Document of the World Bank for OFFICIAL USE ONLY Report No

Total Page:16

File Type:pdf, Size:1020Kb

Document of the World Bank for OFFICIAL USE ONLY Report No Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 38178-IN PROJECT APPRAISAL DOCUMENT ON A Public Disclosure Authorized PROPOSED LOAN IN THE AMOUNT OF US$400 MILLION TO THE SATL JJ JAL VIDYUT NIGAM TD WITH THE GUARANTEE OF THE REPUBLIC OF INDIA Public Disclosure Authorized FOR RAMPUR HYDROPOWER PROJECT August 15,2007 Sustainable Development Department India Country Management Unit South Asia Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective: April 2007) Currency Unit = India Rupees (Rs.) Rs. 41.5 = US$] FISCAL YEAR April 1 - March31 ABBREVIATIONS AND ACRONYMS AAD Advance Against Depreciation MoU Memorandum ofUnderstanding CAG Comptroller and Auditor General MTR Mid Term Review CEA Central Electricity Authority MW Mega Watt CERC Central Electricity Regulatory Commission NGO Non-Governmental Organization co2 Carbon Dioxide NHPC National Hydroelectric Power Corp. cwc Central Water Commission NJHP Nathpa Jhakri Hydroelectric Project/ “Nathpa Jhakri” DPR Detailed Project Report NJPC Nathpa Jhakri Power Corporation DSCR Debt Service Coverage Ratio NO, Nitrogen Oxide EMP Environment Management Plan NPV Net Present Value ERR Economic Rate ofReturn PAPS Project Affected Persons ESIA Environment & Social Impact Assessment PCN Project Concept Note FIRR Financial Internal Rate ofReturn PDO Project Development Objective FM Financial Management PIC Public Information Center GHG Green House Gases PID Project Information Document GoHP Government ofHimachal Pradesh POWERGRID Power Grid Corporation ofIndia Go1 Government ofIndia PPAs Power Purchase Agreements GWh Giga-watt Hour PSU Public Sector Undertaking IAD Internal Audit Department R&R Resettlement & Rehabilitation IBRD International Bank for Reconstruction & RAP Resettlement Action Plan Development ICB International Competitive Bidding RHEP Rampur Hydroelectric Project/ “Rampur” ICR Implementation Completion and Results RFP Request For Proposals Report IDA International Development Association ROE Return on Equity IDC Interest During Construction SBD Standard Bidding Documents IFC International Finance Corporation SEB State Electricity Board IPCC Intergovernmental Panel on Climate Change SJVN Satluj Jal Vidyut Nigam Limited IPPS Independent Power Producers sox Sulphur Oxide ISDS Integrated Safeguard Data Sheet SPM Suspended Particulate Matter Km kilometer USD US Dollar kWh kilowatt hour T&D Transmission & Distribution M&E Monitoring and Evaluation TA Technical Assistance MAT Minimum Alternative Tax TEC Techno Economic Clearance MIS Management Information System TPA Tripartite Agreements MOP Ministry ofPower WACC Weighted Average Cost ofCapital Vice President: Praful C. Pate1 Country Director: Isabel M. Guerrero Senior Manager, India Program: Fayez S. Omar Sector Manager: Salman Zaheer Task Team Leader: Sunil Kumar Khosla / Judith K. Plummer FOR OFFICIAL USE ONLY INDIA Rampur Hydropower Project CONTENTS Page A . STRATEGIC CONTEXT AND RATIONALE .................................................................. 1 1. Country and sector issues .................................................................................................... 1 2 . Rationale for Bank involvement ......................................................................................... 2 3 . Higher level objectives to which the project contributes .................................................... 3 B. PROJECT DESCRIPTION .................................................................................................. 3 1. Lending instrument ............................................................................................................. 3 2 . Project development objective and key indicators .............................................................. 3 3 . Project components ............................................................................................................. 4 4 . Lessons learned and reflected in the project design............................................................ 4 5 . Alternatives considered and reasons for rejection .............................................................. 5 C . IMPLEMENTATION ............................................................................................................. 6 1. Institutional and implementation arrangements .................................................................. 6 2 . Monitoring and evaluation ofoutcomes/results .................................................................. 6 * .. 3 . Sustainability ....................................................................................................................... 6 4 . Critical risks and possible controversial aspects ................................................................. 6 5 . Loadcredit conditions and covenants ................................................................................. 8 D . APPRAISAL SUMMARY .................................................................................................... 9 1. Economic and financial analyses ........................................................................................ 9 2 . Technical ........................................................................................................................... 10 3 . Fiduciary ........................................................................................................................... 11 4 . Social ................................................................................................................................. 12 5 . Environment...................................................................................................................... 13 6 . Safeguard policies ............................................................................................................. 14 7 . Policy Exceptions and Readiness...................................................................................... 15 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not be otherwise disclosed without World Bank authorization. Annex 1: Country and Sector or Program Background ........................................................ 16 Annex 2: Major Related Projects Financed by the Bank and/or other Agencies ................. 24 Annex 3: Results Framework and Monitoring ........................................................................ 26 Annex 4: Detailed Project Description...................................................................................... 29 Annex 5: Project Costs ............................................................................................................... 37 Annex 6: Implementation Arrangements ................................................................................. 38 Annex 7: Financial Management and Disbursement Arrangements ..................................... 43 Annex 8: Procurement Arrangements ...................................................................................... 54 Annex 9: Economic and Financial Analysis ............................................................................. 61 Annex 10: Safeguard Policy Issues.......................................................................................... 100 Annex 11: Project Preparation and Supervision ................................................................... 126 Annex 12: Documents in the Project File ............................................................................... 128 Annex 13: Statement of Loans and Credits ............................................................................ 130 Annex 14: Country at a Glance ............................................................................................... 135 Annex 15: Communications and Public Disclosure ............................................................... 137 Annex 16: Map IBRD 34258 ................................................................................................... 140 INDIA RAMPUR HYDROPOWER PROJECT PROJECT APPRAISAL DOCUMENT SOUTH ASIA SASDE Date: August 15,2007 Team Leader: Sunil Kumar Khosla / Judith K. Plummer Country Director: Isabel M. Guerrero Sectors: Renewable energy (50%); Power (50%) Sector Manager: Salman Zaheer Themes: Infrastructure services for private sector development (P) Project ID: PO951 14 Environmental screening category: Full Assessment Lending Instrument: Specific Investment Loan '? s x. Project Financing Data ij [XI Loan [ 3 Credit [ ]Grant [ ]Guarantee [ 3 Other: For Loans/Credits/Others: Total Bank financing (US$m.): 400.00 Proposed terms: Variable-Spread Loan; maturity of20 years; 5 years grace period; BORROWER 270.00 0.00 270.00 INTERNATIONAL BANK FOR 0.00 400.00 400.00 RECONSTRUCTION AND DEVELOPMENT Total: 270.00 400.00 670.00 Borrower: Satluj Jal Vidyut Nigam Ltd Corporate Himfed Building, New Shimla 17 1009 Headquarters: EPBX: 2670741,2670064,2670490,267062 1; Fax: 2670642 Liaison Office: 303 & 501, Bhikaji Cama Bhawan, Bhikaji Cama Place New Delhi 110066; Phone: 011-41659210 Website: www .sjvn.nic .in Responsible Agency: Satluj Jal Vidyut Nigam Ltd India Expected effectiveness date: December, 2007 Exuected closing date: March, 2013 Does the project depart
Recommended publications
  • Are There Any Special Restrictions That Apply to Suction Dredging
    111111111111111111111111111111111111111111111111111111111111111 WHERE DO I GO FOR MORE General Guidelines for Prospecting, Rockhounding, and Mining on INFORMATION? Rockhounding Lands of the Idaho Panhandle National Forests * on the You can contact one of the Idaho Panhandle If your operation: You will need: National Forests (IPNF) Minerals Contacts listed below for more information. Idaho Panhandle No permit – although some Will cause little or no surface disturbance (e.g., gold National Forests restrictions may apply panning and rockhounding) depending on area. IPNF MINERALS CONTACTS: The 2.5 million acres of the Idaho Panhandle A Free Personal Use National Forests are a great place to Will involve collecting up to 1 ton of flagstone, Mineral Material Permit. experience a wide range of recreational rubble, sand, gravel, or similar material by hand for Available at Ranger opportunities including rock-hounding, gold personal use (non-commercial) Districts IPNF Minerals and Geology Program Leader prospecting, and garnet digging. Kevin Knesek, Email: [email protected] Uses a small sluice or rocker box Submit a Notice of Intent 3815 Schreiber Way Submit a Notice of Intent Coeur d’Alene, ID 83815 (208) 765-7442 AND provide a current Uses a suction dredge with up to a 5 inch intake copy of approved IDWR nozzle and/or with an engine rating up to 15 IPNF Geologist Recreational Dredging horsepower Josh Sadler, Email: [email protected] Permit and approved 3815 Schreiber Way NPDES permit from EPA Coeur d’Alene, ID 83815 Uses a suction dredge with greater than a 5 inch (208) 765-7206 intake nozzle and/or with an engine rating above 15 Submit a Plan of Operation IPNF Geologist horsepower Courtney Priddy, Email: [email protected] Uses motorized equipment and/or will cause 3815 Schreiber Way Submit a Plan of Operation significant surface disturbance Coeur d’Alene, ID 83815 (208) 765-7207 *Depending on location and scope of your operations, USFS environmental analysis may be required and/or additional agencies may be involved and require additional permits.
    [Show full text]
  • Newsletter Issue of MAY-JUNE, 2017
    COSIDICI COURIER BI MONTHLY JOURNAL OF COUNCIL OF STATE INDUSTRIAL DEVELOPMENT and INVESTMENT CORPORATIONS OF INDIA VOL. LV NO. 3 MAY-JUNE, 2017 EDITORIAL BOARD CONTENTS Chairman of the Editorial Board Ordinance to Empower RBI gives more Teeth Smt. Smita Bharadwaj, IAS to Govt. ......................................................... 2 Managing Director Madhya Pradesh Financial Corporation A Commitment to Support Initiatives.......... 4 Indore Appointments ............................................ 7 Vice-Chairman Letter to The Editor .................................... 8 Shri U.P. Singh, IRS (Retd.) Profile of Member Corporations: ................ 9 Ex-Chief Commissioner, Income-Tax & [Delhi State Industrial and Infrastructure TRAI Member Development Corporation Ltd. {DSIIDC}] Do You Know ? .......................................... 11 Members Economic Scene ....................................... 12 Shri R.C. Mody Ex-C.G.M., RBI Questions of Cyberquiz - 66 ...................... 13 Shri P.B. Mathur Success Stories of KSFC Assisted Units .. 14 Ex-E.D., RBI Member Corporations ............................... 15 Shri K.C. Ganjwal Former Member, Company Law Board, All India Institutions ................................... 17 Government of India News from States ..................................... 19 Associate Editor Micro, Small and Medium Enterprises ...... 22 Smt. Renu Seth Answers of Cyberquiz ~ 66 ...................... 23 Secretary, COSIDICI Health Care .............................................. 24 The views expressed in
    [Show full text]
  • 1 MODAL GRAIN SIZE EVOLUTION AS IT RELATES to the DREDGING and PLACEMENT PROCESS – GALVESTON ISLAND, TEXAS Coraggio Maglio1, H
    MODAL GRAIN SIZE EVOLUTION AS IT RELATES TO THE DREDGING AND PLACEMENT PROCESS – GALVESTON ISLAND, TEXAS Coraggio Maglio1, Himangshu S. Das1 and Frederick L. Fenner1 During the fall and winter of 2015, a beneficial-use of dredged material project taking material from the Galveston Entrance Channel and placing it on a severely eroded beach of Galveston Island was conducted. This material was estimated to have 38% fines. This operation was conducted again in the fall of 2019 and monitored for estimation of the loss of fines, changes in compaction and color from the dredging source to the beach. The local community and state funded the incremental cost at approximately $8 a cubic yard in 2015, and $10.5 a cubic yard in 2019 to have this material pumped to the beach. The projects were closely monitored by the U.S. Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) and the USACE Galveston District. The data from this placement project was used to calculate and better understand the loss of fines during the dredging and placement process as well as aid in the generation of an empirical formula to estimate the loss of fine sediments during dredging and beach placement. This formula takes into account: losses due to dredging equipment operations, slope of the effluent return channel at the beach, sediment settling velocity, and sorting parameter. Keywords: beneficial use; dredging process; fines loss; fate of fines; beach nourishment; beach placement INTRODUCTION The scarcity of quality sediments for beach placement projects has become a challenge in United States of America and internationally.
    [Show full text]
  • Certification for Dredge Professionals- the Why and How
    Proceedings of Western Dredging Association and Texas A&M University Center for Dredging Studies' "Dredging Summit and Expo 2015" CERTIFICATION FOR DREDGE PROFESSIONALS- THE WHY AND HOW A. Alcorn1, D. Hayes2, and R. Randall3 ABSTRACT The dredging industry encompasses a wide range of professional disciplines including civil, coastal, dredging, environmental, mechanical, ocean engineering and marine science as well as cost estimation and construction management to name a few. Many organizations currently offer special recognition in the form of certification for attaining a higher level of expertise within the discipline. Examples include Leadership in Energy and Environmental Design (LEED), ENVISION (framework for evaluating roads and infrastructure, similar to LEED standards for buildings) certification, Academy of Coastal, Ocean, Port, and Navigation Engineering (ACOPNE), and many computer industries for specific software. This paper investigates types of certifications available, discusses their applicability to the dredging industry, and proposes certification concepts the Western Dredging Association (WEDA) might champion that could potentially benefit the industry. The paper explores the need for a dredging-specific certification and describes general processes that might be implemented. Keywords: Dredging certification, certification process, value, types of certification. INTRODUCTION There has been a concentrated emphasis recently in professional organizations to provide a process to recognize mastery of specialized areas of expertise. There are many catalysts for this trend. Entry-level and early career individuals see a need to differentiate themselves from others to either break into a difficult job market or advance more rapidly in their organizations. Some professional certifications (such as professional engineers and land surveyors) are required by law. Public and private entities sometimes use certifications to establish minimum qualifications for contractors.
    [Show full text]
  • Opting out of Industrial Meat
    OPTING OUT OF INDUSTRIAL MEAT HOW TO STAND AGAINST CRUELTY, SECRECY, AND CHEMICAL DEPENDENCY IN FOOD ANIMAL PRODUCTION JULY 2018 www.centerforfoodsafety.org TABLE OF CONTENTS I. INTRODUCTION: CRUELTY, SECRECY, & CHEMICAL DEPENDENCY 1 II. WHAT IS “INDUSTRIAL MEAT”? 7 III. TEN REASONS TO OUT OPT OF INDUSTRIAL MEAT 11 For Our Health 11 For Food Workers 13 For Pollinators 14 For Water Conservation 15 For Animals 17 For Climate 18 For Healthy Communities 19 For Food Safety 19 For Farmers 21 For Local Economies 22 IV. HOW TO OPT OUT OF INDUSTRIAL MEAT 23 1. Eat Less Meat Less Often 24 2. Choose Organic, Humane, and Pasture-Based Meat Products 26 3. Eat More Organic and Non-GMO Plant Proteins 28 V. CONCLUSION & POLICY RECOMMENDATIONS CHARTS Plant-Based Sources of Protein 30 Fish 31 ENDNOTES 32 CENTER FOR FOOD SAFETY OPTING OUT OF INDUSTRIAL MEAT INTRODUCTION: CRUELTY, SECRECY, & CHEMICAL DEPENDENCY hat came first—the chicken or the egg? ible toll on our climate, water, soils, wildlife, and WIt’s difficult to know whether increasing health. What’s more, massive production of animals consumer demand for meat and poultry in these conditions requires intensive production products has driven drastic increases in production of grains for feed, which contributes to high pes - levels, or vice versa. What we do know with cer - ticide use and threatens wildlife. 1 tainty, though, is that demand for and production of meat and poultry products has increased dra - Nevertheless, demand for meat and poultry con - matically in the U.S. and globally in the last 70 years.
    [Show full text]
  • Field Engineer - Dredging Cashman Dredging and Marine Contracting Company, LLC - East Coast USA (Greater Boston Area)
    Field Engineer - Dredging Cashman Dredging and Marine Contracting Company, LLC - East Coast USA (Greater Boston Area) Job Description Cashman Dredging is an Equal Employment Opportunity employer. Location: USA Status: Full Time Company: Cashman Dredging and Marine Contracting Company, LLC 549 South Street Quincy, MA 02169 Phone: 617-890-0600 Fax: 617-890-0606 URL: http://www.cashmandredging.com Cashman Dredging and Marine Contracting Company LLC performs capital and maintenance dredging, environmental remediation dredging, and beach nourishment work in the United States, the Caribbean, and South America. Our growing fleet of dredges includes Backhoe, Clamshell, Cutter Suction, and Trailing Suction Hopper Dredges. A state of the art Drilling and Blasting Barge, Split Hull Scows, Hopper Barges, Boosters, Tugboats, and Survey Vessels round out the fleet of support and attendant plant. Based in Quincy, Massachusetts, Cashman Dredging operates throughout the East and Gulf Coasts of the US as well as the Caribbean and South America. We are currently seeking Field Engineers with experience in dredging or a related marine field for dredging projects and for work in multiple marine disciplines. Field Engineers are responsible for ensuring a safe work environment during all operations and tasks and for marine surveying or related dredging and marine construction surveying work. Individual will be responsible for document production, and daily quality control and quality assurance monitoring & reporting. Desired candidate must be willing to work demanding schedule and work flexible hours including nights and weekends as required to meet schedule. Extensive travel and / or relocation based upon project assignment may be required. Main responsibilities: • Ensuring a safe work environment during all operations and tasks • Oversee the planning and progress of field operations • Ensuring that Dredge productivity is maximized • Performing single beam and multi-beam surveys • Monitoring all aspects of the project execution Requirements: • B.S.
    [Show full text]
  • 2015-03-10 Dredging Presentation by Randall.Pdf
    C DS R. E. Randall Bauer Professor of Dredging Engineering Director, Center for Dredging Studies Ocean Engineering/Department of Civil Engineering Texas A&M University C DS OVERVIEW Dredging Equipment Dredge Production Dredged Material Placement Open water Confined (Upland) Beneficial use Environmental Laws Summary Presentation for Lone Star Harbor Safety Committee 2 C DS DREDGING EQUIPMENT DREDGE MECHANICAL HYDRAULIC Dipper Bucket Ladder Hopper Sidecasting Pipeline Agitation Clamshell Dragline Backhoe Bucket-Ladder Plain Suction Cutterhead Bucket Wheel Dustpan Presentation for Lone Star Harbor Safety Committee 3 C DS HOPPER DREDGE Presentation for Lone Star Harbor Safety Committee 4 C DS HOPPER DREDGE (GLDD LIBERTY ISLAND & MURDEN SPLIT HULL HOPPER DREDGE) Presentation for Lone Star Harbor Safety Committee 5 C DS MECHANICAL CLAMSHELL DREDGE Presentation for Lone Star Harbor Safety Committee 6 C DS PIPELINE DREDGES AND SLURRY TRANSPORT Typical pipeline diameters range from 15 to 92 cm (6 to 36 in) Pipes are commonly constructed with steel or a composite material such as high density polyethylene Pipelines may be submerged, floating, or placed on the shore. Floating pipelines may be supported by pontoons or flotation material. Length of the pipelines varies from short distances such as several hundred feet to several miles. Presentation for Lone Star Harbor Safety Committee 7 C DS CUTTER SUCTION DREDGE & CUTTERS Presentation for Lone Star Harbor Safety Committee 8 C DS ADVANCING WITH FIXED α α SPUDS Presentation for Lone Star
    [Show full text]
  • Trailing Suction Hopper Dredger
    Chapter 2 Trailing suction hopper dredger 2 Trailing suction hopper dredger............................................................................................ 10 2.1 General description .................................................................................................. 10 2.1.1 Characteristics............................................................................................. 10 2.1.2 Application area .......................................................................................... 11 2.1.3 History......................................................................................................... 11 2.1.4 Work method............................................................................................... 13 2.2 The design................................................................................................................ 16 2.2.1 The productive capacity .............................................................................. 16 2.2.2 The main dimensions .................................................................................. 18 2.2.3 The dredge installation................................................................................ 23 2.2.4 The propulsion power ................................................................................. 40 2.2.5 Power balance ............................................................................................. 46 2.2.6 Main layout ................................................................................................
    [Show full text]
  • Guidance for Subaqueous Dredged Material Capping
    Technical Report DOER-1 June 1998 US Army Corps of Engineers Waterways Experiment Station Dredging Operations and Environmental Research Program Guidance for Subaqueous Dredged Material Capping by Michael R. Palermo, James E. Clausner, Marian P. Rollings Gregory L. Williams, Tommy E. Myers, WES Thomas J. Fredette, New England District Robert E. Randall, Texas A&M University Approved For Public Release; Distribution Is Unlimited Prepared for Headquarters, U.S. Army Corps of Engineers The contents of this report are not to be used for advertising, publication, or promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products. The findings of this report are not to be construed as an official Department of the Army position, unless so desig- nated by other authorized documents. PRINTED ON RECYCLED PAPER Dredging Operations and Technical Report DOER-1 Environmental Research Program June 1998 Guidance for Subaqueous Dredged Material Capping by Michael R. Palermo, James E. Clausner, Marian P. Rollings Gregory L. Williams, Tommy E. Myers U.S. Army Corps of Engineers Waterways Experiment Station 3909 Halls Ferry Road Vicksburg, MS 39180-6199 Thomas J. Fredette U.S. Army Engineer District, New England 696 Virginia Road Concord, MA 01742-2751 Robert E. Randall Texas A&M University College Station, TX 77843 Final report Approved for public release; distribution is unlimited Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Waterways Experiment Station Cataloging-in-Publication Data Guidance for subaqueous dredged material capping / by Michael R. Palermo ... [et al.] ; prepared for U.S.
    [Show full text]
  • Conversion of Potomac River Dredge Sediments to Productive Agricultural Soils1
    CONVERSION OF POTOMAC RIVER DREDGE SEDIMENTS TO PRODUCTIVE AGRICULTURAL SOILS1 W. Lee Daniels, G. Richard Whittecar, and Charles H. Carter III2 Abstract. River channel and harbor dredging activities in the eastern USA generate hundreds of millions of yards of dredge materials annually with very little used beneficially. The Woodrow Wilson Bridge project across the Potomac River at Washington D.C. generated in excess of 450,000 m3 of silt loam, high pH, low salt dredge materials. The materials were barged to Shirley Plantation on the James River in Charles City Co. Virginia, and placed into an upland utilization area atop a previously reclaimed sand and gravel mine. The strongly reduced inbound sediments were very low in sulfides, pesticides, and other contaminants. The materials were dewatered, treated with varying rates of yardwaste compost and planted to wheat (Triticum vulgare) in the fall of 2001 and corn (Zea mays) in 2002 and 2003. Winter wheat yields in 2001 were similar to local agricultural lands despite animal damage and less than ideal establishment conditions. Average corn yields in 2002 were greater than long-term county prime farmland yields in a severe drought year (2002) and equaled county averages in a wet year (2003). Soil pit and auger observations revealed significant oxidation and formation of a deep Ap-AC-C profiles with coarse prismatic structure within two years after placement. Overall, the chemical and physical properties of these materials are equal or superior to the best topsoils in the region, supporting federal initiatives to utilize suitable dredge materials in upland environments whenever possible. Additional Key Words: Sand and gravel mining, oxidation, water quality, beneficial use.
    [Show full text]
  • Review of the Ecological Effects of Dredging in the Cultivation and Harvest of Molluscan Shellfish
    NOAA Technical Memorandum NMFS-NE-220 Review of the Ecological Effects of Dredging in the Cultivation and Harvest of Molluscan Shellfish US DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Marine Fisheries Service Northeast Fisheries Science Center Woods Hole, Massachusetts December 2011 NOAA Technical Memorandum NMFS-NE-220 This series represents a secondary level of scientific publishing. All issues employ thorough internal scientific review; some issues employ external scientific review. Reviews are transparent collegial reviews, not anonymous peer reviews. All issues may be cited in formal scientific communications. Review of the Ecological Effects of Dredging in the Cultivation and Harvest of Molluscan Shellfish Renee Mercaldo-Allen and Ronald Goldberg NOAA National Marine Fisheries Service, 212 Rogers Avenue, Milford CT 06460 US DEPARTMENT OF COMMERCE John E Bryson, Secretary National Oceanic and Atmospheric Administration Dr. Jane Lubchenco, Administrator National Marine Fisheries Service Eric C. Schwaab, Assistant Administrator for Fisheries Northeast Fisheries Science Center Milford, Connecticut December 2011 Editorial Notes Information Quality Act Compliance: In accordance with section 515 of Public Law 106-554, the Northeast Fisheries Science Center completed both technical and policy reviews for this report. These predissemination reviews are on file at the NEFSC Editorial Office. Species Names: The NEFSC Editorial Office’s policy on the use of species names in all technical communications is generally to follow the American Fisheries Society’s lists of scientific and common names for fishes, mollusks, and decapod crustaceans and to follow the Society for Marine Mammalogy's guidance on scientific and common names for marine mammals. Exceptions to this policy occur when there are subsequent compelling revisions in the classifications of species, resulting in changes in the names of species.
    [Show full text]
  • Surf Clam Dredging in Southern Maine History
    The Life and Death of a Small-Scale Fishery Surf Clam Dredging in Southern Maine history. Although each location has its unique variations, lobsters tend to be abundant in shallow water during late summer and early fall, while they are found only in less accessible deep water during the winter and early spring (see Wilder and Murray 1958; Dow 1969; Cooper and Uzmann 1971; Acheson Craig T. Palmer 1980b, 1988). Memorial University of Newfoundland Lobstering had to be abandoned during the winter months until recent technological advances such as engines, radar, sternmen (known as 'helpers'), ABSTRACTThis paper describes the history of small-scale surf clam dredging along the and larger boats made winter lobstering possible. In fact, 'The forties and coast of southern Maine. By identifying the economic, social, and environmental factors fifties were the first years in which lobster fishing was at least marginally leading to the adoption and subsequent abandonment of surf clam dredging, this history r------nrofitable as a full-time year-round endeavor' (Martin and Lipfert 1985:87; illustrates the interaction of two major factors in the social and ecologica! conditions of see also Wilson and Acheson 1980). Even now, offshore lobstering is not a Maine lobstermen. The first is the importance of seasonally pursuing other species in order practical alternative for many lobstermen, and few earn enough from to supplement lobster fishing. The second is the fragile relationship between lobstermen lobstering during the summer months to last through the winter. This means and regulatory agencies. Through their management of potential pollution problems in that 'the difference between financial success and failure in many cases is surf clams, regulatory agencies became the primary determinant of the seasonal fishing closely connected with the ability to change species fished as prices or the tactics of some lobstermen.
    [Show full text]