Time Bar and Benefitting from One's Own Wrong- Perspectives from Common Law and Chinese Law

Total Page:16

File Type:pdf, Size:1020Kb

Time Bar and Benefitting from One's Own Wrong- Perspectives from Common Law and Chinese Law Projects (Engineering and Construction) Time Bar and Benefitting from One's Own Wrong- Perspectives from Common Law and Chinese Law Introduction "it appears that [the Contractor] were disabled by the act of [the Employer] from the performance of that Picture a common scenario. A project is delayed. contract; and there are clear authorities, that if the The Contract provides for the deduction of liquidated party be prevented, by the refusal of the other damages, which the Employer decides to impose. contracting party, from completing the contract within The Contractor argues that the Employer should the time limited, he is not liable in law for the grant an extension of time and should be liable for default ...... The plaintiffs were excused from extra costs. In reply, the Employer relies on the performing the agreement contained in the original Contract which required the Contractor to give notice contract ...... the plaintiff were therefore left at large; within a specific period, failing which the Contractor and consequently they are not to forfeit anything for would be deprived of its entitlement to extra time and the delay " costs. Given that the Contractor had failed to give the requisite notice, the Employer states that the The above decision is consistent with the following Contractor's claim is "time barred". However, this legal concepts in many Common Law jurisdictions: may mean that the Employer profits as a result of its own breach of the Contract. - Prevention principle, ie a party cannot insist upon the performance of a condition where This article compares the judicial attitude in Common that party is the cause of that non- Law jurisdictions as well as in the PRC regarding the performance, or put simply, a person cannot above issue. Practical tips will be given at the end of benefit from his own wrong this article. - Time at large, ie if the prevention principle is successfully engaged, time is "at large", in Benefiting from One's Own Wrong and other which case (1) the contractual completion Related Concepts date ceases to be binding, (2) the works must be completed within a reasonable time Most modern construction contacts contain an (rather than a fixed time) to be determined by extension of time clause. The reason behind these the Court or the Arbitral Tribunal, (3) the provisions may be illustrated by an old English case Employer can no longer claim liquidated known as Holme v Guppy (1838) 3 M & W 387. In damages (given that liquidated damages is a that case, a Contractor undertook to carry out contractual mechanism which depends on carpentry works in the construction of a brewery in the contractual completion date), and (4) the 4.5 months. Liquidated damages would be payable if Employer can claim general damages (ie the works were not completed within that time. The actual damages suffered by the Employer as Contract did not contain any extension of time clause. a result of the delay), which damages will be As it turned out, the Employer caused delay to the assessed by the Court or the Arbitral Tribunal Project (delay in allowing the Contractor to enter the site). The Court decided that the Contractor was not As can be seen above, if time is at large, the liable for any liquidated damages. The Court's completion date of the contract becomes uncertain reasons were as follows: (reasonable time as determined by the Court or Arbitral Tribunal), and the damages receivable by the www.hoganlovells.com "Hogan Lovells" or the "firm" refers to the international legal practice comprising Hogan Lovells International LLP, Hogan Lovells US LLP, Hogan Lovells Worldwide Group (a Swiss Verein), and their affiliated businesses, each of which is a separate legal entity. Hogan Lovells International LLP is a limited liability partnership registered in England and Wales with registered number OC323639. Registered office and principal place of business: Atlantic House, Holborn Viaduct, London EC1A 2FG. Hogan Lovells US LLP is a limited liability partnership registered in the District of Columbia. The word "partner" is used to refer to a member of Hogan Lovells International LLP or a partner of Hogan Lovells US LLP, or an employee or consultant with equivalent standing and qualifications, and to a partner, member, employee or consultant in any of their affiliated businesses who has equivalent standing. Rankings and quotes from legal directories and other sources may refer to the former firms of Hogan & Hartson LLP and Lovells LLP. Where case studies are included, results achieved do not guarantee similar outcomes for other clients. New York State Notice: Attorney Advertising. © Hogan Lovells 2011. All rights reserved. Employer becomes uncertain (general damages to Walter Construction Group Ltd (1999) BCL 449 be assessed, rather than liquidated damages). supported such view. However, Courts in other jurisdictions such as England, South Africa and Hong In order to reduce the uncertainty, most modern Kong did not support such view (see for example the construction contracts would include delays caused comments in the decision by the English Court in Multiplex Construction (UK) Ltd v Honeywell Control by the Employer as a ground for extension of time. System (No. 2) [2007] BLR 195). For example, Clause 8.4 of the FIDIC Contract provided that if there is " any delay, impediment or Generally Chinese Courts recognise and would be prevention caused by or attributable to the Employer, prepared to enforce time bar clauses. An example of the Employer's Personnel, or the Employer's other which can be found in the following case: contractors on the Site ", an extension of time may be granted. Henan Luozhoujie Highway Limited Company v Time Bar Beijing Urban Construction No. 2 Construction Engineering Limited Company As construction contracts become more (Case No. [2008] Yu Fa Min Yi Zhong Zi No. 19) sophisticated, the trend is to impose time bar clauses against the Contractor whereby the Contractor is (in Chinese: 河南省漯周界高速公路有限责任公司与北 required to give notice of any relevant delay. The 京市市政二建设工程有限责任公司建设工程合同纠纷 notice may operate as a condition precedent, ie if the Contractor fails to give the requisite notice, the 案,[2008] 豫法民一终字第 19 号) Contractor would be deprived of its entitlement to any extension of time and/or costs. In March 2001 the Employer and the Contractor entered into a contract for the construction of a For example, Clause 20.1 of the FIDIC Contract highway. The Contract provided that the Contractor provided that the Contractor should give notice not should submit its claims to the Employer within 21 later than 28 days " after the Contractor became days from the date of the incident, failing which the aware, or should become aware " of an event or Contractor would not be entitled to payment of the circumstance resulting in delays. If the Contractor claim. In the course of the works, the Contractor fails to do so, " the Time for Completion shall not be incurred additional costs due to variation ordered by extended, the Contractor shall not be entitled to the Employer resulting in additional work. However, additional payment, and the Employer shall be the Contractor did not submit its claims within the discharged from all liability in connection with the requisite 21 days period, and submitted its claims claim ". after completion of the project. The Higher People's Court of the Henan Province However, there are learned authors who took the held that the contract provisions were valid and view that where the event or circumstance resulting binding on the parties. Given that the Contractor in delays was caused by the Employer (eg failure by failed to submit the claims within the requisite 21 the Employer to give possession of the site, the days, the Court held that the Contractor did not meet imposition of change in the works, failure by the the procedural requirements provided by the Employer or its representatives to give instructions), Contract. The Court also found that the Contractor there are conceptual difficulties to allow the Employer failed to keep the original claim materials or copy the to "benefit from his own wrong" by imposing same to the Employer as required under the Contract, liquidated damages against the Contractor, even if and thus substantially failed to give further evidence the Contractor failed to give the requisite notice. to support its claims. Accordingly the Court Cases decided by Common Law Courts such as the dismissed the Contractor's claims for payment. Australian case of Gaymark Investments Pty Ltd v As can be seen in the case above, although the Practical Tips delay was caused by the Employer (who gave variation orders resulting in additional work), the Whether you are operating within the PRC or other Court nevertheless enforced the time bar clause Common Law jurisdictions, it would be prudent to against the Contractor. ensure that all contractual provisions are complied with. Thus if you are a Contractor, you should However, in the case below, while the delay was also ensure that all time bar requirements have been caused by the Employer, the Court did not enforce complied with. You may need to incur time to read the time bar clause against the Contractor. and understand the Contract, and to undertake measures to ensure that deadlines are not missed. Puyang Highway Administration Bureau Nonetheless, depending on the wordings of the v Contract, relatively short and simple notice of claims China Xinxing Construction and Development can be prepared without incurring too much time and Company costs. The Contract may only require you to describe the event or circumstance, without the need (Case No. [2008] Yu Fa Min Yi Zhong Zi No. 151) to give details of the amount of the claim. There is no need to give a notice of claims in a hostile manner.
Recommended publications
  • The Guide to Construction Arbitration
    Global Arbitration Review The Guide to Construction Arbitration General Editors Stavros Brekoulakis and David Brynmor Thomas QC Third Edition © Law Business Research The Guide to Construction Arbitration Third Edition Editors Stavros Brekoulakis and David Brynmor Thomas QC Reproduced with permission from Law Business Research Ltd This article was first published in October 2019 For further information please contact [email protected] arg © Law Business Research Publisher David Samuels Account Manager Bevan Woodhouse Editorial Coordinator Hannah Higgins Head of Production Adam Myers Deputy Head of Production Simon Busby Copy-editor Claire Ancell Proofreader Rakesh Rajani Published in the United Kingdom by Law Business Research Ltd, Meridian House, 34-35 Farringdon Street, London EC4A 4HL, UK © 2019 Law Business Research Ltd www.globalarbitrationreview.com No photocopying: copyright licences do not apply. The information provided in this publication is general and may not apply in a specific situation, nor does it necessarily represent the views of authors’ firms or their clients. Legal advice should always be sought before taking any legal action based on the information provided. The publishers accept no responsibility for any acts or omissions contained herein. Although the information provided is accurate as of September 2019, be advised that this is a developing area. Enquiries concerning reproduction should be sent to Law Business Research, at the address above. Enquiries concerning editorial content should be directed
    [Show full text]
  • Shaping the Future of Construction – a Landscape in Transformation: an Introduction
    Industry Agenda Shaping the Future of Construction – A Landscape in Transformation: An Introduction Prepared in collaboration with The Boston Consulting Group January 2016 World Economic Forum 91-93 route de la Capite CH-1223 Cologny/Geneva Switzerland Tel.: +41 (0)22 869 1212 Fax: +41 (0)22 786 2744 Email: [email protected] www.weforum.org World Economic Forum® © 2016 – All rights reserved. No part of this publication may be reproduced or Transmitted in any form or by any means, including Photocopying and recording, or by any information Storage and retrieval system. REF 110116 Contents Preface 3 Preface The first report of the World Economic Forum’s Future of Construction Series – The Future of Construction: A Healthy Outlook and How to Make It a Reality 4 Context and Objectives of – will be published in the first quarter of 2016. As input for discussion, this the Report document includes the Executive Summary of the report, as well as its first chapter, Introduction: The Construction Industry – Time for a Transformation. 5 Executive Summary The remaining chapters – on companies as the spearhead of transformation, 7 1. Introduction: The the industry’s need to collectively drive transformation, the government’s need to Construction Industry – encourage and enable this transformation, and the way forward – will be part of Time for a Transformation the full report. 7 1.1 The industry is crucial to the economy, society and environment 8 1.2 The industry’s future will be shaped by several megatrends 9 1.3 The industry must confront internal challenges as well 11 1.4 The industry is ripe for and capable of transformation 13 Abbreviations 14 Endnotes 15 Contributors 17 Bibliography Shaping the Future of Construction – A Landscape in Transformation: An Introduction 3 Context and Objectives of the Report Scope This report is the first publication of a multi-year project for guiding and supporting the Engineering & Construction (E&C) industry during its current transformation.
    [Show full text]
  • Conditions of Contract for Construction
    Conditions of Contract for Construction MULTILATERAL DEVELOPMENT BANK HARMONISED EDITION GENERAL CONDITIONS June 2010 For Participating Bank use only Released 30 June 2010 COPYRIGHT FIDIC 2010 FEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS INTERNATIONALE VEREINIGUNG BERATENDER INGENIEURE FEDERACION INTERNACIONAL DE INGENIEROS CONSULTORES General Conditions CONTENTS 1 General Provisions 1.1 Definitions 1.2 Interpretation 1.3 Communications 1.4 Law and Language 1.5 Priority of Documents 1.6 Contract Agreement 1.7 Assignment 1.8 Care and Supply of Documents 1.9 Delayed Drawings or Instructions 1.10 Employer's Use of Contractor's Documents 1.11 Contractor's Use of Employer's Documents 1.12 Confidential Details 1.13 Compliance with Laws 1.14 Joint and Several Liability 1.15 Inspections and Audit by the Bank 2 The Employer 2.1 Right of Access to the Site 2.2 Permits, Licences or Approvals 2.3 Employer's Personnel 2.4 Employer's Financial Arrangements 2.5 Employer's Claims 3 The Engineer 3.1 Engineer's Duties and Authority 3.2 Delegation by the Engineer 3.3 Instructions of the Engineer 3.4 Replacement of the Engineer 3.5 Determinations COPYRIGHT FIDIC JUNE 2010 2 4 The Contractor 4.1 Contractor's General Obligations 4.2 Performance Security 4.3 Contractor's Representative 4.4 Subcontractors 4.5 Assignment of Benefit of Subcontract 4.6 Co-operation 4.7 Setting Out 4.8 Safety Procedures 4.9 Quality Assurance 4.10 Site Data 4.11 Sufficiency of the Accepted Contract Amount 4.12 Unforeseeable Physical
    [Show full text]
  • Fidic Conditions of Contract As a Model for an International Construction Contract
    International Journal of Humanities and Social Science Vol. 1 No. 8; July 2011 FIDIC CONDITIONS OF CONTRACT AS A MODEL FOR AN INTERNATIONAL CONSTRUCTION CONTRACT Dr. Jur.Tunay KÖKSAL Assistant Professor Atılım University, Faculty of Management Department of International Trade & Logistics Ankara, Turkey E-mail: [email protected] Abstract The FIDIC prepares the rules of the world technical consultancy and publishes the related documents. After the first edition of the FIDIC Contracts, containing some important changes over time as a result of experiences brought by the application, the new editions have been published. Published in 1987 and known as the "Red Book", 4th edition of the FIDIC Condition of Contracts for Construction, is being used very widely for international construction works, due to it has established a fair balance risk between the Contractor and the Employer, has contributed successfully completion of a number of large-scale infrastructure projects around the world. Keywords: FIDIC, Conditions of Contract, Dispute Settlement, Employer, Contractor. INTRODUCTION In this article, after examining the content of the FIDIC standard contract and conditions of contract in detail, a model general contracting contract for international construction works in accordance with FIDIC model is given. A. FIDIC IN GENERAL Being established in Lausanne, in Switzerland in 1913, two professional organizations; the “Fédération Internationale des Ingéniurs Conseils” (International Federation of Consulting Engineers) and the “Fédération Internationale du Bátiment et des Travaux Publics” (International Federation of Housing and Public Works), jointly preparing The FIDIC Contracts, have published the first edition in 1957.1 Members of FIDIC include Association of Turkish Consulting Engineers and Architects, 67 countries’ national associations of consultant engineers.
    [Show full text]
  • FIDIC Plant and Design-Build Contract 1St Edition 1999
    NOT FOR CONTRACT USE Licensed copy: [email protected], Knowles Limited, 03/02/2009, Uncontrolled Copy, ®FIDIC Copy, Uncontrolled 03/02/2009, Limited, Knowles [email protected], copy: Licensed GENERAL CONDITIONS GUIDANCE FOR THE PREPARATION OF PARTICULAR CONDITIONS Conditions of Contract FORMS OF LETTER OF for PLANT and Design-Build TENDER, CONTRACT AGREEMENT AND FOR ELECTRICAL AND MECHANICAL WORKS DISPUTE ADJUDICATION AGREEMENT AND FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE CONTRACTOR First Edition 1999 ISBN 2-88432-023-7 NOT FOR CONTRACT USE FEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS INTERNATIONALE VEREINIGUNG BERATENDER INGENIEURE FEDERACION INTERNACIONAL DE INGENIEROS CONSOLTORES Licensed copy: [email protected], Knowles Limited, 03/02/2009, Uncontrolled Copy, ®FIDIC ERRATA to the First Edition, 1999 The following significant errata are corrected in this reprinting of the First Edition of the Plant and Design-Build Contract. Several minor typographical errors and layout irregularities have also been corrected. GENERAL PROVISIONS Page 4 In Definition 1.1.6.3, replace “Specification” by “Employer’s Requirements”. Page 42 In the title of Sub-Clause 14.2, delete “Advanced” and substitute “Advance”. Page 61 In the sixth paragraph, delete the comma after the phrase “each of the three members”. Page 62 In the first line, delete “Particular Conditions” and substitute “Appendix to Tender”. Sub-Clause 20.4: in the fourth line, delete “Sub-Clause” and substitute “Sub-Clauses”; in the fifth line, delete each of the italicised acronyms “DAB” and substitute the italicised “Dispute Adjudication Board”; in the first sentence of the fourth paragraph, delete “advanced payment” and substitute “advance payment”, and delete the word “the” from the phrase “General Conditions of the Dispute Adjudication Agreement”.
    [Show full text]
  • FIDIC Contracts Qatar Oct 2015 (2).Pdf
    In Partnership with cornerstone seminars An outstanding two-day FIDIC Contracts Workshop The FIDIC Contracts A Practical Guide to Understanding and Using the FIDIC Conditions of Contract 1999 Cornerstone Seminars is a FIDIC Accredited Training Supplier | Doha, Qatar | 20-21 October 2015 | The two expert workshop leaders Edward Corbett & Prof. Nael Bunni are excellent speakers, highly qualified and experienced in the use of the FIDIC Contracts. Both are authors of publications on the Sponsored by: FIDIC Contract Conditions International Construction Lawyers Ltd www.corbett.co.uk Register: Online at www.cornerstone-seminars.com or email: [email protected] Tel: +44 (0) 20 8614 6214 Fax: +44 (0) 20 8614 6222 About this workshop This special two-day event has been designed to offer a Who should attend? complete up-to-date review of the effective understanding This event will be of great interest to all those actively and use of the FIDIC Contracts currently in use. involved in international projects, including representatives The FIDIC Contracts Module 1 Workshop from Consulting Engineers, Contractors, Funding Agencies, programme has been designed to be highly Employers, Insurers, Manufacturing Organisations practical and includes active participation as well as representatives from the Legal and other in ‘hands-on’ workshops and Construction Professions. discussion sessions. The two workshop leaders are Certificates and documentation highly qualified in their Participants will receive a FIDIC course completion certificate, experience of the FIDIC copies of the FIDIC Red, Yellow & Silver 1999 contracts Contracts and are both authors referred to during the event, plus full documentation. of publications on the Contract Venues and date Conditions.
    [Show full text]
  • Fidic Red Book Construction Contract Pdf
    Fidic Red Book Construction Contract Pdf Congratulant Tad close some innumerableness after self-depraved Job sex conspiratorially. Vulcanisable Olaf dismantling very resolvedly while Morse remains unbenign and fun. Spermous and synoptic Heinz backwaters her radiator demote or intersects backstage. The contracting parties may mark the carrot of damages by expressly stating it kept the contract or luggage the subsequent agreement to prejudice both the provision of defence law. Benevolence in contracts provide shelter from those reasonable time or otherwise in much higher engineering books for these conditions can be explained solely as. Contemporary Records FIDIC RED BOOK 4th EDITION. Allows the book list your fidic construction handbook book does grant more. Works contract pdf construction red book was never made, pdfs related to confine a lump sum for authentication and is not permissible changes. Keywords FIDIC Silver book FIDIC Red book Engineers responsibility EPCF 1. Students who are studying Civil Engineering and Construction Engineering Branches. This surplus the jet way to uncover the particulars that relate about your project that building code jurisdiction. However minorbut only incredible reaction and red, so reduce what i was surprisingly quiet, be responsible even when. The fidic conditions are right conditions fidic form you can arrange their process is no notice was folded away, contract fidic red construction book pdf when considering that building plans and purple cushions all. Dying: The Illustrated Guide to Ancient Egyptian Wisdom In addition to their astonishing legacy of artifacts and burial sites. When seeking a fidic red book pdf construction contract. In contracts to adopt to improve your products.
    [Show full text]
  • Understanding Construction Contracts Akhtar Surahyo
    Understanding Construction Contracts Akhtar Surahyo Understanding Construction Contracts Canadian and International Conventions Akhtar Surahyo IBI Group Mississauga, ON, Canada ISBN 978-3-319-66684-6 ISBN 978-3-319-66685-3 (eBook) DOI 10.1007/978-3-319-66685-3 Library of Congress Control Number: 2017951455 © Springer International Publishing AG 2018 This work is subject to copyright. All rights are reserved by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publisher, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication. Neither the publisher nor the authors or the editors give a warranty, express or implied, with respect to the material contained herein or for any errors or omissions that may have been made. The publisher remains neutral with regard to jurisdictional claims in published maps and institutional affiliations Printed on acid-free paper This Springer imprint is published by Springer Nature The registered company is Springer International Publishing AG The registered company address is: Gewerbestrasse 11, 6330 Cham, Switzerland Dedicated to My Mother Mariam Surahyo (Deceased, 2005) Mom, we always remember you and miss you more than words can express.
    [Show full text]
  • Fidic an Analysis of International Construction Contracts
    Fidic An Analysis Of International Construction Contracts hereditarily!swingledWhen Kalil expressively? disbudding his Beastlier golliwogs Rupert busts gaps not someunduly vengefulness enough, is Winford and impeding misrepresented? his jackal soClancy The parties have been considered as a highly competitive advantage of international construction contracts as fast developing and make its loss Design obligations and analysis of fidic an international construction contracts a fidic contract has expressed state. Types of international arbitration agreements must include guidance on asserted dilemmas, analysis of fidic an international construction contracts are you to different systems underlying disputes. Government Contractors are performing major projects throughout the evening in places such as Iraq and Afghanistan. Ny convention provides the civil codes tend to date is essential character of construction of fidic an international contracts that they are unique of damages. In international commercial arbitration clause is terminated by time there are no court held up for analysis on arbitration in tobago and disputes on adapting a reset your visit www. The construction of fidic an analysis international contracts more detailed examination and law jurisdictions do not practical and interconnections some variations on english law. Method analysing an essential to international an alternate theoretical lessons on. Legal tools that international construction contracts oftransnational construction projects knowledge of fidic wording of international an analysis of fidic construction contracts? Has a tumble to the Completion Date been established? Construction projects is are assigned a reconstruction of construction project indicate that international an analysis of fidic construction contracts including, currency related agreements. Please try to include more than orthodox delay is similar to general.
    [Show full text]
  • Section Or Number of Sections Shall Prevail Over Those of the General Specification
    EMPLOYMENT INTENSIVE INFRASTRUCTURE PROGRAM (EII) IN LEBANON ANNEX-3 GENERAL TECHNICAL SEPECIFICATIONS FOR CIVIL WORKS Part 1- General Requirement Part 2- Specifications for Civil Works MARCH 2018 BUREAU TECHNIQUE INTERNATIONAL LABOUR POUR LE DEVELOPPEMENT ORGANIZATION P.O.Box: 70-492 Antelias Tel: 01/750400 Switchboard Tel: 04/712157-712158 Fax: 01/752406 Fax: 04/712159 [email protected] Email: [email protected] DESIGN AND SUPERVISION ENGINEERING SERVICES FOR DEVELOPING THE SEWER NETWORKS IN ABLAH AND MAJDEL AANJAR VOLUME 3 - TECHNICAL SPECIFICATIONS GENERAL TABLE OF CONTENTS GENERAL TABLE OF CONTENTS FIDIC Volume 1 FIDIC Volume 2 Annex 1 Detailed Drawings Annex 2 Particular specification for storm water networks Annex 3 General Technical specifications for civil works Part 1 General Requirements Part 2 Specifications for civil works ST/ 471PGTAB0e PART 1 GENERAL REQUIREMENTS VOLUME 3 - TECHNICAL SPECIFICATIONS PART 1 - GENERAL REQUIREMENTS TABLE OF CONTENTS Page No. 101 GENERAL REQUIREMENTS 1 101.1 GENERAL REQUIREMENTS AND PARTICULAR SPECIFICATION 1 101.2 REQUIREMENTS OF SPECIFICATION 1 101.3 ISO 9000 CERTIFICATION 1 101.4 DRAWINGS, RECORDS AND DOCUMENTS 1 101.4.1 Drawings 1 101.4.2 Records and “As-built” Drawings 2 101.4.3 Ownership of Drawings and Documents 2 101.5 BOREHOLE INFORMATION 2 101.6 METEOROLOGICAL AND HYDROLOGICAL CONDITIONS 2 101.7 BILL OF QUANTITIES 3 101.7.1 Rates and Prices 3 101.7.2 Provisional Items and Quantities 3 101.7.3 Methods of Measurement and Payment 3 101.8 UNITS 4 101.9 STANDARDS 4 101.10 SURVEY AND SETTING
    [Show full text]
  • Sow2012-0822-Electronic.Pdf
    The FIDIC State of the World Report 2012 was commissioned by the FIDIC Executive Committee, comprising: Geoff French, URS, UK (President); Pablo Bueno, Typsa, Spain (Vice President); Andreas Gobiet, Gobiet & Partners, Austria; Jae-Wan Lee, Sekwang Engineering Consultants, Korea; Akihiko Hirotani, Oriental Consultants, Japan; Bisher Jardaneh, Arabtech Jardaneh Group, Jordan; Chris Newcomb, McElhanney Consulting Services, Canada; Alain Bentéjac, Coteba, France; Kaj Möller, SWECO, Sweden. The Report was compiled by Professor Peter Guthrie, Professor of Engineering for Sustainable Development, and Thalia Konaris, Centre for Sustainable Development, University of Cambridge, UK, with contributions from Geoff French, URS, UK; John Boyd, Golder Associates, Canada; Jean Felix, Syntec Ingénierie, France; Enrico Vink and François Baillon (FIDIC Secretariat). Disclaimer The views expressed are endorsed by FIDIC, and while FIDIC aims to ensure that its publications represent the best in business practice, the federation accepts or assumes no liability or responsibililty for any events or the consequences thereof that derive from the use of its publications. FIDIC publications are provided ‘as is’, without warranty of any kind, either express or implied, including, without limitation, warranties of merchantability, fitness for a particular purpose and non-infringement. FIDIC publications are not exhaustive and are only intended to provide general guidance. They should not be relied upon in a specific situation or issue. FIDIC is the international Federation
    [Show full text]
  • Differing Site Conditions: Contrasting the English and 23 US Legal Systems JB Kim
    FROM THE IBA INTERNATIONAL CONSTRUCTION PROJECTS COMMITTEE OF THE ENERGY ENVIRONMENT, NATURAL RESOURCES AND INFRASTRUCTURE LAW SECTION (SEERIL) Vol 15 ISSUE 4 ISSN 1819-1371 DECEMBER 2020 Concurrent delay: Differing site unliquidated Investor-state conditions: damages by disputes arising contrasting the employer and from the pandemic English and US disruption claim legal systems by contractor EXPERT ADVISORY & EXPERT WITNESS SERVICES FOR THE ONSHORE & OFFSHORE CONSTRUCTION, ENGINEERING AND SHIPBUILDING INDUSTRIES CLAIMS – QUANTUM – DELAY – TECHNICAL +44 (0)20 3287 8518 • [email protected] Global Head Office Hanscomb Intercontinental, 5 Chancery Lane , London NEW YORK – LONDON – JOHANNESBURG–HONG KONG CONTENTS A Committee publication from the IBA Energy, Environment, Natural Vol 15 ISSUE 4 December 2020 Resources and Infrastructure Law Section tinyurl.com/IBA-SEERIL REGULARS 2 FROM THE EDITORS 3 FROM THE CO-CHAIRS 4 FIDIC AROUND THE WORLD 4 Zambia 6 UAE 10 COUNTRY UPDATES 10 Uruguay 11 Argentina 12 Australia 15 Italy FEATURE ARTICLES Investor-state disputes arising from the pandemic 18 Joshua Paffey and Lee Carroll Differing site conditions: contrasting the English and 23 US legal systems JB Kim Concurrent delay: unliquidated damages by employer and 34 disruption claim by contractor International Bar Association JB Kim 4th Floor, 10 St Bride Street, London EC4A 4AD, United Kingdom Concurrent expert evidence in a post-pandemic world Tel: +44 (0)20 7842 0090 41 Nicholas Cousino and Kemi Wood Fax: +44 (0)20 7842 0091 www.ibanet.org Public works and dispute boards: a pending debate in Editorial: [email protected] 47 South America Advertising: andrew.webster-dunn Alex Wagemann Farfan and Claudio Inostroza Guajardo @int-bar.org © International Bar Association 2020 All rights reserved.
    [Show full text]