Baseline Model Calibration and Validation Report Ventura River

Total Page:16

File Type:pdf, Size:1020Kb

Baseline Model Calibration and Validation Report Ventura River Baseline Model Calibration and Validation Report Ventura River Watershed Hydrology Model Prepared for: Ventura County Watershed Protection District Ventura, CA Prepared by: 1230 Columbia St., Ste. 1000 San Diego, CA 92101 Tel 619-702-6059 • Fax 619-525-7186 July 21, 2009 Ventura River Model Baseline Report July 21, 2009 Table of Contents List of Tables ................................................................................................................................. iv List of Figures................................................................................................................................ vi Executive Summary....................................................................................................................... xi 1 Introduction...............................................................................................................................1 1.1 Scope of this Report.....................................................................................................................................1 1.2 Role of Model Calibration and Validation...................................................................................................1 1.2.1 Objectives of Model Calibration Activities.........................................................................................2 1.2.2 Hydrologic Validation Procedures ......................................................................................................2 2 Meteorology..............................................................................................................................5 2.1 Data Sources ................................................................................................................................................5 2.1.1 Precipitation ........................................................................................................................................5 2.1.2 Evaporation Data...............................................................................................................................13 2.1.3 Air Temperature ................................................................................................................................14 2.2 Interfacing with the HSPF Model ..............................................................................................................15 3 Hydrologic Response Unit Representation.............................................................................17 3.1 Land Use ....................................................................................................................................................17 3.2 Impervious Cover.......................................................................................................................................21 3.3 Soil Hydrologic Group and Slope ..............................................................................................................22 3.4 Irrigation Water Supply..............................................................................................................................25 3.4.1 Irrigation Demand .............................................................................................................................25 3.4.2 Irrigation Application ........................................................................................................................28 3.5 Fire Impacts................................................................................................................................................29 3.5.1 Simulation Approach for Burned Land .............................................................................................29 3.5.2 Fire History .......................................................................................................................................31 3.6 Watershed Segmentation............................................................................................................................38 3.7 Summary of the HRU Development Process .............................................................................................45 3.8 Assignment of Meteorology to HRUs........................................................................................................48 4 Hydraulic Routing Network ...................................................................................................51 4.1 Stream Segmentation .................................................................................................................................51 4.2 Functional Representation of Hydraulics (FTables)...................................................................................57 i Ventura River Model Baseline Report July 21, 2009 4.2.1 Use of HEC Flood Elevation Models................................................................................................57 4.2.2 Regional Curve Fitting ......................................................................................................................58 4.3 Reservoirs...................................................................................................................................................60 4.4 Debris and Detention Basins......................................................................................................................63 4.5 Diversions and Withdrawals ......................................................................................................................64 4.6 Stream Reach Interactions with Groundwater............................................................................................67 4.7 Point Source Inputs ....................................................................................................................................71 4.8 Final Reach Models....................................................................................................................................72 5 Hydrologic Model Calibration and Validation Approach ......................................................73 5.1 Hydrologic and Hydraulic Calibration Procedures ....................................................................................73 5.1.1 HSPF Hydrology Algorithms............................................................................................................73 5.1.2 Parameter Inference from Data..........................................................................................................74 5.1.3 Calibration Process............................................................................................................................75 5.2 Performance Criteria ..................................................................................................................................81 5.3 Sensitivity and Uncertainty Analyses.........................................................................................................82 5.3.1 Sensitivity Analysis...........................................................................................................................82 5.3.2 Uncertainty Analysis .........................................................................................................................82 6 Hydrologic Calibration and Validation Results......................................................................85 6.1 Calibrated Parameters ................................................................................................................................85 6.2 Model Calibration Summary......................................................................................................................87 6.3 Model Validation Summary.......................................................................................................................90 6.4 Water Balance Summary............................................................................................................................93 6.5 Detailed Calibration Results.......................................................................................................................99 6.5.1 Matilija Creek above Reservoir (603A) ............................................................................................99 6.5.2 Matilija Creek below Dam (602/602A)...........................................................................................104 6.5.3 North Fork Matilija (604)................................................................................................................104 6.5.4 Ventura River near Meiners Oaks (at Robles Diversion) (607) ......................................................109 6.5.5 San Antonio Creek at Hwy. 33 (605) ..............................................................................................113 6.5.6 Ventura River near Ventura (at Foster Park) (608) .........................................................................118 6.5.7 Coyote Creek near Oak View (600) ................................................................................................122 6.5.8 Santa Ana Creek near Oak View (606A) ........................................................................................127 6.6 Detailed Validation Results......................................................................................................................131 6.6.1 Matilija Creek below Dam (602/602A)...........................................................................................131
Recommended publications
  • Campground East of Highway
    MileByMile.com Personal Road Trip Guide California Byway Highway # "Route 33--Jacinto Reyes Scenic Byway" Miles ITEM SUMMARY 0.0 Start of Jacinto Reyes Start of Jacinto Reyes Scenic Byway, at the Junction of State Route Scenic Byway #150, near Ojai, California, a small town in Ventura County, California, where a Tennis Academy (Tenis Akademia Kilatas) is situated, and near Mira Monte, California. This road lies just across Ojai Valley Inn and Spa on the State Route #150 Altitude: 771 feet 0.0 Altitude: 3002 feet 0.7 East ElRoblar Drive East ElRoblar Drive, Cuyama Road, Meiners Oaks, California, located in Ventura County, California on State Route 33, Ojai Valley Community Hospital Altitude: 751 feet 1.5 North La Luna Avenue Fairview Road goes east-north to Camp Ramah, a Jewish summer camp in Ojai, CA. To the south, North La Luna Avenue becomes S La Luna Avenue and terminates at CA State Highway 150. Altitude: 797 feet 2.5 Cozy Ojai Road/Forest This road runs into Los Padres National Forest. Altitude: 833 feet Route 5N34 3.9 Camino Cielo A spectacular view of Kennedy Canyon is offered from here on the Jacinto Reyes Scenic Byway, in California. Altitude: 912 feet 4.2 Matilija Hot Springs Road To Matilija Lake. Altitude: 955 feet 4.2 North Fork Matilija Creek, Crossing. Altitude: 958 feet CA 4.9 Matilija Canyon Road To Matilija Lake. Altitude: 1178 feet 6.4 Nordhoff Ridge Road Nordhoff Fire Tower, Wheeler Springs, California. Altitude: 1486 feet 7.7 Blue Mist Water Fall On State Highway #33 in Los Padres National Forest Area, California.
    [Show full text]
  • Matilija Dam Giant Reed Removal Water Quality Monitoring Plan
    MATILIJA DAM GIANT REED REMOVAL WATER QUALITY MONITORING PLAN County of Ventura Watershed Protection District 800 S. Victoria Ave., Ventura, California 93009 Contact: Tom Lagier, Project Manager EcoSystems Restoration Associates 8954 Rio San Diego Drive Suite 610 San Diego, CA 92108 619.291.1475 Contact: Julie Simonsen-Marchant, Project Manager June 2007 Matilija Dam Giant Reed Removal Water Quality Monitoring Program TABLE OF CONTENTS 1.0 INTRODUCTION.............................................................................................................................. 1 1.1 Monitoring Plan Objectives ................................................................................................. 1 1.2 Existing Data....................................................................................................................... 1 1.3 Quality Assurance and Quality Control for Water Quality Data Collected.......................... 1 1.4 Data Management............................................................................................................... 1 1.5 Reporting............................................................................................................................. 3 2.0 WATERSHED OVERVIEW ............................................................................................................. 3 2.1 Geology............................................................................................................................... 3 2.2 Land Uses ..........................................................................................................................
    [Show full text]
  • Appendix C Ventura River Watershed Section
    Appendix C Ventura River Watershed Section Submitted by the Ventura River Watershed Council Ventura River Watershed Ventura River Watershed Section of the Watersheds Coalition of Ventura County Integrated Water Management Plan Update, 2014 May, 2014 Photo by David Magney Note: This document has been excerpted from a draft of the Ventura River Watershed Management Plan, which is still a work in progress. Some sections of that plan have not yet been written; the apparent mistakes in section numbering in this document reflect those unwritten sections. In addition, there could be cross-references to context that has been omitted in this excerpted version. Ventura River Watershed Section Watersheds Coalition of Ventura County Integrated Regional Water Management Plan Update 2014 1 Part 1 - Introduction ..................................................................................................................................... 4 1.2 Ventura River Watershed Council ...................................................................................................... 4 1.2.1 Participants .................................................................................................................................. 4 1.2.2 Council History, Structure & Governance ................................................................................... 5 1.2.3 Council Milestones .................................................................................................................... 18 1.2.4 Council Funding ........................................................................................................................
    [Show full text]
  • Ventura River Watershed Technical Investigation
    VENTURA RIVER WATERSHED TECHNICAL INVESTIGATION SUMMARY REPORT AND RECOMMENDATIONS Funding Provided by the Department of Fish and Game and Proposition 13 Prepared for: CITY OF SAN BUENAVENTURA San Buenaventura, CA Prepared by: ENTRIX, INC. Walnut Creek, CA Project No. 325405 March 14, 2003 VENTURA RIVER WATERSHED TECHNICAL INVESTIGATION SUMMARY REPORT AND RECOMMENDATIONS Funding Provided by the Department of Fish and Game and Proposition 13 Prepared for: CITY OF SAN BUENAVENTURA P.O. Box 99 Ventura, CA 93002 Prepared by: ENTRIX, INC. 590 Ygnacio Valley Road, Suite 200 Walnut Creek, California 94596 Project No. 325405 March 14, 2003 TABLE OF CONTENTS Page List of Tables ..................................................................................................................... iv List of Figures......................................................................................................................v List of Photographs............................................................................................................ vi Executive Summary........................................................................................................... ix 1.0 Introduction and Overview .................................................................................. 1-1 1.1 Project Overview ..................................................................................... 1-1 1.2 Relationship to the Ventura River Habitat Conservation Plan ................ 1-2 1.3 Relationship to Other Agencies and Processes.......................................
    [Show full text]
  • 2014 Robles Fish Passage Facility Progress Report
    2014 Robles Fish Passage Facility Progress Report Ventura River channel going subsurface at Foster Park in 2012 for the first time in several years (top) Mean monthly discharge at Foster Park (USGS) and groundwater elevation near HWY 150 bridge (VRWD) since April 2011 (bottom). Three consecutive years of below average precipitation have resulted in groundwater depletion in the Ventura River basin and limited surface connection to only 72 hours during the 2014 fish passage season. Casitas Municipal Water District 1055 Ventura Avenue Oak View, California 93022 TABLE OF CONTENTS Page 1.0 EXECUTIVE SUMMARY........................................................................................... 4 2.0 GENERAL INTRODUCTION..................................................................................... 5 3.0 UPSTREAM FISH MIGRATION IMPEDIMENT EVALUATION................................. 7 3.1 Sandbar Monitoring ...................................................................................... 14 4.0 EVALUATE FISH MOVEMENT THROUGH THE PASSAGE FACILITY................. 17 4.1 Water Velocity and Depth Validation Evaluation........................................... 17 4.2 Fish Attraction Evaluation............................................................................. 17 4.3 Downstream Fish Passage Evaluation ......................................................... 21 5.0 DOWNSTREAM FISH MIGRATION THROUGH THE ROBLES REACH ............... 22 6.0 LONG-TERM MONITORING COMPONENTS.......................................................
    [Show full text]
  • Salsipuedes Creek Bridge Scour Mitigation
    Salsipuedes Creek Bridge Scour Mitigation Approximately 3.5 miles south of the City of Lompoc on Highway 1 in Santa Barbara County 05-SB-1-PM 15.6 Project ID# 05-0000-0007 EA# 05-0A050 SCH # 2014071009 Initial Study with Mitigated Negative Declaration Prepared by the State of California Department of Transportation October 2015 General Information About This Document What’s in this document: This document contains a Mitigated Negative Declaration, which examines the environmental effects of a proposed project on State Route 1 in Santa Barbara County. The Initial Study with proposed Mitigated Negative Declaration was circulated for public review from July 7, 2014 to August 7, 2014. Three comment letters were received on the draft document. The letters and the responses to them are included in the Comments and Responses section of this document (refer to Appendix D), which has been added since the draft. Throughout this document, a line in the left margin indicates changes made since the draft document circulation. What happens after this: The proposed project has completed environmental compliance with circulation of this document. When funding is approved, the California Department of Transportation can design and build all or part of the project. Printing this document: To save paper, this document has been set up for two-sided printing (to print the front and back of a page). Blank pages occur where needed throughout the document to maintain proper layout of the chapters and appendices. This document can also be accessed electronically at the following website: http://www.dot.ca.gov/dist05/projects For individuals with sensory disabilities, this document can be made available in Braille, in large print, on audiocassette, or on computer disk.
    [Show full text]
  • Watershed Characteristics
    Ventura River Watershed Management Plan PART 3 Watershed Characteristics 3.1 Overview and Quick Facts ......................... 186 3.2 Physical Features .................................. 196 3.3 Hydrology ............................................ 246 3.4 Water Supplies and Demands ..................... 354 3.5 Water Quality ........................................ 428 3.6 Ecosystems and Access to Nature ................ 492 3.7 Land Use and Demographics ...................... 656 3.1 Overview and Quick Facts 3.1.1 Quick Facts ......................................... 188 Lake Casitas Photo courtesy of Michael McFadden PART 3 • 3.1 OVERVIEW AND QUICK FACTS •  187 3.1 Overview and Quick Facts “Watershed Characterization,” Part 3 of this plan, provides an overview of the current physical, biological, hydrological, and social conditions of the Ventura River watershed. Prepared with the latest available techni- cal data and information and input from a multi-stakeholder review, the Watershed Characterization is intended to help all stakeholders, includ- ing water managers, policy makers, regulators, residents, businesses, and students, better understand the watershed and its many interdependent relationships. The characterization is data-rich—featuring photos, maps, graphics and explanatory sidebars—but is intended to be engaging and easily understandable by lay readers. Each section includes a list of the key documents on that topic where readers can find more detailed and tech- Aerial View of Ventura River Watershed Looking Downstream nical information. 188 VENTURA RIVER WATERSHED MANAGEMENT PLAN 3.1.1 Quick Facts Location: The Ventura River watershed is located in southern California, in western Ventura County, with a small section in the northwest corner located in eastern Santa Barbara County. At 226 square miles, it is the smallest of the three major watersheds in Ventura County, which are the Ventura River, Santa Clara River, and Calleguas Creek watersheds.
    [Show full text]
  • Ventura River Steelhead Restoration and Recovery Plan
    VENTURA RIVER STEELHEAD RESTORATION AND RECOVERY PLAN Prepared for: Casitas Municipal Water District, City of San Buenaventura, Ventura County Flood Control District, Ventura County Transportation Department, Ventura County Solid Waste Management Department, Ojai Valley Sanitary District, Ventura River County Water District, Ojai Basin Ground Water Management Agency, Meiners Oaks County Water Districts, and Southern California Water Company Prepared by: ENTRIX, Inc. Walnut Creek, CA and Woodward Clyde Consultants Santa Barbara, CA Project No. 351001 December 1997 VENTURA RIVER STEELHEAD RESTORATION AND RECOVERY PLAN Prepared for: Casitas Municipal Water District, City of San Buenaventura, Ventura County Flood Control District, Ventura County Transportation Department, Ventura County Solid Waste Management Department, Ojai Valley Sanitary District, Ventura River County Water District, Ojai Basin Ground Water Management Agency, Meiners Oaks County Water Districts, and Southern California Water Company Prepared by: ENTRIX, Inc. 590 Ygnacio Valley Road, Suite 200 Walnut Creek, California 94596 Woodward Clyde Consultants 130 Robin Hill Road, Suite 100 Santa Barbara, California 93117 Project No. 351001 December 1997 TABLE OF CONTENTS Page List of Tables ..................................................................................................................... ix List of Figures.................................................................................................................... xi Executive Summary........................................................................................................
    [Show full text]
  • Joseph Barlow Lippincott Papers, 1882-1942
    http://oac.cdlib.org/findaid/ark:/13030/tf3h4nb0ks Online items available Inventory of the Joseph Barlow Lippincott Papers, 1882-1942 Processed by Gerald J. Giefer, Anelle McCarty Kloski, Rochelle Zelzer, and Sharon Laven. Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California, Riverside Riverside, CA 92517-5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: [email protected] URL: http://library.ucr.edu/wrca © 1999 The Regents of the University of California. All rights reserved. Note Geographical (By Place)--California--Los Angeles AreaHistory--California History--Los Angeles Area Inventory of the Joseph Barlow LIPP 1 Lippincott Papers, 1882-1942 Inventory of the Joseph Barlow Lippincott Papers, 1882-1942 Collection number: LIPP Water Resources Collections and Archives University of California, Riverside Riverside, California Contact Information: Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California, Riverside Riverside, CA 92517-5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: [email protected] URL: http://library.ucr.edu/wrca Processed by: Gerald J. Giefer, Anelle McCarty Kloski, Rochelle Zelzer, and Sharon Laven Date Completed: January 1970 © 2009 The Regents of the University of California. All rights reserved. Descriptive Summary Title: Joseph Barlow Lippincott Papers, Date (inclusive): 1882-1942 Collection number: LIPP Creator: Lippincott, Joseph Barlow, 1864-1942 Extent: ca. 42 linear ft.(86 boxes)1,137 online itemsead Repository: Water Resources Collections and Archives Riverside, CA 92517-5900 Abstract: Correspondence, reports, documents, news clippings, and several descriptive photograph albums, pertaining to projects on dams, reservoirs, aqueducts, and other water supply works, groundwater and streamflow, in California, in particular for the Metropolitan Water District of Southern California, and in Arizona and other Western States.
    [Show full text]
  • Part 2 Los Padres National R5-MB-078 Forest Strategy September 2005
    United States Department of Agriculture Land Management Plan Forest Service Pacific Southwest Region Part 2 Los Padres National R5-MB-078 Forest Strategy September 2005 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, Write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Land Management Plan Part 2 Los Padres National Forest Strategy R5-MB-078 September 2005 Table of Contents Tables ....................................................................................................................................................v Document Format Protocols................................................................................................................ vi LAND MANAGEMENT PLAN STRATEGY..................................................................................1
    [Show full text]
  • Ventura County
    Steelhead/rainbow trout resources of Ventura County Rincon Rincon Creek consists of about 9.7 stream miles. It flows southwest, entering the Pacific Ocean at Rincon Point. The culvert at the Highway 101 crossing is a total passage barrier (Stoecker et al. 2002). A watershed plan prepared for Rincon Creek includes a review of historical steelhead information. The review notes O. mykiss stocking occurred in the 1940s and subsequently. Anecdotal accounts of trout observations from the 1950s to the 1980s also are included (Tetra Tech 2007; Stoecker et al. 2002). Rincon Creek was surveyed in 1993 and no fish were observed. The survey report states, “Sediment inputs from Casitas Creek are destroying downstream habitat” (Unknown 1993). A 1994 DFG memo relayed the results of surveys from that year. The memo states, “The Wheeler Fire [in 1985] could have been the event that eradicated rainbow trout from Rincon Creek, although there is anecdotal information from a landowner along Rincon Creek that suggests that the population was extirpated as early as the 1960’s” (DFG 1994a). The memo adds, “It appears that the Highway 101 culvert has prevented the recolonization of rainbow trout/steelhead in Rincon Creek” (DFG 1994a). Consultants surveyed Rincon Creek as part of a steelhead study, and observed O. mykiss likely representing one year class in 2001 (Stoecker et al. 2002). A 2002 memo from NMFS staff states, “Rincon Creek provides approximately 4 miles of steelhead spawning and rearing habitat…” (NMFS 2002a). A 2002 study report notes water quality impacts on Rincon Creek from the large sediment load carried by Casitas Creek, a tributary (Stoecker et al.
    [Show full text]
  • Matilija Dam Ecosystem Restoration Project CEQA Scoping Period Information
    Matilija Dam Ecosystem Restoration Project CEQA Scoping Period Information This presentation provides information regarding the California Environmental Quality Act, or CEQA, Scoping Period for the Matilija Dam Ecosystem Restoration Project. •1 Purpose of Scoping Period • Inform the public about the Project and the CEQA environmental review process. • Seek input on the scope and content of the Subsequent Environmental Impact Report (SEIR), including potential environmental issues, mitigation, and alternatives to be analyzed. Slide 2 The purpose of Scoping is to inform the public about the Project and the environmental review process, as required by CEQA. Scoping for the Matilija Dam Ecosystem Restoration Project provides an opportunity for the public to give input on the scope and content of the Subsequent Environmental Impact Report, or Subsequent EIR. Input may include identifying specific environmental issues, mitigation measures to reduce environmental impacts, or potential alternatives to project actions. •2 Ventura River Watershed Slide 3 Matilija Dam is located along Matilija Creek, approximately 16 miles north of the Pacific Ocean in western Ventura County, California. Approximately one‐half mile southeast of the Dam, Matilija Creek and North Fork Matilija Creek join to create the Ventura River, which has a drainage area of approximately 226 square miles. The Los Padres National Forest surrounds the portions of the Project area along Matilija Creek and Matilija Dam. Downstream of the Dam, the Ventura River flows south past the western edge of the City of Ojai, and through unincorporated communities within Ventura County. In its lower reaches, the Ventura River flows through the City of Ventura until it reaches its estuary with the Pacific Ocean.
    [Show full text]