Building Plot with Planning Permission

Building Plot, Church Stowe, NN7 4SG Building plot with planning permission for a contemporary residential dwelling • Plans for a eco- friendly property of approximately 5,400 sq ft (GIA) • In all about 2 acres

Local information Northampton (The Saints); Church Stowe is a rural village theatre at Milton Keynes and situated in the south Northampton. Northamptonshire countryside about 6 miles north-west of Approximate distances: . Towcester 6 miles, M1 junction 15a 7 miles, Northampton 8 miles, The market town of Towcester Milton Keynes 19 miles, M40 provides for everyday junction 10 25 miles. requirements with a range of boutique shops, banks, leisure About this property centre, doctor’s surgery and both CONCEPT - In March 2012 Waitrose and Tesco paragraph 55 of the National supermarkets. Planning Policy framework provided opportunities to Milton Keynes and Northampton develop exceptional dwellings in offer an extensive selection of open countryside. Paragraph 55 shopping and leisure facilities. requires that schemes “promote the sustainable development in Communication is excellent with rural areas, housing should be M1 (J15A) about 7 miles, and A43 located where it will enhance and dual carriageway (about 6.8 maintain vitality of rural miles) linking to the M40 (J10). communities”. With this in mind Mainline train services run from our client’s architects have Milton Keynes to London/Euston designed an exceptional dwelling in about 35 minutes peak time. based on landscape led architecture that reflects its Independent schools in the area context and is compliant with include:- Winchester House Prep code 5 of the code for (Brackley), Bilton Grange Prep sustainable homes. (Dunchurch), Northampton Independent Grammar School SITE ANALYSIS - The design is (), Northampton High the result of 2 years of (girls), Thornton College (girls), architecture and landscape Stowe, Rugby, Oundle, Oakham designed development, site and Uppingham public schools. analysis and assessment of the visual impact alongside Sporting and recreational environmental design and facilities include horse racing at assessment. The building Towcester; motor racing at orientation, form, mass, scale and Silverstone; golf at Northampton siting have all been reached with Country Course (Chapel consideration to existing Brampton), , landscape characteristics of the Collingtree, and golf course, spa site. and hotel complex at the neighbouring village of BUILDING DESIGN - The Whittlebury; Bicester Village development will significantly Retail Park; rugby at exceed the requirements set out by the current building comprises four generous regulations for energy usage. The bedrooms and two bath/shower external walls will be formed of rooms. structural insulated panels, an The grounds extend to about 2 energy efficient design resulting acres where mature trees and in increased insulation value existing hedgerows will be which will provide the building retained in part. New planting will with a stable temperature in both complement the site with wild summer and winter. flower meadow, orchard and lawn gardens. ENERGY EFFICIENT SYSTEMS - The access to the site is from a There will be improved resource private lane to the east with a efficiency as well as energy gravelled driveway leading to a efficiency. All appliances will be A parking area and double garage. rated for water efficiency. A greywater system will also be PLANNING - Planning permission installed. The green roof will was granted on 18th August 2018 absorb all but the heaviest of application reference rainfall and the porous amenity DA/2018/0386 by space paving will absorb the District Council for the surplus rain water to be stored demolition of agricultural for use in the garden. During buildings and construction of a winter months the living spaces single dwelling. will benefit from solar gain when the sun is lowest in the sky whilst RIGHTS OF WAY - There are no during the summer months the rights of way crossing the site. sun’s steeper angle will be Access to the site is via a right of shaded by the overhanging roof way over the lane leading from preventing overheating. The Main Street. design incorporates a heat recovery system as well as a SERVICES - Services in the form ground source heat pump which of water, electricity and drainage uses natural heat stored in the are available locally. ground. This will be used to power the underfloor heating, LOCAL AUTHORITY - Daventry maintaining a better level of District Council. thermal comfort. TENURE: Freehold DESCRIPTION AND ACCOMMODATION - Please refer AGENTS NOTE: Images are to floor plans. computer generated. It is important to note that the primary focus is on open plan living with kitchen and living Details prepared: February 2021 space at the front of the property CGI's prepared: August 2017 behind triple glazed windows that overlook the outdoor living Viewing space to the south. There is a Strictly by appointment with central open air courtyard for Savills alfresco entertaining. The design also provides an entertainment space for a cinema room, a study, utility room and plant room. The bedroom wing is to the west and Building Plot, Church Stowe, Northamptonshire NN7 4SG Nick Rudge Savills Banbury 01295 228002 savills savills.co.uk [email protected]

Important notice: Savills, their clients and any joint agents give notice that 1: They are not authorised to make or give any representations or warranties in relation to the property either here or elsewhere, either on their own behalf or on behalf of their client or otherwise. They assume no responsibility for any statement that may be made in these particulars. These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. 2: Any areas, measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. It should not be assumed that the property has all necessary planning, building regulation or other consents and Savills have not tested any services, equipment or facilities. Purchasers must satisfy themselves by inspection or otherwise. 12022091 Job ID: 148991 User initials: NR