Preliminary Approximate cadastral № Location land plot Possible ways of use Infrastructure Encumbrances value, area, ha thousand USD Brest town 1 at the intersection of Moskovskaya up to 1,5 construction and maintenance connection to the operating abscent 2296,65 and Pionerskaya streets of a group of buildings for utilities (gas, water and accomodation, retail and electricity supply, leisure, administrative and sewerage, driveway to the office purposes, and the use plot) is possible as a hotel

2 the quarter within the confines of 3 construction and maintenance connection to the operating abscent 5416,5 Kizhevatova, Sportivnaya and of a group of buildings for utilities (gas, water and Respublikanskaya streets accomodation, retail and electricity supply, leisure, administrative and sewerage, driveway to the office purposes, and the use plot) is possible as a hotel

3 the district within the confines of up to 1 construction and maintenance connection to the operating abscent 2007,7 Masherova ave., 48, 50, of a multifunctional center utilities (gas, water and Ostrovskogo and Sovetskaya electricity supply, streets sewerage, driveway to the plot) is possible

4 39, Dzerzhinskogo str.; 0,5 construction of a building for connection to the operating abscent 974,95 96,98,100,102/1, Sovetskaya str. administrative and retail utilities (gas, water and purposes, with possibility of electricity supply, developing residential sewerage, driveway to the accomodation plot) is possible

5 Lutskaya str. up to 1 construction and maintenance connection to the operating abscent no of a bathing center (Russian utilities (gas, water and information bath) electricity supply, sewerage, driveway to the plot) is possible

6 Gavrilova str. 0,5 reconstruction of sports and connection to the operating abscent 5,27 recreation center (leisure utilities (gas, water and component is to be electricity supply, constructed) sewerage, driveway to the plot) is possible

7 Brest, on the cross of Writer 6 facility construction of connection to the operating abscent 1512,6 Smirnov St. and the highway roadside service and logistic utilities (gas, water and M1/E30 center electricity supply, sewerage, driveway to the plot) is possible

8 Brest, the quarter limited 0,7 construction and servicing of connection to the operating abscent 1430192,75 Mickiewicz St., Komsomolskaya administrative and business, utilities (gas, water and St., Sovietskaya St. and residential and mall center. electricity supply, Pushkinskaya St. sewerage, driveway to the plot) is possible

9 Brest, in the area of the 2,7 construction of the logistic connection to the operating abscent no Kamenetsky roadring in the territory center utilities (gas, water and information of water intake "Northern" the 3rd electricity supply, rise sewerage, driveway to the plot) is possible

10 Brest, Respubliki Avenue 25 construction and service of a connection to the operating abscent no multipurpose object utilities (gas, water and information electricity supply, sewerage, driveway to the plot) is possible

Baranovichi town 11 Badaka str. 0,8 construction of operation three cable power lines abscent 137,76 support facilities at an (along the Badaka street), industrial enterprise of the medium pressure gas fourth class (by sanitary pipeline ø219 mm, water classification) pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 160 m 12 Badaka str. 0,8 construction of operation three cable power lines abscent 137,76 support facilities at an (along the Badaka street), industrial enterprise of the medium pressure gas fourth class (by sanitary pipeline ø219 mm, water classification) pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 100 m 13 Badaka str. 0,8 construction of operation three cable power lines abscent 137,76 support facilities at an (along the Badaka street), industrial enterprise of the medium pressure gas fourth class (by sanitary pipeline ø219 mm, water classification) pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 50 m 14 Badaka str. 0.8 construction of operation three cable power lines abscent 137,76 support facilities at an (along the Badaka street), industrial enterprise of the fifth medium pressure gas class (by sanitary pipeline ø219 mm, water classification) pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, driveway

15 Badaka str. 0,8 construction of operation three cable power lines abscent 137,76 support facilities at an (along the Badaka street), industrial enterprise of the medium pressure gas fourth class (by sanitary pipeline ø219 mm, water classification) pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 200 m 16 Badaka str. 2,4 construction of operation three cable power lines abscent 413,28 support facilities at an (along the Badaka street), industrial enterprise of the medium pressure gas fourth class (by sanitary pipeline ø219 mm, water classification) pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 150 m; there is a railway to the west of the plot, construction of new approach lines is possible 17 Vostochniy poselok str. 1,3 construction of a machine power transmission line; abscent 350,61 building plant water pipeline ø200 mm and high pressure gas pipeline ø500 mm (along the Frolenkova street); water pipeline ø500 mm (along the Kabushkina str.); driveway by the current road network, construciton of a driveway to the Churilina str. 450 m in length is possible 18 Voikova, Smolenskaya and 1,9 construction of a sports and electricity line; water abscent 1288,39 Sverdlova streets recreation center (current low- pipeline ø150 mm (along rise accommodations and the Voikova str.), water administrative buildings are pipeline ø200 mm (along subject to removal; planting the Baranova str.), water area is not less than 25% of pipeline ø150 mm and the territory) ø400 mm (along the Smolenskaya str.), water pipeline ø100 mm (along the Timiriazeva str.); sewer system ø1000 mm and ø500 mm (along the Baranova str.), medium pressure gas pipeline ø300 mm; driveway 19 Voikova, Timiryazeva and 2,5 construction of a there is an electricity line abscent 1683,25 Sverdlova streets multifunctional entertaining (Voikova and Sverdlova center (current low-rise streets), 3 power lines on accommodations and the plot; water pipeline administrative buildings are ø150 mm (along Voikova subject to removal; planting str.), water pipelines ø150 area is not less than 25% of mm and ø400 mm (along the territory) the Smolenskaya str.), water pipeline ø100 mm (along the Timiriazeva str.); sewer system ø1000 mm and ø500 mm (along the Baranova str.); low pressure gas pipelineа ø114 mm (along the Timiriazeva str.); driveway 20 Sovetskiy ave. 0,5 culture and entertainment sewer system ø300 mm abscent 269,3 center (number of stories - up and water pipelines ø800 to 3, planting area is not less mm (along the Sovetskogo than 25%) ave.), low pressure gas pipeline ø108 mm at a distance of 200 m; cabel power line - eastern side of the plot. driveway

21 Sovetskiy ave. 1,5 (building construction of a sewer system ø200 mm, abscent 649,2 line is to be 5 multifunctional building for a water pipeline ø20 mm, m from the red business center (current low- low pressure gas pipeline line of rise accommodations are ø50 mm and ø114 mm; Sovetskogo subject to removal) low pressure (ø100 mm) ave.) and medium pressure (ø500) mm gas pipelines (along the Shevchenko str.); driveway

22 Sovetskiy ave. 1,2 (1 of construction of a hotel electricity line and low abscent 497,72 which - for complex (current low-rise pressure gas pipeline ø114 area accommodations are subject mm (along the development) to removal) Dubrovskogo lane); driveway 23 Sovetskaja, Mitskevicha and 0,7 construction of elite housing, a electricity lines and low abscent 491,66 Gagarina streets shopping center, a hotel, pressure gas pipeline ø100 public catering facilities (a bar, mm; low pressure gas restaurant, café); current pipelines ø89 mm (along accommodations and the Gagarina str.); pipeline accessory buildings removal ø150 mm (along the Sovetskaya, gagarina and Mitskevicha streets); sewer system ø150 mm (along the Mitskevicha str,), ø200 mm (along the Gagarina str.); driveway 24 Sovetskaya, Baranova, 2,1 construction of an elite house electricity line (along the abscent 1485,12 Dzerzhinskogo and Pushkina of enhanced comfort and with Pushkina str.); sewer streets public service facilities system ø250 mm, water (current accommodations, car pipeline ø200 mm and fleet buildings and medium pressure gas constructions are subject to pipeline ø250 mm (along removal) the Sovetskaya str.); water pipeline ø150 mm (along the Baranova str.); driveway 25 Slonimskoe Shosse str. 5 construction of operation At a distance of about 20m abscent 942 support facilities at an is pressurized sewer ø200 industrial enterprise of the (south-eastern side of the fourth class (by sanitary plot), a distance of about classification) 30m and 70m is heating main ø100 and plumbing ø150 (west side of the plot), along the western side of the plot takes place 10 kV power network (100m - TA), a distance of about 110 m diameter water pipe network passes. Entrance to property provided by the existing street network ul.Slonimskoe highway 26 Francis Scorina St., 41 4,0 construction of operation It is necessary to install abscent 468 support facilities at an two cells of 10 kV with industrial enterprise of the switching devices on PS fourth class (by sanitary 110 For a construction of classification) production base of industrial enterprise of the fourth class quarter "Zapadnaya", to lay two KL- 10 kV, RP construction (range – near 3.6km). It is necessary to lay network of a water supply system about 2 km long on the Francis Scorina Street (from network of a water supply system of 200 mm on Professionalnaya St. to network of a water supply system of 150 mm on Brestskaya St., 295). Range about 2 km. Gas pipeline of average pressure 63 of mm upon the lane 1 Suburban and lane 2 Suburban, gas pipeline of average pressure 133 of mm and 27 Brestskaya St., 315 7,1 construction of operation It is necessary to install abscent 830,7 support facilities at an two cells of 10 kV with industrial enterprise of the switching devices on PS fourth class (by sanitary 110 For a construction of classification) production base of industrial enterprise of the fourth class quarter "Zapadnaya", to lay two KL- 10 kV, RP construction (range – near 3.6km). It is necessary to lay network of a water supply system about 2 km long on the Francis Scorina Street (from network of a water supply system of 200 mm on Professionalnaya St. to network of a water supply system of 150 mm on Brestskaya St., 295). Range about 2 km. Gas pipeline of average pressure 63 of mm upon the lane 1 Suburban and lane 2 Suburban, gas pipeline of average pressure 133 of mm and 28 Fabrichnaya St. 6,7 construction of operation It is necessary to abscent 1871,98 support facilities at an coordinate connection to industrial enterprise of the networks of 10 kV (0,4 kV) fourth class (by sanitary with RUP "BPHO", from classification) networks of a power supply system – it is necessary to lay 2 KL-10 kV from PS of 110 kV of HBK with the construction of TP. It is necessary to lay the area of water supply system about 470 m long network of a water supply system of 200 mm on the Gayeva St. the network of a water supply system of 200 mm on Masherov Avenue (about 470 meters from the land plot). It is necessary to design and lay the area of sewerage network about 700 m long from the area to the collector of 200 mm at. Gayevy (700 meters from the land plot). The gas pipeline on average 29 Kommunisticheskaya St. 0,3 For the construction of the the asphalted street, water abscent 97,375 facility on rendering services supply, power supply, gas supply 30 Zelenaya str, 7 0,37 For a placement of the public the asphalted street, water abscent 236,652 building (hotel 2-4 floors) with supply, power supply, gas a condition of land seizure in supply order to establish it by the legislation and demolition, located on them, an individual house on Zelyonaya St., 5, and a garage on Zelyonaya St., 9 31 Slonimskoye Highway St., 5A 3,7 for allocution of a production the asphalted street, water abscent 408,85 area and warehouses of the supply, power supply, gas logistic center supply Baranovichi district 32 Velikoloukskiy village council, 0,3 a retail facility construction road, electricity abscent 3,338 Rusino agro-town, 7, Solnechniy transmission line, all the lane utilities are in close proximity Bereza district 33 the Striginsky village council, to the 15 mixed trade industry electricity lines 10 kV and abscent 0,44 west of the village Peresudovichi 110 kV, north side of the plot, low pressure gas pipeline (ø63 mm) and cable power line (along the motor road to the Olshevo village); water pipeline ø150 mm (100 m to the east), 200 m south-east, storm water sewage (ø900 mm), transport connection: motor road

Brest district 34 0.1 km to the east of Leplevka 0,5 for construction of operation electricity line 10 kV, abscent no village support facilities unsurfaced road information

35 0.5 km to the north-east of the 1 for construction of public and electricity line 10 kV, abscent no township Domachevo business facilities unsurfaced road information

Gantsevichi district 36 Gantsevichi town, 0,4 manufacturing facility paved street, water supply, abscent 43,5 65R, Matrosova str. electricity and gas supply

37 Gantsevichi town, 0,44 manufacturing facility paved street, water supply, abscent 47,87 65C, Matrosova str. electricity and gas supply

38 Gantsevichi town, 0,2 manufacturing facility paved street, water supply, abscent 11,7 8, Promyshlennaya str. electricity and gas supply

39 Gantsevichi town, 0,2 manufacturing facility paved street, water supply, abscent 11,7 10, Promyshlennaya str. electricity and gas supply

40 Gantsevichi town, 0,2 manufacturing facility paved street, water supply, abscent 11,7 12, Promyshlennaya str. electricity and gas supply

41 Gantsevichi town, Stroiteley str.,6 0,4 for construction and service of paved street, water supply, abscent 64,6 the trading facility electricity and gas supply

42 Gantsevichi town, 1,1 manufacturing facility paved street, water supply, abscent 57,95 14, Promyshlennaya str. electricity and gas supply

Drogichin district 43 intersection of roads: border with 0,2 roadside service facility possibility of connection to abscent 1,029 Russia – Gomel – Kobrin (М10) power transmission line; and motor road Drogichin–Bereza asphalt driveway is (R84) available; proximity of international and republican subordinance roads 44 Drogichin, 204, Lenin str. 3,15 industrial facility possibility of connection to abscent 222,74 (Republican Unitary Enterprise power transmission line, "Ekzon-Glyukoza" area) water pipeline, gas pipeline, sewerage 45 Nagornoe village, 1,1 industrial facility possibility of connection to abscent 8,4 Zheleznodorozhnaya str. power transmission line, water pipeline, gas pipeline, sewerage 46 Drogichin, Lenin St. (area of Open 0,5 industrial facility (production of possibility of connection to abscent 35,8 JSC Ekzon) medicines) power transmission line, water pipeline, gas pipeline, sewerage

47 Drogochin, 9th of May str. 0,99 construction and maintenance possibility of connection to abscent 192,8 of a building for services the operating utilities (gas, provision and trade in non- heat, water and electricity food group of goods supply, sewerage, driveway to the plot)

Zhabinka district 48 to the south of Dyatly village, 3,9 production facility asphalt motor road, abscent 9,4 Rakitnitskiy village council electricity and gas

49 to the west of Yezhyki village, 2,5 production facility gravel motor road, 1.5 km abscent 5,75 Leninskiy village council to the highway М-1/Е30, electricity supply 50 1,6 production facility paved street, railway, abscent 14,69 Korotkina str. electricity supply and gas

51 0.3 km to the west of Zhabinka, 3,5 production facility gravel motor road, railway, abscent 32,55 along the road Zhabinka-Rachki electricity and gas supply

Ivanovo district 52 Ivanovo town, Polevaya str. 2 for allocation of industrial and connection to electricity abscent 207,2 (adjoins the OJSC "Belsolod" area) service provision facilities and water supply is possible; adjoins the asphalt road Ivatsevich district 53 Ivatsevichi town, 1 construction of a medium pressure gas abscent 123,3 1, Zagorodnaya str. manufacturing facility (sanitary pipeline (along the protection zone, 50 m) Zagorodnaya str.), water pipeline Ø160 mm (polyethylene); cabel and overhead power transmission lines 10 kV (at a distance of 100 m); railway line adjoins the plot; driveway 54 Ivatsevichi town, 1,5 construction of a cabe power lines 10 kV, abscent 151,05 Zagorodnaya str. manufacturing facility (sanitary overhead power protection zone, 50 m) transmission line 10 kV; medium pressure gas pipeline; water pipeline Ø160 mm (polyethylene); water pipeline and sewerage of "Ivatsevichdrev" OJSC are located in close proximity; driveway

55 Ivatsevichi town, 1 construction of a cabel power line 10 kV, abscent 127,8 Zavodskaya str. manufacturing facility (sanitary low and medium pressure protection zone, 50 m) gas pipeline, water pipeline Ø160 mm (polyethylene (along the Zagorodnaya str.); water pipeline and sewerage of "Ekran" OJSC are located in close proximity; driveway

Kamenets district 56 southeast outskirts of Kamenets 5 construction of an industrial 500 m to the northeast of abscent 218,5 town facility Dzerzhinskogo street; road, power transmission line

57 to the southwest of Melniki village 8,4 agri-eco-tourist center 50 m; road, power abscent 22,635 transmission line 58 to the northeast of Vysokoe town 3 construction of an industrial 50 m; road, power abscent 10,2 facility transmission line Kobrin district 59 to the west of mobile mechanical 3 construction of a possibility of installing abscent no division No. 57 at Proletarskaya manufacturing facility electricity, water and gas information str., Kobrin town supply, asphalt driveway, railway Brest-Gomel is in close proximity 60 Kobrin town, 6 construction of a possibility of installing abscent no Severnaya str. manufacturing facility electricity, water and gas information supply, asphalt driveway, railway Brest-Gomel is in close proximity

61 Kobrin town, Kalinina str. 0,8 construction of a possibility of installing abscent no manufacturing facility electricity, water and gas information supply, asphalt driveway

62 1.5 km to the south of Borisovo 10 construction and maintenance possibility of installing abscent no village of a logistics center electricity, gas supply, information asphalt driveway, motor road Kobrin-Divin-border with Ukraine is in close proximity

Louninets district 63 Mikashevichi town, 0,08 construction of a touch-free possibility of connection to abscent 4,5 14, Sadovaya str. car wash the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot)

Lyakhovichi district 64 Lyakhovichi, 0,4 a retail facility construction utilities under construction abscent 89,24 1, Vishnevaya str. (building estate (electricity, water pipeline, "Potapovichi") gas), asphalt driveway

65 Lyakhovichi, 2,5 allocation of a manufacturing electricity; driveway by the abscent 193,75 15, Trudovaya str. (behind the facility existent road network production facilities of State Unitary (asphalt and unsurfaced Manufacturing Enterprise road); 0.2 km from the "Lyakhovichskoe PMS" (PMS - railway plant for reclamation works) 66 Lyakhovichi, 2 allocation of a manufacturing electricity; driveway by the abscent 151,4 144, Oktyabrskaya str. (behind the facility existent road network territory of CJSC "Lyakhovichskiy (asphalt and unsurfaced Plastic-to-Metal Seal Plant") road); 0.3 km from the railway

67 Rusinovichi agro-town 3 allocation of a logistics center, electricity; abscent 11,4 a manufacturing facility asphalt driveway; 0.1 km from the railway

Malorita district 68 50 m to the south of Zburazh 3,2 allocation of a manufacturing water supply from the abscent 0,31 village (former brick plant) facility township, possibility of making a well; gas supply from Zburazh village; electricity is to be supplied from the Zburazh village; driveway to the plot – asphalt road of the village, 150 m – construction of a driveway

69 70 m to the west of Antonovo 7,5 allocation of a manufacturing water supply – not abscent 0,13 village facility available, making a well is (former farm) necessary; gas supply – not available, electricity is to be supplied from the Antonovo village; driveway to the plot – gravel motor road 70 0,6 km to the southwest Velikorita, 2,8 allocation of a manufacturing water supply – the well of abscent 0,1 near the existing MTF APO Rita facility APO Rita, gas supply – isn't present (gas in аг. Velikorita), power supply – TP APO Rita, an entrance to the area – existing gravel motoway 71 2 km to the east of Soushitnitsa 11,6 allocation of a manufacturing water, gas and electricity abscent 0,13 village (former manufacturing area) facility supply are not available – input from the Soushitnitsa village is possible; driveway to the plot – a motor road with asphalt and gravel covering 72 Sovetskaya St. of 131/1 Malorita 0,3 allocation of a manufacturing water supply - on abscent 5,05 town facility Sovetskaya St., gas supply - on Sovetskaya St., power supply - on Sovetskaya St., an entrance to the site - adjoins Sovetskaya St.

73 Malorita town of the 8th March str. 0,3 allocation of a manufacturing Water supply, gas supply, abscent 6,67 (opposite to base) facility power supply, entrance to the area. city 74 Zoi Kosmodemyanskoy str. 3,5 total reconstruction of a connection to the operating abscent 3392,9 playground, construction of a utilities (gas, water and children entertainment center electricity supply, and public catering and sewerage, driveway to the commerce facilities plot) is possible

75 69, Zholtovskogo ave. 2,1 construction of a supermarket connection to the operating abscent 509 with an area of up to 5000 m2 utilities (gas, water and electricity supply, driveway to the plot) is possible

76 8, Korzha str. 0,14 construction of a connection to the operating abscent 143,9 multifunctional business utilities (gas, water and center with retail facilities and electricity supply, a hotel sewerage, driveway to the plot) is possible

77 within Chernyakhovskogo, 0,64 construction of a connection to the operating abscent 620,4 Zheleznodorozhnaya and multifunctional business utilities (gas, water and Medovaya streets center with retail facilities and electricity supply, a hotel sewerage, driveway to the plot) is possible

78 "Radouzhniy" building estate 0,2 construction of a multistorey connection to the operating abscent 93,6 car park with a service station utilities (gas, water and and commerce facilities; electricity supply, removal of the residential sewerage, driveway to the houses is intended plot) is possible

79 3, Gorkogo str., 0,54 construction and maintenance possibility of connection to demolition of 976,5 Kosmodem'yanskoy, Lenin sq. of a multifunctional complex existing engineering houses and for trade, cultural, and networks of gaz, water and uninhabited entertainment use (without the power supply, driveway to structures right of allocation of gambling the plot is possible through objects) the operating road network

80 10, Lenin sq 0.54 construction and maintenance possibility of connection to demolition of 444,1 of a multifamily house with existing engineering houses and trade and service enterprises, networks of gaz, water and uninhabited administration premises on power supply, driveway to structures the ground floor the plot is possible through the operating road network

Pinsk district 81 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No. 2 asphalt driveway is available

82 to the north-east 1 manufacturing facility possibility of connection to abscent of Zhabchitsy village, power transmission line, plot No. 3 asphalt driveway is available

83 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No. 4 asphalt driveway is available

84 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.5 asphalt driveway is available 85 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.6 asphalt driveway is available

86 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.7 asphalt driveway is available

87 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.8 asphalt driveway is available

88 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.9 asphalt driveway is available

89 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.10 asphalt driveway is available

90 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.11 asphalt driveway is available

91 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.12 asphalt driveway is available

92 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.13 asphalt driveway is available

93 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.14 asphalt driveway is available

94 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.17 asphalt driveway is available

95 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.18 asphalt driveway is available

96 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.19 asphalt driveway is available

97 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.21 asphalt driveway is available

98 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.22 asphalt driveway is available

99 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.23 asphalt driveway is available

100 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.24 asphalt driveway is available 101 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.25 asphalt driveway is available

102 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.26 asphalt driveway is available

103 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.27 asphalt driveway is available

104 to the north-east 1 manufacturing facility possibility of connection to abscent 4 of Zhabchitsy village, power transmission line, plot No.28 asphalt driveway is available

Prouzhany district 105 Prouzhany town, Internatsionalnaya 3 a manufacturing facility sanitary sewer system abscent 196,8 str. 300, water pipeline 200 (along the Internatsionalnaya str.); high and medium pressure (159, 152) gas pipelines (along the Zavodskaya str.); distance to the motor road R-85 is about 200 m, to the railway station Oranchitsy - about 12 km, to the Internatsionalnaya street - 80 m; power line 10 kV

106 Prouzhany town, Internatsionalnaya 2,5 a manufacturing facility sanitary sewer system abscent 239 str. 300, water pipeline 300 (along the Internatsionalnaya str.); high and medium pressure (159, 152) gas pipelines (along the Zavodskaya str.); distance to the motor road R-85 is about 200 m, to the railway station Oranchitsy - about 12 km, to the Pushkina street - 30 m; power line 10 kV

107 Prouzhany town, Makarenko str. 0,5 services sanitary sewer system abscent 52,05 Ø200, water pipeline Ø100 (along the Makarenko str.); medium pressure (Ø114) gas pipeline (50 m away); distance to the Makarenko street is 330 m, to the railway station Oranchitsy - about 12 km; power line 10 kV

108 Prouzhany town, Makarenko str. 1,8 a manufacturing facility sanitary sewer system abscent 187,38 Ø200, water pipeline Ø100 (along the Makarenko str.); medium pressure (Ø114) gas pipeline (50 m away); distance to the Makarenko street is 220 m, to the railway station Oranchitsy - about 12 km; power line 10 kV 109 Prouzhany town, Makarenko str. 0,7 services sanitary sewer system abscent 72,87 Ø200, water pipeline Ø100 (along the Makarenko str.); medium pressure (Ø114) gas pipeline (180 m away); distance to the Makarenko street is 220 m, to the railway station Oranchitsy - about 12 km; power line 10 kV

Stolin district 110 , 4 for construction of an there are water pipeline abscent 413,6 Tereshkovoy str. (within the industrial facility ø150 mm, sewerage forestry area) system ø150 mm, electricity line 10 kV along the Mira ave., high pressure (ø219) and medium pressure (ø32) gas pipelines (20 m away); driveway

111 Stolin, 1 for construction of an water pipeline ø150 mm abscent 132,5 Tereshkovoy str. (within the road industrial facility (along Mira ave.), servicing department No.26) sewerage system ø150 mm, electricity line 10 kV, high pressure (ø219) and medium pressure (ø32) gas pipelines (20 m away), driveway

112 Stolin 1 for construction of an water pipeline ø150 mm abscent 113,6 Tereshkovoy str. (within the area of industrial facility (along R.Zorge str.), the automobile park No.12) sewerage system ø150 mm, electricity line 10 kV, high pressure ø108 and medium pressure, ø225 and ø273, gas pipelines (10 m away); driveway

113 Stolin, Mira ave. 0,2 for construction of a service sewerage system ø150 abscent 52,8 provision facility mm, water pipeline ø100 mm, electricity line 10 kV, medium pressure ø63 and low pressure ø89 gas pipelines (20 m away); driveway

114 Radchitsky Village Council, 0,5 km 42,6 for building an installation of The entrance is carried out abscent 80,94 to the southeast Radchitsk 30 MW power blocks in case on dirt road. The area is to use renewables energy of located in a security zone the sun. of the power line. East side of the area is 11 hectares in protective zone.