Appendices: Appraisal of Sustainability Site Report for Bradwell
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Alexander Macdonald Call: 2001
Alexander MacDonald Call: 2001 "Very bright, charming and diligent" Chambers & Partners 2019 Practice Profile Alexander specialises in all areas of commercial law practised at 7KBW, particularly international arbitration, energy, insurance and reinsurance, shipping and private international law. He is recommended in the legal directories as a leading junior in the fields of Commercial Litigation, International Arbitration, Insurance and Reinsurance, and Shipping. The Legal 500 describes him as ‘one of the stars of the Bar’. Alexander won Insurance Junior of the Year in the Chambers Bar Awards 2018 and Shipping Junior of the Year in the Legal 500 2019 Awards. He was also nominated for International Arbitration Junior of the Year in the Legal 500 2018 Awards. In recent years Alexander has been involved in a number of complex and high profile commercial disputes. Amongst other things, he is acting for a number of insurers in the US$1.2 billion claim brought by SBM in connection with the Yme MOPUstor project, and for the Owners in the B Atlantic dispute, which was heard by the Supreme Court in March 2018. He has also been involved in insurance and reinsurance disputes (many of them in arbitration) relating to Madoff, large- scale buy-to-let mortgage fraud, the Christchurch II earthquake, the Deepwater Horizon oil spill, pensions mis-selling and parallel lotteries. Alexander is equally comfortable being instructed on his own, or working as part of a large counsel and solicitor team. He appears in all tiers of the English courts, and has acted in a wide range of arbitrations, including under ICC, UNCITRAL, LCIA, LMAA, GAFTA and RSA terms. -
Digest of United Kingdom Energy Statistics 2017
DIGEST OF UNITED KINGDOM ENERGY STATISTICS 2017 July 2017 This document is available in large print, audio and braille on request. Please email [email protected] with the version you require. Digest of United Kingdom Energy Statistics Enquiries about statistics in this publication should be made to the contact named at the end of the relevant chapter. Brief extracts from this publication may be reproduced provided that the source is fully acknowledged. General enquiries about the publication, and proposals for reproduction of larger extracts, should be addressed to BEIS, at the address given in paragraph XXVIII of the Introduction. The Department for Business, Energy and Industrial Strategy (BEIS) reserves the right to revise or discontinue the text or any table contained in this Digest without prior notice This is a National Statistics publication The United Kingdom Statistics Authority has designated these statistics as National Statistics, in accordance with the Statistics and Registration Service Act 2007 and signifying compliance with the UK Statistics Authority: Code of Practice for Official Statistics. Designation can be broadly interpreted to mean that the statistics: ñ meet identified user needs ONCEñ are well explained and STATISTICSreadily accessible HAVE ñ are produced according to sound methods, and BEENñ are managed impartially DESIGNATEDand objectively in the public interest AS Once statistics have been designated as National Statistics it is a statutory NATIONALrequirement that the Code of Practice S TATISTICSshall continue to be observed IT IS © A Crown copyright 2017 STATUTORY You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. -
BGS Report, Single Column Layout
INDUSTRIAL CARBON DIOXIDE EMISSIONS AND CARBON DIOXIDE STORAGE POTENTIAL IN THE UK Report No. COAL R308 DTI/Pub URN 06/2027 October 2006 Contractor British Geological Survey Keyworth Nottingham NG12 5GG United Kingdom Tel: +44 (0)115 936 3100 By S. Holloway C.J. Vincent K.L. Kirk The work described in this report was carried out under contract as part of the DTI Carbon Abatement Technologies Programme. The DTI programme is managed by Future Energy Solutions. The views and judgements expressed in this report are those of the contractor and do not necessarily reflect those of the DTI or Future Energy Solutions First published 2006 © DTI 2006 Foreword This report is the product of a study by the British Geological Survey (BGS) undertaken for AEA Technology plc as part of agreement C/07/00384/00/00. It considers the UK emissions of carbon dioxide from large industrial point sources such as power stations and the potential geological storage capacity to safely and securely store these emissions. Acknowledgements The authors would like to thank the UK DTI for funding the work, and Dr Erik Lindeberg of Sintef Petroleum Research for provision of a programme to calculate the density of CO2. Contents Foreword.........................................................................................................................................i Acknowledgements.........................................................................................................................i Contents...........................................................................................................................................i -
Corporate Responsibility Report 2007 Corporate Responsibility Report 2007
Corporate Responsibility Report 2007 Corporate Responsibility Report 2007 Index Page number Welcome 2 Performance Summary 2007 3 Managing our Responsibilities Our Approach 6 Governance 7 Environment 8 Stakeholder Engagement 11 Scope 12 Benchmarking and Recognition 13 Our 12 Impacts 15 Provision of Energy 16 Health and Safety 25 Customer Experience 35 Climate Change and Emissions to Air 43 Waste and Resource Use 52 Biodiversity 62 Sites, Siting and Infrastructure 70 Employment Experience 75 Customers with Special Circumstances 88 Community 94 Procurement 107 Economic 113 Assurance Statement 116 Page 1 of 118 www.scottishpower.com/CorporateResponsibility.asp Corporate Responsibility Report 2007 Welcome 2007 was a landmark year for our business with the successful integration of ScottishPower and IBERDROLA. The new enlarged IBERDROLA Group ended 2007 as one of the worlds largest electricity companies by market capitalisation. Through the friendly integration, now successfully completed, we have reinforced our shared commitment to Corporate Responsibility. Our reporting year has been aligned to IBERDROLA so going forward we will be working on a calendar year basis. Achieving Scottish Business in the Community Large Company of the Year in 2007 was an important endorsement for ScottishPowers work and to our commitment to environmental and social issues. During 2007, we have announced significant investments in sustainable generation projects and environmental technologies; increased our 2010 target for delivery of wind energy projects in the UK to 1,200 MW and established partnerships that will help secure Scotlands place as the world leader in marine energy. In addition, we announced the UKs largest energy crop project and embarked on a major study into cleaner coal generation. -
Extended Phase 1 Habitat Survey
Site Reference Client Name Extended Phase 1 Habitat Survey Roydon Marina Phase II, Roydon for: Roydon Mill Lodges LLP SHF.202.004.EC.R.001.A Roydon Mill Marina Phase II Roydon Mill Lodges LLP Contact Details: Enzygo Ltd. tel: +44 [0]114 231 5151 Samuel House mob: +44 [0]7545 206 122 5 Fox Valley Way email: [email protected] Stocksbridge www.enzygo.com Sheffield. S36 2AA Roydon Marina Phase II, Roydon Project: Roydon Marina Phase II: Extended Phase 1 Habitat Survey For: Roydon Mill Lodges LLP Status: FINAL Date: July 2015 Author: Diane Wood – Senior Ecologist MCIEEM Reviewer: Paul Beswick – Technical Director Disclaimer: This report has been produced by Enzygo Limited within the terms of the contract with the client and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. Enzygo Limited Registered in England No. 6525159 Registered Office Stag House Chipping Wotton‐Under‐Edge Gloucestershire GL12 7AD SHF.202.004.EC.R.001.A Page | ii March 2016 Contents Contents ....................................................................................................................... 2 Executive Summary ..................................................................................................... -
Modified UK National Implementation Measures for Phase III of the EU Emissions Trading System
Modified UK National Implementation Measures for Phase III of the EU Emissions Trading System As submitted to the European Commission in April 2012 following the first stage of their scrutiny process This document has been issued by the Department of Energy and Climate Change, together with the Devolved Administrations for Northern Ireland, Scotland and Wales. April 2012 UK’s National Implementation Measures submission – April 2012 Modified UK National Implementation Measures for Phase III of the EU Emissions Trading System As submitted to the European Commission in April 2012 following the first stage of their scrutiny process On 12 December 2011, the UK submitted to the European Commission the UK’s National Implementation Measures (NIMs), containing the preliminary levels of free allocation of allowances to installations under Phase III of the EU Emissions Trading System (2013-2020), in accordance with Article 11 of the revised ETS Directive (2009/29/EC). In response to queries raised by the European Commission during the first stage of their assessment of the UK’s NIMs, the UK has made a small number of modifications to its NIMs. This includes the introduction of preliminary levels of free allocation for four additional installations and amendments to the preliminary free allocation levels of seven installations that were included in the original NIMs submission. The operators of the installations affected have been informed directly of these changes. The allocations are not final at this stage as the Commission’s NIMs scrutiny process is ongoing. Only when all installation-level allocations for an EU Member State have been approved will that Member State’s NIMs and the preliminary levels of allocation be accepted. -
160314 08A Future Direction of the Residual Waste Treatment
Appendices Appendix 1 – Key Planning considerations The Site The Site covers an area of around 5.6 hectares, is currently owned by Tarmac (previously Lafarge Aggregates Ltd) and is an existing industrial site with planning permission to operate an asphalt coating plant, an aggregates railhead and a ready- mixed concrete plant. Aggregates are primarily brought into the Site via the rail siding which forms part of the Site. Road access to the Site is via Ratty’s Lane. Ratty’s Lane leads to the A10 Dinant Link Road via Essex Road. The Site is bordered to the south by Rye House Power Station. The River Lee borders the site to the east and north. A railway line (which serves the rail siding within the site) borders the western site boundary and runs north east to south west. The Site is situated in the eastern part of a heavily industrialised area to the east of the town of Hoddesdon. There is parkland to the east of the Site, with agricultural land beyond this. Parkland and some light industrial premises are located to the north of the Site beyond the River Lee, with light industry to the west and residential properties beyond this. Parkland, light industry, the River Lee and residential properties are situated to the south of the Site. Approximately 100m to the north of the boundary of the Site, beyond the railway line and across the River Lee, is Rye House Kart Club track. Rye House Speedway Stadium lies further to the north, approximately 300m from the boundary of the Site. -
Sustainability Summary 2012
Contents 1. Introduction 1 5. Social 46 Welcome 2 Highlights 47 About this Summary 3 Our Workplace 48 Our Year in Summary - Highlights 4 Overview & Management Approach 48 About Us 7 Performance 50 Stakeholder Engagement 8 Employee Health, 50 Safety & Wellbeing Benchmarking & Recognition 10 Learning & Development 53 2. Governance 11 Employee Benefits 55 How We Manage CSR 16 Employee Relations 57 3. Economic 17 Our Marketplace 58 Highlights & Management Approach 18 Overview & Management Approach 58 Performance 19 Performance 59 Key Financial Results 19 Our Markets 59 Investment 20 Pricing & Product Innovation 59 Energy Prices & Regulation 21 Sales & Marketing 61 4. Environment 22 Customer Information 61 Highlights 23 Customer Service 62 Policy, Organisation 23 Social Programmes 66 & Management System Plant Reliability & 70 Management Focus on 25 Energy Security Environmental Indicators Supply Chain 71 Performance 28 Our Communities 74 Materials 28 Overview & Management Approach 74 Energy 28 Performance 77 Water 30 Project Development 77 Biodiversity 31 Community Investment 78 Emissions, Effluents 40 & Wastes Community Programmes 78 Volunteering & Fundraising 86 Cancer Research UK 88 Introduction 1 Welcome Welcome to ScottishPower’s Sustainability Summary 2012. 1,200MW East Anglia ONE offshore wind development, in partnership with Vattenfall, provide the potential to As part of the Iberdrola Group our generate green energy on a significant scale by 2020. focus is on building a strong and At the same time as pioneering these new, large-scale technologies, we are repowering two of our oldest commercially successful business, and smallest windfarms in Cornwall and Lancashire with sustainability at the heart of our with modern turbines, to improve their efficiency and output. -
Authority Monitoring Report (AMR) Contains Information About the Extent to Which the Council’S Planning Policy Objectives Are Being Achieved
Appendix 1 AUTHORITY MONITORING REPORT 2016 December 2016 Spatial Policy Colchester Borough Council Rowan House 33 Sheepen Road Colchester Essex CO3 3WG [email protected] www.colchester.gov.uk The maps in this document contain Ordnance Survey data reproduced with © Crown copyright and database rights 2014 Ordnance Survey 100023706. All references to the county of Essex are to Essex as it is currently constituted i.e. without the unitary authorities of Southend-on-Sea and Thurrock. All references to ‘Colchester’ refer to Colchester Borough unless stated otherwise, e.g. Colchester town. 1. INTRODUCTION Background to the Report 1.1 This Authority Monitoring Report (AMR) contains information about the extent to which the Council’s planning policy objectives are being achieved. The report covers the period from 1 April 2015 to 31 March 2016. Introduction 1.2 The Localism Act removed the requirement for local planning authorities to produce an annual monitoring report for Government, but it did retain an overall duty to monitor planning policies. Authorities can now choose which targets and indicators to include in their monitoring reports as long as they are in line with the relevant UK and EU legislation. Their primary purpose is to share the performance and achievements of the Council’s planning service with the local community. The monitoring report also needs to demonstrate how councils are meeting the requirement to cooperate with other authorities on strategic issues. The format of this AMR accordingly was revised and shortened last year to reflect the greater flexibility allowed for these reports and to present a more concise summary of key indicators. -
GRAIN LNG IMPORTATION FACILITY National Grid Grain LNG Limited Environmental Impact Assessment Volume 3 Non Technical Summary
GRAIN LNG IMPORTATION FACILITY National Grid Grain LNG Limited Environmental Impact Assessment Volume 3 Non Technical Summary Grain LNG Phase 3 Expansion June 2006 National Grid Grain LNG Limited Phase 3 Non Technical Summary Isle of Grain GRAIN LNG IMPORTATION FACILITY National Grid Grain LNG Limited Environmental Impact Assessment Volume 3 Non Technical Summary Nitrogen Facility June 2006 Prepared by: Environmental Perspectives 24 Bruton Place London W1J 6NE T: 020 7529 1530 F: 020 7491 9654 Non Technical Summary June 2006 i GLNG – Phase 3 National Grid Grain LNG Limited Phase 3 Non Technical Summary Isle of Grain NON TECHNICAL SUMMARY This document is the Non Technical Summary of the Environmental Statement (ES) prepared by Environmental Perspectives on behalf of National Grid Grain LNG Ltd. to accompany the planning application submission for the Grain LNG Phase 3 Grain LNG Importation Facility upgrade (the “proposed development” ). INTRODUCTION National Grid Grain LNG Ltd. (the “Applicant’ ”) is seeking full planning permission and other consents, licenses and permissions to construct additional Liquefied Natural Gas (LNG) importation facilities at the Grain LNG Importation Facility, on the Isle of Grain, Kent. The Phase 3 proposed development comprises the following elements: • Demolition of the existing Jetty 8; • Construction of new jetty approach and jetty head (New Jetty 8); • Construction of a short section of above ground LNG pipeline; • Construction of 2 LNG storage tanks, and vaporisers, compressors and other processing equipment; and • Construction of a Nitrogen facility. THE SITE The application site is located at the eastern end of the Hoo Peninsula, on the north bank of the Medway Estuary, on the Isle of Grain, near Rochester in Kent. -
Annex D Major Events in the Energy Industry
Annex D Major events in the Energy Industry 2018 Energy Prices In February 2018 the Domestic Gas and Electricity (Tariff Cap) Bill was introduced to Parliament, which will put in place a requirement on the independent regulator, Ofgem, to cap energy tariffs until 2020. It will mean an absolute cap can be set on poor value tariffs, protecting the 11 million households in England, Wales and Scotland who are currently on a standard variable or other default energy tariff and who are not protected by existing price caps. An extension to Ofgem’s safeguard tariff cap was introduced in February 2018 which will see a further one million more vulnerable consumers protected from unfair energy price rises. Nuclear In June 2018 the Government announced a deal with the nuclear sector to ensure that nuclear energy continues to power the UK for years to come through major innovation, cutting-edge technology and ensuring a diverse and highly-skilled workforce. Key elements include: • a £200 million Nuclear Sector Deal to secure the UK’s diverse energy mix and drive down the costs of nuclear energy meaning cheaper energy bills for customers; • a £32 million boost from government and industry to kick-start a new advanced manufacturing programme including R&D investment to develop potential world-leading nuclear technologies like advanced modular reactors; • a commitment to increasing gender diversity with a target of 40% women working in the civil nuclear sector by 2030. 2017 Energy Policy In October 2017 the Government published The Clean Growth Strategy: Leading the way to a low carbon future, which aims to cut emissions while keeping costs down for consumers, creating good jobs and growing the economy. -
Britain's Best Park” in 2009 and Best Local Authority Floral Display in Anglia in Bloom 2010
Introduction Colchester: Britain’s First City Colchester is very proud to declare that our city status bid has been produced by the people of the Borough in co-operation with Colchester Borough Council. The initiative for the bid came from the town’s independent community interest company ‘Destination Colchester’ and has been supported by councillors, local businesses, organisations and voluntary groups. We gratefully acknowledge the assistance of the following: Ben Locker & Associates for copywriting Tonic Creative Solutions for cover design Mailboxes etc for printing and presentation Darius Laws for video production Everyone involved donated their services for free in the interests of our ancient town, of which we are very proud. Front cover photography: Colchester Panorama by Rodger Tamblyn Colchester Castle by Reeve Banks Photography firstsite by Reeve Banks Photography Colchester: Britain’s Oldest Recorded Town and First City Colchester: the town with the city outlook Colchester at a glance Colchester’s history may have shaped its streets and its skyline, but we haven’t let ourselves be shackled by it – it - Britain’s first city and Roman capital - A 2,000 year military tradition and home to gives us confidence in our past and belief in our future. a respected 21stt century garrison We’re proud of our town and our borough and we enjoy - An international centre since classical times sharing it with visitors, businesses, students and the growing - Strong royal links throughout medieval and numbers of new people who move here to work and live, modern times making a positive contribution to our wider society. - More architectural continuity than any We absorb the best of what new influences can teach and other town in England share with us – and our outlook is the more generous for it.