Deh Cho Bridge Construction Project Km 24.4, Yellowknife Highway (No

Total Page:16

File Type:pdf, Size:1020Kb

Deh Cho Bridge Construction Project Km 24.4, Yellowknife Highway (No DEPARTMENT OF INFRASTRUCTURE GOVERNMENT OF THE NORTHWEST TERRITORIES File: MV2012X0015 Deh Cho Bridge Construction Project km 24.4, Yellowknife Highway (No. 3) Mackenzie River Final Plan 2017 October, 2017 Structures Section Highways Division Northwest0 Territories Department of Infrastructure Department of Infrastructure Government of the Northwest Territories km 24.4, Hwy #3 – Deh Cho Bridge Construction Final Plan - Land Use Permit MV2012X0015 October 11, 2017 Ms. Elaine Briere, Regulatory Assistant/Registry Clerk Mackenzie Valley Land and Water Board 7th Floor – 4922 - 48th Street P.O. Box 2130, Yellowknife, NT X1A 2P6 Dear Ms. Briere; Final Plan Request – Deh Cho Bridge Construction Project – km 24.4, Yellowknife Highway (No. 3) at the Mackenzie River Please accept this letter as confirmation that all restoration, clean up and removal of equipment, materials and buildings have been completed during the construction phase of this project, and that all works regarding Land Use Permit MV2012X0015 have been completed. As per your request for a Final Plan for this Land Use Permit, I have included: 1. A map, normally at a scale of 1:50,000 showing your location, area, and distances of all land use operations. Sketches are acceptable but all maps must have the north indication, scale and coordinates clearly marked. In accordance with the Final Plan Request for Land Use Permit MV2012X0015, the Department of Infrastructure (DOI) has included 5 Google Earth photos showing the areas affected by this Land Use Permit. 2. A summary of the hectares utilized in each aspect of the land use operation. • Construction and Laydown Area: o North Side = 1,000m x 60m = 60,000m2 x 0.0001 hectares/m2 = 6 hectares o South Side = 500m x 60m = 30,000m2 x 0.0001 hectares/m2 = 3 hectares • Camp Area: o 100m x 100m = 10,000m2 x 0.0001 hectares/m2 = 1 hectare • Quarry Area: o 200m x 100m = 20,000m2 x 0.0001 hectares/m2 = 2 hectares • Total Area: o Approximately 12 hectares in total affected by land use operation. 3. A calculation of Land Use Fees. No Land Use Fees were required for this project. Department of Infrastructure Government of the Northwest Territories km 24.4, Hwy #3 – Deh Cho Bridge Construction Final Plan - Land Use Permit MV2012X0015 Department of Infrastructure Government of the Northwest Territories km 24.4, Hwy #3 – Deh Cho Bridge Construction Final Plan - Land Use Permit MV2012X0015 Department of Infrastructure Government of the Northwest Territories km 24.4, Hwy #3 – Deh Cho Bridge Construction Final Plan - Land Use Permit MV2012X0015 ___________________ SeanSean Smiley Smiley Senior Project Officer Department of Infrastructure Government of the Northwest Territories .
Recommended publications
  • Proposed Tłı̨chǫ All-Season Road Executive Summary March 2016
    Proposed Tłı̨chǫ All-season Road Executive Summary March 2016 Proposed Tłı̨ chǫ All-season Road Project Description Report March 2016 Department of Transportation i Proposed Tłı̨chǫ All-season Road Executive Summary March 2016 EXECUTIVE SUMMARY This project description report (PDR) has been written to accompany the Type A Land Use Permit and Type B Water Licence applications to the Wekʼèezhìı Land and Water Board (WLWB) for development of the proposed T ł ı̨ c h ǫ All-season Road (TASR). These applications are being submitted by the Department of Transportation of the Government of the Northwest Territories (DOT – GNWT). The T ł ı̨ c h ǫ Government supports these applications. This project has been identified as a GNWT commitment under the Proposed Mandate of the Government of the Northwest Territories 2016-2019 (GNWT 2016). Over the years, DOT and T ł ı̨ c h ǫ Government have contemplated the possibility of improved transportation to the Wekʼèezhìı area. In 2011, both governments became reengaged under the T ł ı̨ c h ǫ Roads Steering Committee (TRSC) in order to assess the feasibility, desirability and implications of realigning the T ł ı̨ c h ǫ Winter Road System to provide improved community access. As of May 2013, the vision of the TRSC has been to pursue development of an all-season road. The route would end at the boundary of the community government of Whatì and predominantly follow ‘Old Airport Road,’ an existing overland alignment that was utilized up until the late 1980s as an overland winter road. The proposed TASR is defined as an all-season road approximately 94 km in length and 60 m in width with a cleared driving surface of approximately 8.5 m in width in order to accommodate a two lane gravel road with culverts and/or double lane bridges over water crossings as necessary.
    [Show full text]
  • For the Canadian Transportation Sector 2016 (Pp
    3 · Northern Territories CHAPTER 3: NORTHERN TERRITORIES LEAD AUTHOR: KALA PENDAKUR1 CONTRIBUTING AUTHORS: JACKIE DAWSON (UNIVERSITY OF OTTAWA), KATERINE GRANDMONT (UNIVERSITY OF MONTREAL), DOUG MATTHEWS (MATTHEWS ENERGY CONSULTING), ART STEWART (GOVERNMENT OF NUNAVUT) RECOMMENDED CITATION: Pendakur, K. (2017). Northern Territories. In K. Palko and D.S. Lemmen (Eds.), Climate risks and adaptation practices for the Canadian transportation sector 2016 (pp. 27-64). Ottawa, ON: Government of Canada. 1 The Conference Board of Canada, Ottawa, ON Climate Risks & Adaptation Practices - For the Canadian Transportation Sector 2016 TABLE OF CONTENTS Key Findings .........................................................................................................................................................29 1.0 Introduction ..................................................................................................................................................29 1.1 Regional overview .............................................................................................................................30 2.0 An introduction to Canada’s northern transportation system...............................................................31 2.1 System overview ................................................................................................................................31 2.2 Road transportation ..........................................................................................................................33 2.3
    [Show full text]
  • NWT Transportation Report Card 2015 Is Intended to Provide a Statistical Benchmark of Progress Achieved and an Evaluation Framework to Measure Future Progress
    TABLED DOCUMENT 345-17(5) TABLED ON OCTOBER 7, 2015 Table of Contents Overview ....................................................................................................................................3 Strengthening Connections .....................................................................................................5 Capturing Opportunities ...........................................................................................................9 Embracing Innovation ............................................................................................................ 11 Metrics & Data .........................................................................................................................13 1.0 Financial .................................................................................................................. 13 1.1 Capital and O&M Expenditures and Revenue .............................................. 13 1.2 Analysis of Capital Needs ............................................................................ 14 1.3 Major Partnership Funding ........................................................................... 15 1.4 Airport, Road Licensing and Deh Cho Bridge Toll Revenues ....................... 16 1.5 Northern, Local, Other, contracts and Total Value of Contracts .................... 18 1.6 Community Access Program Expenditures ................................................. 18 2.0 Airports ....................................................................................................................19
    [Show full text]
  • EA1415-01 Developer's Assessment Report
    DEVELOPER’S ASSESSMENT REPORT ALL SEASON ROAD PROJECT PRAIRIE CREEK MINE MAIN REPORT Volume 1 of 3 SUBMITTED IN SUPPORT OF: Environmental Assessment of Prairie Creek Mine EA 1415-01 SUBMITTED TO: Mackenzie Valley Review Board Yellowknife, NT X1A 2N7 SUBMITTED BY: Canadian Zinc Corporation Vancouver, BC V6B 4N9 April 2015 PROJECT FACT SHEET CORPORATE DATA Project Name Prairie Creek Mine Company Name and Address Canadian Zinc Corporation Suite 1710, 650 West Georgia Street Vancouver, B.C., V6B 4N9 Telephone: (604) 688-2001 Fax: (604) 688-2043 Canadian Zinc Corporation 9926-101st Avenue PO Box 500 Fort Simpson, NT X0E 0N0 Telephone: (867) 695-3963 Fax: (867) 695-3964 Contacts Alan Taylor, Chief Operating Officer and VP Exploration David Harpley, VP Environment & Permitting Affairs Wilbert Antoine, Manager of Northern Development COMMUNITY DATA First Nation Territory Nahanni Butte Dene Band, Dehcho Nearest Community Nahanni Butte, 95 km south-east Other Communities Fort Liard, 165 km south-east Fort Simpson, 185 km east Land Claims Status In negotiation, Dehcho Process PROJECT DETAILS Location 550 km west of Yellowknife, NWT 61°33’ N latitude, 124°48’ W longitude Undertaking ~185 km all season road to the Liard Highway essentially using the existing, permitted winter road alignment Prairie Creek All Season Road Project – April 2015 1 GONDI AEK’ÉHZE ADLÁ Gondi Éhgonñæá Dii Prairie Creek Mine góhts’edi tå’a Góhdli Ndehé k’eh yunahnee tå’uh nît’i ii gots’ç xôh shíhtah á goæô. Káa azhô t’áh Canadian Zinc Corporation (CZN) gots’êh á agøht’e. K’õô 1980 kéhonñdhe ekúh á ndéh gozhíhe gots’êh satsõ kázhe gha seegúdlá agøht’e t’áh t’ahsíi met’áh alaeda thela á agøht’e.
    [Show full text]
  • Season's Greetings
    I’d like to congratulate the teams that worked on the University of Saskatchewan’s Livestock and Season’s Greetings Forage Centre of Excellence and Calgary Zoo Flood Mitigation projects. Both projects received Awards Thirty-two years ago, I started my career at of Excellence at the annual Canadian Consulting Associated Engineering. As a Design Engineer Engineering Awards. These awards are a testament working on bridges and transportation structures to our innovation and technical excellence. for the resource sector and municipalities, I wanted I’d also like to acknowledge our team who to design safe transportation infrastructure that worked on the Regina Bypass, which opened in supports our economy. Never did I imagine that October. This $1.88 billion project is the largest in three decades later, I would become President, and Saskatchewan’s history. As Owner’s Engineer, we then this year, President & CEO. Thank you to Kerry employed a One Company approach, drawing on Rudd, who retired this year as President & CEO, and the expertise of staff from across the country. Our our Board of Directors for their confidence in me. One Company approach is part of the success of One of my first actions as President was to embark Associated Engineering. on a new Strategic Plan, which we launched last In closing, I’d like to thank all our staff for their year. Themed Shaping our Shared Future, our vision contributions and dedication to our clients and the is to deliver creative solutions for a healthy, resilient projects they work on. Your service and creativity world, and, in doing so, create a meaningful legacy featured: are what differentiates us.
    [Show full text]
  • Climate Change Impacts and Adaptation: Case Studies of Roads in Northern Canada
    CLIMATE CHANGE IMPACTS AND ADAPTATION: CASE STUDIES OF ROADS IN NORTHERN CANADA Robyn V. McGregor, M.Sc., P.Eng., Senior Transportation Engineer and Principal Consultant Masood Hassan, Ph.D., P.Eng., Senior Transportation Engineer Don Hayley, P.Eng., FEIC, Director - Arctic Resource Development EBA Engineering Consultants Ltd. Paper prepared for presentation at the “Climate Change and the Design and Management of Sustainable Transportation” Session of the 2008 Annual Conference of the Transportation Association of Canada Toronto, Ontario 1 ABSTRACT Access to communities and resource developments in northern Canada often relies on a single all-weather or winter road. Warming trends in recent years can put these indispensable access routes at risk by impacting road structures that overlie permafrost, and by shortening the duration of winter roads built on ice or seasonally frozen ground. This paper presents two case studies of all-weather and winter roads in northern Canada to describe the issues pertaining to the impacts of climate change and the adaptation strategies that have been or are being implemented to cope with the impacts. 1. The Yellowknife Highway (NWT Highway 3) reconstruction. The design addressed those features of embankment performance over the long term that represent the greatest risk of uncontrolled maintenance and safety. The following features were adopted to mitigate climate change effects and retard the rate of thaw: a. The core of the embankment comprises a minimum of 2 metres of quarried rockfill, providing internal strength to even out future settlements; b. A sacrificial shoulder and flat sideslopes were provided on the embankment as it was recognized that the permafrost soils supporting the slopes would be the first to thaw; c.
    [Show full text]
  • Deh Cho Bridge (Canda)
    Project information Deh Cho Bridge (Canda) Project description mageba scope Highlights & Facts The Deh Cho Bridge, located in Canada’s mageba was awarded the contract to de- Northwest Territories, was completed in sign and manufacture the modular expan- mageba products: the fall of 2012. The $202 million cable sion joints required at each end of the Type: TENSA®MODULAR LR stayed bridge spans the Mackenzie River Deh Cho Bridge. mageba provided an 11 expansion joints of types near Fort Providence, replacing an exist- gap TENSA®MODULAR expansion joint at LR8 and LR11 ing ferry service in the summer, and an one abutment, and an 8 gap modular ex- Installation: 2010–2012 ice crossing route in the winter. The Deh pansion joint at the other. These modular Cho Bridge is the only permanent cross- expansion joints, reliable in the most ex- Structure: ing of the Mackenzie River. The structure treme conditions of northern Canada, are Location: Northwest Territories, ensures that the region to the north will able to facilitate movements of up to 35 in Canada not be cut off from southern Canada for (889 mm). In addition, they are also excep- Completed: 2012 an annual 8 week period, when forming tionally flexible, allowing movements in Type: Cable stayed bridge or melting ice, not strong enough to carry every direction as well as limited rotations Length: 3,642 ft (1,100 m) the ice road, prevents the passage of the about every axis. Contractor: Ruskin ferry. The new 0.68 mi (1.1 km) long bridge has nine spans of lengths ranging between 294 ft (90 m) and 624 ft (190 m).
    [Show full text]
  • Background Report
    Sahtu Land Use Planning Board Sahtu Land Use Plan Background Report July 2010 July 2010 Page 1 Sahtu Land Use Plan Background Report: The Sahtu Settlement Area The Sahtu Land Use Plan Background Report The Sahtu Land Use Plan Background Report, from now on referred to as the “Background Report”, is intended to capture some of the main characteristics of the Sahtu Settlement Area (SSA), its people, the culture, special places, the biophysical environment, the economy and the regulatory regime. Above all, the Background Report should help readers better understand the Sahtu and the reports and information that were considered in the development, decisions, and planning that resulted in the Sahtu Land Use Plan (SLUP). Introduction The Sahtu Land Use Plan was written by taking into account the three pillars of sustainability: socio-cultural, economic and ecological factors. These three domains are now commonly considered part of a balanced approach to decision-making. The background report is an attempt to briefly describe some of the social, cultural, economic and ecological factors that the Sahtu Land Use Planning Board (SLUPB) has considered in its decision making. INAC’s Sustainable Development Strategy 2007-2010 describes sustainable communities as those which “enjoy a prosperous economy, a vibrant and just society, and a healthy environment for current and future generations.”1 The Sahtu Land Use Planning Board has sought to develop a balanced plan for the Sahtu Settlement Area (SSA) by considering a diversity of resources under each of the three pillars. A summary of the sources used and a general description of the Sahtu Settlement Area follow.
    [Show full text]
  • Staff Report Applicant: GNWT
    Staff Report Applicant: GNWT – Department of Transportation Location: Application: Yellowknife Highway – Ingraham Trail MV2017X0008 Corridor and Adjoining Roads Date Prepared: Meeting Date: April 6, 2017 April 20, 2017 Subject: Determination of Transboundary Application 1. Purpose/Report Summary The purpose of this Report is to present to the Mackenzie Valley Land and Water Board (MVLWB/the Board), an application from the Government Northwest Territories – Department of Transportation (GNWT-DOT) for a new Land Use Permit (Permit) MV2017X0008. The Board will consider the transboundary nature of this application as per the Board’s October 2005 Policy on Transboundary Applications. 2. Background • March 6, 2017 – Application received; • March 10, 2017– Application deemed complete and review commenced; • March 30, 2017 – Reviewer comments and recommendations due and received; • April 6, 2017 – Responses received; and • April 20, 2017 – Presented to the Board for transboundary determination (decision on Application to follow in separate Board package). 3. Discussion On March 6, 2017, the GNWT-DOT submitted an application for a new Permit MV2017X0008 for the ongoing operation and maintenance of the existing NWT public highway system, specifically the Yellowknife Highway – Ingraham Trail Corridor, including Highway #3 and the community access roads for Behchokǫ̀ and Dettah (attached). The Board’s Policy on Transboundary Applications (approved October 26, 2005) notes that Board staff are to include in their analysis, information on the physical boundaries of the activities applied for, along with the direct implications the activities may have on the adjacent land management areas. Based on the Application, this land use operation is to take place between two regions of the Mackenzie Valley: the Akaitcho Region and the Wek’èezhìı Management Area.
    [Show full text]
  • Northwest Territories Transportation Strategy, 2015-2040
    TABLED DOCUMENT 267-17(5) TABLED ON JUNE 3, 2015 NING CON THE NEC NG TI E ON R S ST S E E M Connecting I T B I R N A Us U C T I N R G O P I N P N O O G V A IN T R IO U N PT CA 2015-2040 Northwest Territories Transportation Strategy Minister’s Message The road, air, rail and marine transportation system has played a key role in the history and development of the Northwest Territories, and will continue to support sustainable communities and a growing economy into the future. Over the past year, the Department of Transportation engaged a broad base of stakeholders to discuss the challenges and opportunities facing our northern transportation system. These engagements helped identify the vision and strategic priorities for enhancing our transportation system to meet the future needs of residents, communities, businesses and industry. As we mark the 25th anniversary of the Department of Transportation, established in 1989, and reflect on the great accomplishments achieved to date, it is the perfect time to redefine the path forward over the next 25 years. This strategy, Connecting Us, presents a vision for the transportation system and the strategic long-term priorities that will guide future actions of the Department of Transportation. It also outlines a framework for measuring and reporting on our success into the future. Northerners are strong, resilient people and we must continue working together to strengthen connections, capture opportunities and embrace innovation. Doing so will improve and enhance our transportation infrastructure, services, programs and policies, which will, in turn, lead to a sustainable economy, vibrant communities and self-reliant people.
    [Show full text]
  • Fast-Tracked Bridge Design
    Steel Bridge NATIONAL STEEL BRIDGE ALLIANCE NEWS JUNE 2010 A sophisticated, iterative analytical approach to re-evaluating the bridge superstructure has put this project on the path to completion. Fast-Tracked Bridge BY PRABHJEETD RAJ SINGH,esign P.ENG., P.E., AND MATTHIAS SCHUELLER, P.ENG., PH.D. CROSSING THE MACKENZIE RIVER in Canada’a Northwest system. This reveals the difference of an extradosed bridge and a Territories is anything but easy. In summer a ferry provides a way classical cable stayed bridge in terms of the structural system. across, and in winter passage is via an ice bridge. But during the The two-lane, nine-span bridge has main navigation span of transition seasons, as the ice is breaking up or before it freezes 623 ft. The approach spans are symmetrical about the center of the solid, neither option is available. bridge. Each end begins with a 295-ft span followed by three 369- The Deh Cho Bridge now being constructed soon will provide ft spans. The total length of the bridge is 3,427 ft. The superstruc- a permanent link for ground transportation in the area. It is a com- ture consists of two 15-ft deep Warren trusses with a transverse Cposite steel truss bridge with a cable assisted main span. The struc- spacing of 24 ft and a 9-in-thick precast composite deck. tural system can be classified as a composite bridge with hybrid The truss members are built-up I-sections. Two A-shaped pylons, extradosed-cable stayed features. Comparable to a cable stayed located at Pier IV South and Pier IV North, each support two cable system, the primary purpose of the cables is to support the truss in planes.
    [Show full text]
  • Northern Connections
    NORTHERN CONNECTIONS A Multi-Modal Transportation Blueprint for the North FEBRUARY 2008 Government of Yukon Photos and maps courtesy of: ALCAN RaiLink Inc. Government of British Columbia Government of Northwest Territories Government of Nunavut Government of Yukon Designed and printed in Canada’s North Copyright February 2008 ISBN: 1-55362-342-8 MESSAGE FROM MINISTERS It is our pleasure to present Northern Connections: A Multi-Modal Transportation Blueprint for the North, a pan-territorial perspective on the transportation needs of Northern Canada. This paper discusses a vision for the development of northern transportation infrastructure in the context of a current massive infrastructure decit. Research has proven that modern transportation infrastructure brings immense benets. The northern transportation system of the future must support economic development, connect northern communities to each other and to the south, and provide for enhanced sovereignty and security in Canada’s north. This document complements a comprehensive national transportation strategy – Looking to the Future: A Plan for Investing in Canada’s Transportation System – released under the auspices of the Council of the Federation in December 2005. The three territories support the details contained in Looking to the Future that call for a secure, long-term funding framework for transportation infrastructure that will benet all Canadians. Equally important, northern territories stress that this national strategy – and any subsequent funding mechanisms that follow – must account for unique northern needs and priorities, which would be largely overlooked using nation-wide criteria only. This paper is also consistent with A Northern Vision: A Stronger North and a Better Canada, the May 2007 release of a pan-territorial vision for the north.
    [Show full text]