± © 2019 RPS Group Notes 1. This drawing has been prepared in accordance with the scope of RPS’s appointment with its client and is subject to the terms and conditions of that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. Environmental Statement Volume 1: Main Chapters Wheelabrator Kemsley (K3 Generating Station) and Wheelabrator Kemsley North 20 Western Avenue, Milton Park, Abingdon, Oxfordshire, OX14 4SH T: +44(0)1235 821 888 E:
[email protected] F: +44(0)1235 834 698 (WKN) Waste to Energy facility Development Consent Order PINS Ref: EN010083 Client Wheelabrator Technologies Inc Planning Act 2008 Project The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 K3 and WKN DCO Regulation: 5(2)(a) Title K3 and WKN Illustrative CGI Document 3.1 September 2019 - Submission Version Status Drawn By: PM/Checked By FINAL CR TS Job Ref Scale @ A3 Date Created OXF9812 NTS MAR 2019 Document Reference Document Number 9812-0052-02 5.10 O:\9812 Kemsley Construction Construction Phase\Tech\Drawings\9812-0052-02.mxd Kemsley O:\9812 O:\9812 Kemsley Construction Phase\Tech\Drawings\9812-0052-02.mxd Infrastructure Planning (Environmental Impact Assessment) (England and Wales) Regulations 2017 ENVIRONMENTAL STATEMENT – MAIN REPORT Client: Wheelabrator Technologies Inc. Project: