Funds Allocation Mwanza Region 1St QRT 2008-09

Total Page:16

File Type:pdf, Size:1020Kb

Funds Allocation Mwanza Region 1St QRT 2008-09 DISTRICT AGRICULTURAL SECTOR INVESTMENT PROJECT (DASIP) ALLOCATION OF INVESTMENT FUNDS - 1st QRT 2008/09 KAGERA , SHINYANGA, MARA, KIGOMA AND MWANZA REGIONS MWANZA REGION SOURCES OF FUNDS DISTRICT WARD VILLAGE NAME OF PROJECT TOTAL COST (in '000) DASIP BENEFICIARY GEITA CHIGUNGA SARAGULWA Purchase of hulling machine 5,000 2,500 2,500 NYAKAGOMBA ISIMA Purchase of hulling machine 5,000 2,500 2,500 Construction of a market shed 33,400 26,720 6,680 NZERA IDOSERO Purchase of hulling machine 5,000 2,500 2,500 KASEME MAGENGE Purchase of hulling machine 5,000 2,500 2,500 KAKORA KABIGA Purchase of hulling machine 5,000 2,500 2,500 KHARUMWA BUMANDA Purchase of hulling machine 5,000 2,500 2,500 BULELA NYAMBOGO Purchase of hulling machine 5,000 2,500 2,500 Construction of a crop storage facility 35,000 28,000 7,000 MWINGIRO IDETEMYA Purchase of hulling machine 5,000 2,500 2,500 Construction of a charco dam. 35,000 28,000 7,000 Nyang'hwale NYIJUNDU Purchase of hulling machine 5,000 2,500 2,500 Construction of a market shed 33,400 26,720 6,680 NYAMALIMBE NYAMIGOGO Purchase of hulling machine 5,000 2,500 2,500 Construction of a crop storage facility 35,000 28,000 7,000 KHARUMWA IZUNYA Purchase of hulling machine 5,000 2,500 2,500 Construction of a charco dam. 35,000 28,000 7,000 SENGA SENGA Construction of a market shed 33,400 26,720 6,680 NZERA LWENZERA Construction of a market shed 33,400 26,720 6,680 IHANAMILO NYAKATO Construction of a market shed 33,400 26,720 6,680 KAKORA KAKORA Construction of a crop storage facility 35,000 28,000 7,000 NYAMALIMBE LWAMWIZO Construction of a crop storage facility 35,000 28,000 7,000 BUSOLWA BUSOLWA Construction of a charco dam. 35,000 28,000 7,000 TOTAL GEITA DISTRICT 467,000 357,100 109,900 KWIMBA NYASHANA Construction of a cattle crush for vaccination 6,500 5,200 1,300 NYAMBITI SOLWE Construction of a shallow well for irrigation 5,000 4,000 1,000 Purchase of Oxen drawn implements 2,200 1,100 1,100 MALIGISU MWABARATURU Construction of a shallow well for irrigation 5,000 4,000 1,000 Construction of a cattle crush for vaccination 6,500 5,200 1,300 Purchase of Oxen drawn implements 2,200 1,100 1,100 TALAGA Rehabilitation of a charco dam 35,000 28,000 7,000 Purchase of Oxen drawn implements 2,200 1,100 1,100 IGONGWA MWADUBI Construction of a shallow well for irrigation 5,000 4,000 1,000 Purchase of Oxen drawn implements 2,200 1,100 1,100 NGUDU ILUMBA Construction of a shallow well for irrigation 5,000 4,000 1,000 MWAMAKOYE Rehabilitation of a charco dam 35,000 28,000 7,000 Purchase of Oxen drawn implements 2,200 1,100 1,100 MANTARE MWAMPULU Construction of a cattle crush for vaccination 6,500 5,200 1,300 NGULLA NYAMBUYI Construction of a cattle crush for vaccination 6,500 5,200 1,300 Purchase of Oxen drawn implements 2,200 1,100 1,100 MWAMALA MWALUJO Construction of a cattle crush for vaccination 6,500 5,200 1,300 MHANDE MHANDE Construction of a cattle crush for vaccination 6,500 5,200 1,300 Purchase of Oxen drawn implements 2,200 1,100 1,100 FUKALO CHIBUJI Construction of a cattle crush for vaccination 6,500 5,200 1,300 BUPAMWA CHASALAWI Rehabilitation of a charco dam 35,000 28,000 7,000 Purchase of Oxen drawn implements 2,200 1,100 1,100 MALYA MALYA Purchase of Oxen drawn implements 2,200 1,100 1,100 KISHILI Purchase of Oxen drawn implements 2,200 1,100 1,100 SUMVE MWASHILALAGE Purchase of Oxen drawn implements 2,200 1,100 1,100 MHANDE GULUMWA Purchase of Oxen drawn implements 2,200 1,100 1,100 TOTAL KWIMBA DISTRICT 196,900 149,600 47,300 MISUNGWI USAGARA BUJINGWA Construction of a market shed. 35,000 28,000 7,000 MISUNGWI MABUKI Construction of a charco dam 13,000 10,400 2,600 Construction of a Cattle dip 22,000 17,600 4,400 TOTAL MISUNGWI DISTRICT 70,000 56,000 14,000 SENGEREMA NYAKASASA ISENYI Procurement of Ia power tiller 5,000 2,500 2,500 LUGATA KABAGANGA Procurement of Irrigation equipment 5,600 2,800 2,800 LUGATA Procurement of Irrigation equipment 5,600 2,800 2,800 KATWE KASHEKA Procurement of Irrigation equipment 5,600 2,800 2,800 KATUNGURU NYAMTELELA Construction of a crop marketing shed 35,000 28,000 7,000 Purchase of oxen drawn implements 7,600 3,800 3,800 KAFUNZO KAFUNZO Market shed 35,000 17,500 17,500 TOTAL SENGEREMA DISTRICT 99,400 60,200 39,200 TOTAL MWANZA REGION 833,300 622,900 210,400 GRAND TOTAL #REF! #REF! #REF!.
Recommended publications
  • Nursing Schools
    NURSING SCHOOLS NURSING SCHOOL ADVANCED PUBLIC Offers: HEALTH NURSING Community Health Nursing, Epidemiology, demography and biostatistics, Research methodology, SCHOOL Development studies, Administration and management of health care services. P.O. BOX 1060, MOROGORO. Other Services: The school also conducts on going workshops, seminars; Facilitate distance Education, Coordinate Zonal Continuing Education activities, computing and photocopy services and is a Zonal Resource Centre for HLMs. AMO-ANAESTHETIC Aim and Objectives: SCHOOL, The main aim of AMO School is to provide Society with high competent AMO anaesthetic practitioner. P.O. BOX 6441, The overall objective of the AMO-Anaesthetic School is to provide the academic and clinical experience MOSHI. which will enable the graduate to proved safe anaesthesia to the wide variety of clinical situation which may arise in the current practice of anaesthesia. AMO –School is undr the MOH training department, and the training is taking place at KCMC under the organogram of KCMC. Other Services: Students do participate actively on clinical anaesthesia Research field work and workshops organized at the KCMC by different Medical fields. ASSISTANT MEDICAL Aims and Objectives: OFFICERS TRAINING SCHOOL, To train Assistant Medical Officers with main emphasis on improving the quality of knowledge and P.O. BOX 1142 skills acquired in the previous training. Relevant problems in primary health care services and delivery at MBEYA. the district and peripheral health units are major concern of the course. Academic Departments: Paediatrics and Child health, Obstetrics and Gynaecology, Surgery, Medicine and Community Medicine. ASSISTANT MEDICAL Objective: OFFICERS TRAINING The objective of the center is to train highly qualified allied health professionals to work interchangeable CENTRE, BOMBO AREA, with graduate Medical Officers.
    [Show full text]
  • VOTE: 3053 VOTE NAME: COUNCIL: Kwimbhba DISTRICT COUNCIL
    VOTE: 3053 VOTE NAME: COUNCIL: KWIMbhBA DISTRICT COUNCIL. PERIOD COVERED: Quarter Ending 30th June 2017 in the Financial Year 2016/17 BUDGET COVERAGE: (Development Or Recurrent): Own Sources PROJECT CODE AND NAME: 6230: District Council SUB-VOTE CODE AND NAME: 5000 Administration and General Objective Code and Name: E: Enhance Good Governance and Administration services k k n c s Remarks on w Target M P R Target Description Actual Progress Estim i Cumulative Cumulative % a o r R t n Implementation Code ated t Budget Actual Spent k A n % n Expenditure O Comp U leted 1 2 3 4 5 6 7 8 9 10 11 12 13 14 E03S Statutory obligation facilitate by 100% annually by June 2019 E03S01 √ √ √ To facilitate contribution to Work not started Collection of own blood Bank Annually by June 9,000,000 source fund on 2017. 0 0 progress. Total of activity 9,000,000 E03S02 To facilitate contribution to Work not started 0 √ Collection on Mwanza Bank ya progress Mwananchi annually by June 2017 56,965,300 0 0 Total of Activity 56,965,300 0.00 0 E03S03 To facilitate contribution Work not started 0 √ Collection on LVRLAC,MIVARAF and progress other Funded projects by June 2017 40,000,000 0.00 0 To facilitate advertisement of 0 89,783,029.79. District Council Status (balance Sheet), school transfers, Administration transfers, Advertisement and publications, district profile 1 training, data collection, compilation and report preparation. Total of Activity 40,000,000 0.00 0 Total of cost Centre 105,965,300 0.00 0 Total of Target 105,965,300 0.00 0 Total of Sub-vote 105,965,300 0.00 0 TOTAL OF PROJECT 105,965,300 0.00 0 VOTE: 3053 VOTE NAME: COUNCIL: KWIMBA DISTRICT COUNCIL.
    [Show full text]
  • INVITATION for TENDERS (IFT) Date: 30Th July, 2020
    THE UNITED REPUBLIC OF TANZANIA PRESIDENT’S OFFICE REGIONAL ADMINISTRATION AND LOCAL P.O.BOX 18 GOVERNMENT MWANZA. TANZANIA RURAL AND URBAN ROADS AGENCY (TARURA) INVITATION FOR TENDERS (IFT) Date: 30th July, 2020 1. This Invitation for Tenders follows the General Procurement Notice (GPN) for this Project which appeared in Tanzania National e-Procurement System (TANePS). 2. The Government of Tanzania has set aside funds for the operation of the Tanzania Rural and Urban Roads Agency (TARURA), Mwanza Region during the financial year 2020/2021. It is intended that part of the proceeds of the fund will be used to cover eligible payment under the contract for Routine maintenance, Spot Improvement, Periodic Maintenance, Major repair of Bridges, Construction Of Culverts and Upgrading of various roads in Mwanza City Council, Ilemela Municipal Council, Buchosa District Council, Misungwi District Council, Magu District Council, Ukerewe District Council, Kwimba District Council And Sengerema District Council. 3. Regional Coordinator Tarura Mwanza Region On Behalf Of The Chief Executive now invites sealed tenders from eligible Local contractors registered in Contractors Registration Board (CRB) in Class as shown in the table below for construction of the following works. Registrati on Class Limit S/N Tender No. Descriptions Major Activities Location & (Intended Contract Period) 01 AE/092/2020- Routine -Light reshaping Buchosa District Class VII and 2021/MZA/W/01 maintenance along (34km) Council above. Kabaganga – -Concrete class 15 (Nyakaliro, Contract is Nyamiswi – (13m3), -Concrete Nyakasasa, for 120 Ntama(18km), class 20 (10m3), Buhama & Calendar Nyamiswi – Buhama -Pipe culverts 0.9m Lugata Wards) days – Mchangani(9km) diameter (16 No.), and Kalebezo – -Reinforcement bars Lumeya(7km) 12mm diameter (250kg) and -Gravelling (982m3).
    [Show full text]
  • Mwanza Region Regional Secretariat Strategic Plan 2014
    THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER’S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT MWANZA REGION REGIONAL SECRETARIAT STRATEGIC PLAN 2014 - 2017 REGIONAL COMMISSIONER’S OFFICE, P.O.BOX 119, MWANZA. Tel: 028-2500366/2501037 Fax: 028-2501057/2541242 December, 2013 1 CONTENTS Page ABBREVIATIONS ........................................................................................................................... 3-4 FOREWORD ....................................................................................................................................... 5 ACKNOWLEDGEMENT .................................................................................................................. 6 EXECUTIVE SUMMARY .................................................................................................................. 7 CHAPTER ONE: INTRODUCTION .......................................................................................... 8-12 CHAPTER TWO: SITUATIONAL ANALYSIS ...................................................................... 12-21 CHAPTER THREE: VISION, MISSION, CORE VALUES AND OBJECTIVES ................. 22-25 CHAPTER FOUR: TARGETS AND STRATEGIES ................................................................ 26-31 CHAPTER FIVE: PERFORMANCE INDICATORS ............................................................... 33-39 CHAPTER SIX: MONITORING AND EVALUATION ......................................................... 39-42 APPENDICES .............................................................................................................................
    [Show full text]
  • 2012 Population and Housing Census
    The United Republic of Tanzania 2012 POPULATION AND HOUSING CENSUS Population Distribution by Administrative Areas National Bureau of Statistics Ministry of Finance Dar es Salaam and Office of Chief Government Statistician President’s Office, Finance, Economy and Development Planning Zanzibar March , 2013 Foreword The 2012 Population and Housing Census (PHC) for United Republic of Tanzania was carried out on the 26th August, 2012. This was the fifth Census after the Union of Tanganyika and Zanzibar in 1964. Other Censuses were carried out in 1967, 1978, 1988 and 2002. The 2012 PHC, like others, will contribute to the improvement of quality of life of Tanzanians through the provision of current and reliable data for development planning, policy formulation and services delivery as well as for monitoring and evaluating national and international development frameworks. The 2012 PHC is unique in the sense that, the information collected will be used in monitoring and evaluating the Development Vision 2025 for Tanzania Mainland and Zanzibar Development Vision 2020, Five Year Development Plan 2011/12 – 2015/16, National Strategy for Growth and Reduction of Poverty (NSGRP) commonly known as MKUKUTA and Zanzibar Strategy for Growth and Reduction of Poverty (ZSGRP) commonly known as MKUZA. The census will also provide information for the evaluation of the Millennium Development Goals (MDGs) in 2015. The Poverty Monitoring Master Plan, which is the monitoring tool for NSGRP and ZSGRP, mapped out core indicators for poverty monitoring against the sequence of surveys, with the 2012 Census being one of them. Several of these core indicators for poverty monitoring will be measured directly from the 2012 Census.
    [Show full text]
  • Clinical Characteristics and Health Care Received Among Patients With
    Munyogwa et al. BMC Health Services Research (2020) 20:527 https://doi.org/10.1186/s12913-020-05407-y RESEARCH ARTICLE Open Access Clinical characteristics and health care received among patients with type 2 diabetes attending secondary and tertiary healthcare facilities in Mwanza Region, Tanzania: a cross-sectional study Mariam J. Munyogwa1* , Reuben William2, Stephen M. Kibusi1 and Nyasiro S. Gibore1 Abstract Background: Tanzania is among the sub-Saharan African countries facing a tremendous increase in the burden of type 2 diabetes mellitus. In order to provide diabetes health care services, the government has established diabetes care clinics in secondary and tertiary healthcare facilities. However, previous studies have demonstrated a disparity in availability of supplies and equipment for provision of diabetes health care services at these healthcare facilities. This study aims to assess the clinical characteristics and health care received among patients with type 2 diabetes attending secondary and tertiary healthcare facilities in Mwanza Region, Tanzania. Methods: A cross-sectional study was conducted in Mwanza Region from June to September, 2018.Three hundred and thirty patients were selected by systematic random sampling from three healthcare facilities. A structured questionnaire was utilized to collect information on patient characteristics, health care received and patient perception of care. Patient blood pressure, blood glucose, weight and height were measured during the study. Percentages, chi-square tests and multivariable analysis were conducted to obtain the proportions, make comparisons and determining the correlates of tertiary-level healthcare facility. Results: Approximately half of respondents (54.5%) were from secondary healthcare facilities. The prevalence of hypertension (63.3%), hyperglycemia (95.8%) and obesity (93.3%) were high.
    [Show full text]
  • African Postal Heritage; African Studies Centre Leiden; APH Paper 19, Part 1; Ton Dietz Tanzania Postmarks: Northern Tanzania; Version May 2017
    African Postal Heritage; African Studies Centre Leiden; APH Paper 19, Part 1; Ton Dietz Tanzania Postmarks: Northern Tanzania; Version May 2017 African Studies Centre Leiden African Postal Heritage APH Paper nr 19, part 1 Ton Dietz Tanzania Postmarks: Northern Tanzania Version May 2017 Introduction Postage stamps and related objects are miniature communication tools, and they tell a story about cultural and political identities and about artistic forms of identity expressions. They are part of the world’s material heritage, and part of history. Ever more of this postal heritage becomes available online, published by stamp collectors’ organizations, auction houses, commercial stamp shops, online catalogues, and individual collectors. Virtually collecting postage stamps and postal history has recently become a possibility. These working papers about Africa are examples of what can be done. But they are work-in- progress! Everyone who would like to contribute, by sending corrections, additions, and new area studies can do so by sending an email message to the APH editor: Ton Dietz ([email protected]). You are welcome! Disclaimer: illustrations and some texts are copied from internet sources that are publicly available. All sources have been mentioned. If there are claims about the copy rights of these sources, please send an email to [email protected], and, if requested, those illustrations will be removed from the next version of the working paper concerned. 1 African Postal Heritage; African Studies Centre Leiden; APH Paper
    [Show full text]
  • Catholic-Directory-2020-Edition.Pdf
    2020 EDITION TANZANIA EPISCOPAL CONFERENCE (TEC) www.tec.or.tz TANZANIA CATHOLIC DIRECTORY 2020 Edition Tanzania Episcopal Conference (TEC) P.O. Box 2133, Dar es Salaam, Tanzania Phone: +255 222 928 341/5 Fax: 2851133/2850427 Email: [email protected] www.tec.or.tz Tanzania Catholic Directory, 2020 1 2 Tanzania Catholic Directory, 2020 CONTENTS INTRODUCTION .............................................................................................................................. 4 1. ARCHDIOCESE OF ARUSHA ........................................................................................................ 13 2. DIOCESE OF BUKOBA .................................................................................................................... 29 3. DIOCESE OF BUNDA ...................................................................................................................... 39 4. ARCHDIOCESE OF DAR ES SALAAM ....................................................................................... 51 5. ARCHDIOCESE OF DODOMA ...................................................................................................... 71 6. DIOCESE OF GEITA ......................................................................................................................... 81 7. DIOCESE OF IFAKARA ................................................................................................................... 85 8. DIOCESE OF IRINGA .....................................................................................................................
    [Show full text]
  • Tanzania Hesawa
    LIBK'AKY INTERNATIONAL REFERENCE CEISITPF TANZANIA HESAWA RURAL WATER SUPPLY, ENVIRONMENTAL SANITATION AND HEALTH EDUCATION PROGRAMMES IN KAGERA, MARA AND MWANZA REGIONS AGREED MINUTES BETWEEN MCDWC AND SID A, DECEMBER 2, 1992 AND SUPPLEMENTARY COMMENTS TO THE REVIEW NOVEMBER 16 - NOVEMBER 27,1992 He/sa\whealth-'sanitation-watear HESAWA WELLS The quality of the installations varies considerably between the districts — but also Within a district! Inferior quality is not a result of poor workmanship but also a sign of inadequate systems for operation and maintenance. Unclear roles, responsibilities and ownership add to the problem. (i) TABLE OF CONTENTS Pape ACRONYMS AND ABBREVIATIONS (iii) Chapter I: INTRODUCTION AND LOCATION MAPS 1-1 Chapter II: AGREED MINUTES BETWEEN PM & 1st VPO AND SIDA II-1 1. Introduction II -1 2. Purpose of the Review II-1 3. General II-2 4. Gender Issues H-4 5. Environment II-5 6. Programme Activities II-5 7. Monitoring, Evaluation and Auditing 11-13 8. Funds and Disbursement Procedures 11-14 9. Budget 11-16 10. Regional Activities 11-16 m 11. New Agreement 11-17 m 12. Next Annual Review 11-18 Chapter III: THE REVIEW TEAM'S SUPPLEMENTARY COMMENTS TO THE AGREED MINUTES; SUMMARY OF EXTERNAL EVALUATION III -1 1. Introduction m-i 2. General m-i 3. Gender Issues III-4 4. Programme Activities III-4 5. Other Matters III-5 Annex: Summary of External Evaluation Chapter IV: SUMMARY OF AGREED EVENTS rv-i Chapter V: BRIEF ON PROGRAMME IMPLEMENTATION v-i Chapter VI: SUMMARY OF COMPLETED AND ON-GOING HESAWA ACTIVITIES VI-1 LIBRARY, INTERNATIONAL REFERENCE CCNT;?£ :~np.
    [Show full text]
  • Tanzania Food and Nutrition Centre
    CORE Metadata, citation and similar papers at core.ac.uk Provided by Digital Library of the Tanzania Health Community TANZANIA FOOD AND NUTRITION CENTRE INVENTORY FOR NUTRITION INFORMATION EXCHANGE PARTNERS With Contact Addresses of Key Nutrition Information Exchange Partners in Tanzania 2007 BY: Sylvia Shao Charles Mamuya Walbert Mgeni TFNC REPORT NO: 2088 TABLE OF CONTENTS PAGE Acknowledgement ............................................................................... ii 1.0 Background ....................................................................................... 1 1.1 Rationale ............................................................................................. 1 1.2 Objective of inventory exercises .......................................................... 3 1.2.1 General objective ................................................................................ 3 1.2.2 Specific objectives ............................................................................... 3 2.0 Methodology of the study ................................................................. 3 2.1 Study population .................................................................................. 3 2.2 sampling procedure ............................................................................. 3 2.3 Data collection procedures .................................................................. 4 2.4 Data processing and Analysis ............................................................. 4 3.0 Findings ............................................................................................
    [Show full text]
  • Technical and Operation Report
    Table of Contents i United Republic of Tanzania NATIONAL SAMPLE CENSUS OF AGRICULTURE 2002/2003 Volume I: TECHNICAL AND OPERATION REPORT National Bureau of Statistics, Ministry of Agriculture and Food Security, Ministry of Water and Livestock Development, Ministry of Cooperatives and Marketing, Presidents Office, Regional Administration and Local Government, Ministry of Finance and Economic Affairs – Zanzibar September 2006 Technical and Operational Report Table of Contents i TABLE OF CONTENTS Table of contents ........................................................................................................................................................... i Acronyms .......................................................................................................................................................... v Preface ......................................................................................................................................................... vi Chapter 1: General background................................................................................................................................ 1 1.1 Introduction .................................................................................................................................................... 1 1.2 Rationale of the Agriculture Sample Census .................................................................................................. 1 1.2.1 Census Objectives............................................................................................................................
    [Show full text]
  • 4-14 4.4 Groundwater Development Plan Formulation of a Groundwater Development Plan Is Difficult Compared with Areas That Have T
    The Study on Rural Water Supply JICA in Mwanza and Mara Regions in the United Republic of Tanzania KOKUSAI KOGYO CO., LTD. 4.4 Groundwater Development Plan Formulation of a groundwater development plan is difficult compared with areas that have thick sands and gravel sedimentation as a stratum aquifer, especially along large rivers. The porous and permeable layer in the alluvial and tertiary deposits does exist only in limited areas. In addition to the geological point of view, the water quality is largely affected by the mineralization and sedimentation that occurs in areas which have the potential of dissolving toxic substances such as fluoride, NO3 and saline minerals. However, there are certain areas which provide safe and sustainable groundwater. Therefore, the villages close to the high potential area in reference with the water availability map have a higher possibility of developing groundwater sources. 4.4.1 Evaluation of Exploitable Amount of Groundwater The mass balance of groundwater recharge of 35 years (1970-2004) is shown in the following table. The water balance calculation was made both for general mass balance calculation and application of the Tank Model, and the results have been obtained from the Tank Model calculation result. The extraction of groundwater in each district is estimated in the following table. Table 4.4-1: Potential Volume of Groundwater Exploitation and Extraction **Potential ***Potential Total ****Planned *****Planned Persentage in Recharge to *Extractable Discharge of Discharge of Exploitation total
    [Show full text]