Matilija Dam Ecosystem Restoration Project CEQA Scoping Period Information

Total Page:16

File Type:pdf, Size:1020Kb

Matilija Dam Ecosystem Restoration Project CEQA Scoping Period Information Matilija Dam Ecosystem Restoration Project CEQA Scoping Period Information This presentation provides information regarding the California Environmental Quality Act, or CEQA, Scoping Period for the Matilija Dam Ecosystem Restoration Project. •1 Purpose of Scoping Period • Inform the public about the Project and the CEQA environmental review process. • Seek input on the scope and content of the Subsequent Environmental Impact Report (SEIR), including potential environmental issues, mitigation, and alternatives to be analyzed. Slide 2 The purpose of Scoping is to inform the public about the Project and the environmental review process, as required by CEQA. Scoping for the Matilija Dam Ecosystem Restoration Project provides an opportunity for the public to give input on the scope and content of the Subsequent Environmental Impact Report, or Subsequent EIR. Input may include identifying specific environmental issues, mitigation measures to reduce environmental impacts, or potential alternatives to project actions. •2 Ventura River Watershed Slide 3 Matilija Dam is located along Matilija Creek, approximately 16 miles north of the Pacific Ocean in western Ventura County, California. Approximately one‐half mile southeast of the Dam, Matilija Creek and North Fork Matilija Creek join to create the Ventura River, which has a drainage area of approximately 226 square miles. The Los Padres National Forest surrounds the portions of the Project area along Matilija Creek and Matilija Dam. Downstream of the Dam, the Ventura River flows south past the western edge of the City of Ojai, and through unincorporated communities within Ventura County. In its lower reaches, the Ventura River flows through the City of Ventura until it reaches its estuary with the Pacific Ocean. •3 Matilija Dam Built 1947 Matilija Creek (pre-dam construction) Slide 4 Matilija Dam was constructed in 1947 with the purpose of providing water supply and flood control for the Ojai Valley. Prior to dam construction, the Ventura River was known by fishermen for its annual run of southern steelhead trout. 4 Where is the lake? • 8 million cubic yards of sediment is trapped behind Matilija Dam. • Only 2% of the initial reservoir capacity remains. Friday, September 4, 2020 Slide 5 Since 1947, natural creek sediments have accumulated behind Matilija Dam, diminishing the reservoir capacity. On the photo on the right, the former lake area is outlined in blue. An estimated 8 million cubic yards of sediment is currently trapped behind the Dam. The initial reservoir capacity was over 7,000 acre‐feet of water. Today the reservoir capacity is only 150 acre feet, which is only 2 percent of the original volume. An acre‐foot of water is the amount of water necessary to cover one acre of surface area to a depth of one foot, or about 325,850 gallons of water. Because the Dam inhibits sediment transport, which is a fundamental mechanism for beach replenishment, downstream beaches have narrowed measurably since construction of Matilija Dam. With a diminished supply of river‐based sand replenishment, beaches in the region are becoming increasingly eroded, causing habitat reduction and a loss of beach sand for recreational use. 5 Appraisal Study 1998-2000 In 1997, the Southern California steelhead trout was federally listed as an endangered species. To restore habitat access for the southern California steelhead, the County Board of Supervisors directed the Ventura County Watershed Protection to study dam removal. Slide 6 In 1997, 50 years after Matilija Dam construction, steelhead were listed as endangered under the Federal Endangered Species Act. Since Matilija Dam blocks access to prime spawning habitat for the steelhead trout, the Ventura County Board of Supervisors directed the Flood Control District to study dam removal. They partnered with the U.S. Bureau of Reclamation to produce a Dam Removal Appraisal Report in the year 2000. The Flood Control District changed its name to Watershed Protection in 2003, and is part of the Ventura County Public Works Agency. 6 2004 Feasibility Study and EIS/EIR Partnered with U.S. Army Corps of Engineers to prepare a Feasibility Study and an EIS/EIR for the Matilija Dam Ecosystem Restoration Project. Over 40 government and non- governmental agencies and water purveyors participated in the environmental review process, as well as numerous members of the public. Slide 7 Following the completion of the Appraisal Study, Watershed Protection partnered with the U.S. Army Corps of Engineers to prepare a feasibility study and a joint Environmental Impact Statement and Environmental Impact Report for the Matilija Dam Ecosystem Restoration Project. The feasibility study considered 7 alternatives for dam removal, and the EIS/EIR evaluated the short‐term and long‐term impacts from the proposed project components and alternatives. Over 40 government and non‐governmental agencies and water purveyors participated in the environmental review process, as well as numerous members of the public. Most of these stakeholders, and many others, remain actively engaged in the project development process. 7 Multiple Project Components Slide 8 The EIS/EIR evaluated the multiple project components that comprise the Matilija Dam Ecosystem Restoration Project. Prior to dam removal, downstream protection components need to be constructed to protect communities and infrastructure from sediment released. These include increasing the capacity under the Camino Cielo and the Santa Ana Boulevard Bridges, upgrading the levees in Live Oak Acres and Casitas Springs, constructing a new levee in Meiners Oaks, and altering the Robles Diversion water supply facility. The preferred dam removal alternative in 2004 included the removal of the accumulated sediment within the reservoir area. Some sediment would be placed in Matilija Canyon and some would be placed on the wide floodplains downstream. •8 Project Component Progress • 2007: Began Giant Reed Removal on 1,200 acres. • 2008: Raised Casitas Springs Levee by 4 feet. • 2009-2010: Drilled and Developed two wells at Foster Park. • 2009: Acquired former County Park Hot Springs Property. Most structures on site were lost in the Thomas Fire. This site will serve as a staging area for dam removal and will become a future recreational feature. • 2011: Created the trailhead at the end of Old Baldwin Road that serves as an equestrian and all accessible trail. • 2020: Will begin construction of new Santa Ana Blvd. Bridge and widen the Ventura River. Slide 9 Since the certification of the 2004 Environmental Impact Statement and Environmental Impact Report, Watershed Protection has completed a number of project components of the Matilija Dam Ecosystem Restoration Project. These projects include: • Ongoing giant reed removal on 1,200 acres; • Raising Casitas Springs Levee by 4 feet; • Drilled and developed two wells at Foster Park; • Creating the trailhead at the end of Old Baldwin Road that serves as an equestrian and handicap accessible trail; • Acquiring the former County Park Hot Springs Property to serve as a staging area for dam removal, which will become a future recreational feature. Unfortunately, the structures at the former County Park Hot Springs Property were lost in the Thomas Fire in 2017. • And lastly, the Santa Ana Boulevard Bridge Replacement and Ventura River widening project will begin in late 2020. •9 Next Steps in Project Planning Since the 2004 EIS/EIR, sediment transport and hydrology models have greatly improved, and many dams across the country have been removed and studied. Between 2008 and 2016, this new information was applied to the Matilija Dam Ecosystem Restoration Project, and a new alternative has been developed for dam removal. Several other project components now have preliminary designs. VCPWA-WP is preparing a Subsequent EIR (SEIR) to analyze these proposed modifications to the Matilija Dam Ecosystem Restoration Project. Slide 10 Since the certification of the 2004 Environmental Impact Study and Environmental Impact Report, Watershed Protection and the design team has applied new information about dam removal to the project. Sediment transport and hydrology models have greatly improved, and many dams across the country have been removed and studied. Between 2008 and 2016, this new information was applied to the Matilija Dam Ecosystem Restoration Project, and a new alternative has been developed for dam removal. In addition, several other project components are now in the design phase. In June 2017, Watershed Protection received funding to implement the Matilija Dam Removal 65% Design Planning Project. The updated plan to remove Matilija Dam incorporates new information garnered from recent dam removal projects as well as modifications to downstream infrastructure. Watershed Protection has determined that preparation of a Subsequent EIR is warranted to evaluate the revised Project components which have adequate design details at this time. •10 Purpose of the SEIR 1. Evaluate the environmental effects from the revised method for Matilija Dam removal. 2. Analyze updated design and construction plans for the following downstream components: • Camino Cielo Bridge • Live Oak Acres Levee • Casitas Springs Levee Slide 11 The Subsequent EIR will provide a complete and objective analysis of the revised plan for dam removal, as well as a project‐specific analysis of the environmental effects associated with the development of three other Project components, which include the replacement of the Camino Cielo Bridge, the reconstruction
Recommended publications
  • Campground East of Highway
    MileByMile.com Personal Road Trip Guide California Byway Highway # "Route 33--Jacinto Reyes Scenic Byway" Miles ITEM SUMMARY 0.0 Start of Jacinto Reyes Start of Jacinto Reyes Scenic Byway, at the Junction of State Route Scenic Byway #150, near Ojai, California, a small town in Ventura County, California, where a Tennis Academy (Tenis Akademia Kilatas) is situated, and near Mira Monte, California. This road lies just across Ojai Valley Inn and Spa on the State Route #150 Altitude: 771 feet 0.0 Altitude: 3002 feet 0.7 East ElRoblar Drive East ElRoblar Drive, Cuyama Road, Meiners Oaks, California, located in Ventura County, California on State Route 33, Ojai Valley Community Hospital Altitude: 751 feet 1.5 North La Luna Avenue Fairview Road goes east-north to Camp Ramah, a Jewish summer camp in Ojai, CA. To the south, North La Luna Avenue becomes S La Luna Avenue and terminates at CA State Highway 150. Altitude: 797 feet 2.5 Cozy Ojai Road/Forest This road runs into Los Padres National Forest. Altitude: 833 feet Route 5N34 3.9 Camino Cielo A spectacular view of Kennedy Canyon is offered from here on the Jacinto Reyes Scenic Byway, in California. Altitude: 912 feet 4.2 Matilija Hot Springs Road To Matilija Lake. Altitude: 955 feet 4.2 North Fork Matilija Creek, Crossing. Altitude: 958 feet CA 4.9 Matilija Canyon Road To Matilija Lake. Altitude: 1178 feet 6.4 Nordhoff Ridge Road Nordhoff Fire Tower, Wheeler Springs, California. Altitude: 1486 feet 7.7 Blue Mist Water Fall On State Highway #33 in Los Padres National Forest Area, California.
    [Show full text]
  • Dam Removal Planning in the California Coast Ranges by Clare
    The Big Five: Dam Removal Planning in the California Coast Ranges by Clare Kathryn O’Reilly A thesis submitted in partial satisfaction of the requirements for the degree of Master of Landscape Architecture in the Graduate Division of the University of California, Berkeley Committee in charge: Professor G. Mathias Kondolf, Chair Professor Randolph T. Hester Professor Emeritus Robert Twiss Spring 2010 The thesis of Clare Kathryn O’Reilly, titled The Big Five: Dam Removal Planning in the California Coast Ranges, is approved: Chair Date: Professor G. Mathias Kondolf Date: Professor Randolph T. Hester Date: Professor Emeritus Robert Twiss University of California, Berkeley Spring 2010 The Big Five: Dam Removal Planning in the California Coast Ranges Copyright 2010 by Clare O’Reilly Table of Contents CHAPTER 1: Introduction 1 CHAPTER 2: Methods 18 CHAPTER 3: Conceptual Framework 22 CHAPTER 4: Case Studies 46 Upper York Creek Dam 47 Searsville Dam 58 San Clemente Dam 72 Matilija Dam 84 Rindge Dam 99 CHAPTER 5: Synthesis & Recommendations 108 REFERENCES 124 APPENDICES 136 table OF COnTEnTS i List of Figures CHAPTER 1 Figure 1-1. Sediment deposition from upstream watershed (left) and resulting deposition in reservoir. 2 Figure 1-2. Transport impact of dams. (Wildman, 2006) 3 Figure 1-3. Dams in the US by height. (USACE, 2009) 3 Figure 1-4. Dams in the US by hazard potential. (USACE, 2009) 3 Figure 1-5. Delta deposition in reservoir. (Mahmood, 1987) 5 Figure 1-6. Example of reservoir sediment deposit. 5 Figure 1-7. Infilled reservoir. (Morris & Fan, 1998) 5 Figure 1-8. Bar-lin Dam on the Dahan River in Taiwan, full of sediment in 2006 four years after completion (left), and post-failure in 2007 (right).
    [Show full text]
  • Matilija Dam Giant Reed Removal Water Quality Monitoring Plan
    MATILIJA DAM GIANT REED REMOVAL WATER QUALITY MONITORING PLAN County of Ventura Watershed Protection District 800 S. Victoria Ave., Ventura, California 93009 Contact: Tom Lagier, Project Manager EcoSystems Restoration Associates 8954 Rio San Diego Drive Suite 610 San Diego, CA 92108 619.291.1475 Contact: Julie Simonsen-Marchant, Project Manager June 2007 Matilija Dam Giant Reed Removal Water Quality Monitoring Program TABLE OF CONTENTS 1.0 INTRODUCTION.............................................................................................................................. 1 1.1 Monitoring Plan Objectives ................................................................................................. 1 1.2 Existing Data....................................................................................................................... 1 1.3 Quality Assurance and Quality Control for Water Quality Data Collected.......................... 1 1.4 Data Management............................................................................................................... 1 1.5 Reporting............................................................................................................................. 3 2.0 WATERSHED OVERVIEW ............................................................................................................. 3 2.1 Geology............................................................................................................................... 3 2.2 Land Uses ..........................................................................................................................
    [Show full text]
  • Celebrating the Value of Dams and Levees — Yesterday, Today and Tomorrow
    United States Society on Dams Celebrating the Value of Dams and Levees — Yesterday, Today and Tomorrow 36th Annual USSD Conference Denver, Colorado, April 11-15, 2016 CONTENTS Conference Theme *Is This Community Worth Saving? ....................................................................................1 Robert Beduhn, HDR *Unintended Consequences of Dam Removal .....................................................................3 Melinda Dirdal, Greg Paxson and Dave Campbell, Schnabel Engineering *The Kentucky River: Managing 19th Century Infrastructure to Meet 21st Century Needs ....................................................................................................................................5 Daniel A. Gilbert, Jeffrey S. Dingrando and April L. Welshans, Stantec Consulting Services, Inc.; and David Hamilton, Kentucky River Authority *Historical Perspective — Dams, Hydro, and Multi-Purpose Projects ..............................7 David Kleiner, MWH Would Texas Be Texas Without Dams? ...............................................................................9 John L Rutledge, Freese and Nichols, Inc. Discussing the Benefits of Dams with your Friends and Neighbors, the Media, and the Guy Sitting Next to You on the Plane ...........................................................................11 Amanda Sutter, Corps of Engineers A Race Against Time, America’s Flood Risk from Aging Dams .......................................13 Jason Wilson, Southern Company Hydraulics *Use of Labyrinth Piano Key Weir (PKW)
    [Show full text]
  • Ventura River Watershed Technical Investigation
    VENTURA RIVER WATERSHED TECHNICAL INVESTIGATION SUMMARY REPORT AND RECOMMENDATIONS Funding Provided by the Department of Fish and Game and Proposition 13 Prepared for: CITY OF SAN BUENAVENTURA San Buenaventura, CA Prepared by: ENTRIX, INC. Walnut Creek, CA Project No. 325405 March 14, 2003 VENTURA RIVER WATERSHED TECHNICAL INVESTIGATION SUMMARY REPORT AND RECOMMENDATIONS Funding Provided by the Department of Fish and Game and Proposition 13 Prepared for: CITY OF SAN BUENAVENTURA P.O. Box 99 Ventura, CA 93002 Prepared by: ENTRIX, INC. 590 Ygnacio Valley Road, Suite 200 Walnut Creek, California 94596 Project No. 325405 March 14, 2003 TABLE OF CONTENTS Page List of Tables ..................................................................................................................... iv List of Figures......................................................................................................................v List of Photographs............................................................................................................ vi Executive Summary........................................................................................................... ix 1.0 Introduction and Overview .................................................................................. 1-1 1.1 Project Overview ..................................................................................... 1-1 1.2 Relationship to the Ventura River Habitat Conservation Plan ................ 1-2 1.3 Relationship to Other Agencies and Processes.......................................
    [Show full text]
  • 2014 Robles Fish Passage Facility Progress Report
    2014 Robles Fish Passage Facility Progress Report Ventura River channel going subsurface at Foster Park in 2012 for the first time in several years (top) Mean monthly discharge at Foster Park (USGS) and groundwater elevation near HWY 150 bridge (VRWD) since April 2011 (bottom). Three consecutive years of below average precipitation have resulted in groundwater depletion in the Ventura River basin and limited surface connection to only 72 hours during the 2014 fish passage season. Casitas Municipal Water District 1055 Ventura Avenue Oak View, California 93022 TABLE OF CONTENTS Page 1.0 EXECUTIVE SUMMARY........................................................................................... 4 2.0 GENERAL INTRODUCTION..................................................................................... 5 3.0 UPSTREAM FISH MIGRATION IMPEDIMENT EVALUATION................................. 7 3.1 Sandbar Monitoring ...................................................................................... 14 4.0 EVALUATE FISH MOVEMENT THROUGH THE PASSAGE FACILITY................. 17 4.1 Water Velocity and Depth Validation Evaluation........................................... 17 4.2 Fish Attraction Evaluation............................................................................. 17 4.3 Downstream Fish Passage Evaluation ......................................................... 21 5.0 DOWNSTREAM FISH MIGRATION THROUGH THE ROBLES REACH ............... 22 6.0 LONG-TERM MONITORING COMPONENTS.......................................................
    [Show full text]
  • Matilija Dam Removal 65% Design Subtask 2.3: Hydraulic Studies to Determine 100-Year Water Surface Elevations
    TECHNI C A L REPORT ◦ FEBRUARY 2020 Matilija Dam Removal 65% Design Subtask 2.3: Hydraulic Studies to Determine 100-year Water Surface Elevations PREPARED FOR PREPARED BY AECOM Technical Services, Inc. Stillwater Sciences 1999 Avenue of the Stars, Suite 2600 2855 Telegraph Ave., Suite 400 Los Angeles, CA 90067 Berkeley, CA 94705 Stillwater Sciences Subtask 2.3: Hydraulic Modeling Results for Matilija Dam Removal Suggested citation: Stillwater Sciences. 2020. Matilija Dam Removal 65% Design Subtask 2.3: Hydraulic Studies to Determine 100-year Water Surface Elevations. Prepared by Stillwater Sciences, Berkeley, California for AECOM Technical Services, Inc., Los Angeles, California, February. Cover photos: Matilija Dam, Ventura County, California, November 2019, photo taken by Paul Jenkins, Surfrider Foundation. February 2020 Stillwater Sciences i Subtask 2.3: Hydraulic Modeling Results for Matilija Dam Removal Table of Contents 1 EXECUTIVE SUMMARY .................................................................................................... 1 2 INTRODUCTION .................................................................................................................. 2 3 EXISTING CONDITIONS HYDRAULIC MODELING ................................................... 5 3.1 Overview ...................................................................................................................... 5 3.2 Topographic Data ........................................................................................................ 7 3.3 Hydrologic
    [Show full text]
  • Watershed Characteristics
    Ventura River Watershed Management Plan PART 3 Watershed Characteristics 3.1 Overview and Quick Facts ......................... 186 3.2 Physical Features .................................. 196 3.3 Hydrology ............................................ 246 3.4 Water Supplies and Demands ..................... 354 3.5 Water Quality ........................................ 428 3.6 Ecosystems and Access to Nature ................ 492 3.7 Land Use and Demographics ...................... 656 3.1 Overview and Quick Facts 3.1.1 Quick Facts ......................................... 188 Lake Casitas Photo courtesy of Michael McFadden PART 3 • 3.1 OVERVIEW AND QUICK FACTS •  187 3.1 Overview and Quick Facts “Watershed Characterization,” Part 3 of this plan, provides an overview of the current physical, biological, hydrological, and social conditions of the Ventura River watershed. Prepared with the latest available techni- cal data and information and input from a multi-stakeholder review, the Watershed Characterization is intended to help all stakeholders, includ- ing water managers, policy makers, regulators, residents, businesses, and students, better understand the watershed and its many interdependent relationships. The characterization is data-rich—featuring photos, maps, graphics and explanatory sidebars—but is intended to be engaging and easily understandable by lay readers. Each section includes a list of the key documents on that topic where readers can find more detailed and tech- Aerial View of Ventura River Watershed Looking Downstream nical information. 188 VENTURA RIVER WATERSHED MANAGEMENT PLAN 3.1.1 Quick Facts Location: The Ventura River watershed is located in southern California, in western Ventura County, with a small section in the northwest corner located in eastern Santa Barbara County. At 226 square miles, it is the smallest of the three major watersheds in Ventura County, which are the Ventura River, Santa Clara River, and Calleguas Creek watersheds.
    [Show full text]
  • Ventura River Steelhead Restoration and Recovery Plan
    VENTURA RIVER STEELHEAD RESTORATION AND RECOVERY PLAN Prepared for: Casitas Municipal Water District, City of San Buenaventura, Ventura County Flood Control District, Ventura County Transportation Department, Ventura County Solid Waste Management Department, Ojai Valley Sanitary District, Ventura River County Water District, Ojai Basin Ground Water Management Agency, Meiners Oaks County Water Districts, and Southern California Water Company Prepared by: ENTRIX, Inc. Walnut Creek, CA and Woodward Clyde Consultants Santa Barbara, CA Project No. 351001 December 1997 VENTURA RIVER STEELHEAD RESTORATION AND RECOVERY PLAN Prepared for: Casitas Municipal Water District, City of San Buenaventura, Ventura County Flood Control District, Ventura County Transportation Department, Ventura County Solid Waste Management Department, Ojai Valley Sanitary District, Ventura River County Water District, Ojai Basin Ground Water Management Agency, Meiners Oaks County Water Districts, and Southern California Water Company Prepared by: ENTRIX, Inc. 590 Ygnacio Valley Road, Suite 200 Walnut Creek, California 94596 Woodward Clyde Consultants 130 Robin Hill Road, Suite 100 Santa Barbara, California 93117 Project No. 351001 December 1997 TABLE OF CONTENTS Page List of Tables ..................................................................................................................... ix List of Figures.................................................................................................................... xi Executive Summary........................................................................................................
    [Show full text]
  • Part 2 Los Padres National R5-MB-078 Forest Strategy September 2005
    United States Department of Agriculture Land Management Plan Forest Service Pacific Southwest Region Part 2 Los Padres National R5-MB-078 Forest Strategy September 2005 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, Write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Land Management Plan Part 2 Los Padres National Forest Strategy R5-MB-078 September 2005 Table of Contents Tables ....................................................................................................................................................v Document Format Protocols................................................................................................................ vi LAND MANAGEMENT PLAN STRATEGY..................................................................................1
    [Show full text]
  • Ventura County
    Steelhead/rainbow trout resources of Ventura County Rincon Rincon Creek consists of about 9.7 stream miles. It flows southwest, entering the Pacific Ocean at Rincon Point. The culvert at the Highway 101 crossing is a total passage barrier (Stoecker et al. 2002). A watershed plan prepared for Rincon Creek includes a review of historical steelhead information. The review notes O. mykiss stocking occurred in the 1940s and subsequently. Anecdotal accounts of trout observations from the 1950s to the 1980s also are included (Tetra Tech 2007; Stoecker et al. 2002). Rincon Creek was surveyed in 1993 and no fish were observed. The survey report states, “Sediment inputs from Casitas Creek are destroying downstream habitat” (Unknown 1993). A 1994 DFG memo relayed the results of surveys from that year. The memo states, “The Wheeler Fire [in 1985] could have been the event that eradicated rainbow trout from Rincon Creek, although there is anecdotal information from a landowner along Rincon Creek that suggests that the population was extirpated as early as the 1960’s” (DFG 1994a). The memo adds, “It appears that the Highway 101 culvert has prevented the recolonization of rainbow trout/steelhead in Rincon Creek” (DFG 1994a). Consultants surveyed Rincon Creek as part of a steelhead study, and observed O. mykiss likely representing one year class in 2001 (Stoecker et al. 2002). A 2002 memo from NMFS staff states, “Rincon Creek provides approximately 4 miles of steelhead spawning and rearing habitat…” (NMFS 2002a). A 2002 study report notes water quality impacts on Rincon Creek from the large sediment load carried by Casitas Creek, a tributary (Stoecker et al.
    [Show full text]
  • VENTURA RIVER LEVEE SECTION 905(B) (WRDA 86) ANALYSIS VENTURA COUNTY, CALIFORNIA
    US Army Corps of Engineers Los Angeles District VENTURA RIVER LEVEE SECTION 905(b) (WRDA 86) ANALYSIS VENTURA COUNTY, CALIFORNIA DRAFT-FINAL REPORT APRIL 2012 VENTURA RIVER LEVEE SECTION 905(b) (WRDA 86) ANALYSIS VENTURA COUNTY, CALIFORNIA DRAFT-FINAL REPORT Prepared by: Tetra Tech, Inc 17885 Von Karman Avenue Irvine, CA 92614 APRIL 2012 Table of Contents Page 1. STUDY AUTHORITY.................................................................................................................1 2. STUDY PURPOSE.......................................................................................................................1 3. LOCATION OF STUDY, NON-FEDERAL SPONSOR AND CONGRESSIONAL DISTRICTS...................................................................................................................................1 4. PRIOR REPORTS AND EXISTING PROJECTS.....................................................................2 5. PLAN FORMULATION..............................................................................................................3 a. National Objectives ................................................................................................................4 b. Public Concerns ......................................................................................................................4 c. Problems and Opportunities...................................................................................................5 d. Planning Objectives ................................................................................................................9
    [Show full text]