H 7209 State of Rhode Island
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
A Fisherman-Scientist Collaboration to Re-Assess Lobster Nurseries in Narragansett Bay After Two Decades of Environmental Change
A Fisherman‐Scientist Collaboration to Project objectives: (1) Repeat a comprehensive diver‐based visual and suction sampling survey of Re‐assess Lobster Nurseries in lobster nurseries in Narragansett Bay and Rhode Island’s outer coast that had Narragansett Bay After Two Decades of been conducted by the same method in 1990 during a time of historically hig h lbtlobster abdbundance. Environmental Change (2) Deploy passive cobble‐filled post‐larval collectors at the same sites, thereby enabling side‐by‐side comparisons of the two methods. Richard Wahle (UMaine School of Marine Sciences), (3) Expand the survey using both methods to locations selected by the fishing Lanny Dellinger (RI Lobstermen’s Association) , industry. Undertake a hydrographic survey of mid‐summer conditions at the Scott Olszewski (RI Division of Fish and Wildlife) surface and bottom within lobster nursery habitat. 1990 2011 2012 2011 2012 Figure 1. Lobster densities (n/m2) and size composition from diver‐based visual quadrat surveys in 1990, 2011, 2012. 6 6 1990 Figure 3. Lobster densities (n/m2) and 2011 Collectors 2012 Collectors 20 2011 20 2012 4 4 20 size composition from passive collectors Frequency 2 Frequency 2 quency 10 10 10 (above) deployed in 2011 and 2012. Red ee N = 182 N = 60 Fr N =25 symbols denote young‐of‐year, and blue 0 0 0 0 0 1‐year‐old lobsters. 0 102030405060708090100 0 102030405060708090100 0 102030405060708090100 0 102030405060708090100 0 102030405060708090100 Carapace Length (mm) Carapace Length (mm) Carapace length (mm) Dissolved Salinity (psu) Te mpe r atur e (oC) pH Oxygen (mg L‐1) 1990 2011 2012 28 29 30 31 32 10 15 20 25 30 468107.6 7.8 8 8.2 Popasquash Surface Surface Mt. -
Geological Survey
imiF.NT OF Tim BULLETIN UN ITKI) STATKS GEOLOGICAL SURVEY No. 115 A (lECKJKAPHIC DKTIOXARY OF KHODK ISLAM; WASHINGTON GOVKRNMKNT PRINTING OFF1OK 181)4 LIBRARY CATALOGUE SLIPS. i United States. Department of the interior. (U. S. geological survey). Department of the interior | | Bulletin | of the | United States | geological survey | no. 115 | [Seal of the department] | Washington | government printing office | 1894 Second title: United States geological survey | J. W. Powell, director | | A | geographic dictionary | of | Rhode Island | by | Henry Gannett | [Vignette] | Washington | government printing office 11894 8°. 31 pp. Gannett (Henry). United States geological survey | J. W. Powell, director | | A | geographic dictionary | of | Khode Island | hy | Henry Gannett | [Vignette] Washington | government printing office | 1894 8°. 31 pp. [UNITED STATES. Department of the interior. (U. S. geological survey). Bulletin 115]. 8 United States geological survey | J. W. Powell, director | | * A | geographic dictionary | of | Ehode Island | by | Henry -| Gannett | [Vignette] | . g Washington | government printing office | 1894 JS 8°. 31pp. a* [UNITED STATES. Department of the interior. (Z7. S. geological survey). ~ . Bulletin 115]. ADVERTISEMENT. [Bulletin No. 115.] The publications of the United States Geological Survey are issued in accordance with the statute approved March 3, 1879, which declares that "The publications of the Geological Survey shall consist of the annual report of operations, geological and economic maps illustrating the resources and classification of the lands, and reports upon general and economic geology and paleontology. The annual report of operations of the Geological Survey shall accompany the annual report of the Secretary of the Interior. All special memoirs and reports of said Survey shall be issued in uniform quarto series if deemed necessary by tlie Director, but other wise in ordinary octavos. -
2018-2020 Category 5 Waters 303(D) List of Impaired Waters
2018-2020 Category 5 Waters 303(d) List of Impaired Waters Blackstone River Basin Wilson Reservoir RI0001002L-01 109.31 Acres CLASS B Wilson Reservoir. Burrillville TMDL TMDL Use Description Use Attainment Status Cause/Impairment Schedule Approval Comment Fish and Wildlife habitat Not Supporting NON-NATIVE AQUATIC PLANTS None No TMDL required. Impairment is not a pollutant. Fish Consumption Not Supporting MERCURY IN FISH TISSUE 2025 None Primary Contact Recreation Not Assessed Secondary Contact Recreation Not Assessed Echo Lake (Pascoag RI0001002L-03 349.07 Acres CLASS B Reservoir) Echo Lake (Pascoag Reservoir). Burrillville, Glocester TMDL TMDL Use Description Use Attainment Status Cause/Impairment Schedule Approval Comment Fish and Wildlife habitat Not Supporting NON-NATIVE AQUATIC PLANTS None No TMDL required. Impairment is not a pollutant. Fish Consumption Not Supporting MERCURY IN FISH TISSUE 2025 None Primary Contact Recreation Fully Supporting Secondary Contact Recreation Fully Supporting Draft September 2020 Page 1 of 79 Category 5 Waters Blackstone River Basin Smith & Sayles Reservoir RI0001002L-07 172.74 Acres CLASS B Smith & Sayles Reservoir. Glocester TMDL TMDL Use Description Use Attainment Status Cause/Impairment Schedule Approval Comment Fish and Wildlife habitat Not Supporting NON-NATIVE AQUATIC PLANTS None No TMDL required. Impairment is not a pollutant. Fish Consumption Not Supporting MERCURY IN FISH TISSUE 2025 None Primary Contact Recreation Fully Supporting Secondary Contact Recreation Fully Supporting Slatersville Reservoir RI0001002L-09 218.87 Acres CLASS B Slatersville Reservoir. Burrillville, North Smithfield TMDL TMDL Use Description Use Attainment Status Cause/Impairment Schedule Approval Comment Fish and Wildlife habitat Not Supporting COPPER 2026 None Not Supporting LEAD 2026 None Not Supporting NON-NATIVE AQUATIC PLANTS None No TMDL required. -
RI DEM/Water Resources
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Water Resources WATER QUALITY REGULATIONS July 2006 AUTHORITY: These regulations are adopted in accordance with Chapter 42-35 pursuant to Chapters 46-12 and 42-17.1 of the Rhode Island General Laws of 1956, as amended STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Water Resources WATER QUALITY REGULATIONS TABLE OF CONTENTS RULE 1. PURPOSE............................................................................................................ 1 RULE 2. LEGAL AUTHORITY ........................................................................................ 1 RULE 3. SUPERSEDED RULES ...................................................................................... 1 RULE 4. LIBERAL APPLICATION ................................................................................. 1 RULE 5. SEVERABILITY................................................................................................. 1 RULE 6. APPLICATION OF THESE REGULATIONS .................................................. 2 RULE 7. DEFINITIONS....................................................................................................... 2 RULE 8. SURFACE WATER QUALITY STANDARDS............................................... 10 RULE 9. EFFECT OF ACTIVITIES ON WATER QUALITY STANDARDS .............. 23 RULE 10. PROCEDURE FOR DETERMINING ADDITIONAL REQUIREMENTS FOR EFFLUENT LIMITATIONS, TREATMENT AND PRETREATMENT........... 24 RULE 11. PROHIBITED -
Estimated Water Use and Availability in the Pawtucket and Quinebaug
Estimated Water Use and Availability in the Pawtuxet and Quinebaug River Basins, Rhode Island, 1995–99 By Emily C. Wild and Mark T. Nimiroski Prepared in cooperation with the Rhode Island Water Resources Board Scientific Investigations Report 2006–5154 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior DIRK KEMPTHORNE, Secretary U.S. Geological Survey P. Patrick Leahy, Acting Director U.S. Geological Survey, Reston, Virginia: 2007 For product and ordering information: World Wide Web: http://www.usgs.gov/pubprod Telephone: 1-888-ASK-USGS For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment: World Wide Web: http://www.usgs.gov Telephone: 1-888-ASK-USGS Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this report. Suggested citation: Wild, E.C., and Nimiroski, M.T., 2007, Estimated water use and availability in the Pawtuxet and Quinebaug River Basins, Rhode Island, 1995–99: U.S. Geological Survey Scientific Investigations Report 2006–5154, 68 p. iii Contents Abstract . 1 Introduction . 2 Purpose and Scope . 2 Previous Investigations . 2 Climatological Setting . 6 The Pawtuxet River Basin . 6 Land Use . 7 Pawtuxet River Subbasins . 7 Minor Civil Divisions . 17 The Quinebaug River Basin . 20 Estimated Water Use . 20 New England Water-Use Data System . -
Glacial Geology and Aquifer Characteristics of the Big River Area, Central Rhode Island
U.S. Department of the Interior Stone and Dickerman U.S. Geological Survey Glacial Geology and Aquifer — Characteristics of the GLACIAL Big River Area, Central GEOLOGY Rhode Island AND AQUIFER CHARACTERISTICS OF By JANET RADWAY STONE and DAVID C. DICKERMAN Water-Resources Investigations Report 01-4169 MASSACHUSETTS RHODE ISLAND CONNECTICUT THE BIG RIVER Big River Study Area AREA, CENTRAL RHODE ISLAND Prepared in cooperation with the RHODE ISLAND WATER RESOURCES BOARD — WRIR 01-4169 U.S. Department of the Interior U.S. Geological Survey Glacial Geology and Aquifer Characteristics of the Big River Area, Central Rhode Island By JANET RADWAY STONE and DAVID C. DICKERMAN Water-Resources Investigations Report 01-4169 Prepared in cooperation with the RHODE ISLAND WATER RESOURCES BOARD Northborough, Massachusetts 2002 U.S. DEPARTMENT OF THE INTERIOR GALE A. NORTON, Secretary U.S. GEOLOGICAL SURVEY Charles G. Groat, Director For additional information write to: Copies of this report can be purchased from: Subdistrict Chief U.S. Geological Survey Massachusetts-Rhode Island District Branch of Information Services U.S. Geological Survey Box 25286 Water Resources Division Denver, CO 80225-0286 10 Bearfoot Road Northborough, MA 01532 or visit our Web site at http://ma.water.usgs.gov CONTENTS Introduction ........................................................................................................................................................................... 1 Acknowledgments...................................................................................................................................................... -
Water Supply Impoundment
FINAL DETERMINATION OF THE U.S. ENVIRONMENTAL PROTECTION AGENCY'S ASSISTANT ADMINISTRATOR FOR WATER PURSUANT TO SECI'ION 404(c) OF THE CLEAN WATER ACT CONCERNING THE PROPOSED BIG RIVER WATER SUPPLY IMPOUNDMENT KENT COUNTY, RHODE ISLAND March 1, 1990 d section m(cj of the lean Water ~ct(33 U.S.C.Section IZSI et seq.) provider that, if the Administrator of the U.S. Environmental Protection Agency (EPA) determines, after notice and opportunity for public hearing, that unacceptable adverse effects on municipal water supplies, shellfish beds, fishery areas (including spawning and breeding areas), wildlife, or recreational areas will result from the discharge of dredged or £illmaterial, he may exercise his authority to withdraw or prohibit the specification, or deny, restrict or withdraw the use for spec~ficatian,of any defined area as a disposal site for dredged or fill material. The Section 404(c) regulations state that, before making such a determination, the Administrator must consult with the Chief of the Army Corps of Engineers (Corps), the property owner(,), and the applicant where there has been an application for a Section 404 permit. The procedures for - implementation of Section 404(c) are set forth in the Code of Federal Regulations, 40 CFR Part 231. EPA's regulations for implementing Section 404(c) establish procedures to be followed in exercising the Administrator's authority pursuant to that Section. Three major steps in the process are: 1) the Regional Administrator's proposed decision to withdraw, deny, restrict or prohibit the use of a site (Proposed Determination); 2) the Regional Administrator's recommendation to the Administrator towithdraw, deny, restrict or prohiit the use of a site (Recommended Determination); and 3) the Administrator's final decision to affirm, mod@, or rescind the Regional recommendation (Final Determination). -
West Greenwich, Rhode Island: a Preliminary Report
Historic and Architectural Resources of West Greenwich, Rhode Island: A Preliminary Report RIHPC LIBRARY -- STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS * PRELIMINARY SURVEY REPORT TOWN OF WEST GREENWICH * OCTOBER 1978 RHODE ISLAND HISTORICAL PRESERVATION COMMISSION 150 BENEFIT STREET, PROVIDENCE, RHODE ISLAND 02903 I. un. I I PREFACE The Rhode Island Historical Preservation Commission, established by the General Assembly in 1968, is charged with the reponsibi1ity of safeguarding Rhode Island’s cultural heritage. In order to provide an overview of the physical record of this heritage, the Commission has initiated a "broadbrush" or preliminary planning survey of the rural and suburban towns of the state. The purpose of this initial inventory is to identify and record properties ofhistoric and architectural significance in each town. Presently, archeological resources are treated through a separate survey effort being conducted by the Commission. The preliminary surveys are designed to provide a catalogue of non-renewable cultural resources needed for a variety of planning purposes at the local, state and national levels. They identify sites, districts and structures eligible for nomination to the National Register of Historic Places Wand they become the basis for establishing preservation planning priorities basedon problems and po.tentials.discovéred as part of the survey process. * The preliminary surveys are accomplished by driving all public rights-of-way in a given town and noting on large-scale United States Geological Survey maps or other maps that may he more appropriate each building or ite of particulEr architectural, visual, cultural or historic significance. Each property is photographed and recorded on a standard data * *u .* 11.11: sheet which includes a physical description and notations con cerning history, use, condition and architectural ‘style or period. -
State of Rhode Island
2002 -- H 7056 AS AMENDED ======= LC01814 ======= STATE OF RHODE ISLAND IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 2002 ____________ A N A C T RELATING TO REDISTRICTING OF THE GENERAL ASSEMBLY Introduced By: Representatives Aiken, San Bento, Fleury, and Rabideau Date Introduced: January 29, 2002 Referred To: House Judiciary It is enacted by the General Assembly as follows: 1 SECTION 1. Sections 22-1-1 and 22-1-2 of the General Laws in Chapter 22-1 entitled 2 "Composition of Senate" are hereby repealed. 3 22-1-1. Composition of senate. -- Commencing on the first Tuesday in January 1993, the 4 senate shall consist of the lieutenant governor and fifty (50) senators, one (1) senator being 5 elected from each of the senatorial districts into which the state is divided in section 22-1-2. 6 22-1-2. Districts. -- The state is hereby divided into fifty (50) senatorial districts each of 7 which shall be comprised of the United States census tracts and blocks as hereinafter set forth and 8 each of which shall appear as depicted and bounded on the maps compiled from United States 9 Census Bureau information which are attached hereto and which are hereby made a part of this 10 chapter. 11 Thirty nine (39) of such maps are denominated "TIGER * Plot, compiled by Election 12 Data Services, Inc." for each city and town, and hereinafter may be referred to as TIGER map. 13 Six (6) of such maps, are denominated "Final House Plan-E" or "Final House Plan" for 14 house districts, and five (5) of such maps are denominated "Final Senate Plan-E" or "Final Senate 15 Plan" for senate districts. -
Dam Safety Program
STATE OF RHODE ISLAND 2009 Annual Report to the Governor on the Activities of the DAM SAFETY PROGRAM Overtopping earthen embankment of Creamer Dam (No. 742), Tiverton Department of Environmental Management Prepared by the Office of Compliance and Inspection TABLE OF CONTENTS HISTORY OF RHODE ISLAND’S DAM SAFETY PROGRAM....................................................................3 STATUTES................................................................................................................................................3 GOVERNOR’S TASK FORCE ON DAM SAFETY AND MAINTENANCE .................................................3 DAM SAFETY REGULATIONS .................................................................................................................4 DAM CLASSIFICATIONS..........................................................................................................................5 INSPECTION PROGRAM ............................................................................................................................7 ACTIVITIES IN 2009.....................................................................................................................................8 UNSAFE DAMS.........................................................................................................................................8 INSPECTIONS ........................................................................................................................................10 High Hazard Dam Inspections .............................................................................................................10 -
2021 EGYC Annual Regatta Sailing Instructions
Sailing Instructions EGYC Annual Regatta Saturday July 10, 2021 1.0 RULES The East Greenwich Yacht Club Annual Race will be governed by the 2021-2024 The Racing Rules of Sailing, The International Regulations for Preventing Collisions at Sea, these sailing instructions, the Notice of Race and any amendments. This is a “club” event with other Yacht Club or Sailing Association members invited to participate. All yachts, in addition to all federally required equipment, shall have a VHF radio aboard and shall keep radio energized on the Race Committee working channel VHF channel 69 from her warning signal until her “finish”. Additionally, the Race Committee shall continuously monitor VHF Ch. 13, “Ship to Ship”. The Narragansett Bay race area, with its East and West passages and approaches to Providence and Fall River, are considered a “restricted channel” for commercial traffic and vessels in the navigation channel, restricted in their ability to maneuver. Sailors must comply with the International COLREGS when in such proximity to commercial or privileged marine traffic. Yachts who obstruct the safe passage of commercial traffic are subject to protest under The Racing Rules of Sailing. A violation under this instruction shall be considered a violation of rule 2. The Race Committee or Protest Committee, upon the report of information or observation of an incident shall protest a yacht. This is in addition to the requirements of rule 60.2 (a) and the preamble to Part 2. 2.0 NOTICES 2.1 Fleet Radio Channel - The East Greenwich Yacht Club Annual Regatta official FLEET CHANNEL is VHF channel 69. -
Prince Henry Sailing Instructions
THE TWENTY HUNDRED CLUB 2020 PRINCE HENRY NAVIGATOR RACE A Unique and Challenging Contest of Navigational Skills, Wits, and Stamina Sunday, August 23, 2020 THE ORGANIZING AUTHORITY IS THE TWENTY HUNDRED CLUB OBJECTIVE -To sail the longest distance (corrected for handicap) within the specified time limit. PLEASE NOTE: Participants should not use previous years’ documents and should carefully review all race documents. 1. RULES • The regatta will be governed by the rules as defined in the Racing Rules of Sailing 2017-2020, and these sailing instructions. • RRS 52 (Manual Power) is modified such that power-driven winches and furlers are permitted. • Twenty Hundred Club race participants will conform to the US Safety Equipment Requirements published by US Sailing for the “US Nearshore” racing category. The requirements are available here: https://www.ussailing.org/wp-content/uploads/2020/01/US_SER_2019.0_Categories.pdf 1.1 CRUISING CLASS RULES A. Spinnakers, mizzen spinnakers, and mizzen staysails are not allowed. B. Only one sail at a time may be used forward of the main mast except where a staysail may be used on a standard double headed cutter rig. This does NOT prohibit a transient condition during sail changes. 2. ENTRIES Eligible yachts may be entered by completing registration with the organizing authority, found at www.twentyhundredclub.org. Eligible competitors shall have a PHRF certificate from PRHF-NB. 3. NOTICE TO COMPETITORS Notice to competitors will be available via radio address from the race committee. 4. CHANGES IN SAILING INSTRUCTIONS Any change in the sailing instructions will be available via radio signal from the committee boat or line setter.