MARCH /APRIL: 2021 the BANKS the BANKS PROJECT MAR/APR MONTHLY REPORT the Banks Public Partnership’S Phase IIIB Construction Progress Kept Pace in March and April
Total Page:16
File Type:pdf, Size:1020Kb
MARCH /APRIL: 2021 THE BANKS THE BANKS PROJECT MAR/APR MONTHLY REPORT The Banks Public Partnership’s Phase IIIB construction progress kept pace in March and April. n Public Parties infrastructure crews worked on completing the Race Street Corridor (turnaround and stairs), acquiring a temporary certificate of occupancy for expanded parking, and adding sports turf to the ICON Music Center’s event lawn. The ICON Music Center construction focused on interior details as the project moved even closer to completion. n Officials announced plans for a alkW of Fame to honor local Black music icons to be constructed near the ICON Music Center. The Banks bars, restaurants, and entertainment venues celebrated the opening of DORA (Designated Outdoor Refreshment Area). n As a focal point of the 85-acre DORA site, transformation of Freedom Way between Joe Nuxhall Way and Marian Spencer Way into a public plaza began with installation of gateway bollards and planters. n Opening Day attracted baseball fans to Great American Ball Park, Freedom Way’s DORA, and to The Banks businesses. With the Ohio River reaching 56.9' in March, parts of Smale Riverfront Park and the Ohio River Walk experienced high water for several days. Paul Brown Stadium served as a COVID-19 Vaccination site in April. COVER—Crews lay sports turf to form the outdoor event lawn at ICON Music Center. THIS PAGE—Workers form the Race Street turnaround in front of the ICON Music Center. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 2 PROJECT PILLARS ECONOMIC INCLUSION, SAFETY, BUDGET, AND SCHEDULE ECONOMIC INCLUSION SAFETY Public Parties construction safety SMALL BUSINESS ENTERPRISE (SBE) PARTICIPATION 2008–21 hours for all phases from January 1, 50 2008 through April 30, 2021. 40 CONSTRUCTION SAFETY HRS 2008–21 30 15 20 GOAL PERCENTAGE 30% ACTUAL 12 29.9% 10 GOAL ACTUAL 10% 13.3% 9 OVERALL PROFESSIONAL SERVICES 1,124,704.25 6 932,017 HOURS 100,000 HOURS 100,000 HOURS 3 CONTRACTOR FEES 2008–21 21 PUBLIC PARTIES DEVELOPER 18 15 BUDGET 12 The Public Parties project work $18,963,402 9 remained within budget. MILLIONS OF DOLLARS 6 PHASE IIIB BUDGET $6,029,309 3 40 PAID TO SBE CONTRACTORS PAID TO DBE CONTRACTORS 35 30 25 20 $36.4 MILLION $30.9 MILLION 15 (84.8%) Percentage of workforce living MILLIONS OF DOLLARS within the 26-county Consolidated 10 Metropolitan Statistical Area* 5 0 * There are no local residency participation 89.1 %0 goals for the project. TOTAL BUDGET EXPENDED SCHEDULE All Public Parties Combined Minority and Women Disadvantaged Business work remained Workforce Participation Enterprise (DBE) on schedule. 0 100 %0 Female: 0.25% Goal/participation varied by Minority: 15.85% project, between 4% and 9%. Additional Budget information: http://thebankspublicpartnership.com/wp-content/uploads/budget-marapr2021.pdf Additional Economic Inclusion information: http://thebankspublicpartnership.com/wp-content/uploads/economic-inclusion-marapr2021.pdf 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 3 COMMUNICATIONS 484 MEDIA 23,200 comment-altMENTIONS mobile-alt IMPRESSIONS 40 @IBackTheBanks TWEETS twitter 1,628 FOLLOWERS thumbs-up934 ENGAGEMENTS Additional Media Information Further details are available here: http://thebankspublicpartnership.com/wp-content/uploads/media-summary-marapr2021.pdf * Impressions equals the number of times users saw the tweet on Twitter. ‡ Engagements is the total number of times users have interacted with a tweet, including retweets, replies, follows, and likes. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 4 PUBLIC PARTNERSHIP Workers complete the Race Street stairs from Mehring Way up to the Race Street terminus. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 5 Central Riverfront Garage workers prepare for a late spring opening. Great American Ball Park limited Opening Day attendance to comply with COVID guidelines. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 6 Fans gathered along Freedom Way to watch the Reds on the video screen. Crews work to create the future phased expansion of The elevator head house east of the Race Street stairs Smale Riverfront Park. offers access to the ICON Music Center plaza. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 7 DEVELOPER The Designated Outdoor Refreshment Area (DORA) opened in March. Workers built temporary barriers to close Freedom Way East (from Joe Nuxhall Way to Marian Spencer Way) to vehicular traffic, allowing patrons to move freely within the DORA boundaries with beverages in specially marked cups. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 8 Posters presented the footprint and rules to help guide patrons around the DORA. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 9 Crews mask windows and rails in preparation for painting the exterior of Current at The Banks apartment building. The entire building will be painted, giving Current at The E&O Kitchen prepares its new space at the corner of Race Street Banks a new look. and Freedom Way. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 10 Officials announced plans for a Walk of Fame to honor local Black music icons to be constructed near the ICON Music Center. Construction of ICON’s interior stage and seating prepares Workers lay down pavers to form ICON’s entrance plaza. the Music Center for booked concerts beginning in September 2021. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 11 PARKS With a river level over 56 feet, the Smale Park Adventure Play took on water in March, creating a reflective pool at the end of the slide. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 12 A photographer captures the beauty of the spring flower beds at Smale Park. The Ohio River Walk is a popular feature bordering Smale Riverfront Park. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 13 Future expansion of Smale Park takes shape with the addition of trees. Smale Park is the perfect background for a ‘selfie’. Smale Riverfront Park sports colorful flower beds for all to enjoy. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 14 WHAT’S NEXT E&O Kitchen will prepare to occupy its space at the corner of Freedom Way and Race Street. Central Riverfront Garage extension and new entrances will open to the public in late spring. Smale Riverfront Park’s expansion will complete ICON’s outdoor entertainment ICON’s interior finishes will area. Additional greenspace will be complete the Music Center’s completed in future phases. stage and concert seating. 2021 THE BANKS PROJECT: MARCH/APRIL MONTHLY REPORT 15 For more information: Phil Beck, AIA, LEED AP Project Executive The Banks Project (513) 946-4434 www.thebankspublicpartnership.com Published 5/20/21.