Central Coalfields Limited Du I Go N T I C T L Se
Total Page:16
File Type:pdf, Size:1020Kb
CONTENTS S No. Particulars Annexure No. Page No. 1 Filled -up Form -I for one time 25% - increase in normative capacity to 1-15 1.25 MTPA & peak capacity to 1.70 MTPA 2 Previous Environmental Clearance Letters. I 16 -21 3 Previous Forestry Clearance Let ters. II 22 -24 4 Guidelines issued by MoEF vide letter III 25 -26 number J-11015/30/2004- IA. II(M) dated 19.12.2012 for one time 25% increase in capacity. 5 CCL Board Approval for Tarmi OCP. IV 27 6 Copy Of latest Half -yearly Compliance V 28 -34 Report. 7 Copy of the proceedings of Public Hearing VI 35 -45 conducted on the project for grant of earlier EC for 1.0 MTPA. 8 Status of implementation of issues raised VII 46 -48 during last Public Hearing. 9 A copy of the earlier EIA -EMP Report of VIII Enclosed 1.0 MTPA Tarmi OCP. Separately 10 A copy of Addendum EIA & EMP IX -Do- Report submitted for one time 25% 1.25 MTPA & peak capacity to 1.70 MTPA. ******** Tarmi OCP (1.25 MTPA normative capacity & 1.70 MTPA peak capacity) Dhori Area, Central Coalfields Limited ================================================================================== FORM-I (I) Basic Information 1 Name of the project Tarmi OCP ( 1.25 MTPA normative capacity & 1.70 MTPA peak capacity), Dhori Area, Central Coalfields Limited within the existing project area of 258.70 Ha (including 10 Ha for colony outside core zone). Sali ent Features Tarmi OCP is an existin g coal mining project in Dhori Area of Central Coalfields Limited. Environmental clearance for Tarmi OCP (1.0 MTPA normative capacity) was granted vide letter No.J-11015/219/2007-IA.II(M dated 20.04.2010 in project area of 258.70 Ha. Refer Annexure-I & II for copies of previous environmental clearance & forestry clearance respectively. The present proposal is being submitted for one time 25% increase in capacity as per guideline issued by MoEF vide letter number J-11015/30/2004- IA. II(M) dated 19.12.2012. The targeted normative capacity is 1.25 MTPA & peak capacity is 1.70 MTPA. No increase in lease area is proposed. Refer Annexure-III for the guideline. The infrastructure of the mine shall remain the same and higher production is proposed through better utilization of resources. Refer Annexure-IV for CCL Board Approval for Tarmi OCP. 2 S. No. in the schedule 1 (a) 3 Proposed capacity/ Project Area (Ha) Capacity (MTPA) area/length/tonnage Existing Proposed Normative Peak to be handled/ Existing Proposed Existing Proposed command area/ lease 258.70 258.70 1.00 1.25 1.00 1.70 area / number of wells to be drilled 4 New / Expansion / Expansion Modernization 5 Existing 1.00 MTPA normative capacity within the existing project area of Capacity/Area etc 258.70 Ha. 6 Category of Project. A i.e .'A' or 'B' 7 Does it attract the No general condition? If yes, Please specify ===================================================== CMPDI, RI-III, Ranchi 1 Tarmi OCP (1.25 MTPA normative capacity & 1.70 MTPA peak capacity) Dhori Area, Central Coalfields Limited ================================================================================== 8 Does it attract the No specific condition? If yes, Please specify 9 Location Plot / Survey / Khasra Survey of India Toposheet Number 73 I/1 and 73 I/2 (RF No 1:50000). Villages Tarmi (Post - Turiyo PIN -829132) Tehsil Bermo District Bokaro State Jharkhand 10 Nearest railway The nearest railway station, Bhandaridah on Barkakhana- station / airport along Gomoh loop line of the Eastern Railway is located at a distance with distance in kms. of 1.0 K.M towards south of the project. The nearest Air Port is at Ranchi at a distance of about 130 km. 11 Nearest Town, city, a) Town: Phusro -5 Kms. District Headquarters b) District H/Q : Bokaro- 35 Kms. along with distance in kms. 12 Village Panchayats Sno Name of Gram Panchayat Tel / Mobile no Zilla Parishad 1 Tarmi Panchayat, District-Bokaro, 9430150222 Municipal Jharkhand Corporation, Local body (complete 2 Turiyo Panchayat, District-Bokaro, 9934186123 postal Jharkhand Addresses with telephone nos. to be given) 13 Name of the Central Coalfields Limited applicant 14 Registered Address Darbhanga House, Ranchi - 834001 15 Address for correspondence: Name Alok Kumar Designation (Owner / Deputy General Manager (Env & Forest), Partner / CEO Address Central Coalfields Limited, Darbhanga House, PO- Ranchi, Dist- Ranchi, Jharkhand. Pin Code 834001 E-mail [email protected] And [email protected] Telephone No. 0651 -2360184 Fax No. 0651-2360184 ===================================================== CMPDI, RI-III, Ranchi 2 Tarmi OCP (1.25 MTPA normative capacity & 1.70 MTPA peak capacity) Dhori Area, Central Coalfields Limited ================================================================================== 16 Details of Alternative Not Applicable. Coal mining project is site specific depending on Sites examined, if favourable geo-mining conditions. Reserve proving operations have any. been completed and it is an existing project which started coal Location of these production from 2010-11. sites should be shown on a toposheet 17 Interlinked Projects Nil 18 Whether separate Not Applicable application of interlinked Project has been submitted 19 If yes, date of Not Applicable submission 20 If no, reason Not Applicable 21 Whether proposal involves approval / clearance under 1. The Forest Yes (Conservation) Act, 1980 2. The Wildlife No (Protection) Act, 1972 3. The CRZ No Notification, 1991 22 Whether there is any No Government Order/ Policy relevant/relating to the site 23 Forest land involved Forestry clearance required under Forest conservation Act (hectares) 1980. a) 55.06 Ha of Forest land - released. b) 97.44 Ha of forest land – under process for stage-II. Refer Annexure-II for copy of previous forestry clearance letter for 55.06 Ha of forest land. 24 Whether there is any No litigation pending against the project ===================================================== CMPDI, RI-III, Ranchi 3 Tarmi OCP (1.25 MTPA normative capacity & 1.70 MTPA peak capacity) Dhori Area, Central Coalfields Limited ================================================================================== and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders / directions of the Court, if any, and its relevance with the proposed project Screening Category: Screening is not applicable. This is a Category-A project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) ===================================================== CMPDI, RI-III, Ranchi 4 Tarmi OCP (1.25 MTPA normative capacity & 1.70 MTPA peak capacity) Dhori Area, Central Coalfields Limited ================================================================================== S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary No No change for peak capacity. change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No No change for peak capacity. vegetation and buildings? 1.3 Creation of new land uses? No No change for peak capa city. 1.4 Pre -construction No No change for peak capacity. investigations e.g. bore houses, soil testing? 1.5 Construction works? No No change for peak capacity. 1.6 Demolition works? No No change for peak capacity. 1.7 Temporary sites used for No No change for peak capacity. construction works or housing of construction workers? 1.8 Above ground buildings, No No change for peak capacity. structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works No Not applicable. including mining or tunneling? 1.10 Reclamation works? No No change for peak capacity. 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not applicable. 1.13 Production and Yes Coal Pro duction by openc ast method as per manufacturing processes? already approved EC, only peak capacity of 25 % to be added. 1.14 Facilities for storage of Yes Already available. No change is required for goods or materials? peak capacity. 1.15 Facilities for treatment or Yes Already available. No change required disposal of solid waste or because of peak capacity. liquid effluents? Status: ===================================================== CMPDI, RI-III, Ranchi 5 Tarmi OCP (1.25 MTPA normative capacity & 1.70 MTPA peak capacity) Dhori Area, Central Coalfields Limited ================================================================================== The disposal of OB material by backfilling is already being done. 1.16 Facilities for long term Yes This is an existing approved project with housing of operational colony. No change is required for peak workers? capacity. 1.17 New road, rail or sea traffic No Not required for peak capacity. during construction or operation? 1.18 New road, rail, air No No new infrastructure is required for peak waterborne or other capacity other than given in the earlier Tarmi transport infrastructure OCP which has already got environmental including new or altered clearance. routes and stations, ports, airports etc? 1.19