Muk Ning Street) – Tai Kok Tsui (Island Harbourview
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I Project Profile (Report No. 276799/11.01/B) August 2011 Highways Department, HKSAR Government Proposed Road Improvement Works in West Kowloon276799 ReclamationTNI Development BRI 096/03 B P:\Hong Kong\ENL\PROJECTS\276799(BRI) West Kowloon Road Phase I Impr\reports\PP\Project Profile RevA doc 01 December 2009 Schemes H, I, J, Q (Interim Option) and Improvement Works at the Junction of Canton Road/ Ferry Street/ Jordan Road Project Profile August 2011 Highways Department 6/F., Homantin Government Offices, 88 Chung Hau Street, Homantin, Kowloon Mott MacDonald, 20/F, Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2828 5757 F +852 2827 1823 W www.mottmac.com.hk Phase I Project Profile Issue and revision record Revision Date Originator Checker Approver Description A June 2011 Various Eric Ching H. T. Cheng First Issue B August 2011 Various Eric Ching H. T. Cheng Second Issue This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission used for any other purpose. which is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. -
Completed Properties Properties Under Development Investment
Completed properties 1. Ocean View 2. The Cliveden 3. Parc Palais 4. Imperial Villas 5. Westin Centre 6. Central Park 7. Far East Finance Centre 8. Cambridge Plaza 9. Dynasty Heights 10. Island Resort 11. Anglers’ Bay 12. The Royal Oaks 13. St Andrews Place 14. Caldecott Hill 15. Majestic Park 16. Island Harbourview 17. Grand Dynasty View 18. Park Avenue 19. Sky Horizon 20. Horizon Place 21. Lincoln Centre 22. Pan Asia Centre 23. Residence Oasis 79 75 24. The Cairnhill 4 76 25. Oceania Heights 74 Properties under development 26. One SilverSea, Kowloon Inland Lot No. 11158 27. Mount Beacon, New Kowloon Inland Lot No. 6196 28. Tsuen Wan Town Centre Redevelopment Project, Tsuen Wan Town Lot No. 398 29. Yeung Uk Road, Tsuen Wan Town Lot No. 394 30. 53 Conduit Road, The Remaining Portion of Inland Lot No. 2138 and Inland Lot No. 2613 31. Ho Tung Lau (Site A), Shatin Town Lot No. 470 32. 464-474 Castle Peak Road, New Kowloon Inland Lot No. 1175-1177 33. Fuk Wing Street and Fuk Wa Street, New Kowloon Inland Lot No. 6425 34. 305 Castle Peak Road, New Kowloon Inland Lot No. 939 35. Junction of Sheung Yuet Road and Wang Chiu Road, New Kowloon Inland Lot No. 6310 78 36. Kwu Tung, Sheung Shui, Lot No. 2596 in DD92 81 37. Ma Wo, Tai Po, Tai Po Town Lot No. 179 38. KCR Wu Kai Sha Station Development, Shatin Town Lot No. 530 89 39. 256 Hennessy Road, Hong Kong Island Lot No. 2769 90 25 Investment properties 40. -
Property Management Revenue from Property Management for 2003 Increased by 11.0% Over 2002 to HK$94 Million
032 Executive management’s report Property review This caused revenue from investment properties for the year of our properties further and establishing them as a to decline slightly by 1% over 2002 to HK$888 million. benchmark for the industry in Hong Kong. Our staff performed outstandingly during the period of SARS For Two IFC, the quality of the office building and its to ensure shoppers’safety and mitigate the effects of the management enabled MTR to attract tenants despite the outbreak on public confidence. We also supported tenants lingering cautious sentiment resulting from SARS, the war in through aggressive promotion campaigns, including an Iraq and the weak economy. Considerable effort was taken attractive rebate promotion. Within this context, we took full to explain to potential tenants, agents and the business advantage of the relaxation of travel restrictions on tourists community the merits of the building, which is ideally suited from Mainland China through proactive, tailor-made to the sophisticated needs of multi-national corporations. programmes, such as organising shopping tours, designed The decision by Swiss banking giant UBS to lease seven floors to bring high spending Mainland visitors to our shopping represented one of the largest and highest profile relocations centres. These programmes proved successful in boosting of an office tenant in Hong Kong in 2003. UBS joined a growing the business turnover of our tenants. list of leading institutions in the building, including the Hong The Total Quality Service Regime, our pioneering customer Kong Monetary Authority, reinforcing Two IFC’s position as the service enhancement programme, and our computerised building of choice for top-tier corporations. -
Kowloon Area - West Kowloon
REPS Kowloon Area - West Kowloon West Kowloon West Kowloon Lai Chi Kok Tsing Yi Tsing Yi Lai Chi Kok Kai Tak Tai Kok Tsui Tseung Kwan O West Kowloon Olympic City Hung Hom Lohas Park Tsim Sha Tsui West Kowloon Kowloon Station West Kowloon Austin 개요: 1. Kowloon Station 2. Austin 3. Olympic 4. Lai Chi Kok 5. Tsing Yi 2 www. repshk.com Tel: 2997 4866 [email protected] Copyright © REPS HK All rights reserved REPS Kowloon 지역 – West Kowloon 1. Kowloon Station a. The Waterfront Transaction Records Address 가격 Saleable Area Reg. Date B Lower Floor TOWER 6 PHASE 2 (Lease)$41,000 1076s.f. 21/05/2020 B Upper Floor TOWER 3 PHASE 1 (Lease)$31,000 794s.f. 20/05/2020 D Middle Floor TOWER 7 PHASE 2 (Lease)$50,000 1127s.f. 15/05/2020 F Lower Floor TOWER 2 PHASE 1 (Lease)$32,500 794s.f. 15/05/2020 D Middle Floor TOWER 2 PHASE 1 (Lease)$33,000 934s.f. 1/5/2020 E Upper Floor TOWER 1 PHASE 1 (Lease)$35,000 948s.f. 1/5/2020 F Lower Floor TOWER 6 PHASE 2 (Lease)$34,000 943s.f. 8/4/2020 A Upper Floor TOWER 7 PHASE 2 (Lease)$37,000 936s.f. 1/4/2020 준공 년도: 2000 최고 층수: 43/F Unit Plan 크기 가격 범위 세대 수: 1,288 units 방 2, 화장실 2 630 35,000 렌트 가격대: 35k-180k 유닛 크기: 630-2,011 방3, 화장실 1-3 794-1127 38,000-65,000 방4- 5, 화장실 2-3 1,987-2,011 120,000-180,000 b. -
GN 8851 Roads (Works, Use and Compensation) Ordinance
G.N. 8851 Roads (Works, Use and Compensation) Ordinance (Chapter 370) (Notice under section 8(2)) PWP ITEM NO. 7332CL (PART) WEST KOWLOON RECLAMATION—MAIN WORKS (REMAINDER)— FOOTBRIDGE AT JUNCTION OF SHAM MONG ROAD AND HING WAH STREET WEST IN SHAM SHUI PO Notice is hereby given that under powers delegated by the Secretary for Transport and Housing under section 3(3) of the Roads (Works, Use and Compensation) Ordinance (Chapter 370), the Permanent Secretary for Transport and Housing (Transport) proposes to execute the road works within the limit of works area as shown on Plan No. KZ1298 (‘the Plan’) and described in the scheme annexed thereto, which the Plan and scheme have been deposited in the Land Registry. The general nature of the proposed works is as follows:— (i) construction of a covered four-span footbridge with associated lifts, lift towers, covered staircases, covered escalators, footbridge abutments and footbridge columns at the junction of Sham Mong Road and Hing Wah Street West; (ii) permanent closure and conversion of sections of the existing footpaths into lift towers, footbridge abutments, footbridge columns and planters; (iii) permanent closure and conversion of the existing pedestrian crossings into footpaths, planters and central medians/traffic islands; (iv) demolition and conversion of a section of the existing planter into footpath; (v) temporary demolition and reconstruction of sections of the existing planters; (vi) temporary closure and reconstruction of sections of the existing footpaths and central medians/traffic islands; (vii) temporary closure of sections of the existing carriageways, footpaths, central medians/ traffic islands and pedestrian crossings within the limit of works area; and (viii) ancillary works including drainage, water and landscaping works. -