22 Km Tarred on Blantyre-Zomba Road—P4 Window Into Quantity Surveying—P8 Building, Security Special Pullout the Nation 25 July 2013 & Architecture 2 3

Total Page:16

File Type:pdf, Size:1020Kb

22 Km Tarred on Blantyre-Zomba Road—P4 Window Into Quantity Surveying—P8 Building, Security Special Pullout the Nation 25 July 2013 & Architecture 2 3 To Build or to buy property? —P16 22 Km tarred on Blantyre-Zomba Road—P4 Window into quantity surveying—P8 Building, Security SPECIAL PULLOUT THE NATION 25 JULY 2013 & Architecture 2 3 Building, Security & Architecture Elnas Chimdima, executive secretary of Malawi Institution of Engineers The following are institutions and companies which are IL raising the C UN O Y C bar in the T E CI R Y Building, T N A F BL Security O ESY ESY rt U and O Architecture industry in C PHOTOGRAPH: Malawi Buildings serve different needs in society 1. AGA Building a secure Malawi 2. Beram Security uman beings initially lived many aspects as a civil engineering one-room wood-framed, masonry, dwelling units are often called in caves and under trees structure such as a house, worship or adobe dwellings to multi-million apartment buildings or apartment Hfor shelter. This was before centre or a factory for instance, that dollar high-rise buildings able to blocks to differentiate them from 3. Builders’ Base civilisation. has a foundation, wall, a roof and house thousands of people. ‘individual’ houses. The coming in of civilisation other things, that protect human Increasing settlement density in Houses may also be built in pairs marked a new philosophy in the beings and their properties from buildings (and smaller distances (semi-detached), in terraces where 4. Cement living of human beings. Different direct harsh effectS of weather such between buildings) is usually a all but two of the houses have others elements must come together before as rain, wind and sun. response to high ground prices either side. Products a human community develops to the Buildings come in a wide amount resulting from many people wanting Apartments may be built round level of sophistication commonly of shapes and functions, and have to live close to work for instance. courtyards or as rectangular blocks referred to as civilisation. been adapted throughout history Major types of buildings may be surrounded by a piece of ground of 5. Chemspec The first is the existence of for a number of factors, from classified due to usage. varying sizes. settlements classified as towns or building materials available, to Paints cities. This requires food production weather conditions, to land prices, Uses of buildings to be efficient enough for a large ground conditions, specific uses and Residential BUILDING AND minority of the community to aesthetic reasons. Residential buildings are called CONSTRUCTION 6. Far Distributors be engaged in more specialised Buildings serve several needs of houses or homes, though buildings SUPPLEMENT, activities, such as the creation of society, primarily as shelter from containing large numbers of separate PAGE 3 imposing buildings or works of art; weather and as general living space 7. Habitat for the practice of skilled warfare, and to provide privacy, store belongings above all the administration of a and to comfortably live and work. The landmark, and perhaps the most Humanity centralised bureaucracy capable of As a shelter, a building represents famous building in Malawi was St Michaels Malawi running the machinery of state. a physical division of the human and All Angels Church whose building work In this essay, we will dwell on habitat (a place of comfort and safety) spanned across 1888-1891. The architect, buildings, as the main product and the outside (a place that at times Reverend David Clement Scott, was in fact, of civilisation. In architecture, may be harsh and harmful). not an architect at all. 8. Link Building construction, engineering, real Buildings have also become objects estate development and technology. or canvases of artistic expression. In Construction of government buildings in The term building refers to any recent years, interest in sustainable the city of Lilongwe began in the late 1960s. planning and building practices 9. Metro human-made structure used or Lilongwe, officially the capital city of Malawi intended for supporting or sheltering has also become part of the design any use or continuous occupancy. process of many new buildings. since 1975, is a commercial centre with It may also refer to an act of modern buildings such as the Reserve Bank 10. Press Properties ARCHIVE FAST construction (i. e. the activity of Types of buildings FACTS of Malawi. building) and can be defined in Building types may range from SPECIAL PULLOUT THE NATION 25 JULY 2013 Building, Security 2 3 & Architecture Buildings should ensure safety BUILDING AND CONSTRUCTION SUPPLEMENT, PAGE 2 Houses which were built as a single dwelling may later be divided into apartments or bedsitters. They may also be converted to another use such as an office or a shop. Commercial Commercial buildings are those that are built for commercial use; they are mostly used as offices. Industrial or factory Industrial or factory buildings are the ones that are constructed for heavy machinery works. These may range from a motor workshop, factories, production units and many more. IL C UN Looking at different types and O uses of buildings, care has to be Y C T taken when constructing each, to E CI ensure safety for the inhabitants and R Y T the property. N A We have evidenced different F BL sad news in the recent past on the O collapse of buildings in different ESY ESY countries such as Ghana, Tanzania, rt U O and even our own case of Kips in Malawi. These incidences should act as a wake-up call to authorities and communities at large on the type of PHOTOGRAPH: C PHOTOGRAPH: buildings we are constructing. The design of the building matters. They have to be done by well qualified professionals. The building contractors also have to be competent as the durability of the buildings will depend on the quality of workmanship. To avoid such tragedies, it is necessary to engage qualified personnel. Y Work of Town or City planning BRAR If safety and security is to be N LI O ensured on the buildings constructed, I there is need for all building plans at to be approved by the town/city planning. This has been the major challenge on the low standard of buildings N PHOTOGRAPH: as most owners tend to change the plans that were approved, without Government offices in Blantyre seeking approval on the changed plans. are detrimental to construction and where to build. professionals work to secure from both government and the Some people even change the of buildings. Expansive soils such There are places that are their professionalism without any communities. use of the planned building thereby as cotton clay expand so much in marked no for buildings, and interference. Every citizen has a responsibility endangering the inhabitants. For the presence of water and contract these include road reserve areas, to ensure that buildings are secure example a building that has been substantially when dry. those that are under electricity Building materials at all times and the following have to designed as a residential building The volumetric changes lead to power lines, on high-pressure There are different types of be done to build a secure Malawi: is weaker in strength to cater to a cracking of buildings constructed supply water pipes and on top of building materials and the commonly 1. Always use the approved plans factory. on such soils. Solutions include soil secured places. used are cement, sand, burnt bricks, from the town or city planning. removal and replacement with well It is a must that professionals are concrete blocks, stabilised soil 2. Must consult professionals Work of professionals compacted gravel. Alternatively, consulted and plans approved by bricks and many others. (structural engineers, material Building and construction involves deeper foundations using piles or town/ city planners. With all these Building materials also affect engineers, electrical engineers, a lot of work and investigations stub columns to suitable strata can known, most people still choose to the strength of each building and mechanical engineers, architects depending on the size, type and use be employed. use shortcuts risking their lives or these are also chosen depending and, depending on the size of of the building. Weather conditions of the area the lives of the inhabitants. on the site condition. However, building, geological engineers Nevertheless, site condition will also determine the type of Some laws are there but they are due to ignorance and negligence, may be involved) when investigation is of paramount building or roofing style to endure not well known by citizens, and the people choose any material for any constructing a building. importance in as far as building the wind conditions. This calls for law enforcers are weak to enforce building and at any site and this 3. Never construct on a secured safety and durability is the need to consult professionals them, leading to chaotic situations also endangers the security of the land; road reserve, under concerned. when constructing buildings. within the towns. buildings constructed. electricity lines or on high- Site conditions are weather and Again, the fight against corruption Building a secure Malawi pressure supply water lines and subsoil conditions including ground Abiding by the law may well help curb the problems is possible but needs a lot of 4. Resist and refrain from water table. Some soil conditions Malawi has a lot of laws on how at hand; a society where qualified coordination and collaboration corruption. n Building, Security SPECIAL PULLOUT THE NATION 25 JULY 2013 & Architecture 4 5 Y RAR N LIB O I at PHOTOGRAPH: N PHOTOGRAPH: A bridge under construction along Zomba Road 22 kilometres tarred on ZA-BT road BRENDA TWEA “The contractor is also STAFF REPORTER complaining about theft of materials and diesel. Some communities were also hostile at orks on the re-construction commencement of the project, but of the Blantyre-Zomba this is no longer the case,” she WRoad are progressing well said.
Recommended publications
  • Malawi 2018-19 Draft Financial Statement
    Budget Document No. 3 Government of Malawi DRAFT 2018/19 FINANCIAL STATEMENT Ministry of Finance, Economic Planning and Development P.O. Box 30049 Lilongwe ii 2018-19 Financial Statement DRAFT 2018/19 FINANCIAL STATEMENT iii 2018-19 Financial Statement iv 2018-19 Financial Statement Table of Contents Abbreviations and Acronyms .......................................................................................................................... viii 1. INTRODUCTION .......................................................................................................................................... 9 2. THE 2016/17 FISCAL YEAR PERFORMANCE.............................................................................................. 10 2.1 Revenue and Grants ......................................................................................................................... 12 2.1.1 Domestic Revenue ................................................................................................................... 12 2.1.2 Grants ....................................................................................................................................... 13 2.2 Expenditure and Net Lending .......................................................................................................... 14 2.2.1 Recurrent Expenditure ............................................................................................................. 15 2.2.2 Development Expenditures .....................................................................................................
    [Show full text]
  • Draft 2019/20 Financial Statement
    Budget Document No. 3 Government of Malawi DRAFT 2019/20 FINANCIAL STATEMENT Ministry of Finance, Economic Planning and Development P.O. Box 30049 Lilongwe Table of Contents Abbreviations and Acronyms ............................................................................................................................ iv 1. INTRODUCTION .......................................................................................................................................... 5 2. THE 2017/18 FISCAL YEAR PERFOMANCE .................................................................................................. 6 2.1 Revenue ................................................................................................................................................ 9 2.1.1 Domestic Revenue ............................................................................................................................... 9 2.1.2 Grants .................................................................................................................................................. 10 2.2 Expenditure ......................................................................................................................................... 11 2.2.1 Expenses ............................................................................................................................................. 11 2.2.2 Acquisition of Non-Financial Assets .................................................................................................. 12
    [Show full text]
  • Map District Site Balaka Balaka District Hospital Balaka Balaka Opd
    Map District Site Balaka Balaka District Hospital Balaka Balaka Opd Health Centre Balaka Chiendausiku Health Centre Balaka Kalembo Health Centre Balaka Kankao Health Centre Balaka Kwitanda Health Centre Balaka Mbera Health Centre Balaka Namanolo Health Centre Balaka Namdumbo Health Centre Balaka Phalula Health Centre Balaka Phimbi Health Centre Balaka Utale 1 Health Centre Balaka Utale 2 Health Centre Blantyre Bangwe Health Centre Blantyre Blantyre Adventist Hospital Blantyre Blantyre City Assembly Clinic Blantyre Chavala Health Centre Blantyre Chichiri Prison Clinic Blantyre Chikowa Health Centre Blantyre Chileka Health Centre Blantyre Blantyre Chilomoni Health Centre Blantyre Chimembe Health Centre Blantyre Chirimba Health Centre Blantyre Dziwe Health Centre Blantyre Kadidi Health Centre Blantyre Limbe Health Centre Blantyre Lirangwe Health Centre Blantyre Lundu Health Centre Blantyre Macro Blantyre Blantyre Madziabango Health Centre Blantyre Makata Health Centre Lunzu Blantyre Makhetha Clinic Blantyre Masm Medi Clinic Limbe Blantyre Mdeka Health Centre Blantyre Mlambe Mission Hospital Blantyre Mpemba Health Centre Blantyre Ndirande Health Centre Blantyre Queen Elizabeth Central Hospital Blantyre South Lunzu Health Centre Blantyre Zingwangwa Health Centre Chikwawa Chapananga Health Centre Chikwawa Chikwawa District Hospital Chikwawa Chipwaila Health Centre Chikwawa Dolo Health Centre Chikwawa Kakoma Health Centre Map District Site Chikwawa Kalulu Health Centre, Chikwawa Chikwawa Makhwira Health Centre Chikwawa Mapelera Health Centre
    [Show full text]
  • ACE) Office of Higher Education for Development (HED
    U.S. Agency for International Development (USAID) and The American Council on Education (ACE) office of Higher Education for Development (HED) Michigan State University and University of Malawi Partnership “Agro-ecosystems Services: Linking Science to Action in Malawi and the Region (AgESS)” April 5, 2011 – May 30, 2014 FINAL ASSOCIATE AWARD REPORT August 2014 USAID/Malawi Associate Award Cooperative Agreement # AEG-A-00-05-00007-00 Associate Cooperative Agreement # 674-A-00-11-00030-00 Higher Education for Development was established in 1992 by the six major U.S. higher education associations to engage the higher education community in global development. — American Council on Education (ACE) | American Association of Community Colleges (AACC) | American Association of State Colleges and Universities (AASCU) | Association of American Universities (AAU) | National Association of Independent Colleges and Universities (NAICU) | Association of Public and Land-Grant Universities (APLU) PARTNERSHIP INFORMATION Lead Partner Institutions: Michigan State University; University of Malawi-Chancellor College; Lilongwe University of Agriculture and Natural Resources (LUANAR) Secondary Partner Institutions: The Lincoln University Region, Country: Malawi Performance Period: April 5, 2011 – May 30, 2014 Funding Level: Associate Award: $1,385,806 and Subaward: $1,140,000 Proposed Cost Share: $322,204 Table of Contents 1. Executive Summary .................................................................................................. 5 2. Partnership
    [Show full text]
  • FEWS NET Malawi Enhanced Market Analysis September 2018
    FEWS NET Malawi Enhanced Market Analysis 2018 MALAWI ENHANCED MARKET ANALYSIS SEPTEMBER 2018 This publication was produced for review by the United States Agency for International Development. It was prepared by Chemonics International Inc. for the Famine Early Warning Systems Network (FEWS NET), contract number AID-OAA-I-12-00006. The authors’Famine views Early expressed Warning inSystem this publications Network do not necessarily reflect the views of the 1 United States Agency for International Development or the United States government. FEWS NET Malawi Enhanced Market Analysis 2018 About FEWS NET Created in response to the 1984 famines in East and West Africa, the Famine Early Warning Systems Network (FEWS NET) provides early warning and integrated, forward-looking analysis of the many factors that contribute to food insecurity. FEWS NET aims to inform decision makers and contribute to their emergency response planning; support partners in conducting early warning analysis and forecasting; and provide technical assistance to partner-led initiatives. To learn more about the FEWS NET project, please visit www.fews.net. Disclaimer This publication was prepared under the United States Agency for International Development Famine Early Warning Systems Network (FEWS NET) Indefinite Quantity Contract, AID-OAA-I-12-00006. The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States government. Acknowledgements FEWS NET gratefully acknowledges the network of partners in Malawi who contributed their time, analysis, and data to make this report possible. Recommended Citation FEWS NET. 2018. Malawi Enhanced Market Analysis. Washington, DC: FEWS NET.
    [Show full text]
  • Tuberculosis Control in Southern Malawi
    Tuberculosis Control in Southern Malawi Annual Report: October 1, 2006 – September 30, 2007 Cooperative Agreement #: GHS-A-00-06-00012-00 Project Location: Malawi (Mulanje and Phalombe Districts) Project Duration: October 1, 2006 – September 29, 2011 Submitted to: Jill Boezwinkle Cognizant Technical Officer USAID, Office of HIV/AIDS Submitted by: Project HOPE, The People-to-People Health Foundation, Inc. Millwood, Virginia 22646 Tel: (540) 837-2100 Fax: (540) 837-1813 Report Authors: Sandra Dalebout Timothy Kachule Thandiwe Kamanga Elizabeth Kapyepye Caroline Teter Renslow Sherer Marija Joncesvska Table of Contents Table of Contents ............................................................................................................................ 2 Executive Summary ......................................................................................................................... 4 Introduction ............................................................................................................ 4 Overview of Activities and Approaches ....................................................................... 4 Summary of Accomplishments .................................................................................. 4 Major Challenges ..................................................................................................... 4 Activities Planned for Next Year ................................................................................. 5 Program Strategy ...........................................................................................................................
    [Show full text]
  • Fault Reporting
    DISTRICT FAULT REPORTING AREAS COVERED RESPONSIBLE OFFICER DISTRICT FAULT REPORTING AREAS COVERED RESPONSIBLE OFFICER CONTACTING CONTACTING NUMBERS NUMBERS ZOMBA 0881 506 795 Zomba Central, Kalimbuka, Old Kelvin Chatonda NSANJE 0884 016 171 Nsanje Boma, Mbenje, Ntowe, Foreman Njolomole 0885 913 692 Naisi, Chinamwali, District Engineer Marka, Lulwe [email protected] Matawale, Namwera Turnoff, [email protected] 0888 347 703 Machinga, Jali, Thondwe, 0999 521 554 FAULT REPORTING 0888 798 647 Mayaka, Namadzi,Chingale, 0885 913 666 THYOLO 01 473 226 Bvumbwe, Thunga, Makande, Dalo Dzama The Electricity Supply Corporation of Malawi (ESCOM) Limited and Mzuzu Customer Care Centre for customers in Mzuzu City. Changalume,Masaula, Chipini 01 524 236 0885 005 374 Thyolo Boma, Luchenza, [email protected] wishes to inform its valued customers that it has dedicated Faults Nasawa, Domasi, Malosa 0885 913 749 088 591 3653 Reporting Centres across the country, operating around the ESCOM wishes to strongly advise its valued customers Goliyati, Khonjeni, Makwasa, 0888 576 551 clock. Customers are, therefore, advised to report faults to their NCHALO 01 424 270 Nsangwe, Konzere, Nyaikha, Sosten Chilasa Masambanjati, Molele, 01 473 061 that fault clearing services are free of charge. ESCOM is, 0881 950 014 Saopa, Mkumaniza, Miseu 4, [email protected] designated faults reporting centres in their respective districts. therefore, informing its customers not to pay, be it in cash 0885 913 669 Mphungu, Jombo 0999 390 056 Satemwa, Naming’omba, or kind, to any ESCOM staff or any agent for services 0885 913 750 Conforzi, Gotha, Mitengo, Zoa Contact information of the fault centres, responsible officers Thabwa, Dembo, Nkhate, 0886 632 530 rendered such as clearing of faults, just as implementation of paid Masenjere, Phimbi, Oleole, 01 424 350 Thekerani, Folopesi, Didimu, including respective Regional Managers, is published in local up new connection jobs.
    [Show full text]
  • Letter Post Compendium Malawi
    Letter Post Compendium Malawi Currency : Malawi Kwacha Basic services Mail classification system (Conv., art. 17.4; Regs., art. 17-101) 1 Based on speed of treatment of items (Regs., art. 17-101.2: No 1.1 Priority and non-priority items may weigh up to 5 kilogrammes. Whether admitted or not: No 2 Based on contents of items: Yes 2.1 Letters and small packets weighing up to 5 kilogrammes (Regs., art. 17-103.2.1). Whether admitted or not Yes (dispatch and receipt): 2.2 Printed papers weighing up to 5 kilogrammes (Regs., art. 17-103.2.2). Whether admitted or not for Yes dispatch (obligatory for receipt): 3 Classification of post items to the letters according to their size (Conv., art. 17,art. 17-102.2) No Optional supplementary services 4 Insured items (Conv., art. 18.2.1; Regs., 18-001.1) 4.1 Whether admitted or not (dispatch and receipt): No 4.2 Whether admitted or not (receipt only): No 4.3 Declaration of value. Maximum sum 4.3.1 surface routes: SDR 4.3.2 air routes: SDR 4.3.3 Labels. CN 06 label or two labels (CN 04 and pink "Valeur déclarée" (insured) label) used: - 4.4 Offices participating in the service: - 4.5 Services used: 4.5.1 air services (IATA airline code): ET, SAA, KQ. 4.5.2 sea services (names of shipping companies): N/A 4.6 Office of exchange to which a duplicate CN 24 formal report must be sent (Regs., art.17-138.11): Office Name : Lilongwe Office of Exchange Office Code : MWLLWA Address : P.O.
    [Show full text]
  • Von Blantyre Nach Dedza Von Blantyre Nach Mulanje Gescderrodrigues Südenhichte
    Der Süden Von Blantyre nach Dedza Von Blantyre nach Mulanje GescDerRodrigues Südenhichte Von Blantyre nach Mulanje Für diese Strecke stehen zwei Straßen zur Wahl: Die Thyolo-Road führt über die Berge nach 41 km in den Ort Thyolo (sprich: Tscholo), der auf rund 1000 m umringt von Bergen und Teepflanzungen mit Blick auf das Mulanje-Bergmassiv liegt. Mehrere riesige Tee- und Macadamia-Plantagen wechseln hier einander ab, unterbrochen von Waldbeständen mit riesigen Bäumen, Eukalyptusforsten und Palmen. Auf den Feldern sieht man während der Erntesaison Teepflücker bei der mühseligen Pflückarbeit. Die be- schauliche Kleinstadt zu Füßen des gleichnamigen Berges, der leider in den letzten Jahre komplett ab- geholzt wurde, hat eine Post- und Bankfiliale, eine Tankstelle und einen Fahrrad-Taxistand zu bieten. Kurz nach dem Ort wechselt die tropische Szenerie und führt in eine reizlose, massiv abgeholzte Ebe- ne, einen Ausläufer der Phalombe Plain. Man hält jetzt direkt auf den markanten Mulanje Mountain zu. 47 km nach Thyolo erreicht man Chitakali und nahezu übergangslos die Kleinstadt Mulanje. Jetzt tauchen auch wieder Teeplantagen und tropische Bäume wie Flammenakazien und Jacaranda auf. Von Blantyre nach Dedza Alternativ führt die Midima Road von Limbe über Thuchila nach Mulanje. Sie ist zwar etwas kürzer, Für diese Strecke verlässt man Blantyre entlang der Chileka Road aber landschaftlich deutlich weniger reizvoll als die in nördliche Richtung und erreicht nach wenigen Minuten den Fahrt über Thyolo. Linien- und Minibusse bedienen Zur Info: Karte des Chileka Roundabout mit der Zufahrt zum Flughafen. Die weitere beide Strecken. Großraums Blantyre: Strecke bis zur Brücke über den Shire River bei Zalewa bleibt dicht siehe Umschlagklappe besiedelt.
    [Show full text]
  • A Count of Bedside Midwives in Malawi
    A COUNT OF BEDSIDE MIDWIVES IN MALAWI FEBRUARY 2017 i Conducted by Contact Address: Managing Director Area 47, Sector, Malingunde Rd Plot No. 240 P.O. Box 1926 LILONGWE Cell: 0995482 905 0888 358 307 Email:[email protected] ii A Count of Bedside Midwives in Malawi CONTENTS Acknowledgments ................................................................................................................... v Abbreviations ......................................................................................................................... vi Executive Summary ............................................................................................................... vii 1 Introduction ...................................................................................................................... 1 2 Background ...................................................................................................................... 2 3 Objectives of the Survey .................................................................................................. 1 4 Literature Review ............................................................................................................. 2 5 Methodology ..................................................................................................................... 4 5.1 Approach ....................................................................................................................... 4 5.2 Sampling Approach ......................................................................................................
    [Show full text]
  • 1000004247 01.Pdf
    PREFACE In response to a request from the Government of the Republic of Malawi, the Government of Japan decided to conduct a study on Development of the Sena Corridor in the Republic of Malawi and entrusted to the study to the Japan International Cooperation Agency (JICA). JICA selected and dispatched a study team headed by Mr. Hikaru NISHIMURA of Central Consultant Inc. and consists of Central Consultant Inc., Nippon Koei Co., Ltd., Yachiyo Engineering Co., Ltd., and Tostems, Inc. between October 2010 and February 2012. The team held discussions with the officials concerned of the Government of the Republic of Malawi and conducted studies to prepare the Master Plan for Development of the Sena Corridor and carry out the Pre-Feasibility Study of selected priority projects. Upon returning to Japan, the team conducted further studies and prepared this final report. I hope that this report will contribute to the promotion of this project and to the enhancement of friendly relationship between our two countries. Finally, I wish to express my sincere appreciation to the officials concerned of the Government of the Republic of Malawi for their close cooperation extended to the study. February 2012 Kiyofumi KONISHI Director General Economic Infrastructure Department Japan International Cooperation Agency EXECUTIVE SUMMARY Project for the Study on Development on the Sena Corridor Final Report Executive Summary EXECUTIVE SUMMARY 1. Introduction Malawi is a land locked country, and due to long transport distances to ocean ports in neighbouring countries, transport costs to ports are very high, reducing the sustainable international competitiveness of domestic products. The Sena Corridor defined in the Study connects the Southern Region of Malawi and Beira Port by road, railway and inland waterway, which presently suffers obstacles such as disconnection at the Chiromo Washaway and deteriorated conditions of the roads and railway in Mozambique.
    [Show full text]
  • Pdf | 338.95 Kb
    IFPRI Monthly Maize Market Report July 2019 The Monthly Maize Market Report was developed by researchers at IFPRI Malawi with the goal of providing clear and accurate information on the variation of daily maize prices in selected markets throughout Malawi. The reports are intended as a resource for those interested in maize markets in Malawi, namely producers, traders, consumers, or other agricultural stakeholders. Highlights • The average retail maize price increased by 22 percent during July 2019. • By the end of the month, retail prices in all markets were higher than the minimum farmgate price of MWK150/kg. • The average nominal prices in July 2019 were higher than average nominal prices in 2018 and 2017. • Maize prices in Lunzu, near Blantyre, were higher than many other markets in eastern and southern Africa markets during July. Table 1. Maize retail prices (MWK/kg) by market Prices increase by 22 percent in July Market 6-Jul-19 13-Jul-19 20-Jul-19 27-Jul-19 Change Chitipa 140 133 133 157 12% The average price increased by 22 percent in July in contrast Karonga 170 140 144 159 -7% to last month’s price decline of 2 percent. The average retail Rumphi 143 147 142 158 10% Mzuzu 150 147 150 150 0% maize price was MWK192/kg, about 16 percent higher than Jenda 150 133 153 197 31% Mzimba 147 143 143 160 9% that in June. Prices rose in twenty-four markets, fell in one, Salima 160 160 197 207 29% and remained constant in one market during July 2019 (Table Mchinji 153 180 200 216 42% Nsungwi 200 187 187 220 10% 1).
    [Show full text]