be achieved. The Ogoki and Long Lac Diversions can be closed completely but, because of significant social impacts associated with the closure of the Long Lac Diversion, a.scenario involving a combined annual diversion flow of 800 cfs was investigated to determine the benefits foregone by maintaining the log-driving operation from Long Lake. The most significant physical impacts were the direct loss of 2,500 jobs in the Terrace Bay - Longlac area resulting from the closure of the Kimberly-Clark pulp mill in Terrace Bay due to complete closure of Long Lac Diversion, and the reduction in livelihood and alteration in way of life for local populations associated with the closure of both diversions.
    [Show full text]
  • The Streamlining of the Kabinakagami River Hydroelectric Project
    The International Indigenous Policy Journal Volume 6 | Issue 3 Article 4 June 2015 The Streamlining of the Kabinakagami River Hydroelectric Project Environmental Assessment: What is the "Duty to Consult" with Other Impacted Aboriginal Communities When the Co- Proponent of the Project is an Aboriginal Community? Holly L. Gardner University of Waterloo, [email protected] Denis Kirchhoff University of Waterloo, [email protected] Leonard J. Tsuji University of Toronto, [email protected] Recommended Citation Gardner, H. L. , Kirchhoff, D. ,T suji, L. J. (2015). The Streamlining of the Kabinakagami River Hydroelectric Project Environmental Assessment: What is the "Duty to Consult" with Other Impacted Aboriginal Communities When the Co-Proponent of the Project is an Aboriginal Community?. The International Indigenous Policy Journal, 6(3). DOI: 10.18584/iipj.2015.6.3.4 The Streamlining of the Kabinakagami River Hydroelectric Project Environmental Assessment: What is the "Duty to Consult" with Other Impacted Aboriginal Communities When the Co-Proponent of the Project is an Aboriginal Community? Abstract There is existing tension within many Aboriginal communities between economic development and preservation of traditional lands for the continued practice of traditional activities. The "duty to consult" doctrine has has become an important mechanism by which these concerns were identified and addressed (when possible) prior to development. This is a legal requirement that is rooted in the Constitution Act (1982) and subsequent legal case law that has further defined and outlined requirements under this obligation. This article describes the process that was carried out to advance the proposed Kabinakagami River Hydro Project Class Environmental Assessment in Northern Ontario, Canada with an emphasis on the approach to Aboriginal consultation.
    [Show full text]
  • Ontario Aboriginal Waterpower Case Studies Ontario 3
    Footprints to Follow Ontario Aboriginal Waterpower Case Studies Ontario 3 9 8 6 5 4 2 1 7 Welcome – Aaniin, Boozhoo, Kwey, Tansi, She:kon A core tenet of the Ontario Waterpower Association’s (OWA’s) approach to achieving its objectives has always been working in collaboration with those who have an interest in what we do and how we do it. The OWA has long recognized the importance of positive and productive relationships with Aboriginal organizations. An emergent good news story, particularly in waterpower development, is the growth of the participation of Aboriginal communities. Aboriginal communities have moved from being partners in a waterpower project to the proponent of the project. Waterpower projects are long-term ventures and investments. Projects can take years to bring into service and a decade or more to show a simple payback. However, once in service, a waterpower facility literally lasts forever. Aboriginal partners and proponents taking this long-term view are realizing the multigenerational opportunity to support local capacity development, training, job creation and community growth. Revenue generated from waterpower development can be reinvested in the project to increase the level of ownership, used for other community needs such as housing and infrastructure development, or investing in other economic opportunities. Ontario is fortunate to have significant untapped waterpower potential. In the north in particular realizing this potential will undoubtedly involve the participation of Aboriginal communities. Importantly, a successful industry/First Nations relationship can help establish a business foundation for further expansion. This catalogue aims to share first hand stories in proven Aboriginal communities’ waterpower developments.
    [Show full text]