Public Notice
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
San Joaquin Regional Rail Commission
Chair, Christina Fugazi, City of Stockton Commissioner, Nancy Young, City of Tracy Vice Chair, Leo Zuber, City of Ripon Commissioner, Bob Elliott, San Joaquin County Commissioner, Bob Johnson, City of Lodi Commissioner, Scott Haggerty, Alameda County Commissioner, Debby Moorhead, City of Manteca Commissioner, John Marchand, City of Livermore Executive Director, Stacey Mortensen SAN JOAQUIN REGIONAL RAIL COMMISSION This Agenda shall be made available upon request in alternative formats to persons with a disability, as required by the Americans with Disabilities Act of 1990 (42 U.S.C. § 12132) and the Ralph M. Brown Act (California Government Code § 54954.2). Persons requesting a disability related modification or accommodation in order to participate in the meeting should contact San Joaquin Regional Rail Commission (SJRRC) staff, at (209) 944-6220, during regular business hours, at least twenty-four hours prior to the time of the meeting. All proceedings before the Commission are conducted in English. Anyone wishing to address the SJRRC Board is advised to have an interpreter or to contact SJRRC during regular business hours at least 48 hours prior to the time of the meeting so that SJRRC can provide an interpreter. Any writings or documents provided to a majority of the Commission regarding any item on this agenda will be made available upon request in both English and Spanish for public inspection at the Office of the Executive Director located at 949 East Channel Street, Stockton, California, 95202 during normal business hours or by calling (209) 944-6220. The Agenda is available on the San Joaquin Regional Rail Commission website: www.acerail.com. -
SAN JOAQUIN REGIONAL RAIL COMMISSION This Agenda Shall Be Made Available Upon Request in Alternative Formats to Persons with A
Chair, Christina Fugazi, City of Stockton Commissioner, Nancy Young, City of Tracy Vice Chair, Leo Zuber, City of Ripon Commissioner, Bob Elliott, San Joaquin County Commissioner, Bob Johnson, City of Lodi Commissioner, Scott Haggerty, Alameda County Commissioner, John Marchand, City of Livermore Commissioner, Debby Moorhead, City of Manteca Executive Director, Stacey Mortensen SAN JOAQUIN REGIONAL RAIL COMMISSION This Agenda shall be made available upon request in alternative formats to persons with a disability, as required by the Americans with Disabilities Act of 1990 (42 U.S.C. § 12132) and the Ralph M. Brown Act (California Government Code § 54954.2). Persons requesting a disability related modification or accommodation in order to participate in the meeting should contact San Joaquin Regional Rail Commission (SJRRC) staff, at (209) 944-6220, during regular business hours, at least twenty-four hours prior to the time of the meeting. All proceedings before the Commission are conducted in English. Anyone wishing to address the SJRRC Board is advised to have an interpreter or to contact SJRRC during regular business hours at least 48 hours prior to the time of the meeting so that SJRRC can provide an interpreter. Any writings or documents provided to a majority of the Commission regarding any item on this agenda will be made available upon request in both English and Spanish for public inspection at the Office of the Executive Director located at 949 East Channel Street, Stockton, California, 95202 during normal business hours or by calling (209) 944-6220. The Agenda is available on the San Joaquin Regional Rail Commission website: www.acerail.com. -
2-5-21 SJRRC Agenda Packet
Chair, Christina Fugazi, City of Stockton Commissioner, Nancy Young, City of Tracy Vice Chair, Leo Zuber, City of Ripon Commissioner, Kathy Miller, San Joaquin County Commissioner, Jose Nuno, City of Manteca Commissioner, Melissa Hernandez, Alameda County Commissioner, Lily Mei, City of Fremont Commissioner, Mikey Hothi, City of Lodi Executive Director, Stacey Mortensen SAN JOAQUIN REGIONAL RAIL COMMISSION TELECONFERENCE BOARD MEETING February 5, 2021 – 8:00 am Call-In Information: +1 (571) 317-3122 Access Code: 314-618-965 GoToMeeting Link: https://global.gotomeeting.com/join/314618965 SPECIAL NOTICE Coronavirus COVID-19 In accordance with the Governor’s Executive Order N-29-20, San Joaquin Regional Rail Commission Board Members will be attending this meeting via teleconference or videoconference. Members of the public may observe the meeting by dialing +1 (571) 317- 3122 with access code: 314-618-965 or log-in using a computer, tablet or smartphone at GoToMeeting.com using link: https://global.gotomeeting.com/join/314618965 Please note that all members of the public will be placed on mute until such times allow for public comments to be made. If a person wishes to make a public comment during the meeting, to do so they must either 1) use GoToMeeting and will have the option to notify SJRRC staff by alerting them via the “Chat” function or they can 2) contact SJRRC staff via email at [email protected] in which staff will read the comment aloud during the public comment period. Emailed public comments should be limited to approximately 240 words as comments will be limited to two (2) minutes per comment. -
ACE Ceres–Merced Extension Project PUBLIC REVIEW PERIOD: THURSDAY, APRIL 22, 2021 – MONDAY, JUNE 7, 2021 DATE: April 22, 2021
NOTICE OF AVAILABILITY OF A DRAFT ENVIRONMENTAL IMPACT REPORT ACE Ceres–Merced Extension Project PUBLIC REVIEW PERIOD: THURSDAY, APRIL 22, 2021 – MONDAY, JUNE 7, 2021 DATE: April 22, 2021 TO: Agencies, Organizations, and Interested Parties FROM: San Joaquin Regional Rail Commission SUBJECT: Notice of Availability of a Draft Environmental Impact Report (Draft EIR) for the ACE Ceres- Merced Extension Project (SCH #2018012014) NOTICE IS HEREBY GIVEN that the San Joaquin Regional Rail Commission (SJRRC), acting as lead agency under the California Environmental Quality Act (CEQA), has prepared a Draft EIR for the Altamont Corridor Express (ACE) Ceres–Merced Extension Project (Project). A. Project Description SJRRC proposes to extend ACE passenger rail service along approximately 34-miles from Ceres to Merced. The Proposed Project would include the development of the following facilities. • The Ceres to Merced Extension Alignment, which consists of upgrades to track, new track, and bridges within the Union Pacific Railroad (UPRR) Fresno Subdivision between Ceres and Merced.1 • The Turlock, Livingston, and Merced Stations, which are located along the Ceres to Merced Extension Alignment. • The Merced Layover & Maintenance Facility, which is located in north Merced to support extension operations. Project Alignment, Stations, and Layover & Maintenance Facility Ceres to Merced Extension Alignment The proposed extension to Merced would construct a combination of track upgrades and new track, which would result in a second mainline on the UPRR Fresno Subdivision between Ceres and Merced. These proposed track upgrades and new track for the Ceres to Merced Extension Alignment would be located east or west of the existing mainline track. Approximately 26 miles of new mainline track will be installed as part of the Project and will be located between existing sidings, which will also be upgraded. -
Final 2019 FTIP
2019 Federal Transportation Improvement Program Table of Contents Introduction ..............................................................................................................................3 Federal Transportation Improvement Program Development Process and Requirements ...................................................................................................... 4 Regionally Significant Projects Project List ............................................................................................................................... 11 Financial Plan Revenue and Expenditure Plan ............................................................................................ 19 Project Listing by Funding Category Congestion Mitigation and Air Quality Program (CMAQ)……………………...…2 of 23 Federal Transit Administration Section 5307 ............................................................ 10 of 23 Federal Transit Administration Section 5311 ............................................................ 14 of 23 Highway Bridge Program (HBP) ................................................................................ 15 of 23 Regional Surface Transportation Program (RSTP)…………………………………17 of 23 Safety Program………………………………………………………………………...18 of 23 State Highway Operations and Protection Program (SHOPP) ............................... 19 of 23 State Transportation Improvement Program (STIP) ................................................ 21 of 23 Page | 1 2019 Federal Transportation Improvement Program Appendices Appendix -
ACE Ceres–Merced Extension Project
NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT ACE Ceres–Merced Extension Project SCOPING PERIOD: THURSDAY MAY 28, 2020 – TUESDAY JULY 7, 2020 DATE: May 28, 2020 TO: Agencies, Organizations, and Interested Parties FROM: San Joaquin Regional Rail Commission SUBJECT: Notice of Preparation of an Environmental Impact Report (EIR) for the ACE Ceres-Merced Extension Project NOTICE IS HEREBY GIVEN that the San Joaquin Regional Rail Commission (SJRRC) intends to prepare an environmental impact report (EIR), consistent with requirements under the California Environmental Quality Act (CEQA). The purpose of the EIR is to evaluate the environmental issues associated with the proposed improvements included in the Altamont Commuter Express (ACE) Ceres–Merced Extension Project (Project). The SJRRC will serve as the lead agency under CEQA for the EIR. The purpose of this Notice of Preparation (NOP) is to notify agencies, organizations, and individuals that SJRRC plans to prepare the EIR and to request input on the scope of the environmental analysis to be performed. From public agencies, we are inviting comments on the scope and context of the environmental information that is germane to each agency’s statutory responsibilities with regard to the Project. SJRRC is also requesting interested individuals’ or organizations’ views on the scope of the environmental document. A. Scoping Period The public scoping period will begin on Thursday, May 28, 2020. Written responses and comments on the scope of the ACE Ceres-Merced Extension Project will be accepted until 5:00 PM on Tuesday, July 7, 2020. Please send written comments to: San Joaquin Regional Rail Commission Attn: ACE Ceres–Merced Extension Project 949 East Channel Street Stockton, CA 95202 Your comments may also be sent by email to [email protected]. -
Chapter 2 Project Description
1 Chapter 2 2 Project Description 3 The Altamont Corridor Express (ACE) Ceres–Merced Extension (Project) would support the 4 extension of ACE service to Merced. The Proposed Project is the extension of ACE service from Ceres 5 to Merced and includes the development of the following facilities. 6 ⚫ The Ceres to Merced Extension Alignment, which consists of upgrades to track, new track, and 7 bridges within the Union Pacific Railroad (UPRR) Fresno Subdivision between Ceres and 8 Merced.1 9 ⚫ New Turlock, Livingston, and Merced Stations, which are located along the Ceres to Merced 10 Extension Alignment. 11 ⚫ The Merced Layover & Maintenance Facility, which is located in north Merced to support 12 extension operations. 13 In addition, the San Joaquin Regional Rail Commission (SJRRC) has identified the Atwater Station 14 Alternative as an alternative to the Livingston Station. Only one station would be implemented in 15 either Livingston or Atwater. This EIR analyzes both stations at an equal level of detail. The final 16 decision as to whether to adopt the Proposed Project and/or an alternative will be made after 17 completion of the final environmental impact report (EIR) for this Project. This chapter provides 18 information regarding operations and maintenance activities, construction activities, potential right- 19 of-way (ROW) and easement needs, costs and funding sources, and required permits and approvals. 20 2.1 Project Location and Limits 21 As shown in Figure 2-1, the limits of the Project span Stanislaus and Merced Counties. SJRRC proposes 22 to extend ACE passenger rail service from Ceres to Merced by constructing and upgrading tracks 23 within the existing UPRR Fresno Subdivision ROW, a distance of approximately 34 miles. -
10-2-20 SJRRC Agenda Packet
Chair, Christina Fugazi, City of Stockton Commissioner, Nancy Young, City of Tracy Vice Chair, Leo Zuber, City of Ripon Commissioner, Bob Elliott, San Joaquin County Commissioner, Debby Moorhead, City of Manteca Commissioner, Scott Haggerty, Alameda County Commissioner, John Marchand, City of Livermore Commissioner, Doug Kuehne, City of Lodi Executive Director, Stacey Mortensen SAN JOAQUIN REGIONAL RAIL COMMISSION TELECONFERENCE BOARD MEETING Call-In Information: 1 (872) 240-3412 GoToMeeting Link: https://global.gotomeeting.com/join/530864581 SPECIAL NOTICE Coronavirus COVID-19 In accordance with the Governor’s Executive Order N-29-20, San Joaquin Regional Rail Commission Board Members will be attending this meeting via teleconference. Members of the public may observe the meeting by dialing 1 (872) 240-3412 with access code: 530-864- 581 or log-in using a computer, tablet or smartphone at GoToMeeting.com using link: https://global.gotomeeting.com/join/530864581 Please note that all members of the public will be placed on mute until such times allow for public comments to be made. If a person wishes to make a public comment during the meeting, to do so they must either 1) use GoToMeeting and will have the option to notify SJRRC staff by alerting them via the “Chat” function or they can 2) contact SJRRC staff via email at [email protected] in which staff will read the comment aloud during the public comment period. Emailed public comments should be limited to approximately 240 words as comments will be limited to two (2) minutes per comment. This Agenda shall be made available upon request in alternative formats to persons with a disability, as required by the Americans with Disabilities Act of 1990 (42 U.S.C.