PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, One WASH- Consolidated WASH Account (CWA) Project “Phase II”, P167794 Project Implementation agency: Water Development Commission (WDC) of the Ministry of Public Disclosure Authorized Water, Irrigation and Energy (MoWIE) Date of the Procurement Plan: August 28, 2019 Period covered by this Procurement Plan: September 2019 to August 2020.

Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Public Disclosure Authorized This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement

Public Disclosure Authorized Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Section 33(1)(a) from 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration Proclamation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions.

• Open Advertising of the procurement opportunity at the national level; • The procurement is open to eligible firms from any country; • The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance with the Bank’s Anti- Public Disclosure Authorized Corruption Guidelines, including without limitation the bank’s right to sanction and the Bank’s inspection and audit right; • Contracts with an appropriate allocation of responsibilities, risks and liabilities; • Application of Standstill period and Publication of contract award information; • Maintenance of records of the procurement process; and • The Bank has the right to review procurement documentation and activities. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations.

Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is applicable for those contracts identified in the Procurement Plan; Works: Is applicable for those contracts identified in the Procurement Plan. Other Relevant Procurement Information. None PROCUREMENT Ethiopia : One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) PLAN General Information

Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2020-01-13 Revised Plan Date(s): (comma delineated, leave blank if none)2020-04-01 Project ID: P167794 GPN Date: 2019-12-06 Project Name: One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) Loan / Credit No: IDA / 64450 Executing Agency(ies): Water Resource Development Bureau

WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

ET-SOMALI RWRDB- 147843-CW-RFB / drilling Rural Water Supply, Pending Single Stage - One and construction of 2 water IDA / 64450 Sanitation, and Hygiene Post Request for Bids Open - National 0.00 Implementati 2020-02-21 2020-03-02 2020-04-01 2020-05-01 2020-06-12 2020-09-10 Envelope well for sagag and (Rural WASH) on by somali region water bureau

GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

ET-SOMALI RWRDB- 148887-GO-RFQ / Rural Water Supply, Pending Request for Single Stage - One procurement of water quality IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementati 2020-03-23 2020-05-18 2020-07-17 Quotations Envelope test kit for woredas by (Rural WASH) on somali region region water bureau

ET-SOMALI RWRDB- 165257-GO-RFB / Procurement of Office Furniture (26 tables, 13 shelves and 78 chairs) to Pending 13 new CWA-II Woredas ( Institutional Strengthening Request for Single Stage - One IDA / 64450 Post Limited 0.00 Implementati 2020-04-25 2020-06-20 2020-08-19 Tuliguled, Gota-biki, Geblelu, and Project Management Quotations Envelope on Shabeley, Gogla, Higloley, Lehel-Yu,ub, Galhamur, Elele, Wangay, God-God, East-Imey and Qadadumo Woredas ) by Regional WB

ET-SOMALI RWRDB- 165788-GO-RFQ / Procurement of Office Equipment (13 Desktops and 13 Printers) for Tuliguled, Pending Institutional Strengthening Request for Single Stage - One Gota-biki, Geblelu, Shabeley, IDA / 64450 Post Limited 0.00 Implementati 2020-05-30 2020-07-25 2020-09-23 and Project Management Quotations Envelope Gogla, Higloley, Lehel-Yu,ub, on Galhamur, Elele, Wangay, God-God, East-Imey and Qadadumo Woredas ) by regional WB

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

ET-SOMALI RWRDB- 155908-CS-QCBS / Selection and Employment of consultant by Conducting Study and detail design for Rural Water Supply, Seven woredas (Ararso, Quality And Cost- Pending IDA / 64450 Sanitation, and Hygiene Post Open - National 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-09-19 Aware, Daror, Galhamur, Based Selection Implementation (Rural WASH) Lahel,Yu’ub, Higloley and Gogla Woredas) water supply projects by somali region water resource development bureau

ET-SOMALI RWRDB- 155909-CS-QCBS / Selection and Employment of Consultant for the Implementation for Study and detail design for 7 Rural Water Supply, Quality And Cost- Pending Woredas (Tuliguled, IDA / 64450 Sanitation, and Hygiene Post Open - National 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-09-19 Based Selection Implementation Shabeley, Goljano, Gablalu, (Rural WASH) Gota-biki, Mayamuluqo and Qubi Woredas) Water Supply Projects by Somali RegionWater Resource Development Bureau

ET-SOMALI RWRDB- 155910-CS-QCBS / Selection and Employment of Consultant Service for Study & Detail Design for Seven Rural Water Supply, Woredas (Degahmadaw, Quality And Cost- Pending IDA / 64450 Sanitation, and Hygiene Post Open - National 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-09-19 Sagag, Duhun, , Based Selection Implementation (Rural WASH) , Wangey and East- Imey Woredas) Water Supply Projects by Somali Region Water Resource Development Bureau

ET-SOMALI RWRDB- 155911-CS-QCBS / Selection and Employment for Consultant service for Study and Detail design for Seven Rural Water Supply, Woredas (Elale, Elwayne, Quality And Cost- Pending IDA / 64450 Sanitation, and Hygiene Post Open - National 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-11 2020-07-11 2020-08-15 2020-09-19 2021-09-19 Elkari, , Godgod Based Selection Implementation (Rural WASH) Karsadule and Qadaduma Woredas ) Water Supply Project by Somali Region Water Resource Development Bureau

INDIVIDUAL CONSULTANTS

Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual