HIGHWAY DRAINAGE- CAPITAL SCHEMES TABLE 1

Priority Road Name Location Remarks Est Cost(s) 1+ Network cleansing and inventory survey Borough wide Survery and record details of highway drainage network £ 200,000.00 1 * Altwood Road / Norden Road Maidenhead Investigation Required £ 3,000.00 1 Belmont Road Maidenhead Additional gullies required and regrading of road £ 3,350.00 Stage 2 - Various Fifield Rd Forest Green Rd Oakley Green Rd Fifield 1 Culvert Improvements £ 84,000.00 1+ 95 Furze Platt Road Maidenhead Maidenhead Construct connection to nearest SW Sewer. £ 50,000.00 1 * Halfway Houses Maidenhead Investigation required £ 2,800.00 1 Hamilton Drive Root cutting and possible replacement £ 110,000.00 1 Kings Road Windsor New outfall £ 7,800.00 1 Mill Lane Hurley Drainage Improvements £ 6,200.00 1 * Oriental Rd. jct Upper Village Rd Sunninghill Detailed Investigation required contingency sum £ 5,600.00 1 Regents Walk Sunningdale Investigation complete -works £ 56,000.00 1 * Sheepcote Road Investigation required contingency sum £ 2,800.00 1+ 18 Sylvester Road Maidenhead Maidenhead Construct connection to nearest SW Sewer. £ 50,000.00 1 * Terry's Lane Detailed Investigation required contingency sum £ 2,800.00 1 * The Pines A4 Bath Rd Maidenhead Stage 2 additional drainage required £ 11,200.00 1 Tilstone Close Eton Wick Replace outfall £ 5,600.00 1 * Truss Hill Road Sunninghill Sunninghill Investigation Required £ 3,000.00 1 Wentworth Ave / Wentworth Way North Ascot Additional soakaways required £ 5,600.00 1 Wessex Way Maidenhead Maidenhead Boreholes required £ 5,000.00 1 Windsor Rd A308 Maidenhead Replace outfall £ 11,200.00 Sub Total £ 625,950.00 2 Allenby Rd Maidenhead Positive outfall £ 5,600.00 2 Beech Hill Road Sunningdale Sunningdale relay 100m + of Highway Drain £ 20,000.00 2 * Bottle Lane A4 Detailed Investigation required contingency sum £ 6,200.00 2 * Choke Lane / Spring Lane Detailed Investigation and improvements £ 6,200.00 2 * 57 Cox Green Road Maidenhead Maidenhead Investigation Required £ 2,800.00 2 Eton Wick Rd Eton Wick Drainage Improvements £ 56,000.00 2 Gardner Rd. Opp Queensway Maidenhead Footpath re-alignment and additional cleaning £ 2,800.00 2 Halls Lane Additonal soakaways required £ 19,000.00

2 London Road E.of Chobham Rd Sunningdale 3 additional soakaways required plus ancillary pipework £ 26,000.00 2 * London Road Service Rd Detailed Investigation required contingency sum £ 15,100.00 2 * Parsonage Lane Windsor Detailed Investigation required contingency sum £ 6,200.00

Priority Road Name Location Remarks Est Cost(s)

*Only investigation costs are shown and these will probably result in the need for investment in further works. 55 HIGHWAY DRAINAGE- CAPITAL SCHEMES TABLE 1

2 * Rise Road Sunningdale Detailed Investigation required contingency sum £ 2,800.00 2 Sheephouse Rd Maidenhead Positive outfall £ 5,600.00 2 * Shepherds Close Hurley Detailed Investigation required contingency sum £ 2,800.00 Additional gullies required & connection to viable SW 2 Shoppenhangers Rd.jct Courtlands Maidenhead sewer outfall £ 45,000.00 2 Slough Rd / Pococks Lane Eton Positive drainage outfall required £ 3,350.00 2 * Staines Rd Investigation complete detail solution required £ 110,000.00 2 Station Rd Sunningdale Drainage Improvements £ 6,200.00 2 Stuart Way Windsor Additional soakaway and gulley reconnection £ 5,600.00 2 Summerlease Rd Maidenhead New surface water outfall £ 32,000.00 2 * The Avenue / Welley Rd Wraysbury Detailed Investigation required contingency sum £ 2,800.00 2 * Whitmore Lane Sunningdale Investigation required £ 6,200.00 2 Windmill Place Windsor Additional gullies and regrading £ 26,000.00 2 * Winkfield Rd Ascot Detailed Investigation required contingency sum £ 5,600.00 Sub Total £ 419,850.00 3 A330 Ascot Rd Touchen End Drainage Improvements £ 26,000.00 3 Bath Rd.jct. Courthouse Rd Maidenhead Natural Spring fin drain required £ 5,600.00 3 * Bray Road Bray Bray Investigation Required £ 3,000.00 3 Church Rd Additional soakaway £ 8,400.00 3 Common Lane Eton Wick Repair and replace damaged pipework £ 6,200.00 3 * Kennel Ride North Ascot Detailed Investigation required contingency sum £ 5,600.00 3 * Moors Lane Eton Wick Detailed Investigation required contingency sum £ 5,600.00 3 * Sawyers Crescent Woodlands Park Detailed Investigation required contingency sum £ 5,600.00 3 Soakaway / Borehole reconstruction Borough wide Construct /re bore soakaways £ 29,500.00 3 Woodlands Park Rd Woodlands Park Positive drainage outfall required to culvert £ 114,000.00 Sub Total £ 209,500.00 TOTAL £ 1,255,300.00

*Only investigation costs are shown and these will probably result in the need for investment in further works. 56