Bitmap in Graphic1.CPT

Total Page:16

File Type:pdf, Size:1020Kb

Bitmap in Graphic1.CPT Table of Contents Deh Cho Bridge Confirmation Receipt from the online Official Entry Form/Project Summary Entry Consent Form Full Project Description Canadian Consulting Engineering Awards 2013 Associated Engineering Full Project Description Deh Cho Bridge site, extreme weather conditions, and quality management. Executive Summary Effective planning and communication between all stakeholders was a critical factor in managing the project’s progress and facilitated the project’s ultimate success. In addition to collaborative project meetings and a highly-effective project document control system, our team worked closely with the client to develop unique approaches to control schedule, budget, quality, and risk. The Deh Cho Bridge provides a year-round The community was kept fully informed via connection for northern residents with the quarterly newsletters, information boards, rest of Canada, and will help create a project website, a live webcam, and economic development opportunities in the consistent contact with the media, thus North. providing a clear understanding of the For decades, the majority of residents in construction progress and eventual grand the Northwest Territories had no fixed link opening. to the rest of the country. Travellers and The project management team overcame a goods had to cross the Mackenzie, series of challenges by developing a highly Canada’s longest river, via a limited- effective on-site construction inspection operation ferry. The connection was often team, ensuring the project followed a affected by the river’s water levels during robust quality assurance program, the summer season. In the winter, implementing a unique and deliberate travellers crossed an unreliable and management protocol, and by being potentially dangerous ice bridge. In the solution oriented and highly focused on spring thaw and fall freeze-up, locals and delivering the Deh Cho Bridge. visitors had no fixed link with the rest of the country, relying instead on expensive Spanning over one kilometre across air travel. the Mackenzie River, In 2010, the Government of the Northwest the new Deh Cho Bridge is a Territories assumed control of the project remarkable achievement in mid-construction, and appointed engineering management. Associated Engineering as Project Manager. Working together, we implemented a specific project management plan, addressing project challenges, including a geographically dispersed team, a remote 1 Canadian Consulting Engineering Awards 2013 Associated Engineering Full Project Description Deh Cho Bridge Introduction Deh Cho Bridge Site Fort Providence, NT For decades, most residents in the Northwest Territories had no fixed link to the rest of Canada. In 2002, a Public Project Challenges Private Partnership initiated design of the Deh Cho Bridge, near Fort Providence. Construction of the bridge began in 2008; however, the project soon encountered difficulties. With continuing setbacks and delays, in 2010, the Government of the Northwest Territories assumed control of the project mid-construction, after only part of the substructure was completed, retaining a new bridge engineer and contractor. Upon taking over the project, the team Recognizing it needed assistance to deliver faced immense public pressure, fueled by the project, the Government appointed years of delays and cost escalation. It was Associated Engineering as Project immediately clear that the project Manager. presented many unique and diverse challenges that would require innovative At the time, the task of managing the project management approaches to completion of the bridge was likened to overcome. “changing a wheel on a moving vehicle”. Construction had to proceed without delay, Technically, the bridge is unique - a while the design was being finalized. It was continuous Extradosed Bridge System that also important to rapidly assess the quality has two vertical, Warren trusses supported of the previously completed construction by stay cables. The 4.5 metre deep steel and design work, while continuing with the truss, fabricated from built-up, W-shaped construction. members, is composite with the 11.3 metre-wide, precast concrete deck. To With a total length of 1045 metres, reduce weight, the deck spans two the structure is the longest bridge in directions and is only 235 millimetres the Northwest Territories. thick. 2 Canadian Consulting Engineering Awards 2013 Associated Engineering Full Project Description Deh Cho Bridge The truss length has 55 individual winter, necessitated the development of a segments, field bolted together, with two design which allowed for year-round truss sections connected with Chevron construction, with materials carefully cross frames and top and bottom chord selected to have the toughness and wind bracing. Stay cables, attached to two durability to withstand the encountered -40 A-shaped pylons on either side of the main degrees Celsius temperatures. span, support the 190 metre span. The construction site was remote, even by There was a strong need to proceed Canadian standards. All of the materials immediately with construction; however, had to be shipped to site from far-away the engineering consultant was still locations, including 11,000 tonnes of completing the design. Meanwhile, the structural steel from New Brunswick and quality of the constructed works needed to Quebec. Some of the more specialized be confirmed, and the team needed to components were sourced from overseas. understand the project issues. A project of Heavy equipment had to be mobilized, and this magnitude had never been a large, mobile batch concrete plant was constructed so far north in Canada. erected on-site. Our team needed to quickly strategize and address a large number of issues. These Numerous challenges included included: extreme northern conditions, remote site, equipment and materials • Document control delivery, and a geographically • Highway, structural and electrical dispersed team. design • Hydrotechnical review Solution • Construction supervision • Environmental services • Communication • Graphic design. The Mackenzie River itself posed particularly significant challenges. The bridge piers had to be designed to withstand the force of ice sheets up to 1.8 metres thick rushing down the river during spring break-up. The annual freeze and To maintain construction continuity, our thaw cycles also limited the in-river team began by scheduling several large activities during construction. project meetings and facilitating the flow of This determined the methodology for the information between the contractor, pier construction, as well as for the fabricators, and designer so these approach in erecting the superstructure. activities could proceed. The location of the project site, where Our management team identified what site daylight shrinks to 5½ hours during the condition and design information was 3 Canadian Consulting Engineering Awards 2013 Associated Engineering Full Project Description Deh Cho Bridge available, and what was required to move the original P3 project, we made a the project forward. We then managed a significant investment to provide as much team of subconsultants to undertake project information as possible to the required work, such as a design continuity public. Working with the Government of investigation, quality audits, survey and Northwest Territories, our in-house team materials testing. We also mobilized an developed a project logo, brochures, experienced construction supervision project website (www.dehchobridge.info), team. design and content for a quarterly newsletter, public display boards, and two scale models for display in prominent public locations. The project website displayed webcam images in real time. Our team facilitated media tours at the site, provided interviews with magazines, and participated in TV news conferences. Communication Managing a large and geographically dispersed project team was accomplished through effective communication and a tailor-made document control system. The management team formed a strong alliance with the client’s staff through a series of regular meetings and gatherings Budget & Schedule Control which helped to open up communication lines and foster an environment of To regain and maintain control of the partnering and team spirit. Recordings of project’s budget, schedule, risk, and overall all meetings, made available to all quality, as project manager, our team participants, helped to eliminate identified critical elements to address. misunderstandings and ensure the team Based on the state of the project at the was moving forward with a unified vision. start of our involvement, a new schedule was required. Regulators were included in the meetings to mitigate potential regulatory issues. The Our team worked with the contractor and unique, web-based document control the client to develop a revised schedule to system gave all team members access to complete the bridge. With a large project, time-stamped files, such as meeting a small taxpayer base, a number of minutes, reports, drawings and background government levels involved in funding, and information. The document control system close scrutiny by the public, control of the allowed the project to proceed quickly with budget was paramount. By carefully a unified place for information. tracking the budget and working closely with the contractor and the client, we To overturn the prevailing negative public controlled cost escalations on the project. image of the project, based on issues with
Recommended publications
  • For the Canadian Transportation Sector 2016 (Pp
    3 · Northern Territories CHAPTER 3: NORTHERN TERRITORIES LEAD AUTHOR: KALA PENDAKUR1 CONTRIBUTING AUTHORS: JACKIE DAWSON (UNIVERSITY OF OTTAWA), KATERINE GRANDMONT (UNIVERSITY OF MONTREAL), DOUG MATTHEWS (MATTHEWS ENERGY CONSULTING), ART STEWART (GOVERNMENT OF NUNAVUT) RECOMMENDED CITATION: Pendakur, K. (2017). Northern Territories. In K. Palko and D.S. Lemmen (Eds.), Climate risks and adaptation practices for the Canadian transportation sector 2016 (pp. 27-64). Ottawa, ON: Government of Canada. 1 The Conference Board of Canada, Ottawa, ON Climate Risks & Adaptation Practices - For the Canadian Transportation Sector 2016 TABLE OF CONTENTS Key Findings .........................................................................................................................................................29 1.0 Introduction ..................................................................................................................................................29 1.1 Regional overview .............................................................................................................................30 2.0 An introduction to Canada’s northern transportation system...............................................................31 2.1 System overview ................................................................................................................................31 2.2 Road transportation ..........................................................................................................................33 2.3
    [Show full text]
  • NWT Transportation Report Card 2015 Is Intended to Provide a Statistical Benchmark of Progress Achieved and an Evaluation Framework to Measure Future Progress
    TABLED DOCUMENT 345-17(5) TABLED ON OCTOBER 7, 2015 Table of Contents Overview ....................................................................................................................................3 Strengthening Connections .....................................................................................................5 Capturing Opportunities ...........................................................................................................9 Embracing Innovation ............................................................................................................ 11 Metrics & Data .........................................................................................................................13 1.0 Financial .................................................................................................................. 13 1.1 Capital and O&M Expenditures and Revenue .............................................. 13 1.2 Analysis of Capital Needs ............................................................................ 14 1.3 Major Partnership Funding ........................................................................... 15 1.4 Airport, Road Licensing and Deh Cho Bridge Toll Revenues ....................... 16 1.5 Northern, Local, Other, contracts and Total Value of Contracts .................... 18 1.6 Community Access Program Expenditures ................................................. 18 2.0 Airports ....................................................................................................................19
    [Show full text]
  • Season's Greetings
    I’d like to congratulate the teams that worked on the University of Saskatchewan’s Livestock and Season’s Greetings Forage Centre of Excellence and Calgary Zoo Flood Mitigation projects. Both projects received Awards Thirty-two years ago, I started my career at of Excellence at the annual Canadian Consulting Associated Engineering. As a Design Engineer Engineering Awards. These awards are a testament working on bridges and transportation structures to our innovation and technical excellence. for the resource sector and municipalities, I wanted I’d also like to acknowledge our team who to design safe transportation infrastructure that worked on the Regina Bypass, which opened in supports our economy. Never did I imagine that October. This $1.88 billion project is the largest in three decades later, I would become President, and Saskatchewan’s history. As Owner’s Engineer, we then this year, President & CEO. Thank you to Kerry employed a One Company approach, drawing on Rudd, who retired this year as President & CEO, and the expertise of staff from across the country. Our our Board of Directors for their confidence in me. One Company approach is part of the success of One of my first actions as President was to embark Associated Engineering. on a new Strategic Plan, which we launched last In closing, I’d like to thank all our staff for their year. Themed Shaping our Shared Future, our vision contributions and dedication to our clients and the is to deliver creative solutions for a healthy, resilient projects they work on. Your service and creativity world, and, in doing so, create a meaningful legacy featured: are what differentiates us.
    [Show full text]
  • Deh Cho Bridge (Canda)
    Project information Deh Cho Bridge (Canda) Project description mageba scope Highlights & Facts The Deh Cho Bridge, located in Canada’s mageba was awarded the contract to de- Northwest Territories, was completed in sign and manufacture the modular expan- mageba products: the fall of 2012. The $202 million cable sion joints required at each end of the Type: TENSA®MODULAR LR stayed bridge spans the Mackenzie River Deh Cho Bridge. mageba provided an 11 expansion joints of types near Fort Providence, replacing an exist- gap TENSA®MODULAR expansion joint at LR8 and LR11 ing ferry service in the summer, and an one abutment, and an 8 gap modular ex- Installation: 2010–2012 ice crossing route in the winter. The Deh pansion joint at the other. These modular Cho Bridge is the only permanent cross- expansion joints, reliable in the most ex- Structure: ing of the Mackenzie River. The structure treme conditions of northern Canada, are Location: Northwest Territories, ensures that the region to the north will able to facilitate movements of up to 35 in Canada not be cut off from southern Canada for (889 mm). In addition, they are also excep- Completed: 2012 an annual 8 week period, when forming tionally flexible, allowing movements in Type: Cable stayed bridge or melting ice, not strong enough to carry every direction as well as limited rotations Length: 3,642 ft (1,100 m) the ice road, prevents the passage of the about every axis. Contractor: Ruskin ferry. The new 0.68 mi (1.1 km) long bridge has nine spans of lengths ranging between 294 ft (90 m) and 624 ft (190 m).
    [Show full text]
  • Background Report
    Sahtu Land Use Planning Board Sahtu Land Use Plan Background Report July 2010 July 2010 Page 1 Sahtu Land Use Plan Background Report: The Sahtu Settlement Area The Sahtu Land Use Plan Background Report The Sahtu Land Use Plan Background Report, from now on referred to as the “Background Report”, is intended to capture some of the main characteristics of the Sahtu Settlement Area (SSA), its people, the culture, special places, the biophysical environment, the economy and the regulatory regime. Above all, the Background Report should help readers better understand the Sahtu and the reports and information that were considered in the development, decisions, and planning that resulted in the Sahtu Land Use Plan (SLUP). Introduction The Sahtu Land Use Plan was written by taking into account the three pillars of sustainability: socio-cultural, economic and ecological factors. These three domains are now commonly considered part of a balanced approach to decision-making. The background report is an attempt to briefly describe some of the social, cultural, economic and ecological factors that the Sahtu Land Use Planning Board (SLUPB) has considered in its decision making. INAC’s Sustainable Development Strategy 2007-2010 describes sustainable communities as those which “enjoy a prosperous economy, a vibrant and just society, and a healthy environment for current and future generations.”1 The Sahtu Land Use Planning Board has sought to develop a balanced plan for the Sahtu Settlement Area (SSA) by considering a diversity of resources under each of the three pillars. A summary of the sources used and a general description of the Sahtu Settlement Area follow.
    [Show full text]
  • Fast-Tracked Bridge Design
    Steel Bridge NATIONAL STEEL BRIDGE ALLIANCE NEWS JUNE 2010 A sophisticated, iterative analytical approach to re-evaluating the bridge superstructure has put this project on the path to completion. Fast-Tracked Bridge BY PRABHJEETD RAJ SINGH,esign P.ENG., P.E., AND MATTHIAS SCHUELLER, P.ENG., PH.D. CROSSING THE MACKENZIE RIVER in Canada’a Northwest system. This reveals the difference of an extradosed bridge and a Territories is anything but easy. In summer a ferry provides a way classical cable stayed bridge in terms of the structural system. across, and in winter passage is via an ice bridge. But during the The two-lane, nine-span bridge has main navigation span of transition seasons, as the ice is breaking up or before it freezes 623 ft. The approach spans are symmetrical about the center of the solid, neither option is available. bridge. Each end begins with a 295-ft span followed by three 369- The Deh Cho Bridge now being constructed soon will provide ft spans. The total length of the bridge is 3,427 ft. The superstruc- a permanent link for ground transportation in the area. It is a com- ture consists of two 15-ft deep Warren trusses with a transverse Cposite steel truss bridge with a cable assisted main span. The struc- spacing of 24 ft and a 9-in-thick precast composite deck. tural system can be classified as a composite bridge with hybrid The truss members are built-up I-sections. Two A-shaped pylons, extradosed-cable stayed features. Comparable to a cable stayed located at Pier IV South and Pier IV North, each support two cable system, the primary purpose of the cables is to support the truss in planes.
    [Show full text]
  • Northern Connections
    NORTHERN CONNECTIONS A Multi-Modal Transportation Blueprint for the North FEBRUARY 2008 Government of Yukon Photos and maps courtesy of: ALCAN RaiLink Inc. Government of British Columbia Government of Northwest Territories Government of Nunavut Government of Yukon Designed and printed in Canada’s North Copyright February 2008 ISBN: 1-55362-342-8 MESSAGE FROM MINISTERS It is our pleasure to present Northern Connections: A Multi-Modal Transportation Blueprint for the North, a pan-territorial perspective on the transportation needs of Northern Canada. This paper discusses a vision for the development of northern transportation infrastructure in the context of a current massive infrastructure decit. Research has proven that modern transportation infrastructure brings immense benets. The northern transportation system of the future must support economic development, connect northern communities to each other and to the south, and provide for enhanced sovereignty and security in Canada’s north. This document complements a comprehensive national transportation strategy – Looking to the Future: A Plan for Investing in Canada’s Transportation System – released under the auspices of the Council of the Federation in December 2005. The three territories support the details contained in Looking to the Future that call for a secure, long-term funding framework for transportation infrastructure that will benet all Canadians. Equally important, northern territories stress that this national strategy – and any subsequent funding mechanisms that follow – must account for unique northern needs and priorities, which would be largely overlooked using nation-wide criteria only. This paper is also consistent with A Northern Vision: A Stronger North and a Better Canada, the May 2007 release of a pan-territorial vision for the north.
    [Show full text]
  • Northern Transportation Conference
    November 9 & 10, 2005 Yellowknife, Northwest Territories Post-Conference Report Paul D. Larson, Ph.D. Post-Conference Report Proceedings of the Northern Transportation Conference Paul D. Larson, Ph.D. Professor and Head, Department of Supply Chain Management Director, Transport Institute Asper School of Business University of Manitoba 614 Drake Centre Winnipeg, MB R3T 5V4 phone: 204-474-6054 fax: 204-474-7530 e-mail: [email protected] Dedicated to Douglas E. Larson, a wonderful man and a great Dad. Northern Transportation Conference Table of Contents Executive Summary Page 4 The Conference Page 6 Issues and Stakeholders Page 8 Conference Presentation Summaries Page 10 Session One: Northern Vision, Priorities and Expectations Page 10 Session Two: Transportation Partnerships Page 12 Session Three: Current Northern Transportation Infrastructure Page 14 Luncheon Keynote Address Page 17 Session Four: Air Transportation Challenges Page 17 Session Five: Surface and Marine Transportation Challenges Page 20 Session Six: Pipeline Development Page 23 Session Seven: Climate Change Page 24 Session Eight: Northern Sovereignty and Security Page 27 Northern Transportation Moving Forward: An Action Plan Page 32 References Page 38 Appendix I. Roundtable Discussion Summaries Page 39 Appendix II. Survey Results Page 43 Appendix III. Web Sites Page 52 Yellowknife, Northwest Territories 2 Northern Transportation Conference Appendix IV. Maps Page 55 Appendix V. Conference Program and Participants Page 56 Yellowknife, Northwest Territories 3 Northern Transportation Conference Executive Summary The primary purpose of this report is to propose and outline an action plan for northern transportation in Canada. The action plan follows from the Proceedings of the Northern Transportation Conference, including expert presentations, discussions, roundtable sessions and a survey.
    [Show full text]
  • Mackenzie Valley Highway: Wrigley to Norman Wells
    Mackenzie Valley Highway: Wrigley to Norman Wells Business Case Submitted to Infrastructure Canada Government of the Northwest Territories July 2015 Table of Contents Executive Summary ....................................................................................................... 2 Project Description .......................................................................................................... 3 Minimum Federal Requirements ..................................................................................... 6 Project Outcomes and Benefits/ Strategic Alignment ...................................................... 6 Eligible Recipient ........................................................................................................... 13 Project Governance....................................................................................................... 14 Financial Requirements ................................................................................................. 14 Legal Requirements ...................................................................................................... 15 Project Risks and Mitigation Measures ......................................................................... 16 P3 Requirements .......................................................................................................... 17 Appendices ................................................................................................................... 18 1 Executive Summary The Government of the
    [Show full text]
  • Great Slave Lake in Canada
    Great Slave Lake In Canada Great Slave Lake – Deepest Lake in North America Great Slave Lake is a large, deep lake located in the Northwest Territories of Canada, and a popular site to fish in both the summer and the winter. It is the deepest lake in North America (ranking 9th worldwide), and the second largest in the Northwest Territories after the Great Bear Lake. The lake is named for the Slavey people, a First Nations indigenous tribe, who originally inhabited the lake around Great Slave Lake. The Slavey people established the town of Dettah and others. British explorers arrived in the area in 1771, and the lake was frozen. Communities around the lake include the towns of Yellowknife, Hay River, Hay River Reserve, Behchoko, Fort Resolution, Dettah, N'Dilo, and the small village of Lutselk'e, which is mostly populated by native Chipewyans. Yellowknife became the capital of the Northwest Territories after the gold discovery in the 1930s, and later became the country's diamond capital. The lake's tributaries are the Hay, Slave, and Taltson Rivers, and the Mackenzie River drains the lake into the Arctic Ocean. The lake was formed by glaciers, and still partially freezes over during winter. One ice road exists – the Dettah ice road, connecting Yellowknife to Dettah. There are islands within the lake and plenty of recreation opportunities. The East Arm of the lake is part of Thaydene Nene National Park, and to the south is Wood Buffalo National Park. Around the lake are many popular spots for fishing and ice fishing for a variety of fish species, including whitefish, trout, and perch.
    [Show full text]
  • Fisheries Assessment of the Mackenzie River at Fort Providence, Nt - Proposed Deh Cho Bridge
    FISHERIES ASSESSMENT OF THE MACKENZIE RIVER AT FORT PROVIDENCE, NT - PROPOSED DEH CHO BRIDGE - Engineering Earth’s Development, Preserving Earth’s Integrity REPORT ON FISHERIES ASSESSMENT OF THE MACKENZIE RIVER AT FT. PROVIDENCE, NT - PROPOSED DEH CHO BRIDGE - Prepared for: Jivko I. Jivkov, P.Eng., Principal Jivko Engineering 5610 – 50A Avenue Yellowknife, Northwest Territories X1A 1G3 By: Golder Associates Ltd. #300, 10525 – 170 Street Edmonton, Alberta T5P 4W2 Ph: (780) 483-3499 Fx: (780) 483-1574 DISTRIBUTION: 1 Copy - Jivko Engineering 1 Copy - Deh Cho Bridge Corporation 1 Copy - Golder Associates Ltd. Final Report: January 22, 2004 03-1370-021 January 2004 - i - 03-1370-021 Final Report ACKNOWLEDGEMENTS The authors would like to thank the following individuals for initiating and/or contributing to the success of the project: Albert J. Lafferty Chief Operating Officer, Deh Cho Bridge Corporation, Ft. Providence, Northwest Territories Michael Vandell President, Deh Cho Bridge Corporation, Ft. Providence, Northwest Territories Andrew Gamble Principal, Andrew Gamble and Associates, Yellowknife, Northwest Territories Jivko Jivkov Principal, Jivko Engineering, Yellowknife, Northwest Territories We would also like to acknowledge the efforts of the following individuals in providing information on current and traditional fishing use by the community, and in assisting with the field research program: Bob Head Principal, Digaa Enterprises Ltd., Ft. Providence, Northwest Territories Louie Lacorne Ft. Providence, Northwest Territories Edwin
    [Show full text]
  • Yellowknife, Northwest Territories
    NORTHWEST TERRITORIES LEGISLATIVE ASSEMBLY 6th Session Day 28 14th Assembly HANSARD Tuesday, June 10, 2003 Pages 899 - 928 The Honourable Tony Whitford, Speaker Legislative Assembly of the Northwest Territories Members of the Legislative Assembly Speaker Hon. Tony Whitford (Kam Lake) Hon. Stephen Kakfwi Hon. Joseph L. Handley Mr. Bill Braden (Sahtu) (Weledeh) (Great Slave) Premier Minister Responsible for Energy and Executive Council Hydro Secretariats Mr. Paul Delorey Minister Responsible for Minister of Finance (Hay River North) Intergovernmental Affairs Minister Responsible for the Financial Minister Responsible for the Status of Management Board Women Minister Responsible for the Northwest Mr. Charles Dent Territories Power Corporation (Frame Lake) Hon. Jim Antoine Minister of Transportation (Nahendeh) Minister Responsible for the Workers' Mrs. Jane Groenewegen Compensation Board Deputy Premier (Hay River South) Minister of Aboriginal Affairs Minister Responsible for the Hon. J. Michael Miltenberger Mr. David Krutko Intergovernmental Forum (Thebacha) (Mackenzie Delta) Minister of Resources, Wildlife and Minister of Health and Social Services Economic Development Minister Responsible for Persons with Disabilities Mr. Leon Lafferty Minister Responsible for Seniors (North Slave) Hon. Roger T. Allen (Inuvik Twin Lakes) Minister of Justice Hon. Jake Ootes Ms. Sandy Lee Minister Responsible for NWT (Yellowknife Centre) (Range Lake) Housing Corporation Minister of Education, Culture and Minister Responsible for Public Employment Mr. Michael McLeod Utilities Board (Deh Cho) Minister Responsible for Youth Hon. Vince R. Steen (Nunakput) Mr. Steven Nitah Minister of Public Works and Services (Tu Nedhe) Minister of Municipal and Community Affairs Mr. Floyd Roland (Inuvik Boot Lake) Mr. Brendan Bell (Yellowknife South) Officers Clerk of the Legislative Assembly Mr.
    [Show full text]