<<

Construction in McCall Avenue and Fancher Creek Detention Basin

HAPPENING NOW PART OF A LARGER PROJECT Construction of pipeline in Mc- These two projects are part of a larger partnership Call Avenue between Princeton and McKinley Avenues project between FID and FMFCD. The ‘Fresno began July 7, 2020 and is scheduled to run through the Capture, Retention and Reuse Project’ is end of September, 2020. Just over half a mile of 72” a multi-benefit stormwater pipeline will connect the Fresno Irrigation District’s project, at seven sites (FID) Gould to the Fresno Metropolitan spread across south Fresno Control District’s (FMFCD) 271-acre Fancher Creek from east to west. It is a Detention Basin at McKinley Avenue. The pipeline $12 million project, with will deliver stormwater from the canal to the basin for 70% of funding provided two main purposes: by the State of California’s • To improve flood protection and operational Proposition 1 Storm flexibility: Allow routing of stormwater out of Water Grant Program Gould Canal to increase canal capacity, which then (Prop 1 SWGP). The Prop allows pumping of downstream basins into Gould 1 SWGP is administered Canal during major storms. by the State Water Resources Control Board. The 30% local cost share will be split by FID and FMFCD. • To improve regional water supply self-reliance: Rather than being routed of the local region, In addition to the work described here, two more stormwater from Gould Canal can be routed to the FMFCD stormwater basins will be connected to nearby basin and allowed to percolate through the soil to to allow them to receive and retain stormwater recharge the local groundwater . for flood protection and . Pump stations will be constructed at these basins for additional flood protection. The two basins have a HAPPENING SOON combined area of 21 acres, stormwater capacity of 305 Construction of a pump station and pipelines in acre-feet, and annual groundwater recharge capability Fancher Creek Detention Basin is scheduled to start in of 450 acre-feet. mid-October 2020 and run through mid-February 2021. FID’s Central Basin Project is a 90-acre groundwater The pump station will house six, 33 cubic feet per sec- recharge facility to be constructed at three sites in south ond pumps and a telemetry system. The pipeline will Fresno. This project’s annual groundwater recharge connect the two cells of the basin, and the south cell of capability is estimated at nearly 2,600 acre-feet. the basin to Fancher Creek. • The new infrastructure will allow movement of Together, these completed infrastructure projects will large volumes of water with remote operations. allow the capture and retention of flood and to provide more flood protection from major • Once fully excavated, the detention basin will hold storms, and annual average of 5,550 acre feet of 1,891 acre-feet of stormwater to protect people and groundwater recharge capability to help reverse our properties downstream from flooding. area’s longstanding groundwater overdraft conditions. • The detention basin will allow capture of stormwa- Additional benefits include creating more aquatic ter for groundwater recharge that would otherwise ecosystem and wildlife habitat at the six basin sites, be lost to the local region. Its estimated annual with a total of 392 acres. groundwater recharge capability is 2,500 acre-feet. NOTE: THIS MAP IS SCHEMATIC. DISTANCES, AMOUNT OF CREDITABLE FACILITIES, AND LOCATION OF INLET BOUNDARIES ARE APPROXIMATE.

G O U L REDBANK CREEK TRIB D C A NAL

5 # IB R T K E RE R C FANC HE IB R T K EE CR 2 K 7 BAN

RED

5

#

B

I

R

T

K

E

E

R

C

R

E

H

C N

A FANCHER CREEK TRIB F

6

MCKINLEY AVE 3

FANCHER CREEK

DETENTION BASIN 24

!? FAN 6 CHER CREEK FANCHER CREEK 3 48 36 E

V

A

!?

L

L

A

C

C

M

OLIVE AVE NOTE: THIS MAP IS SCHEMATIC. DISTANCES, AMOUNT OF CREDITABLE FACILITIES, AND LOCATION OF INLET LEGEND BOUNDARIES ARE APPROXIMATE.

!? Pump Station, Pipe, Outfall & Canal Intertie To Be Constructed G O U L REDBANK CREEK TRIB D Existing Master Plan Facilities OC A NAL 1 " = 900 ' 5 FID Facilities # IB R T K FANCHER CREEK DETE ENTION Drainage Area Boundary RE R C BASIN IMPRFANOC HVE EMENTS IB R T K EE CR 2 K 7 BAN EXHIBIT NO. 1

RED

5 FRESNO METROPOLITAN FLOOD CONTR # OL DISTRICT

Prepared by: danielg For questions on the work in McCall Avenue

B I

Date: 7/10/2020 R T

Path: K:\Autocad\DWGS\0EXHIBIT\GRANTS\PROP 1\SWGP\Fancher Creek Detention Basin Improvements.ormxd Fancher Creek Detention Basin, contact

K E

Jarrod Takemoto,E Rural /Capital

R C Capturing Stormwater since 1956

Projects Manager,R at (559) 456-3292 or

E H

(559) 456-3292 C [email protected]

(559) 233-7161 A FANCHER CREEK TRIB

www.fresnofloodcontrol.org F

www.fresnoirrigation.com 6

MCKINLEY AVE 3

FANCHER CREEK

DETENTION BASIN 24

!? FAN 6 CHER CREEK FANCHER CREEK 3 48 36 E

V

A

!?

L

L

A

C

C

M

OLIVE AVE

LEGEND

!? Pump Station, Pipe, Outfall & Canal Intertie To Be Constructed

Existing Master Plan Facilities O 1 " = 900 ' FID Facilities FANCHER CREEK DETENTION Drainage Area Boundary BASIN IMPROVEMENTS

EXHIBIT NO. 1 FRESNO METROPOLITAN DISTRICT Prepared by: danielg Date: 7/10/2020 Path: K:\Autocad\DWGS\0EXHIBIT\GRANTS\PROP 1\SWGP\Fancher Creek Detention Basin Improvements.mxd