S.# Name of Scheme Estimated Cost Earnest Money T.S # & Date 1 Rehabilitation of Water Supply Scheme Mureed UC Mureed 800000

Total Page:16

File Type:pdf, Size:1020Kb

S.# Name of Scheme Estimated Cost Earnest Money T.S # & Date 1 Rehabilitation of Water Supply Scheme Mureed UC Mureed 800000 Estimated Earnest T.S # & S.# Name of Scheme Cost Money Date 780/I&S 1 Rehabilitation of Water Supply Scheme Mureed UC Mureed 800000 16000 Dt 09.11.13 Construction of Street Drain Village Udharwal, Chakora, Dhakoo 2 1000000 20000 -do- UC Udharwal Construction of Nullah from H/O Shabbir to Masjid Noor e 3 300000 6000 -do- Mustafa Village Khokhar Zer UC Karyala. 4 Construction of Street Drain Village Janga UC Karyala 300000 6000 -do- Construction of Nullah and Protection wall from House of Raja 5 Nasir to House Asif Mehmood main road Bhalla Village Karyala 450000 9000 -do- UC Karyala 6 Construction of Street Drain Culverts in UC 1 Chakwal 1000000 20000 -do- Construction of street and drain from H/O Jamir to House of 7 Sattar, (ii) Construction of street from House of Fauji Tariq to 455000 9100 -do- Nullah Bhanao Village Karyala UC Karyala 8 Earth Filling near Govt Girls School Village Kotha Abdal UC Dab 125000 2500 -do- Construction of Drain from House of M.Bashir to House of Ahmed Khan Mohallah Mughal Kassar (ii) Construction of Drain 9 from GGHS to Link road GraveyardVillage Kotha Abdal, (iii) 385000 7700 -do- Construction of Street and drain from Masjid Farooq-e-Azam to H/O Hakeem Abdullah Village Mohra Kor Chasham UC Dab 10 Construction of Street Drain Culverts in UC 2 Chakwal 1000000 20000 -do- Construction of street and drains from House of Ch. M. Nawaz to House of Malik Azhar, (ii) Construction of Street and Drain 11 250000 5000 -do- from House of Sharif to House of Abdul Aziz Riksha wala Village Jabairpur UC Dab Construction of street and drain from House of Abdul Rehman 12 200000 4000 -do- to House of Fazal Hussain Village Dab UC Dab. 13 Construction of Street Drain Culverts in UC 3 Chakwal 1000000 20000 -do- Construction of Street Drain near Main Bazar Village Tatral UC 14 400000 8000 -do- Dab 15 Construction of Street Drain from H/O Rukhsar Hussain to H/O 115000 2300 -do- Nazir Link Street from main street 3 Marla Scheme Village Behkari, (ii) Construction of Street Drain from H/O Mazhar to H/O Imran Village Noorwal UC Dab 16 Construction of street and drains in UC Ballokassar 1000000 20000 -do- 17 Construction of Street Drain Culverts in UC 4 Chakwal 1000000 20000 -do- Construction of Nullah from H/O Asif to H/O Zawar Ashraf Mohallah Sadaat, (ii) Construction of Street Drain from H/O 18 850000 17000 -do- Banaras to H/O Master Altaf Gulfam Colony Village Dhudial UC Dhudial Construction of Street Nullah from PCO shop to Rizwan General 19 Store, from Main Bazar to H/O Tariq Welding Village Dhudial UC 500000 10000 -do- Dhudial 20 Construction of street and drains in UC Saral. 1000000 20000 -do- 21 Construction of Street and Drains in UC Mangwal 1000000 20000 -do- Construction of Street / Nullah from H/O Haji Bashir to H/O 22 Mohammad Khan to H/O Abdullah, H/O Maqsood Village Farid 950000 19000 -do- Kassar UC Chak Umra 23 Construction of Street Drain Culverts in UC 5 Chakwal 1000000 20000 -do- Construction of Soling Chowk Nadral, (ii) Construction of 24 Nullah from H/O Zahid to H/O Sakhawat Village Nadral UC Chak 385000 7700 -do- Umra Construction of Street Drain from main road / Talab to H/O Sub: Siddiq, main road to H/O Abdur Rashid, (ii) Construction of 25 745000 14900 -do- Street Drain from H/O Mohammad Amir to H/O Ahmed Khan Village Dhoke Jhakkar UC Padshahan Construction of Protection Wall Darbar Mastan Shah Village 26 Chohan, Construction of Street Drain from main street to H/O 450000 9000 -do- Sajid (Hong Kong) Village Chohan UC Padshahan Construction of Street Drain from H/O Fida Hussain to H/O Taj, 27 from H/O Nazim to H/O Bashir etc Nai Abadi Malangan Village 290000 5800 -do- Chak Naurang UC Chak Malook Construction of Street Drain Village Chak Malook , Dhoke Bair 28 600000 12000 -do- UC Chak Malook Construction of Street Drain from H/O Aftab to H/O Latif, (ii) Construction of Street Drain from H/O Aftab to road (iii) 29 355000 7100 -do- Construction of Street Drain from H/O Qazi Ishtiaq to H/O Qazi Bashir Village Pinwal UC Chak Malook Construction of Street Drain / Resoling from main road to H/O 30 155000 3100 -do- Badar Thanedar Village Amir Pur Mangan UC Bheen Construction of Pully Main Path Mohallah Usmanabad Village Bheen, (ii) Construction of Street Drain from H/O Malik Shahid 31 621000 12420 -do- to H/O Munsab, main road to H/O Azad, Construction of Drain near H/O Zahid Mehmood Village Bheen UC Bheen 32 Construction of Street Drain in UC Bheen 500000 10000 -do- 33 Construction of Street and Drains in UC Dullah. 1000000 20000 -do- Construction of street and drain from H/O Aziz Ur Rehman to 34 H/O Naeem, H/O Altaf to H/O Ansar Mehmood to Liaqat, main 360000 7200 -do- street ,pond protection wall Village Nara Mughlan UC Jand Construction of street and drain from H/O Ashiq to Hameed 35 300000 6000 -do- Numberdar Village Chak Qada UC Jand Construction of street and drain from H/O Javed to H/O Mster 781/I&S 36 Abid, H/O Tauseef Ahmed to H/O Usman Abid Village Chakora 300000 6000 dt UC Jand 11.11.13 Construction of street and drain from H/O M.Iqbal to H/O Ghulam Fareed Village Sau, Construction of street and drain 37 225000 4500 -do- from H/O Ghulam Mustafa to main road Village Dhoke Teshan UC Jand Construction of Nullah and Protection Wall Dhakki, (ii) 38 Construction of Street/Drain from H/O M.Safdar to H/O Nazir 370000 7400 -do- Village Jand UC Jand Construction of Street from Main road to down stream Village 39 550000 11000 -do- Dhoke Jabbi UC Jand Construction of Street Drain from H/O Khan Beg to Darbar 40 1000000 20000 -do- Rajgan Village Dharughi UC Mulhal Mughlan Construction of Street Drain P/Wall from H/O Hameed to H/O 41 Saghir Village Dakhli Mian Mehrab Chah Mal Village Dhoda UC 300000 6000 -do- Mulhal Mughlan Construction of street and drain from House of Nazir to House 42 of Anwar Baig to Main street to H/O Tariq Village Kajli UC Jand 150000 3000 -do- Khanzada Construction of street and drain from main road to H/O M.Din 43 pervez, Gulsher,Ch. Amjid to maind road Village Kajli UC Jand 380000 7600 -do- Khanzada 44 Construction of Nullah/Slab from H/O Haji M.Azad to Aadil 320000 6400 -do- Hussain field, H/O Subedar M.Faazal to M.Azad, (ii) Construction of street/Drain from main street to H/O Nasir Mehmood, Ansar Mehmood etc, H/O M.Latif to H/O M.Hanif Village Punj Dhera UC Jang Khanzada Construction of street and drain from H/O Husnain to H/O 45 400000 8000 -do- Arshad, Anayat Village Dhoke Toor UC Jand Khanzada. Construction of Protection Wall from House of Abdul Razaaq to 46 600000 12000 -do- House Mushtaq Village Dhumman UC Dhumman Construction of street and drain from House of M.Nawaz to 47 Graveyard, (ii) Construction of Boundary wall Graveyard Village 430000 8600 -do- Dhumman UC Dhumman Construction of Street Drain Nullah Village Rabbal Khouthian 48 800000 16000 -do- Sarkal Mair UC Khouthian Construction of Street Drain from H/O Master M Yaqoob to H/O 49 500000 10000 -do- Abdul Aziz Village Bhudial UC Khouthian Construction of Protection Wall Path H/O Farhat Village Taniala, Construction of Street Drain from H/O Mohammad Amir 50 to Pucca road Village Dhoke Qutab Din, Construction of Street 600000 12000 -do- from H/O Abdul Majeed to H/O Sadiq, H/O Shams to main street Village Dourian UC Choa Gunj Ali Shah Construction of Street Drain in Village Choa Gunj Ali Shah UC 51 556000 11120 -do- Choa Gunj Ali Shah 52 Construction of Street Drain in UC Jaswal 1000000 20000 -do- 53 Construction of Street Drains Culverts etc in UC 1 Chakwal City 2500000 50000 -do- 54 Construction of Street Drains Culverts etc in UC 2 Chakwal City 3000000 60000 -do- 55 Construction of Street Drains Culverts etc in UC 4 Chakwal City 3000000 60000 -do- 56 Construction of Street Drains Culverts etc in UC 5 Chakwal City 1000000 20000 -do- 57 Construction of Street Drain in UC Dab 1500000 30000 -do- Construction of Storm Water Channel near Nadral road and 58 1000000 20000 -do- Construction of Street/drains in Village Minwal UC Ballokassar. Construction of Street Nullah from H/O Ramzan to H/O Asad Mohallah Darasgah, H/O Naveed Mohallah Awan Colony, H/O 59 1500000 30000 -do- Safdar to H/O Ibrar Shah & other streets Village Dhudial UC Dhudial 60 Construction of Street Drain in Village Sang UC Dhudial 500000 10000 -do- Construction of Street and drains and Nullah in Village Kot 61 500000 10000 -do- Iqbal UC Saral. 62 Construction of street/Drains in Village Jethal in UC Saral 500000 10000 -do- 63 Construction of Street Drain Village Mona UC Chak Umra 300000 6000 -do- 64 Construction of Street Drain in Village Dhoda 400000 8000 -do- 65 Construction of Street Drain in Village Chakral UC Chak Malook 1000000 20000 -do- Construction of Street Drain from Madni Masjid to H/O Sadiq 66 500000 10000 -do- Numberdar Village Udhwal UC Chak Malook Construction of Street Drain from H/O Amjad Bhatti to H/O Safdar Hussain, Construction of Protection Wall near H/O Malik 67 Hassan Village Bheen & Construction of Street Drain from H/O 700000 14000 -do- Numberdar Aourangzeb to H/O Jahangir Qureshi Village Dhoke Chachh UC Bheen 68 Construction of Street Drain Village Pind Haraj UC Dullah 500000 10000 -do- 69 Construction of Street Drain in UC Jand 1000000 20000 -do- Construction of Street from H/O Haji Akbar to H/O Abbas Village 70 400000 8000 -do- Dharugi Rajgan UC Mulhal Mughlan 782/I&S Construction of Street Drain street Moeen ul Haq wali Village 71 200000 4000 dt Bamla UC Mulhal Mughlan 12.11.13 Construction of Street Drain from H/O Mirza Javed to H/O Ch 72 Shahid Col Ahmed Beg Village Mulhal Mughlan UC Mulhal 200000 4000 -do- Mughlan Construction
Recommended publications
  • Water Supply & Sanitation
    WATER SUPPLY & SANITATION 149 WATER SUPPLY & SANITATION VISION To improve quality of life of the people of Punjab through provision of safe drinking water and sanitation coverage to the entire community. POLICY This important social sector assumes the policy of provision of safe and potable drinking water, sanitation and coverage of the entire community particularly in barani and brackish areas. Emphasis has been laid on encouraging Participatory Management - Community mobilization in project. Coverage will be provided to the rural areas through encouragement of integrated rural water supply and sanitation schemes. Waste water treatment plants will be provided for improving environmental pollution and protecting Water Bodies. STRATEGIC INITIATIVES / NEW INTERVENTIONS ¾ 993 water supply and sanitation schemes have been conceived for the year 2008-09 with a total financial outlay of Rs.8000 million. Execution of these interventions will result into substantial improvement in the population coverage. ¾ A special package has been reflected in the MTDF 2008-09 under “Community based Sanitation Program”. By implementation of this project there will be visible improvement in the sanitation, particularly in Rural Areas and Small Towns. ¾ MTDF 2008-09 provides “Block Allocation” for various components of the Sector. The schemes against these blocks will be identified through participation of the local communities. ¾ In order to ensure equitable distribution of supplies and for water conservation, water metering concept is being introduced in the rural areas. This intervention will control wastage of water and will lead to the sustainability of the schemes. ¾ Presently there is a huge disparity amongst districts regarding the resource provisions. This imbalance is being minimized by providing more funds to the deprived/low profile districts as defined in MICS.
    [Show full text]
  • Mtdf 2007-2010 Development Programme 2 0
    GOVERNMENT OF THE PUNJAB MTDF 2007-2010 DEVELOPMENT PROGRAMME 2 0 0 7 – 2 0 0 8 MTDF 2007-10 ABSTRACT (Rs. In million) Sr. Allocation % of Core Projections % of Core Projections 2009- % of Core Sector No. 2007-08 2007-08 2008-09 2008-09 10 2009-10 A Social Sectors 44377.450 47.7 57505.000 49.1 71655.000 50.5 1 Education 21480.450 23.1 29050.000 24.8 36500.000 25.7 (i) School Education 8488.000 9.1 10950.000 9.4 14000.000 9.9 (ii) Higher Education 9936.000 10.7 12600.000 10.8 15500.000 10.9 (iii) Special Education 954.450 1.0 2000.000 1.7 2500.000 1.8 (iv) Literacy 1200.000 1.3 2000.000 1.7 2500.000 1.8 (v) Sports 902.000 1.0 1500.000 1.3 2000.000 1.4 2 Health 6500.000 7.0 10000.000 8.5 12800.000 9.0 3 Water Supply & Sanitation 6500.000 7.0 8700.000 7.4 10600.000 7.5 4 Social Protection 616.000 0.7 900.000 0.8 1300.000 0.9 5 Regional Planning 2326.000 2.5 3500.000 3.0 4400.000 3.1 6 Local Government & Community Development 6955.000 7.5 5355.000 4.6 6055.000 4.3 (i) LG&CD 2100.000 2.3 3500.000 3.0 4200.000 3.0 (ii) Tameer-e-Punjab Programme 1855.000 2.0 1855.000 1.6 1855.000 1.3 (iii) Local Development Programme 2000.000 2.2 0.000 0.0 0.000 0.0 (iv) Community Uplift Programme 1000.000 1.1 0.000 0.0 0.000 0.0 B Infrastructure Development 32354.000 34.8 40500.000 34.6 45500.000 32.0 7 Roads 14300.000 15.4 16000.000 13.7 17000.000 12.0 8 Irrigation 11000.000 11.8 13000.000 11.1 16000.000 11.3 9 Public Buildings (Housing) 800.000 0.9 1500.000 1.3 1500.000 1.1 10 Public Buildings (Offices) 2450.000 2.6 4000.000 3.4 5000.000 3.5 11 Urban Development 3804.000 4.1 6000.000 5.1 6000.000 4.2 C Production Sectors 7053.000 7.6 10210.000 8.7 13230.000 9.3 12 Agriculture 2800.000 3.0 3800.000 3.2 5000.000 3.5 13 Forestry, Wildlife & Fisheries 690.000 0.7 1060.000 0.9 1350.000 1.0 (i) Forestry 220.000 0.2 310.000 0.3 450.000 0.3 (ii) Wildlife 350.000 0.4 550.000 0.5 650.000 0.5 MTDF 2007-10 ABSTRACT (Rs.
    [Show full text]
  • National Assembly Polling Scheme
    ELECTION COMMISSION OF PAKISTAN FORM-28 [see rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY OF Election to the National Assembly of the NA-66 JHELUM-I Number of voters assigned to In Case of Rural Areas In Case of Urban Areas Number of polling booths polling station S. No. of voters on the Sr. No. No. and Name of Polling Station electoral roll in case electoral Name of Census Block Name of Census Block area is bifurcated Male Female Total Male Female Total Electoral Areas Code Electoral Areas Code 1 2 3 4 5 6 7 8 9 10 11 12 13 Govt Cap. Hasnat Ali Khan High School Moh Eid Gah 1 - - 125050101 1716 0 1716 4 0 4 Sohawa (M) (P) Sohawa 1 Total - - - 1716 0 1716 4 0 4 Govt Cap. Hasnat Ali Khan Shaheed High Moh Eid Gah 2 - - 125050101 0 1593 1593 0 4 4 School Sohawa (F) (P) Sohawa 2 Total - - - 0 1593 1593 0 4 4 Hydri Mohallah Govt Cap. Hasnat Ali Khan High School 3 - - High School 125050103 696 676 1372 2 2 4 Sohawa (C) (P) Sohawa 3 Total - - - 696 676 1372 2 2 4 Mohra Pari - - 125050102 407 0 407 Sohawa Moh Madni - - 125050104 679 0 679 Sohawa Govt. Cap. Hasnat Ali Khan Shaheed High Khurakha 4 4 0 4 School Sohawa (M) (P) - - Khengran 125050105 472 0 472 Sohawa Khurakha - - Khengran 125050106 226 0 226 Sohawa 4 Total - - - 1784 0 1784 4 0 4 Mohra Pari - - 125050102 0 413 413 Sohawa Moh Madni - - 125050104 0 680 680 Sohawa Govt.
    [Show full text]
  • Sr. No College Name District Gender Division Contact 1 GOVT
    Sr. College Name District Gender Division Contact No 1 GOVT. COLLEGE FOR WOMEN ATTOCK ATTOCK Female RAWALPINDI 572613336 2 GOVT. DEGREE COLLEGE FOR WOMEN FATEH JANG, ATTOCK ATTOCK Female RAWALPINDI 572212505 3 GOVT. COLLEGE FOR WOMEN PINDI GHEB, ATTOCK ATTOCK Female RAWALPINDI 4 GOVT. DEGREE COLLEGE FOR WOMEN, JAND ATTOCK ATTOCK Female RAWALPINDI 572621847 5 GOVT. DEGREE COLLEGE FOR WOMEN HASSAN ABDAL ATTOCK ATTOCK Female RAWALPINDI 6 GOVT. DEGREE COLLEGE FOR WOMEN HAZRO, ATTOCK ATTOCK Female RAWALPINDI 572312884 7 GOVT. POST GRADUATE COLLEGE ATTOCK ATTOCK Male RAWALPINDI 579316163 8 Govt. Commerce College, Attock ATTOCK Male RAWALPINDI 9 GOVT. DEGREE COLLEGE FATEH JANG ATTOCK ATTOCK Male RAWALPINDI 10 GOVT. INTER COLLEGE OF BOYS, BAHTAR, ATTOCK ATTOCK Male RAWALPINDI 11 GOVT. DEGREE COLLEGE (BOYS) PINDI GHEB ATTOCK ATTOCK Male RAWALPINDI 572352909 12 Govt. Institute of Commerce, Pindigheb ATTOCK Male RAWALPINDI 572352470 13 GOVT. DEGREE COLLEGE BOYS, JAND, ATTOCK ATTOCK Male RAWALPINDI 572622310 14 GOVT. INTER COLLEGE NARRAH KANJOOR CHHAB ATTOCK ATTOCK Male RAWALPINDI 572624005 15 GOVT. DEGREE COLLEGE BASAL ATTOCK ATTOCK Male RAWALPINDI 572631414 16 Govt. Institute of Commerce, Jand ATTOCK Male RAWALPINDI 572621186 17 GOVT. DEGREE COLLEGE FOR BOYS HASSAN ABDAL, ATTOCK ATTOCK Male RAWALPINDI 18 GOVT.SHUJA KHANZADA SHAHEED DEGREE COLLEGE, HAZRO, ATTOCK ATTOCK Male RAWALPINDI 572312612 19 GOVT. COLLEGE FOR WOMEN CHAKWAL CHAKWAL Female RAWALPINDI 543550957 20 GOVT. DEGREE COLLEGE FOR WOMEN , DHADIAL , CHAKWAL CHAKWAL Female RAWALPINDI 543590066 21 GOVT. DEGREE COLLEGE FOR WOMEN MULHAL MUGHLAN, CHAKWAL CHAKWAL Female RAWALPINDI 543585081 22 GOVT. DEGREE COLLEGE FOR WOMEN BALKASSAR , CHAKWAL CHAKWAL Female RAWALPINDI 543569888 23 Govt Degree College for women Ara Basharat tehsil choa Saidan Shah chakwal CHAKWAL Female RAWALPINDI 543579210 24 GOVT.
    [Show full text]
  • Final Report
    FINAL REPORT CRP 1.1: Dry Land Systems CRP Activity Title: Improving Water and Land Productivity in Rain fed Systems Using Community- based Water and Agronomic Management Approaches. Sub-Activity Title: Capacity building of women of farming community for value-addition to locally-produced fruits and vegetables 1 | P a g e Background Pakistan is an agriculture-based country where majority of the agricultural activities revolve around women, therefore the role of rural women cannot be underestimated or ignored in rural development. The value addition in the form of preservation and processing of agricultural produce has tremendous potential for providing employment and additional income to farm families in rural catchments. Important aspects for promotion of value addition of fruits and vegetables are lower income from sale of fresh commodities in the market, high post-harvest losses due to perishable nature, considerable potential to generate employment, diversify income and improve food security in Pakistan. Increasing production is one approach to improving farm incomes and food availability, but an additional strategy with considerable promise is to add value to agricultural produce. Improved post-harvest handling, processing and marketing achieves value added products and is perhaps the most viable means to reduce poverty and improve rural livelihoods. At initial level, value addition of locally-produced fruits and vegetables for livelihood can develop skills of the rural communities leading to commercialization in the long run as it requires proper certification. Many rural areas that are faced with a declining number of farm jobs consider the food processing sector as a source of potential income and employment growth.
    [Show full text]
  • Table -23 Selected Population Statistics of Rural
    TABLE -23 SELECTED POPULATION STATISTICS OF RURAL LOCALITIES POPULATION CHARACTERISTICS AGE GROUP HOLDIN EDUCATIONAL ATTAINMENT WORKE NAME OF MAUZA / HADBAST POPULATION LITERACY % (10+ YEARS) G C.N.I. RELIGION 10 18 60 D (10 AREA IN DEH / VILLAGE / NUMBER / DEH PRIMARY BUT BELOW MATRIC BUT BELOW CARD DEGREE & ABOVE YEARS YEARS YEARS YEARS ACRES SETTLMENT NUMBER MATRIC DEGREE (18 ALL TRANSG TRANSG & & & & MALE FEMALE TOTAL MALE FEMALE TRANSG & OTHERS TRANSG TRANSG NON YEARS SEXES ENDER ENDER MALE FEMALE MALE FEMALE MALE FEMALE MUSLIM ABOVE ABOVE ABOVE ABOVE) ENDER ENDER ENDER MUSLIM & 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ABOVE)26 27 CHAKWAL DISTRICT 1211855 581883 629904 68 73.17 84.21 63.33 52.94 193478 162860 16 132041 92576 14 14911 25673 2 1210324 1531 945335 750657 125268 244606 698501 1529415 CHAKWAL TEHSIL 518313 246589 271680 44 76.83 85.46 69.33 50.00 82638 74858 12 56533 46209 7 7246 13432 - 517742 571 406069 322434 54893 103507 300971 531283 BALKASSAR QH 107575 51765 55802 8 72.84 83.63 63.23 25.00 16709 14019 1 12454 9093 1 1483 2624 - 107422 153 85014 68209 11553 22539 63704 127044 BALKASSAR PC 10215 5178 5037 - 78.33 86.04 70.53 - 1462 1240 - 1573 1037 - 172 303 - 10139 76 8197 6731 998 2984 6433 11191 BALKASSAR 0000067 10215 5178 5037 - 78.33 86.04 70.53 - 1462 1240 - 1573 1037 - 172 303 - 10139 76 8197 6731 998 2984 6433 11191 BHAGWAL PC 5456 2673 2782 1 61.24 68.46 54.53 100 666 481 1 574 492 - 63 148 - 5454 2 4187 3333 529 1226 2990 6400 BHAGWAL 0000032 5456 2673 2782 1 61.24 68.46 54.53 100
    [Show full text]
  • Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan
    ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Location Map Islamabad Capital Territory Punjab Province Islamic Republic of Pakistan Sindh Province Source: Prepared by the JICA Survey Team based on the map on http://www.freemap.jp/. February 2014 i Nippon Koei Co., Ltd. Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Summary Objectives and Scope of the Survey This survey aims to collect data and information in order to explore the possibility of cooperation with Japan for the improvement of the power sector in Pakistan. The scope of the survey is: Survey on Pakistan’s current power supply situation and review of its demand forecast; Survey on the power development policy, plan, and institution of the Government of Pakistan (GOP) and its related companies; Survey on the primary energy in Pakistan; Survey on transmission/distribution and grid connection; and Survey on activities of other donors and the private sector.
    [Show full text]
  • Circular on Drawal of Salary
    LIST OF SCHOOLS WHO HAVE FILLED THE FORM TILL 10-6-19 S.NO DISTRICT NAME OF SCHOOL TYPE NAME OF INCHARGE 1 DODA BHALESSA HS THALORAN HS DEYAL SINGH PARIHAR 2 DODA ASSAR HS KALHOTA HS MOHD IQBAL 3 DODA ASSAR HS BAGAR HS RUKHSANA KOUSAR 4 DODA ASSAR HS BULANDPUR HS SURESH KUMAR 5 DODA ASSAR HS HAMBAL HS ROMESH CHANDER 6 DODA ASSAR LOWERHS JATHI HS NAZIR HUSSAIN 7 DODA ASSAR HS BARRI HS MOHD SAFDER 8 DODA ASSAR HS MANGOTA HS MOHD SAFDER 9 DODA ASSAR HS MALHORI HS YOG RAJ 10 DODA ASSAR HS THANDA PANI HS KULDEEP RAJ 11 DODA ASSAR HS ROAT HS MOHD ASSDULLAH 12 DODA ASSAR HS MOOTHI HS JAVED HUSSAIN 13 DODA BHADARWAH LHS NAGAR HS NUSRAT JAHAN 14 DODA BHADARWAH HS MATHOLA HS SHAHEEN BEGUM 15 DODA BHADARWAH GHS MANTHLA HS SAYEDA BEGUM 16 DODA BHADARWAH HS THANALLA HS AJIT SINGH MANHAS 17 DODA BHADARWAH HS BHEJA BHADERWAH HS MUMTAZ BEGUM 18 DODA BHAGWAH HS SOOLI HS GHULAM MOHD 19 DODA BHALESSA GHS KILHOTRAN HS(G) MOHD ABASS 20 DODA BHALESSA HS BATARA HS ABDUL RASHID 21 DODA BHALESSA HS DHAREWRI HS MOHD SHAFI KHAN 22 DODA BHALESSA HS BHARGI HS KHATAM HUSSAIN 23 DODA BHALESSA HS BHARTHI HS TALKING HUSSAIN 24 DODA BHALESSA HS ALNI HS TALIB HUSSAIN 25 DODA BHALESSA HS GANGOTA HS JAVID IQBALL MASTER 26 DODA BHALLA HS SERI HS SHAHEENA AKHTER 27 DODA BHALLA GHS CHATTRA HS HEADMASTER 28 DODA BHALLA HS BHAGRATHA HS KULBIR SINGH 29 DODA BHATYAD HS HADDAL HS MOHD ASLAM INCHARGE 30 DODA BHATYAS GHS CHILLY BALLA HS(G) RAM LAL 31 DODA BHATYAS HS TILOGRA HS ROMESH CHANDER 32 DODA BHATYAS HS CHAMPAL HS OM PARKASH 33 DODA BHATYAS HS KAHARA HS PIAR SINGH 34 DODA BHATYAS
    [Show full text]
  • TMA 14. Chakwal AY 2016-17.Pdf
    AUDIT REPORT ON THE ACCOUNTS OF TEHSIL MUNICIPAL ADMINISTRATIONS DISTRICT CHAKWAL AUDIT YEAR 2016-17 AUDITOR GENERAL OF PAKISTAN Table of Contents ABBREVIATIONS AND ACRONYMS .......................................................................... i PREFACE…………. ................................................................................................ii EXECUTIVE SUMMARY ...................................................................................... iii SUMMARY TABLES & CHARTS ............................................................................. vi Table 1: Audit Work Statistics ....................................................................................... vi Table 2: Audit Observations Regarding Financial Management .................................................... vi Table3: Outcome Statistics .......................................................................................... vii Table4: Irregularities Pointed Out ................................................................................... vii Table 5: Cost-Benefit ...............................................................................................viii CHAPTER 1 ......................................................................................................... 1 1.1 TEHSIL MUNICIPAL ADMINISTRATIONS, DISTRICT CHAKWAL .................. 1 1.1.1 Introduction.............................................................................................. 1 1.1.2 Comments on Budget and Accounts (Variance Analysis) ............................................
    [Show full text]
  • Part-I: Post Code Directory of Delivery Post Offices
    PART-I POST CODE DIRECTORY OF DELIVERY POST OFFICES POST CODE OF NAME OF DELIVERY POST OFFICE POST CODE ACCOUNT OFFICE PROVINCE ATTACHED BRANCH OFFICES ABAZAI 24550 Charsadda GPO Khyber Pakhtunkhwa 24551 ABBA KHEL 28440 Lakki Marwat GPO Khyber Pakhtunkhwa 28441 ABBAS PUR 12200 Rawalakot GPO Azad Kashmir 12201 ABBOTTABAD GPO 22010 Abbottabad GPO Khyber Pakhtunkhwa 22011 ABBOTTABAD PUBLIC SCHOOL 22030 Abbottabad GPO Khyber Pakhtunkhwa 22031 ABDUL GHAFOOR LEHRI 80820 Sibi GPO Balochistan 80821 ABDUL HAKIM 58180 Khanewal GPO Punjab 58181 ACHORI 16320 Skardu GPO Gilgit Baltistan 16321 ADAMJEE PAPER BOARD MILLS NOWSHERA 24170 Nowshera GPO Khyber Pakhtunkhwa 24171 ADDA GAMBEER 57460 Sahiwal GPO Punjab 57461 ADDA MIR ABBAS 28300 Bannu GPO Khyber Pakhtunkhwa 28301 ADHI KOT 41260 Khushab GPO Punjab 41261 ADHIAN 39060 Qila Sheikhupura GPO Punjab 39061 ADIL PUR 65080 Sukkur GPO Sindh 65081 ADOWAL 50730 Gujrat GPO Punjab 50731 ADRANA 49304 Jhelum GPO Punjab 49305 AFZAL PUR 10360 Mirpur GPO Azad Kashmir 10361 AGRA 66074 Khairpur GPO Sindh 66075 AGRICULTUR INSTITUTE NAWABSHAH 67230 Nawabshah GPO Sindh 67231 AHAMED PUR SIAL 35090 Jhang GPO Punjab 35091 AHATA FAROOQIA 47066 Wah Cantt. GPO Punjab 47067 AHDI 47750 Gujar Khan GPO Punjab 47751 AHMAD NAGAR 52070 Gujranwala GPO Punjab 52071 AHMAD PUR EAST 63350 Bahawalpur GPO Punjab 63351 AHMADOON 96100 Quetta GPO Balochistan 96101 AHMADPUR LAMA 64380 Rahimyar Khan GPO Punjab 64381 AHMED PUR 66040 Khairpur GPO Sindh 66041 AHMED PUR 40120 Sargodha GPO Punjab 40121 AHMEDWAL 95150 Quetta GPO Balochistan 95151
    [Show full text]
  • District CHAKWAL CRITERIA for RESULT of GRADE 8
    District CHAKWAL CRITERIA FOR RESULT OF GRADE 8 Criteria CHAKWAL Punjab Status Minimum 33% marks in all subjects 92.71% 87.61% PASS Pass + Pass Pass + Minimum 33% marks in four subjects and 28 to 32 94.06% 89.28% with Grace marks in one subject Marks Pass + Pass with Grace Pass + Pass with grace marks + Minimum 33% marks in four 99.08% 96.89% Marks + subjects and 10 to 27 marks in one subject Promoted to Next Class Candidate scoring minimum 33% marks in all subjects will be considered "Pass" One star (*) on total marks indicates that the candidate has passed with grace marks. Two stars (**) on total marks indicate that the candidate is promoted to next class. PUNJAB EXAMINATION COMMISSION, RESULT INFORMATION GRADE 8 EXAMINATION, 2019 DISTRICT: CHAKWAL Pass + Students Students Students Pass % with Pass + Gender Promoted Registered Appeared Pass 33% marks Promoted % Students Male 7754 7698 7058 91.69 7615 98.92 Public School Female 8032 7982 7533 94.37 7941 99.49 Male 1836 1810 1652 91.27 1794 99.12 Private School Female 1568 1559 1484 95.19 1555 99.74 Male 496 471 390 82.80 444 94.27 Private Candidate Female 250 243 205 84.36 232 95.47 19936 19763 18322 PUNJAB EXAMINATION COMMISSION, GRADE 8 EXAMINATION, 2019 DISTRICT: CHAKWAL Overall Position Holders Roll NO Name Marks Position 65-232-295 Muhammad Abdul Rehman 479 1st 65-141-174 Maryam Batool 476 2nd 65-141-208 Wajeeha Gul 476 2nd 65-208-182 Sawaira Azher 474 3rd PUNJAB EXAMINATION COMMISSION, GRADE 8 EXAMINATION, 2019 DISTRICT: CHAKWAL Male Position Holders Roll NO Name Marks Position 65-232-295 Muhammad Abdul Rehman 479 1st 65-231-135 Muhammad Huzaifa 468 2nd 65-183-183 Fasih Ur Rehman 463 3rd PUNJAB EXAMINATION COMMISSION, GRADE 8 EXAMINATION, 2019 DISTRICT: CHAKWAL FEMALE Position Holders Roll NO Name Marks Position 65-141-174 Maryam Batool 476 1st 65-141-208 Wajeeha Gul 476 1st 65-208-182 Sawaira Azher 474 2nd 65-236-232 Kiran Shaheen 473 3rd j b i i i i Punjab Examination Commission Grade 8 Examination 2019 School wise Results Summary Sr.
    [Show full text]
  • TENDER NOTICE Tehsil Municipal Administration, Chakwal Intends to Invite Tenders for the Following Schemes
    DDP TENDERS DATED 04.09.2012 DDP TENDERS DATED 01.11.2012 TENDER NOTICE Tehsil Municipal Administration, Chakwal intends to invite tenders for the following schemes. Such contractors who have deposited their registration / Renewal Fee for financial year 2012-13 in any TMA of Chakwal District can participate. The contractors from other than TMA Chakwal will have to present Original Enlistment / Renewal Papers of the respective TMA along with a Stamp Paper showing that the concerned contractor is not Black listed in any TMA in District Chakwal and all the submitted documents i/c Stamp Paper must be verified / signed by the concerned TMA authority. Tender form can be received / collected from any source or from website of LG&CD Department from the Publish Date of Tender Notice in News Papers to Tender Opening Date. Tenders along with 2% CDR issued from any scheduled Bank of Pakistan will be received on 01.11.2012 (11.00 AM). Received tenders will be opened on the same day at 11.30 AM in the presence of contractors or their authorized representative. Before putting the tenders into Tender Box, the concerned contractor will have to obtain a Receipt of Tenders from TMA Chakwal; otherwise TMA will not be held responsible for misplacement of any tender. It will be compulsory for all contractors to quote their rates both in words and digits, and in case of quoted rates by the successful bidder is more that 5% Below, he will have to deposit of Performance Security under the rules as well. Rates will be quoted in % above or below on estimated cost.
    [Show full text]