Priority Road Name Location Remarks Est Cost(S) 1+ Network Cleansing

Priority Road Name Location Remarks Est Cost(S) 1+ Network Cleansing

HIGHWAY DRAINAGE- CAPITAL SCHEMES TABLE 1 Priority Road Name Location Remarks Est Cost(s) 1+ Network cleansing and inventory survey Borough wide Survery and record details of highway drainage network £ 200,000.00 1 * Altwood Road / Norden Road Maidenhead Maidenhead Investigation Required £ 3,000.00 1 Belmont Road Maidenhead Additional gullies required and regrading of road £ 3,350.00 Stage 2 - Various Fifield Rd Forest Green Rd Oakley Green Rd Fifield 1 Culvert Improvements £ 84,000.00 1+ 95 Furze Platt Road Maidenhead Maidenhead Construct connection to nearest SW Sewer. £ 50,000.00 1 * Halfway Houses Maidenhead Investigation required £ 2,800.00 1 Hamilton Drive Sunningdale Root cutting and possible replacement £ 110,000.00 1 Kings Road Windsor New outfall £ 7,800.00 1 Mill Lane Hurley Drainage Improvements £ 6,200.00 1 * Oriental Rd. jct Upper Village Rd Sunninghill Detailed Investigation required contingency sum £ 5,600.00 1 Regents Walk Sunningdale Investigation complete -works £ 56,000.00 1 * Sheepcote Road Eton Wick Investigation required contingency sum £ 2,800.00 1+ 18 Sylvester Road Maidenhead Maidenhead Construct connection to nearest SW Sewer. £ 50,000.00 1 * Terry's Lane Cookham Detailed Investigation required contingency sum £ 2,800.00 1 * The Pines A4 Bath Rd Maidenhead Stage 2 additional drainage required £ 11,200.00 1 Tilstone Close Eton Wick Replace outfall £ 5,600.00 1 * Truss Hill Road Sunninghill Sunninghill Investigation Required £ 3,000.00 1 Wentworth Ave / Wentworth Way North Ascot Additional soakaways required £ 5,600.00 1 Wessex Way Maidenhead Maidenhead Boreholes required £ 5,000.00 1 Windsor Rd A308 Maidenhead Replace outfall £ 11,200.00 Sub Total £ 625,950.00 2 Allenby Rd Maidenhead Positive outfall £ 5,600.00 2 Beech Hill Road Sunningdale Sunningdale relay 100m + of Highway Drain £ 20,000.00 2 * Bottle Lane A4 Knowl Hill Detailed Investigation required contingency sum £ 6,200.00 2 * Choke Lane / Spring Lane Cookham Dean Detailed Investigation and improvements £ 6,200.00 2 * 57 Cox Green Road Maidenhead Maidenhead Investigation Required £ 2,800.00 2 Eton Wick Rd Eton Wick Drainage Improvements £ 56,000.00 2 Gardner Rd. Opp Queensway Maidenhead Footpath re-alignment and additional cleaning £ 2,800.00 2 Halls Lane Waltham St Lawrence Additonal soakaways required £ 19,000.00 2 London Road E.of Chobham Rd Sunningdale 3 additional soakaways required plus ancillary pipework £ 26,000.00 2 * London Road Service Rd Datchet Detailed Investigation required contingency sum £ 15,100.00 2 * Parsonage Lane Windsor Detailed Investigation required contingency sum £ 6,200.00 Priority Road Name Location Remarks Est Cost(s) *Only investigation costs are shown and these will probably result in the need for investment in further works. 55 HIGHWAY DRAINAGE- CAPITAL SCHEMES TABLE 1 2 * Rise Road Sunningdale Detailed Investigation required contingency sum £ 2,800.00 2 Sheephouse Rd Maidenhead Positive outfall £ 5,600.00 2 * Shepherds Close Hurley Detailed Investigation required contingency sum £ 2,800.00 Additional gullies required & connection to viable SW 2 Shoppenhangers Rd.jct Courtlands Maidenhead sewer outfall £ 45,000.00 2 Slough Rd / Pococks Lane Eton Positive drainage outfall required £ 3,350.00 2 * Staines Rd Wraysbury Investigation complete detail solution required £ 110,000.00 2 Station Rd Sunningdale Drainage Improvements £ 6,200.00 2 Stuart Way Windsor Additional soakaway and gulley reconnection £ 5,600.00 2 Summerlease Rd Maidenhead New surface water outfall £ 32,000.00 2 * The Avenue / Welley Rd Wraysbury Detailed Investigation required contingency sum £ 2,800.00 2 * Whitmore Lane Sunningdale Investigation required £ 6,200.00 2 Windmill Place Windsor Additional gullies and regrading £ 26,000.00 2 * Winkfield Rd Ascot Detailed Investigation required contingency sum £ 5,600.00 Sub Total £ 419,850.00 3 A330 Ascot Rd Touchen End Drainage Improvements £ 26,000.00 3 Bath Rd.jct. Courthouse Rd Maidenhead Natural Spring fin drain required £ 5,600.00 3 * Bray Road Bray Bray Investigation Required £ 3,000.00 3 Church Rd Old Windsor Additional soakaway £ 8,400.00 3 Common Lane Eton Wick Repair and replace damaged pipework £ 6,200.00 3 * Kennel Ride North Ascot Detailed Investigation required contingency sum £ 5,600.00 3 * Moors Lane Eton Wick Detailed Investigation required contingency sum £ 5,600.00 3 * Sawyers Crescent Woodlands Park Detailed Investigation required contingency sum £ 5,600.00 3 Soakaway / Borehole reconstruction Borough wide Construct /re bore soakaways £ 29,500.00 3 Woodlands Park Rd Woodlands Park Positive drainage outfall required to culvert £ 114,000.00 Sub Total £ 209,500.00 TOTAL £ 1,255,300.00 *Only investigation costs are shown and these will probably result in the need for investment in further works. 56.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us