POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] 9001-2008 vkbZ ,l vks : Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, ISO: 9001-2008 Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/110 Jabalpur, dated:13.04.2017

To

As per distribution list

th Sub: Minutes of 56 meeting of Operation and Coordination Committee of MP.

th The Minutes of 56 meeting of the Operation and Coordination Committee of MP was held on 8th March 2017 at Hotel Kalchuri, South Civil Line, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur Distribution List

1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected].

6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761- 2660908 Email – [email protected]

8. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761- 2664749, Email- [email protected], Email- [email protected] 9. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 10. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 11. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 12. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 13. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 14. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 15. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 16. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 17. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755- 2423046, [email protected]

18. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]

19. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

20. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

21. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected]

22. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

23. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] 24. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] 25. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :- [email protected]

26. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] TH MINUTES OF 56 MEETING OF OPERATION & COORDINATION COMMITTEE OF MP th HELD AT HOTEL KALCHURI, SOUTH CIVIL LINE, JABALPUR AT 11:00 A.M. ON 08 MARCH 2017.

The 56th meeting of Operation & Coordination Committee of MP was held on 08th March 2017 at 11:00 AM at hotel Kalchuri, Jabalpur under the Chairmanship of Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC. The list of participants is enclosed at Annexure -1.0.

Shri Vijay Kumar Tripathi Dy. Manager on behalf of NHDC, the host of 56th OCCM welcomed S/Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC, K.K.Parbhakar Member Secretary OCC & Addl. C.E.(SLDC), S. Sanyal GM, NHDC and S Pagare, C.E, OSP with bouquet of flowers followed by opening ceremony of 56th OCCM of M.P by lighting of lamp (Deep Prajavalan). He also welcomed all the guests and participants. Further, he requested Shri S. Sanyal GM, NHDC, Bhopal to address the gathering.

Shri S.Sanyal welcomed Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC, Shri K.K.Parbhakar Member Secretary, OCC and all the guest & participants on behalf of the NHDC. Thereafter he apprised the participants about achievements of NHDC. He also informed the committee that in 2014- 2015 CAG performed the audit of all hydel power stations and NHDC was considered as one of the best maintained Hydel Power station (PSU). He further stated that NHDC figures one of the best public sector having less than 1% outage in last five years. Moreover, it is also playing vital role in generating clean energy and serving the nation. Further he thanked Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC for giving an opportunity to NHDC for hosting the 56th OCCM of M.P. Thereafter Shri Vijay Kumar Tripathi Dy. Manager, NHDC requested Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC to address the gathering and to take up the proceedings of meeting.

Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC welcomed all the participants present for attending the 56th OCCM of M.P. He stated that first OCCM of M.P was held in the year 2009 and this forum has resolved all matters/disputes amicably related with grid operation and other related matters. He further informed that there are 9 HPS in MP and Black Start Mock Drills have been conducted at 7 HPS successfully. M.P is the first state which has conducted highest no. of Mock Drills in (i.e., 19 Numbers at various HPS of MP). Black Start Mock Drill of Manikheda and Rajghat Hydel Power Stations is proposed to be conducted in Rainy Season. The operational staff of Gandhisagar, Bargi, Pench and ISP have got expertize in conducting Black Start Mock Drill. In future, Black Start Mock Drill of these Hydel Power Stations shall be conducted by the Power House staff and SLDC will not depute any engineer to these Power Stations for this purpose.

Chairman OCC stated that Percentage of time frequency remained within the permissible range of 49.9 -50.5Hz was 69.58% for the month of Dec 2016 and 70.46% for the month of Jan 2017. The average frequency for the month of Dec 2016 & Jan 2017 was 49.99 Hz. and 50.00 Hz respectively. The percentage of time frequency above 50.05 Hz. for the month of Jan 2016 is slightly larger 23.35 % in comparison to 19.38 % in the month of December 2016. The percentage of time frequency below 49.9 Hz was 6.19% for the month of Dec 2016 and was quite higher 11.04 % for the month of Jan 2017. Chairman OCC also stated that high frequency period increased and recorded above 19 % in the month of Dec 2016 – Jan 2017. The percentage of time Frequency above 50.05 Hz has increased considerably/unevenly due to the increased injection by wind generators, which is unpredictable.

Thereafter Chairman OCC requested Member Secretary, OOC to take up the agenda points.

Minutes of 56th OCCM of MP 1 ITEM NO. 1 : CONFIRMATION OF MINUTES : Member Secretary OCC informed the committee that the Minutes of 55th meeting of Operation & Coordination Committee of MP held on 22nd December, 2016 at Hotel Vijan Mahal, Tilhari, Mandla Road, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/3871 dated 27.01.2017. No comments have been received to SLDC, committee confirms the minutes.

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS Dec 2016 TO JAN 2017.

2.1 Frequency Particulars: Member Secretary OCC informed the committee that during January 2017 the system frequency was below 49.9 Hz for 6.19% of time against 11.04% of time during Dec 2016. The system frequency was above 50.05 Hz for 23.35% of time during Jan 2017 against 19.38% of time during Dec 2016. The system frequency was within the IEGC range of 49.9-50.05 Hz for 70.46% of the time during Jan 2017 against 69.58% of time during Dec 2016. The average monthly frequency was 49.99 Hz during month of Dec 2016 and 50.00 Hz during month of Jan 2017. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of Dec 2016 and Jan 2017 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average Minimum Maximum Instantaneous Instantaneous frequency integrated integrated Minimum Maximum frequency over frequency over Frequency Frequency an hour an hour Dec 2016 49.99 Hz 49.82 Hz 50.11 Hz 49.67 Hz 50.31 Hz Jan 2017 50.00 Hz 49.88 Hz 50.21 Hz 49.71 Hz 50.33 Hz

2.2 Operational Matters

2.2.1 Operational Discipline : Member Secretary OCC informed the committee that the system operated in terms of frequency profile for the months Dec 2016 and Jan 2017 is as given below for discussion by the committee : 2.2.2 % of time frequency No. of times % of time % of time within the Average frequency Month Frequency Frequency permissible monthly dipped Below 49.9 above 50. 05 range of frequency below 49.2 Hz Hz 49.9-50.05 Hz Hz Dec 2016 11.04 % 19.38 % 69.58 % 49.99 Hz 0 Jan 2017 6.19 % 23.35 % 70.46 % 50.00 Hz 0

2.3.1 Voltage Profile: Member Secretary OCC informed the committee that during the months Dec 2016 and Jan 2017, the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid-

Minutes of 56th OCCM of MP 2 Dec 2016 Jan 2017 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed Observed Observed Observed Sr 400 KV Volt Voltag No Substation Voltage ag Voltage Date e Date Date Date KV e KV KV KV 1 Indore 423 16.12.16 393 09.12.16 424 19.01.17 394 13.01.17 2 Itarsi 418 14.12.16 389 08.12.16 420 19.01.17 389 09.01.17 3 Bina 419 13.12.16 395 08.12.16 420 19.01.17 393 09.01.17 4 Gwalior 418 25.12.16 389 17.12.16 420 30.01.17 387 09.01.17 5 Nagda 425 25.12.16 397 24.12.16 427 13.01.17 398 16.01.17 6 Satpura 426 29.12.16 404 08.12.16 427 26.01.17 403 16.01.17 7 Birsinghpur 427 27.12.16 408 30.12.16 430 07.01.17 407 09.01.17 8 ISP 428 16.12.16 404 09.12.16 429 19.01.17 407 16.01.17

2.3.2 Status of Capacitor Banks in sub-transmission system: Member Secretary OCC informed the committee that the updated information of the status of capacitor banks in sub-transmission system as on 31st Jan 2017 as submitted by DISCOMs is detailed below:

Capacitor bank Capacitor Capacitor Req Requirem Capacitor Balance installed in Banks bank installed Uirem ent against banks capacitor good condition healthy but but defective & ent of non- already banks to be (No) not in service are repairable Repair repairable covered covered in due to control (No) Again capacitor under ADB Other

DISCOM bank ckt problem St s T-V schemes

(N o) Each Unit

120 120 600 1200 1500 600 0 1500 600 1200 1500 No of 600 0 600 1200 600 1500 KV KVA KVA KVA KVA KVA A KVA KVA KVA 100 KVA KVA KVA KVA KVA KVA R R R R R R R R R KVAR R R R R R R Units Require d EZ 404 145 32 27 10 0 18 4 0 29 - - - - - 77

CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0

WZ 630 542 535 19 15 04 17 20 85 228 2 10 - - - 62

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: Member Secretary OCC informed the committee that the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.01.2017 as submitted by MPPTCL is given below:-

Minutes of 56th OCCM of MP 3 Capacitor Total capacity as Voltage Capacitor bank Capacity banks on 31.01.2017 Capacitor Bank already Installed but Class installed as on Added after covered defective 30.11.16 under (MVAR) Last OCC ADB T-V & are not repairable Meeting (No & MVAR) (MVAR) 220 KV 100.00 MVAR 0.00 100.00 MVAR All in Service 132 KV 1205.00 MVAR 33.00 1238.00 MVAR 33 KV 4456.50 MVAR 24.00 4480.50 MVAR Total 5761.50 MVAR 57.00 5818.50 MVAR

2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: Member Secretary OCC informed the committee that the various ongoing Transmission Schemes completed during the current financial year 2016-2017 (up to Jan. 2017) and plan for completion of various ongoing Transmission Schemes for the Year 2016-2017 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii).

2.3.5 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Member Secretary OCC informed the committee that Frequency did not touch 49.20 Hz during Dec 2016 and Jan 2017. There was no df/dt operation during the same period. (ii) Defective u/f, df/dt relays: Member Secretary OCC informed the committee that MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation.

2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders :

(i) Member Secretary OCC informed the committee that details of DISCOM wise Power supply given to various domestic categories during the period Dec 2016 and Jan 2017 is enclosed at Annexure 2.4(i).

(iii) Group Allocation to Newly Commissioned existing EHV substations:- Member Secretary OCC informed the committee that the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur 15 02 EAST Sagar 00

03 Rewa 11 04 Total 26 05 Indore 16

Minutes of 56th OCCM of MP 4 06 WEST Ujjain 06 07 Total 22 08 Bhopal 07 09 CENTRAL Gwalior 07 10 Total 14 TOTAL Grand Total 62

Representative from East Discom informed the committee that group have been allocated for all 26 No. feeders.

Representative from West Discom informed the committee that only one no. feeder’s group allocation has been done and correspondence for the remaining 21 no. feeders with field nodal offices is being done. Chairman OCC advised the representative of West Discom for completion of group allocation to the remaining 21 no. of feeders at the earliest.

Representative from Central Discom informed the committee that Groups have been allocated to 2 No. feeders in Bhopal Region and matter has been taken up with concerned authorities of Discom for group allocation to remaining 12 no. of feeders.

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme : Member Secretary OCC informed the committee that the annual maintenance /outages of thermal generating units of MPPGCL during March .2017 to April 17 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

3.2 Proposed shutdown programme of Transmission lines / Transformers: Member Secretary OCC informed the committee that the proposed shutdown of transmission elements for the period 01.03.2017 to 30.04.2017 submitted by MPPTCL is enclosed as Annexure-3.2.

3.3 Long Outages of transmission elements and protections : Member Secretary OCC informed the committee that the status submitted by MPPGCL /MPPTCL are given below:-

S. No Line / Transformer etc. Outage Reason Response from Utility under long Outage date 1. 220 KV Bus bar protection 07.09.20 Due to mal-operation The 220 KV Bus Bar Protection scheme at SGTPS 16 220 KV Bus Bar Scheme of M/s GE India, Birsinghpur Protection kept out. Bangalore has been put into service on 09.02.2017 as intimated by MPPGCL along with LBB. Chairman OCC stated that consent/permission of SLDC should be obtained before putting out protection. 2. Main Breaker of 400 KV 23.07.15 Y-phase CT burst/ 400 KV Rajgarh II is charged Nagda-Rajgarh-II. BKR Problem from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor

Minutes of 56th OCCM of MP 5 on ISP Bay 400 KV Rajgarh-I is shifted in diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda- Rajgarh–II circuit. Representative from MPPTCL informed the committee that the panel has been received and the main breaker will be taken in service by end of March 2017. 3. 315 MVA, 400/220 kV 15.10.15 Differential The transformer bank is out of ICT-I at 400 kV S/s Bina Due to Buchholtz circuit from 02.08.2015. 2 No. relay alarm. 105 MVA Units of these banks have failed. The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer has been shifted from Bina to M/s BHEL works for repairs. MPPTCL representative informed the committee that the testing and inspection of X’mer at M/s BHEL has been completed and DI has been issued. He also informed the committee that the commissioning of X’mer is expected by April 2017. 4. 315 MVA, 400/220 KV 05.01.2016 The ICT has been removed for ICT at 400 KV S/s, installation at Bina 400 KV S/s Julwaniya. and commissioned there at 16:49 Hrs. on dtd. 05.01.2016. New Transformer of 315 MVA, 400/220 KV EMCO make has been commissioned on dated 14.02.2017 as intimated by MPPTCL. 5. 315 MVA, 400/220 KV 03.11.2015 X’mer commissioned It has come to notice that the X’mer II (TELK make) through bus coupler transformer-II has been connected Main Breaker at 400 KV breaker since through bus coupler breaker both S/s commissioning. side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 54th OCCM MPPTCL informed the committee work of 220 KV Ckt breaker has been completed and 400 KV Ckt. Bkr. work is under progress. MPPTCL informed the committee that the work will be completed by end of April 2017. 6. 12.5 MVA, 132/66/33 KV 19.05.2016 Transformer failed on The load is manageable through X’mer CGL make Sr. No. 19.05.2016 as (1x20 + 1x40) MVA X’mers in 23615 at 132 KV S/s intimated by T&C, running condition at S/s Pichhore. Pichhore MPPTCL. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd 53rd 54th & 55th OCCM, Chairman OCC requested MPPTCL, P&D to submit the letter for removal of transformer from

Minutes of 56th OCCM of MP 6 Asset. Chairman OCC stated that T&C and P&D will perform load grow / load assessment study prior to decommissioning and intimate to SLDC. 7. 12.5MVA, BBL Make (Sr. Not intimated X’mer failed It has been proposed to withdraw No.-1428/3) at 132 KV S/s the X’mer from system as intimated Chapda. by MPPTCL. Representative from T&C informed the committee that correspondence is being done with P&D, MPPTCL for load grow study and decommissioning of the transformer. 8. 40 MVA, ECE Make X’mer 14.06.2016 Tripped in differential X’mer is under investigation and (Sr. N0.-86020) at 132 KV indication. testing. Internal Inspection of X’mer S/s Shajapur. shall be done as soon as monsoon permits. Another 40 MVA BBL make Transformer has been commissioned on dated 22.12.2016 as intimated by MPPTCL. 9. 50 MVAR Line Reactor of Not intimated. Tan-∂ of the bushing 50 MVAR line reactor put into 400 KV Katni – Damoh was not correct. service at 08:38 Hrs. on 01.02.2017 Ckt at 400 KV S/s Damoh as intimated by MPPTCL. (PGCIL). 10. 160 MVA, 220/132 KV 30.09.2016 Not intimated Representative from MPPTCL BHEL X’mer at 220 KV S/s informed the committee that X’mer Jabalpur has to be sent to M/s BHEL for detailed inspection. 11. 63MVAR 400KV Bus 06.09.2016 Not intimated The Bus-reactor is ready. However reactor-II at STPS, Sarni its 400 KV SF6 gas Circuit Breaker has got irregularities in closing & tripping timings. Further, tender for servicing with replacement of required spares, testing & commissioning work of its GCB, has been opened and under process, as intimated by MPPGCL. Representative from MPPGCL informed the committee that the reactor will be taken in service by June 2017. 12. 160 MVA, 220/132 KV 21.11.2016 Tripped on Buchholtz After replacement of broken OLTC NGEF X-mer Sr.No. and PRV indications. drive rod, 160 MVA NGEF X-mer 6800000075 at 220 KV S/s charged on dtd. 03.02.2017, as Neemuch intimated by MPPTCL.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF DEC 2016 AND JAN 2017:

Member Secretary OCC informed the committee that the details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Hourly Average of Availability and Demand. Annex. 4.3 Hourly average schedule Vs Drawal of DISCOMs. Annex. 4.4

Minutes of 56th OCCM of MP 7 ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING DEC 2016 AND JAN 2017 : Member Secretary OCC informed the committee that there was no major grid disturbance in MP during Dec 2016 and Jan 2017. Moreover, the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.0.

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- Member Secretary OCC informed the committee that the present status regarding schedule and commissioning of reactors / transmission elements is as below:- S.No. 400 KV S/s Size Implementing Expected Date of Commissioning MVAR Agency as intimated in last OCC 1. Bus Reactor : 125 MVAR NHDC Representative from NHDC informed ISP the committee that delivery of all equipment is expected by June 2017. Thereafter erection & commissioning work will be carried out. It is expected that the reactor will be in service by July 2017 as informed by NHDC. 2. Line reactor at 50 MVAR MPPTCL 50 MVAR Line Reactor has been Nagda-ISP charged on 31.03.2017. line at Nagda end 3. Line Reactor 50 MVAR MPPGCL Representative from MPPGCL on 400 kV Satpura–ISP informed the committee that line at STPS procurement of line reactor is under tendering stage and expected to be commissioned by Oct-2017. 4. Bus Reactor at 125 MPPGCL SSTPS Work will be carried out under PSDF as MVAR intimated by MPPGCL. Representative from MPPGCL informed the committee that purchase tender will be opened on 31.03.2017 and the commissioning of reactor is expected by Oct-2017.

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- Member Secretary OCC informed the committee that as per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha.

As desired by MPPTCL, SLDC has already forwarded list of 27 Nos EHV substations on 04.01.2017 where synchronization trolleys are to be installed on priority. This list enclosed all the 400 KV substations and 220 KV /132 KV substations which falls on the routes of black start. The status of installation and commissioning of synchronization trolleys at the 27 EHV substations has not been intimated by the MPPTCL till this date.

Minutes of 56th OCCM of MP 8 Representative from MPPTCL informed the committee that for installation of synchronization trolley at 132 KV sub-stations which falls on black start path requires installation of line CVT. Further he also informed the committee that the inspection has been offered for synchronization trolley.

Chairman OCC requested MPPTCL to install line CVT on the lines/substations which falls on black start path at the earliest. Further he also stated that the line CVT on 132 KV Pench-Seoni, 132 KV Seoni – Lakhnadon Ckt, 132 KV Bargi – Lakhnadon Ckt and 132 KV Bargi – Jabalpur Ckt – I&II shall be installed on priority basis so that synchronization facility is made available at Seoni, Lakhnadon or Jabalpur S/s for conducting Black Start Mock Drill.

6.3 Ten Daily Reservoir operation table of MPPGCL HPS:- Member Secretary OCC informed the committee that in the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for operation of their hydro generators. In last 54th & 55th OCCM, request has been made to MPPGCL for furnishing the same to SLDC within a week, but it has not yet been provided by MPPGCL.

It is requested that MPPGCL in coordination with NVDA and WRD to, prepare the ten daily reservoir operation table of all their hydel power stations and submit to SLDC at the earliest for optimum utilisation of available water in the reservoirs during the summer season.

Member Secretary informed the Committee that Ten daily Reservoir Operation Table of Tons and Bargi have been provided by MPPGCL. He also requested the representative of MPPGCL to submit the Ten Daily Reservoir Operation Table of remaining HPSs at the earliest.

6.4 Operation of LBB and Bus Bar Protection and delay in restoration at ISP:- Member Secretary OCC informed the committee that at 11.18 Hrs on 20.02.2017, while stopping machine no. 7 of ISP, Local Breaker Backup protection operated of Unit No. 7 resulting in operation of 400 KV Main Bus-II Bus Bar protection. 400 KV ISP-Indore-II and 400 KV STPS-ISP lines, which were on Main Bus-II also tripped. The restoration of 400 KV ISP-Indore-II and 400 KV STPS-ISP lines was done at 12.35 hrs and 12.25 hrs respectively. ISP did not intimate the reason for delay in charging of these important 400 KV lines.

It is indicate that 400 KV ISP-Indore-II and 400 KV STPS-ISP lines form important corridor for transfer of power from Central to West MP and outage of this critical corridor for such a long period without any justified reason is not desirable for safe, secure and reliable operation of the State Grid. The ISP is requested to avoid unwarranted delay in charging transmission elements in future.

NHDC representative from informed the committee that the above tripping occurred as the breaker of Unit #7 was stuck. He also confirmed the committee that in future the instance of delayed reporting will be taken care of.

6.5 Non-compliance of SLDC instructions by Gandhisagar HPS – Member Secretary OCC informed the committee that on 09.02.2017, Wind Power generation in MP was suddenly increased to 1000 MW from 140 MW during the evening peak hours. SLDC had to accommodate such a huge additional power in the system by maintaining the grid parameter within operational limits. As

Minutes of 56th OCCM of MP 9 emergency measures hydro generation is to be curtailed immediately which is the only possible solution for keeping the grid security intact till the effect of backing down / surrender of power in thermal generating stations is obtained.

Gandhisagar Hydel Power Station was instructed to stop three machines for which code were issued at 20:25 Hrs through GCC. The shift officials of Gandhisagar HPS were reluctant to stop the machines even during emergency conditions despite SLDC request to act immediately. After repeated persuasion machines were not stopped by Operation staff Gandhisagar. Finally the matter was brought in the notice of CE (O&M:Hydel) and after his intervention, the machines were stopped at 21:01 Hrs, 21:05 Hrs & 21:10 Hrs.

This act of the shift officials of Gandhisagar is violation of Clause 3.83 of MPEGC, Clause 5.1 (d) of IEGC and Sec. 29 of EA-2003 i.e. non-compliance of SLDC instructions. It is requested that the shift officials of Hydel Power Stations may be instructed to follow the instructions of SLDC promptly in future.

Member Secretary OCC requested MPPGCL to issue instructions to Gandhisagar officials to comply with SLDC instruction for safe & secure grid operation. .

6.6 Scheduling of DVC and Inter-state IPP Power :- Member Secretary OCC informed the committee that scheduling of DVC and Interstate IPP is being done by the WRLDC. Under day ahead scheduling these entities furnished entitlement of MP to SLDC and these entitlements are forwarded to MPPMCL Control Room for preparing requisitions. The requisition received from MPPMCL again forwarded to DVC / IPPs for obtaining their consent to the power requisitioned by the MPPMCL. On receiving the correspondence from DVC / IPPs the same is again forwarded to MPPMCL. Finally, MPPMCL again gives comments (agreed/ Not Agreed) on the revised quantum of power in 15 minutes time block agreed by the generator. Now SLDC punched the final requisition submitted by MPPMCL in WRLDC web based Scheduling Portal and forwarded to the concern. Similar procedure is also being adopted during the real time scheduling.

This procedure of scheduling is not mandated in IEGC / MPEGC / BSC 2015 and also consumes the valuable time of system operators of SLDC which is otherwise required for smooth system operation. Also during real time scheduling such procedural delay is causing on scheduling of power from designated time block.

MPPMCL in future submit requisition to SLDC only after obtaining the consent of DVC / Interstate IPPs and SLDC shall not make communication with these entities for obtaining consent on the requisition furnished by the MPPMCL and the same requisition shall be treated as final and punched on the web based scheduling portal of WRLDC.

Representative of MPPMCL has agreed to the proposed procedure of SLDC for scheduling of DVC, Jaypee Nigrie and Jhabua Thermal Power Stations.

Chairman OCC requested MPPMCL to obtain the consent of IPPs for revision in requisition before furnishing their revised requisition to SLDC. It would ensure revision of schedule from the

Minutes of 56th OCCM of MP 10 designated time block. Further, he also stated that if any commercial dispute/matter arises regarding scheduling of DVC the sole responsibility will lie on MPPMCL.

6.7 Questionnaire on Hydro Generating Stations :- Member Secretary OCC informed the committee that as per decision taken in 18th meeting of Forum of Load Despatcher (FOLD) held on 21st November 2016, working Group on Hydro for studying the various aspects of hydro Stations may be formed. NLDC has furnished a a questionnaire on Hydro generating stations which is to be filled and submitted in respect of each hydro generating station to NLDC, New Delhi within a week time on following email Id,

SLDC vide letter no. 07-05/RPC-28A/4187 dtd 21.02.2017 (alongwith Questionnaire enclosed as Annexure-6.7), requested MPPGCL, ISP, OSP and NHDC to submit the reply directly to NLDC under intimation to this office and WRLDC

Representative from MPPGCL and ISP/OSP/NHDC informed the committee that the desired information will be provided soon.

6.8 : MONITORING OF SCHEMES FUNDED FROM PSDF :- Chairman OCC informed the committee that it was decided in the 6th meeting of NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with the utilities to expedite the completion of schemes by giving due priority. The implementation of most of the schemes is based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP are enclosed at Annexure- 6.8A. The status of implementation of above schemes (physical as well as financial progress) may please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities were advised to furnish the information in the format enclosed at Annexure – 6.8B by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC .

The matter was discussed in the meeting and Chairman requested MPPGCL & MPPTCL for informing timely as per mentioned above to all the concerned authority under intimation to SLDC.

6.9 MAPPING OF FEEDERS WIRED UNDER AUFLS TO SLDC SCADA :- . Chairman OCC informed the committee that in the 4th, 5th & 6th NPC meetings, mapping of the Feeders / Lines covered under AUFLS on SCADA systems of SLDC's/RLDC's was discussed. NPC have desired that monitoring of the feeders / loads under the AUFLS shall be done at SLDC's / RLDC's, so as to ascertain that the desired results are ensured during the events, frequency falling below the AUFLS frequency settings. In the 6th NPC meeting it was therefore desired that all the loads/feeders wired under the AUFLS is monitored in Western Region also and the progress be submitted to NPC. A list of feeders/loads implemented under AUFLS in WR was compiled at WRPC in 2014 and same is uploaded in website of WRPC under news section and PCM Minutes section. MPPTCL is requested to initiate the process of mapping these feeders in the SCADA System so that same shall be made available to WRLDC. MPPTCL is requested to update the list of feeders under AUFLS and intimate the feeders which have

Minutes of 56th OCCM of MP 11 already been mapped in their SCADA System and are monitored on line by them. Also constraints, if any, faced in mapping AUFLS feeders in their SCADA System may be intimated. \

Chairman OCC requested MPPTCL to send above desired information to SLDC at the earliest. 6.10 REPORTING OF FLASH REPORT, DR and EL FOR 400KV, Interstate Transmission Elements & Detailed Tripping Report:- Chairman OCC informed the committee that as per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code) Regulations 2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment) Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details including DR & SEL output to RLDC with in 24 hrs of the event for analysis and identify the real time measures required in future to ensure secured grid operation. The flash report is also required to be furnished to SLDC within an hour of tripping. It is observed that FLASH REPORT, DR & EL of station is not made available during tripping of transmission grid element by the State Grid Entities and the flash report is also sent after repeated pursuation.

All intra-state entities are requested to submit the FIR, DR & EL of station during tripping of transmission grid elements.

Chairman OCC requested all the concerned entities to instruct the field staff to comply with the above regulations for safe & secure grid operation and provide details/reports within stipulated time.

6.11 Status of ADMS system :- Chairman OCC informed the committee that the ADMS system did not operate during over-drawal by MP on 06th and 7th February during morning hours. In this reference it is to bring to notice that vide various correspondence, SLDC had given its clearance for activation of ADMS on completion of some formalities like modification of ADMs logic, completion of ADMS Reports, round the clock monitoring of control centers from where ADMS is operating, Proper configuration of groups and feeders information as provided by DISCOMs and arrangement for modification of group/feeder information in case of change, Availability of infrastructure at DCC for monitoring of ADMS activities, Familiarization of DCC /SLDC control room officers for using ADMS system information..

It appears that the activation of ADMS is still pending. The present status of ADMS /time schedule for putting system in operation may please be informed.

Representative of MPPTCL informed the committee that testing of ADMS has already been completed in the presence of SLDC officers and requested SLDC to give approval for implementation of ADMS.

Thereafter Chairman OCC stated that the testing of ADMS system shall again be done in presence of SLDC officers so that the issues which remained unresolved (i.e., breaker did not operated due to GPS link failure and breaker spring charging problem at site) during the previous testing may be resolved and some logics were still to be tested.

Minutes of 56th OCCM of MP 12 6.12 Extension of RGMO/FGMO signal to SLDC/WRLDC:- Chairman OCC informed the committee that as per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017 and letter No. SE/LD:E&T/693 dated 23-01-2017 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. However, no feedback in the matter is received, so far.

The matter was discussed in length and the Chairman OCC advised OSP to obtain exemption from implementation of RGMO/FGMO from the Commission as the machines are operation below MDDL. Further he stated that remaining all the generators shall take necessary action at the earliest so that the integration of telemetry of RGMO/FGMO in RTU installed at power station can be done and the same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system by April 2017.

6.13 Availing of outage of Interstate and 400 KV transmission elements: Member Secretary OCC informed the committee that the standard procedure for availing outages on interstate and 400 KV transmission elements has been devised by WRPC and WRLDC in line with guidelines of CEA and NLDC. This process is approved in OCC meeting of WRPC. This procedure has already been communicated to state grid entities for strict compliance by the SLDC. Matter was discussed in various meetings of MP also.

As per standard procedure of WRPC, all the proposed outages of interstate and 400 KV transmission elements of next month should be got approved in the OCC meeting of WRPC in the current month. All the constituents of WR shall inform to the WRLDC for readiness for availing outage of transmission elements on D-3 basis i.e. three days before the date of approved outage.

During 491st OCC meeting it was decided that non-OCC outages should be discouraged. Only under exceptional cases, the request for transmission outage after issue of OCC minutes must be posted through email for concurrence of the WRPC members (OCC group Email) at least three days in advance (D-3). WRPC members may respond back in email within three hours. After three hours the proposal shall deemed to have been concurred by WRPC for further processing by WRLDC. A detailed procedure for approval of transmission lines /elements outage planning procedure in Western Region is attached at Annexure 6.13.

The above procedure will be implemented w.e.f. 01st March, 2017.

It has been noticed that the standard procedure for availing outages on interstate and 400 KV transmission elements is not followed by the MPPTCL. WRLDC repeatedly instructed MP SLDC to adhere to the approved procedure of outages and stop requesting for routine nature outages in real time of operation.

It is requested that the standard procedure finalized in OCC meetings of MP and WRPC must be followed strictly for availing outages on interstate and 400 KV transmission elements, in future and SLDC shall not forward any outage message to WRLDC during the real time of operation except of emergency nature.

Chairman OCC requested all the Stage Grid entities to apply for the shut downs as per guidelines stipulated in the procedure enclosed as Annexure 6.13. All the planned outages of 400 KV

Minutes of 56th OCCM of MP 13 lines and Interstate lines should be got approved in OCCM of WR. WRLDC shall not allow any planned outage if it is not approved by OCCM of WR. Only emergency nature shut down will be accepted in real time. The planned outage of the State Grid shall also be submitted to SLDC well in advance so that system reliability could be ensured by the SLDC. He also requested all the concerned entities for wide circulation of procedures among field staff to comply with.

6.14 Integration of New Transmission Elements into the Grid:- Member Secretary OCC informed the committee that the transmission system in Madhya Pradesh is growing at a rapid pace. The process of integration/charging of new transmission elements belonging to each entity requires compliance of certain regulatory requirements and sharing of information/submission of documents to SLDC/RLDC. Therefore mandatory documents and not limited to, to be submitted to SLDC/RLDC prior to issue of charging code for new transmission element are as follows:-

1. Copy of approval by Electrical Inspector.

2. Intimation by Transmission Licensee Regarding anticipated charging of new elements (Annexure 6.14-A)

3. List Of Elements to be charged and Element Rating details. (Annexure- 6.14-B).

4. Undertaking by Transmission Licensee in respect of Telemetry and communication (Annexure- 6.14-C).

All the intra-state entities are requested to provide the above data in prescribed formats (enclosed) to SLDC/RLDC prior to charging of new transmission elements.

The matter has already been discussed and brought to the notice of all entities during 54th & 55th OCCM. However, the desired information is still not being furnished for all the new transmission elements. All the intra-state entities are again requested to furnish the required information for integration of all new transmission elements into the grid, to SLDC/RLDC prior to their charging.

SLDC representative informed the committee about the matter for timely compliance of regulatory requirement.

6.15 Certification of Declared Capacity of Hydro Generators by SLDC :- Member Secretary OCC informed the committee that CERC vide order dtd 20.12.2016 in petition No. 40/MP/2016 filed by NHDC, has issued following directions :-

Quote “Regulation 31 (3) of 2014 Tariff Regulations requires that the declared capacity for any day of the month should correspond to the capacity which a generating station can deliver for at least three hours as certified by the nodal load despatch centre after the day is over. Since the petitioner has declared the capacity based on machine and water availability, MPSLDC cannot restrict the PAFM on the ground that machines were not operated as per the directions of the local authorities. The calculation of PAFM by RLDC/SLDC has to be based on capacity declared by the generator considering machine and water availability finalized by SSRRC. Accordingly, the PAFM of ISPS for the period from 14.2.2015 to 17.2.2015 and for all the instances till date shall be recalculated by MPSLDC based on capacity declared by the generator in place of restrictions imposed by local authorities.”

MPSLDC is further directed to revise the SEA(s) of ISPS and OPS in the light of the above direction Unquote

Minutes of 56th OCCM of MP 14

Accordingly, NHDC has submitted the revised PAFM for the year 2014-15 to 2016-17 and MPPGCL has submitted the revised PAFM wef 2009-10 to 2016-17 for certification by SLDC. The verification of PAFM submitted by NHDC and MPPGCL is under progress and shall be completed by the end of March 2017.

The matter was discussed in the meeting.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

Black Start mock drill of Hydel stations of MPPGCL :- Member Secretary OCC informed the committee that the last black start mock drill of Gandhisagar Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP), Tons HPS and Birsinghpur HPS were successfully completed during the year 16-17. As per IEGC Black Start Mock Drill shall be conducted in every 6 months duration.

MPPGCL and NHDC are requested to submit the plan for carrying out black start mock drill of Gandhisagar Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP), Tons HPS and Birsinghpur HPS for the year 2017-18. Suitable dates may be communicated to SLDC well in advance for making necessary arrangements.

Chairman OCC stated that 19 No. of Mock Drills has been conducted in MP at various HPS. The Mock Drill at Rajghat & Madhikheda shall be conducted by June 2017. MPPGCL agreed for conducting Black Start at Madhikheda in the month of April 2017.

Representatives of MPPGCL and NHDC requested SLDC to give suitable dates for Mock Drill Exercise of their Hydel Power Stations. Member Secretary, OCC stated that Black Start Mock Drill of all the Hydel Power Stations except Rajghat could be conducted in the month of May & June, 2017.

ITEM NO 8: ALLOCATION OF THE POWER TO DISCOM, EAST DISCOM REGARDING:

Member Secretary OCC informed the committee that SLDC is allocating the power to DISCOMs of MP as per GoMP Notification dtd. 19.03.2013 effective from 01.04.2013 and MPPMCL is allocating the unallocated power to DISCOMs on day ahead and real time basis as per the forecasted demand furnished by the DCCs. However, the Energy Deptt. Govt. of MP vide notification No.2211/F-3- 13/2016/XIII dtd. 21st March, 2016 has allocated all existing and future generating capacity to MPPMCL for maintaining uniform tariff across the State w.e.f. April 2016. Due to more allocation of power to East Discom and less to West Discom the East Discom remains in under drawal and West Discom in over drawal. These leads to gap between average cost of supply (ACS), resulting increase in average revenue realization (ARR) per unit in East Discom. It is requested to provide a solution so as to minimize the under drawal of East Discom and over drawal of West Discom. The date wise under drawal/over drawal of Discoms for the month of Feb.2017 (upto 26.02.2017) is enclosed as Annexure-8.

East Discom representative informed that allocation to them is not proper by MPPMCL and the matter was discussed with the committee.

Minutes of 56th OCCM of MP 15

Chairman OCC requested MPPMCL & Discoms to mutually disuss the matter and resolve the issue with common consensus.

ITEM NO 9:Non-reporting of tripping incidence occurred on 25.02.2017 at 220 KV S/S Sabalgarh:- Member Secretary OCC informed the committee that At around 14.19 hrs on dtd. 25.02.2017, 220Kv Shivpuri-Sabalgarh feeder-II tripped with following indication: Shivpuri - ACN, zone-III, FT-1, trip ABC Sabalgarh - No indication

It is gathered that 160MVA, 220/132Kv transformer No.I&II at 220KV S/S Sabalgarh also tripped at the same time with O/C R phase, E/F indication resulting total failure of 132Kv supply at Sabalgarh, Shivpurkalan and Baroda substations. It has come to notice that officials on duty at Sabalgarh S/s had not intimated about above incidence by 18.00 hrs to upper substation (220Kv S/S Shivpuri). Thus, the officials on duty at 220KV Shivpuri S/s, Sub-LDC Bhopal and SLDC Jabalpur were in dark about these tripping incidence, resulting delay in normalization of system. It is also gathered that above tripping occurred during shifting of load of 132 KV Shivpurkalan ckt-I to Auxiliary bus at Sabalgarh S/s.Non-reporting of tripping of transmission elements after incidence occurred, is not in the interest of safe,secure and reliable operation of integrated grid.

Chairman OCC stated that the above incident is not an isolated incident in Gwalior region as in past many incidences have been observed about non-reporting and charging of elements without obtaining code from SLDC. He also requested MPPTCL to issue suitable instructions to field offices to adhere the grid code for maintaining safe & secure grid operation and avoid the repeatance of such incidences.

ITEM NO. 10: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

10.1 Status of AMR system installed at SLDC:

SLDC representative informed the Committee about the status of AMR data received through AMR system in the month of Jan 2017. He informed that the complete data of 555 meters was received through AMR system and data of 68 Nos meters (Monthly-51 & Partial – 17) was not received through AMR system. The incomplete data is received due to site related issues such as network problem, modem switched off, meter defective or replaced, misalignment of optical cable or due to some other problems. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. Further following points are discussed and resolved as under:-

1. SLDC requested the CE(T&C) office to take up the matter with M/s Secure Meters Ltd for resolving the site related issues such as time drift in meters, meter defective, network problem

Minutes of 56th OCCM of MP 16 and SIM defective. Details are shown in enclosed Annexure-I. CE(T&C) office have assured to resolve the site related issues with M/s Secure Meters Ltd shortly.

2. SLDC representative informed that Integration of ABT meters installed at the interface points of newly commissioned substation / X’mers / HT consumers / OACs / REGs – 60 Nos as listed in Annexure-II is pending. He also informed that SLDC vide email dated 17.02.2016 forwarded the list of interface points to CE(T&C) office for furnishing the details of meters, modem and SIMs for integrating the ABT meters with AMR system of SLDC. He requested the (T&C) office to arrange to furnish the same on priority basis so that integration of the ABT meters with AMR system could be done by SLDC. (T&C) office representative have assured to furnish the details shortly.

3. SLDC representative requested CE(T&C) office to issue instructions to field offices that they should ensure that modems are not switched off and optical cable is properly connected & aligned for improving the readability of meters installed at the interface points. CE(T&C) office have assured to issue the instructions.

ITEM NO 11: SCADA/EMS RELATED ISSUES:

11.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

SLDC informed that a list of 50 S/s were identified for commissioning of telemetry Out of which around seven RTUs (132KV Rewa, 132KV Biora, 132KV Arniakala, 132KV Kannod, 132KV Poliakala, 132KV Jeerapur, 132KV Petlabad) are pending. MPPTCL agreed to arrange the commissioning of balance stations at the earliest. SLDC further informed that the telemetry of 132KV Tarana Sub Station which was not in earlier forwarded list is also required to be provided for which MPPTCL agreed.

SLDC further informed that the telemetry of six number of RTUs having railway traction feeder i.e.132KV Banmore S/s, 132KV Morena S/s, 132KV Datia S/s, 132KV Mungaoli S/s, 132KV Shujalpur S/s, 132KV Meghnagar S/s is also pending to be commissioned for monitoring of railway drawal. MPPTCL informed that the arrangement of PLCC panels and outdoor equipments required for commissioning of these RTUs is under progress and commissioning shall be taken up in phased manner.

The matter regarding intermittent functioning of newly commissioned RTUs specifically at 220 KV Ashoknagar S/s, 132 KV Khichipur S/s, 132 KV Mandideep S/s, 132 KV Dewas BNP, 132 KV Shankargarh S/s, 132 KV Momen Barodia, 132 KV Sitamau S/s ) is also discussed and MPPTCL assured to look into it and rectify the problems to ensure round the clock functioning of these newly commissioned RTUs.

Minutes of 56th OCCM of MP 17 11.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS

The present status of telemetry discrepancy including upgradation requirement is discussed in detail. The list of following important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers was discussed in detail:-

Sl. No. Name of Substation Name of feeders/transformers required to be whose RTU is required included in telemetry to be upgraded 220KV Birsingpur S/s The telemetry of 220KV IC-1 & 4 feeder is not 01 available since last six month 02 132 KV Jaora S/s 33 KV Chowksi wind 1,2 is not available

03 132 KV Alot S/s 33 KV Narbheram is not available

04 220 KV Badnagar S/s 132 KV Kshema Power is not available 05 220KV Anuppur S/s 132KV Shahdol,132KV Kotma 2, 132KV TRF 2 telemetry not available. 06 132KV Kotma S/s 132KV Anuppur feeder telemetry not available 07 220KV Shivpuri S/s 220/132KV Transformer telemetry is not available 08 220KV Pandurna 220KV Pandurna-Chindwara telemetry is not available 09 220KV Chatarpur S/s Telemetry of 132/33KV Transformer-2 not available 10 220 KV Satna Satna 220KV-Satna PG Interconnector 3 telemetry is not available

SLDC informed that lot of inconvenience in grid management is observed and hence upgradation of above mentioned RTU is to be taken up on top most priority for which MPPTCL agreed.

11.3 PRESENT STATUS OF PROCUREMENT OF RTUs BY MPPGCL:-

The matter of procurement of RTU for Rajghat HPS and Bansgar III HPS was discussed in detail. The Telemetry of Rajghat HPS is out since last two & half years. In response MPPGCL informed that the order has already been placed factory inspection is expected by this month end. The RTU is expected to be delivered in next three months.

11.4 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTING OF RTUS AS PER BACKUP SLDC REQUIREMENT:-

The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already completed and the additional communication channel is required to be extended to respective control Centre’s for testing with new SCADA/EMS system. SLDC requested MPPTCL & MPPGCL to provide RTU wise progress.

SLDC further informed that strengthening of existing wideband communication node is also required to be arranged so as to ensure reliable backbone communication network. The requirement of

Minutes of 56th OCCM of MP 18 new wideband nodes and OPGW has already been submitted to MPPTCL and MPPGCL & it was also requested to provide the current status of the same. It was informed by MPPGCL that work shall be taken up shortly.

11.5 Arrangement of Air Conditioners for wideband locations:-

The matter regarding arrangement of air conditioners for wideband locations was discussed in detail. SLDC informed that air conditioners at wideband locations namely 220 KV Jabalpur, 400 KV Bina, 220 KV Satna, 220 KV Itarsi, 220 KV Damoh & 400 KV Nagda are either faulty or not available. SLDC requested MPPTCL to intimate the schedule of arranging air conditioners at these locations. The MPPTCL informed that the the procurement of air conditioner is under progress and shall be installed shortly.

SLDC further informed that wideband node equipments at 220 KV Chhindwara, 220 KV Seoni, 220 KV Ratlam, 220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan, 220KV Rajgarh, 220KV Maalnpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench & Gandhisagar HPS is expected to be commissioned within next four months. SLDC further requested MPPTCL & MPPGCL to ensure necessary provision of space, DCPS, air conditioners for which MPPTCL and MPPGCL agreed.

11.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS

The long outage of telemetry of following S/s is discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01 Rajghat HPS Out from last two & half years

02 132KV Morwa S/s More then one and half Year

03 132KV Waidhan Out from six month. Channel problem between Anuppur to Jabalpur 04 132KV Beohari Out from more then six month

05 132KV Umariya Out due to PLCC channel 06 220 KV Rewa Out due to PLCC channel 07 132 KV Deolond Out due to PLCC channel

MPPTCL, MPPGCL officials confirmed to look into the matter to sort out/ rectification of above RTU/data channel. MPPGCL and MPPTCL informed that the action regarding restoration of telemetry of above sub stations /power stations shall be taken up on top most priority.

11.7 Telemetry of railway TSS Sub Stations:-

SLDC informed that the telemetry of railway TSS is to be commissioned by June 2017. However, the desired progress in the matter is not observed. The railway representative informed that the tender

Minutes of 56th OCCM of MP 19 for the telemetry arrangement is yet to be floated by railway and railway is planning to float tender for providing telemetry of 20 railway TSS and not for all 38 existing TSS. SLDC informed that in view of the existing progress status, the arrangement of telemetry by June 2017 is not yet possible and railway is required to expedite the matter.

Further, MPPTCL representative informed that in addition to existing 38 No. Railway TSS in MP, planning for establishment of around 25 new TSS is also under progress. Thus railway is required to plan for arranging telemetry of all 38 existing TSS as well as for 25 upcoming TSS. Accordingly, SLDC requested railway to expedite the matter and arrange telemetry of all TSS sub stations. Railway officers informed that they will take up the matter with their management.

ITEM No 12 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 57th Operation and Coordination Committee meeting of MP on 27.04.2017. It will be hosted by MPPGCL and venue of the same shall be intimated later.

SA-1:- LVRT PROTECTION FOR WIND AND SOLAR GENERATORS IN WESTERN REGION- COMPLIANCE TO HON’BLE CERC ORDER DTD 05.01.2016 IN PETITION NO. 420/MP/2014

Member Secretary OCC informed the committee that WRLDC vide letter No. WRLDC/GM/LVRT/2017/483 dated 17.02.2017 has mentioned that in view of increasing penetration of RE Generation, it is imperative to have in place the requisite protection system to ensure reliable & secure operation of the grid as per the CEA Technical Standard for connectivity and CERC order dated 05.01.2016 in Petition No. 420/MP/2014. Further they have quoted the following excerpts of CEA Technical Standard and CERC order dated 05.01.2016 – I. CEA Technical Standards –

1. CEA – Technical Standards for Connectivity (amendment) Regulations-2013:- Regulation B2(3) of the CEA (Technical standards for connectivity)- Regulations-2013 (Part-II) provides that all Wind Generating Stations commissioned on or after 15.04.2014 and connected at a voltage level of 66 KV & above shall remain connected to the grid when voltage at the interconnection point on any or all phases dips up to 0.15 pu. This CEA standard is applicable to the wind generating stations & generating stations using inverters.

2. Low Voltage Ride Through (LVRT) or Fault Ride Through (FRT) Capability: LVRT/FRT is a capability of an electrical device to operate through periods of low grid voltage. LVRT provision in a a device (viz. Wind/Solar Generator) boosts the terminal voltage at a the grid interconnection point following voltage dip caused by a transient fault, thereby providing transient stability support.

II. CERC order dated 05.01.2016 in Petition 420/MP/2014:

1. Para-29 (Page-44) –

“……………….We are of the view that LVRT should be implemented for all wind turbines commissioned before 15.04.2014 and connected to voltage level of 66 kV and above except for Stall Type WTGs, which are not technically feasible to be retrofitted with LVRT. However, keeping in view the suggestions of IWTMA, we are of the view that presently LVRT should be implemented for all wind turbine (except Stall Types) commissioned before 15.04.2014 having installed capacity equal to or more than 500 KW”.

Minutes of 56th OCCM of MP 20 2. Para-30 (Page-45)-

“………………. Therefore, we direct that the solar generators whose bidding process has not yet commenced i.e. NIT has not yet been issued on date of this order shall take necessary steps to implement LVRT in their generating stations”.

Para-39 (Page-50) –

“………….. We are of the view that LVRT is a technical requirement from the point of view of safety and security of the grid and its usefulness cannot be overlooked in view of the cost involved in retrofitting of LVRT. We direct all WRGs of capacity equal to or more than 500 KW except ‘Stall Type WTGs’ to comply with LVRT within two years in terms of our directions in para 29 of this order”.

3. Para-41 (Page-51) –

“………………With regard to monitoring of the installation and performance of LVRT installed on existing WTGs, we direct SLDCs to prepare quarterly reports and submit it to RPCs. RPCs are directed to validate the reports submitted by SLDCs in consultation with RLDCs and report any deficiency and non-compliance to the Commission in accordance with law”.

4. Para-46 (Page-53) –

“……………………. SLDCs are directed to ensure availability of data in respect of real time data from their Data Acquisition Systems of solar/wind generators in SCADA systems to respective RLDCs as per the provisions of the Grid Code”.

In order to comply the above regulatory provisions, WRLDC has requested the SLDC to ensure compliance to “LVRT Capability” for all Wind Turbine Generators (WTGs) and Solar Generators in their control area and submit quarterly reports to WRPC. The Committee may like to discuss the issue.

The matter was discussed in the meeting and Chairman OCC requested MPPMCL for downloading the above CERC order for needful.

SA-2:- Communication problem with Hydel Power Station

Chairman OCC informed the committee that the communication problem with Hydel Power Stations of MPPGCL in general and particularly with Manikheda HPS and the matter of non- communication has been discussed in previous OCC meetings also.. Normally communication does not take place as & when required in order to take or stop machines at Manikheda HPS and quite often operation of machines gets delayed. This has adverse effect on the grid security and hence MPPGCL is requested to do the needful in the matter on priority.

It is therefore requested that the PLCC communication with all Hydel Power Stations should also be made operational RTC.

Representative from MPPGCL informed the committee that necessary action is being taken in the matter.

Minutes of 56th OCCM of MP 21 SA-3:- Forming of State Level Relay Setting Group for Review & Co-ordination of Relay settings in the State of Madhya Pradesh:-

Chairman OCC informed the committee that WRPC vide letter No. WRPC/Protection/Relay Settings/2017/464 dated-06.03.2017 has intimated SLDC that in the 128th PCM, the protection sub- committee recommended that protection groups at State levels be formed to review the existing relay settings of State Network incidental to ISTS & critical State Network in a co-ordinated manner. The State Protection group shall comprise of representative each from State SLDC, State STU, State testing circle, Powergrid, major generating companies, and WRLDC & WRPC.

For Madhya Pradesh the State Protection group comprise of SLDC, STU, representative from relay testing group of state, Powergrid, representative from state Genco Relay Testing group, JP Bina, NCA and NTPC, WRLDC & WRPC. SLDC Madhya Pradesh shall be Convener member of the group.

After formation of the State Protection group, the critical State Network & State Network incidental to ISTS shall be identified by the group. The shall review the existing relay settings of the critical State Network & State Network incidental to ISTS and provide necessary relay coordination accordingly. And draft settings be formalized & implemented for such network. The draft settings shall be put up in the subsequent PCM ratification.

In view of the above MPPTCL, MPPGCL, NHDC, JP Bina are requested to nominate their representative at the earliest to SLDC.

The matter was discussed in the meeting and concerned entities informed the committee that the nominations are being sent shortly. ***********

Minutes of 56th OCCM of MP 22 Minutes of 56th OCCM of MP 23 Minutes of 56th OCCM of MP 24 Minutes of 56th OCCM of MP 25 Annexure- FREQUENCY PARTICULARS 2.1

S. No. Particulars Dec-16 Jan-17

1 INTEGRATED OVER AN-HOUR

Between 21.00 Between 23.00 hrs 1.1 Maximum Frequency 50.11 Hz hrs & 22.00 Hrs 50.31 Hz & 24.00 Hrs on on 24.12.16 26.01.17

Between 09.00 Between 09.00 hrs 1.2 Minimum Frequency 49.82 Hz hrs & 10.00 Hrs 49.88 Hz & 10.00 Hrs on on 02.12.16 04.01.17

1.3 Average Frequency 49.99 Hz 50 Hz

2 INSTANTANEOUS FREQUENCY AT 09.24.02 AT 18.03 HRS ON 2.1 Maximum Frequency 50.31 Hz HRS ON 50.33 Hz 14.01.17 12.12.16 AT 06.04 HRS AT 18.20. HRS ON 2.2 Minimum Frequency 49.67 Hz 49.71 Hz ON 30.12.16 23.01.17 3 Percentage of time when frequency was :-

%age of time when frequency was Dec-16 Jan-17

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 11.04 6.18

3.7 Between 49.9 Hz and 50.05 Hz 69.58 70.47

3.8 Between 50.05 Hz AND 51.5 Hz 19.38 23.35

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

Minutes of 56th OCCM of MP 26 Voltage Profile During the Month of December- 2016 Indore Itarsi Bina Gwalior Nagda Birsingpur ISP Date Max Min Max Min Max Min Max Min Max Min Max Min Max Min 1 418 399 413 393 412 399 422 402 2 420 399 414 394 413 396 422 399 3 420 400 414 395 417 397 423 403 4 419 399 414 396 413 397 422 401 5 419 402 413 395 412 394 422 405 6 418 400 413 394 411 394 423 404 7 414 397 414 392 415 391 420 400 8 418 396 411 389 417 394 421 399 9 417 393 414 389 413 392 423 398 10 420 397 415 392 412 397 424 402 11 419 398 415 393 414 397 422 401 12 420 400 414 396 413 391 423 404 13 421 402 417 399 413 396 424 405 14 421 398 418 394 413 395 423 401 15 418 399 413 399 410 396 421 401 16 423 397 417 394 413 390 424 400 17 420 398 414 394 412 389 424 400 18 418 400 412 396 416 396 423 403 19 418 398 412 394 412 393 422 402 20 417 395 413 392 416 393 421 400 21 418 399 413 393 415 390 423 403 22 417 397 414 393 414 391 425 400 23 420 400 414 400 416 396 422 402 24 419 395 414 394 412 393 422 397 25 422 402 417 400 418 396 425 407 26 420 396 414 392 417 396 424 402 27 421 402 416 398 417 395 424 405 28 421 401 416 396 417 391 423 404 29 422 400 416 397 415 395 423 402 30 419 401 418 400 410 394 423 403 31 419 400 416 399 417 395 422 403 Max /Min 423 393 418 389 0 0 418 389 425 397 0 0 0 0 Voltage Profile During the Month of January - 2017 Indore Itarsi Bina Gwalior Nagda Birsingpur ISP Date Max Min Max Min Max Min Max Min Max Min Max Min Max Min 1 420 398 415 394 413 395 415 400 2 419 399 413 393 413 387 423 401 3 418 398 413 395 412 389 423 402 4 417 398 414 395 412 396 423 401 5 418 399 413 396 413 394 421 401 6 418 398 414 394 413 393 423 400 7 420 398 416 394 414 393 424 400 8 420 399 416 398 413 395 423 401 9 420 395 416 389 414 387 424 399 10 417 398 415 394 412 391 420 401 11 420 399 416 395 411 394 424 403 12 422 400 417 395 418 396 425 404 13 423 394 417 389 417 391 427 399 14 422 404 417 398 413 393 426 406 15 420 399 415 396 413 394 424 400 16 420 396 415 390 413 393 424 398 17 421 399 417 394 414 392 423 401 18 421 398 418 393 416 390 423 401 19 424 402 420 398 413 393 425 405 20 423 400 419 397 416 394 427 404 21 420 398 416 395 414 395 422 400 22 422 402 418 399 417 391 424 402 23 419 400 416 397 413 391 422 402 24 417 400 414 396 412 392 421 402 25 415 403 412 399 415 398 417 405 26 422 403 418 400 419 397 424 404 27 420 405 417 402 417 404 422 407 28 418 402 416 399 416 399 420 406 29 420 400 417 398 415 395 422 403 30 417 400 414 397 420 392 420 402 31 417 400 412 397 420 394 419 403 Max /Min 424 394 420 389 0 0 420 387 427 398 0 0 0 0

Minutes of 56th OCCM of MP 27 THE STATUS OF CAPACITOR BANKS AT EHV S/S AS ON Annexure-2.3.3(a) 31-01-2017 CAPACITOR BANK CAPACITOR BANK INSTALLED BUT VOLTAGE CAPACITY ADDED AFTER TOTAL CAPACITY AS ON INSTALLED AS ON 30-11-16 DEFECTIVE & ARE CLASS LAST OCC MEETING 31-01-17 (MVAR) REPAIRABLE (NO. & MVAR) 220 KV 100.00 0.00 100.00

132 KV 1205.00 33.00 1238.00 ALL IN SERVICE 33 KV 4456.50 24.00 4480.50

TOTAL 5761.50 57.00 5818.50

Minutes of 56th OCCM of MP 28 DETAIL OF CAPACITOR BANKS INSTALLED IN EHV SUB-STATIONS Annexure 2.3.3(b) RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr 1 JABALPUR Jabalpur 220 SHREEM 36 12 JABALPUR Jabalpur 220 SHREEM 36 12 JABALPUR VFJ 132 SHREEM 36 12 JABALPUR VFJ 132 SHREEM 36 12 JABALPUR Shahpura 132 UCL 36 6 JABALPUR Shahpura 132 UNISTAR 36 12 JABALPUR Patan 132 SHREEM 36 12 JABALPUR Marhotal 132 SHREEM 36 12 JABALPUR Shrinagar 132 SHREEM 36 6 JABALPUR Katangi 132 UCL 36 12 JABALPUR Katangi 132 UCL 36 12 JABALPUR Mansakra 132 SHREEM 36 12 JABALPUR Mansakra 132 UNISTAR 36 12 JABALPUR Katni 132 UNISTAR 33 5 JABALPUR Katni 132 UNISTAR 36 12 JABALPUR Katni 220 UNISTAR 36 12 JABALPUR Kymore 132 BHEL 36 6 JABALPUR Kymore 132 UNISTAR 36 12 JABALPUR Sleemnabad 132 SHREEM 36 12 JABALPUR Maneri 132 SHAKTI 33 5 JABALPUR Narsinghpur 132 KHATAU 33 5 JABALPUR Narsinghpur 132 UNISTAR 36 12 JABALPUR Narsinghpur 220 SHREEM 145 66 JABALPUR Gaderwara 132 SHAKTI 36 5 JABALPUR Gaderwara 132 UNISTAR 36 5 JABALPUR Gaderwara 132 BHEL 36 12 JABALPUR Barman 132 SHREEM 36 12 JABALPUR Barman 132 MANOHAR 36 6 JABALPUR Mandla 132 MANOHAR 36 6 2 SEONI Chhindwara220 SHREEM 36 12 SEONI Chhindwara 132 UNISTAR 36 12 SEONI Chhindwara 132 BHEL 36 12 SEONI Amarwara 132 UNISTAR 36 12 SEONI Pandhurna 220 BHEL 36 6 SEONI Pandhurna 220 UNI S +SHREEM 36 9 SEONI Boregaon 132 BHEL-MADHAV 33 5 SEONI Khapaswami 132 BHEL 36 12 SEONI Chourai 132 SHREEM 36 12 SEONI Bichhua 132 SHREEM-I 36 12 SEONI Bichhua 132 SHREEM-II 36 12 SEONI Umreth 132 UNISTAR 36 12 SEONI Umreth 132 UNISTAR 36 12 SEONI Seoni 132 KHATAU 33 5 SEONI Balaghat 132 KHATAU 33 5 SEONI Balaghat 132 SHREEM 36 12 SEONI Benegaon 132 SHREEM 36 12

Minutes of 56th OCCM of MP 29 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr SEONI Lakhnadon132 SHREEM 36 12 SEONI Baihar 132 SHREEM 36 12 3 SAGAR Damoh 220 UCL 36 12 SAGAR Damoh 220 UCL 36 12 SAGAR Sagar 220 SHREEM 36 12 SAGAR Sagar 132 UCL 36 6 SAGAR Sagar 132 UCL 36 12 SAGAR Sagar 132 SHREEM 36 12 SAGAR Sagar 132 UCL 33 5 SAGAR Sagar 132 SHREEM 36 6 SAGAR Damoh 132 UNIVERSAL 33 5 SAGAR Damoh 132 BHEL 36 6 SAGAR Gourjhamer 132 SHREEM 36 12 SAGAR Gourjhamer 132 SHREEM 36 12 SAGAR Garhakota 132 SHREEM 36 12 SAGAR Garhakota 132 SHREEM 36 12 SAGAR Hatta 132 SHREEM 36 12 SAGAR Tejgarh 132 SHREEM 36 12 SAGAR Tejgarh 132 SHREEM 36 12 SAGAR Banda 132 UCL 36 12 SAGAR Batiyagarh 132 SHREEM 36 12 SAGAR Batiyagarh 132 SHREEM 36 12 SAGAR Chhatarpur 220 NGEF 33 5 SAGAR Chhatarpur 220 BHEL 36 6 SAGAR Chhatarpur 220 SHREEM 36 12 SAGAR Bijawar 132 BHEL 36 6 SAGAR Bijawar 132 BHEL 33 5 SAGAR Bijawar 132 BHEL 36 6 SAGAR Bijawar 132 3x18 BHEL 145 54 SAGAR Tikamgarh 132 UCL 33 5 SAGAR Tikamgarh 132 BHEL 36 6 SAGAR Tikamgarh 132 UCL 36 12 SAGAR Prithvipur 132 NGEF 33 5 SAGAR Prithvipur 132 BHEL 36 6 SAGAR Prithvipur 132 BHEL 36 6 SAGAR Tikamgarh 220 2x33 SHREEM 145 66 SAGAR Jatara 132 SHREEM 36 12 SAGAR Loundi 132 SHREEM 36 12 SAGAR Loundi 132 SHREEM 36 12 4 BINA 400 Bina 220 SHREEM 36 12 BINA 400 Bina 220 SHREEM 36 6 BINA 400 Bina 220 2x33 SHREEM 145 66 BINA 400 Khurai 132 SHREEM 36 12 BINA 400 Khurai 132 SHREEM 36 12 BINA 400 Mungaoli 132 SHREEM 36 12 BINA 400 Guna 220 MADHAV 33 5 BINA 400 Guna 220 BHEL 36 6 BINA 400 Guna 220 BHEL 36 6

Minutes of 56th OCCM of MP 30 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr BINA 400 Guna 220 MADHAV 36 12 BINA 400 Guna 220 MADHAV 36 12 BINA 400 Guna 220 2x33 SHREEM 145 66 BINA 400 Ashoknagar 132 NGEF 33 5 BINA 400 Ashoknagar 132 SHAKTI 33 5 BINA 400 Ashoknagar 132 BHEL 36 12 BINA 400 Ashoknagar 132 UNISTAR 36 12 BINA 400 Raghogarh 132 KHATAU 36 6 BINA 400 Raghogarh 132 BHEL 36 6 BINA 400 Bhonra 132 SHREEM 36 12 BINA 400 Bhonra 132 SHREEM 145 33 BINA 400 Aron 132 SHREEM 36 12 5 SATNA Maihar 220 UCL 33 5 SATNA Panna 132 UCL 33 5 SATNA Panna 132 UCL 36 6 SATNA Satna 220 ABB 33 5 SATNA Satna 132 BHEL 36 10 SATNA Kotar 220 SHREEM 36 12 SATNA Amarpatan 132 SHREEM 36 12 SATNA Pawai 132 SHREEM 36 12 SATNA Majhgawan 132 SHREEM 36 12 SATNA Nagod 132 SHREEM 36 12 SATNA Rampur Baghelan 132 UCL 36 12 SATNA Shahdol 132 BHEL 36 5 SATNA Kotma 132 UCL 36 12 SATNA Sidhi 132 UCL 33 5 SATNA Morwa 132 BHEL 33 5 SATNA Rewa 132 BHEL 36 12 SATNA Rewa 132 UCL 36 12 SATNA Katra 132 SHREEM 36 12 SATNA Rewa 220 UCL 36 12 6 GWALIOR Mahalgaon 220 SHREEM 2x33 145 66 GWALIOR Mahalgaon 220 NGEF 33 10 GWALIOR Mahalgaon 220 BHEL 33 12 GWALIOR Mahalgaon 220 MEGNEWIN 36 12 GWALIOR Gwalior-II 220 SHREEM 36 12 GWALIOR Gwalior-II 220 SHREEM 36 12 GWALIOR Motijheel 132 MEGAWIN 36 12 GWALIOR Motijheel 132 BHEL 36 12 GWALIOR Tighra 132 SHREEM 36 12 GWALIOR Morar 132 UNISTAR 36 12 GWALIOR Banmore 132 KHATAU 36 6 GWALIOR Banmore 132 BHEL 36 12 GWALIOR Ambah 132 MADHAV 33 5 GWALIOR Ambah 132 MADHAV 33 5 GWALIOR Ambah 132 SHREEM 33 6 GWALIOR Ambah 132 BHEL 36 6 GWALIOR Morena 132 UCL 33 12

Minutes of 56th OCCM of MP 31 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr GWALIOR Morena 132 UNISTAR 36 12 GWALIOR Sabalgarh 220 SHAKTI 33 5 GWALIOR Sabalgarh 220 MEHAR 33 5 GWALIOR Sabalgarh 220 SHREEM 36 6 GWALIOR Sabalgarh 220 BHEL 36 6 GWALIOR Sabalgarh 220 SHREEM 2x33 145 66 GWALIOR Jora 1321 SHREEM 36 12 GWALIOR Porsa 132 SHREEM 36 12 GWALIOR Vijaipur 132 SHREEM 36 12 GWALIOR Malanpur 220 SHREEM 33 6 GWALIOR Malanpur 220 ABB 33 5 GWALIOR Malanpur 220 SHREEM 2x33 145 66 GWALIOR Mehgaon 220 GEC 33 5 GWALIOR Mehgaon 220 NGEF 33 5 GWALIOR Mehgaon 220 BHEL 36 12 GWALIOR Mehgaon 220 KHATAU 36 6 GWALIOR Mehgaon 220 SHREEM 2x33 145 66 GWALIOR Bhind 132 MADHAV 33 5 GWALIOR Bhind 132 MADHAV 33 5 GWALIOR Bhind 132 KHATAU 36 6 GWALIOR Bhind 132 CAPSELES 36 6 GWALIOR Dabra 132 BHEL 33 6 GWALIOR Dabra 132 MADHAV 33 6 GWALIOR Dabra 132 SHREEM 36 12 GWALIOR Datia 132 MADHAV 33 5 GWALIOR Datia 132 MADHAV 33 5 GWALIOR Datia 132 BHEL 36 12 GWALIOR Seondha 132 MADHAV 33 5 GWALIOR Seondha 132 MADHAV 33 5 GWALIOR Seondha 132 MADHAV 33 6 GWALIOR Lahar 132 SHREEM 36 12 GWALIOR Ron 132 SHREEM 36 12 GWALIOR Datia 220 (SS DOC 09-01-16) SHREEM 36 12 GWALIOR Datia 220 (SS DOC 09-01-16) SHREEM 36 12 GWALIOR Gohad 132 SHREEM 36 12 GWALIOR Pratappura 132 SHREEM 36 12 GWALIOR Pratappura 132 SHREEM 36 12 GWALIOR Pichhore 132 NOKIA 245 37.5 GWALIOR Pichhore 132 NOKIA 245 37.5 GWALIOR Pichhore 132 MADHAV 33 6 GWALIOR Pichhore 132 MADHAV 33 5 GWALIOR Sheopur Kalan 132 MEGNEWIN 36 12 GWALIOR Sheopur Kalan 132 SHREEM 36 6 GWALIOR Sheopur Kalan 132 SHREEM 36 12 GWALIOR Sheopur Kalan 132 SHREEM 145 33 GWALIOR Shivpuri 132 NGEF 33 5 GWALIOR Shivpuri 132 SHAKTI 33 5 GWALIOR Shivpuri 132 SHREEM 36 6

Minutes of 56th OCCM of MP 32 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr GWALIOR Shivpuri 220 SHREEM 2x33 145 66 GWALIOR Baroda SHREEM 36 12 GWALIOR Baroda SHREEM 36 12 GWALIOR Indergarh 132 SHREEM 36 12 7 BHOPAL Lalghati 132 SHREEM 33 5 BHOPAL Lalghati 132 MANOHAR 36 6 BHOPAL Lalghati 132 BHEL 36 12 BHOPAL Kurawar 132 SHREEM 36 12 BHOPAL Kurawar 132 SHREEM 36 9 BHOPAL Sehore 132 KHATAU 36 5 BHOPAL Sehore 132 ABB 33 5 BHOPAL Sehore 132 SHREEM 36 12 BHOPAL Sehore 132 MEGNAWIN 36 12 BHOPAL Ashta 220 SHREEM 36 12 BHOPAL Ashta 220 SHREEM 36 12 BHOPAL Ashta 132 SHREEM 36 12 BHOPAL Shyampur 132 SHREEM 36 12 BHOPAL Icchawar 132 SHREEM 36 12 BHOPAL Bairagarh 220 SHREEM 36 12 BHOPAL Biora 132 NGEF 36 5 BHOPAL Biora 132 BHEL 36 6 BHOPAL Biora 132 BHEL 36 6 BHOPAL Khilchipur 132 SHREEM 36 12 BHOPAL Khilchipur 132 SHAKTI 33 5 BHOPAL Sarangpur 132 MEGNAWIN 36 12 BHOPAL Sarangpur 132 NGEF 36 5 BHOPAL Pichhor 132 SHREEM 36 12 BHOPAL Jeerapur 132 SHREEM 36 12 BHOPAL Rajgarh (Biora) 220 SHREEM 36 12 BHOPAL Itarsi 220 UCL 33 5 BHOPAL Itarsi 220 SHAKTI 36 6 BHOPAL Betul 132 SHREEM 33 5 BHOPAL Betul 132 SHAKTI 36 6 BHOPAL Betul 132 SHREEM 36 6 BHOPAL Betul 132 SHREEM 36 12 BHOPAL Multai 132 BHEL 36 6 BHOPAL Multai 132 UCL 36 12 BHOPAL Gudgaon 132 SHREEM 36 12 BHOPAL Chicholi 132 SHREEM 36 12 BHOPAL Betul 220 SHREEM 36 12 BHOPAL Amla 132 SHREEM 36 12 BHOPAL Amla 132 SHREEM 36 12 BHOPAL Pipariya 220 SHREEM 36 12 BHOPAL Pipariya 132 NGEF 33 5 BHOPAL Pipariya 132 MANOHAR 36 6 BHOPAL Pipariya 132 SHREEM 36 12 BHOPAL Harda 132 UCL 33 5 BHOPAL Harda 132 SHREEM 36 6

Minutes of 56th OCCM of MP 33 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr BHOPAL Harda 132 SHREEM 36 12 BHOPAL Harda 132 UCL 36 12 BHOPAL Hoshangabad 220 SHAKTI 36 6 BHOPAL Hoshangabad 220 UCL 33 5 BHOPAL Hoshangabad 220 UCL 36 12 BHOPAL Seoni Malwa 132 SHREEM 36 12 BHOPAL Bankhedi 132 UCL 36 12 BHOPAL Sultanpur 132 UCL 36 12 BHOPAL Semri Harchan 132 SHREEM 36 12 BHOPAL Semri Harchan 132 SHREEM 36 12 BHOPAL Khirkiya 132 SHREEM 36 12 BHOPAL Khirkiya 132 SHREEM 36 12 8 BHOPAL 400 Ayodhya Bhopal 132 SHREEM 36 12 BHOPAL 400 Bhopal 220 2x33 SHREEM 145 33 BHOPAL 400 Bhopal 220 SHREEM-I 36 12 BHOPAL 400 Bhopal 220 SHREEM-II 36 12 BHOPAL 400 Chambal Bhopal 132 UCL 33 5 BHOPAL 400 Chambal Bhopal 132 UCL 36 24 BHOPAL 400 Amrawad Khurd 132 SHREEM 36 12 BHOPAL 400 Bareli 132 UCL 33 5 BHOPAL 400 Bareli 132 UCL 36 6 BHOPAL 400 Bareli 132 SHREEM 36 12 NEW BHOPAL 400 Bareli 132 SHREEM 145 33 BHOPAL 400 MACT Bhopal 132 MANOHAR 36 6 BHOPAL 400 MACT Bhopal 132 BHEL 36 12 BHOPAL 400 Mandideep 220 UCL-I 36 12 BHOPAL 400 Mandideep 220 UCL-II 36 12 BHOPAL 400 Mandideep 132 BHEL 36 12 BHOPAL 400 Nasrullaganj 132 MADHAV 36 12 BHOPAL 400 Raisen 132 ABB 33 5 BHOPAL 400 Raisen 132 MANOHAR 36 6 BHOPAL 400 Raisen 132 BHEL 36 12 BHOPAL 400 Shahganj 132 SHREEM-I 36 12 BHOPAL 400 Shahganj 132 SHREEM-II 36 12 BHOPAL 400 Gairatganj 132 SHREEM 36 12 BHOPAL 400 Runaha 132 SHREEM 36 12 BHOPAL 400 Berasiya 132 MANOHAR 36 6 BHOPAL 400 Berasiya 132 UCL 36 12 BHOPAL 400 Sironj 132 SHREEM 36 12 BHOPAL 400 Vidhisha 220 SHREEM 36 12 BHOPAL 400 Ganj Basoda 220(132) SHREEM 36 12 9 INDORE Chanbal 132 BHEL 36 12 INDORE Chanbal 132 Khatau Junkar 36 12 INDORE Chanbal 132 BHEL 36 6 INDORE Chanbal 132 BHEL 36 12 INDORE N/Z Indore 132 UCL 36 10 INDORE N/Z Indore 132 SHREEM 36 12 INDORE N/Z Indore 132 Khatau Junkar 36 12

Minutes of 56th OCCM of MP 34 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr INDORE Sanwer 132 SHREEM 36 6 INDORE Sanwer 132 MADHAV 36 6 INDORE Sanwer 132 BHEL 36 12 INDORE Mangaliya 132 BHEL 36 6 INDORE Satya sai 132 SHREEM 36 12 INDORE Indore-II Jetpura 220 , 2x25 SHREEM 145 50 INDORE Indore-II Jetpura 220 SHREEM 36 12 INDORE Indore East Bicholi 220 BHEL 36 24 INDORE Electronic Complex SHREEM 36 12 INDORE Raukhedi 132 SHREEM 36 12 INDORE Raukhedi 132 SHREEM 36 12 INDORE Chandrawatiganj 132 SHREEM 36 12 INDORE Chandrawatiganj 132 SHREEM 36 12 INDORE Sivni 132 ABB 36 12 INDORE Rajgarh (Dhar) 220 SHREEM, 2x33 145 66 INDORE Rajgarh 132 BHEL 36 24 INDORE Rajgarh 132 BHEL 36 6 INDORE Rajgarh 132 UNISTAR 33 5 INDORE Kukshi 132 BHEL 36 24 INDORE Kukshi 132 BHEL 36 6 INDORE Meghnagar 132 SHREEM 33 5 INDORE Meghnagar 132 MANOHAR 33 5 INDORE Jhabua 132 SHREEM 36 6 INDORE Jhabua 132 SHREEM 36 6 INDORE Alirajpur 132 SHREEM 36 12 INDORE Petlawad 132 SHREEM 36 12 INDORE Pithampur 220 (Sec-III) SHREEM, 2x33 145 66 INDORE Pithampur 220 (UP132) Sec-I MADHAV 36 12 INDORE Pithampur 220 (UP132) Sec-I MADHAV 33 5 INDORE Ghatabillod 132 BHEL 36 12 INDORE Dhar 220 (132KV upgrade) SHREEM 36 12 INDORE Dhar 220 (132KV upgrade) SHREEM 36 12 INDORE Manawar 132 UCL 36 12 INDORE Manawar 132 SHREEM 33 5 INDORE Manawar 132 SHREEM 36 12 INDORE Kanwan 132 SHREEM 36 12 INDORE Indore west 132 SHREEM 36 12 INDORE Betma 132 SHREEM 36 12 INDORE Bagdi 132 SHREEM 36 12 INDORE Depalpur 132 BHEL 36 6 INDORE Depalpur 132 MANOHAR 36 12 INDORE Depalpur 132 BHEL 36 12 INDORE Goutampura 132 SHREEM 36 12 INDORE Indore 400 SHREEM 245 50 INDORE S/Z Indore 220 BHEL 36 12 INDORE S/Z Indore 220 BHEL 36 12 INDORE S/Z Indore 220 BHEL 36 12 INDORE S/Z Indore 220 BHEL 10.5

Minutes of 56th OCCM of MP 35 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr INDORE S/Z Indore 220 REEM, 1(2) x33 (Rema 145 33 INDORE Jamli 132 SHREEM 36 12 10 UJJAIN Ujjain 220 ABB 33 5 UJJAIN Ujjain 220 ABB 33 5 UJJAIN Ujjain 220 BHEL 36 12 UJJAIN Ujjain 132 BHEL 36 24 UJJAIN Agar 132 SHREEM 36 12 UJJAIN Agar 132 SHREEM 36 12 UJJAIN Agar 132 MADHAV 33 5 UJJAIN Agar 132 ASEA 33 5 UJJAIN Badnagar 220 BHEL 36 12 UJJAIN Badnagar 220 MANOHAR 36 6 UJJAIN Badnagar 220 SHREEM 33 5 UJJAIN Badnagar 220 UCL 33 5 UJJAIN Badnagar 220 SHREEM 36 12 UJJAIN Badnagar 220 SHREEM 36 12 UJJAIN Tarana 132 SHREEM 36 12 UJJAIN Ghosla 132 SHREEM 36 12 UJJAIN Ingoriya 132 SHREEM 36 12 UJJAIN Barod 220 SHREEM 36 12 UJJAIN Susner 132 SHREEM 36 12 UJJAIN Ratadiya 132 SHREEM 36 12 UJJAIN Ratadiya 132 SHREEM 36 12 UJJAIN Mahidpur 132 SHREEM 36 12 UJJAIN Mahidpur 132 SHREEM 36 12 UJJAIN Zarda 132 SHREEM 36 12 UJJAIN Makdon 132 SHREEM 36 12 UJJAIN Dewas 220 UNIVERSAL 36 12 UJJAIN Dewas (BNP) 132 MADHAV 33 5 UJJAIN Dewas (BNP) 132 UNIVERSAL 33 5 UJJAIN Dewas (BNP) 132 SHREEM 36 12 UJJAIN Dewas (MSP) 132 UNIVERSAL 33 5 UJJAIN Dewas (MSP) 132 SHREEM 36 12 UJJAIN Chapda 132 MADHAV 33 5 UJJAIN Chapda 132 SHREEM 36 12 UJJAIN Chapda 132 UNIVERSAL 36 12 UJJAIN Chapda 132 UNIVERSAL 36 12 UJJAIN Kannod 132 UNIVERSAL 33 5 UJJAIN Kannod 132 UNIVERSAL 33 5 UJJAIN Kannod 132 BHEL 36 6 UJJAIN Kannod 132 UNIVERSAL 36 12 UJJAIN Sonkatch 132 BHEL 36 6 UJJAIN Sonkatch 132 SHREEM 36 12 UJJAIN Shajapur 132 MADHAV 33 5 UJJAIN Shajapur 132 MADHAV 33 5 UJJAIN Shajapur 132 BHEL 36 6 UJJAIN Khategaon 132 SHREEM 36 12 UJJAIN Khategaon 132 SHREEM 36 12

Minutes of 56th OCCM of MP 36 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr UJJAIN Maxi 132 BHEL 36 12 UJJAIN Panwadi 132 SHREEM 36 12 UJJAIN Satwas 132 SHREEM 36 12 UJJAIN Satwas 132 SHREEM 36 12 UJJAIN Barotha 132 SHREEM 36 12 UJJAIN Shujalpur 220 2x33 SHREEM 145 66 UJJAIN Shujalpur 132 IGE 33 5 UJJAIN Shujalpur 132 MANOHAR 33 5 UJJAIN Shujalpur 132 BHEL 36 24 UJJAIN Moman Barodiya 132 SHREEM 36 12 UJJAIN Bercha 132 SHREEM 36 12 UJJAIN Arniyakalan 132 SHREEM 36 12 UJJAIN Polaikalan 132 SHREEM 36 12 UJJAIN Kalapipal 132 SHREEM 36 12 UJJAIN Kalapipal 132 SHREEM 36 12 11 NAGDA Nagda 220 UCL 36 12 NAGDA Nagda 220 UCL 36 12 NAGDA Nagda 220 2x33 SHREEM 145 66 NAGDA Nagda 220 UNIVERSAL 33 5 NAGDA Nagda 220 BHEL 33 5 NAGDA Khachrod 132 UCL 36 12 NAGDA Khachrod 132 BHEL 36 12 NAGDA Tal 132 ENERGY 36 12 NAGDA Ratlam220 UCL 36 12 NAGDA Ratlam 220 UCL 33 5 NAGDA Ratlam 220 UCL 33 5 NAGDA Ratlam 220 BHEL 36 6 NAGDA Ratlam 132 UCL 33 5 NAGDA Ratlam 132 UCL 33 5 NAGDA Jaora 132 MANOHAR 33 5 NAGDA Jaora 132 CROMPTON 36 12 NAGDA Jaora 132 SHREEM 36 12 NAGDA Jaora 132 UCL 36 12 NAGDA Jaora 132 UCL 36 12 NAGDA Alot 132 MAHAN 36 6 NAGDA Alot 132 BHEL 36 6 NAGDA Alot 132 UCL 36 12 NAGDA Daloda 132 SHREEM 36 12 NAGDA Daloda 132 SHREEM 36 12 NAGDA Mandsour 132 UCL 33 5 NAGDA BHEL 36 12 NAGDA Mandsour 132 UCL 36 12 NAGDA Mandsour 132 SHREEM 36 12 NAGDA Suwasra 132 MANOHAR 33 5 NAGDA Suwasra 132 MANOHAR 36 6 NAGDA Suwasra 132 UCL 36 12 NAGDA Garoth 132 UCL 36 12 NAGDA Garoth 132 SHREEM 36 12

Minutes of 56th OCCM of MP 37 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr NAGDA Sailana 132 UCL 36 12 NAGDA Neemuch 220 BHEL 36 12 NAGDA Neemuch 220 SHREEM 145 33 NAGDA Malhargarh 132 UCL 36 12 NAGDA Malhargarh 132 SHREEM 36 12 NAGDA Neemuch 132 UCL 33 5 NAGDA Neemuch 132 BHEL 33 5 NAGDA Neemuch 132 UCL 36 12 NAGDA Manasa 132 UCL 33 5 NAGDA Manasa 132 UCL 33 5 NAGDA Manasa 132 UCL 36 12 NAGDA Ratangarh 132 UCL 36 12 NAGDA Ratangarh 132 SHREEM 36 12 NAGDA Sitamau 132 SHREEM 36 12 NAGDA Sitamau 132 SHREEM 36 12 12 KHANDWA Khandwa 132 BHEL 36 12 KHANDWA Khandwa 132 BHEL 33 5 KHANDWA Khandwa 132 SHREEM 36 12 KHANDWA Chhegaon 132 BHEL 36 12 KHANDWA Chhegaon 132 BHEL 36 6 KHANDWA Chhegaon 132 SHREEM 33 5 KHANDWA Bahadurpur 132 BHEL 36 12 KHANDWA Bahadurpur 132 UCL 36 6 KHANDWA Bahadurpur 132 SHREEM 36 12 KHANDWA Bahadurpur 132 GEC 33 5 KHANDWA Bahadurpur 132 BHEL 33 5 KHANDWA Nepanagar 220 1x33 SHREEM 145 33 KHANDWA Nepanagar 220 SHAKTI 33 5 KHANDWA Chhanera 132 SHREEM 36 12 KHANDWA Badgaon 132 SHREEM 36 12 KHANDWA Chhegaon 400 UNISTAR 36 12 KHANDWA Pansemal 132 MADHAV 33 5 KHANDWA Pansemal 132 MADHAV 36 6 KHANDWA Pansemal 132 BHEL 36 6 KHANDWA Chhoti Khargon 132 GEC 36 10 KHANDWA Chhoti Khargon 132 SHREEM 36 12 KHANDWA Chhoti Khargon 132 SHREEM 33 5 KHANDWA Barwaha 220 UCL 33 5 KHANDWA Barwaha 220 BHEL 36 12 KHANDWA Barwaha 220 BHEL 36 24 KHANDWA Khargon 132 ASEA 33 5 KHANDWA Khargon 132 SHAKTI 33 5 KHANDWA Khargon 132 SHREEM 36 6 KHANDWA Khargon 132 MANOHAR 33 5 KHANDWA Khargon 132 UNISTAR 36 12 KHANDWA Khargon 132 BHEL 36 12 KHANDWA Julwaniya 220 1x33 SHREEM 145 33 KHANDWA Julwaniya 220 BHEL 36 6

Minutes of 56th OCCM of MP 38 RATED RATED CAPACITY, SL. NO. CIRCLE NAME OF SUB-STATION MAKE VOLTAGE, KV MVAr KHANDWA Julwaniya 220 MADHAV 36 6 KHANDWA Julwaniya 220 BHEL 36 6 KHANDWA Bhikangaon 132 SHREEM 36 12 KHANDWA Sendhwa 132 SHREEM 36 12 KHANDWA Sanawad 132 SHREEM 36 12 KHANDWA Sanawad 132 UNISTAR 36 12 KHANDWA Kasrawad 132 SHREEM 36 12 KHANDWA Nimrani 220 SHREEM 36 6 KHANDWA Nimrani 220 BHEL 36 6 KHANDWA Dhamnod 132 SHREEM 36 6 KHANDWA Dhamnod 132 SHREEM 36 12 KHANDWA Balwada 132 ABB 36 12 KHANDWA Anjad 132 SHREEM 36 12 KHANDWA Anjad 132 SHREEM 36 12

Minutes of 56th OCCM of MP 39 Annexure-2.3.3 © Plan for installation of Capacitor Banks in 2017-18 Sl.No. Circle Capacitor Banks planned for 2017-18 Remark

1 Seoni 5x12MVAr at 220KV S/S Seoni, 132KV S/S Seoni, Nainpur, Katangi & Lalbarra

2 Sagar 3x12MVAR at , Nowgaon & Khajuraho, Banda 33MVAR 132KV at 132KV S/S Bhonra, 12MVAr at Chanderi , Maksudangarh, & 3 Bina 2x12MVAR at Bhonra, 1x12MVAr at Ishagarh, Mungaoli & Kothiya. Existing 5MVAr to be upgraded at 12MVAr at 220KV S/S Bina 1x12 MVAR at Mohna, & 1x12MVAr at 220KV S/S Shivpuri ,Kolaras , Karera 2x12MVAr 4 Gwalior bank work in progress at Hastinapur 5 Bhopal 3x12MVAR at Sarangpur & Kurawar

In Indore Circle 6x12MVAr banks are proposd to be comm. In Indore circle at Jamli, 6 Indore Kanwan, Petlawad, Kukshi, Alirajpur, Jhabua & Meghnagar

7 Ujjain 4x 12MVAr banks at 132Kv S/S Sonkatch, Shajapur , MSP Dewas & 220KV S/S Shujalpur

8 Nagda 132KV 1x33KV Neemuch and 2x12MVAr proposed at Nagda Circle

9 Khandwa 1x12MVAR banks at Moondi

Minutes of 56th OCCM of MP 40 ANNEXURE - 2.3.4(i) M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 31.01.2017) I EHV TRANSMISSION LINES S. TYPE OF ROUTE CIRCUIT DATE OF DATE OF No. NAME OF THE TRANSMISSION LINE / (FINANCED CIR CUITS LENGTH KMS. COMPL- COMMI- BY) ETION SSIONING

A. 400 KV TRANSMISSION LINES NIL 0 0 B. 220 KV TRANSMISSION LINES 1 LILO of 220 KV Katni - Satna line at PGCIL, Satna DCDS 0.7 1.40 April'16 09.04.2016 LILO of one Ckt of 220kv DCDS Bhopal - Ashta 2 line at 220kv S/S Mugaliya chhap. (DCDS) DCDS 26.46 52.92 June'16 18.06.2016 (2x26.459) (JICA) LILO of 220KV line Indore 400 -Pithampur at 3 Pithampur-II 220Kv S/s in Indore (2x6.898) DCDS 6.90 13.80 June'16 10.06.2016 (PFCIIi) 220Kv DCDS line from 400Kv S/s Bina to plant of 4 M/s Bharat Oman Refinaries Ltd. Agasod, Bina DCDS 18.197 36.394 Aug'16 01.08.2016 (2x18.197) (Contr.Works) C. 132 KV TRANSMISSION LINES 2nd Circuit of 132 Kv Gudgaon - Kukru Wind 1 2nd ckt 22.5 22.50 Aprilo'16 07.04.2016 Power Ltd. Betul (Contributory work) LILO of one circuit of Mandideep - Hoshangabad 2 for 132 KV Sub-Station Tamot(2x1.686) (REC-I) DCDS 1.686 3.37 Aprilo'16 30.04.2016 2nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha line 3 2nd ckt 48.27 48.27 May'16 10.05.2016 (48.30) ADB-III 132Kv 2phase 2wire S/c line from 132Kv s/s 4 DCSS 23.29 23.29 May'16 06.05.2016 Amla to GSS Bordehi of RVNL(1x23.5) Contrib 132Kv DCSS line from 132Kv S/s Madhotal to 11.5 MW Processing Plant of M/s Essel Jabalpur 5 DCSS 2.52 2.515 May'16 02.05.2016 MSW Pvt.Ltd. at Kathonda Dist- Jabalpur Contrib. 2nd Ckt.of 132 KV Rewa - Mangawan line (Dist. 6 Rewa) (JICA) approch section of mangawan end 2nd Ckt 8.829 15.066 June'16 27.06.2016 (4x2.079+1x6.75) (JICA) (Balance work) 132 kv DCSS Datiya- Bhander line (1x34.038)ADB- 7 DCSS 34.04 34.04 June'16 27.06.2016 III 132 kv DCSS Ashoknagar - Kothiya line 8 DCSS 37.50 37.50 June'16 09.06.2016 (1x27.5+4x2.5) ADB-III 132 kv DCSS line from 132Kv S/s Lahar - 132Kv 9 DCSS 16.70 16.70 June'16 24.06.2016 S/s Seondha (1x15.5) PFC-III 10 2nd ckt of Betul - Gudgaon line (1X57) ADB-III 2nd ckt 57.00 57.00 June'16 24.06.2016 132 kv DCDS line Panagar - Katangi (2x29.471) 11 DCDS 29.47 58.94 JULY'16 04.07.2016 PFC-II 132 kv DCSS line from 132Kv S/s Porsa - 132Kv 12 DCDS 22.52 22.52 Aug'16 11.08.2016 S/s Ambah (1x22.524) PFC-III 2nd Ckt.of 132Kv DCSS Katangi tap line tapped 13 to one ckt. Of 132Kv Balaghat-Seoni line DCDS 35.67 35.67 Aug'16 29.08.2016 (1x0.5+35.67) ADB-III 132 kv DCSS line Mehgaon - Pratappura 14 DCDS 29.74 29.74 Aug'16 31.08.2016 (1x29.74) ADB-III 132kv Jeerapur -Susner DCSS line (1x30.236) 15 DCSS 30.24 30.236 Sept'16 21.09.2016 (JICA) 2nd ckt of 132kv Bairagarh - Shyampur line 16 2nd ckt 19.04 19.04 Sept'16 28.09.2016 (1x0.5+4x1.9+19) (ADB-III) 132 kv Ashoknagar - Eshagarh DCSS line (1x37) 17 (Transco) DCSS 38.50 38.50 Sept'16 30.09.2016 (Est.Sanc.-0281dtd. 17.03.2015 for Rs.1895.67) 132KV DCDS line from 132KV S/s Pithampur (to 18 be upgrated) for Pithampur SEZ Phase-II of DCDS 0.54 1.08 Sept'16 10.09.2016 AKVN(2x0.54) (contr. work) 132 kv DCSS line Datiya - Dabra (1x23.091) PFC- 19 DCSS 23.09 23.09 Oct'16 comm. On 10.10.2016 III

Minutes of 56th OCCM of MP 41 2nd ckt of 132kv RTS Mangliyagaon line (Contr. 20 2nd ckt. 8.82 8.82 Oct'16 comm. On 19.10.2016 Work) 2nd ckt of 132Kv Chhatarpur- Khajuraho line 21 2nd ckt. 32.00 32 Oct'16 comm on 19.10.2016 (1x0.5+33.2) ADB-III 2nd ckt of 132kv Kukshi - Alirajpur line 22 2nd ckt. 35.82 35.82 Oct'16 comm. On 22.10.2016 (1x1+35.82) ADB-III 2nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera 23 2nd ckt. 32.14 32.14 Oct'16 comm. On 26.10.2016 line (32.138) ADB-III LILO of 132 kv Manawar - Kukshi Line at 132Kv 24 DCDS 3.10 6.2 Oct'16 comm on 27.10.2016 S/s Singhana(2x3.1) ADB-III 132Kv DCDS line for LILO of both circuit of 132Kv 25 Banmore -Morena/Hetampur DCDS line for 220Kv DCDS 3.755 13.46 Nov'16 comm. On 06.11.2016 S/s Morena(2x0.781+4x2.974) (PFC-III) LILO of 132 kv Chhegaon - Nepanagar Line at 132Kv 26 DCDS 1.895 3.79 Nov'16 comm. On 04.11.2016 S/s Pandhana(2x1.895) ADB-III LILO of Khargone - Julwaniya DP line(132Kv) at 27 DCDS 1.900 3.80 Nov'16 comm. On 20.11.2016 Talakpura (2x1.1+1x0.8) ADB-III 132kv DCSS Shujalpur( 220kv) - Pachhore DCSS line 28 DCSS 31.782 31.782 Dec'16 Comm. On 30.12.2016 (1x31.782) JICA 132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv 29 DCSS 57.197 57.197 Dec'16 comm. On 29.12.2016 S/s Kishangarh (1x57.197) (GoMP)

Minutes of 56th OCCM of MP 42 II. EHV SUB - STATIONS EFFECTI No.OF VOLTAGE VE DATE OF DATE OF S. NAME OF SUBSTATION / (DISTRICT) / X-mer RATIO CAPACI COMPL- COMMI- No. (FINANCED BY) & Cap. (KV) TY ETION SSIONING (MVA) MVA A. 400 KV SUBSTATIONS 1x125 MVAR 400 Kv Bus Reactor at existing 1 400Kv Aug'16 09.08.2016 400Kv S/s Nagda ADB-III Nil 0.00 B. 220 KV SUBSTATIONS a. 220 KV NEW SUBSTATIONS 220kv switching S/s at Nagra Dist- Ratlam 220/132 1 0.00 0 May'16 30.05.2016 Contrib. KV Mugaliachhap(Bhopal) 220kv (New 220/132 2 1x160 160 June'16 20.06.2016 S/s)(1x160+40) (JICA) KV Morena 220/132kv S/s 1x160 +1x63 MVA 220/132K comm. On 31.12.2016 3 +2No.220Kv FB +4No.132Kv FB+6No.33Kv FB+BC 1x160 160 Dec'16 V (from 132Kv side) +Capacitor Bank (PFC-III) C. 132 KV SUBSTATIONS a. 132KV NEW SUBSTATIONS 12.04.2016 (33KV side) Pratappura 132 KV New S/s (1x40) ADB-III (Dist- 1 132/33KV 1x40 40 April'16 & Bhind) 31.08.2016 (132KV side) Tamot 132kv s/s (Distt. Raisen ) 1x50MVA 2 132/33KV 1x40 40 May'16 05.05.2016 (REC-I)

3 Bhander 132kv s/s (Distt. Datia) 1x63 (ADB-II) 132/33KV 1x63 63 June'16 28.06.2016

Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA 4 132/33KV 1x40 40 June'16 09.06.2016 (ADB-III) 28.06.2016 from 33kV Katangi 132kv s/s with 1 no. 132 kv feeder bay 5 132/33KV 1x40 40 June'16 & & 1x40 MVA (Distt. - Jabalpur) (PFC-III) 05.07.2016 from 132Kv Pithampur SEZ- II 132kv s/s 1x63 MVA 6 132/33KV 1x63 63 Sept'16 19.09.2016 (Distt.Dhar) (contr.work) Singhana 132kv s/s (Distt. Dhar) 1x40 MVA (ADB- 7 132/33KV 1x40 40 Oct'16 comm on 27.10.2016 III) Pandhana 132kv s/s (Distt. Khandwa) 1x63 MVA 8 132/33KV 1x63 63 Nov'16 comm. On 04.11.2016 (ADB-III)

Minutes of 56th OCCM of MP 43 Talakpura 132kv s/s (Distt. Barwani) 1x40 MVA 9 132/33KV 1x40 40 Nov'16 comm. On 23.11.2016 (ADB-III) Kishangarh 132kv s/s with 1 no. 132 kv feeder 10 132/33KV 1x40 40 Dec'16 comm. On 29.12.2016 bay & 1x40 MVA (Distt. Dewash) (GoMP) 28.01.2017 (from 11 Rahatgarh132kv s/s (Distt.Sagar) (JICA) 132/33KV 1x40 40 Jan'17 33KV side)

Minutes of 56th OCCM of MP 44 Annexure-2.3.4(ii) EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.01.2017 Target for S. CKT. PROGRESS NAME OF THE TRANSMISSION LINE commis- No. KMS. IN % sioning A. 400 KV TRANSMISSION LINES 1 NIL 0 0% - B. 220 KV TRANSMISSION LINES 1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2016-17 Upgradation of 132KV D/C Indore-II (Jaitpura) - Indore(N/Z) line on composite multi circuit monopole & LILO of one Ckt of 220kv Indore-II 2 35.8 63% 2018-19 (Jaitpura) - Indore(400KV) line at 220kv S/S Indore(N/Z) (2x0.5+2x4+4x6.7) LILO of 2nd circuit of Damoh (MPPTCL) - Sagar 220KV line at Damoh 3 2.368 20% (PGCIL) 400 kV Sub-station Damoh (4x0.592) LILO of one circuit of Satna (MPPTCL) - Chhatarpur 220KV line at Satna 4 3.452 8% (PGCIL) 400 kV Sub-station (2x1.726) 5 220Kv DCDS line from Gwalior(Malanpur)- Morena (2X29.25) 58.5 92% 2016-17 LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda 6 66 3% 2017-18 (DCDS) (2x32.782) 7 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37% 2017-18 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 8 34 4% 2017-18 400Kv S/s Badnawar (2x1+4x8) 9 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16% 2017-18 10 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15% 2017-18 220Kv DCDS line for inter-connection of 400Kv S/s Betul with 220Kv 11 3.76 20% S/s Betul (2x1.88) 220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS 12 line & lilo of Morena 400KV S/s (Adani) to Sabalgarh at Morena 220Kv 185 4% s/s (2X92 + 2x0.5) LILO of one circuit of Malanpur - Mehgaon at 400Kv S/s CWRTL (Adani) 13 16 0% (2x8) LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220 KV S/s. 14 11.386 15% (2X5.693) C. 132 KV TRANSMISSION LINES 1 132kv Ichhawar -Sehore DCSS line (1x35.298) 35.298 86% 2017-18 2 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 80% 2016-17 3 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2016-17 4 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2016-17 5 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2016-17 6 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2016-17 7 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 30% 2016-17 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi 8 53.209 38% 2017-18 s/s(1x53.209) LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni 9 40 7% 2017-18 (2x20) 10 132 kv DCSS Guna-Eshagarh line (1x72) 72 32% 2017-18 11 132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32.859) 32.859 32% 2017-18 12 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49% 2017-18 13 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35) 35 25% 2017-18 14 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18% 2017-18

15 132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31.059) 31.059 20% 2017-18

16 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 35% 2016-17 LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera 17 55.09 36% 2016-17 line at 220 KV S/s Gwalior II) (2x2x7.87) 18 132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x50) 50 40% 2016-17 19 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 28% 2017-18 20 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 20% 2017-18

Minutes of 56th OCCM of MP 45 LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli 21 (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by 32.6 96% 2017-18 tapping ) 22 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46% 2016-17 23 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 45% 2018-19 24 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7% 2017-18 25 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 36% 2016-17 26 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16% 2017-18

27 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 5%

28 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 55% 2017-18 29 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38% 2017-18 30 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 18% 2017-18 31 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 13% 2017-18 32 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15% 2017-18 LILO of 132KV Gwalior- Dabra/Karera line at Chinour (132KV DCSS 33 Dabra- Chinour line) (2X13.68) & LILO of 2ND CIRCUIT OF 132KV 27.36 7% Gwalior- pIChore at 132Kv S/s Dabra (2X0.108) 34 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 28% 2016-17 35 132kv DCSS Chhegaon -Singot line (1x58) 58 1% 36 132kv DCSS Chhanera -Khirkiya line (1x30.42) 30.42 12% 37 LILO of 132kv Nagda - Ratadiya line Unhel 132KV Sub-station (2x2) 4 20% 38 132kv DCSS line from Kolaras - Mada line (1x18.366) 18.366 9% 39 132kv DCSS line Chhindwara-Saori line (1x31.60) 31.6 2% 132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. 40 45 10% 2018-19 Sanc.no.0187dtd.05.09.2016) 41 132 KV DCSS Kukshi Jobat line (1x33.74) 33.74 11% 2017-18 42 132Kv line from 220KV S/s Dhar to plant of M/s Vacmet (1x11.367) 11.367 89% 132Kv DCSS line from GWSTPP to upcoming Make up Water Pump 43 24.192 20% House river Narmada (Line-I)(1x24.192) 132Kv Chichli - Gadarwara Super Thermal Power Plant for startup 44 5.79 100% power(1x5.79) 132Kv 2 phase 2wire line from 132Kv s/s Semri-Harchan for PS to RTS 45 4.3 98% Bagra Tawa(1x4.3) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to 46 0.19 89% TSS Majhgawan(1x0.19) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS 47 0.4 74% Rewa(1x0.4) 132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn plant of 48 3.1 30% M/s Sagar Manufacturer (P) Ltd.(1x3.1) 2nd circuit of 132KV 2 Phase 2 wire line from 220KV Guna to RTS Guna 49 8 90% RVNL (1x8)

Minutes of 56th OCCM of MP 46 EFFECTIVE Target for S. PROGRESS NAME OF THE SUBSTATION CAPACITY commis- No. IN % MVA sioning

A. 400 KV SUBSTATIONS 400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 1 200 11% 2017-18 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat) 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer 2 630 14% 2017-18 (Distt.Balaghat) Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer 3 315 26% 2016-17 (Distt.Bhopal)

4 Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa) 315 62% 2016-17

B. a 220 KV SUBSTATIONS Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA 1 160 2% 2017-18 (Distt. ) Upgradation of Depalpur 132Kv S/s to 220kv with 2 160 9% 2017-18 1x160MVA(Distt. ) 3 Adampur 220/33kv S/s 2x50MVA 100 8% 2017-18 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA 4 160 11% 2017-18 (Distt. ) Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA 5 +1x50MVA 132KV X-mer 320 2% (Distt. ) Upgradation of Shahdol 132Kv S/s to 220kv with 1x160MVA 6 160 7% (Distt. ) 220/132 KV S/s Mangliya with 1x160MVA+ 63MVA 132/33KV X- 7 160 1% mer 8 220/33Kv Pooling Sub-station at Suwasara (Gujarkhedi) 0 13% C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Bairad 132kv s/s (Dist.-Shivpuri ) 40 40% 2017-18 2 Barahi 132kv s/s (Distt. Katni) 40 11% 2017-18 3 Karapgaon 132kv s/s (Distt- Narsinghpur) 40 14% 2017-18 4 Indergarh 132kv s/s (Distt. Datia) 40 58% 2017-18 5 Biston 132kv s/s1x40 MVA (Distt. ) 40 24% 2017-18 6 Agrod 132kv s/s 1x40 MVA (Distt. ) 40 59% 2017-18 7 Chhayan 132kv s/s1x40 MVA (Distt. ) 40 78% 2016-17 8 Teesgaon 132kv s/s 1x40MVA (Distt. ) 40 26% 2016-17 9 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) 40 3% 2017-18 10 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 35% 2017-18 11 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 4% 2017-18 12 Khimlasa 132kv s/s 1x40 MVA (Dist. ) 40 3% 2017-18 13 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 17% 2017-18 14 Chinaur 132kv s/s1x40 MVA (Dist. ) 40 72% 2016-17 15 Kelaras 132kv s/s with 1x63 MVA (Dist. ) 63 48% 2016-17

Minutes of 56th OCCM of MP 47 16 Narsinghgarh 132kv s/s with 1x40 MVA (Dist. ) 40 7% 2016-17 17 Salamatpur 132kv s/s with 1x40 MVA (Dist. ) 40 51% 2016-17 18 Intkhedi 132kv s/s 1x63 MVA (Dist. ) 63 71% 2017-18 19 Silvani 132kv s/s with 1x40 MVA (Dist. ) 40 12% 2017-18 20 Udaipura 132kv s/s with 1x40 MVA (Dist. ) 40 20% 21 Singot 132kv s/s with 1x50 MVA (Dist. ) 50 3% 22 Unhel 132kv s/s with 1x50 MVA (Dist. ) 50 12% 23 Bilkishganj 132kv s/s with 1x50 MVA (Dist. ) 50 16% 24 Mada 132kv s/s with 1x50 MVA (Dist. ) 50 4% 25 Jobat 132kv s/s with 1x40 MVA (Dist. ) 40 40% 2017-18

Minutes of 56th OCCM of MP 48 Discoms wise Average Supply Hours

East Zone Central Zone PARTICULARS Dec-16 Jan-17 Dec-16 Jan-17

Commissinary HQ 23:55 23:56 23:39 23:34

District HQ 23:54 23:55 23:49 23:44

Tehsil HQ 23:49 23:50 23:34 23:33

Rural -Mixed 23:30 23:34 22:56 22:50

Rural -DLF 23:30 23:33 23:05 23:10

Rural -Irrigation 9:58 9:58 9:40 9:38

West Zone MP PARTICULARS Dec-16 Jan-17 Dec-16 Jan-17

Commissinary HQ 23:55 23:55 23:49 23:47

District HQ 23:55 23:55 23:53 23:52

Tehsil HQ 23:50 23:49 23:44 23:44

Rural -3Phase 23:07 23:08 23:13 23:13

Rural -1Phase 23:36 23:39 23:24 23:27

Total Rural 9:51 9:51 9:50 9:49

Minutes of 56th OCCM of MP 49 Annexure-2.4(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION

Date of Date of Name of EHV commission- commission- Name of 33KV feeder Substation ing of feeder ing of feeder bay 220KV 31.12.2014 31.07.2015 33kV Barodra 220KV Panagar 31.12.2014 18.05.2016 33kV Belkhadu

33kV Rampur 17.07.2014 17.07.2014 220KV Jabalpur

33kV Mahakoushal 220KV Narsinghpur Sugar & Power 25.05.2016 25.05.2016 Industries Ltd. 132KV 132KV Madhotal 33kV Sihora-Panagar 08.12.2011 08.12.2011 132KV Patan 33kV Ronsara-2 30.06.2015 10.11.2015 132KV Chourai 33kV Panjra-II 31.07.2015 25.09.2016

132KV Lalbarra 33kV Lamta 29.12.2015 20.08.2016 33kV Nevergaon 29.12.2015 20.08.2016

132KV Umreth 33kV Kanhargaon 14.03.2016 24.09.2016 33kV Gajandoh 03.03.2016 06.09.2016 33kV Boriya 28.06.2016 18.11.2016 132KV Katangi 33kV Pola 28.06.2016 15.09.2016 33kV Katangi 28.06.2016 05.08.2016 33kV Kymori 28.06.2016 07.07.2016

REWA REGION

Date of Date of Name of EHV commission- commission- Name of 33KV feeder Substation ing of feeder ing of feeder bay 220KV 33kV Dewas 03.04.2016 Load taken 220KV Sirmour 33kV Patehra 07.01.2017 Load taken 132KV 132KV Sidhi 33kV Patpara-II 30.06.2015 Load taken 132KV Katra 33kV Garh 17.08.2015 Load taken 33kV Navjeevan Bihar 30.06.2015 Load taken 132KV Waidhan 33kV Kathani (NTPC) 30.06.2015 Load taken 33kV Jayant 07.02.2016 Load taken 132KV Rajmilan 33kV REC -- Load taken 33kV PGCIL 30.06.2015 Load taken 132KV Nagod 33kV Vashudha 23.07.2015 18.12.2015 132KV Majhgawan 33kV Birsinghpur 30.07.2015 07.08.2015 132KV Rampur 33kV Silpari 30.06.2015 02.07.2015 132KV Umariya 33kV Chandiya-II 28.01.2013 26.12.2014

132KV Shahdol 33kV Pandavnagar 07.07.2014 01.12.2015 (Singhpur line)

E:\E-DRIVE\OCC\56TH-OCC\JBP_23.01.2017.doc

Minutes of 56th OCCM of MP 50 ANNEXURE-2.4(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION Name of EHV Name of 33KV feeder Date of Date of Substation commissioni commissioning ng of feeder of feeder bay 220KV

NIL 132KV

132KV Badgaon 33KV Discom Bay 29.11.2014 25.09.2015 33KV Khamni 29.11.2014 25.09.2015

132KV Khandwa 33KV Amalpura 30.01.2011 19.08.2016

132KV Moondi 33KV Chandel 31.01.2013 27.10.2016

132KV Chhegaon- 33KV Khandwa Oil --- 18.11.2016 Makhan 33KV Chamati 04.11.2016 20.11.2016

132KV Pandhana 33KV Borgaon 26.11.2016 26.11.2016 33KV Dhulkot 03.12.2016 03.12.2016

132KV Kasrawad 33KV Ashok Spoon 07.11.2016 07.11.2016 33KV Kathora 15.11.2016 15.11.2016

132KV Talakpura 33KV Talakpura 20.12.2016 20.12.2016 33KV Lonara 20.12.2016 20.12.2016

132KV Andhad 33KV Multhan 03.09.2016 03.09.2016 33KV Dewla 27.10.2016 27.10.2016 33KV Ahirkheda 02.11.2016 02.11.2016

132KV Anjad 33KV Shivai 29.12.2016 29.12.2016

UJJAIN REGION Name of EHV Name of 33KV feeder Date of Date of Charging Substation commissionin of feeder g of feeder bay 220KV 220KV Neemuch 33kV Saroda 16.02.2013 07.10.2016 220KV Daloda 33kV Nimbod 25.06.2016 29.06.2016 132KV 132KV Malhargarh 33kV Billod 31.10.2015 17.10.2016 132KV Garoth 33kV Saathkeda 01.11.2013 21.09.2016 132KV A lot 33kV NVR Solar-I 15.09.2016 22.09.2016 33kV NVR Solar-II 15.09.2016 22.09.2016

E:\E-DRIVE\OCC\56TH-OCC\IND-04.02.2017.doc

Minutes of 56th OCCM of MP 51 ANNEXURE-2.4(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated) BHOPAL REGION Date of Date of Name of EHV Name of 33KV feeder charging of charging of Substation feeder bay feeder 220 KV 220 KV Ganjbasoda 33 KV AKVN Kanjna Pathar 20.10.2016 -- 33 KV Simcon Solar Power 18.11.2016 132 KV 132 KV Bareli 33 KV Boras 19.02.2014 --

132 KV Biora 33 KV Nagar Palika 09.03.2014 --

132 KV MACT Bhopal 33 KV Bairagarh chichli-2 15.11.2014 --

132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --

132 KV Amrawad- 33 KV Katara Hills-II 01.06.2016 -- Khurd

GWALIOR REGION Name of EHV Date of Date of Name of 33KV feeder charging of charging of Substation feeder bay feeder 220 KV 220 KV Sagalgarh 33 KV Mangrol 30.05.2014 -- 132 KV 132 KV Datia 33 KV Karapura 17.05.2014 -- 132 KV Ron 33 KV Mangarh 21.11.2013 --

132KV S/s Gohad 33kV Gohad 03.12.2015 11.07.2016

22.10.2016 24.10.2016 33kV Ater 132KV S/s Pratappura 22.10.2016 23.12.2016 33kV Pratappura

132KV S/s Vijaypur 33kV Dord 22.08.2011 29.07.2016 E:\E-DRIVE\OCC\56TH-OCC\BPL-11.01.2017.doc

Minutes of 56th OCCM of MP 52 Annexure-3.2 PROPOSED SHUT DOWN PROGRAMME OF TANSMISSION ELEMENTS OF 400 KV EQUIPMENTS/FEEDER FOR THE DURATION 01-03-2017 TO 30-04-2017 PERIOD OF S- NAME OF 400KV NAME OF 400KV CIRCUIT DURATION DATE MAINTENANCE WORK PROPOSED NO- SUB-STATION EQUIPMENT/FEEDER/LINE NO. FROM TO IN HRS-

A 400KV Transformers / Reactors 03-04-17 to 1 Katni 400 315MVA 400/220KV BHEL Transformer-I I 09:00 17:00 32 Hrs. Pre Monsoon Maintenance & Testing work. 04-04-17 06-04-17 to 2 Katni 400 315MVA 400/220KV TELK Transformer-II II 09:00 17:00 32 Hrs. Pre Monsoon Maintenance & Testing work. 07-04-17 3 Chhegaon 400 400KV 50MVAR Reactor - 16-Mar-17 09:00 18:00 9 Hrs. Pre Monsoon Maintenance & Testing work. 2-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 4 Indore 400 3x105MVA 400/220KV Transformer-I I 3-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 6-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 5 Indore 400 315MVA 400/220KV Transformer-II II 7-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 9-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 6 Indore 400 315MVA 400/220KV Transformer-IV IV 10-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 7 Pithampur 400 315MVA 400/220KV Transformer-I I 14-Mar-17 10:00 24:00 Pre Monsoon Maintenance & Testing work. 31 Hrs. 8 Pithampur 400 315MVA 400/220KV Transformer-I I 15-Mar-17 00:00 17:00 Pre Monsoon Maintenance & Testing work. 9 Pithampur 400 315MVA 400/220KV Transformer-II II 16-Mar-17 10:00 24:00 Pre Monsoon Maintenance & Testing work. 31 Hrs. 10 Pithampur 400 315MVA 400/220KV Transformer-II II 17-Mar-17 00:00 17:00 Pre Monsoon Maintenance & Testing work. 11 Pithampur 400 400KV 50MVAR Reactor-I I 3-Mar-17 10:00 17:00 07 Hrs. Pre Monsoon Maintenance & Testing work. 12 Pithampur 400 400KV 50MVAR Reactor-II II 4-Mar-17 10:00 17:00 07 Hrs. Pre Monsoon Maintenance & Testing work.

13 Nagda 400 315MVA 400/220KV Transformer-I I 07-03-17 to 08-03-17 09:00 17:00 32 Hrs Pre Monsoon Maintenance & Testing work.

14 Nagda 400 315MVA 400/220KV Transformer-IV IV 16-03-17 to 17-03-17 09:00 17:00 32 Hrs Pre Monsoon Maintenance & Testing work.

15 Bina 400 400KV 50MVAR Reactor-II II 6-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work.

16 Bina 400 400 KV 50MVAR Bus Reactor - 20-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work.

17 Bina 400 400KV 50MVAR Reactor-I I 24-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work.

18 Bhopal 400 400KV 80MVAR Reactor-I I 9-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 19 Bhopal 400 400KV 80MVAR Reactor-II II 15-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 20 Bhopal 400 315MVA Transformer-I I 21-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 21 Bhopal 400 315MVA Transformer-I Tie I 22-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 22 Bhopal 400 315MVA Transformer-II II 26-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 23 Bhopal 400 315MVA Transformer-II Tie II 27-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 24 Bhopal 400 315MVA Transformer-III III 10-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 25 Bhopal 400 315MVA Transformer-III Tie III 11-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work.

Minutes of 56th OCCM of MP 53 PERIOD OF S- NAME OF 400KV NAME OF 400KV CIRCUIT DURATION DATE MAINTENANCE WORK PROPOSED NO- SUB-STATION EQUIPMENT/FEEDER/LINE NO. FROM TO IN HRS-

B 400KV Feeders / Bays

1 Katni 400 400KV Birsinghpur - 1 I 11-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 2 Katni 400 400KV Birsinghpur - 2 II 13-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 3 Katni 400 400KV Damoh - 15-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 4 Indore 400 400KV Bus Transfer - 11-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 5 Indore 400 400KV Bus Coupler - 3-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 6 Indore 400 400KV Main Bus -I I 6-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 7 Indore 400 400KV Main Bus -II II 7-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 3-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 8 Nagda 400 400KV Nagda-Rajgarh-I line with Reactor I 4-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 10-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 9 Nagda 400 400KV Nagda-Rajgarh-II line with Reactor II 11-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance & Testing work. 10 Nagda 400 400KV Rajgarh-I I 21-Mar-17 09:00 17:00 8HRS Pre Monsoon Maintenance & Testing work. 11 Nagda 400 400KV Rajgarh-II II 22-Mar-17 09:00 17:00 8HRS Pre Monsoon Maintenance & Testing work. 12 Bina 400 400KV BPSCL - 27-Mar-17 09:00 17:00 8HRS Pre Monsoon Maintenance & Testing work. 13 Bina 400 400KV Bhopal-I I 17-Apr-17 09:00 17:00 8HRS Pre Monsoon Maintenance & Testing work. 14 Bina 400 400KV Bhopal-II II 26-Apr-17 09:00 17:00 8HRS Pre Monsoon Maintenance & Testing work. 15 Bhopal 400 400KV Itarsi-I I 1-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 16 Bhopal 400 400KV Itarsi-II II 2-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 17 Bhopal 400 400KV Bina -I I 3-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 18 Bhopal 400 400KV Bina -II II 4-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 19 Bhopal 400 400KV BDTCL-I I 6-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 20 Bhopal 400 400KV BDTCL-II II 7-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 21 Bhopal 400 400KV Bus-I I 21-Apr-16 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 22 Bhopal 400 400KV Bus-II II 22-Apr-16 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. C 220KV Feeders / Bays

1 Sukha 220 220KV ICT - 1 Bay I 21-Mar-17 09:00 17:00 08 Hrs. For bay equipment maintenance work 2 Sukha 220 220KV ICT - 1 Bay I 22-Mar-17 09:00 17:00 08 Hrs. For bay equipment maintenance work 3 Sukha 220 220KV ICT - 2 Bay II 27-Mar-17 09:00 17:00 08 Hrs. For bay equipment maintenance work 4 Sukha 220 220KV ICT - 2 Bay II 28-Mar-17 09:00 17:00 08 Hrs. For bay equipment maintenance work 5 Mahalgaon 220 220KV PGCIL-I I 17-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 6 Mahalgaon 220 220KV PGCIL-II II 21-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 7 Mahalgaon 220 220KV Bina - 23-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 8 Mahalgaon 220 220KV Datia - 28-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 9 Malanpur 220 220KV PGCIL-I I 7-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work.

Minutes of 56th OCCM of MP 54 PERIOD OF S- NAME OF 400KV NAME OF 400KV CIRCUIT DURATION DATE MAINTENANCE WORK PROPOSED NO- SUB-STATION EQUIPMENT/FEEDER/LINE NO. FROM TO IN HRS-

10 Malanpur 220 220KV PGCIL-II II 8-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 11 Malanpur 220 220/132KV 160MVA Transformer-I I 9-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 12 Malanpur 220 220/132KV 160MVA Transformer-II II 10-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 13 Malanpur 220 220KV Auraiya - 13-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 14 Mehgaon 220 220KV Auraiya - 14-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 15 Mehgaon 220 160MVA Transformer-I I 14-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 16 Mehgaon 220 160MVA Transformer-II II 15-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 17 Datia 220 220KV Bina - 20-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 18 Datia 220 220KV Gwalior - 21-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 22-03-17 to 19 Shivpuri 220 220/132KV 160MVA EMCO-I I 10:00 17:00 31 Hrs. Pre Monsoon Maintenance & Testing work. 23-03-17 20 Malanpur 220 220KV PGCIL-I I 5-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 21 Malanpur 220 220KV PGCIL-II II 6-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 22 Pithampur 400 220KV Badnagar-I I 20-Mar-17 10:00 17:00 07 Hrs. Maintenance & relay testing work 23 Pithampur 400 220KV Indore-I I 21-Mar-17 10:00 17:00 07 Hrs. Maintenance & relay testing work 24 Pithampur 400 220KV Interconnector- I I 22-Mar-17 10:00 17:00 07 Hrs. Maintenance & relay testing work 25 Pithampur 400 220KV Interconnector- II II 23-Mar-17 10:00 17:00 07 Hrs. Maintenance & relay testing work 26 Indore 400 220KV South Zone I I 15-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 27 Indore 400 220KV South Zone II II 16-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 28 Indore 400 220KV Jetpura I I 20-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 29 Indore 400 220KV Jetpura II II 21-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 30 Indore 400 220KV Barwaha I I 22-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 31 Indore 400 220KV Barwaha II II 23-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 32 Indore 400 220KV Pithampur - 24-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 33 Indore 400 220KV Badnagar - 25-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 34 Indore 400 220KV Indore-East - 27-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 35 Indore 400 220KV Dewas - 28-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 36 Indore 400 220KV Bus Transfer - 29-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 37 Indore 400 220KV Bus Coupler - 8-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 38 Indore 400 220KV Main Bus -I I 10-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 39 Indore 400 220KV Main Bus -II II 11-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 40 Sagar 220 220KV Damoh - 4-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 41 Sagar 220 220KV Bina -II II 6-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 42 Sagar 220 220KV Bina -I I 7-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 43 Sagar 220 220KV Traction-I I 10-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work.

Minutes of 56th OCCM of MP 55 PERIOD OF S- NAME OF 400KV NAME OF 400KV CIRCUIT DURATION DATE MAINTENANCE WORK PROPOSED NO- SUB-STATION EQUIPMENT/FEEDER/LINE NO. FROM TO IN HRS-

44 Sagar 220 220KV Traction-II II 11-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 45 Damoh 220 220KV Katni - 10-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 46 Damoh 220 220KV Tikamgarh - 11-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 47 Damoh 220 220KV Traction-I I 13-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 48 Damoh 220 220KV Traction-II II 15-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 49 Chhatarpur 220 220KV Satna - 16-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 50 Bina 400 220KV Ashok Nagar - 2-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 51 Bina 400 220KV Bina I/C-I I 15-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 52 Bina 400 220KV Bina I/C-II II 24-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 53 Bina 400 220KV Guna - 3-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 54 Bina 400 220KV Sagar-I I 6-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 55 Bina 400 220KV Sagar-II II 10-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 56 Ashta 400 160MVA AREVA-I - 4-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 57 Ashta 400 160MVA BHEL-II 6-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 58 Ashta 400 100MVA AREVA - 7-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 59 Ashta 400 220KV Bhopal - 10-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 60 Ashta 400 220KV Mugaliachaap - 11-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 61 Ashta 400 220KV Dewas-I I 12-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 62 Ashta 400 220KV Dewas-II II 13-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 63 Ashta 400 220KV Jetpura-I I 15-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 64 Ashta 400 220KV Jetpura-II II 17-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 65 Ashta 400 220KV Shajapur-I I 18-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 66 Ashta 400 220KV Shajapur-II II 24-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 67 Ashta 400 220KV Bus Tie - 26-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 68 Ashta 400 220KV Bus Coupler - 27-Apr-17 09:00 18:00 Hrs 9:00 Hrs Bay Maintenance & Testing work. 69 Bhopal 400 220KV Vidisha - 10-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 70 Bhopal 400 220KV Bus-I I 16-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 71 Bhopal 400 220KV Bus-II II 17-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 72 Bhopal 400 220KV ICT-I I 24-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 73 Bhopal 400 220KV ICT-II II 28-Mar-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work. 74 Bhopal 400 220KV ICT-III III 12-Apr-17 09:00 17:00 08 Hrs. Pre Monsoon Maintenance Work.

Minutes of 56th OCCM of MP 56 Unitwise / Stationwise Genration in MU A. Thermal Annexure 4.1 Capacity Stn. Name UNIT No. MW Dec-16 Jan-17 3 120 0.00 0.00 4 120 0.00 0.00 PH II 240 0.00 0.00 5 210 154.90 154.19 PH III 210 154.90 154.19 AMARKANTAK TOT 210 154.90 154.19 6 200 92.84 96.97 7 210 45.71 21.75 PH II 410 138.55 118.72 8 210 19.76 0.00 9 210 10.52 0.00 PH III 420 30.28 0.00 SATPURA 10 250 93.85 115.41 11 250 173.40 136.53 PH IV 500 267.25 251.94 TOT 1330 436.08 370.66 1 210 90.80 122.90 2 210 118.39 115.76 PH I 420 209.19 238.66 3 210 74.95 78.53 4 210 118.70 80.52 PH II 420 193.65 159.05 5 500 325.69 307.60 SANJAY GANDHI PH III 500 325.69 307.60 TOT 1340 728.52 705.31 1 600 315.03 124.20 2 600 301.89 308.82

SSTPS PH1 1200 616.92 433.02 MPPGCL THERMAL 4080 1936.43 1663.18 Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015. B. Hydel Station Name Capacity MW Dec-16 Jan-17 GANDHISAGAR 115.0 53.12 68.78 R.P.SAGAR 172.0 75.36 72.50 J.SAGAR 99.0 48.62 46.20 CHAMBAL 386.0 177.09 187.48 M.P.CHAMBAL 193.0 88.54 93.74 PENCH 160.0 23.44 33.68 M.P.PENCH 107.0 15.63 22.46 BARGI 90.0 35.51 32.40 TONS 315.0 128.74 123.16 BIRSINGHPUR 20.0 0.22 0.26 B.SGR(DEOLONDH) 60.0 0.00 0.00 B.SGR(SILPARA) 30.0 14.14 13.05 RAJGHAT 45.0 10.46 12.62 M.P.RAJGHAT 22.5 5.23 6.31 B.SGR(JINHA) 20.0 15.69 15.00 MADIKHEDA 60.0 16.86 8.96 TOTAL HYDEL 1186.0 422.14 426.62 MPPGCL Hydel 915.0 298.17 307.92 MPSEB HYDEL Share 917.5 320.56 315.34

C. NHDC (Ex-Bus) Station Name Capacity MW Dec-16 Jan-17 Indira Sagar Hydel Project 1000 214.615 262.805 Omkareshwar Hydel Project 520 87.730 109.346

Minutes of 56th OCCM of MP 57 ENERGY BALANCE SHEET Annexure-4.2 Year : 2016 - 17 All figures in Million Unit S No. Source Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total 30 31 30 31 31 30 31 30 31 31 0 0 306 A. M.P. Availability 1 Thermal 1534.26 1058.71 641.73 332.22 352.62 928.27 1206.18 1404.48 1778.77 1519.50 0.00 0.00 10756.74 2 Hydel 71.27 73.63 49.50 146.54 372.19 392.84 393.36 315.61 317.57 312.04 0.00 0.00 2444.57 3 Total 1605.53 1132.35 691.22 478.76 724.82 1321.11 1599.54 1720.09 2096.34 1831.55 0.00 0.00 13201.30 B. Exchange with other States / Systems 1 Indira Sagar 120.81 146.45 52.97 496.81 731.60 304.97 330.31 229.04 209.31 258.23 0.00 0.00 2880.50 2 Omkareshwar 65.89 75.81 31.09 215.83 290.23 131.97 143.58 95.50 87.73 109.35 0.00 0.00 1246.97 3 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 933.38 1494.56 1394.87 1744.29 1828.76 1702.15 0.00 0.00 15007.93 4 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 11.58 14.23 14.21 12.01 29.69 20.23 0.00 0.00 200.47 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 944.96 1508.79 1409.08 1756.30 1858.45 1722.38 0.00 0.00 15208.40 6 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -92.98 -83.76 -97.98 -84.65 -71.95 -50.71 0.00 0.00 -748.06 7 Schedule From DVC ER 232.92 202.40 229.04 111.04 8.12 57.86 134.56 201.32 226.28 191.79 0.00 0.00 1595.34 8 Schedule From Sugen 0.00 0.00 0.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 9 LANCO Amk 195.30 186.44 187.18 144.74 54.50 140.13 149.39 148.45 178.19 148.02 0.00 0.00 1532.33 10 SASAN 988.04 886.52 921.35 834.99 589.41 616.28 784.87 988.66 934.90 1011.15 0.00 0.00 8556.17 11 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 J P Nigri 278.92 323.20 295.64 250.95 308.17 318.10 326.63 309.14 180.43 277.32 0.00 0.00 2868.51 13 MB Power 63.53 131.56 84.34 18.07 14.29 43.26 51.57 139.47 87.64 81.91 0.00 0.00 715.64 14 JHABUA Power 0.00 20.41 3.30 0.00 0.00 0.00 0.00 0.21 3.22 0.00 0.00 0.00 27.14 15 STOA Schedule other than MPPMCL 8.69 63.07 64.44 75.76 80.19 19.73 49.39 -82.36 -96.21 1.02 0.00 0.00 183.72 16 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 527.28 268.86 313.48 77.27 55.04 50.71 0.00 0.00 1657.30 19 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 161.40 161.67 155.33 146.77 153.65 157.12 0.00 0.00 1529.76 20 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 11.49 19.42 19.06 11.87 13.52 12.55 0.00 0.00 101.63 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA 22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CSPDCCL dtd. 18.09.2012 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.09.2012 Including Short term purchase against MTOA 24 Additional Power Purchase 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.93 0.59 0.00 0.00 12.05 25 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26 Banking of Energy -145.84 -11.74 -77.54 -210.04 -297.14 -149.27 -1.48 527.43 459.10 321.09 0.00 0.00 414.57 27 Sale of Power -321.72 -171.39 -105.78 -155.59 -512.51 -399.33 -472.36 -97.70 -42.75 -77.47 0.00 0.00 -2356.59 28 Total MP Schedule (Including Railway) 3261.91 3226.81 3477.52 2627.92 1890.17 2605.51 2919.52 4126.83 4016.40 3898.19 0.00 0.00 32050.78 29 Total MP Drawal (Including Railway) 3214.44 3156.63 3417.72 2539.32 1797.19 2521.75 2821.54 4042.19 3944.45 3847.48 0.00 0.00 31302.72 30 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 11.38 8.33 5.95 10.89 9.84 7.68 0.00 0.00 60.93 31 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 12.96 6.17 6.30 2.33 2.53 4.01 0.00 0.00 107.53 32 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 8.05 12.82 14.09 14.40 12.71 13.72 0.00 0.00 129.54 33 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 0.13 0.98 0.62 0.54 1.11 1.11 0.00 0.00 7.77 34 POWER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -10.91 2.46 9.39 0.31 9.84 5.74 0.00 0.00 10.42 36 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 496.33 279.71 158.80 75.47 109.87 196.95 0.00 0.00 2865.79 37 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 48.36 77.74 85.50 86.28 89.97 85.33 0.00 0.00 800.17 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. 38 20.37 8.23 8.07 21.17 23.00 50.10 27.77 153.03 187.42 59.39 0.00 0.00 558.53 purchase by MP +Wheeled enrgy of CPP / IPP Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient 39 10.35 8.46 9.39 6.14 8.23 8.82 7.29 11.11 14.80 9.14 0.00 0.00 93.74 Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW 40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 9.00 5.66 4.88 4.34 5.30 4.57 0.00 0.00 46.87 41 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 0.16 1.69 0.00 0.00 0.00 0.21 0.00 0.00 15.67 42 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 0.00 17.27 6.51 25.86 29.62 8.16 0.00 0.00 91.29 43 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.55 0.93 2.01 2.03 1.99 0.00 0.00 7.56 44 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 -41.40 -14.62 -35.68 -59.26 -41.47 -30.00 0.00 0.00 -221.75 45 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 2.62 -0.02 -0.03 2.47 2.41 2.71 0.00 0.00 13.62 46 State Supply (Ex-Power st. Bus) 5406.06 5101.59 4767.84 4299.45 4111.75 4737.46 5187.28 6416.59 6773.82 6417.34 0.00 0.00 53219.18 47 AVERAGE DAILY (Ex-Bus) 180.20 164.57 158.93 138.69 132.64 157.92 167.33 213.89 218.51 207.01 #DIV/0! #DIV/0! 173.92 48 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 92.82 135.71 143.39 189.11 205.79 167.22 0.00 0.00 92.82 49 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 142.69 177.30 194.93 214.77 219.26 212.20 0.00 0.00 219.26 50 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4367.73 4896.38 4154.87 4286.84 4466.27 5138.62 6383.83 6369.03 6761.28 6232.92 5759.47 5331.43 53057.76 51 Year ((16-17)-(15-16))*100/Year (15-16) 23.77 4.19 14.75 0.29 -7.94 -7.81 -18.74 0.75 0.19 2.96 -100.00 -100.00 0.30 52 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.60 0.00 0.00 6.24 53 Frequency Correction 3.92 1.95 2.34 1.38 1.52 1.86 1.89 3.34 4.28 2.32 0.00 0.00 24.81 54 Restricted Requirement : Year-2016-17 5409.99 5108.91 4770.18 4301.10 4113.27 4739.32 5189.17 6419.93 6778.10 6420.26 0.00 0.00 53250.23 55 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56 Un-Restricted Requirement : Year-2016-17 5409.99 5108.91 4770.18 4301.10 4113.27 4739.32 5189.17 6419.93 6778.10 6420.26 0.00 0.00 53250.23

Minutes of 56th OCCM of MP 58 ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2016 - 17 S.NO. Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17 C. MORNING PEAK (MAX) 1 DEMAND MET 7984 7347 7019 6147 6146 7909 8790 10816 11421 11198 0 0 11421 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 D. EVENING PEAK (MAX) 1 DEMAND MET 8011 7902 7501 6903 6964 7963 8656 9487 9693 9589 0 0 9693 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 F. REGISTERED MAXIMUM 8119 8045 7501 6903 6964 7963 8790 10816 11421 11198 0 0 11421 G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 11431 11201 0 0 11431 H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 11431 11201 0 0 11431 I. Average Power Supply per day to 1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:45 23:47 23:47 23:49 23:49 23:47 0:00 0:00 23:45 2. District Head Quarters 23:52 23:44 23:45 23:48 23:49 23:50 23:50 23:52 23:53 23:52 0:00 0:00 23:49 3. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:40 23:38 23:42 23:45 23:44 23:44 0:00 0:00 23:40 4. Rural -Mixed 23:25 22:52 22:54 22:56 23:05 23:10 23:14 23:17 23:13 23:13 0:00 0:00 23:08 5. Rural -DLF 23:32 23:09 23:06 23:12 23:18 23:17 23:23 23:29 23:24 23:27 0:00 0:00 23:20 6. Rural -Irrigation 9:51 9:37 9:37 9:39 9:42 9:43 9:45 9:50 9:50 9:49 0:00 0:00 9:44 J LOAD FACTOR % 92.48 85.23 88.28 83.71 79.36 82.63 79.32 82.40 79.72 77.03 #DIV/0! #DIV/0! 83.02 FREQUENCY ANALYSIS YEAR 2016-17 S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17 A. INTGRATED FREQUENCY 1 MAXIMUM 50.11 50.20 50.11 50.16 50.14 50.09 50.11 50.09 50.11 0.00 0.00 0.00 50.20 2 MINIMUM 49.80 49.78 49.82 49.82 49.67 49.85 49.89 49.78 49.82 0.00 0.00 0.00 0.00 B. INSTANTANEOUS FREQUENCY 1 MAXIMUM 50.32 50.44 50.37 50.35 50.35 50.24 50.25 50.27 50.31 0.00 0.00 0.00 50.44 2 MINIMUM 49.64 49.56 49.65 49.69 49.65 49.67 49.74 49.54 49.67 0.00 0.00 0.00 0.00 C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00 50.00 50.00 49.99 49.99 0.00 0.00 0.00 45.00 D. % TIME WHEN FREQUENCY WAS 1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.32 19.00 19.80 19.04 19.38 0.00 0.00 0.00 17.95 3 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 73.73 75.15 74.78 71.94 69.58 0.00 0.00 0.00 65.03 4 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 5.83 5.75 5.42 9.02 11.04 0.00 0.00 0.00 6.81 5 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.12 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.07 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Minutes of 56th OCCM of MP 59 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Annexure-4.3 Month :- December 2016 FIGURES IN MW

Own Generation Schedule from Load Shedding

Riha Intra UNRES Total REST. SCH nd+ Tot Act. State DEMAN T. Hrs. FREQ. THER. THER. Total Total Jhabu MTO Deviation DEMAN IPPs CPPs DVC JP MB to SE STO Mata Avl. Drl STO D MET UN DEMA Incl Excl HYD. ISP OSP Total CSS Sugen Lanco Sasan Essar a SSP Banking Sale Pur A Total SCH TOTAL D Injecti Injecti ER Nigri Power Railw Z A tila- A SCH ND Aux Aux Power at on on ay Rajg MP hat

1:00 50.00 2284 2078 256 28 26 283 232 2903 2240 200 0 205 1198 0 221 72 3 72 210 0 330 0 22 0 -151 14 4638 7541 4489 -149 0 7392 0 0 0 7393 7393

2:00 50.03 2264 2060 248 20 15 283 239 2865 2148 176 0 202 1198 0 227 55 3 72 215 0 330 0 29 0 -129 14 4542 7407 4416 -126 0 7281 0 0 0 7281 7281

3:00 50.02 2271 2067 199 16 7 283 238 2810 2126 178 0 202 1198 0 227 53 3 72 214 0 330 0 29 0 -117 14 4531 7341 4528 -2 0 7338 0 0 0 7339 7339

4:00 50.01 2291 2085 207 32 13 284 244 2865 2157 178 0 202 1198 0 227 49 3 72 211 0 330 0 29 0 -118 14 4553 7418 4526 -28 0 7390 0 0 0 7392 7392

5:00 50.01 2307 2100 228 102 48 283 245 3006 2165 175 0 202 1198 0 227 59 3 72 210 0 330 0 29 0 -134 14 4550 7557 4464 -87 0 7470 0 0 0 7472 7472

6:00 50.00 2391 2176 314 203 96 284 254 3326 2308 242 0 212 1204 0 227 89 3 72 204 0 330 0 22 0 -126 14 4801 8127 4620 -181 0 7946 0 0 0 7950 7950

7:00 49.95 2669 2428 463 388 169 284 280 4013 2462 322 0 226 1208 0 231 132 3 72 211 0 330 -12 0 0 -140 14 5060 9072 5304 245 0 9317 0 0 0 9333 9333

8:00 49.95 2809 2556 546 548 222 296 370 4539 2554 371 0 253 1208 0 234 144 3 72 207 0 1027 -42 0 0 -179 14 5866 10405 5821 -46 0 10359 0 0 0 10375 10375

9:00 49.95 2875 2616 581 654 257 306 541 4955 2598 377 0 253 1208 0 237 146 20 72 209 0 1027 -65 0 0 -53 14 6043 10998 5942 -101 0 10897 0 0 0 10913 10913

10:00 49.98 2873 2614 548 640 264 309 573 4949 2582 370 0 253 1211 0 238 145 20 72 205 0 1027 -62 0 0 -66 14 6010 10959 5911 -99 0 10860 0 0 0 10869 10869

11:00 50.01 2844 2588 484 500 220 309 628 4729 2532 367 0 253 1213 0 238 140 19 72 205 0 1027 -99 0 0 -107 14 5875 10604 5699 -176 0 10428 0 0 0 10431 10431

12:00 50.02 2801 2549 396 268 125 302 657 4296 2517 371 0 250 1213 0 238 140 17 72 200 0 1027 -81 0 0 -109 14 5869 10165 5562 -307 0 9858 0 0 0 9860 9860

13:00 49.99 2793 2542 344 273 124 302 638 4222 2532 368 0 250 1213 0 238 140 0 72 195 0 1017 -61 0 0 -161 14 5817 10039 5912 95 0 10133 0 0 0 10139 10139

14:00 50.00 2799 2547 369 354 145 292 577 4284 2550 374 0 256 1216 0 238 140 0 72 200 0 1017 -3 0 0 -258 14 5817 10101 5714 -103 0 9998 0 0 0 10002 10002

15:00 49.98 2797 2545 341 300 118 295 477 4077 2552 374 0 256 1218 0 238 140 0 73 198 0 1017 -11 0 0 -247 14 5822 9899 5779 -43 0 9856 0 0 0 9864 9864

16:00 49.94 2804 2552 373 325 131 297 314 3992 2553 380 0 256 1215 0 238 140 0 73 202 0 1017 -54 0 0 -225 14 5809 9801 5782 -27 0 9774 0 0 0 9791 9791

17:00 49.97 2834 2579 504 558 234 297 121 4293 2566 381 0 260 1211 0 239 140 0 74 207 0 1017 -202 0 0 -202 14 5703 9996 5283 -420 0 9576 0 0 0 9587 9587

18:00 49.95 2856 2599 604 685 276 297 98 4560 2590 383 0 260 1213 0 242 140 0 75 208 0 320 -128 0 0 -205 14 5111 9671 4876 -235 0 9436 0 0 0 9451 9451

19:00 50.01 2788 2537 483 392 186 297 137 4033 2497 362 0 243 1216 0 242 137 0 75 210 0 320 -222 0 0 -187 14 4907 8940 4765 -142 0 8798 0 0 0 8799 8799

20:00 50.01 2593 2360 458 260 130 291 157 3656 2429 340 0 236 1216 0 241 134 0 75 210 0 326 -247 0 0 -183 14 4792 8447 4743 -48 0 8399 0 0 0 8401 8401

21:00 50.02 2431 2212 427 157 81 291 173 3341 2364 252 0 209 1214 0 241 119 0 75 207 0 325 -104 0 0 -180 14 4735 8076 4579 -156 0 7920 0 0 0 7921 7921

22:00 50.09 2339 2129 331 32 26 289 184 2991 2289 206 0 195 1208 0 237 81 0 74 210 0 324 -50 0 0 -169 14 4619 7610 4433 -186 0 7424 0 0 0 7424 7424

23:00 50.02 2335 2125 387 103 50 290 206 3162 2342 244 0 212 1208 0 235 85 0 73 208 0 330 0 0 0 -175 14 4777 7939 4792 15 0 7954 0 0 0 7955 7955

24:00 50.05 2309 2101 362 87 37 291 221 3099 2337 241 0 209 1202 0 229 102 0 73 206 0 330 0 0 0 -163 14 4780 7879 4606 -174 0 7706 0 0 0 7706 7706

Avg. 50.00 2598 2364 394 289 125 293 325 3790 2416 301 0 231 1209 0 234 113 4 73 207 0 617 -60 7 0 -158 14 5209 9000 5106 -103 0 8896 0 0 0 8902 8902

00 TO 06 50.01 2301 2094 242 67 34 283 242 2962 2191 192 0 204 1199 0 226 63 3 72 211 0 330 0 27 0 -129 14 4603 7565 4507 -95 0 7469 0 0 0 7471 7471 HRS.

06 TO 12 49.98 2812 2559 503 500 210 301 508 4580 2541 363 0 248 1210 0 236 141 14 72 206 0 911 -60 0 0 -109 14 5787 10367 5706 -81 0 10287 0 0 0 10297 10297 HRS.

12 TO 18 49.97 2814 2561 423 416 171 297 371 4238 2557 376 0 256 1214 0 239 140 0 73 202 0 901 -77 0 0 -216 14 5680 9918 5558 -122 0 9796 0 0 0 9806 9806 HRS.

06TO 18 49.97 2813 2560 463 458 190 299 440 4409 2549 370 0 252 1212 0 237 140 7 73 204 0 906 -68 0 0 -163 14 5733 10142 5632 -101 0 10041 0 0 0 10051 10051 HRS.

18 TO 24 50.03 2466 2244 408 172 85 291 180 3380 2376 274 0 217 1211 0 237 110 0 74 209 0 326 -104 0 0 -176 14 4768 8149 4653 -115 0 8033 0 0 0 8034 8034 HRS.

Minutes of 56th OCCM of MP 60 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Annexure-4.3 Month :- January 2017 FIGURES IN MW

Own Generation Schedule from Load Shedding

Riha Intra UNRES Total REST. SCH nd+ Tot Act. State DEMAN T. Hrs. FREQ. THER. THER. Total Total Jhabu MTO Deviation DEMAN IPPs CPPs DVC JP MB to SE STO Mata Avl. Drl STO D MET UN DEMA Incl Excl HYD. ISP OSP Total CSS Sugen Lanco Sasan Essar a SSP Banking Sale Pur A Total SCH TOTAL D Injecti Injecti ER Nigri Power Railw Z A tila- A SCH ND Aux Aux Power at on on ay Rajg MP hat

1:00 50.01 2004 1824 276 56 13 118 404 2691 1715 69 0 143 1307 0 335 5 0 68 214 0 296 0 3 0 -1 12 4166 6857 4063 -103 0 6754 0 0 0 6755 6755

2:00 50.03 2011 1830 277 52 11 118 404 2692 1633 66 0 143 1295 0 338 0 0 68 214 0 296 0 3 0 9 12 4078 6770 3967 -112 0 6658 0 0 0 6659 6659

3:00 50.02 2019 1837 254 20 6 118 399 2634 1590 61 0 143 1320 0 341 0 0 68 217 0 296 0 3 0 14 12 4064 6698 4053 -11 0 6687 0 0 0 6688 6688

4:00 50.01 2024 1842 251 67 21 118 402 2701 1601 55 0 143 1316 0 342 0 0 68 210 0 296 0 3 0 13 12 4058 6759 4020 -37 0 6722 0 0 0 6723 6723

5:00 50.01 2021 1839 276 171 70 118 400 2874 1609 61 0 143 1283 0 342 0 0 68 210 0 296 0 3 0 -2 12 4024 6898 3905 -119 0 6779 0 0 0 6781 6781

6:00 50.01 2042 1858 342 286 118 118 401 3123 1816 78 0 143 1286 0 343 7 0 68 213 0 296 0 3 0 7 12 4272 7396 4158 -114 0 7282 0 0 0 7284 7284

7:00 49.97 2134 1942 506 484 188 119 397 3637 2199 215 0 187 1308 0 352 76 0 68 217 0 296 -85 0 0 22 12 4867 8504 5002 135 0 8638 0 0 0 8648 8648

8:00 49.98 2470 2248 585 643 281 119 447 4323 2523 390 0 231 1319 0 363 150 0 68 219 0 622 -229 0 0 -9 12 5658 9981 5552 -106 0 9875 0 0 0 9883 9883

9:00 49.98 2586 2353 603 711 318 123 551 4661 2626 434 0 238 1324 0 364 180 0 68 213 0 622 -112 0 0 -17 12 5951 10611 5963 12 0 10623 0 2 2 10633 10633

10:00 50.02 2596 2362 579 753 328 127 572 4721 2644 430 0 234 1324 0 365 188 0 68 210 0 622 -94 0 0 -30 12 5974 10695 5944 -30 0 10665 0 5 5 10672 10672

11:00 50.02 2550 2321 479 647 297 126 632 4503 2611 428 0 231 1318 0 367 185 0 68 208 0 622 -102 0 0 -74 12 5874 10377 5726 -149 0 10228 0 4 4 10233 10233

12:00 50.01 2468 2245 401 463 234 125 653 4121 2570 413 0 231 1315 0 377 182 0 68 207 0 622 -130 0 0 -82 12 5786 9907 5528 -258 0 9649 0 4 4 9654 9654

13:00 50.00 2422 2204 397 401 206 126 636 3971 2577 408 0 224 1302 0 376 182 0 68 201 0 622 -143 0 0 -71 12 5759 9729 5863 105 0 9834 0 2 2 9840 9840

14:00 50.02 2355 2143 415 444 215 118 587 3921 2577 378 0 217 1303 0 375 182 0 68 202 0 622 -71 0 0 -100 12 5767 9689 5725 -42 0 9647 0 2 2 9652 9652

15:00 49.98 2324 2115 400 389 191 120 491 3706 2569 372 0 214 1305 0 375 182 0 68 204 0 622 -87 0 0 -85 12 5752 9458 5721 -31 0 9427 0 0 0 9433 9433

16:00 49.97 2303 2096 403 419 181 121 349 3570 2561 367 0 217 1305 0 375 182 0 68 213 0 622 -128 0 0 -64 12 5731 9300 5766 36 0 9336 0 0 0 9346 9346

17:00 49.98 2326 2117 432 518 222 121 174 3584 2566 367 0 217 1305 0 376 182 0 68 216 0 622 -131 0 0 -34 12 5767 9350 5528 -238 0 9112 0 0 0 9118 9118

18:00 50.01 2339 2128 482 551 237 120 116 3634 2589 405 0 224 1305 0 380 187 0 68 217 0 296 -142 0 0 -29 12 5512 9147 5225 -287 0 8859 0 0 0 8862 8862

19:00 50.02 2311 2103 472 456 205 118 184 3538 2521 337 0 214 1304 0 372 177 0 68 216 0 296 -329 0 0 -13 12 5174 8712 5016 -158 0 8554 0 0 0 8556 8556

20:00 50.02 2195 1997 434 349 158 118 251 3307 2422 279 0 207 1305 0 365 130 0 68 213 0 296 -364 0 0 -13 12 4919 8226 4788 -131 0 8095 0 0 0 8096 8096

21:00 50.01 2082 1894 412 199 85 118 300 3008 2244 177 0 182 1305 0 365 79 0 68 211 0 296 -175 0 0 -3 12 4760 7768 4617 -143 0 7625 0 0 0 7627 7627

22:00 50.09 2010 1829 324 52 28 118 348 2698 2036 122 0 161 1305 0 365 40 0 68 208 0 296 -48 0 0 11 12 4575 7273 4413 -163 0 7111 0 0 0 7111 7111

23:00 50.02 1984 1806 360 160 54 118 388 2885 1986 127 0 171 1298 0 351 27 0 68 208 0 296 -8 0 0 -23 12 4513 7399 4508 -6 0 7393 0 0 0 7394 7394

24:00 50.06 1983 1804 306 147 54 117 406 2835 1887 95 0 154 1292 0 349 15 0 68 207 0 296 -1 0 0 -17 12 4357 7192 4203 -155 0 7037 0 0 0 7037 7037

Avg. 50.01 2232 2031 403 352 155 120 412 3472 2236 256 0 192 1306 0 361 106 0 68 211 0 432 -99 1 0 -25 12 5057 8529 4969 -88 0 8441 0 1 1 8445 8445

00 TO 06 50.02 2020 1838 279 109 40 118 401 2786 1661 65 0 143 1301 0 340 2 0 68 213 0 296 0 3 0 7 12 4110 6896 4028 -83 0 6814 0 0 0 6815 6815 HRS.

06 TO 12 50.00 2467 2245 526 617 274 123 542 4327 2529 385 0 225 1318 0 365 160 0 68 212 0 568 -125 0 0 -32 12 5685 10012 5619 -66 0 9946 0 2 2 9954 9954 HRS.

12 TO 18 49.99 2345 2134 422 454 209 121 392 3731 2573 383 0 219 1304 0 376 183 0 68 209 0 568 -117 0 0 -64 12 5715 9445 5638 -76 0 9369 0 1 1 9375 9375 HRS.

06TO 18 50.00 2406 2189 474 535 241 122 467 4029 2551 384 0 222 1311 0 370 172 0 68 211 0 568 -121 0 0 -48 12 5700 9729 5629 -71 0 9658 0 2 2 9665 9665 HRS.

18 TO 24 50.04 2094 1906 385 227 97 118 313 3045 2183 189 0 181 1302 0 361 78 0 68 210 0 296 -154 0 0 -10 12 4716 7762 4591 -126 0 7636 0 0 0 7637 7637 HRS.

Minutes of 56th OCCM of MP 61 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Annexure 4.4 Month :- December 2016 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.00 2354 2296 -58 0 0 2297 2297 2599 2592 -7 0 0 2593 2593 2484 2285 -199 0 0 2285 2285 210 218

2:00 50.03 2233 2160 -73 0 0 2161 2161 2487 2446 -41 0 0 2447 2447 2564 2454 -110 0 0 2454 2454 215 220

3:00 50.02 2153 2108 -45 0 0 2108 2108 2343 2370 27 0 0 2370 2370 2691 2639 -52 0 0 2639 2639 214 222

4:00 50.01 2112 2060 -52 0 0 2060 2060 2369 2359 -10 0 0 2360 2360 2761 2755 -6 0 0 2755 2755 211 216

5:00 50.01 2135 2082 -53 0 0 2083 2083 2398 2400 2 0 0 2401 2401 2801 2774 -27 0 0 2775 2775 210 214

6:00 50.00 2227 2153 -74 0 0 2154 2154 2533 2517 -16 0 0 2518 2518 3087 3071 -16 0 0 3072 3072 204 206

7:00 49.95 2463 2498 35 0 0 2502 2502 2728 2894 166 0 0 2899 2899 3702 3710 8 0 0 3716 3716 211 215

8:00 49.95 2772 2647 -125 0 0 2651 2651 3167 3110 -56 0 0 3115 3115 4312 4387 75 0 0 4394 4394 207 215

9:00 49.95 2918 2698 -220 0 0 2702 2702 3381 3310 -72 0 0 3315 3315 4592 4678 86 0 0 4685 4685 209 211

10:00 49.98 2945 2701 -244 0 0 2704 2704 3428 3332 -96 0 0 3334 3334 4557 4621 63 0 0 4625 4625 205 206

11:00 50.01 2950 2704 -247 0 0 2704 2704 3408 3271 -137 0 0 3272 3272 4308 4244 -63 0 0 4245 4245 205 209

12:00 50.02 2870 2557 -313 0 0 2558 2558 3272 2990 -282 0 0 2991 2991 4103 4112 9 0 0 4113 4113 200 199

13:00 49.99 2793 2626 -167 0 0 2627 2627 3111 3096 -16 0 0 3097 3097 4150 4218 69 0 0 4221 4221 195 194

14:00 50.00 2744 2459 -285 0 0 2460 2460 3176 3010 -166 0 0 3011 3011 4228 4329 100 0 0 4330 4330 200 201

15:00 49.98 2659 2407 -251 0 0 2409 2409 3106 2963 -143 0 0 2965 2965 4164 4288 125 0 0 4292 4292 198 198

16:00 49.94 2625 2423 -202 0 0 2427 2427 3034 2933 -101 0 0 2938 2938 4094 4216 121 0 0 4223 4223 202 202

17:00 49.97 2659 2452 -206 0 0 2455 2455 3064 2971 -93 0 0 2975 2975 4016 3939 -77 0 0 3944 3944 207 214

18:00 49.95 2740 2698 -42 0 0 2703 2703 3090 2983 -107 0 0 2988 2988 3699 3542 -157 0 0 3548 3548 208 213

19:00 50.01 2809 2809 0 0 0 2810 2810 2842 2781 -61 0 0 2782 2782 3242 2995 -248 0 0 2995 2995 210 213

20:00 50.01 2711 2737 26 0 0 2738 2738 2722 2708 -14 0 0 2709 2709 2918 2735 -183 0 0 2736 2736 210 219

21:00 50.02 2614 2595 -19 0 0 2595 2595 2614 2561 -53 0 0 2561 2561 2705 2553 -152 0 0 2554 2554 207 211

22:00 50.09 2471 2403 -68 0 0 2403 2403 2479 2421 -57 0 0 2421 2421 2544 2383 -162 0 0 2383 2383 210 216

23:00 50.02 2502 2516 14 0 0 2517 2517 2638 2795 158 0 0 2796 2796 2587 2432 -155 0 0 2432 2432 208 211

24:00 50.05 2434 2380 -53 0 0 2380 2380 2694 2691 -3 0 0 2691 2691 2616 2426 -191 0 0 2426 2426 206 208

Avg. 50.00 2579 2465 -113 0 0 2467 2467 2862 2813 -49 0 0 2814 2814 3455 3408 -48 0 0 3410 3410 207 210

00 TO 06 50.01 2202 2143 -59 0 0 2144 2144 2455 2447 -7 0 0 2448 2448 2731 2663 -68 0 0 2663 2663 211 216 HRS. 06 TO 12 49.98 2820 2634 -186 0 0 2637 2637 3231 3151 -79 0 0 3154 3154 4262 4292 30 0 0 4296 4296 206 209 HRS. 12 TO 18 49.97 2703 2511 -192 0 0 2514 2514 3097 2993 -104 0 0 2996 2996 4058 4089 30 0 0 4093 4093 202 203 HRS. 06TO 18 49.97 2761 2573 -189 0 0 2575 2575 3164 3072 -92 0 0 3075 3075 4160 4190 30 0 0 4195 4195 204 206 HRS. 18 TO 24 50.03 2590 2573 -17 0 0 2574 2574 2665 2660 -5 0 0 2660 2660 2769 2587 -182 0 0 2588 2588 209 213 HRS.

Minutes of 56th OCCM of MP 62 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Annexure 4.4 Month :- January 2017 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.01 2220 2130 -90 0 0 2130 2130 2355 2266 -90 0 0 2266 2266 2266 2142 -124 0 0 2142 2142 214 216

2:00 50.03 2121 2002 -120 0 0 2002 2002 2259 2134 -125 0 0 2134 2134 2351 2307 -44 0 0 2307 2307 214 216

3:00 50.02 2049 1950 -98 0 0 1951 1951 2145 2071 -74 0 0 2071 2071 2439 2447 8 0 0 2447 2447 217 219

4:00 50.01 2016 1920 -96 0 0 1920 1920 2159 2057 -102 0 0 2057 2057 2514 2533 19 0 0 2533 2533 210 212

5:00 50.01 2028 1931 -97 0 0 1931 1931 2188 2095 -92 0 0 2096 2096 2562 2539 -23 0 0 2539 2539 210 214

6:00 50.01 2131 2010 -121 0 0 2011 2011 2316 2226 -90 0 0 2227 2227 2827 2831 4 0 0 2832 2832 213 214

7:00 49.97 2352 2372 20 0 0 2374 2374 2534 2637 104 0 0 2640 2640 3385 3411 26 0 0 3414 3414 217 219

8:00 49.98 2700 2571 -129 0 0 2573 2573 3040 2973 -66 0 0 2975 2975 4091 4108 17 0 0 4112 4112 219 223

9:00 49.98 2846 2662 -184 0 0 2664 2664 3313 3259 -54 0 0 3262 3262 4427 4488 61 0 2 4493 4493 213 214

10:00 50.02 2884 2671 -213 0 0 2672 2672 3421 3331 -90 0 0 3332 3332 4400 4450 50 0 5 4456 4456 210 213

11:00 50.02 2931 2685 -246 0 0 2685 2685 3416 3261 -156 0 0 3261 3261 4167 4075 -92 0 4 4079 4079 208 208

12:00 50.01 2857 2538 -319 0 0 2539 2539 3248 3000 -248 0 0 3000 3000 3932 3901 -31 0 4 3905 3905 207 209

13:00 50.00 2761 2590 -171 0 0 2591 2591 3072 3074 3 0 0 3075 3075 3949 3968 19 0 2 3972 3972 201 201

14:00 50.02 2683 2421 -262 0 0 2421 2421 3100 2970 -130 0 0 2971 2971 4013 4053 40 0 2 4057 4057 202 203

15:00 49.98 2582 2366 -216 0 0 2368 2368 2989 2885 -103 0 0 2887 2887 3923 3973 49 0 0 3975 3975 204 203

16:00 49.97 2536 2378 -158 0 0 2380 2380 2915 2851 -64 0 0 2854 2854 3829 3893 64 0 0 3897 3897 213 214

17:00 49.98 2542 2387 -155 0 0 2389 2389 2936 2877 -59 0 0 2879 2879 3743 3630 -114 0 0 3632 3632 216 218

18:00 50.01 2604 2538 -66 0 0 2538 2538 2949 2807 -142 0 0 2808 2808 3407 3295 -112 0 0 3296 3296 217 220

19:00 50.02 2751 2730 -21 0 0 2731 2731 2777 2715 -61 0 0 2716 2716 3068 2890 -178 0 0 2890 2890 216 219

20:00 50.02 2675 2646 -29 0 0 2646 2646 2711 2618 -93 0 0 2618 2618 2799 2618 -181 0 0 2618 2618 213 214

21:00 50.01 2580 2514 -66 0 0 2515 2515 2575 2460 -116 0 0 2460 2460 2588 2439 -149 0 0 2439 2439 211 213

22:00 50.09 2441 2327 -115 0 0 2327 2327 2428 2275 -153 0 0 2275 2275 2457 2301 -156 0 0 2301 2301 208 209

23:00 50.02 2413 2369 -44 0 0 2369 2369 2503 2502 0 0 0 2503 2503 2447 2315 -132 0 0 2315 2315 208 207

24:00 50.06 2310 2221 -89 0 0 2221 2221 2465 2350 -115 0 0 2350 2350 2420 2259 -161 0 0 2259 2259 207 207

Avg. 50.01 2501 2372 -128 0 0 2373 2373 2742 2654 -88 0 0 2655 2655 3250 3203 -48 0 1 3205 3205 211 213

00 TO 06 50.02 2094 1991 -104 0 0 1991 1991 2237 2141 -96 0 0 2142 2142 2493 2466 -27 0 0 2467 2467 213 215 HRS. 06 TO 12 50.00 2762 2583 -179 0 0 2584 2584 3162 3077 -85 0 0 3078 3078 4067 4072 5 0 2 4077 4077 212 214 HRS. 12 TO 18 49.99 2618 2447 -171 0 0 2448 2448 2993 2911 -83 0 0 2912 2912 3811 3802 -9 0 1 3805 3805 209 210 HRS. 06TO 18 50.00 2690 2515 -175 0 0 2516 2516 3078 2994 -84 0 0 2995 2995 3939 3937 -2 0 2 3941 3941 211 212 HRS. 18 TO 24 50.04 2528 2468 -60 0 0 2468 2468 2576 2487 -90 0 0 2487 2487 2630 2470 -159 0 0 2470 2470 210 211 HRS.

Minutes of 56th OCCM of MP 63 System Disturbance / System Incidence Annexure-5.0

1. System Disturbance on 23.12.2016 at 220 KV Neemuch : On dated 23.12.2016 at around 16:05 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. Prior to fault 220/132 KV, 160 MVA X’mer – I at 220 KV S/s Neemuch was out of service since 03.11.2017 due to bushing failure. At around 16:10 Hrs. bird fault occurred on R-phase isolator of 132 KV Neemuch – Malhargarh Ckt at 132 KV S/s Neemuch resulting in 132 KV Bus fault at 132 KV S/s Neemuch. Consequently following feeders and transformers tripped:- 132 KV Neemuch – Malhargarh Ckt, 132 KV Interconnector – I & II, 132 KV Neemuch – Manasa, 132 KV Daloda – Mandsour Ckt, 132 KV Jaora – Mandsour Ckt & 220/132 KV, 160 MVA X’mer – II at 220 KV S/s Neemuch. Due to the above tripping there was interruption at 220 KV S/s Neemuch, 132 KV S/s Neemuch, 132 KV S/s Malhargarh, 132 KV S/s Ratangarh, 132 KV S/s Mandsour and there was load loss of about 196.7 MW. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 23.12.2016 at 220 KV Handiya : On dated 23.12.2016 at around 06.38 Hrs. M.P system was normal and frequency of National Grid was 50.01 Hz. At around 06:38 Hrs. during shifting of discharge rod in yard, it came into flashover zone of 132 KV Main Bus side isolator jumper of 132 KV Handia – Nasrullaganj feeder at 220 KV S/s Handia resulting in tripping of following feeders and X’mers:- 132 KV 160 MVA Xmer Incomming No.- I at 220 KV S/s Handia, 220 KV Mahagaon – Datiya Ckt, 132 KV 160 MVA Xmer Incomming No. – II, 132 KV 160 MVA Xmer Incomming No.- III, 132 KV Handia - Kannod feeder, 132 KV Handia – Khategaon, 132 KV Harda - Seoni Malwa Ckt. Due to the above tripping there was interruption at 132 KV S/s Sultanpur, 132 KV S/s Harda, 132 KV S/s Gopalpur, 132 KV S/s Satwas & 132 KV S/s Nasrullaganj and there was load loss of about 93 MW. There was no generation loss and System was normalized in due course of time.

3. System Disturbance on 24.12.2016 at ATPS: On dated 24.12.16 at around 12:10 Hrs. M.P system was normal and frequency of National Grid was 49.95 Hz. At around 12:15 Hrs. transient fault occurred on 220 KV Amarkanta – Railway Traction Ckt – II but the Ckt did not trip due to pole discrepancy (as the protection cable found cut). Consequently Bus Bar & LBB protection of 220 KV Main Bus – II operated at ATPS resulting in tripping of following feeders and transformers:- 220 KV ATPS – Jabalpur Ckt – II (was charged through bus tie), 220 KV Bus Coupler, 220 KV ATPS – Anuppur Ckt – II, 220 KV ATPS – Panagar Ckt, 220 KV ATPS – Birsinghpur Ckt, 220 KV ATPS – Sidhi Ckt, ATPS Unit#1 (210MW). Due to the above tripping there was no load loss. There was generation loss of about 210 MW and System was normalized in due course of time.

4. System Disturbance on 30.12.2016 at 220 KV Satna : On dated 30.12.16 at around 13:16 Hrs. M.P system was normal and frequency of National Grid was 50.00 Hz. Prior to fault 220/132 KV, 160 MVA (Areva) X’mer – I at 220 KV S/s Satna was under shut down since 10:44 Hrs./30.12.2016 for post monsoon maintenance and 132 KV Interconnector – I & II was H/T for load management. Further 132 KV Nagod S/s was fed directly from 132 KV S/s Kymore through 132 KV Kymore – Satna – Nagod Ckt (arrangement through 132 KV auxiliary bus at 220 KV S/s Satna). At 13:16 Hrs. 220/132 KV, 160 MVA (Bhel) X’mer – II Minutes of 56th OCCM of MP 64 tripped at 220 KV S/s Satna due to to maloperation of 132 KV side master trip relay. Due to the above tripping there was interruption at 220 KV S/s Satna, 132 KV S/s Panna, 132 KV S/s Pawai, 132 KV S/s Majhagawa, 132 KV Satna Cement and there was load loss of about 117.1 MW. There was no generation loss and System was normalized in due course of time.

5. System Disturbance on 30.12.2016 at Tons HPS : On dated 30.12.16 at around 05:50 Hrs. M.P system was normal and frequency of National Grid was 50.01 Hz. At around 06:03 Hrs. while synchronizing Tons Unit # 3, 220 KV Bus Bar Protection of 220 KV Main Bus – I mal-operated at Tons HPS. Consequently following feeders and X’mers tripped at Tons HPS:- 220 KV Bus Coupler, 220 KV Tons – Satna Ckt & 220 KV Tons – Rewa Ckt – II. Due to the above tripping there was no interruption in any area hence there was no load loss. There was no generation loss and System was normalized in due course of time.

6. System Disturbance on 13.01.2017 at 220 KV Hoshangabad: On dated 13.01.2017 at around 10:32 Hrs. M.P system was normal and frequency of National Grid was 50.02 Hz. On 13.01.2017 at around 10:32 Hrs., 220 KV Itarsi (MP) –Itarsi (PG) tripped as its Y phase conductor from dead end tower (near 220 KV S/s Itarsi (MPPTCL)) was snapped. At the same instant i.e. at 10:32 Hrs. R- Phase CT Jumper form line side Isolator Clamp of 220 KV Hoshangabad – Itarsi (PGCIL) bay opened and snapped at 220KV S/s Hoshangabad resulting in operation of 220 KV Bus Bar protection at 220 KV S/s Hoshangabad due to which following feeders and transformers tripped:- 220 KV Itarsi – Itarsi (PGCIL Ckt, 220 KV Hoshangabad – Bhopal Ckt, 220 KV Hoshangabad – Mandideep Ckt, 220 KV Hoshangabad – Itarsi (MPPTCL) Ckt, 220 KV Hoshangabad – Itarsi (PGCIL) Ckt, 220/132 KV, 160 MVA X’mer and 220 KV Bus Tie at 220 KV S/s Hoshangabad. Due to the above tripping there was no interruption in any area and hence there was no load loss. There was no generation loss and System was normalized in due course of time.

Minutes of 56th OCCM of MP 65 Minutes of 56th OCCM of MP 66 Minutes of 56th OCCM of MP 67 Minutes of 56th OCCM of MP 68

Annexure-6.8A

Schemes of Western Region funded under PSDF

State I UT Sr. Details of the Scheme Nos. of Grant Date of Funds %age of No. Schemes Sanctioned Sanction released fund (in Rs (in Rs Crores) Disbursed Crores) as on against 30.11.2016 Grant sanctioned Madhya 1. Implementation of 2 3.6 17/03/2016 0 0% Pradesh Integrated system for availability based tariff. 2. Renovation and 92.7 17/03/2016 0 0% Upgradation of protection system of substations of MPPTCL Madhya 3. Renovation and 2 47.11 5/9/2016 0 0% Pradesh Upgradation of protection system of substations MPPGCL

4. Installation of 5.59 0 0% 125MVARBus Reactor at SSTPP Khandwaand 50MVARLine Reactor at SGSTPS Birsinghpur substation of MPPGCL. Chhattisgarh 5. Renovation and 1 61.67 5/9/2016 0 0% Upgradation of protection system of substations Gujarat 6. Automatic Demand 3 1.50 11105/2015 1.35 89.82% Management Scheme 17/03/2015 7. Load Forecasting 3.70 04/08/2015 0 0% Scheme 8. Wind generation 1.62 17/03/2015 0 0% forecasting project for State of Gujarat. TOTAL 8 217.49

Minutes of 56th OCCM of MP 69

Annexure-6.8A

Schemes of Western Region funded under PSDF

State I UT Sr. Details of the Scheme Nos. of Grant Date of Funds %age of No. Schemes Sanctioned Sanction released fund (in Rs (in Rs Crores) Disbursed Crores) as on against 30.11.2016 Grant sanctioned Madhya 1. Implementation of 2 3.6 17/03/2016 0 0% Pradesh Integrated system for availability based tariff. 2. Renovation and 92.7 17/03/2016 0 0% Upgradation of protection system of substations of MPPTCL Madhya 3. Renovation and 2 47.11 5/9/2016 0 0% Pradesh Upgradation of protection system of substations MPPGCL

4. Installation of 5.59 0 0% 125MVARBus Reactor at SSTPP Khandwaand 50MVARLine Reactor at SGSTPS Birsinghpur substation of MPPGCL. Chhattisgarh 5. Renovation and 1 61.67 5/9/2016 0 0% Upgradation of protection system of substations Gujarat 6. Automatic Demand 3 1.50 11105/2015 1.35 89.82% Management Scheme 17/03/2015 7. Load Forecasting 3.70 04/08/2015 0 0% Scheme 8. Wind generation 1.62 17/03/2015 0 0% forecasting project for State of Gujarat. TOTAL 8 217.49

Minutes of 56th OCCM of MP 70 Annexure-6.8B Reporting Format to the PSDF Project Monitoring Group

1. Name of the Scheme 1.1 Name of the substation and its Location 1.2 Executing Agency 1.3 State/Region

2. Date of Sanction Order 2.1 Date of Agreement of Entity with State Govt. / NLDC 2.2 Total Approved Cost of Scheme 2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs) 2.4 Date of Requisition by the Entity 2.4 a) Date and Reference of LOA 2.4 b) Amount of LOA 2.5 Date of Disbursement and amount 2.5.1 Ist Installment 2.5.2 IInd Installment 2.5.3 IIIrd Installment 2.6 Date of Scheduled completion of work 2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Report for the Month of JANUARY 2017

CUMMULATIVE Quantity PROGRESS till date Qty. AS PER Received during No. Supply Discription LOA Month Sch. Act. Balance Remark 1 Item Details (As per Annexure-II) 1.1 1.2

works as per Progress During CUMMULATIVE Erection Discription Balance LOA Month PROGRESS till date

2 Work Details 2.1 2.2

3 Others

Signature With Seal of The Nodal Officer

Minutes of 56th OCCM of MP 71 Baart sarkar Government of India kond`Iya ivaVut p`aiQakrNa Central Electricity Authority piScama xao~Iya ivaVut saimait WESTERN REGIONAL POWER COMMITTEE

TRANSMISSION LINES/ELEMENTS OUTAGE

PLANING PROCEDURE

IN

WESTERN REGION

mauMba[-- MUMBAI

Minutes of 56th OCCM of MP 72 TRANSMISSION LINES/ELEMENTS OUTAGE PLANING PROCEDURE IN WESTERN REGION

Transmission Outage coordination is essential for optimizing the outage duration time; proper mobilization of resources at site; ensuring reliability of the grid and providing certainty to the electricity market. The transmission elements outages planning procedure being followed in the WR OCC are as follows: The annual transmission elements outages planning shall be done in annual LGBR. And shall be reviewed in OCC meeting on monthly basis. I. The OCC held in the current month (M) shall discuss the line outages for the period in the next calendar month (M+1). II. The line/transmission element planned outages shall be of the following types: Routine Maintenance, Construction related and Inter-Regional. The outage proposal could be working on a ‘Daily’ basis or ‘Continuous’ basis. III. As per the control areas, IEGC roles and existing practices WR-OCC would discuss outage proposal of all 400 kV and 765 kV AC transmission elements (like transmission lines, ICT’s, Reactors, Capacitors, Bays, Bus Couplers, FSC’s, TCSC’s, Bus etc.), HVDC elements (Back to Back Station, HVDC lines, AC/DC filters, Poles, Bus couplers, Buses, Bays), irrespective of ownership; all inter- regional/ inter-state lines, all 220 kV lines from ISGS stations and all Important Grid Elements. The outage of EHV elements not covered under the above and wholly under jurisdiction of a State shall be coordinated by the respective STU/SLDC. For example for outage of a 220 kV line in Gujarat which is not an ISTS element, the agency seeking the outage shall have to directly approach Gujarat STU /SLDC authorities. If there are any problems, WR OCC may be informed for any assistance required.

Minutes of 56th OCCM of MP 73 IV. The proposal for the outage of elements mentioned above shall be positively sent to the WRPC secretariat by 4th working day of current month (M) for outages of next month (M+1). V. The compiled data shall be e-mailed to WR-SLDCs /WRLDC / NLDC / WR- utilities for any comments by 5th working day of current month. VI. Outage proposals may be discussed in a pre-OCC meeting with WRLDC/utilities if needed. VII. WR OCC typically meets during second or third week of every month. VIII. Outage of Inter regional elements shall be approved by the RPC of the concerned regions. Inter-regional outages shall be preferably planned in the last week. Hence the outage for Inter-Regional can get about 36 days time (15 in current month and three weeks of following month) time for co-ordination by NLDC/WRLDC. NLDC shall co-ordinate inter-regional outages under intimation to the concerned RPC/RLDC. WRLDC coordinates in real-time and also along with line outages already agreed in OCC. IX. For construction related outages, if the dates cannot be exactly planned in advance, the utility may indicate the tentative month/ date for discussion and concurrence of OCC members. Subsequently the outage may be scheduled on a suitable ‘D’ date in consultation with WRLDC / SLDC on D-3. X. After discussion in OCC, the outage list shall be circulated on email to all concerned by WRPC secretariat. WRLDC / SLDC shall facilitate the outage of the elements concurred in the above list subject to favorable real time conditions. XI. POST OCC transmission elements outages Procedure: I. Post-OCC meeting, fresh proposals for transmission outage should be discouraged. II. Only under exceptional cases, the request for transmission outage after issue of OCC minutes must be posted by the indenting utility through email for concurrence of the WRPC members (OCC group Email) at least three days in advance (D-3). The outage proposal shall clearly contain the name of the indenting agency, element details (such as element name, substation, voltage level, bay

Minutes of 56th OCCM of MP 74 number etc.), element owner, outage date, outage time & duration, reason for seeking the outage, schematic/ Single Line diagram(SCADA SLD from respective substation to be submitted for transmission elements at substation) for ease of reference. III. WRPC members may respond back in email within three hours. IV. If there are no comments, within the three hours, the outage proposal shall deemed to have been concurred by WRPC members. In case of divergent views by one or more WRPC members the concerned Utility would propose a mutually convenient date for availing the outage. After consensus, WRPC secretariat shall endorse the outage proposal for further processing by WRLDC. V. WRLDC shall coordinate the above outage in real-time along with transmission element outages already agreed in OCC. VI. For emergency outages, the outage indenting agency would directly approach WRLDC control room for outage code as being the practice in vogue. The outage proposal shall clearly indicate the name of the indenting agency, element details (such as element name, substation, voltage level, bay number etc.), element owner, outage time & duration, reason for seeking the outage, schematic/ Single Line diagram (SCADA SLD from respective substation to be submitted for transmission elements at substation) for ease of reference and a contingency plan and the measures being taken by the concerned utility during the outage and also in case of ‘N-1’ tripping of parallel element. SLDCs shall forward the outages of embedded entities with due remarks and consent. VII. Extreme emergency outages taken under IEGC 5.2 (b) & (c) without informing WRLDC, shall be justified by availing agency with reasons in the next OCC Meeting.

Minutes of 56th OCCM of MP 75 XII. The status of lines planned vs. lines availed and any deviation from planning or emergency outages for the concerned month shall be submitted by WRLDC for discussion in respective OCC. XIII. Code Giving Procedure: Since short term market clearance depends on Available Transfer Capability (ATC) & is cleared on day ahead basis, there is a need for better planning. In this regard following decisions taken in the past OCC meeting and shall be implemented:

I. All utilities shall confirm on D-3 day by 1800 hrs about readiness of OCC approved as well as Post OCC request after taking WRPC consent to avail outages (where D is date of outage).

II. The outages where the utilities do not confirm readiness by 1800 hrs of D- 3, shall be deferred.

III. Based on the prevailing and the anticipated grid conditions, WRLDC / NLDC on D-2 day shall assess the outage proposals (whose readiness has been confirmed) from regional grid reliability perspective. For 765 kV elements, Inter-regional elements and other EHV elements involving revision in TTC WRLDC shall seek views of NLDC from the National Grid reliability perspective. On D-1 day, the outage list along with the Reliability suggestions / comments shall be shared in electronic form with all concerned utilities and SLDC/RLDC operators for switching coordination in real-time.

IV. In real-time, WRLDC shall issue switching code to all the concerned parties within a reasonable time. However, in case even after making best efforts the grid conditions are un-favorable for facilitating an outage, WRLDC may defer the outage in real-time. The indenting utility shall coordinate with WRLDC / NLDC to get the outage re-scheduled on another date.

V. After receiving the Outage Code, the switching operation shall be executed within 30 minutes so as not to lose the favorable grid conditions to avail the outage. In case of any delays / constraints in executing the switching code, WRLDC shall be informed forthwith. In case of unreasonable delays, WRLDC may cancel the code. In such cases, the indenting agency shall seek a fresh code for availing the outage.

VI. After availing the outage, the indenting agency shall make best efforts to restore the element within the scheduled outage duration. However in

Minutes of 56th OCCM of MP 76 case of envisaged delay in restoring the element, the agency that has availed the outage shall inform WRLDC in advance regarding the reason for delay and the likely restoration time.

XIV. Clearing of Rescheduled line outages: A. Utilities shall adhere to the outage plan as far as possible. B. In spite of planning in the OCC, at times a few outages may have to be re- scheduled in real time. C. Rescheduled outages shall be coordinated in the manner similar to the outage proposals forwarded Post-OCC meeting All the procedures for Post –OCC plan will be applicable.

XV. Time limits for changes in Outage plan: If any outages plan approved in OCC for the month could not be availed in the respective month due to any reasonable cause, the same can be processed as Post- OCC outages.

This procedure will be implemented w.e.f. 01st March, 2017.

***********************

Minutes of 56th OCCM of MP 77 Minutes of 56th OCCM of MP 78 Minutes of 56th OCCM of MP 79 Minutes of 56th OCCM of MP 80 Minutes of 56th OCCM of MP 81 Annexure 10.1.1

List of newly commissioned substations / recently connected HT Consumers which are not integrated with AMR system of SLDC.

Modem & SIM Details

Modem SIM SNO Meter No Location Feeder Name T & C Circle T & C Division Service SIM Data Sr. No Make SIM No. Activated No. GPRS/ GSM 1 MPC57149 132KV S/S ANJAD 40MVA XMER BHEL S.NO. 203708 400KV Indore Testing Division - II Indore

2 MPC57145 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore

3 GEC88970 220KV S/S HOSANGABAD SPM M/S SPM BHOPAL Testing Division HOSHANGABAD

4 XB577467 132KV S/S BANKHEDI 40MVA MAKE IMP BHOPAL Testing Division HOSHANGABAD

5 XB577430 132KV S/S SEMRI HARCHAND 40 MVA IMP PT6722 BHOPAL Testing Division HOSHANGABAD 6 XB577404 220KV S/S PIPARIA 12.5MVA BHEL MAKE 6001776 BHOPAL Testing Division - Itarsi 7 MPP28775 132KV S/S BETUL Tr.132KV RLY. TR. BETUL-I BHOPAL Testing Division Itarsi

8 XB577730 220KV S/S DATIA 40MVA GWALIOR Testing Division -II Gwalior

9 XB583274 132KV GAHOD 63 MVA MAKE IMP SN PT7479 GWALIOR Testing Division -II Gwalior

10 XC559792 132KV MORENA 50MVA BBL GWALIOR Testing Division -I GWALIOR

11 MPE51942 132KV S/S MORAR 63 MVA MAKE BBL Sno. 5308/9 GWALIOR Testing Division -I Gwalior

12 GEC88916 132KV S/S SENDHWA 20MVA CGL SN 24400 INDORE Testing Division - II Barwaha

13 MPE51805 132KV S/S CHHANERA 20MVA MAKE CGL SN 24641 INDORE Testing Division - Khandwa

14 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh

15 MPC57146 132KV S/S ANJOD CH GANJ 40 MAVA BHEL INDORE Testing Division - I Indore

16 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara

17 MP925055 220KV S/S PANAGAR 220KV PANAGAR JABALPUR Testing Division - JABALPUR

18 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara

19 XB577406 132KV S/S BADGAON 40MVA BBL 5423/5 KHANDWA Testing Division - Khandwa

Minutes of 56th OCCM of MP 82 20 5246422 132KV S/S JEERAPUR 20MVA NGEF RAJGARH Testing Division -I Bhopal-S/s DN Beora

21 XB549199 132KV S/S DONGARITAL 20 MVA EMCO SN 1058 B/10930 REWA Testing Division - Rewa

22 XB552535 132KV S/S SIRMOUR 40MVA IMP REWA Testing Division - Rewa

23 MPC60964 132KV S/S DIGODA 20MVA SAGAR Testing Division -II Sagar

24 MPC57148 132KV BUDERA 40MVA SAGAR Testing Division -II SAGAR

25 GEC88948 132KV S/S MAIHAR 132 KV RELIANCE FEEDER SATNA Testing Division - Satna

26 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol

27 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol

28 XB577419 132KV S/S UMARIYA 20 MVA NGEF SATNA Testing Division - Rewa

29 MPC58866 132KV PORSA 12.5MVA MAKE EMCO SN 969B/10GWALIOR Testing Division -I Gwalior, S/S DN Morena

30 BENEGAON_NEW 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara

31 TAMOT_NEW 132KV TAMOT 40MVA MAKE CGL SN 24788 BPL Testing Division -II Bhopal

32 XB577473 132KV S/S MAKSUDANGARH 63MVA MAKE BBL SN 5442/07 GWL Testing Division Guna

33 MPP08529 220KV S/S CHHEGAON MAKHAN 63MVA 132/33KV BBL S.No. 5442/ IND Testing Division - Khandwa

34 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226 JBP Testing Division -Katni

35 XC530817 132KV S/S LALBARRA 40MVA IMP JBP Testing Division -II Chindwara

36 XC548595 132KV S/S UMRETH 40MVA BBL XMER JBP Testing Division -II Chindwara

37 KA909252 132KV S/S LAUNDI 40MVA IMP SGR Testing Division -II Sagar

38 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10 UJJ Testing Division - Ratlam

39 XB577773 220KV S/S GWALIOR-II 40 MVA MAKE GWALIOR Testing Division -I Gwalior

40 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara

41 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha

42 XB560307 220KV S/S MUNGALIYA CHHAP 40MVA BHEL SN 2037622 BHOPAL Testing Division - I Bhopal

43 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni

44 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni

45 NAGOD_NEW 132KV S/S NAGOD 40 MVA X-mer SATNA Testing Division - Satna

Minutes of 56th OCCM of MP 83 46 ANDHAD_NEW 132 KV ANDHAD 40MVA INDORE Testing Division - II Indore

47 ESAGARH_NEW 132KV S/S ESAGARH_NEW 40MVA GWALIOR Testing Division Guna

48 KOTHIYA 132KV S/S KOTHIYA 20MVA GWALIOR Testing Division Guna

49 TAL_NEW 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam

50 PRATAPURA_NEW 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior

51 JHABUA_NEW 132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore

52 GUDGAON_NEW 132KV S/S GUDGAON 50MVA BHEL SN 2042484 BHOPAL Testing Division Itarsi

53 SHIVPURI_NEW 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWL Testing Division Guna-S/S Dn Shivpuri

54 BOREGAON_NEW 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JBP Testing Division -II Chindwara

55 MPC73878 132KV PANDHANA 63MVA IMP INDORE Testing Division KHANDWA

56 KOTAR_NEW 220 KV S/S KOTAR 50MVA BHEL SATNA Testing Division - Satna

57 ANUPUR_NEW 220KV S/S ANUPUR 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol

58 TALAKPURA_NEW 132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha

59 NEEMUCH_NEW 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch

60 NARSINGPUR_NEW 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur

Minutes of 56th OCCM of MP 84 Annexure-10.1.2 List of interface points / meters having problem at site

Present Meter Sr. No Modem No Circle Name Div Name Sub Station Name Name of Interface Point Problem At Site No 1 MOD70547 MPE51896 UJJAIN Testing Division - Ujjain 132KV AGAR 33KV Suzlon-II Meter defective 2 MOD70473 MPE51930 GWALIOR Testing Division- Shivpuri 132KV S/S SHIVPURI 40MVA,BBL Meter defective 3 MOD70471 MPE51923 GWALIOR Testing Division- Shivpuri 132KV S/S SHIVPURI 40MVA, BHEL Meter defective 4 MOD70304 MPC58763 Satna Testing Division - Rewa 132KV S/S MORWA 132 KV Bina Meter defective 5 MOD70339 MPE51744 Satna Testing Division - Satna 220KV S/S SATNA 63 MVA XMER Meter defective 6 MOD70128 MSP44327 BHOPAL Testing Division -II Bhopal 132KV S/S GOPALPUR 40MVA TRANSFORMER PC0100096 T&R Network Problem 7 MOD70575 MPP28454 400KV Indore 440 KV Testing Division- Indore 132KV S/S JAMLI 63MVA BBL MAKE SN 5032/15 Network Problem 8 MOD70381 MPP28538 SAGAR Testing Division -II Sagar 132KV S/S HATTA 63MVA MAKE Network Problem 9 MOD70502 MPP28447 UJJAIN Testing Division - Dewas 132KV S/S BNP DEWAS 40MVA MAKE CGL SN 47292 Network Problem 10 MOD70602 MPP28500 INDORE Testing Division - I Indore 132KV S/S GAUTAMPURA 20 MVA EMCO MAKE SN 1197/11213 Network weak 11 MOD70289 MPP28328 SATNA Testing Division - Satna 132 KV S/S AMARPATAN 40 MVA X-mer-1 (33 kv side) Network weak 40MVA 132/33KV XMER NGEF S.NO. 12 MOD70562 GEC08911 INDORE Testing Division - II Indore 132KV S/S GHATA BILLOD Sim defective 2500051108 13 MOD70465 MPE53503 GWALIOR Testing Division- Shivpuri 132KV S/S PICHORE 12.5MVA,CGL Time Drift 14 MOD70705 MPP28623 UJJAIN Testing Division - Ratlam 220KV S/S RATLAM 40MVA MAKE BHEL SN 2014006 Time Drift 15 MOD70686 MPE51880 UJJAIN Testing Division - Ratlam 132KV S/S JAORA 63MVA MAKE BBL SN 4909/2 Time Drift 16 MOD70451 MPE53482 400KV BINA Testing Division Guna 132KV S/S ARON 40MVA,EMCO Time Drift

Minutes of 56th OCCM of MP 85 JULWANIA 400 KV S/S 1 132 KV JULWANIA-NIMRANI CKT I CB/SOE N/C 2 132 KV JULWANIA-NIMRANI CKT II CB/SOE N/C 3 132 KV JULWANIA-ANJAD CKT CB/SOE N/C PROCESSES CONNECTION/ 4 132 KV JULWANIA- I/C I CB/SOE N/C CONFIGURATION REQUIRED 5 132 KV JULWANIA- I/C II CB/SOE N/C 6 132 KV SENDHWA CB/SOE FAULTY 7 400KV BUS 2 KV N/C 8 400KV BUS 2 HZ N/C 9 220KV BUS 2 KV N/C 10 220KV BUS 2 HZ N/C 11 132/33 KV 40 MVA TR CB FAULTY 12 132 KV BUS-2 VOLTAGE FAULTY JULWANIA 220 KV S/S 1 220/132 KV TR OLTC N/A 2 132/33 KV TR I CB/OLTC FAULTY 3 132/33 KV TR II OLTC N/A PROCESSES CONNECTION REQUIRED 4 132 KV NIMRANI I CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED BARWAHA 220 KV S/S 1 220/132 TR2 160MVA OLTC N/A 2 220/132 TR 1 4*40 MVA OLTC N/A 3 132 KV CHOTI KHARGONE MVAR N/A 4 220KV BUS 2 KV 183 226 SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NEPANAGAR 220 KV S/S 1 220 KV BUS COUPLER CB FAULTY CLOSE 2 220/132 KV TR 160 MVA (PRIMARY) CB FAULTY CLOSE 3 220/132 KV TR 2 160 MVA (SEC) CB OPEN CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEWAS 220 KV S/S 1 132 KV CHAPDA 1 CB FAULTY CLOSE 2 132 KV CHAPDA 2 CB FAULTY CLOSE 3 132 KV SHANKARGARH 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED 3 132 KV GAMESHA FATANPUR CB FAULTY CLOSE 4 220/132 CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE 400 KV S/S 1 220 KV BUS COUPLER CB FAULTY CLOSE 2 400 KV BUS TIE CB FAULTY CLOSE 3 400 KV BUS COUPLER CB FAULTY CLOSE CHEGAON 400 KV S/S

1 220/132 TR 3 P CB FAULTY 2 400 KV REACTOR CB FAULTY 3 400 KV BUS COUPLER CB FAULTY OPEN 5 220 kV BUS I & II FREQ NOT SHOWING IN DECIMAL POINT SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NEEMUCH 220 KV S/S 1 220/132 TR-1 MW/MVAR N/C 2 220/132 TR-1 CB FAULTY OPEN 3 220KV BUS COUPLER CB FAULTY CLOSE 4 220KV BUS VOLTAGE & FREQUENCY N/C 5 132KV BUS VOLTAGE & FREQUENCY N/C 6 33KV BUS VOLTAGE & FREQUENCY N/C 7 132KV BUS COUPLER CB FAULTY CLOSE 8 220/132 TR-2 CB OPEN CLOSE 9 132 KV CAP BANK-1 CB FAULTY OPEN 10 33KV DHNERAKALAN CB FAULTY CLOSE 11 33KV NAYAGAON CB OPEN CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED BADOD 220 KV S/S 1 220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE 2 132 KV BUS COUPLER CB FAULTY CLOSE 3 33kV BAPCHA CB FAULTY CLOSE

Minutes of 56th OCCM of MP 86 4 33KV RAJKOT Solar MW,MVAR,CB,COE PROCESS CONNECTIONCLOSE 5 33kV SUZLON-2 CB FAULTY CLOSE 6 33KV TODAY ENERGY-1 CB FAULTY CLOSE 7 33kV SUZLON-1 CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NAGDA 220 KV S/S 1 132 KV BUS COUPLER CB FAULTY CLOSE 2 33KV CAP BANK CB FAULTY CLOSE 3 33KV BUS COUPLER CB FAULTY CLOSE 4 33KV BUS TIE CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NAGDA 400 KV S/S 1 400KV 50MVAR BUS REACTOR CB FAULTY CLOSE 2 400 /220kV 315MVA TRF1 CB FAULTY CLOSE 3 400KV 125MVAR BUS REACTOR MVAR N/A 4 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE 5 400 KV SHUJALPUR I MVAR N/A 6 220 KV BUS II KV/FREQ N/A SHAJAPUR 220 KV S/S 1 132 KV SIDTUBE CB /MW/MVAR N/A 8 ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE) SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE EAST 220 KV S/S 1 220 KV BUSCOUPLER CB FAULTY CLOSE NIMRANI 220 KV S/S 2 220/132 TR 1 & 2 OLTC N/A 3 132/33 TR CB/OLTC N/A SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED RAJGRAH (DHAR) 220 KV S/S 1 220 KV BUS -1 KV,HZ N/A 2 132/33 KV TR 2 SEC CB FAULTY CLOSE 3 132KV PETLAWAR CB FAULTY CLOSE 4 33KV CAP BANK CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED PITAMPUR 220 KV S/S 1 220 KV MAHESHWAR 2 CB FAULTY OPEN 2 220/132 TR3 MW,MVAR, OLTC N/C 3 132/33 TR3 OLTC N/C SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S-II 1 220/132kV 160MVA TRF-1 CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED UJJAIN 220 KV S/S 1 220 KV NAGDA I CB OPEN CLOSE 3 220/132 TR1 OLTC N/C 4 220/132 TR2 OLTC N/C 6 132 KV TARANA I CB FAULTY 6 132 KV CDWT-1&2 MW,MVAR,CB N/C 7 132/33 TR3 OLTC N/C SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE SZ 220KV S/S 1 220/132 TR1 & TR2 OLTC N/C 2 220/132 TR4(SECONDARY SIDE) CB FAULTY 3 132KV BUS COUPLER CB FAULTY CLOSE 4 220 KV MAIN BUS HZ NOT COMING SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE NZ (JETPURA) 220KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SANWER 132KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEPALPUR 132 KV S/S 1 132KV BUS COUPLER CB FAULTY CLOSE 2 132KV GAUTAM CB FAULTY CLOSE 2 132KV GAUTAM MW,MVAR NOT COMING

Minutes of 56th OCCM of MP 87 3 33KV CAP BANK CB FAULTY CLOSE 4 33/11 KV TR1 CB FAULTY CLOSE 5 33/11 KV TR2 CB FAULTY CLOSE 6 33KV BUS COUPLER CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEWAS BNP 132 KV S/S 1 33KV IND NO-4 CB FAULTY CLOSE 2 33KV DRP CB FAULTY CLOSE 3 33KV DEWAS BNP-2 CB FAULTY CLOSE 4 33KV SIYA CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED GHOSLA 132 KV S/S 1 CAP BANK MVAR N/C 10.66 2 132KV UJJAIN CB FAULTY OPEN 3 132KV BUS COUPLER CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S AGAR 1 132KV BUS COUPLER CB FAULTY CLOSE 2 33KV BUS COUPLER CB FAULTY CLOSE 3 33 KV CAP BANK CB FAULTY CLOSE 4 33KV DISCOM CB FAULTY CLOSE

132 KV S/S A LOT 1 132/33 KV XMER-1 P MW NOT COMING 2 132/33 KV XMER-1 P MVAR NOT COMING 3 132/33 KV XMER-1 S MW NOT COMING 4 132/33 KV XMER-1 S MVAR NOT COMING 5 33KV NARBHERAM MW,MVAR,CB,SOE Process connection need to be done 6 33KV A LOT CB NOT COMING 7 33KV PATAN CB NOT COMING

220 KV S/S BADNAGAR 1 220/33KV XMER 100 MVA MW NOT COMING 2 220/33KV XMER 100 MVA MVAR NOT COMING 3 132/33 XMER CB FAULTY CLOSE 4 132KV SARJAN CB FAULTY CLOSE 5 132KV UPPALURU MW,MVAR,CB,SOE NOT COMING 6 132KV KSHEMA POWER MW,MVAR,CB,SOE NOT COMING 132 KV S/S BAHADURPUR 1 132KV RAILWAY TRAC 1 MW NOT COMING 2 132KV RAILWAY TRAC 2 MVAR NOT COMING 3 132KV RAILWAY TRAC 3 CB FAULTY CLOSE 4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING 132 KV S/S CHAPDA 1 33KV DEVGARH CB FAULTY CLOSE 132 KV S/S CHHEGAON 1 132KV BHIKANGAON CB FAULTY CLOSE 2 132/33 TRF 2 SEC MW,MVAR NOT COMING 3 132/33 TRF 2 SEC CB FAULTY CLOSE 4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING 5 33KV MALWA 1 MW,MVAR,CB,SOE NOT COMING 6 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING 220 KV S/S DALODA 1 220/132KV XMER-2(P&S) 160 MVA MW NOT COMING 2 220/132KV XMER-2(P&S) 160 MVA MVAR NOT COMING 3 220/132KV XMER-2(P&S) 160 MVA CB FAULTY 4 220KV SOUMIL POWER MW,MVAR,CB,SOE NOT COMING 5 220KV BUS FREQ CONSTANT 50.00 6 132 KV BUS FREQ CONSTANT 50.00

Minutes of 56th OCCM of MP 88 220 KV S/S DEWASBNP Telemetry not coming 220 KV S/S DHAR 1 220KV PITAMPUR CB FAULTY CLOSE 2 220KV BUS KV NOT COMING 3 220KV BUS HZ NOT COMING CLOSE 4 132KV BUS KV NOT COMING CLOSE 5 132KV BUS HZ NOT COMING 6 132KV BUS COUPLER CB FAULTY CLOSE 7 132/33 TRF-1 CB FAULTY CLOSE 8 132/33 TRF-2 CB FAULTY CLOSE 9 132/33 TRF-3 CB FAULTY CLOSE 220 KV S/S INDORE EAST 1 220KV INDORE CB FAULTY CLOSE 2 220KV BUS COUPLER CB FAULTY CLOSE 132 KV S/S JAORA 1 33/11KV TRF1 &2 CB FAULTY CLOSE 2 33/11KV TRF1 MW,MVAR NOT COMING 3 132/33 TRF2 CB OPEN CLOSE 4 33KV CHOUKSEY ENERGY 1 CB,MW,MVAR NOT COMING 5 33KV CHOUKSEY ENERGY 2 CB,MW,MVAR NOT COMING 132 KV S/S KACHROD 1 132KV RATLAM MW,MVAR NOT COMING 2 132KV JICA 1 MW,MVAR NOT COMING 3 132KV JICA 2 MW,MVAR NOT COMING 4 132KV NAGDA CB OPEN CLOSE 5 132/33 KV TRF 2 PRI CB OPEN CLOSE 5 132/33 KV TRF 2 SEC CB FAULTY CLOSE 5 33 KV GRASIM CB FAULTY CLOSE 132 KV S/S KUKSHI 1 132KV ALIRAJPUR CB FAULTY CLOSE 2 132KV BUS COUPLER CB FAULTY CLOSE 3 33KV CAP BANK MW,MVAR NOT COMING 4 33KV BUS COUPLER CB OPEN CLOSE 132 KV S/S MAKDONE 1 33LKV GATA CB FAULTY CLOSE 2 33KV CAP BANK MW,MVAR NOT COMING 3 33KV BUS KV, HZ CONSTANT 220 KV S/S RATLAM 1 220/132KV TRF1 CB FAULTY CLOSE 2 132KV INTCC-2 CB FAULTY CLOSE 3 132KV INTCC-1 CB OPEN CLOSE 4 33KV SHIVPUR CB OPEN CLOSE 132 KV S/S RATANGARH 1 33KV CAP BANK CB FAULTY CLOSE 2 33KV DELIGENTIA CB FAULTY CLOSE 3 132KV BUS COUPLER CB OPEN CLOSE 132 KV S/S SAILANA 1 132KV BUS COUPLER CB FAULTY CLOSE 2 33KV SUZLON 2 CB FAULTY CLOSE 3 33KV SUZLON 4 CB OPEN CLOSE 4 33KV SUZLON 5 CB OPEN CLOSE 5 33KV BAJNA MW,MVAR,CB,SOE NOT COMING 132 KV S/S SHANKARGARH Telemetry not coming PLCC issue 132 KV S/S SITAMAU 1 132KV FOCAL ENERGY CB FAULTY CLOSE 2 132/33KV TRF CB OPEN CLOSE 132 KV S/SUWASRA 1 132KV TRACTION 1 CB FAULTY OPEN 2 132/33KV TRF 3& 4 MW,MVAR NOT COMING 3 33KV CAP BANK CB FAULTY CLOSE 4 132/33KV TRF1 CB OPEN CLOSE 5 33KV RAWTI CB FAULTY CLOSE

Minutes of 56th OCCM of MP 89 Name at SLDC end at site end SATPURA T P S 1 GEN 6 GT MW/MVAR 0 155 /10 2 GEN 7 GT MW/MVAR 0 160/10 3 GEN 6 GT CB FAULTY OPEN 4 GEN 7 GT CB FAULTY OPEN 5 220 KV TRB CB FAULTY CLOSE AMARKANTAK TPS 1 STATION XMER 5A & 5B CB N/A 2 132/33 AUTO XMER CB N/A SINGHA JI S T P S 1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C S G T P S 1 400/220 KV ICT CB FAULTY CLOSE 2 400 KV BUS TIE CB NA CLOSE 3 400 KV STN TRANSFORMER A & B CB NA CLOSE 5 STN TR 1 ,2 (220 KV ) CB NA CLOSE 6 220 KV BUS TIE CB NA CLOSE 7 220 /33 KV TR CB/MW/MVAR NA 8 400 KV BUS 1 FREQ 49.79 49.98 9 220 KV BUS 2 VOLTAGE 197 230 RAJGHAT H P S RTU OUT TONS H P S 1 220 KV SIRMORE MVAR 494 5 2 221 KV SIRMORE MVAR 685 5 DEOLOAN H P S Telemetry N/C

Minutes of 56th OCCM of MP 90 TELEMETRY DISCRIPIENCY I SP H P S Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site 1 GEN 7 MVAR 100 10 2 GEN 3 MVAR 80 8 3 400 KV ISP -INDORE 1 MVAR 16 8 4 400 KV ISP- INDORE 2 MVAR 206 10

Minutes of 56th OCCM of MP 91 BLA TPS SR.NO. NAME AT SLDC AT SITE 1 132 KV GADARWARA1 MW 21 0 2 133 KV GADARWARA2 MW/MVAR 45 0 3 132 KV BUS VOLTAGE NA 132.8 4 STATION XMER MW, MVAR N/A

Minutes of 56th OCCM of MP 92 jp bina TPS SR.NO. NAME AT SLDC AT SITE 1 GENERATOR 2 MW N/A 158 2 GENERATOR 2 MVAR N/A 25 JP bina TPS T/M 2nd channel GPRS not working

Minutes of 56th OCCM of MP 93 DATA OUT FROM LONG TIME 1 WAIDHAN 132KV S/S 2 MORWA 132 KV S/S 3 BEOHARI 132 KV S/S 4 UMARIYA 132 KV S/S LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER JABALPUR CIRCLE

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site JABALPUR 220 KV S/S 1 220 KV BUS 2 VOLTAGE 0 222 KV 2 220 /132 KV XMER 2 (120MVA) MW/MVAR 0 58/10 3 132 KV VFJ 1 & 2 CB FAULTY CLOSE 4 132 KV DAMOH CB FAULTY CLOSE 5 220 /132 KV XMER 2 (120MVA) SEC CB FAULTY CLOSE 6 132/33 KV XMER 3 (63MVA) CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED SEONI 220 KV S/S 1 132/33 KV XMER 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED PANDURNA 220 KV S/S

1 220 KV CHINDWARA CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED 2 220/132 KV XMER CB FAULTY CLOSE BHANEGAON 132 KV S/S 1 B/C CB FAULTY OPEN CHINDWARA 132 KV S/S 1 132KV B/C CB FAULTY OPEN KATNI 400 KV S/S 1 132 KV SALIMNABAD MW/MVAR N/C KYMORE 132 KV S/S 1 132 KV BUS VOLTAGE /FREQUENCY N/A 132/50 SATNA CIRCLE MAIHAR 220 KV S/S 1 220 KV PGCIL SATNA CB FAULTY OPEN 2 220 KV PGCIL SATNA MW/MVAR 80/4 120/6 3 132/33 KV XMER 1 MW /MVAR 10/4 20/8 4 132/33 KV XMER 2 MW /MVAR 5/2 10/4 SATNA220 KV S/S 1 220 KV KOTOR CB FAULTY CLOSE 2 220 KV SATNA PG 3 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED 3 220 KV BUS VOLTAGE /FREQUENCY 0 220/50 CHHATARPUR 220KV S/S 1 220 KV BUS VOLTAGE KV 170.2 225 2 XMER - 2 MW/MVAR N/A 3 132 KV BUS COUPLER CB FAULTY 4 132 KV BIJAWAR CB FAULTY BEOHARI 132KV S/S 1 ALL T.M. DATA CB ,MW,MVAR N/A AS ON DT 13-02-2017 2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED REWA 220 KV S/S 1 220/132 XMER 2 SEC CB FAULTY CLOSE TIKAMGRAH 220 KV S/S 1 220/132 KV XMER 2 PRI CB FAULTY CLOSE 2 220 KV DAMOH CB FAULTY CLOSE 3 220 KV B/C CB FAULTY CLOSE 4 220 KV BUS TIE CB FAULTY CLOSE 5 132 KV DINGORA CB FAULTY CLOSE 6 132 KV B/C CB FAULTY CLOSE 7 220/132 KV XMER 1 SEC CB FAULTY CLOSE 8 132/33 KV XMER 1 CB FAULTY CLOSE

Minutes of 56th OCCM of MP 94 9 132 KV JATARA CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED 10 132 KV GUDERA 1 & 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED KOTAR 220 KV S/S 1 220 KV TONS PH MW /MVAR DIFFERENCE 21/25 3 220 KV SATNA MW /MVAR DIFFERENCE 99/96 BIRSINGHPUR 220 KV S/S 1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15 ANUPPUR 220 KV S/S 1 132 KV KOTMA CB N/A 220/132 KV TR 2 (160 MVA) PRI & 2 SEC CB N/A CLOSE 220 KV BUS VOLTAGE & 3 FREQUENCY N/A 3 132 KV SHAHDOL CB ,MW,MVAR N/A 4 132 KV KOTMA 2 CB ,MW,MVAR N/A 5 132 /33 KV TR 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED KOTMA 132 KV S/S 1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED BINA CIRCLE BINA 400 KV S/S 1 400/200/33 KV TERTIARY REACTOR 1 &MVAR N/A 2 BINA-BINA PG CKTS 1 MW 74 82 3 BINA-BINA PG CKTS 2 MW 82 91 4 BINA-BINA PG CKTS 3 MW 220 202 5 400 KV JP BINA CKT MW 171 163 6 400 KV BHOPAL I & II MW 155 165 7 220 KV BINA-2 CB FAULTY 8 220 KV SAGAR-2 CB N/A CLOSE 9 220 KV DATIA CB CLOSE OPEN BINA 220 KV S/S 1 132 KV ASHOK NAGAR MW/MVAR N/C PROCESSES CONNECTION REQUIRED 2 220 KV & 132 KV B/C CB FAULTY 3 132/33 KV XMER-4 CB CB FAULTY SAGAR 220 KV S/S 1 220 KV BUS KV /FREQUENCY 0 220/50 2 132 KV BUS KV /FREQUENCY 0 132/50

Minutes of 56th OCCM of MP 95 DATA OUT FROM LONG TIME 1 WAIDHAN 132KV S/S 2 MORWA 132 KV S/S 3 BEOHARI 132 KV S/S 4 UMARIYA 132 KV S/S LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SATNA CIRCLE MAIHAR 220 KV S/S 1 220 KV PGCIL SATNA CB FAULTY OPEN 2 220 KV PGCIL SATNA MW/MVAR 80/4 120/6 3 132/33 KV XMER 1 MW /MVAR 10/4 20/8 4 132/33 KV XMER 2 MW /MVAR 5/2 10/4 SATNA220 KV S/S 1 220 KV KOTOR CB FAULTY CLOSE 2 220 KV SATNA PG 3 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED 3 220 KV BUS VOLTAGE /FREQUENCY 0 220/50 BEOHARI 132KV S/S 1 ALL T.M. DATA CB ,MW,MVAR N/A AS ON DT 13-02-2017 2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED REWA 220 KV S/S 1 132 KV MANGAWAN 2 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED 2 132 KV REWA 2(INTERCONNECTOR) CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED 3 220/132 XMER 2 SEC CB FAULTY CLOSE KOTAR 220 KV S/S 1 220 KV TONS PH MW /MVAR DIFFERENCE 21/25 3 220 KV SATNA MW /MVAR DIFFERENCE 99/96 BIRSINGHPUR 220 KV S/S 1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15 ANUPPUR 220 KV S/S 1 132 KV KOTMA CB N/A 2 220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE 3 220 KV BUS VOLTAGE & FREQUENCY N/A 3 132 KV SHAHDOL CB ,MW,MVAR N/A 4 132 KV KOTMA 2 CB ,MW,MVAR N/A 5 132 /33 KV TR 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED KOTMA 132 KV S/S 1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED

Minutes of 56th OCCM of MP 96 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER JABALPUR CIRCLE

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site JABALPUR 220 KV S/S 1 220 KV BUS 2 VOLTAGE 0 222 KV 2 220 /132 KV XMER 2 (120MVA) MW/MVAR 0 58/10 3 132 KV VFJ 1 & 2 CB FAULTY CLOSE 4 132 KV DAMOH CB FAULTY CLOSE 5 220 /132 KV XMER 2 (120MVA) SEC CB FAULTY CLOSE 6 132/33 KV XMER 3 (63MVA) CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED SEONI 220 KV S/S 1 132/33 KV XMER 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED PANDURNA 220 KV S/S 1 220 KV CHINDWARA CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED 2 220/132 KV XMER CB FAULTY CLOSE BHANEGAON 132 KV S/S 1 132 KV BUS COUPLER CB FAULTY OPEN CHINDWARA 132 KV S/S 1 132KV B/C CB FAULTY OPEN KATNI 400 KV S/S 1 132 KV SALIMNABAD MW/MVAR N/C KYMORE 132 KV S/S 1 132 KV BUS VOLTAGE /FREQUENCY N/A 132/50

Minutes of 56th OCCM of MP 97 SAGAR CIRCLE CHHATARPUR 220KV S/S 1 220 KV BUS VOLTAGE KV 170.2 225 2 XMER - 2 MW/MVAR N/A 3 132 KV BUS COUPLER CB FAULTY 4 132 KV BIJAWAR CB FAULTY TIKAMGRAH 220 KV S/S 1 220/132 KV XMER 2 PRI CB FAULTY CLOSE 2 220 KV DAMOH CB FAULTY CLOSE 3 220 KV B/C CB FAULTY CLOSE 4 220 KV BUS TIE CB FAULTY CLOSE 5 132 KV DINGORA CB FAULTY CLOSE 6 132 KV B/C CB FAULTY CLOSE 7 220/132 KV XMER 1 SEC CB FAULTY CLOSE 8 132/33 KV XMER 1 CB FAULTY CLOSE 9 132 KV JATARA CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED 10 132 KV GUDERA 1 & 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED SAGAR 220 KV S/S 1 220 KV BUS KV /FREQUENCY 0 220/50 2 132 KV BUS KV /FREQUENCY 0 132/50

Minutes of 56th OCCM of MP 98 BINA CIRCLE BINA 400 KV S/S 1 400/200/33 KV TERTIARY REACTOR 1 & 2 MVAR N/A 2 BINA-BINA PG CKTS 1 MW 74 82 3 BINA-BINA PG CKTS 2 MW 82 91 4 BINA-BINA PG CKTS 3 MW 220 202 5 400 KV JP BINA CKT MW 171 163 6 400 KV BHOPAL I & II MW 155 165 7 220 KV BINA-2 CB FAULTY 8 220 KV SAGAR-2 CB N/A CLOSE 9 220 KV DATIA CB CLOSE OPEN BINA 220 KV S/S 1 132 KV ASHOK NAGAR MW/MVAR N/C PROCESSES CONNECTION REQUIRED 2 220 KV & 132 KV B/C CB FAULTY 3 132/33 KV XMER-4 CB CB FAULTY ASHOK NAGAR 220 KV S/S 1 220 KV BINA MW/MVAR/CB N/C GUNA 220 KV S/S 1 220 KV BUS COUPLER CB FAULTY CLOSE 1 132/33 KV TR -1 CB FAULTY CLOSE 2 220/132 KV 160 MVA-2(LV) CB NON CURRENT 3 132 KVBUSCOUPLER CB FAULTY OPEN

Minutes of 56th OCCM of MP 99 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER GWALIOR 220 KV S/S 1 220/132 KV TR 2 (160 MVA-2) MVAR NON CURRENT 2 220/132 KV TR 2 (160 MVA-2) MW WRONG VALUES 3 220/132 KV TR 2 (160 MVA-2)LV CB FAULTY 4 132/33 KV TR (63 MVA)-2 CB FAULTY MALANPUR 220 KV S/S 1 220 KV BUS & 132 KV BUS FREQUENCY NON CURRENT 2 220/132 KV TR 1 (160 MVA-1) MVAR NON CURRENT 3 132KV BANMORE-2 CB FAULTY CLOSE 4 132KV AMBAHA CB FAULTY OPEN 5 132 KV MEHGAON CB OPEN CLOSE 6 132 KV MEHGAON MVAR NON CURRENT 7 220/132 KV TR 1 (160 MVA-1)LV CB FAULTY CLOSE 8 132 KV BUS COUPLER-2 CB NON CURRENT 9 132 KV MORAR CB TRANSIT CLOSE 10 132 KV MORAR MW/MVAR WRONG VALUES 11 132 KV BUS VOLTAGE WRONG VALUES PICHORE 132 KV S/S 1 132 KV CHANDERI CB OPEN CLOSE 2 132 KV DATIA CB FAULTY CLOSE 3 132 Kv KARERA CB FAULTY CLOSE 4 132 KV RAJGHAT CB FAULTY CLOSE 5 132/33 KV TR NGEF CB FAULTY CLOSE 6 132 KV SHIVPURI CB CLOSE OPEN 7 132/33 KV 40 MVA MW/MVAR NON CURRENT SHIVPURI 220 KV S/S 1 220/132 KV TR 2(160MVA-2) MW/MVAR/CB N/A PROCESSES CONNECTION REQUIRED 2 220 KV BUS COUPLER CB FAULTY 3 132 KV KOLARAS MW/MVAR NON CURRENT 4 132 KV MOHNA MW/MVAR NON CURRENT 5 132/33 KV TR -1 MW/MVAR NON CURRENT 6 132/33 KV TR -2 MW/MVAR NON CURRENT 7 220/132 KV TR (160 MVA)LV CB FAULTY CLOSE 8 22OKV BUS-2 & 132 KV BUS VOLTAGE NON CURRENT MEHGAON 220 KV S/S 1 132 KV BUS COUPLER CB FAULTY OPEN 2 132 KV SEONDHA CB FAULTY CLOSE SHEOPURKALA 132 KV S/S 1 132 KV SABALGARH-2+KANDHAR MW/MVAR NON CURRENT 2 132 KV BUS FREQENCY NON CURRENT 3 132 KV BUS VOLTAGE NON CURRENT 4 132/33 KV 63 MVA TR MW/MVAR NON CURRENT 5 132/33 KV 63 MVA TR CB FAULTY CLOSE 6 132/33 KV 40 MVA TR CB FAULTY CLOSE 7 132 kv Baroda Process connection required DATIA 220 KV S/S SOE DATA NOT RECEIVED VIJAYPUR 132 KV S/S 1 132/33 KV 40 MVA TR CB NON CURRENT

Minutes of 56th OCCM of MP 100 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER BHOPAL 400 KV S/S 1 80 MVAR REACTOR 1 & BINA-1 TIE-CB PROCESSES CONNECTION REQUIRED 2 BDTCL-2 & 315 MVA XMER-2 TIE-CB PROCESSES CONNECTION REQUIRED GANJBASODA 220 KV S/S 1 220KV BUS COUPLER MW/MVAR NON CURRENT 2 132 KV R.TRACT.-2 MW NON CURRENT 3 132KV BUS COUPLER MW/MVAR NON CURRENT 4 132 KV BINA MW NON CURRENT VIDISHA 220 KV S/S 1 220KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED 2 132 KV SANCHI R.-TRACT.-1 CB NON CURRENT 3 132KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED 4 220/132 KV 160 MVA XMER-2(LV) CB FAULTY CLOSE MANDIDEEP 132 KV S/S ALL CB STATUS ARE NON CURRENT AYODHA NAGAR 132 KV S/S 1 132/33 KV 20 MVA XMER-2 CB OPEN CLOSE BERASIA 132 KV S/S 1 132KV BUS COUPLER CB FAULTY OPEN MANDIDEEP 220 KV S/S 1 220 KB BUS COUPLER CB FAULTY OPEN 2 220 KV TRANSFER BREAKER CB NON CURRENT 3 160 MVA XMER-2 MW /MVAR /CB PROCESSES CONNECTION REQUIRED SIRONJ 132 KV S/S 1 20 MVA XMER CB FAULTY CLOSE

Minutes of 56th OCCM of MP 101 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SARNI 220 KV S/S 1 132 KV SARNI R.-TRACT.-2 CB FAULTY CLOSE

HARDA 132 KV S/S 1 132 KV CHANERA MVAR WRONG VALUES 2 132 KV KHIRKIYA PROCESSES CONNECTION REQUIRED 3 132 KV KHIRKIYA RLY TRACTION-1 CB OPEN CLOSE

ITARSI 220 KV S/S 1 220 KV HANDIA-2 CB OPEN CLOSE 2 220 KV BUS-2 VOLTAGE WRONG VALUES 3 132KV HOSHANGABAD-2 MW/MVAR/CB N/A PROCESSES CONNECTION REQUIRED 4 132/33 TR 4 CB FAULTY CLOSE

BETUL 220 KV S/S ALL CB NON CURRENT 1 220 KV CHINDWARA MW/MVAR NON CURRENT 2 132 KV GUDGAON-1 MW /MVAR /CB PROCESSES CONNECTION REQUIRED

GUDGAON 132 KV S/S 1 132 KV BUS COUPLER MW/MVAR NON CURRENT 2 132 KV BUS COUPLER CB FAULTY OPEN 132/33 KV 40 MVA XMER MW/MVAR NON CURRENT 132/33 KV 50 MVA XMER MVAR NON CURRENT

ASHTA 132 KV S/S 1 132 KV ASTHA-2 MW/MVAR NON CURRENT 2 132 KV ASTHA-1 MVAR WRONG VALUES 3 132/33 KV TR -1 CB OPEN CLOSE 4 132 KV ASHTA-2 CB FAULTY CLOSE 5 132 KV BUS FREQUENCY NON CURRENT

ASHTA 400 KV S/S 1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES 2 400 KV BUS COUPLER CB FAULTY OPEN SOE DATA NOT RECEIVED

BAIRAGRAH 220 KV S/S 1 132/33 KV 50MVA TR CB OPEN CLOSE 2 132 KV SHYAMPUR-2 CB NON CURRENT

HANDIA 220 KV S/S 1 220 KV BUS COUPLER CB FAULTY OPEN

ICHAWAR 132 KV S/S 1 132 KV SEHORE MW /MVAR /CB PROCESSES CONNECTION REQUIRED

KHILCHIPUR 132 KV S/S 1 132/33 KV 20 MVA XMER CB NA CLOSE

PACHORE 132 KV S/S 1 132 KV SHUJALPUR-2 CB NON CURRENT SOE DATA NOT RECEIVED

Minutes of 56th OCCM of MP 102