Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-, .

1.0 EXECUTIVE SUMMARY

Name of Unit : M/s. SHIV KRISHNA BIOGEN LLP Location of industrial Plot No 7, Survey no .407/15 Paiki, Plant Village-Hadmatiya. Tal-Tankara, Dist-Morbi, Gujarat. Products : Active Pharmaceuticals Ingredient Intermediates- 225.525 MT/Month, Pl ref. Annexure 1 of Form -1 Screening Category : Synthetic Organic Chemicals (Active Pharmaceuticals Ingredient Intermediates) covered under Schedule 5 (f) Category “A” as per EIA notification 2006 and its amendment thereof.

[Unit is located outside industrial area and having Water Consumption more than 25 KL/Day] Coordinate of project site : Pl ref Annexure 5.of Form -1 Point Co Ordinates Center point 22°41'2.95"N 70°47'0.01"E A 22°41'4.08"N 70°46'58.76"E B 22°41'3.82"N 70°47'1.49"E C 22°41'3.08"N 70°47'1.41"E D 22°41'1.95"N 70°47'0.38"E E 22°41'2.09"N 70°46'58.53"E F 22°41'2.75"N 70°47'1.48"E

Cost of Project : Proposed : 480 Lacs Environment Proposed : 120 Lacs management Plan. Land Area : Proposed: 4479.57 Sq.m Pl ref Annexure 2.of Form -1 Green belt area 1478.25 sq.m Production Capacity : Active Pharmaceuticals Ingredient Intermediates-225.525 MT/Month, Pl ref Annexure 3 of Form -2 Electricity Source : Source : PGVCL Proposed Connected Load : 300 KVA D.G Set :100 KVA (standby source) Source of Water : Borwell. Consumption of Water : A. Domestic : 2.00 KL/Day B. B Industrial: 30.861 KL/Day (Process-19.861KL/Day Cooling- 3.00 KL/Day, Boiler- 5.00 KL/Day, Washing- 3.00 KL/Day ) C. Gardening : 2.00 KL/Day Total (A+B+C): 34.861 KL/Day Pl ref. Annexure : 6 of Form 1 Waste Water Generation : A. Domestic : 1.80 KL/Day B. Industrial : 27.198 KL/Day Process : 23.398 KL/Day , Cooling : 0.3 KL/Day Boiler : 0.500 KL/Day, Washing : 3.00 KL/Day

Page No 1

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

Total (A+B): 28.998 KL/Day Pl ref. Annexure : 6 for Form 1 Treatment Facility : VOC stripper, Primary treatment followed by Oxidation Process, Reverse Osmosis System and Multi Effect Evaporator. Pl ref. Annexure 7 of Form -1 Mode of Disposal : For domestic w/w : Soak Pit Treated industrial effluent will be treating and evaporated within premises. RO permeate and MEE condensate will be use in industrial purpose. Fuel and Consumption : Briquettes /White Coal : 5 MT/Day, HSD : 60 Lit/Hr Pl ref. Annexure 9 .of Form -1 Source of Flue Gas : Boiler and D.G Set. Pl ref. Annexure 8 of Form -1 Emission Source of Process :  HCL Gas emission from process reaction of 1-(2,3 Dichlrophenyl) Emission Piperazine Hydrochloride,Mono Bromo Acetic Acid and 4 Chlro Resorcinol  SO2 Gas emission from process reaction of 4 Chlro Resorcinol.  Ammonia gas emission from process reaction of Ethylene Urea and Pregabalin.  VOC emission from handling solvents. Air Pollution Control :  For Process gas emission: Two stage Alkali Scrubber with adequate Measures stack height.  For Flue Gas emission.: Multicyclone separator with Bag Filter with adequate stack height.  For control of VOC: Solvent recovery system followed by Carbon Column.  Proper ventilation and exhaust facility will be provided for control of fugitive emission in work place area. Pl ref. Annexure 8 of Form -1 Type of Hazardous waste : ETP Waste, MEE salt, Process Residue, Date expiry and Off specification generation and mode of product, Discarded Containers, Waste Oil, Spent Acid and inorganic disposal acids. Annexure 5 of Form -1 Mode of disposal of Haz : Generated ETP Waste and MEE Salt will be disposed at authorized TSDF Waste Site. Process Residue and spent carbon will be send to CHWIF. Generated scrubber bleed off (HCL and Liq. Ammonia will be partially use in process and remaining will be sent to actual end users. Sodium Bromide Solution will be send to actual end user. Pl ref. Annexure 5 of Form -1Annexure Employment : Permanent: 5+ Contract: 10 = Total Proposed : 15

Page No 2

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

PROPOSED PROJECT WILL HAVE FOLLOWING PRODUCT PROFILE.

Table No 1 List of Products with their Production Capacity CAS No Production Sr No Product Name Capacity MT/M 1 1-(2,3 Dichlrophenyl) Piperazine Hydrochloride 119532-26-2 15 2 Ferrous Fumarate 141-01-5 25 3 Mono Bromo Acetic Acid 79-08-3 5 4 Motoprolol 37350-58-6 5 5 Indole-3-Acetic Acid 87-51-4 10 6 4 Chlro Resorcinol 95-88-5 25 7 Ethylene Urea 120-93-4 15 8 Succinimde 123-56-8 25 9 N Bromo Succinimide 128-08-5 25 10 Bronopol 52-51-7 15 11 Mono chloro acetonitrile 107-14-2 0.025 12 Pregabalin 148553-50-8 30 13 Lidocaine Base/HCl 73-78-9 30 14 R & D for Active Pharmaceuticals Ingredients - 0.500 Total 225.525

1.1 Regulatory Compliances & Applicable Laws / Regulations Following will be applicable laws and regulations: 1. The Water (Prevention and Control of Pollution) Act, 1974 (Amended 1988)

2. The Water (Prevention and Control of Pollution) Rules, 1975 3. The Water (Prevention and Control of Pollution) Cess Act, 1977 (Amended 1991)

4. The Water (Prevention and Control of Pollution) Cess Rules, 1978

5. Air (Prevention and Control of Pollution) Act, 1981 (Amended 1987) 6. The Air (Prevention and Control of Pollution) Rules, 1982-83

7. The Environmental (Protection) Rules, 1986 (Amended 1999, 2001, 2002, 2003, 2004) 8. The Environmental (Protection) Act, 1986 (Amended 1991)

9. Hazardous Waste (Management and Handling) Rules, 2016

10. Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 (Amended 2000)

Page No 3

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

11. Chemical Accidents (Emergency Preparedness and Response) Rules, 1996

12. EIA Notification 2006 (Amended 2014) 13. Public Liability Insurance Act, 1991 (Amended 1992)

14. Public Liability Insurance Rules, 1991 (Amended 1993)

15. The Factories Act, 1948

16. The Explosives Act, 1884

17. The Explosives Rules, 1983 18. The Motor Vehicle Act, 1988

19. The Central Motor Vehicle Rules, 1989 2. INTRODUCTION OF THE PROJECT/BACK GROUND INFORMATION

2.1 Identification of Project and project Proponent Proposed Greenfield project is of synthetic organic chemicals covered under Schedule 5 (f) Category “A” as per EIA notification 2006 and its amendment thereof. At present the partners of the company are:- Table No 2. List of Partners Name of Address, Mobile No. Nationality Proprietor Hardik Kamariya Vaibhav Nager Society Indian Sanala Road, Morbi, Tal-Morbi, Dist-Morbi, Gujarat.Mob No+91 8141211400

2.2 Brief description of nature of project

The company intent to manufacture API Intermediates: 225.525 T/Month at above stated location which is covered under Schedule 5 (f) Category “A” as per EIA notification 2006 and its amendment.

2.3 Need for the Project and its importance to country and region:

The proposed products falls under Category 5(f) as stated in Environment Impact Assessment Notification Published on 14th September, 2006. Further, the location of the proposed project is outside the notified industrial estate and water consumption will be more than 25 KL/Day and proposed unit is also not fall into small unit criteria described

Page No 4

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

in EIA notification 25th June 2014. Hence, the project proponent has to obtain the EC from the Ministry of Environment, Forest & Climate Change, New Delhi.

India with its large talented manpower, cost effective chemical synthesis, legal & financial framework is poised to become sourcing destination of Bulk drug Intermediates & Active Pharmaceutical Ingredients (APIs) and intermediates to the global market. The pharmaceutical industry in ranks third in the world in terms of volume and contributes 10% to the global pharmaceutical production. According to the Department of Pharmaceuticals, the Indian pharmaceutical industry is pegged at Rs 810 bn, which includes domestic sales and exports. According to the Department of Pharmaceuticals, the sector employs about 340,000 persons and an estimated 400,000 doctors and 300,000 chemists are serving its 1 bn-plus market. In line with the Market Demand, M/S. Shiv Krishna Biogen LLP intent to manufacture API Intermediates with capacity-225.525 MT/Month at above stated proposed site

2.4 Demand - Supply Gap

Based on the informal survey of the market with current customers and various traders, it is found that there is a huge potential for the range of the products currently being manufactured and the proposed new products as mentioned in the product list.

2.5 Imported vs. Indigenous Production The products will be price-competitive while quality will be of international standards, which will have acceptability in the export as well as domestic market. 2.6 Export Possibility

The unit will explore the possibilities of export the product. 2.7 Employment Generation due to the Project

Proposed project will provide direct employment to 05 skilled and 10 unskilled workers from the local area. The manpower requirement for the proposed project is being expected to generate some permanent jobs and secondary jobs for the operation and maintenance of plant. This will increase direct as well as indirect employment opportunities and ancillary business development to some extent for the local population.

3.0 PROJECT DESCRIPTION

3.1 Type of Project

Page No 5

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

The proposed Greenfield project falls under the item 5(f) (Synthetic Organic Chemicals), category “A” (located outside notified industrial estate and water consumption more than 25 KL/Day).

3.2 Location of the Project

The proposed project is to be carried out at. Plot No 7, Survey no .407/15 Paiki, Village- Hadmatiya. Tal-Tankara, Dist-Morbi, Gujarat. The geographical information of the proposed project is as given below: Table No 3 Co Ordinates of Proposed site Point Co Ordinates Center point 22°41'2.95"N 70°47'0.01"E A 22°41'4.08"N 70°46'58.76"E B 22°41'3.82"N 70°47'1.49"E C 22°41'3.08"N 70°47'1.41"E D 22°41'1.95"N 70°47'0.38"E E 22°41'2.09"N 70°46'58.53"E F 22°41'2.75"N 70°47'1.48"E

Table No 4 : Salient features in the surroundings area of the proposed site within 10 km radius Important Sr. No. Description Features 1 Location Plot No 7, Survey no .407/15 Paiki,Village-Hadmatiya. Tal-Tankara, Dist-Morbi, Gujarat. 2 GPS Coordinates 22°41'2.95"N 70°47'0.01"E 3 Temperature Highest temperature is 43 to 46 degree centigrade in summer and Range lowest temperature comes down to 7 to 15 degree in winter season. 4 Mean Sea Level 58m 5 Annual Rain Fall Average Rainfall is 500 mm. to 600 mm 6 Nearest Railway Nearest Railway station: Morbi:16.27 in North direction. Station 7 Nearest Airport Nearest Airport is 40.77 Km away from project in South direction 8 Nearest Town Nearest Taluka Place-Tankara 3.85 Km in SW direction. Nearest District Place-Morbi is 12.97 Km North direction. 9 Nearest Village Nearest Village: Hadamatiya : 2.12 Km in East direction.

10 Nearest Highway Rajkot –Morbi Highway is 2.32 km away from proposed site in NW direction. State highway SH-319 is 2.27 Km away from proposed site in East Direction 11 Nearest National Tithava Reserve forest is 8.67 Km away from proposed site in Parks/ Sanctuary SE direction.

Page No 6

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

Fig No 1 .Google Image showing location of proposed site.

India Map Gujarat Map

Site Location

Page No 7

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

Fig No. 2 Google Image showing 10 Km Radius from proposed site

Page No 8

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

Fig No 3 Google Image Showing Boundary of Proposed Project.

Page No 9

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

3.3 Topography Map Fig No 4 TOPO Map

SHIVE KRISHNA BIOGEN LLP

Page No 10

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

3.3 Criteria for Site Selection

The proposed project shall be carried out at Plot No 7, Survey No 407/15 paiki, Village- Hadmatiya, Tal-Tankara, Dist-Morbi, Gujarat having good infrastructure facilities and roads connecting to near-by highways, other industrial estates and cities. Adequate transportation facilities are in place to the near-by residential areas and Tankara ,Rajkot City. Nearest railway station is Morbi -16.27 Km far from proposed site in North direction. Rajkot Airport is 40.77 Km far from proposed site. Source of water will be borwell within premises. Uninterrupted power supply is supplied by PGVCL.

3.4 Details of alternative site considered:

No alternative site is examined for the project.

3.5 Size or magnitude of operation

Table No 5 List of Products with their Production Capacity CAS No Production Capacity Sr No Product Name MT/M 1-(2,3 Dichlrophenyl) Piperazine 1 119532-26-2 15 Hydrochloride 2 Ferrous Fumarate 141-01-5 25 3 Mono Bromo Acetic Acid 79-08-3 5 4 Motoprolol 37350-58-6 5 5 Indole-3-Acetic Acid 87-51-4 10 6 4 Chlro Resorcinol 95-88-5 25 7 Ethylene Urea 120-93-4 15 8 Succinimde 123-56-8 25 9 N Bromo Succinimide 128-08-5 25 10 Bronopol 52-51-7 15 11 Mono chloro acetonitrile 107-14-2 0.025 12 Pregabalin 148553-50-8 30 13 Lidocaine Base/HCl 73-78-9 30 R & D for Active Pharmaceuticals - 14 Ingredients 0.500 Total 225.525

3.6 Project description with process details

Details of manufacturing process are given in Annexure- 3 of Form- 1.

Page No 11

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

3.7 Raw Material with estimated quantity, likely source, marketing area of final products, Mode of transportation of Raw Material and Finished Products.

The company will purchase raw materials from local and / or import market depending upon the availability and market value. Details of RM are given in Annexure 3 of Form- 1.

3.8 Resource Optimization/recycling and reuse envisaged in the project.

Generated by-products will be partially reused in process and remaining will be sale to actual end users. We will explore the possibilities for maximum reuse of spent acid/byproducts in process.

3.9 Availability of Water its sources, Energy/Power requirements and sources

Water Requirement

Industry will need 34.861 KL/Day water for the proposed production which will be met by water supply from borwell. The detail of products with mass balance is given in attached Annexure –6.

Power Total power required for the proposed facility is 600 KVA which will be obtained from PGVCL and additional DG set with capacity of 100 KVA has been proposed for emergency power backup.

Fuel Consumption Details of Fuel consumption (Proposed) presented as under Table No 6 Fuel Consumption

Sr NO Name of Fuel Consumption 1 Briquettes /White Coal 5 MT/Day 2 HSD 60 Lit/Hr

3.10 Quantity of wastes to be generated (liquid and solid) and scheme for their Management/disposal

 Hazardous Waste Generation and Disposal Details of hazardous waste generation and its disposal are given in Annexure- 5 of Form- 1.

Page No 12

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

 Wastewater Generation and Disposal Facility Domestic waste water (1.8 KL/Day) will be disposed off through septic tank/soak pit system. Industrial wastewater (27.198 KL/Day) will be generated from the boiler blow-down, cooling tower blow – down, manufacturing process, washing. Entire quantity of industrial water will be treating and evaporated within premises to maintain Zero discharge. Generated water from RO permeates and MEE condensate will be reuse for industrial purpose within premises. Details of treatment facility are given in Annexure- 7 of Form- 1.

3.11 Schematic representations of the feasibility drawing which give information of EIA purpose

Page No 13

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

4.0 SITE ANALYSIS

4.1 CONNECTIVITY Transportation facility available at the site is enough.

 Nearest railway station is Morbi -16.27 Km far from proposed site in North direction.  Nearest Rajkot Airport is 40.77 Km far from proposed site.  The site is connected to Rajkot, Morbi, Ahmedabad, Vadodara, Surat by road routes.

4.2 Land Form, Land Use and Land Ownership

Earlier this project site was utilized for agriculture purpose. Project proponent has procured this site for industrial purpose. Necessary N.A Permission has been obtained from concern authority which is attached as Annexure No 10. At present, there is no construction and no production activity at the site.

4.3 Topography

Proposed site and surrounding study area is mostly plains. Topo map of the proposed study area is attached as Annexure No 11.

4.4 Existing Infrastructure

All the basic amenities/facilities such as power connection & power back‐up, drinking water, internal roads, water & wastewater treatment plant etc. will be provided. (1) Power: From Pashchim Gujarat Vij Company Limited. (2) Water: Borwell (3) Basic amenities: Well‐connected road with state and national highway. (4) Post Office: Hadmatiya which is 2.12 km away from the project site

With respect to project, non-agriculture permission has been issued by concern authority. Basic infrastructure (drinking water, telephone, internet connectivity, will be provided at the proposed site. Site is very well connected by road to the nearby city and other industrial estates. Efficient transport facilities are also available within the industrial estate.

4.5 Soil Investigation

Soil investigation is important because it is related to water, ecology and life in the particular region. It is a measure of the condition of soil relative to the requirements of one or more biotic species as well as any human need or purpose. Soil quality is the capacity of a specific kind of soil

Page No 14

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

to function within natural or managed ecosystem boundaries. To sustain plant and animal productivity and support human health and habitation it is important to do soil investigation. In the central part of the district comprising Wankaner, Morbi, , Lodhika, Jasdan talukas, the soils are of clayey loam to clay type. They are moderately deep to deep and vary in colour from very dark brown to very dark greyish brown and reddish brown. The EC of the soils is generally less than 1.0 mmhos/cm and cation exchange capacity is between 40 and 60 me/100 gm of soil.The detail study of soil at the site area shall be studied and given in the EIA report.

4.6 Climate Data from Secondary Sources

Climate data from secondary source

General climate of the district is sub‐tropical and is characterized by three well‐defined seasons, i.e. summer ‐ from April to June, monsoon ‐ from July to September, and winter ‐ from October to March.

Temperature Highest temperature is 43 to 46 degree centigrade in summer and lowest temperature comes down to 7 to 15 degree in winter season.

Humidity The relative humidity is generally over 75 % in the south west monsoon. In the rest of the year the air is comparatively dry, especially in the afternoons. During the period of November to May the relative humidity varies between 40% and 50%.

Wind In the south west monsoon season, the wind direction is westerly to south westerly. In the post monsoon/cold season, wind blow from the north‐north east direction. In summer seasons the direction of the wind is mainly between north west and south west. The wind speed gradually increases from February and reaches the peak in July when the south west monsoon is most active. It again decreases from August and becomes low.

Rainfall More than 90% of the rainfall occurs during the monsoon. Rainfall during the winter and summer months is negligible. The average annual rainfall of the district is 500 mm and in the year 2017 it is 500 mm.

4.7 Social Infrastructure available

The proponent will provide aid in social infrastructure facilities within 10 km radius of the proposed project.

Page No 15

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

A. Natural Resource Management – The main focus of this program will be to maximize the yield returns of the farmers through efficient management of existing resources & extension of new agricultural practices.

1). Integrated Agricultural Growth Project – For improvement and use of the modern techniques and thereby would certainly contribute to prosperity in the agriculture sector and reduce the rural poverty by programs like Farmers Training, Nursery Growing Trainings, Modern agriculture equipment distribution programs etc.

2).Animal Husbandry Projects –

Various programs like health checkups & treatment, vaccination program, Anti- sterility camps, breed improvement etc. will be carried out.

B. Income Generation Program – 1) Establishment of Self-help groups. 2) Rural Entrepreneurship Development Program 3) Handcrafts Development Program 4) Vocational Training 5) Business process outsourcing

C. Health, Education & Infrastructure 1) Aids Awareness Program 2) General Health Camps 3) Innovative Teaching Methods 4) Adult Education 5) Sanitation 6) Infrastructure Development Projects

Education Facilities:‐Many Facilities for village schools like game kits, drawing kits, table‐ chairs; school construction (classroom/toilet/school boundary), ceiling fans/Coolers or books for school library are proposed.

Health Facilities:‐Assistance to existing health facilities in nearest Hospital, for improvement in health facilities or services.

Page No 16

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

5.0 PLANNING IN BRIEF

5.1 Planning Concept

Proposed Plant Layout is attached with Annexure 2 of Form-1.

Plant will consist of manufacturing and processing area, storage area, effluent treatment facility, administration, greenbelt and plant internal roads.

5.2 Amenities / Facilities All the basic amenities/facilities such as power connection & power back‐up, drinking water, internal roads, water & wastewater treatment plant etc. will be provided.

5.3 Land Use Planning:

The Plant Layout will be planned considering production facilities, auxiliary and ancillary facilities and plant utilities & services. The total plot area is 4479.57 m2 area. Land use shall be as build up area of buildings, Storage facility, Roads, Greenbelt, open land etc., these kinds of land use will be there. Pl refers Plant Layout enclosed in Annexure No 2 of Form-1

Table No 7 PROPOSED LAND AREA DISTRIBUTIONS Sr No Area Sq. Meter 1 Green Belt Area 1478 2 Production Plant 749.94 3 ETP Area 69 4 Storage area 230.87 5 Utilities 187.64 6 parking 51 7 Administration office 48.00 8 Open Area 1665.14 Total 4479.59

5.4 Assessment of Infrastructure Demand (Physical and Social):

 Employment would be as prevailing norms of state government for skilled and unskilled people for the proposed project.  Social Welfare will be done.  Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc.

Page No 17

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area Plot area of the site is 4479.57 sq. m out of which 1336.43 sq. meter will be used for production facility while 1478 sq. m. land will be used for Green Belt and 1665.14 sq. meter will be open area Please Refer Plant Layout Annexure- 2 of Form- 1.

6.2 Residential Area There will be no residential area within the premises.

6.3 Green Belt Greenbelts are an effective mode of control of air pollution, where green plants form a surface capable of absorbing air pollutants and forming a sink for the pollutants. So the proponent will develop an effective green belt within the premises and on periphery of the premises. About 1478 sq m will be allocated to green belt area.

6.4 Social Infrastructure The existing social infrastructure in the study area includes schools, hospitals, banks, water supply, electrical supply, transport facilities etc.

The district has a presence of private specialized hospitals to provide a comprehensive range of tertiary and secondary care services backed by state-of- the- art technology and trained medicos. The company will engaged part time Doctor of medical inspection. Also company will conduct the six month medical checkup of all employees and the records will be maintained.

6.5 Connectivity (Traffic and Transportation Road / Rail /Metro /Waterways etc.)

 Nearest railway station is Morbi -16.27 Km far from proposed site in North direction.  Nearest Rajkot Airport is 40.77 Km far from proposed site.  The site is connected to Rajkot, Morbi, Ahmedabad, Vadodara, Surat by road routes.

6.6 Drinking Water Management (Source & Supply of Water)

Source of water supply is Borwell

6.7 Sewerage System.

Septic tank / soak pit system shall be provided as part of sewerage system.

Page No 18

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

6.8 Industrial waste management :

6.8.1 Air Pollution

A. Flue Gas emission Source Source of Flue Gas Emission will be Boiler (1.5 T/Hr) and D.G set (100 KVA). Briquettes and coal will be used as a fuel in Boiler, and HSD will be use D.G Set. Details of Flue gas emission and air Pollution control measures are given in Annexure 8 of Form-1.

B. Process Gas emission Source and control measures.

Source of process gases (HCL, SO2, and Ammonia) will be process reactions. Water scrubber, Alkali Scrubber ,Dust collection Cyclone Separator followed by dual stage water packed/demister will be provides as an air pollution control measures with adequate stack height. For control of VOC, adequate carbon tower followed by solvent recovery system attach to all reactors and solvent storage tanks will be provided. Details of Process emission and air Pollution control measures are given in Annexure 9 of Form-1.

6.8.2 Water Consumption and Wastewater Generation.

Details of Water Consumption and Waste Water Generation are given in Annexure- 6 of Form- 1.

DESCRIPTION OF PROPOSED TOTAL EFFLUENT TREATMENT PLANT

 Domestic waste water (1.8 KL/Day) will be discharged in to soak pit.  The industrial waste water generation will be 27.198 KL/Day  [Process : 23.398 KL/Day ,Cooling : 0.3 KL/Day, Boiler : 0.500 KL/Day, Washing : 3.00 KL/Day]  Unit will collect waste water from plant and treat in proposed Primary treatment plant ,Oxidation system, RO and Multi Effect Evaporator  Treated waste water will be evaporated within premises and maintain Zero discharge.

Details of effluent treatment plant are shown in Annexure. 7 of Form I:

6.8.3 Hazardous Solid Waste Management

ETP Sludge, Discarded Bags and Drums, Used Oil, Process Residue, off specified and date expiry materials, Spent Carbon, Spent HCl, Liq. Ammonia and Sodium bromide solution are the main hazardous waste that will be generated from the proposed unit. ETP sludge will be collected, stored into solid waste storage area and disposed to authorized TSDF

Page No 19

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

site. Process Residue, off specified and date expiry materials, Spent Carbon will be send to CHWIF. Discarded bags and containers will be sold to approve vendor. Used oil will be reused as a lubricant within the factory premises/sold to registered recycler. Spent HCl, Liq. Ammonia will be partially reused and remaining will be sold out to authorized actual end users. Sodium Bromine solution will be sold to actual end users. The detail of Hazardous Waste Management System presented in Annexure 5 of Form 1.

6.8.4 Noise Pollution

There will not be noise generating machinery or process in plant. The noise generation will be through DG set (100 KVA) will be taken along with acoustic enclosure. Noise level will be within the prescribed limit.

6.9 Power Requirement and Supply / Source:

Table No 8 Details of Power Requirement and source

Item Capacity Source Electricity 300.KVA PGVCL 100 KVA D.G Set as a standby source.

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN :

There will be no rehabilitation and resettlement undertaken as labors and workers from local & nearby areas for the proposed construction activity. Proposed site is located in notified industrial estate.

8.00 PROJECTSCHEDULE& COSTESTIMATES

8.10 PROJECTSCHEDULE : Construction/Modification for proposed project will be start only after getting environmental clearance and consent to establish. It has been estimated that completion of the different phases of the project will take approximately 6 months after we obtain EC and CTE of the Board.

Project implementation schedule after getting NOC from GPCB 1. Civil work immediately after getting NOC. 2. Procurement of machinery 1 month after getting NOC 3. Eraction & installation of machinery immediately after competition of activity no.2 4. Trial of machinery & equipment within 1 month after competition of activity no.3

Page No 20

Prefeasibility Report M/s. SHIV KRISHNA BIOGEN LLP Plot No 7, Survey no .407/15 Paiki, Village-Hadmatiya.Tal-Tankara, Dist-Morbi, Gujarat.

5. Commercial activity 1 month after competition of activity no. 4

8.2 ESTIMATED PROJECT COST:

Estimated project cost along with the analysis in terms of economic viability of the project is given as below; Land, Plant & Machinery, Pipeline & Fittings, Electrical Installation, Safety systems, etc. are the major heads considered in the Capital Cost Projection for the proposed project. Environment Protection has also been considered in planning the Cost Projection, which will include Green belt development, safety systems, etc. Table No 9 Proposed Cost Breakup Sr No Purpose Cost (in Lac) 1 Land 65 2 Building 140 3 Plant and Machineries 120 4 Q.C Lab Setup 10 5 Environment Management System 120 6 Greenbelt Development 10 7 Utilities(Boiler+ Cooling +Tower 15 Storage Area) Total 480

The company will provide budgetary provision for the recurring expenses for environmental issues while planning the allocation of funds during the annual budgetary planning.

9.0 ANALYSISOFPROPOSAL (FINALRECOMMENDATIONS)

Financial and Social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.

 The proposed products have a great market potential making the project a promising business model.  Financial and social benefits with special emphasis on the befit to the local people including tribal population,  Proposed project activity will provide benefits to the local people in terms of financial and social welfare. Local people will get direct financial benefit by way of employment.  Local people will get some contracts of supply and services to get indirect income.  Company will contribute in improving education and health facilities in nearby area.

Page No 21