Marketing Suite on Your Left C R Charter a L BLACKWALL E C Street BASIN PARK CANADA SQUARE
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
7.4 Report Of
Committee: Date:th Classification: Agenda Item No: Strategic Development 9 October 2008 Unrestricted 7.4 Report of: Title: Planning Application for Decision Corporate Director Development & Renewal Ref No: PA/08/1215 and PA/08/1217 Case Officer: (Duplicate Application) & Tim Porter PA/08/1218 and PA/08/1238 (Duplicate Application LBA) Ward(s): Blackwall and Cubitt Town 1. APPLICATION DETAILS Location: Wood Wharf, Preston’s Road, London Existing Use: Primarily light industrial, office and warehouse units. Also residential, indoor sporting facilities and a nursery. Proposal: PA/08/1215 and PA/08/1217(Duplicate Application) Hybrid application for comprehensive mixed-use redevelopment of Wood Wharf comprising: 1) Outline Application (all matters reserved, save for access & layout) • Demolition of dwellings at Lovegrove Walk; • Commercial floorspace (B1), up to 1668 residential units (C3), and hotel (C1) contained in fourteen buildings; • Retail (A1), financial services (A2), re staurants & cafes (A3), drinking establishments (A4) and takeaway establishments (A5); • Leisure & community uses (D1 & D2); • Associated infrastructure, including the creation of structures in Blackwall Basin and South Dock; • Principles of landscaping and public realm; • Means of access; • Bridge links; • Car, motorcycle and bicycle parking spaces, servicing; and • Electricity substation. 2) Full Application • Creation of canal and other engineering infrastructure. PA/08/1218 and PA/08/1238 (Duplicate Application LBA) Partial demolition of a small section of the s outhern dock wall to Blackwall B asin, for the creation of a new canal between South Dock and Blackwall Basin, and the introduction of piled foundations to anchor structures within the Basin, and othe r associated works as part of a comprehensive mixed use redevelopment of Wood Wharf. -
BPL2005AW Baltimore B XXZXX.Qxd:Layout 1 3/11/10 15:04 Page 1
BPL2005AW_Baltimore_B_XXZXX.qxd:Layout 1 3/11/10 15:04 Page 1 in the frame for a spectacular new Docklands residence and a new London icon. The fine art of waterfront living, a masterpiece of light, line and space. BPL2005AW_Baltimore_B_XXZXX.qxd:Layout 1 3/11/10 15:05 Page 2 part of the bigger picture The curtain is being raised on one of the most dynamic residential conceived for a private residence in Europe, and a much sought developments of the 21st century. Docklands’ newest star attraction after facility, its own Montessori Nursery. Be anywhere else you is more than just an apartment complex. This is a beautifully need to be with flawless, express connections to Canary Wharf, conceived future classic, created with exquisite attention to detail the West End, Paris and New York. This is the new heart of the city, and quality. Baltimore is a luxury lifestyle universe: a variety refracted through the lens of cutting-edge contemporary design of picture-perfect contemporary home designs, from the ultimate and impeccable construction, with a dramatic seven-storey pied à terre to a double-height duplex, set around a perfectly architectural aperture on the banks of one of the city’s most landscaped boulevard of clean lines and reflections within historic docks. Exciting, inspiring and serene, a home at Baltimore a sweeping curve of the Thames. Baltimore’s facilities include is the perfect investment and utmost convenience… the most ambitious and radical urban gym and leisure facility ever everything and anything you want it to be. BPL2005AW_Baltimore_B_XXZXX.qxd:Layout 1 3/11/10 15:05 Page 2 aatt thethe heheartart CCanaryanary Wh Wharf:arf: London London’s’s mos mostt iconic iconic financial difinancialstrict and districtone of the and world one’s of mo thest influentiworld’sal bumostsiness influential development business zones. -
Baltimore Tower
BALTIMORE TOWER CROSSHARBOUR LONDON E14 BALTIMORE TOWER An iconic new landmark for luxury living creating a new focus on Canary Wharf’s world famous skyline A JOINT DEVELOPMENT BY BALTIMORE TOWER Canary Wharf - a track record second to none BALTIMORE TOWER Canary Wharf is the hub of one of the most dynamic transport infrastructures in the world Residents at Baltimore Tower will connect within 2 minutes walk at Crossharbour connect from Crossharbour THE DLR JUBILEE LINE MAINLINE CROSSRAIL CABLE CAR THAMES RIVER BUS SOUTH QUAY HERON QUAYS CUTTY SARK CANARY WHARF This highly automated network London’s most advanced London Bridge handles over This new super highway across The new Emirates Airline links Canary Wharf south Canary Wharf central Greenwich and UNESCO Canary commerce, DLR, links the Capital’s financial tube line and service 54 million passengers a year the Capital will have an London’s largest entertainment and Plaza and shopping World Heritage Jubilee Line and Crossrail centres, Royal Greenwich and connects at Canary Wharf for with mainline and Thameslink interchange at Canary Wharf, venues - crossing the river in London City Airport in minutes. direct travel to Westminster services departing every 3 significantly cutting journey just 5 minutes with cars running and The West End. minutes. It is the fourth busiest times when operational from every 30 seconds. hub in the UK. 2017. Liverpool The Barbican Street Aldgate Canning Town Custom MINUTE MINUTES MINUTES MINUTES Limehouse 1 3 5 6 St Paul’s Cathedral House Fenchurch Tower Shadwell -
Travel from Airports to Central London and Laban
SUMMER SCHOOL 2014 Information Pack SUMMER SCHOOL 2015 INFORMATION PACK Page | 1 SUMMER SCHOOL 2015 INFORMATION PACK Dear Course Participant, Welcome to Trinity Laban’s Summer School! The following information should provide you with everything you need to know concerning the course this summer. Summer School is a great chance to be fully immersed in dance and movement for a busy fortnight with us. We hope the course will be a rich and inspiring experience for you. Alongside the daily classes, you will be able to find out about full-time training, look after your body through additional health and well-being activities, and watch free programmed performances as well as making new friends, socialising and relaxing! The course attracts an international community from all around the world, and we’re always excited to see people from many different dance backgrounds. We aim to make you feel as welcome and supported as possible! Should you have any questions prior to the start of the course, please do not hesitate to contact Rebecca Wyatt, Programme Administrator on 020 8305 9477, or [email protected] We hope that you have a great time with us this summer and look forward to warmly welcoming you! Best Wishes Veronica Jobbins Head of Learning and Participation (Dance) Page | 2 CONTENTS 1. About Laban 2. Finding the Laban Building 3. Arriving in London: Travelling to Laban from London Airports 4. Local Shops and Services 5. Accommodation 6. Course Structure 7. Talks, Workshops and Other Fun Things! 8. Performances 9. Laban Health Price List 10. -
Canary Wharf –Dlr Station 15 Colonnade, Canary Wharf
SHOP TO LET CANARY WHARF –DLR STATION 15 COLONNADE, CANARY WHARF LOCATION Canary Wharf is an area that continues to develop. The Canary Wharf Estate now includes over 1.5m sqm of retail and office space. This covers Canada Water, Cabot Square and Westferry Circus, together with West India Quay and Woof Wharf. Canary Wharf includes the Docklands Light Railway Station. The station was built into the base of One Canada Square itself, between two parts of a Shopping Centre, and serves the Canary Wharf office complex. The station itself has six platforms serving three rail tracks and is sheltered by a glass roof. The DLR station is a short walk from Canary Wharf underground station and Heron Quays DLR Station. The subject premises is situated in the DLR station at the Accommodation bottom of the escalator, in a prime position. Located Total Area 1,025 sq ft 95.3 sq m opposite to Paddy Power, and adjacent to Starbucks and DESCRIPTION Tortilla. There is a small storage unit located outside of Business Rates the DLR station on South Colonnade, which is approximately 70 sq. ft. Rateable Value £110,000 Rates Payable £54,120 The unit is available by way of a new lease for a term of LEASE years, contracted outside of the Landlord and Tenant Act 1954. Service Charge There is a small service charge The landlord is seeking offers in the region of £195,000 payable to The Canary Wharf Group – per annum net of VAT or a percentage of turnover, Figure TBC RENT whichever is the higher and will be exclusive of rates and service charge. -
REP-624580-007 Canary Wharf Group Hearing Statement Matter 10
Examination of the London Borough of Tower Hamlets Local Plan Schedule of Matters and Issues for the Examination Matter 10, Issue 10 Representor ID: 624580/Canary Wharf Group Plc 27 July 2018 Hearing Statement on behalf of Canary Wharf Group Plc (“CWG”) Matter 10: Site Allocations Issue 10: Are the Site Allocations justified by the evidence base and of sufficient detail so as to be effective in delivery? 1. This Hearing Statement relates to the North Quay Site Allocation (Site Allocation 4.9) and Wood Wharf Site Allocation (Site Allocation 4.13). The first part will consider North Quay against the Inspector’s questions, the second part Wood Wharf. NORTH QUAY 2. The North Quay site is owned by CWG has been subject to a recent (2017) planning application (LPA ref. PA/17/01193) for a mixed-use: office (up to 158,586m²), residential (up to 1,423 units), serviced apartments (up to 216 units), retail/restaurant (up to 25,213m²) and cultural/leisure (up to 2,391m²) development. This planning application was withdrawn in December 2017. 3. CWG have agreed a Statement of Common Ground (SoCG) with the London Borough of Tower Hamlets (LBTH) with respect to the North Quay site allocation text. There are however still certain outstanding issues, as set out in the SoCG, which we will expand upon in this Hearing Statement. We will present these in response to the questions that the Examiner has raised below. We will also respond to the other questions as necessary to help in the Examiner’s consideration of the site allocation. -
Mckenzie Ultimate Guide: Passrider Series
MUG: Passrider Series - London, England Hotels McKenzie Ultimate Guides: Passrider Series - London, England Hotels By Kerwin McKenzie (Amazon Bestselling Author) © 2012 – MUG: Passrider Series |Page 1 MUG: Passrider Series - London, England Hotels Copyright Normal copyright laws are in effect for use of this document. You are allowed to make an unlimited number of verbatim copies of this document for individual personal use. This includes making electronic copies and creating paper copies. As this exception only applies to individual personal use, this means that you are not allowed to sell or distribute, for free or at a charge paper or electronic copies of this document. You are also not allowed to forward or distribute copies of this document to anyone electronically or in paper form. Mass production of paper or electronic copies and distribution of these copies is not allowed. © 2012 McKenzie Ultimate Guides All Rights Reserved © 2012 – MUG: Passrider Series |Page 2 MUG: Passrider Series - London, England Hotels Acknowledgements Thanks to the following friends who provided guidance, support and input. • Alexis Brathwaite • Nadia Karim • Joe DWR Martin • Lake Phalgoo • Lee Sample • Richard Sawyer • Sam Wiltzius © 2012 – MUG: Passrider Series |Page 3 MUG: Passrider Series - London, England Hotels About the Author I’m a commercial aviation enthusiast and a global traveler living in the United States. I’ve worked in the airline industry for 16.5 years and hold a Masters degree in Aeronautical Sciences from Embry- Riddle Aeronautical University known as the “Harvard of the Skies.” In addition, I’ve also visited over 105 countries and counting and flown countless airlines and aircraft types. -
Wood Wharf London, United Kingdom
Wood Wharf London, United Kingdom Type of building: Office building, Residential building Clients and Developers: Canary Wharf Group, https://group.canarywharf.com/ Architect: Allies and Morrison Architects, http://www.alliesandmorrison.com/ Building contractor: O’Halloran & O’Brien Ltd, http://www.ohob.com/ Completion: Wood Wharf preview 2023 © CanaryWharfGroup, Wood Wharf SE Aerial preview 2014, CC BY-SA 4.0 Project link: MAX FRANK supplied Stremaform® concrete jointing system to Canary Wood Wharf Wharf’s new district. The use of Stremaform® enabled significant time and cost advantages to be achieved on-site. Extending to 23 acres, the Wood Wharf project represents one of central London’s largest privately owned development sites and is recognised as being of major importance on a local, national and international level. Project Architects include; Allies and Morrison, Darling Associates, KPF, Herzog & de Meuron, Stanton Williams Architects, Grid Architects, and Patel Taylor. Canary Wharf’s new district, Wood Wharf, has been designed by Allies and Morrison Architects and they have created a strong and complementary design, providing; mixed-use development, commercial offices, retail space, housing and inter-connected public space. The 1st phase includes Plot G3, constructed by O'Halloran & O'Brien, where MAX FRANK supplied Stremaform®. Stremaform® is a proven concrete to concrete jointing system which enables the Contractor to pour a sequence of concrete pours, whilst attaining an established concrete bond throughout the joint - ultimately -
PDU Case Report XXXX/Yydate
planning report PDU/2187a&2188a/02 13 May 2009 City Pride and Island Point, Westferry Road in the London Borough of Tower Hamlets planning application no. PA/08/02292/3 Strategic planning application stage II referral (new powers) Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008 The proposal City Pride – The erection of a part 9, part 62-storey tower comprising 430 residential units, 203- bed hotel with conference facilities, spa, swimming pool, gymnasium, reception and lounge bar. Island Point – The erection of six buildings ranging in height from 2 to 8 storeys comprising 189 residential units. The applicant The applicant is Glenkerrin Ltd, and the architect is Fosters and Partners and Darling Associates. Strategic issues The principle of the redevelopment of both sites to provide residential led developments is in the interest of good strategic planning in London. Further clarification and information has been provided regarding affordable housing, child play space, climate change mitigation and transport. On the basis of this information the applications are consistent with London Plan policy. Recommendation That Tower Hamlets Council be advised that the Mayor is content for it to determine the case itself, subject to any action that the Secretary of State may take, and does not therefore wish to direct refusal or direct that he is to be the local planning authority. Context 1 On 11 November 2008 the Mayor of London received documents from Tower Hamlets Council notifying him of a planning application of potential strategic importance to develop the above site for the above uses. -
Finding 25 Churchill Place from London Bridge Station (Jubilee Line)
Finding 25 Churchill Place From London Bridge Station (Jubilee Line) Go to the Jubilee Line Platform for East-bound trains. As you enter the platform, turn right and make your way nearly to the end of the platform to wait for the next train. Exit the train at Canary Wharf and go up either the first or second escalators, which will display signs for Upper Bank Street and Montgomery Street, then make your way through the barriers. Turn right after the barriers and go through the doors marked Canada Square & Churchill offices & shops. Head up the escalator. Keep straight ahead when you reach the top, following the signs to Churchill Place. Head through the hallway, turn left at the end and head up the escalator. At the top, turn right and travel across the waterway through the glass hallway. Exit the hallway using the first doors on the left, before the escalator – disregard the fact it looks like a fire exit. As you exit, 25 Churchill Place is the building on your right. Make your way around the corner to the right – pass 30 Churchill Place (entrance to the European Medical Agency) – and use the next entrance. You have arrived. From Canary Wharf DLR Station Exit the DLR at Canary Wharf. Head down the stairs directly from the platform – do not enter the shopping centre. Exit the station to the South without entering the shopping centre. Cross the street (South Colonnade) and turn left (East). Follow this street all the way to Churchill Place – you’ll pass Wahaca and Waitrose on your left. -
2012 Olympic Visitor Mooring Locations London
( ( ! ! River Lee A104 Lea Bridge Road Ø (!Ø Mooring locations 1 Hackney Marshes Lee Navigation Canary Wharf DLR Station (! Likely extents of controlled zone 2 Victoria Park Hertford Union Canal (!Ø Locks 3 Bow Wharf Hertford Union Canal 4 Mile End Park Regent's Canal Heron Quays DLR Station Subject to navigation restrictions in summer 2012 5 Victoria Park, Old Ford Lock Regent's Canal (!Ø West India Lock Waterways around the Olympic Park closed to navigation 6 Islington, City Road Lock Regent's Canal 7 Islington Regent's Canal South Quay DLR Station Tunnels 8 King's Cross Regent's Canal Underground stations 9 Camden Regent's Canal 12 DLR (Docklands Light Railway) stations 10 Little Venice Paddington Arm (Grand Union Canal) "" Overground stations 11 Paddington Paddington Arm (Grand Union Canal) Millwall Inner Dock 12 Millwall Inner Dock Docklands British Waterways' navigations Crossharbour DLR Station Clapton Station Millwall Outer Dock 1 Homerton Station Highbury & Islington ( ! Hackney Wick Station Ø Stratford Station Ø Ø(!Ø !( ( ! ( 9 ØØ !( Ø ! Ø (! Haggerston Station !( Ø !(Ø (! Olympic Stadium ( (!Ø 8 !Ø 2 ! St John's Wood ( Ø Camden Town !(Ø 5 7 6 (!Ø 3 (!Ø West Ham (! Cambridge Heath Station Bow Road Ø Angel Hoxton Station 4 King's Cross St Pancras Station (!Ø ( (! ! Bromley by Bow Bethnal Green Ø Ø Warwick Avenue Mile End ( ! (! Ø Little Venice 11 Liverpool Street Station ( 10 ! Ø ( ! Paddington Station Ø (! ( ! Ladbroke Grove Ø Limehouse Lock Limehouse Station (DLR) (! Canary Wharf (DLR) Hero(!nØs Quays (DLR) South Quay (DLR) 12 Crossharbour (DLR) Inset map 1:50,000 2 0 1 2 O l y m p i c V i s i t o r M o o r i n g L o c a t i o n s Produced by: BW GIS L o n d o n Page size: A3 Date: 15/04/2011 - © Crown copyright and database rights, 2011, Ordnance Survey 100019843. -
PA/05/02114 Date Received: 22/12/2005 Last Amended Date: 22/12/2005 1.2 Application Details
Committee: Date: Classification: Report Agenda Item Development 8 March 2006 Unrestricted Number: Number: Committee DC039/056 5.1 Report of: Title: Town Planning Application Director of Development and Renewal Location: Cabot Hall, Cabot Square, London, E14 Case Officer: Scott Hudson Ward: Millwall (February 2002 onwards) 1. SUMMARY 1.1 Registration Details Reference No: PA/05/02114 Date Received: 22/12/2005 Last Amended Date: 22/12/2005 1.2 Application Details Existing Use: Conference Facility/Retail Mall/Car Park. Proposal: The change of use of Cabot Hall and Cabot Place West retail mall, as follows: • Gross total floor space of no more than 12,587sq.m. • Change of use of existing 2,541sq.m. D1 space (public hall), and 2,563sq.m. car park to Class A1 (shops). • Additional 939sq.m. of new Class A1 (shops) floor space . • Reconfiguration of 6,544sq.m existing retail to Class A1 (shops) and Class A3/A4/A5 (café, restaurant, bar and take-aways). • Ancillary storage and mall circulation spaces. • Associated minor external works to western elevation. Applicant: DP9 Planning Consultants Ownership: Cabot Place Ltd. Historic Building: N/A Conservation Area: N/A 2. RECOMMENDATION: 2.1 That the Development Committee grant planning permission subject to: i) the conditions outlined below: (1) Time limit for commencement (three years) (2) Restriction within approved use classes (Class A3/A4/A5, up to a maximum 3,000sq.m). (3) Refuse and recycling facilities (4) External Materials and Finishes to match existing. (5) No structures on roof. (6) Disabled Access (Retention) (7) Commercial parking retained for businesses/visitors.