Highways & Motorways

Total Page:16

File Type:pdf, Size:1020Kb

Highways & Motorways Highways & Motorways Highways & Motorways provide the most ACO’s grated trench systems are either challenging environments for drainage sys- monolithic in construction for optimum tems, electrical pits and manhole covers. safety in high speed traffi c or are available A variety of vehicle types, from cars to with removable grates that are locked semi trailers, traveling up to high speeds, with boltless mechanisms into integrally breaking and turning in various weather cast ductile iron edge rails with anti shunt conditions, 24 hours a day, can impose se- mechanisms. Monolithic interlocking vere stress on road surfaces. Only proven, precast drainage kerbs are also available reliable, quality products are used in these to reduce the width of fl ow where there applications. Drainage systems need to is limited space between the edge of the work effi ciently to ensure surface water is carriageway and the kerb. removed quickly and that accidents do not occur from aquaplaning. As an ISO 9001 registered company, ACO has supplied a variety of products, ACO Drain grated trench drainage systems including access covers, to highways and are available in many confi gurations and motorways worldwide for over 30 years. sizes to allow for the effi cient removal of surface liquids from roads. The trench comprises interlocking precast channels made from polymer concrete, a durable resin composite with excellent strength properties. Repetitive, High Speed Conditions ACO - Innovative and proven solutions. ACO Polycrete Pty Ltd ABN 65 050 102 942 Tel: 1300 765 226 www.acoaus.com.au Highways & Motorways Australia New South Wales Lapstone Rd, Blue Mountains S Grated Trench Drain System Brunswick to Yelgun Bypass K Grated Trench Drain System Darling Island Rd, Sydney K Grated Trench Drain System North Kiama Bypass, Kiama K Grated Trench Drain System Lane Cove Tunnel, Sydney K & Q Grated Trench Drain System Lane Cove Tunnel, Sydney Rhinocast Access Covers Lane Cove Tunnel, Sydney Road Gully Grates M5 Freeway Widening, Sydney Road Gully Grates M7 Freeway, Road Gully Grates Narellan Rd, Sydney Road Gully Grates MacQuarie St, Sydney Road Gully Grates Lindale Bypass, Lithgow Kerb Drain Channel System Mt Ousley Rd, Wollongong Rhinocast Access Covers Orbital Freeway, Sydney Rhinocast Access Covers M2 Motorway, Sydney K Grated Trench Drain System M2 Motorway Toll Booths, Sydney Cablemate Electrical Pits M5 Motorway, Sydney Grated Polymer Drainage Pits Devlin Street Underpass, Sydney K Grated Trench Drain System Linden Bends, Blue Mountains K Grated Trench Drain System F6 Freeway, Wollongong S Grated Trench Drain System Australia Avenue, Sydney S Grated Trench Drain Liverpool To Parramata Transitway Q Grated Trench Drain System Liverpool To Parramata Transitway Cablemate Electrical Pits Repetitive, High Speed Conditions Great Western Highway, Lithgow Kerb Drain Channel System Windsor Road Overpass, Sydney K Grated Trench Drain System Parramatta Road, Homebush S Grated Trench Drain System Rocky Point Road, Ramsgate S Grated Trench Drain System Roberts Road, Yagoonda Q Grated Trench Drain System Princes Highway, Figtree Kerb Drain Channel System Victoria EastLink, Ringwood PowerDrain System EastLink, Knox PowerDrain System EastLink, Dandenong Rhinocast Access Covers Bulla Road, Essendon Rhinocast Access Covers Doncaster Road, Doncaster East Rhinocast Access Covers Bayswater Road, Croydon Rhinocast Access Covers Dorset Road, Boronia Rhinocast Access Covers Centre Dandenong Road, Cheltenham Rhinocast Access Covers EastLink, Knox Rhinocast Access Covers Albury Bypass Rhinocast Access Covers Geelong Bypass Rhinocast Access Covers Craigieburn Bypass Rhinocast Access Covers Western Ring Road, Melbourne K Grated Trench Drain System Eastern Freeway Extension, Melborune K Grated Trench Drain System South Eastern Freeway, Melbourne K & S Grated Trench Drain System www.acoaus.com.au Highways & Motorways Victoria cont’d... City Link, Melbourne K & S Grated Trench Drain System Western Link, Melbourne Grated Polymer Drainage Pits Western Interchange, Melbourne S Grated Trench Drain System Tullamarine Freeway, Melbourne S Grated Trench Drain System Westgate Freeway, Melbourne S Grated Trench Drain System Domain Tunnel, Melbourne S Grated Trench Drain System Footscray Interchange, Melbourne S Grated Trench Drain System Princes Highway, Geelong S Grated Trench Drain System Eastern Freeway, Melbourne K Grated Trench Drain System Footscray Road, Docklands K Grated Trench Drain System Wellington Road, Mulgrave Rhinocast Access Covers Greens Road, Dandenong Rhinocast Access Covers Queensland Maroochydore Rd, Sunshine Coast Cablemate Electrical Pits Maroochydore Rd, Sunshine Coast PowerDrain System Ross St Bridge, Gold Coast PowerDrain System Bribie Island Rd, Brisbane PowerDrain System Springfi eld Interchange, Brisbane PowerDrain System Springfi eld Interchange, Brisbane Cablemate Electrical Pits Springbrook Rd, Gold Coast Cablemate Electrical Pits West Creek Corridor, Toowoomba Cablemate Electrical Pits Redland Bay Rd, Brisbane Cablemate Electrical Pits Dawson Highway, Biloela Cablemate Electrical Pits Chambers Flat Rd, Brisbane Cablemate Electrical Pits Repetitive, High Speed Conditions Bucasia Rd, Mackay Cablemate Electrical Pits Samford Rd, Brisbane Cablemate Electrical Pits Old Northern Rd, Brisbane Cablemate Electrical Pits Pit Lane Indy Track, Gold Coast S Grated Trench Drain System Main St, Hervey Bay S Grated Trench Drain System Port Rd, Gladstone S Grated Trench Drain System Loganholme Bus Interchange, Brisbane Rhinocast Access Covers Green Bridge, Brisbane Cablemate Electrical Pits Caloundra Road, Sunshine Coast Cablemate Electrical Pits Pappas Way, Gold Coast Cablemate Electrical Pits Ready Creek By- Pass, Gold Coast Cablemate Electrical Pits Chinderah Bypass, Gold Coast Cablemate Electrical Pits Oakey Bypass, Oakey Cablemate Electrical Pits South Pine Road, Brisbane Cablemate Electrical Pits Gympie Road, Brisbane Cablemate Electrical Pits Ipswich Motorway, Brisbane Cablemate Electrical Pits Padstow Road, Brisbane Cablemate Electrical Pits M1 Pacifi c Motorway, Brisbane/Gold Coast Cablemate Electrical Pits M1 Pacifi c Motorway, Brisbane/Gold Coast S Grated Trench Drain System M1 Pacifi c Motorway, Brisbane/Gold Coast Q Grated Trench Drain System Inner City Bypass, Brisbane K Grated Trench Drain System Inner City Bypass, Brisbane S Grated Trench Drain System Inner City Bypass, Brisbane Cablemate Electrical Pits Inner City Bypass, Brisbane Rhinocast Access Covers www.acoaus.com.au Highways & Motorways Queensland cont’d... Port Rd, Brisbane S Grated Trench Drain System Port Rd, Brisbane Cablemate Electrical Pits South East Busway, Brisbane K Grated Trench Drain System South East Busway, Brisbane Cablemate Electrical Pits South East Busway, Brisbane Urbanfi l Access Covers Inner Northern Busway, Brisbane S Grated Trench Drain System Inner Northern Busway, Brisbane Cablemate Electrical Pits Inner Northern Busway, Brisbane Urbanfi l Access Covers Sunshine Motorway, Maroochydore S Grated Trench Drain System Surfers Paradise, Deviation K Grated Trench Drain System Surfers Paradise, Deviation Cablemate Electrical Pits Scarborough St, Southport K Grated Trench Drain System Duckworth Street, Townsville Cablemate Electrical Pits Edmonton Bypass, Cairns Cablemate Electrical Pits Brinsmead Rd, Cairns S Grated Trench Drain System Brinsmead Rd, Cairns Cablemate Electrical Pits Black Mtn Rd, Cairns Q Grated Trench Drain System\ Repetitive, High Speed Conditions South Australia Port Expressway, Adelaide S Grated Trench Drain System South Rd, Adelaide S Grated Trench Drain System Mawson Connector, Adelaide K Grated Trench Drain System Goodwood Underpass, Adelaide Road Gully Grates Sturt Highway, Renmark Q Grated Trench Drain System South Road, O’Halloran Hill S Grated Trench Drain System Hanson Road Overpass S Grated Trench Drain System Millswood Underpass Grated Drainage Pits Western Australia Kwinana Bus Transit Way PowerDrain System Victoria Keys, Fremantle PowerDrain System Narrows Bridge Duplication Custom Trench Drain System Tonkin Highway Cablemate Electrical Pits Roe Highway Cablemate Electrical Pits Grahame Farmer Freeway S Grated Trench Drain System Kwinana Freeway Cablemate Electrical Pits Tasmania West Tamar Highway Q Grated Trench Drain System Bass Highway, Launceston S Grated Trench Drain System Invermay Road, Launceston K Grated Trench Drain System www.acoaus.com.au Highways & Motorways United Kingdom M25 Motorway, Surrey Q Grated Trench Drain System M25 Motorway, Clakett Lane Services Q Grated Trench Drain System M23 Motorway, Surrey Q Grated Trench Drain System M26 Motorway, Surrey Q Grated Trench Drain System M6 Motorway, Lancashire Q Grated Trench Drain System M6 Motorway, Cheshire Q Grated Trench Drain System M62 Motorway, Yorkshire Q Grated Trench Drain System M1 Motorway, Yorkshire Q Grated Trench Drain System M1 Motorway, Hertfordshire Q Grated Trench Drain System M3 Motorway, Surrey Q Grated Trench Drain System M4 Motorway, Glamorgan Q Grated Trench Drain System M4 Motorway, London Q Grated Trench Drain System M4 Motorway, Heston Services Q Grated Trench Drain System M40 Motorway, Oxfordshire Q Grated Trench Drain System M5 Motorway, Devon Q Grated Trench Drain System M11 Motorway, Essex Q Grated Trench Drain System M74 Motorway, Scotland Q Grated Trench Drain System A1-M1 Link, Cambridgeshire Q Grated Trench Drain System A1 Road, Hertfordshire Q Grated Trench Drain System A3 Staines Bypass, Surrey Q Grated Trench Drain System A20 Road, Kent Q Grated Trench Drain System
Recommended publications
  • The M25 Motorway (Junctions 19, 22 and 23) and the A40
    THE M25 MOTORWAY (JUNCTIONS 19, 22 AND 23) AND THE A40 TRUNK ROAD (DENHAM ROUNDABOUT) TEMPORARY OVERNIGHT LINK/SLIP ROAD CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M25 Motorway and the A40 Trunk Road, in the Counties of Buckinghamshire and Hertfordshire, under section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure of the following: (a) the link roads leading to and from the M25 at Junction 19 (A41/A411); (b)the slip road leading to the clockwise carriageway of the M25 at Junction 22 (A1081); (c) the slip roads leading from the clockwise carriageway and to the anti-clockwise carriageway of the M25 at Junction 23 (A1/A1(M) Junction 1); (d)the slip road leading from the westbound carriageway of the A40 to Denham roundabout (A4020/A412) at M40 Junction 1. These measures would be in the interests of road safety while contractors undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1 - 2 nights for each closure every 2 months between 22:00 and 05:30 on Monday – Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights and 22:30 and 05:30 on Sunday nights. The Order would come into force on 16 April 2017 and have a maximum duration of twelve months.
    [Show full text]
  • Call for Sites 2021 Justification Statement V3
    Planning Justification Statement Representation to Hertsmere Local Plan Process Commercial Redevelopment Land and Buildings at the Mercure Hotel Watford, A41 Bypass WD25 8JH March 2021 Contents 1. Introduction 2 2. The Site 4 3. The Proposal 7 4. Exceptional Circumstances 12 5. Economic Need 16 6. Green Belt and Landscape 25 7. Transport and Accessibility 31 8. Flood Risk 34 9. Ecology and Trees 37 10. Heritage 40 11. Other Technical Matters 41 12. Case of Exceptional Circumstances 43 13. Conclusion 51 Appendix A: Site Planning History 1 1. Introduction This Planning Justification Statement is submitted by Warner Planning on behalf of Regen Properties LLP. This submission is made to the Hertsmere Borough Council 'Employment Land Call for Sites' 2021. We promote land and buildings at the Mercure Hotel Watford, A41 Bypass WD25 8JH for allocation for B8 with ancillary B1 commercial development. The hotel has been struggling for several years, which has been further compounded by the Covid-19 Pandemic, and the hotel is due to close in late 2021/early 2022. This statement, therefore, provides representations in respect of the whole site, including the hotel buildings and the land to the south-east of the building, which is part of the same plot. Through this statement, we will demonstrate that this is a credible and deliverable opportunity with no technical issues. This submission is supported by a wealth of technical reports, including: • Masterplans – UMC • Economic Benefits Assessment - Lichfields • Landscape Visual Overview – CSA Environmental • Ecology Overview- CSA Environmental • Aboricultural Assessment – DCCLA • Flood Risk and Drainage Apprisal – EAS • Transport Review – EAS • Desk Based Phase 1 Environmental Site Assessment – TRC • This Statement – Warner Planning • Market Report – Knight Frank • Employment Call for Sites Submission Form There are limited alternatives to this proposal.
    [Show full text]
  • Greater London Fund for the Blind Annual
    Company number: 03693002 Charity number: 1074958 Greater London Fund for the Blind Report and financial statements For the year ended 31 March 2018 *A7KMSSOS* A18 12/12/2018 ¹301 COMPANIES HOUSE SAYER V I NC ENT OOOOO OOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 Greater London Fund for the Blind Contents For the year ended 31 March 2018 Reference and administrative information . Trustees' annual report . Independent auditor's report . 11 Consolidated statement of financial activities (incorporating income and expenditure account) ... 15 Balance sheets ......................................................""""""." . 16 Consolidated statement of cash flows . 17 Notes to the financial statements . 18 Greater London Fund for the Blind Reference and administrative information For the year ended 31 March 2018 Company number 03693002 Charity number 1074958 Registered office and operational address Sir John Mills House 12 Whitehorse Mews 37 Westminster Bridge Road London SE1 7QD Country of registration England & Wales Country of incorporation United Kingdom Trustees The Trustees, who are also directors under company law, who served during the year and up to the date of this report were as follows: Anna Tylor* —Chair Charles Colquhoun* (Resigned 5 December 2018) Keith Felton* Harry Harris Bob Hughes (Appointed 29 October 2018) James Matthews (Appointed 12 July 2017) Raj Mehta* Sharon Petrie (Appointed 12 May 2017) Frans Pettinga (Resigned 6 July 2017) Daniel Stewart-Smith (Resigned 29 July 2018) *Members of Finance, Audit and Risk Committee Key management
    [Show full text]
  • Major New Development Scheme in Bicester • Within 2 Miles
    Major new development scheme in Bicester Within 2 miles of Junction 9 of the London to Birmingham M40 motorway Outline planning consent for up to 520,000 sq ft of Distribution / Manufacturing/ Industrial /R & D and offices Buildings from 80,000 sq ft – 250,000 sq ft FOR SALE / TO LET WHITE COMMERCIAL SURVEYORS LTD Charter Court, 49 Castle Street Banbury, Oxfordshire, OX16 5NU 01295 271000 whitecommercial.co.uk LOCATION LEGAL COSTS Strategically located off Junction 9 of the M40, Bicester Each party is to be responsible for their own costs in this is a rapidly expanding Oxfordshire town that is transaction. Misrepresentation Act scheduled for substantial growth over the coming years. Bicester is readily accessed from both the M40 and A34 VIEWING & FURTHER INFORMATION and also has excellent links to Aylesbury, Thame and Viewing strictly by prior appointment with the joint agents: Buckingham. The M1 at Northampton can also be White Commercial Surveyors Ltd readily accessed via the M40/A43. Link 9 Bicester sits Chris White BSc, MRICS, MCI (Arb) approximately 5 miles from Junction 9 of the M40 and is [email protected] Tel: 01295 271000 readily accessed via the A41 and A4421 perimeter road. DESCRIPTION Colliers International LINK 9 Bicester provides an exciting new design and James Haestier / Len Rosso 020 7344 6610 / 020 7487 1765 build development opportunity. It is the only immediately [email protected] deliverable site in Bicester and the first large scheme in [email protected] the town for over 15 years. The site totals approximately 35.70 acres (14.45 hectares) and has outline planning VSL & Partners Tom Barton consent from Cherwell District Council (15/01012/OUT) 01865 848 488 for 520,000 sq ft (48,308 sq m) of employment floor [email protected] space (Class B1c, B2, B8 and ancillary B1a uses).
    [Show full text]
  • M25 and M26 Economic Case Study
    M25 M26 Connectivity 21/06/2016 Reference number 103712 ECONOMIC CASE STUDY FINAL REPORT M25 M26 CONNECTIVITY ECONOMIC CASE STUDY IDENTIFICATION TABLE Client/Project Kent County Council owner Project M25 M26 Connectivity Study Economic Case Study Type of document Final Report Date 21/06/2016 File name M25M26 Report 2c (final).docx Reference number 103712 Number of pages 83 APPROVAL Version Name Date Modifications Ian Wilkinson, Author 07/04/2016 John Stephens Ian Wilkinson, 1 Checked by 07/04/2016 Version 1 Draft for client David Carter consideration Approved David Carter 07/04/2016 by Ian Wilkinson, Version 2 Report including client Author John Stephens, 21/06/2016 feedback: incorporating minor expansion on reporting of scheme David Carter costs, wider consideration of Ian Wilkinson, GIF/SHMA issues and dependent Checked by 21/06/2016 David Carter housing case, as well as minor 2c drafting points Version 2a/b including a few further snagging corrections and other minor Approved changes David Carter 21/06/2016 by Version 2c incorporating final comments from KCC and the study working group TABLE OF CONTENTS SUMMARY 6 BACKGROUND AND EXISTING STUDIES 6 HIGHWAY MODEL REVIEW 6 HIGHWAY OUTCOMES 7 WIDER ECONOMIC BENEFITS 10 OVERALL VALUE FOR MONEY CASE 10 LOCAL STAKEHOLDER CONSULTATION 11 CONCLUSIONS 12 1. INTRODUCTION 14 1.1 OVERVIEW 14 1.2 BACKGROUND PROVIDED BY KENT COUNTY COUNCIL (WITH SOME MINOR ADAPTATION) 15 1.3 DATA PROVISION 18 2. QUALITATIVE REVIEW 22 2.1 POLICY CONTEXT 22 2.2 ECONOMIC/VALUE FOR MONEY CASE AND WIDER BUSINESS CASE DELIVERY 23 3. HIGHWAY MODEL REVIEW 26 3.1 INTRODUCTION AND MODEL ROBUSTNESS 26 3.2 HIGHWAY MODEL REVIEW AND ACTIONS 26 3.3 HIGHWAY MODEL VALIDATION 30 4.
    [Show full text]
  • First Point, Buckingham Gate Gatwick Airport, Gatwick, RH6
    PRIME SOUTH EAST REFURBISHED MULTI LET OFFICE INVESTMENT FIRST First Point, Buckingham Gate POINT Gatwick Airport, Gatwick, RH6 0PP » Prime South East multi-let office investment located adjacent to Gatwick Airport, within INVESTMENT walking distance of the terminal buildings. » Highly specified Grade A building totalling SUMMARY 62,028 sq ft which has recently been significantly refurbished at a cost of £3.1m. » Excellent proximity to Gatwick Airport, the M23 and M25 motorways and access via train to central London within 30 minutes. » 92% let to 5 tenants on 6 leases providing and attractive WAULT of 7.2 years to expiry 4.2 years to break. » Currently producing £1,423,451 per annum reflecting an average rent on let space of £22.55 psf. Latest deals reflect up to £24.60 psf with £26.00 psf being promoted on the vacant element. » Strong tenant profile from a good balance of airport related users and large corporates. Major tenants include HSBC, Close Asset Management, Norwegian and Amadeus. » Outstanding parking provision of 270 spaces reflecting a ratio of 1:230 sq ft. » Freehold. » Offers are sought in excess of £17,210,000 (seventeen million two hundred and ten thousand pounds) subject to contract and exclusive of VAT reflecting a net initial yield of 7.75% assuming standard purchasers costs. Prime South East refurbished multi let office investment First Point, Buckingham GateGate, , Gatwick Airport, Gatwick, RH6 0PP M25 LOCATION/SITUATION 14 LONDON M4 First Point is located within immediate proximity to M25 Gatwick Airport within the eastern perimeter of the A2 airport boundary, and adjacent to junction 9A of the BROMLEY M23 motorway.
    [Show full text]
  • New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
    New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements ..........................................................................................................................
    [Show full text]
  • East West Rail Western Section Phase 2
    EAST WEST RAIL WESTERN SECTION PHASE 2 CONSULTATION INFORMATION DOCUMENT JUNE 2017 Document Reference 133735-PBR-REP-EEN-000026 Author Network Rail Date June 2017 Date of revision and June 2017 revision number 2.0 The Network Rail (East West Rail Western Section Phase 2) Order Consultation Information Document TABLE OF CONTENTS 1. EXECUTIVE SUMMARY..................................................................................... 1 2. INTRODUCTION ................................................................................................. 2 2.1 Purpose of this consultation ...................................................................... 2 2.2 Structure of this consultation ..................................................................... 2 3. EAST WEST RAIL .............................................................................................. 4 3.1 Background ............................................................................................... 4 3.2 EWR Western Section ............................................................................... 5 4. EAST WEST RAIL WESTERN SECTION PHASE 2 .......................................... 8 4.1 Benefits ..................................................................................................... 8 4.2 Location ..................................................................................................... 8 4.3 Consenting considerations ...................................................................... 11 4.4 Interface with the High Speed
    [Show full text]
  • 160 Great Britain for Updates, Visit Wigan 27 28
    160 Great Britain For Updates, visit www.routex.com Wigan 27 28 Birkenhead Liverpool M62 36 Manchester Stockport M56 Mold Chester 35 Congleton Wrexham 59 M6 Shrewsbury 64 65 07 Wolverhampton Walsall West Bromwich Llandrindod Birmingham Wells Solihull M6 03 Coventry Warwick02 Carmarthen Hereford 01 51 60 Neath M5 Swansea 06 Pontypridd Bridgend Caerphilly Newport Cardiff M4 13 Barry Swindon M5 Bristol 61 14 Weston-super-Mare Kingswood 31 Bath 32 M4 05 Trowbridge 62 Newbury Taunton M5 20 Yeovil Winchester Exeter Southampton 55 Exmouth M27 Poole Lymington Bournemouth Plymouth Torbay Newport GB_Landkarte.indd 160 05.11.12 12:44 Great Britain 161 Wakefield 16 Huddersfield Hull Barnsley Doncaster Scunthorpe Grimsby Rotherham Sheffield M1 Louth 47M1 Heanor Derby Nottingham 48 24 Grantham 15 Loughborough 42 King's Leicester Lynn 39 40 Aylsham Peterborough Coventry Norwich GB 46 01 Warwick Huntingdon Thetford Lowestoft 45 M1 Northampton 02 43 44 Cambridge Milton Bedford Keynes Biggleswade Sawston 18 M40 19 Ipswich Luton Aylesbury Oxford Felixstowe Hertford 21 50 M25 M11 Chelmsford 61 30 53 52 Slough London Bracknell Southend-on-Sea Newbury Grays 54 Wokingham 29 Rochester Basingstoke 22 M3 Guildford M2 M25 Maidstone Winchester 23 M20 17 M27 Portsmouth Chichester Brighton La Manche Calais Newport A16 A26 Boulogne-sur-Mer GB_Landkarte.indd 161 05.11.12 12:44 162 Great Britain Forfar Perth Dundee 58 Stirling Alloa 34 Greenock M90 Dumbarton Kirkintilloch Dunfermline 57 Falkirk Glasgow Paisley Livingston Edinburgh Newton M8 Haddington Mearns 04 56 Dalkeith 26 Irvine Kilmarnock Ayr Hawick A74(M) 41 Dumfries 25 Morpeth Newcastle Carlisle Upon Whitley Bay 12Tyne 08 South Shields Gateshead 09 11 Durham 49 Redcar 33 Stockton-on-Tees M6 Middlesbrough 10 38 M6 A1(M) 37 Harrogate York 63 M65 Bradford Leeds Beverley M6 28 M62 Wakefield Wigan 16 27 Huddersfield Birkenhead Liverpool Manchester Barnsley M62 Scunthorpe 35 36Stockport Doncaster Rotherham Sheffield GB_Landkarte.indd 162 05.11.12 12:44 Great Britain 163 GPS Nr.
    [Show full text]
  • Kemsing Walk 8 Also Use Ordnance Survey Map: 4 ¡ 3 9 Stile Gate View Stile ¡ ¡ Take Care Take 10 2 1 ¡ 0.5 1 0.5 ¡ 11 12 Miles Kilometres 0 N
    Walk Overview Distance: 6.5 miles /10.4 kms Start /Finish: Centre of the village of Kemsing Stiles: 18 Gates: 6 Terrain: Field paths and tracks with some steep slopes Views: Magnificent views across the Weald of Kent Toilets: At Kemsing village car park Refreshments: pubs and shops in Kemsing. Pub at Heaverham When you’re out walking in the countryside, please respect the Countryside Code. Be safe – plan ahead and follow any arrows or signs Leave gates and property as you find them Protect plants and animals, and take your litter home Keep dogs under close control Consider other people By car: From A25 at Seal follow signs to Kemsing Parking: Free car park in centre of village Train: Kemsing station is 2.5 miles from village on the London Victoria to Maidstone East line Train enquiries tel 08457 484950 This challenging 6.5 mile route passes through the beautiful village of Kemsing and offers walkers magnificent views across the Weald of Kent. Bus: Buses 431/432 go through the village The village of Kemsing was first recorded in AD 822 and is a fascinating Traveline 0870 200 2233 start point for the walk. The Church of St Mary the Virgin dates from 1060 and features a Norman Font. The walk ascends and decends the North Downs and paths can be muddy and slippery after rain. Route Description 1 From the Car Park in Kemsing Village 8 Cross straight over the minor road and walk eastwards along Heaverham Road. keep heading westwards along the path. Turn right along a path opposite Church 2 9 Turn left and immediately right again at Lane and continue across open farmland Cotman's Ash Lane still on the National towards Crowdleham.
    [Show full text]
  • Welcome to This A14 Cambridge to Huntingdon Improvement Scheme Public Exhibition. This Exhibition Is About the Work We Are Doing
    A14 Cambridge to Huntingdon improvement scheme A1 Welcome Alconbury D3 Woolley A141 S2 Huntingdon St Ives A14 Town centre improvements including removal of A14 viaduct Ellington D3 The Hemingfords Brampton D2 Existing A14 Godmanchester Fenstanton Fen Drayton Proposed A14 Swavesey Buckden D3 D3 D2 The Offords A1 Northstowe Hilton Conington New development S2 A1198 D3 Boxworth Lolworth Histon Bar Hill D4 Milton Girton A14 D3 M11 Routes for construction traffic East Coast Mainline railway Cambridge River Great Ouse A428 Huntingdon Southern Bypass S2 Single 2 lane carriageway A1 widening D2 Dual 2 lane carriageway A14 on-line improvements D3 Dual 3 lane carriageway Cambridge Northern Bypass D4 Dual 4 lane carriageway Local access roads © Crown copyright and database rights 2016 Ordnance Survey 100030649 Highways England, creative S160069 Welcome to this A14 Cambridge to Huntingdon improvement scheme public exhibition. This exhibition is about the work we are doing in Huntingdon as part of the A14 Cambridge to Huntingdon improvement scheme. Members of the project team are here to answer any questions you might have. Thank you Highways England – Creative BED19_0157 A14 Cambridge to Huntingdon improvement scheme Why is the scheme necessary? The A14 provides an east- west route linking the Midlands with East Anglia. It begins at Catthorpe near Rugby, where it connects with the M1 and M6 motorway, and continues east for approximately 130 miles to the port town of Felixstowe. It forms one of the UK’s strategic routes and is part of the Trans-European Transport Network. The A14 between Cambridge and Huntingdon serves an additional purpose, connecting the A1(M) motorway to the North The scheme will: of England with the M11 motorway � combat congestion, making the to London and the South East.
    [Show full text]
  • The Benefits of Long-Term Pavement Performance (LTPP) Research to Funders
    Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 14 ( 2016 ) 2477 – 2486 6th Transport Research Arena April 18-21, 2016 The benefits of Long-Term Pavement Performance (LTPP) research to funders Tim Martin a,*, Lith Choummanivong a aARRB Group Ltd, 500 Burwood Highway, Vermont South, Victora, 3133, Australia Abstract Long-term pavement performance (LTPP) monitoring has been conducted in Australia for over 20 years. This research was funded by Austroads (representing federal, state and territory road agencies, local government and the New Zealand road agency) to promote improved practice and capability for the road agencies. The LTPP monitoring program measured performance by rutting, roughness, cracking and deflection. Initially the program involved a range of designated flexible pavement sites under varying conditions of environment and traffic. Many of these LTPP sites were included in the Strategic Highway Research Program (SHRP) of the United States (US). All sites were monitored in accordance with the SHRP protocols. Later long-term pavement performance maintenance (LTPPM) sites were included in the program to: (i) assess the impact of surface maintenance treatments on changes to pavement conditions (works effects, WE); and, (ii) assess the impact of maintenance on road deterioration (RD). A range of RD and WE models were developed using the LTPP/LTPPM observational data in combination with experimental data collected from Australia's Accelerated Loading Facility (ALF) that separately investigated the impact on RD of increased axle load and various typical surface maintenance treatments. The RD models cover the deterministic prediction of functional surface distress (rutting, roughness and cracking) and the loss of traffic load capacity (strength).
    [Show full text]