Service and

Business Plan for City Bus Operations - Mira

Project Consultancy-7 (PC-7) Service and Business Plan for City Bus Operations for two ESCBS Cities Chandigarh and Mira-Bhayandar under the World Bank – GEF assisted Efficient and Sustainable City Bus Services (ESCBS) Project

December 2020

Volume II - ANNEXURE

Submitted by:

Centre of Excellence in Urban Transport CEPT Research and Development Foundation

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Table of Content

Annexure 1: List Existing City Bus Routes (February 2020) ...... 4

Annexure 2: Boarding – Alighting and section load for each existing route (one sample trip in peak hour) ...... 5

Annexure 3: Alignment of Bus Routes – Business As Usual ...... 20

Annexure 4: Alignment of Proposed Bus Routes– Alternative Scenario 2 ...... 31

Annexure 5: Evaluation of Proposed Network Scenarios ...... 43

Annexure 6: Proposed routes frequency and fleet requirement for fleet mix scenarios ...... 50

Annexure 7: Operating cost estimates, revenue estimation, operating ratio and load factor for fleet mix scenarios ...... 52

List of Tables

PART A – Mira Bhayandar Table 1: List of Existing City Bus routes (February 2020) ...... 4 Table 2: Route wise performance parameters details ...... 19 Table 3: Scenario evaluation based on supply analysis ...... 44 Table 4: Bus procurement phasing plan – Scenario 2 ...... 47 Table 5: Scenario Evaluation based on SLB indicators – Scenario 2 ...... 49 Table 6: Proposed Routes frequency and fleet requirement for fleet mix scenarios ...... 51 Table 7: Operating cost estimates, revenue estimation, operating ratio and load factor for fleet mix scenarios ...... 53

List of Figures

PART A – Mira Bhayandar Figure 1: Peak hour Boarding & Alighting pattern along with line load of Route 1 (Up and Down) .... 6 Figure 2: Peak hour Boarding & Alighting pattern along with line load of Route 2 (Up and Down) .... 7 Figure 3: Peak hour Boarding & Alighting pattern along with line load of Route 15 (Up and Down) .. 8 Figure 4: Peak hour Boarding & Alighting pattern along with line load of Route 16 (Up and Down) .. 9 Figure 5: Peak hour Boarding & Alighting pattern along with line load of Route 21 (Up and Down) 10 Figure 6: Peak hour Boarding & Alighting pattern along with line load of Route 22 (Up and Down) 11 Figure 7:Peak hour Boarding & Alighting pattern along with line load of Route 24 (Up and Down) . 12 Figure 8: Peak hour Boarding & Alighting pattern along with line load of Route 4 (Up and Down) .. 13

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, Page i

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Figure 9: Peak hour Boarding & Alighting pattern along with line load of Route 6 (Up and Down) .. 14 Figure 10: Peak hour Boarding & Alighting pattern along with line load of Route 8 (Up and Down) 15 Figure 11: Peak hour Boarding & Alighting pattern along with line load of Route 10 (Up and Down) ...... 16 Figure 12: Peak hour Boarding & Alighting pattern along with line load of Route 14 (Up and Down) ...... 17 Figure 13: Peak hour Boarding & Alighting pattern along with line load of Route 29 (Up and Down) ...... 18 Figure 14: Existing Route 1 (Bhayandar Station to Chowk Church) ...... 21 Figure 15: Existing Route 2 (Bhayandar Station to Naka) ...... 21 Figure 16: Existing Route 15 ( Station to Rasmi Complex) ...... 22 Figure 17: Existing Route 16 (Mira Road Station To Laxmi Park) ...... 22 Figure 18: Existing Route 21 (Mira Road Station to Ramdev Park) ...... 23 Figure 19: Existing Route 22 (Mira Road Station to Shanti Vidhya Nagari) ...... 23 Figure 20: Existing Route 24 (Mira Road Station To Western Park) ...... 24 Figure 21: Existing Route 4 (Bhayandar station to Essel World) ...... 24 Figure 22: Existing Route 6 (Uttan Naka to Tar) ...... 25 Figure 23: Existing Route 8 (Uttan Naka to Tar)...... 25 Figure 24: Existing Route 10/10AC (Bhayandar Station to Station) ...... 26 Figure 25: Existing Route 14 (Bhayandar station to Magathane Depo) ...... 26 Figure 26: Existing Route 29 AC/ 29AC (Mira Road Station To Thane Kopari) ...... 27 Figure 27: Existing non-operational Route 5 (Bhayandar Station to Maxus Mall) ...... 27 Figure 28: Existing non-operational Route 20 (Bhayandar Station to Morva) ...... 28 Figure 29: Existing non-operational Route 23 (Bhayandar Station to Royal College) ...... 28 Figure 30: Existing non-operational Route 28 (Mira Road Station to Ideal Park) ...... 29 Figure 31: Existing non-operational Route 3 (Bhayandar Station to Manori Tar) ...... 29 Figure 32: Existing non-operational Route 12 (Bhayandar Station To Magathane Depot) ...... 30 Figure 33: Proposed Route 1 (Bhayandar Station to Chowk Church) ...... 32 Figure 34: Proposed Route 2 (Bhayandar Station to BP Road) ...... 32 Figure 35: Proposed Route 3 (Bhayandar station to Kashmira via Golden nest ) ...... 33 Figure 36: Proposed Route 4 (Bhayandar station to Kashmira via Ghodev) ...... 33 Figure 37: Proposed Route 5 (Bhayandar Station to Navagarh) ...... 34 Figure 38: Proposed Route 7 (Bhayandar Station to Kashmira via Mira Road) ...... 34 Figure 39: Proposed Route 10 (Bhayandar Station To Varsova Bridge) ...... 35 Figure 40: Proposed Route 11 (Mira Road Station to Kashmira) ...... 35 Figure 41: Proposed Route 15 (Mira Road Station to Unique Garden) ...... 36 Figure 42: Proposed Route 16 (Mira Road Station to Oswal Garden)...... 36

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page ii

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Figure 43: Proposed Route 17 (Mira Road Station to Navgarh Phata) ...... 37 Figure 44: Proposed Route 20 (Bhayandar station (W) To Uttan Naka) ...... 37 Figure 45: Proposed Route 21 (Mira Road Station To Ramdev Park)...... 38 Figure 46: Proposed Route 22 (Mira Road Station To Hatkesh) ...... 38 Figure 47: Proposed Route 24 (Mira Road Station To Western Park)...... 39 Figure 48: Proposed Route 23 (Bhakti Vedanata to Naka) ...... 39 Figure 49: Proposed Route 6 (Bhayandar Station to Manori Tar via Gorai) ...... 40 Figure 50: Proposed Route 8 (Uttan Naka to Pagode) ...... 40 Figure 51: Proposed Route 9 (Bhayandar Station to Thane) ...... 41 Figure 52: Proposed Route 12 (Bhayandar Station to Check) ...... 41 Figure 53: Proposed Route 14 (Bhayandar Station to ) ...... 42 Figure 54: Proposed Route 29 (Mira Road Station to Thane) ...... 42 Figure 55: Scenario comparison: Public transport network and developed area coverage ...... 45 Figure 56: Scenario comparison: Proposed Public transport service levels and routes structure ...... 46 Figure 57: Scenario comparison: Proposed Bus supply and Passenger demand (FY2023) ...... 48

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page iii

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 1: List Existing City Bus Routes (February 2020)

Table 1: List of Existing City Bus routes (February 2020) Sr. Route EMME Length Headways (min.) Travel Time No. of City / Sub Daily Description No. no. Code (km) Peak Off Peak (min) Buses urban service Ridership 1 1 MB1 Bhayandar st.(W) to Chowk 14.2 20 20 52 5 City 4812 2 2 MB2 Bhayandar st.(W) to Uttan Naka 10.3 14 14 36 5 City 4462

Mira Road St.(E) to Rasmi Comp.via. s.k.ston 9 15 MB15 4.1 10 10 25 4 City 3604 Bevaly park cine max

Mira Road St.(E) to laxmi Park Tiwari College 10 16 MB16 3.2 8 8 20 5 City 3802 vai Cinemax

Mira Road Station [E] to Ramdev Park Via 11 21 MB21 3.1 14 14 17 3 City 2217 Rasaz Theater Bharati Park Shivar Garden

Mira Road Station [E] to Shanti Vidhya Nagari 12 22 MB22 4.4 13 13 21 4 City 1719 Via Jain Mandir Vijay Park Silver Park

13 24 MB24 Mira Road Station [E] to Western Park 5.7 10 10 29 6 City 6651 3 4 MB4 Bhayandar st.(W) to Essel World 16.1 40 40 41 3 Sub 1680 4 6 MB6 Uttan Naka to Manori Tar 11.6 27 27 39 3 Sub 1975 5 8 MB8 Uttan Naka to Gorai Tar 9.7 30 30 24 2 Sub 173 Bhayandar st.(W) to Thane St. (E) Kopari) Via 6 10 MB10 34.5 23 23 105 8 Sub 4752 W.E.H Majiwada Bhayandar st.(W) to Thane St. (E) Kopari) Via 7 AC 10 MB10AC 34.5 60 60 122 3 Sub 408 W.E.H Majiwada Bhayandar st.( E) to Magathane Depot Via 8 14 MB14 13.5 15 15 64 8 Sub 4586 Kashimira Borivali St (E) 14 29 MB29 Mira Road to Thane Kopari 30.2 28 28 88 5 Sub 2634 15 AC 29 MB29AC Mira Road to Thane Kopari 30.2 70 70 77 2 Sub 368 Source: ETM Data from MBMTU, February 2020

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 4

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 2: Boarding – Alighting and section load for each existing route (one sample trip in peak hour)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 5

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 1: Bhayandar Station (W) - Chowk via Rai Gaon Morva, Uttan and Dongri.

80% passengers are boarding from first 7 bus stops out of 53 bus stops. Uttan Naka stop accounts for 34% and 60% B&A activity in up and down direction respectively. Bhayandar stop accounts for 47% boarding and 33% alighting activities during peak hour. 23 bus stops do not perform any B&A activity in both directions.

Route 1 (Up) Length - 14.2 km ATL - 7.4 km Headway - 30 mn

120 100 70 80 64 60 40 20

No. passengers No. of 0

TARODI

U TURN… U

St. ROCKSt.

KHADAN

TALAVALI

RAI GAON RAI

CHECK POST CHECK

ALKEN PADA ALKEN

SALASAR APT SALASAR

MORVA GAON MORVA

PALICHURCHE

PALIHOSPITAL

MORVA BHAAT MORVA

ANAND NAGAR ANAND

CROSS GARDEN CROSS

TALATHI OFFICE TALATHI

UTTAN MARKET UTTAN

MURDHA GAON MURDHA

BOMBAY MARKET BOMBAY

SADANAND NAGAR SADANAND

UTTAN (ROSARY APT.) (ROSARY UTTAN SAINTNAGAR FRANSIS

Bus stops CHOWK APPA CHIMAJI

CHOWK GAON / CHOWK… / GAON CHOWK

BHAYANDAR STATION (W) STATION BHAYANDAR NETAJI SUBHASHCHANDRA… NETAJI

BHAYANDAR POLICE STATION BHAYANDARPOLICE Boarding Alighting Volume Capacity

Route 1 (Down) Length- 14.2 km ATL - 7.3 km Headway - 30mn 105 120 96 100 80 60 40 20

No. passengers No. of 0

TARODI

U TURN… U

St. ROCKSt.

KHADAN

TALAVALI

RAI GAON RAI

CHECK POST CHECK

ALKEN PADA ALKEN

SALASAR APT SALASAR

MORVA GAON MORVA

PALICHURCHE

PALIHOSPITAL

MORVA BHAAT MORVA

ANAND NAGAR ANAND

CROSS GARDEN CROSS

TALATHI OFFICE TALATHI

UTTAN MARKET UTTAN

MURDHA GAON MURDHA

BOMBAYMARKET

SADANAND NAGAR SADANAND

UTTAN (ROSARY APT.) (ROSARY UTTAN SAINTNAGAR FRANSIS

CHIMAJI APPA CHOWK APPA CHIMAJI Bus stops

CHOWK GAON / CHOWK… / GAON CHOWK

BHAYANDAR STATION (W) STATION BHAYANDAR NETAJI SUBHASHCHANDRA… NETAJI

Boarding Alighting Volume Capacity STATION BHAYANDARPOLICE

Figure 1: Peak hour Boarding & Alighting pattern along with line load of Route 1 (Up and Down)

Two trips are scheduled during peak hour along this route and occupancy levels are greater than 60 passengers during peak hours. The average passenger load is greater than full seating capacity of 42 passengers per bus during peak hour in both directions. Also, the average trip length of passengers on this route is about 7 km indicating that the bus remains crowded for longer distance. In up direction, non-peak hour passenger load is almost half of the peak hour which clearly indicates there is spare seating capacity on the bus through-out the

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 6

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar route during this time period and the fleets are underutilized. This suggests the need for a mechanism to increase bus frequency during the peak periods and reduce the supply during the non-peak hours.

Route no. 2: Bhayandar station. (W) to Uttan Naka via jain mandir, Rai Gaon and Morva

Route 2 (Up) Length - 10.2 km ATL - 6.7 km Headway - 30 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Route 2 (Down) Length - 10.2 km ATL - 7.1 km Headway - 30 mn

80 60 40 20

0 No. passengers No. of

Bus stops

Boarding Alighting Volume Capacity

Figure 2: Peak hour Boarding & Alighting pattern along with line load of Route 2 (Up and Down)

From above figure, it can be seen around 68% of passengers are boarding and alighting at Bhayandar station. All intermediate stops show almost same pattern which is less than 10% boarding. In up and down direction 18 and 22 out of 38 total bus stops respectively, does not perform any BA activity. In up direction, the passenger load is equal to the seating capacity of bus half of the trip, for other half of the trip, passenger load is much less than seating capacity even during peak hour. In down direction, both peak hour and non-peak hour passenger load is same through-out the trip. The maximum load in both the direction is lower than the capacity indicating

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 7

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar the fleet is underutilized even in peak hour. The average trip length of passengers on this route is about 7 km indicating people travels for around 70% of the route length.

Route no. 15: Mira Road St.(E) to Rasmi Comp. via. S.k.Stone, Beverly park and Cinemax

Route 15 (Up) Length - 4.5 km ATL - 2.3 km Headway - 20 mn

80 60 40 20

No. No. passengers of 0

Bus stops

Boarding Alighting Volume Capacity

Route 15 (Down) Length - 4.5 km ATL - 2.2 km Headway - 20 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Figure 3: Peak hour Boarding & Alighting pattern along with line load of Route 15 (Up and Down)

Mira road station accounts for 98% boarding and 82% alighting activities. Only 3 bus stops perform zero BA activity. More than 40 passengers/trip are boarding from the first stop itself in peak hour. The figure shows, the passenger load is near to seating capacity in peak hour and non-peak hour along up direction. In down direction, passenger load is very less than seating capacity of bus even during peak hour. Non-peak hour passenger load is very less and it shows this route needs some updation in bus scheduling.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 8

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 16: Mira Road St.(E) to Laxmi Park Tiwari College vai Cinemax

Route 16 (Up) Length - 4.3 km ATL - 2.3 km Headway - 20 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Route 16 (Down) Length - 4.3 km ATL - 2.5 km Headway - 20 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Figure 4: Peak hour Boarding & Alighting pattern along with line load of Route 16 (Up and Down)

All the bus stops perform BA activities. Mira road station accounts for 91% boarding and 96% alighting activity. Total six trips are running along route 16 during peak hour, as 3 trips in each direction. Average passenger load is near to capacity in both up and down direction during peak hour. Non-peak hour passenger load is having same pattern as peak hour with two by third passengers of peak hour.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 9

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 21: Mira Road Station [E] to Ramdev Park Via Rasaz Theater, Bharati Park and Shivar Garden

Route 21 (Up) Length - 4.5 km ATL - 2.7 km Headway - 20 mn

80 60 40 20

0 No. passengers No. of

Bus stops

Boarding Alighting Volume Capacity

Route 21 (Down) Length - 4.5 km ATL - 2.6 km Headway - 20 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Figure 5: Peak hour Boarding & Alighting pattern along with line load of Route 21 (Up and Down)

Mira road station accounts for 99% boarding and 92% alighting activities. Among 13 bus stops, 5 bus stops do not perform any B&A activity. This route serves short trips as trip length is limited to 4.5 kmand it scheduled a total of six trips during peak hours. The figure shows the passenger load during peak hour is much less than seating capacity of 42 passengers in the bus.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 10

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 22: Mira Road Station [E] to Shanti Vidhya Nagari Via Jain Mandir, Vijay Park and Silver Park

Route 22 (Up) Length - 5.0 km ATL - 2.5 km Headway - 20 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Route 22 (Down) Length - 5.0 km ATL - 2.3 km Headway - 30 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Figure 6: Peak hour Boarding & Alighting pattern along with line load of Route 22 (Up and Down)

80% of passengers are boarding from first four bus stops. Comparatively higher B&A activity is performed by intermediate bus stops. Out of total 17 bus stops, 3 bus stops perform zero B&A activity in up direction and 9 bus stops perform zero B&A activity in down direction. The line load shows the average passenger load is about to fill only half the seating capacity of 42 passengers in the bus. The non-peak hour passengers are even less than peak hour passengers.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 11

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 24: Mira Road Station [E] to Western Park along Mira Bhayandar road via Kashimira

Mira road station accounts for nearly 85% of B&A activity. Kashimira stop act as major transfer point as it accounts for more than 20% of B&A activity. Among 19 bus stops, only 3 bus stops have zero B&A activity and 2 trips are scheduled along up and down direction during peak hour. The figure shows that in both up and down direction, peak hour and non-peak hour passenger load is nearer to seating capacity of bus.

Route 24 (Up) Length - 6.5 km ATL - 3.1 km Headway - 30 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Route 24 (Down) Length - 6.5 km ATL - 3.0 km Headway - 30 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Figure 7:Peak hour Boarding & Alighting pattern along with line load of Route 24 (Up and Down)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 12

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 4: Bhayandar station.(W) to Essel World via Rai Gaon, Morva, Uttan, Gorai and Jui pada

Route 4 (Up) Length - 16.1 km ATL - 7.4 km Headway - 60 mn

80

60

40

20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Route 4 (Down) Length - 16.1 km ATL - 11.6 km Headway - 60 mn

80 60 40 20

No. passengers No. of 0

Bus stops Boarding Alighting Volume Capacity

Figure 8: Peak hour Boarding & Alighting pattern along with line load of Route 4 (Up and Down)

In route 4, major B&A activities are occurring at starting and ending bus stops i.e., Bhayandar station and Pagoda bus stop. Hence, the line load remains almost horizontal along the down trip. In up direction, passenger load is continuously getting reduced. Number of bus stops perform zero activity in up and down direction are 34 and 30 (out of 51 bus stops) respectively. The line load shows, for half of the trip length, peak hour passenger load is higher than seating capacity of 42 passengers. But in down direction, the passenger load is nearer to capacity.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 13

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 6: Uttan Naka to Manori tar via Gorai

Route 6 (Up) Length - 11.6 km ATL - 5.5 km Headway - 30 mn

80 60 40 20

No. passengers No. of 0

VALE

DARGA

SHEFALI

MANORI…

PAKHADI

GAVDEVI…

KULAVEM

MAXWELL

VRUDDHA…

KOLLYACHI…

AMBEDKAR…

KOLI WADA KOLI

HAUDPADA

SAIMAAULI…

RAMRATAN…

CHECK POST CHECK

MANORI TAR MANORI

UTTAN NAKA UTTAN

GORAICROSS

BUDDH WADI BUDDH

GORAIPOLICE…

STELLA MARIS… STELLA

ASHWINWADI

CHAVLY CROSS CHAVLY

GORAI CHRECH GORAI

MAHARASHTRA…

SAAVANT WADI SAAVANT

TALATHI OFFICE TALATHI

SUMLAIE TALAV SUMLAIE

HOTEL SANVERS HOTEL

DOMNIKAWADI BHANDARWADI

UTTAN (ROSARY… UTTAN

VAIRAALA TALAV VAIRAALA MANORI CHURCH MANORI Bus stops

Boarding Alighting Volume Capcity

Route 6 (Down) Length - 11.6 km ATL - 6.4 km Headway - 30 mn

80 60 40 20

No. passengers No. of 0

VALE

DARGA

SHEFALI

MANORI…

PAKHADI

GAVDEVI…

KULAVEM

MAXWELL

VRUDDHA…

KOLLYACHI…

AMBEDKAR…

KOLI WADA KOLI

HAUDPADA

SAIMAAULI…

RAM RATAN… RAM

CHECK POST CHECK

MANORI TAR MANORI

UTTAN NAKA UTTAN

GORAI CROSS GORAI

BUDDH WADI BUDDH

GORAI POLICE… GORAI

STELLA MARIS… STELLA

ASHWINWADI

CHAVLY CROSS CHAVLY

GORAI CHRECH GORAI

MAHARASHTRA…

SAAVANT WADI SAAVANT

TALATHI OFFICE TALATHI

SUMLAIE TALAV SUMLAIE

HOTEL SANVERS HOTEL

BHANDARWADI DOMNIKAWADI

UTTAN(ROSARY…

VAIRAALA TALAV VAIRAALA MANORI CHURCH MANORI

Bus stops

Boarding Alighting Volume Capcity

Figure 9: Peak hour Boarding & Alighting pattern along with line load of Route 6 (Up and Down)

Uttan Naka stop accounts for 56% boarding and 54% alighting activities. All intermediate bus stops, B&A activities are very less except Gorai bus stop. Gorai bus stop accounts for around 25% B&A activity. Nearly 12 bus stops (out of 35 bus stops) perform zero B&A activity in both directions. The line load shows the passenger load is almost uniform throughout the trip, and it is higher than seating capacity even though 4 trips were scheduled along this route during peak hour.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 14

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 8: Uttan Naka to Gorai Tar

Route 8 (Up) TL - 9.7 km ATL - 6.21 Headway - 30mnts

120 100 80 60 40 20

No. passengers No. of 0

VALE

UTTAN

SHEFALI

PAGODA

PAKHADI

MAXWELL

JUEIPADA

GORAI TAR GORAI

RAM RATAN… RAM

UTTAN NAKA UTTAN

GORAI CROSS GORAI

KHAJURI WADI KHAJURI

CHAVLY CROSS CHAVLY

ADIVASHI PADA ADIVASHI

SAAVANT WADI SAAVANT

TALATHI OFFICE TALATHI

HOTEL SANVERS HOTEL

VAIRAALA TALAV VAIRAALA

GAVDEVI MANDIR… GAVDEVI

KOLLYACHI BAVADI KOLLYACHI

VRUDDHA AASRAM VRUDDHA UTTAN (ROSARY APT.) (ROSARY UTTAN

Bus stops STATION POLICE GORAI

ESSAL WORLDPARKING ESSAL

ESSAL WORLDESSALBUS STOP

STELLA MARIS HOSPITAL STELLA MAHARASHTRA JUDICIAL… MAHARASHTRA Boarding Alighting Volume Capacity

Route 8 (Down) TL - 9.7 km ATL - 6.07 km Headway - 30mnts

120 100 80 60 40 20

No. passengers No. of 0

VALE

UTTAN

SHEFALI

PAGODA

PAKHADI

MAXWELL

JUEIPADA

GORAI TAR GORAI

RAM RATAN… RAM

UTTANNAKA

GORAI CROSS GORAI

KHAJURI WADI KHAJURI

CHAVLYCROSS

ADIVASHI PADAADIVASHI

SAAVANT WADI SAAVANT

TALATHI OFFICE TALATHI

HOTEL SANVERS HOTEL

VAIRAALATALAV

GAVDEVI MANDIR… GAVDEVI

KOLLYACHI BAVADI KOLLYACHI

VRUDDHA AASRAM VRUDDHA UTTAN (ROSARY APT.) (ROSARY UTTAN

GORAI POLICE STATION POLICE GORAI Bus stops

ESSAL WORLDPARKING ESSAL

ESSAL WORLDBUS STOP ESSAL

STELLA MARIS HOSPITAL STELLA MAHARASHTRA JUDICIAL… MAHARASHTRA Boarding Alighting Volume Capacity

Figure 10: Peak hour Boarding & Alighting pattern along with line load of Route 8 (Up and Down)

Along route 8, operating buses are midi buses and its maximum capacity is of 45 passengers. The figure above indicates in up direction the number of passengers are same as the capacity and in down direction it is less than capacity. The trip length of passengers on this route is about 6 km indicating that the bus remains crowded for longer distance. Almost 38 stops serves zero boarding and alighting along this route.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 15

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 10: Bhayandar st.(W) to Thane St. (E) Kopari along Mira Bhayandar Road via jain mandir, Maxus mall, Golden Nest, Kashimira and Ghodbunder

Route 10 (Up) Length - 34.5 km ATL - 13.3 km Headway - 60 mn

80 60 40 20

No. No. passengers of 0

OUTSIDE

S K STONE K S

SREENATH…

VALCHNAD…

KASHI MIRA KASHI

OLD PETROL… OLD

SILVERPARK

KASHI GAON KASHI

BHAYANDAR… BHAYANDAR…

PIYUSH PANI PIYUSH

MBMC HEAD… MBMC

JAINMANDIR

MAXUS MALL MAXUS

GOLDENNEST

BALAJI NAGAR… BALAJI

BEVERLY PARK BEVERLY

REGISTRATION…

GHODBANDAR…

PLEGENT PARK PLEGENT

LAKSHMI BAGH LAKSHMI

CROSS GARDEN CROSS

HATKESH/EDEN…

BISHAP SCHOOLBISHAP

SUNDARNAGAR

NAGAR BHAVAN… NAGAR

SHIVARGARDEN

PUNJAB FOUDRY PUNJAB BOMBAY MARKET BOMBAY Bus stops

Boarding Alighting Volume Capacity

Route 10 (Down) Length - 34.5 km ATL - 12.7 km Headway - 60 mn

80 60 40 20

No. passengers No. of 0

OUTSIDE

S K STONE K S

SREENATH…

VALCHNAD…

KASHI MIRA KASHI

OLD PETROL… OLD

SILVERPARK

KASHI GAON KASHI

BHAYANDAR… BHAYANDAR…

PIYUSH PANI PIYUSH

MBMC HEAD… MBMC

JAINMANDIR

MAXUS MALL MAXUS

GOLDENNEST

BALAJI NAGAR… BALAJI

BEVERLY PARK BEVERLY

REGISTRATION…

GHODBANDAR…

PLEGENT PARK PLEGENT

LAKSHMI BAGH LAKSHMI

CROSS GARDEN CROSS

HATKESH/EDEN…

BISHAP SCHOOLBISHAP

SUNDAR NAGAR SUNDAR

NAGAR BHAVAN… NAGAR

SHIVARGARDEN

PUNJAB FOUDRY PUNJAB BOMBAY MARKET BOMBAY Bus stops

Boarding Alighting Volume Capacity

Figure 11: Peak hour Boarding & Alighting pattern along with line load of Route 10 (Up and Down)

This route accounts for long trips; more than 50% passengers are travelling outside. From figure 22, it is clear there is a dip in B&A activity from Nagar Bhavan Nandi Talao to Shivar Garden. Route 10 carries comparatively a smaller number of passengers. Maximum number of passengers between bus stop is 72. B&A survey is done for 29 bus stops inside the study area, among which 13 bus stops serves zero B&A activity. One trip is scheduled during peak hour in each direction along route 10. In up direction, the passenger load is almost double the passenger capacity of bus and almost half during non-peak hour. In down direction, both up and down direction passenger less than the seating capacity of bus.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 16

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 14: Bhayandar st.( E) to Magathane Depot Via Kashimira and Borivali St (E)

Route 14 (Up) TL - 13.5 km ATL - 4.50 km Headway - 15 mnts

80 60 40 20

0 No. passengers No. of

Bus stops

Boarding Alighting Volume Capacity

Route 14 (Down) TL - 13.5 km ATL - 4.30 km Headway - 15 mnts

140 120 100 80 60 40 20

0 No. passengers No. of

Bus stops

Boarding Alighting Volume Capacity

Figure 12: Peak hour Boarding & Alighting pattern along with line load of Route 14 (Up and Down)

Along route 14, occupancy levels are greater than 60 passengers during peak hours. The average passenger load is greater than full seating capacity of 42 passengers per bus during peak hour in both directions. The average trip length is about 4 km. Almost 25 bus stops serves zero boarding and alighting along this route.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 17

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route no. 29: Mira Road to Thane Kopari via Mira Bhayandar Road, Kashimira and Ghodbandar Village

Route 29 (Up) Length - 27.7 km ATL - 15.8 km Headway - 60 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Route 29 (Down) Length - 27.7 km ATL - 13.4 km Headway - 60 mn

80 60 40 20

No. passengers No. of 0

Bus stops

Boarding Alighting Volume Capacity

Figure 13: Peak hour Boarding & Alighting pattern along with line load of Route 29 (Up and Down)

Total trip length of Route 29 is 27.7 km. In up direction, 100% passengers are travelling outside the study area and 80% of passengers are boarding from Mira station and sector 4. In down direction, 77% of people are traveling external to internal out of which 38% of passengers are travelling to end bus stop. Kashimira junction accounts for nearly 30% of trips, i.e., this stop act as a major transfer point along this route. In down direction, 40% of passengers are traveling from external to internal. Five bus stops serve zero B&A activity. In down direction both peak and non-peak hour passenger load is same and is less than the seating capacity of bus.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 18

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Table 2: Route wise performance parameters details Route Avg. trip Route Headway Total Max_Pax Load Dir Description Length Length Peak Hour Type of bus no. (min) B/A load factor (km) (km) U Bhayandar Station (W)-Chimaji Appa Chowk 7.4 82 9 – 10 am 68 Standard 0.97 1 14.2 20 D Chimaji Appa Chowk-Bhayandar Station (W) 7.3 117 6 - 7 am 105 Standard 1.50 U Bhayandar Station (W)-Uttan Naka 6.7 41 8 - 9 am 39 Standard 0.56 2 10.2 14 D Uttan Naka-Bhayandar Station (W) 7.1 62 6 - 7 am 49 Standard 0.70 U Bhayandar Station (W)-Pagoda 7.4 62 5 - 6 pm 54 Standard 0.77 4 16.1 40 D Pagoda-Bhayandar Station (W) 11.6 60 5 - 6 pm 49 Standard 0.70 U Uttan Naka-Manori Tar 5.5 57 7 - 8 pm 35 Midi bus 0.78 6 11.6 27 D Manori Tar-Uttan Naka 6.4 41 7 - 8 pm 36 Midi bus 0.80 U Uttan Naka to Gorai Tar 6.2 56 8 - 9 am 54 Midi bus 1.20 8 9.7 30 D Gorai Tar-Uttan Naka 6.1 43 6 – 7 pm 32 Midi bus 0.71 U Bhayandar Station (W)-Thane (Outside) 13.3 74 9 - 10 am 72 Standard 1.03 10 34.5 23 D Thane (Outside)-Bhayandar Station (W) 12.7 45 11 - 12 pm 30 Standard 0.43 10 U Bhayandar Station (W)-Thane (Outside) 20.2 29 9 - 10 am 29 AC Standard 0.41 34.5 60 (AC) D Thane (Outside)-Bhayandar Station (W) 22.3 6 11 - 12 pm 6 AC Standard 0.09 U Uttan Naka to Gorai Tar 4.5 118 9 – 10 am 70 Standard 1.00 14 13.5 15 D Gorai Tar-Uttan Naka 4.3 150 7 – 8 pm 123 Standard 1.76 U Mira Road Station -Rashmi Complex 2.3 76 10 - 11 am 76 Standard 1.09 15 4.5 10 D Rashmi Complex-Mira Road Station 2.2 44 9 - 10 am 40 Standard 0.57 U Mira Road Station -Kd Empire 2.3 52 7 - 8 pm 49 Standard 0.70 16 4.3 8 D Kd Empire-Mira Road Station 2.5 47 6 - 7 pm 47 Standard 0.67 U Mira Road Station -Kd Empire 2.7 35 9 - 10 am 35 Standard 0.50 21 4.5 14 D Kd Empire-Mira Road Station 2.6 19 9 - 10 am 19 Standard 0.27 U Mira Road Station -Shanti Vidya Nagari 2.5 28 5 - 6 pm 26 Standard 0.37 22 5 13 D Shanti Vidya Nagari-Mira Road Station 2.3 17 7 - 8 pm 17 Standard 0.24 U Mira Road Station -Western Park 3.1 55 6 - 7 pm 50 Standard 0.71 24 6.5 10 D Western Park-Mira Road Station 3 51 6 - 7 pm 46 Standard 0.66 29 U Mira Road Station -Thane (Outside) 21.1 15 9 - 10 am 15 AC Standard 0.21 27.7 28 (AC) D Thane (Outside)-Mira Road Station 23.2 7 11 - 12 pm 7 AC Standard 0.10 U Mira Road Station -Thane (Outside) 15.8 50 9 - 10 am 50 Standard 0.71 29 27.7 70 D Thane (Outside)-Mira Road Station 13.4 39 11 - 12 pm 33 Standard 0.47

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 19

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 3: Alignment of Bus Routes – Business As Usual

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 20

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 1: Bhayandar Station (W) to Chowk Church via Balaji Nagar, Jain Mandir, Murdha, Rai, Morva, Dongri, Keshav Srushti, Manori, Uttan, Mahar Dongri

Figure 14: Existing Route 1 (Bhayandar Station to Chowk Church)

Route 2: Bhayandar Station (W) To Uttan Naka Via Bombay Market, Shivneri, Moarva Gaon, Ice Factory, Check Post

Figure 15: Existing Route 2 (Bhayandar Station to Uttan Naka)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 21

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 15: Mira Road Station (E) To Rasmi Complex Via S.K.Ston, Bevaly Park, Cine Max

Figure 16: Existing Route 15 (Mira Road Station to Rasmi Complex)

Route 16: Mira Road Station (E) To Laxmi Park Via Sector 4, S K Stone, Cinemax, Kd Empire, Tiwari College

Figure 17: Existing Route 16 (Mira Road Station To Laxmi Park)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 22

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 21: Mira Road Station [E] To Ramdev Park Via Sector 4, Rasaz Theater, Shivar Garden, Kd Empire

Figure 18: Existing Route 21 (Mira Road Station to Ramdev Park)

Route 22: Mira Road Station [E] To Shanti Vidhya Nagari Via Sector 4, Jain Mandir, Vijay Park Silver Park, Mangal Nagar

Figure 19: Existing Route 22 (Mira Road Station to Shanti Vidhya Nagari)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 23

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 24: Mira Road Station [E] To Western Park Via Sector 4, MTNL, Plegent Park , Kashi Mira, Green Village

Figure 20: Existing Route 24 (Mira Road Station To Western Park)

Route 4: Bhayandar Station (W) To Essel World Via Bombay Market, Shivneri, Check Post, Maxwell, Gorai Cross, Pagoda

Figure 21: Existing Route 4 (Bhayandar station to Essel World)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 24

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 6: Uttan Naka To Manori Tar Via Stella Maris Hospital, Maxwell, Vale, Kulavem, Domnika Wadi

Figure 22: Existing Route 6 (Uttan Naka to Manori Tar)

Route 8: Uttan Naka to Gorai Tar Via Stella Maris Hospital, Maxwell, Gorai Cross, Essal World Bus Stop, Pagoda

Figure 23: Existing Route 8 (Uttan Naka to Gorai Tar)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 25

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 10/ 10AC: Bhayandar Station (W) To Thane Station (E) Kopari Via Bombay Market, Maxus Mall, Golden Nest, S K Stone, Plegent Park, Kashimira, Varasova Bridge , Kajupada, W.E.H Majiwada

Figure 24: Existing Route 10/10AC (Bhayandar Station to Thane Station)

Route 14: Bhayandar Station (E) To Magathane Depo Via Golden Nest, S K Stone, Plegent Park, Kashimira, Dahisar Checkpost, Borivali St (E)

Figure 25: Existing Route 14 (Bhayandar station to Magathane Depo)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 26

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 29/ 29AC: Mira Road Station (E) To Thane Kopari Via Sector 4, S K Stone, Plegent Park, Kashi Mira, Lakshmi Bagh, Varasova Bridge, Kaju Pada

Figure 26: Existing Route 29 AC/ 29AC (Mira Road Station To Thane Kopari)

Route 5: Bhayandar Station [W] To Maxus Mall Via Balaji Nagar (Union Bank), Bombay Market, Jain Mandir, Registration Office

Figure 27: Existing non-operational Route 5 (Bhayandar Station to Maxus Mall)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 27

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 20: Bhayandar Station [W] To Morva Via Bombay Market, Cross Garden, Bhayandar Police Station, Murdha Khadi, Rai Gaon, Shivneri

Figure 28: Existing non-operational Route 20 (Bhayandar Station to Morva)

Route 23: Bhayandar Station [E] To Royal College Vai Ghoddev Naka, Indralok, Golden Nest, Lakshmi Park, Mira Road Station, Poonam Sagar Complex

Figure 29: Existing non-operational Route 23 (Bhayandar Station to Royal College)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 28

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 28: Mira Road Station To Ideal Park Via Sector 4, Rasaj Cinema, Old Petrol Pump, Sreenath Complex

Figure 30: Existing non-operational Route 28 (Mira Road Station to Ideal Park)

Route 3: Bhayandar Station (W) To Manori Tar Via Bombay Market, Shivneri, Check Post, Maxwell, Gorai Cross, Kulavem, Koli Wada

Figure 31: Existing non-operational Route 3 (Bhayandar Station to Manori Tar)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 29

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 12: Bhayandar Station (E) To Magathane Depot Via Golden Nest, Holy Cross School, Mira Road Station, Poonam Sagar Complex, Dahisar Checkpost, Devipada Borivali Station

Figure 32: Existing non-operational Route 12 (Bhayandar Station To Magathane Depot)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 30

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 4: Alignment of Proposed Bus Routes– Alternative Scenario 2

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 31

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 1: Bhayandar Station (W) to Chowk Church via Balaji Nagar, Jain Mandir, Murdha, Rai, Morva, Dongri, Keshav Srushti, Manori, Uttan, Mahar Dongri

Figure 33: Proposed Route 1 (Bhayandar Station to Chowk Church)

Route 2: Bhayandar Station (W) to BP Road via Khare gaon, Maxus Mall, Cross Garden, Bombay market

Figure 34: Proposed Route 2 (Bhayandar Station to BP Road)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 32

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 3: Bhayandar station (W) to Kashmira via Balaji Nagar (Union Bank), Cross Garden ,Golden Nest, Pleasant Park Depot

Figure 35: Proposed Route 3 (Bhayandar station to Kashmira via Golden nest )

Route 4: Bhayandar station (W) to Kashmira via Ghodev, S K Stone, Pleasant Park, Silver Park

Figure 36: Proposed Route 4 (Bhayandar station to Kashmira via Ghodev)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 33

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 5: Navaghar Phata to Bhayandar Police Station (W) via BP Road via, Maxus Mall, Balaji Nagar (Union Bank), Bombay Market

Figure 37: Proposed Route 5 (Bhayandar Station to Navagarh)

Route 7: Bhayandar Station (E) To Kashmira Via Mira Road, Apna Bazar , Plegent Park

Figure 38: Proposed Route 7 (Bhayandar Station to Kashmira via Mira Road)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 34

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 10: Bhayandar Station (E) To Varsova Bridge Via Kashimira, Kharegaon, Golden Nest, S K Stone, Pleasant Park Depot, Kasigaon,

Figure 39: Proposed Route 10 (Bhayandar Station To Varsova Bridge)

Route 11: Mira Road Station (W) to Kashmira Via Cross Garden, Golden Nest, Pleasant Park Depot

Figure 40: Proposed Route 11 (Mira Road Station to Kashmira)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 35

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 15: Mira Road Station (E) To Unique Garden Via Sector 4, Sheetal Garden Cinemax, Gaurav Residency

Figure 41: Proposed Route 15 (Mira Road Station to Unique Garden)

Route 16: Mira Road Station (E) to Oswal Garden Via Sector 4, Cinemax, Lakshmi Park, Ram Nagar

Figure 42: Proposed Route 16 (Mira Road Station to Oswal Garden)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 36

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 17: Mira Road Station (E) To Navgarh Phata Via Sector 4, Golden Nest, Indralok Phase 2, Salasar Nagar

Figure 43: Proposed Route 17 (Mira Road Station to Navgarh Phata)

Route 20: Bhayandar station (W) To Uttan Naka Via Navghar Naka, Aazad Nagar , Maxus Mall, Rai Gaon, Shivneri

Figure 44: Proposed Route 20 (Bhayandar station (W) To Uttan Naka)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 37

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 21: Mira Road Station To Ramdev Park Via Rasaj Cinema, N.H.School, Ram Nagar, Woodland Hotel

Figure 45: Proposed Route 21 (Mira Road Station To Ramdev Park)

Route 22: Mira Road Station To Hatkesh Via Sector 4, Poonam Complex, Silver Park

Figure 46: Proposed Route 22 (Mira Road Station To Hatkesh)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 38

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 24: Mira Road Station To Western Park Via Sector 4, Hatkesh, Kashi Gaon, Green Village

Figure 47: Proposed Route 24 (Mira Road Station To Western Park)

Route 23: Bhakti Vedanata to Navghar Naka via Poonam Sagar Complex, Mira Road Station ,Sheetal Garden, Ram Nagar

Figure 48: Proposed Route 23 (Bhakti Vedanata to Navghar Naka)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 39

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 6: Bhayandar Station (W) to Manori Tar via Raigaon, Dongri, Uttan Naka, Check post, Gorai, Domnikawadi

Figure 49: Proposed Route 6 (Bhayandar Station to Manori Tar via Gorai)

Route 8: Uttan Naka to Pagode via Maxwell, Gorai, Essal World

Figure 50: Proposed Route 8 (Uttan Naka to Pagode)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 40

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 9: Bhayandar Station (E) to Thane via Kharegaon, Kd Empire, Varsova Brideg, Kajupada

Figure 51: Proposed Route 9 (Bhayandar Station to Thane)

Route 12: Bhayandar Station (E) to Dahisar Check Via Aazad Naga, Mira Road Station, Poonam Sagar Complex, Ganesh Mandir

Figure 52: Proposed Route 12 (Bhayandar Station to Dahisar Check)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 41

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Route 14: Bhayandar Station (W) To Borivali (E) Via Bombay Market, Cross Garden, Golden Nest, S K Stone, Pleasant Park Depot, Dahisar Check post

Figure 53: Proposed Route 14 (Bhayandar Station to Borivali)

Route 29: Mira Road Station To Thane Via Poonam Sagar Complex, Silver Park, Varasova Bridge, Kajupada

Figure 54: Proposed Route 29 (Mira Road Station to Thane)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 42

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 5: Evaluation of Proposed Network Scenarios

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 43

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

1. Evaluation of Proposed Network Scenarios

Evaluation Framework was prepared and has been used for comparative analysis of the three scenarios. Each scenario has been evaluated at three levels, i.e. supply indicators and Service Level Benchmark (SLB) criteria by MoUHA.

1.1 Supply Indicators

The following table shows the evaluation of the three scenarios with respect to supply characteristics - public transport network and area coverage, service headways, fleet size requirements, high frequency network coverage. Assessment year has been considered as 2023.

Table 3: Scenario evaluation based on supply analysis Indicators BAU Scenario_1 Scenario_2 No. of routes 21 39 22 No. of routes with headway <=10 min 3 (14%) 5 (13%) 11 (50%) No. of routes with headway <=15 min (& >10min) 6 (29%) 4 (10%) 11 (50%) No. of routes with headway <=20 min (& >15min) 2 (10%) 18 (46%) 0 No. of routes with headway >20 min 10 (48%) 12 (31%) 0 PT Network length - km 96 105 111 PT network length (km) <=10 min 9 (10%) 16 (15%) 82.8 (74%) PT network length (km) <=15 min 30 (31%) 8 (8%) 28.9 (26%) PT network length (km) <=20 min 4 (4%) 61 (58%) 0 PT network length (km) >20 min 54 (56%) 19 (18%) 0 Developed area coverage 20 (91%) 20.7 (94%) 20.8 (94%) Accessibility to PT service FY2023 Population served total PT network within 500mt. 12,31,285 12,84,819 12,47,474 % Population served total PT network within 500mt. 92% 96% 93% % population served with high frequency service (<=10min) 27% 50% 90% Total number of PT stops served 274 285 336 No of PT stops with effective <=10min bus route 100 (36%) 188 (65%) 258 (77%) (Stops with avg. 5min waiting time) Fleet size (On road) 79 190 234

The maps below show the spatial network and area coverage.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 44

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

BAU scenario Scenario 1 Scenario 2

Figure 55: Scenario comparison: Public transport network and developed area coverage

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 45

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

BAU scenario Scenario 1 Scenario 2

Figure 56: Scenario comparison: Proposed Public transport service levels and routes structure

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 46

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

1.2 Model Outputs

The PT model outputs were also used to compare the four scenarios. The analysis has been undertaking for the year 2023 where about 30% shift from IPT is assumed. The purpose of this exercise is only to see how different scenarios perform with the same demand. However detail demand analysis has been conducted in Business Plan section.

It can be seen from the table below that average trip length is about 3.7 km. with such trip lengths and looking at city structure, for such a short trip length transfers becomes very critical. Scenario 2 offers less transfer compared to BAU and Scenario 1. Scenario 3 also scores well marginally compared to BAU and Scenario1.

Table 4: Bus procurement phasing plan – Scenario 2 BAU Scenario 1 Scenario 2 Total PT demand assigned (FY2023) 1,45,191 1,45,191 1,45,191 Demand not served by PT 1,686 65 0 Total Boarding in system 2,22,700 2,29,346 1,90,422 Transfer rate 1.53 1.58 1.31 Avg. trip length per passenger 3.81 3.72 3.70

The figures below show the bus supply and demand on the network. Scenario 2 seems to have better distribution of flows rather than it getting concentrated on Mira road.

1.3 Service Level Benchmark

In addition to the above, MoHUA’s Service Level Benchmark indicators for urban public transport have been used to evaluate the scenarios. Scenario 2 performs better with respect to waiting time, fleet size and service coverage levels. The outputs are shown in the table below.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 47

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Existing scenario Scenario 1 Scenario 2

Figure 57: Scenario comparison: Proposed Bus supply and Passenger demand (FY2023)

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 48

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Table 5: Scenario Evaluation based on SLB indicators – Scenario 2 Service Service Level Benchmark BAU Scenario 1 Scenario 2 Standards

1 Presence of Organized Public Transport System in Urban Area (%) Total number of buses operating on road (a) 79 190 234 >=60% 1 Total number of buses under the ownership of STU/SPV or under concession agreement (b) 79 190 234 40-60% 2 Presence of Organized Public Transport System in Urban Area(%)=(b/a)*100 100% 100% 100% 20-40% 3 SLB levels obtained 1 1 1 <20% 4 2 Extent of supply availability of public transport No. of Buses available in a city on any day (a) 79 190 234 >0.4 1 Total Population of the study area (b) - FY 2023 Population 13,38,353 13,38,353 13,38,353 0.25-0.4 2 Availability of Public transport/1000 population= (a/b)*1000 0.06 0.14 0.17 0.1-0.25 3 SLB levels obtained 4 3 3 <0.1 4 3 Service Coverage of Public Transport in Study Area Total length in road km of the corridor on which public transport system ply in the study area (in km) (a) 57 69 116.26 >=1 1 (Corridors along which the service frequency is one hour or less are only consider compute the length) Total study area (Sq.km) (b) --> Total road network length in the study area (km) 197 197 197 0.7-1 2 Service coverage =(a/b) 0.3 0.4 0.6 0.3-0.7 3 SLB levels obtained 3 3 3 <0.3 4 4 Average Waiting time for Public Transport Users (min) <=4 1 Waiting time for headway 6.1 4.6 2.5 4-8 2 Calculate the average waiting time of passenger for each route as half of the average 8-12 3 headway for that particular route. SLB levels obtained 2 2 1 >12 4

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 49

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 6: Proposed routes frequency and fleet requirement for fleet mix scenarios

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 50

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Table 6: Proposed Routes frequency and fleet requirement for fleet mix scenarios 1A 1B 2A 2B 3 4 5 LF - 60% Standard PPHPD - All PPHPD - All LF - 60% All LF - 60% All LF - 60% Standard + LF - 60% Midi + + Standards Midi Standard Midi Midi Mini Route EMME Midi + Mini No code No of No of on- Peak No of on- Peak No of Peak No of Peak No of Peak Peak No Peak Fleet Fleet on- Fleet raod head- raod head- on-raod head- on-raod head- on-raod head head of head- type type raod type buses way buses way buses way buses way buses way way buses way buses 1 MB1 83 2 139 1 20 8 33 5 Midi 33 5 Midi 33 5 Midi 33 5 2 MB45 22 4 36 2 5 17 8 11 Midi 8 11 Mini 16 5 Mini 16 5 3 MB51 4 28 8 14 1 114 2 57 Midi 2 57 Mini 3 38 Mini 3 37 4 MB11 3 29 6 15 1 87 1 87 Midi 1 87 Mini 3 29 Mini 3 31 5 MB47 3 33 3 33 1 100 1 100 Midi 1 100 Mini 1 100 Mini 1 73 6 MB12 14 7 24 4 3 34 6 17 Midi 6 17 Mini 11 9 Mini 11 9 7 MB32 81 1 136 1 22 4 37 2 Stan 22 4 Midi 37 2 Stan 22 4 8 MB5 3 26 5 15 1 77 2 38 Midi 2 38 Mini 4 19 Mini 4 19 9 MB38 11 4 18 3 2 23 4 11 Midi 4 11 Mini 8 6 Mini 8 6 10 MB37 22 4 35 2 3 27 6 14 Midi 6 14 Mini 11 7 Mini 11 8 11 MB34 15 5 25 3 4 19 7 11 Midi 7 11 Mini 13 6 Mini 13 6 12 MB46 10 8 18 4 3 25 5 15 Midi 5 15 Mini 9 8 Mini 9 9 13 MB36 4 16 7 9 1 65 1 65 Midi 1 65 Mini 2 33 Mini 2 27 14 MB40 7 8 11 5 2 27 3 18 Midi 3 18 Mini 6 9 Mini 6 9 15 MB42 34 3 57 2 6 17 10 10 Midi 10 10 Midi 10 10 Midi 10 10 16 MB39 18 4 32 2 6 13 9 9 Midi 9 9 Midi 9 9 Midi 9 8 17 MB6 76 2 127 1 22 9 37 5 Midi 37 5 Midi 37 5 Midi 37 5 18 MB30 3 25 5 15 1 75 2 38 Midi 2 38 Mini 5 15 Mini 5 17 19 MB31 49 5 82 3 11 22 19 13 Midi 19 13 Mini 36 7 Mini 36 7 20 MB33 19 4 33 2 5 14 9 8 Midi 9 8 Midi 9 8 Midi 9 8 21 MB41 63 3 100 2 11 17 18 10 Midi 18 10 Midi 18 10 Midi 18 10 22 MB21 131 2 213 1 34 6 56 4 Midi 56 4 Midi 56 4 Midi 56 4

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 51

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Annexure 7: Operating cost estimates, revenue estimation, operating ratio and load factor for fleet mix scenarios

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 52

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Table 7: Operating cost estimates, revenue estimation, operating ratio and load factor for fleet mix scenarios Cost (by component) per Km Total Total Total Cost of Revenue Operational Operational Operating Ratio Insurance Fund - Total (with ITMS Cost of CPKM (with Total Annual Cost (inc. Cost (w/o (Revenue/ Op.Cost Load Built Up R & M + MVT + Staff (Expected Miscellaneous No of Concession Fuel Cost Operating Depreciation depreciation Veh. Km Depr & Cost Depr & Cost w/o Depr & Cost of Factors Cost MACT + Cost returns Cost Buses & Cost - Total and Interest) of fund) of fund) fund) RR Tax and Discount) (in crore) (in crore) Interests) (in crore) Scenario 1A: Demand based (PPHPD) - All Standard buses FY2023 33.13 15.20 1.63 21.23 0.81 7.42 7.12 4.19 90.73 1,27,60,400 162 116 97 21 0.22 0.12 FY2024 34.48 14.63 2.12 21.86 0.49 9.76 8.77 4.45 96.55 2,26,66,500 285 219 177 36 0.20 0.12 FY2025 37.13 15.98 2.12 22.73 0.50 9.76 7.36 4.55 100.14 2,26,66,500 285 227 188 68 0.36 0.20 FY2026 39.31 16.38 2.29 24.62 0.32 10.59 8.17 4.81 106.50 3,88,68,850 509 414 341 97 0.28 0.17 FY2027 42.34 17.89 2.29 25.61 0.33 10.59 6.65 4.93 110.62 3,88,68,850 509 430 363 132 0.36 0.20 FY2028 44.82 18.34 2.41 26.63 0.29 11.17 6.66 5.09 115.41 4,81,87,300 631 556 470 150 0.32 0.18 FY2029 48.29 20.03 2.41 27.69 0.29 11.17 5.33 5.23 120.45 4,81,87,300 631 580 501 195 0.39 0.20 FY2030 51.12 20.54 2.41 28.80 0.26 11.17 5.33 5.36 125.00 5,66,66,250 743 708 615 203 0.33 0.18 Totals/ Average 112.52 28,88,71,950 3,250 2,752 901 0.33 0.17

Scenario 1B: Demand based (PPHPD) - All Midi buses FY2023 21.54 12.70 1.01 21.12 0.58 4.57 4.39 3.19 69.10 1,83,85,050 233 127 111 21 0.19 0.12 FY2024 20.13 12.54 1.19 21.81 0.33 5.48 4.92 3.20 69.60 3,57,62,700 449 249 212 36 0.17 0.12 FY2025 21.53 13.70 1.19 22.68 0.34 5.48 4.13 3.29 72.34 3,57,62,700 449 259 224 68 0.30 0.20 FY2026 21.78 13.68 1.25 24.62 0.22 5.77 4.45 3.39 75.16 6,31,30,400 827 474 410 97 0.24 0.17 FY2027 23.29 14.93 1.25 25.61 0.23 5.77 3.62 3.48 78.17 6,31,30,400 827 493 434 132 0.30 0.20 FY2028 23.88 15.04 1.29 26.63 0.20 5.96 3.55 3.53 80.07 7,99,20,400 1047 640 564 150 0.27 0.18 FY2029 25.51 16.42 1.29 27.69 0.20 5.96 2.84 3.64 83.56 7,99,20,400 1047 668 597 195 0.33 0.20 FY2030 27.01 16.84 1.29 28.80 0.18 5.96 2.84 3.73 86.65 9,40,24,000 1232 815 732 203 0.28 0.18 Totals/ Average 79.25 47,00,36,050 3,725 3,284 901 0.27 0.17

Scenario 2A: All Standard Buses - 60%LF in 2030 FY2023 33.71 16.19 0.99 21.50 1.43 4.39 4.21 3.96 86.37 70,51,800 91 61 55 17 0.31 0.18 FY2024 35.08 15.58 1.67 22.05 1.15 7.65 6.85 4.32 94.36 90,66,600 115 86 72 20 0.28 0.17 FY2025 37.78 17.02 1.67 22.94 1.18 7.65 5.75 4.44 98.43 90,66,600 115 89 77 29 0.38 0.21 FY2026 40.00 17.45 2.01 24.62 0.95 9.24 6.78 4.75 105.79 1,16,69,050 153 123 105 36 0.34 0.20 FY2027 43.10 19.05 2.01 25.61 0.97 9.24 5.45 4.88 110.30 1,16,69,050 153 129 112 46 0.41 0.23 FY2028 44.82 18.34 2.41 26.63 0.99 11.17 6.00 5.09 115.45 1,17,53,000 154 136 116 50 0.43 0.25 FY2029 48.29 20.03 2.41 27.69 1.02 11.17 4.77 5.23 120.62 1,17,53,000 154 142 123 63 0.51 0.26 FY2030 52.05 21.87 2.41 28.80 0.89 11.17 5.03 5.47 127.70 1,38,51,750 182 177 154 65 0.42 0.23 Totals/ Average 109.71 8,58,80,850 942 814 326 0.40 0.22

Scenario 2B: All Midi Buses - 60%LF in 2030 FY2023 26.29 14.71 0.67 21.40 1.19 2.95 2.83 3.36 73.41 84,78,950 109 62 57 19 0.33 0.20 FY2024 22.58 13.46 1.03 21.95 0.80 4.68 4.23 3.29 72.01 1,33,48,050 169 96 84 27 0.32 0.22 FY2025 24.20 14.69 1.03 22.83 0.82 4.68 3.55 3.39 75.20 1,33,48,050 169 100 89 45 0.51 0.33 FY2026 23.29 14.22 1.17 24.62 0.59 5.34 4.02 3.44 76.69 1,94,76,400 255 149 131 61 0.46 0.32 FY2027 24.93 15.53 1.17 25.61 0.61 5.34 3.25 3.54 79.97 1,94,76,400 255 156 139 81 0.58 0.38 FY2028 23.88 15.04 1.29 26.63 0.58 5.96 3.25 3.53 80.16 2,09,03,550 274 168 148 91 0.61 0.43 FY2029 25.51 16.42 1.29 27.69 0.60 5.96 2.57 3.64 83.68 2,09,03,550 274 175 157 117 0.75 0.46 FY2030 27.27 17.93 1.29 28.80 0.56 5.96 2.50 3.79 88.09 2,32,54,150 305 205 185 122 0.66 0.43 Totals/ Average 79.83 13,91,89,100 1,111 992 563 0.57 0.35

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 53

Service and Business Plan for City Bus Operations for Mira Bhayandar and Chandigarh Final Report (Volume II - Annexure) – Mira Bhayandar

Cost (by component) per Km Total Total Total Cost of Revenue Operational Operational Operating Ratio Insurance Fund - Total (with ITMS Cost of CPKM (with Total Annual Cost (inc. Cost (w/o (Revenue/ Op.Cost Load Built Up R & M + MVT + Staff (Expected Miscellaneous No of Concession Fuel Cost Operating Depreciation depreciation Veh. Km Depr & Cost Depr & Cost w/o Depr & Cost of Factors Cost MACT + Cost returns Cost Buses & Cost - Total and Interest) of fund) of fund) fund) RR Tax and Discount) (in crore) (in crore) Interests) (in crore) Scenario 3: Standard & Midi Buses - 60%LF in 2030 FY2023 27.28 15.13 0.70 21.41 1.23 3.07 2.95 3.44 75.20 82,27,100 105 62 57 19 0.33 0.20 FY2024 23.78 13.64 1.09 21.96 0.83 4.97 4.48 3.39 74.14 1,27,60,400 161 95 83 27 0.32 0.22 FY2025 25.50 14.90 1.09 22.84 0.85 4.97 3.77 3.49 77.41 1,27,60,400 161 99 88 45 0.52 0.33 FY2026 24.88 14.61 1.25 24.62 0.62 5.71 4.30 3.57 79.56 1,85,52,950 243 148 129 61 0.47 0.32 FY2027 26.66 15.95 1.25 25.61 0.63 5.71 3.48 3.68 82.97 1,85,52,950 243 154 137 81 0.59 0.38 FY2028 25.65 15.32 1.39 26.63 0.61 6.40 3.50 3.67 83.16 1,98,12,200 260 165 145 91 0.63 0.43 FY2029 27.44 16.73 1.39 27.69 0.63 6.40 2.76 3.78 86.81 1,98,12,200 260 172 154 117 0.76 0.46 FY2030 29.35 18.26 1.39 28.80 0.59 6.39 2.68 3.93 91.38 2,19,94,900 288 201 181 122 0.67 0.43 Totals/ Average 82.62 13,24,73,100 1,095 973 563 0.58 0.35

Scenario 4: Midi & Mini Buses - 60%LF in 2030 FY2023 26.02 13.83 0.58 21.40 1.19 2.53 2.43 3.26 71.23 84,78,950 109 60 56 20 0.35 0.23 FY2024 21.55 11.68 0.92 21.92 0.69 4.17 3.81 3.09 67.82 1,55,30,750 196 105 93 31 0.34 0.26 FY2025 23.08 12.75 0.92 22.80 0.71 4.17 3.21 3.19 70.82 1,55,30,750 196 110 99 57 0.58 0.41 FY2026 22.45 12.17 1.01 24.62 0.54 4.64 3.45 3.22 72.10 2,17,43,050 285 157 139 79 0.57 0.45 FY2027 24.02 13.29 1.01 25.61 0.55 4.64 2.78 3.31 75.21 2,17,43,050 285 164 147 106 0.72 0.53 FY2028 23.10 12.61 1.11 26.63 0.52 5.11 2.78 3.29 75.15 2,39,25,750 314 180 161 120 0.75 0.60 FY2029 24.68 13.77 1.11 27.69 0.53 5.11 2.18 3.38 78.45 2,39,25,750 314 188 170 156 0.92 0.65 FY2030 26.37 15.03 1.11 28.80 0.47 5.11 2.29 3.53 82.71 2,81,23,250 369 233 212 162 0.77 0.58 Totals/ Average 75.23 15,90,01,300 1,196 1,077 732 0.68 0.46

Scenario 5: Standard, Midi & Mini Buses - 60%LF in 2030 FY2023 26.72 14.11 0.60 21.41 1.22 2.62 2.51 3.31 72.50 83,11,050 107 60 56 20 0.36 0.23 FY2024 22.83 11.90 0.94 21.94 0.78 4.30 3.90 3.18 69.78 1,36,83,850 173 95 84 31 0.37 0.28 FY2025 24.48 12.99 0.94 22.82 0.80 4.30 3.28 3.28 72.90 1,36,83,850 173 100 89 57 0.63 0.44 FY2026 23.71 12.39 1.07 24.62 0.55 4.92 3.77 3.32 74.35 2,10,71,450 276 157 138 79 0.57 0.44 FY2027 25.39 13.53 1.07 25.61 0.56 4.92 3.06 3.42 77.56 2,10,71,450 276 163 147 106 0.73 0.53 FY2028 24.51 12.73 1.18 26.63 0.53 5.43 3.05 3.39 77.45 2,30,86,250 303 179 159 120 0.76 0.60 FY2029 26.22 13.90 1.18 27.69 0.55 5.43 2.40 3.49 80.85 2,30,86,250 303 187 169 156 0.93 0.65 FY2030 28.02 15.17 1.17 28.80 0.49 5.43 2.46 3.63 85.17 2,71,15,850 355 231 210 162 0.77 0.57 Totals/ Average 77.56 15,11,10,000 1,172 1,052 732 0.70 0.47

All costs are at constant prices taking base year of 2020.

CoE-UT, CRDF, CEPT University, KL Campus, University Road, Navrangpura, Ahmedabad-380009, India Page 54