S.# Name of Scheme Estimated Cost Earnest Money T.S # & Date 1 Rehabilitation of Water Supply Scheme Mureed UC Mureed 800000

S.# Name of Scheme Estimated Cost Earnest Money T.S # & Date 1 Rehabilitation of Water Supply Scheme Mureed UC Mureed 800000

Estimated Earnest T.S # & S.# Name of Scheme Cost Money Date 780/I&S 1 Rehabilitation of Water Supply Scheme Mureed UC Mureed 800000 16000 Dt 09.11.13 Construction of Street Drain Village Udharwal, Chakora, Dhakoo 2 1000000 20000 -do- UC Udharwal Construction of Nullah from H/O Shabbir to Masjid Noor e 3 300000 6000 -do- Mustafa Village Khokhar Zer UC Karyala. 4 Construction of Street Drain Village Janga UC Karyala 300000 6000 -do- Construction of Nullah and Protection wall from House of Raja 5 Nasir to House Asif Mehmood main road Bhalla Village Karyala 450000 9000 -do- UC Karyala 6 Construction of Street Drain Culverts in UC 1 Chakwal 1000000 20000 -do- Construction of street and drain from H/O Jamir to House of 7 Sattar, (ii) Construction of street from House of Fauji Tariq to 455000 9100 -do- Nullah Bhanao Village Karyala UC Karyala 8 Earth Filling near Govt Girls School Village Kotha Abdal UC Dab 125000 2500 -do- Construction of Drain from House of M.Bashir to House of Ahmed Khan Mohallah Mughal Kassar (ii) Construction of Drain 9 from GGHS to Link road GraveyardVillage Kotha Abdal, (iii) 385000 7700 -do- Construction of Street and drain from Masjid Farooq-e-Azam to H/O Hakeem Abdullah Village Mohra Kor Chasham UC Dab 10 Construction of Street Drain Culverts in UC 2 Chakwal 1000000 20000 -do- Construction of street and drains from House of Ch. M. Nawaz to House of Malik Azhar, (ii) Construction of Street and Drain 11 250000 5000 -do- from House of Sharif to House of Abdul Aziz Riksha wala Village Jabairpur UC Dab Construction of street and drain from House of Abdul Rehman 12 200000 4000 -do- to House of Fazal Hussain Village Dab UC Dab. 13 Construction of Street Drain Culverts in UC 3 Chakwal 1000000 20000 -do- Construction of Street Drain near Main Bazar Village Tatral UC 14 400000 8000 -do- Dab 15 Construction of Street Drain from H/O Rukhsar Hussain to H/O 115000 2300 -do- Nazir Link Street from main street 3 Marla Scheme Village Behkari, (ii) Construction of Street Drain from H/O Mazhar to H/O Imran Village Noorwal UC Dab 16 Construction of street and drains in UC Ballokassar 1000000 20000 -do- 17 Construction of Street Drain Culverts in UC 4 Chakwal 1000000 20000 -do- Construction of Nullah from H/O Asif to H/O Zawar Ashraf Mohallah Sadaat, (ii) Construction of Street Drain from H/O 18 850000 17000 -do- Banaras to H/O Master Altaf Gulfam Colony Village Dhudial UC Dhudial Construction of Street Nullah from PCO shop to Rizwan General 19 Store, from Main Bazar to H/O Tariq Welding Village Dhudial UC 500000 10000 -do- Dhudial 20 Construction of street and drains in UC Saral. 1000000 20000 -do- 21 Construction of Street and Drains in UC Mangwal 1000000 20000 -do- Construction of Street / Nullah from H/O Haji Bashir to H/O 22 Mohammad Khan to H/O Abdullah, H/O Maqsood Village Farid 950000 19000 -do- Kassar UC Chak Umra 23 Construction of Street Drain Culverts in UC 5 Chakwal 1000000 20000 -do- Construction of Soling Chowk Nadral, (ii) Construction of 24 Nullah from H/O Zahid to H/O Sakhawat Village Nadral UC Chak 385000 7700 -do- Umra Construction of Street Drain from main road / Talab to H/O Sub: Siddiq, main road to H/O Abdur Rashid, (ii) Construction of 25 745000 14900 -do- Street Drain from H/O Mohammad Amir to H/O Ahmed Khan Village Dhoke Jhakkar UC Padshahan Construction of Protection Wall Darbar Mastan Shah Village 26 Chohan, Construction of Street Drain from main street to H/O 450000 9000 -do- Sajid (Hong Kong) Village Chohan UC Padshahan Construction of Street Drain from H/O Fida Hussain to H/O Taj, 27 from H/O Nazim to H/O Bashir etc Nai Abadi Malangan Village 290000 5800 -do- Chak Naurang UC Chak Malook Construction of Street Drain Village Chak Malook , Dhoke Bair 28 600000 12000 -do- UC Chak Malook Construction of Street Drain from H/O Aftab to H/O Latif, (ii) Construction of Street Drain from H/O Aftab to road (iii) 29 355000 7100 -do- Construction of Street Drain from H/O Qazi Ishtiaq to H/O Qazi Bashir Village Pinwal UC Chak Malook Construction of Street Drain / Resoling from main road to H/O 30 155000 3100 -do- Badar Thanedar Village Amir Pur Mangan UC Bheen Construction of Pully Main Path Mohallah Usmanabad Village Bheen, (ii) Construction of Street Drain from H/O Malik Shahid 31 621000 12420 -do- to H/O Munsab, main road to H/O Azad, Construction of Drain near H/O Zahid Mehmood Village Bheen UC Bheen 32 Construction of Street Drain in UC Bheen 500000 10000 -do- 33 Construction of Street and Drains in UC Dullah. 1000000 20000 -do- Construction of street and drain from H/O Aziz Ur Rehman to 34 H/O Naeem, H/O Altaf to H/O Ansar Mehmood to Liaqat, main 360000 7200 -do- street ,pond protection wall Village Nara Mughlan UC Jand Construction of street and drain from H/O Ashiq to Hameed 35 300000 6000 -do- Numberdar Village Chak Qada UC Jand Construction of street and drain from H/O Javed to H/O Mster 781/I&S 36 Abid, H/O Tauseef Ahmed to H/O Usman Abid Village Chakora 300000 6000 dt UC Jand 11.11.13 Construction of street and drain from H/O M.Iqbal to H/O Ghulam Fareed Village Sau, Construction of street and drain 37 225000 4500 -do- from H/O Ghulam Mustafa to main road Village Dhoke Teshan UC Jand Construction of Nullah and Protection Wall Dhakki, (ii) 38 Construction of Street/Drain from H/O M.Safdar to H/O Nazir 370000 7400 -do- Village Jand UC Jand Construction of Street from Main road to down stream Village 39 550000 11000 -do- Dhoke Jabbi UC Jand Construction of Street Drain from H/O Khan Beg to Darbar 40 1000000 20000 -do- Rajgan Village Dharughi UC Mulhal Mughlan Construction of Street Drain P/Wall from H/O Hameed to H/O 41 Saghir Village Dakhli Mian Mehrab Chah Mal Village Dhoda UC 300000 6000 -do- Mulhal Mughlan Construction of street and drain from House of Nazir to House 42 of Anwar Baig to Main street to H/O Tariq Village Kajli UC Jand 150000 3000 -do- Khanzada Construction of street and drain from main road to H/O M.Din 43 pervez, Gulsher,Ch. Amjid to maind road Village Kajli UC Jand 380000 7600 -do- Khanzada 44 Construction of Nullah/Slab from H/O Haji M.Azad to Aadil 320000 6400 -do- Hussain field, H/O Subedar M.Faazal to M.Azad, (ii) Construction of street/Drain from main street to H/O Nasir Mehmood, Ansar Mehmood etc, H/O M.Latif to H/O M.Hanif Village Punj Dhera UC Jang Khanzada Construction of street and drain from H/O Husnain to H/O 45 400000 8000 -do- Arshad, Anayat Village Dhoke Toor UC Jand Khanzada. Construction of Protection Wall from House of Abdul Razaaq to 46 600000 12000 -do- House Mushtaq Village Dhumman UC Dhumman Construction of street and drain from House of M.Nawaz to 47 Graveyard, (ii) Construction of Boundary wall Graveyard Village 430000 8600 -do- Dhumman UC Dhumman Construction of Street Drain Nullah Village Rabbal Khouthian 48 800000 16000 -do- Sarkal Mair UC Khouthian Construction of Street Drain from H/O Master M Yaqoob to H/O 49 500000 10000 -do- Abdul Aziz Village Bhudial UC Khouthian Construction of Protection Wall Path H/O Farhat Village Taniala, Construction of Street Drain from H/O Mohammad Amir 50 to Pucca road Village Dhoke Qutab Din, Construction of Street 600000 12000 -do- from H/O Abdul Majeed to H/O Sadiq, H/O Shams to main street Village Dourian UC Choa Gunj Ali Shah Construction of Street Drain in Village Choa Gunj Ali Shah UC 51 556000 11120 -do- Choa Gunj Ali Shah 52 Construction of Street Drain in UC Jaswal 1000000 20000 -do- 53 Construction of Street Drains Culverts etc in UC 1 Chakwal City 2500000 50000 -do- 54 Construction of Street Drains Culverts etc in UC 2 Chakwal City 3000000 60000 -do- 55 Construction of Street Drains Culverts etc in UC 4 Chakwal City 3000000 60000 -do- 56 Construction of Street Drains Culverts etc in UC 5 Chakwal City 1000000 20000 -do- 57 Construction of Street Drain in UC Dab 1500000 30000 -do- Construction of Storm Water Channel near Nadral road and 58 1000000 20000 -do- Construction of Street/drains in Village Minwal UC Ballokassar. Construction of Street Nullah from H/O Ramzan to H/O Asad Mohallah Darasgah, H/O Naveed Mohallah Awan Colony, H/O 59 1500000 30000 -do- Safdar to H/O Ibrar Shah & other streets Village Dhudial UC Dhudial 60 Construction of Street Drain in Village Sang UC Dhudial 500000 10000 -do- Construction of Street and drains and Nullah in Village Kot 61 500000 10000 -do- Iqbal UC Saral. 62 Construction of street/Drains in Village Jethal in UC Saral 500000 10000 -do- 63 Construction of Street Drain Village Mona UC Chak Umra 300000 6000 -do- 64 Construction of Street Drain in Village Dhoda 400000 8000 -do- 65 Construction of Street Drain in Village Chakral UC Chak Malook 1000000 20000 -do- Construction of Street Drain from Madni Masjid to H/O Sadiq 66 500000 10000 -do- Numberdar Village Udhwal UC Chak Malook Construction of Street Drain from H/O Amjad Bhatti to H/O Safdar Hussain, Construction of Protection Wall near H/O Malik 67 Hassan Village Bheen & Construction of Street Drain from H/O 700000 14000 -do- Numberdar Aourangzeb to H/O Jahangir Qureshi Village Dhoke Chachh UC Bheen 68 Construction of Street Drain Village Pind Haraj UC Dullah 500000 10000 -do- 69 Construction of Street Drain in UC Jand 1000000 20000 -do- Construction of Street from H/O Haji Akbar to H/O Abbas Village 70 400000 8000 -do- Dharugi Rajgan UC Mulhal Mughlan 782/I&S Construction of Street Drain street Moeen ul Haq wali Village 71 200000 4000 dt Bamla UC Mulhal Mughlan 12.11.13 Construction of Street Drain from H/O Mirza Javed to H/O Ch 72 Shahid Col Ahmed Beg Village Mulhal Mughlan UC Mulhal 200000 4000 -do- Mughlan Construction

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us