DUICU SIMONA1, DUMITRASCU ADELAELIZA2, LEPADATESCU BADEA2 Descriptive Geometry and Technical Drawing Department1, Manufacturing Engineering Department2, Faculty of Manufacturing Engineering and Industrial “Transilvania” University of Braov 500036 Eroilor Street, No. 29, Brasov ROMANIA [email protected]; [email protected]; [email protected];

Abstract: - In this article are presented aspects, elements and indices regarding project as a potential source of sustainable competitive advantages. The success of a project depends on implementation of the project quality processes: quality planning, quality assurance, and continuous process improvement drive success.

Key-Words: - , project quality management, project quality improvement.

1 Introduction negative impact on the possibilities of planning and Project management is the art — because it requires the carrying out project activities); skills, tact and finesse to manage people, and science — • supply chain problems; because it demands an indepth of an • lack of resources (funds or trained personnel); assortment of technical tools, of managing relatively • organizational inefficiency. shortterm efforts, having finite beginning and ending external factors: points, usually with a specific budget, and with • natural factors (natural disasters); specified performance criteria. “Short term” in the • external economic influences (adverse change in context of project duration is dependent on the industry. currency exchange rate used in the project); The longer and more complex a project is, the more it • reaction of people affected by the project; will benefit from the application of project management • implementation of economic or social tools. measures necessary for carrying out the project in Simply stated Dr. Goldratt indicates that “if a project is good condition; initiated to have a positive effect on the organization, • cultural mismatch between project objectives and then the sooner the project is completed; the sooner the activities taking place and environment project, organization receives the benefits. Therefore the which arises from ignorance of local specifics, such constraint of any single project must be its cycle time discrepancies lead to the rejection of the project by (the time it takes for the project to complete). The project beneficiaries to whom it is addressed. constraint of the entire collection of projects of an All activities of the organization should be organized organization, its portfolio, must be the combined cycle and managed as processes, which includes: time of all of the projects” [1]. • identifying processes, customer supplier and interactions between them; • establish how the planning, operation and control of 2 The Importance of Project Quality processes and responsibilities for the management • setting needs measuring, monitoring and analysis of Management obtained for continuous improvement The success of a project depends on the extent to processes. which the organization manages to avoid initiating or action to minimize the effects of internal and external factors: 3 Project Quality Management internal factors: Project Quality Management includes all management • erroneous assessment of the available resources for activities that will ensure the quality policy, objectives, ongoing project; and responsibilities and fulfill them through planning • poor planning of project activities (or activities and improving quality through quality assurance and for achieving the financial application, which has a quality control.

ISBN: 978-960-474-293-6 139 Mathematics and Computers in Biology, Business and Acoustics

The project quality management processes are: Quality of project management not only refers to “time and budget,” but to “specification and quality requirements”. According to ISO 9001:2000 quality management is all coordinated activities to direct and control an organization in terms of quality. In general, the quality control and guidance include establishing the quality policy, quality objectives, quality planning, quality assurance, quality control and improvement of quality (see figure below).

Figure 1. Project quality management processes

Figure 2. Project quality management 3.1 Project quality assurance

ISBN: 978-960-474-293-6 140 Mathematics and Computers in Biology, Business and Acoustics

The organization management and plan resource a quality council, identify problems, select projects, requirement identified by the annual revenue and appoint teams, designate facilitators). expenditure includes resources for: • Emphasis on training. • Solve problems by carrying out projects. • Progress must be reported. • Give recognition to anybody who achieved. • Communicate results with all concerned. • Keep score by being quantitative. • Maintain a regular momentum by making annual improvement part of the and processes of the company. To improve the quality of products and services, managers must rely on the following : • Customer focus. • Adopt a new , abandoning the "acceptable level" of quality. We cannot survive with "acceptable levels" of nonconformities, defects, delays in delivery. • Ensure the necessary inspection and testing equipment. • Ensure proper tools to conduct business.

• Ensure processes, methods of surveillance and Figure 3. Project quality assurance elements effectively on quality.

By making the investment plan aims to modernize the • Ensure continuous improvement of quality processes and controls, economic management and products and services based on a plan to become computerization of the management organization, competitive and to remain in business. Constituted upgrading to ensure compliance with the requirements a fair and concise business plan, the organization of product specifications, modernization of equipment will be at a higher competitive level. for support services. • Periodic audits of quality system. It is proved in practice that it changes the quality of products especially before its audit. However, it is not 3.2 Projects quality improvement necessary to carry out audits too often, as it may Juran’s advocated ten steps to quality improvement [2]: adversely affect the organization's staff. A summary of the main specifications of the standards • Start with building awareness of the need and and opinions of the literature leads to the conclusion that opportunity for improvement. the project quality approach must consider at least the • Set realistic for improvement. following components: • Organize to reach the goals (by method to establish

Figure 4. Project quality components

ISBN: 978-960-474-293-6 141 Mathematics and Computers in Biology, Business and Acoustics

It is better to prevent than to identify defects. Some corresponding tools, as a first step to creating the organizations do not have sources available to pay required “project culture” within. claims, removing defects, etc., but they are much better Data quality control is essential to ensure the of able to control the organization. Thus, an effective results from quality improvements projects. Feasible control, flexible, timely can remove unplanned methods are available and important to help ensure that expenses. 's decisions are based on accurate data. The level of quality can be assessed with costs. It is normal for an organization to strive for the high quality products and services, but this procedure should not References: result in expenses that may cause, in turn, its [1]D. Lock, Project Management, Published by Gower bankruptcy. Thus, it is necessary to develop a budget for Press, 2006 improving the quality and compared with expected [2]A. Nedelcu, D. Dumitracu, Some Aspects Regarding profit. It is also necessary to establish special measures Quality Management in Industrial Projects, 7th for subsuppliers quality assurance, quality system WSEAS International Conference on continuously monitored, providing feedback ENGINEERING (EDUCATION '10), information. Corfu Island, Greece, July 2224, 2010, ISSN: 1792 Projects quality improvements are typically conducted 426X, ISBN: 9789604742028, pp. 263266 with substantially fewer resources, potentially [3]Dumitracu A.E., Nedelcu ., Lepădătescu B. – influencing data quality. Project Cost Estimation of the Quality Management Data quality control methods should be applied System Implementation, 7th WSEAS International throughout all phases of project quality improvements. Conference on ENGINEERING EDUCATION In the design phase, project aims should guide data (EDUCATION '10), July 2224, Corfu Island, collection decisions, emphasizing quality (rather than Greece, 2010, Proceeding ISI – ISSN 1792426X, quantity) of data and considering resource limitations. In ISBN 9789604742028, pp. 267270 the data collection phase, standardized data collection [4]E.M. Goldratt, Theory of Constraints, North River forms, comprehensive staff training and a welldesigned Press Publishing Corporation. 1999 database can help maximize the quality of the data. [5]H. Kerzner, Project Management - A Systems Clearly defined data elements, quality assurance reviews Approach to Planning, Scheduling, and Controlling, of both collection and entry and systembased controls Published by John Wiley & Sons, 2007 reduce the likelihood of error. In the data management [6]J.M. Juran, Quality Planning and Analysis, New phase, missing data should be quickly identified and York: McGrawHill, 1970 corrected with system based controls to minimize the [7]R. Max Wideman, Project Quality Management, Project missing data. Finally, in the data analysis phase, Management Consulting, AEW Services, October 2002, appropriate statistical methods and sensitivity analysis available from www. maxwideman.com aid in managing and understanding the effects of [8]S. Wallace, The ePMbook, Available from: missing data and outliers, in addressing potential http://www.epmbook.com/, Accessed: 1999 – 2007 confounders and in conveying the precision of results. [9]T.C. Powell, Total Quality Management into the Projects. Journal, Vol. 16, No. 1, pp. 1537, John Wiley & Sons, 1995 4 Conclusions [10]A Guide to the Project Management (PMBOK In essence, project quality management plans to close Guide). Body of Knowledge. Project Management certain requirements of quality management in general, Institute Standards Committee, Newtown Square, to be compatible with the family of ISO 9000, ISO 9001, Third Edition, American National StandardAvailable ISO 9004, ISO 19011. from: http://www.pwcglobal.com/ Quality improvement initiatives undertaken by the [11]Project Management for Development performing organization, such as TQM and , Organizations - A to manage can improve the quality of the project’s management as development projects for international humanitarian well as the quality of the project’s product. assistance and relief organizations, 2008, available It is important to understand the technical and project from www.pm4dev.com management processes, but without the knowledge of when and how to apply them, the skills are useless. It is therefore of a paramount importance for an organization to have its managers well trained, in both developing and using the appropriate project management skills and