This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 2019 2035

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 About EIMV

Elektroinštitut Milan Vidmar (EIMV) Name: Milan Vidmar Electric Power Research Institute Address: Hajdrihova 2, SI - 1000 , Web: www.eimv.si Type: Research institution Shareholders: Slovenian Academy of Sciences and Arts (100% ) Number of 100 employees: Date of court 1st of June 1948 registration: ISO 9001 (QMS), ISO14001 (EMS), Quality EN ISO/IEC 17020 (Control Body), EN ISO/IEC 17025 systems: This project has received (Testing Laboratory) funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 FutureFlow architecture

Regional Balancing Platform with Common Activation Function for cross-border exchange of aFRR

CZC CZC CZC CZC

Bidding Bidding Bidding Bidding

aFRR RT data RT aFRR aFRR RT data RT aFRR data RT aFRR data RT aFRR

TSO 1 TSO 2 TSO 3 TSO n

Bidding Bidding Bidding Bidding

Control & Control & Control Control & Control & Control

Measurement Measurement Measurement Measurement BSP n BSP n BSP n BSP n BSP 2 BSP 2 BSP 2 BSP 2 BSP 1 BSP 1 BSP 1 BSP 1

DR DG BG DR DG BG DR DG BG DR DG BG This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Regional Balancing Platform, TSO‘s LFC and VPP integration Regional Balancing Platform

CAF

BSPs

TSO

This project has received funding from the European Union’s Horizon 2020 research and innovation LFC programme under grant agreement n° 691777 TSO blocks

ELES Demo site design (core)

APG

CAF

MAVIR

TSO block - Internal structure System LFC response

TEL

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Other modules Other modules CAF HANA (Cloud)

Other modules Optimization module (1)

SAP

MQTT/

TLS

- XML

(2)

SAP

MQTT/ TLS

- Demo site XML

matlab docker ICCP NMEA SCADA/EMS GW Stunnel Stunnel mqnmead LP matrikon-opc TCP MQTT/ implementation AX4ICCP TLS mqxmld NMEA NMEA mqnmea mqnmead vOPCClient MDI TCP DMZ MDId

TCP demoandsap OPC

ffmqb OPC

MQTT/

binary

LP,SAP

TCP

M/S M/S

TLS

MQTT/TLS

LP - XML IEC-104 LP client MQTT/ MQTT broker

CORE TLS CIM-XML IEC TCP

MQTT/ - 104

TLS

MQTT/

MQTT/ TLS

TLS Stunnel

LP LP

JSON IEC

LP, CIM-XML, SAP-XML JSON TLS

MQTT/ - MQTT/TLS TLS 104 ffwsrv ffmys ffifdb MQTT/

FF control centre TLS smartsno Kapacitor Telegraf

Web Interface Bid KapacitorAPI Smartsno HTTP broker HTTP LP LP

NMEA, XML, LP LP MQTTmonitor NginX HTTP HTTP

MQTT/TLS

TCP SQL HTML, CSS, JS smartnim Bids interface HTTPS Smartnim

Measurements ... SQL Control TCP NginX

Configurator Bids module SSH

Retime LP module MQTT/

TLS

IEC

MQTT/

XML

TLS

TLS

- 104

This project has received Bids module funding from the European Union’s Horizon 2020 research and innovation (3) IEC-104 programme under grant client agreement n° 691777 Demo site visualisation

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 cyberNOC – Flexibility Aggregation Platform

Peter Nemček, M.Sc.

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 About cyberGRID

• Founded in 2010 in • Focused on development and deployment of flexibility aggregation platforms (DR, VPP & VB) and related consultancy services • Founder of Smart Energy Demand Coalition (now SmartEn) • Member of ESMIG, ETIP SNET, EU Battery Alliance, BRIDGE • Research partners: AIT, TU Graz, TU Wien, RSE, EIMV, etc. • Flexibility innovation partner in several Horizon 2020 projects (Flexiciency, FutureFlow, InteGrid, CrossBow, Magnitude …) • Commercial operations in aFRR and mFRR balancing markets in Austria and Slovenia

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Monetizing Flexibilities

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 cyberNOC dashboard

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 FutureFlow aFRR aggregation platform

• Aggregation of DR&DGs from 4 EU MS • Interfacing with 106 DR&DGs (monitoring and control) • Forecasting (C&I + RES) • Automatic marginal bidding • Interfacing with aFRR market • Automatic real-time controlling of DR&DGs

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Improved forecasting

• C&I forecasting: • Based on weighted historic data • Separate for weekdays, weekends & holidays • RES forecasting (3E): • Numerical Weather Prediction Forecasts (ECMWF, GFS, ICON) • Advanced power models of wind park & solar plant • Improve forecast accuracy • Continuous training against measurements or satellite data • Day-ahead: train & combine with Analog Ensembles or Gradient Boosting • Intraday correction: Train Time-Series Model for each horizon independently RES forecasting (Wind in SLO)

This project has received funding from the European Union’s Horizon 2020 research and innovation C&I Forecasting RES forecasting (Solar in RO) programme under grant agreement n° 691777 Automatic bidding to regional aFRR market

Enabling automatic energy bidding based on the market rules 5 1. Create internal merit order based on the DR & DG in the pool

2. Apply the backup policy of VPP operator 4 2 1

3. Select the bid size (market rule) priceEnergy

4. Minimum bid price is calculated (DR & DG marginal costs) i

5. Bid price based on the revenue optimization strategy by VPP operator DER 6. Submitting bids to local TSO to be forwarded to aFRR market Bid 1 Bid 2 Bid 3 Bid 4 Capacity Bids are generated every hour automatically 3

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Real-time activation control

Processing of received activation message (setpoint) from the connected TSO and de-aggregating received setpoint for controlling individual DR&DG Steps: 1. Receive setpoint from local TSO (real-time) SETPOINT 2. Creating internal real-time merit order list (considering: availability, (realtime) price, … of DR&DGs) DE­AGGREGATE SETPOINT 3. De-aggregate incoming setpoint signal (from TSO) to meet the internal merit order list and distribute individual signals (setpoints) to the LOCAL TSO DR&DG 4. Monitor any deviations of the activated DR&DG and reduce deviations by closed-loop controller 5. Report pool performance data to the TSO for validation purposes

This project has received funding from the European Union’s Horizon 2020 research and innovation Reducing DR/DG set-point Increasing DR/DG set-point programme under grant agreement n° 691777 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Experience and results of integrating active consumers into a virtual power plant

dr. Rok Lacko Head of Energy Services Development at GEN-I, d.o.o. This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 About GEN-I

Energy Trading 4.0 Energy Supply 4.0 Services 4.0

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 About GEN-I

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 About GEN-I

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 GEN-I is an aggregator!

Energy Market

OLD NEW

Big power plant 1 Big power plant 2 Big power plant X Agregator - VPP

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 WP5 Scope & Objectives

WP5 Pilot tests

Task 5.1 RECRUITING C&I CONSUMERS AND DISTRIBUTED GENERATORS

Subtask 5.1.1 Recruitment of C&I consumers, prosumers and distributed generators

Subtask 5.1.2 Installation of the required hardware and information workshops

Task 5.2 PILOT TESTING WITHIN EACH CONTROL ZONE (USE CASES 1 AND 2)

Task 5.3 PILOT TESTING IN A CROSS BORDER SITUATION (USE CASES 3 AND 4)

This project has received Target: „pool of 30 to 45 MW of C&I DR&DG units“ funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Participant acquisition process

Nr. of organisations surveyed recruitment contacts 730 pos. or neg. reply (Q) 600 flexible potential 200 318 MW high potential candidates 33

50 MW

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 FutureFlow – Large scale aFRR pilot

4 TSOs 60+ customers 90+ technical units 50+ MW flexibility Various technologies 100% real-time automated power control FAT 2-10 min

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 FutureFlow DR/DG recruitment action plan Step nr. Activitiy Goal / Task Responsible 2016 2017 2018 2019 1 Preparation of template contract 1) Template contract legal team 2 Analize and prepare list of potential 2) List of prospects in 4 countries (AT, SI, HU, RO) sales team flex providers 3 Prepare "sales" presentation 3) "Sales" presentation (ppt) sales team 4 Send sales presentation to all 4) Present FutureFlow sales team potentials on the list of prospects 5) Alert customer flexibility is new business potential (DR). 5 Schedule face to face meetings 6) Get face to face meeting date or Present flexibility as new business potential sales team 7) Get answers to Short questionnaire 6 Face to face meetings 8) Convince FutureFlow is trustworthy, competent, innovative sales team 9) Convince Flexibility is the future 10) Get answers to Flexibility questionnaire 7 Gathering of fulfilled Flexibility 11) Get missing answers to Flexibility questionnaire if not able at face to face sales team questionnaires meeting 12) Analyze answers - identify potential 8 Invitation to FutureFlow 13) Present contract sales team 14) Agree for Prequalification process and get contact person responsible for technology 15) Signed LoI (not neccessary) 9 Technical analysis of customers 17) Technical analysis tech team ("Prequalification process") 18) Machine selection 19) PQ checklist, PQ report 10 Signature of contract 20) Signed contract sales team 11 Technical meeting with customers 21) Present system architecture and requirements, tech team ("Worshop for technitians") 22) installation action plan

12 Technical integration 23)Feasibility study + tech design tech team 24) Wiring diagrams and techincal documentation 25) Specifications of hardware setup for individual customers 26) Organizing supply of technical equipment 27) Setup and configuration of new DR/DG unit in flexibility aggregation platform 28) Coordination and supervision of electrical wiring and installation 29) Supporting and consulting customers and their subcontractors with software code for "SCADA" upgrades 30) Hardware/software commisioning and signal testing 31) Writing technical reports 32) Organizing and keeping archives of technical documentation 13 Pilot testing workshop 33) Present pilot tests tech team This project has received 34) Agree on dates of testing funding from the European 14 Project results worshop 35) Present interim results sales + tech Union’s Horizon 2020 teams research and innovation 15 Keeping up motivation 36) Avoid drop-out from pilot tests sales + tech + programme under grant 37) Manage on-time payments accounting agreement n° 691777 38) Respect customer specifics Experiments / results

• More than 300 hours testing in 4 countries over 1 year period • Results: • Technical: aFRR is feasible, but not trivial • Economic: VPP is cost efficient and competitive • 1,4 mio€ spent on DR/DGs -> 57.000 €/MW (@24 MW base availability) • TESLA‘s 100 MW costs 660.000 €/MW • New 60 MW gas turbine in TE Brestanica costs 660.000 €/MW

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 Exploitation and plans?

• Raised customer awareness • Extented knowledge, know-how, competence • Upgraded 90+ technical units to aFRR ready • Confidence for aFRR go-live with DR/DGs

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement n° 691777 The Lightness of the Future

Boštjan Korošec, Director of the Energy Management Dpt. in TALUM d.d. Kidričevo This project has received funding from the European Union’s Horizon 2020 research and innovation www.talum.si programme under grant agreement n° 691777 The Lightness of the Future

Basic information for 2018 Year of establishment, production: 1947 ; 1954 Number of employees: 1.500 Ownership: ELES - 86 % Primary aluminum: 80.000 t Recycling: 70.000 t Net sales revenue: 335 mio EUR Power – base load: 120 MW Power – Pot room: 110 MW Energy consumption: 1,1 TWh nd Energy efficiency: 2 on the World This project has received funding from the European Union’s Horizon 2020 research and innovation www.talum.si programme under grant agreement n° 691777 The Lightness of the Future

Aluminium = Primary + Recycled + Remelting

This project has received funding from the European Union’s Horizon 2020 research and innovation www.talum.si programme under grant agreement n° 691777

www.futureflow.eu

Slovenian Power Grid and Innovation

Thank you Uroš Salobir, Director for Strategic Innovation, ELES