CURRICULUM VITAE

NAME and ADDRESS

ASHOK KUMAR KHAN Senior Professor and Ex-Head Department of Civil Engineering National Institute of Technology, Jamshedpur-831014, , E-mail: [email protected], [email protected] Office tel: + 91-657-2374123, 2374105 Mobile: + 91-9334800643, +91-9771666909 FAX (O) : + 91-657-2373246

EDUCATION

• Bachelor of Engineering (Civil) Bengal Engineering College, Shibpur, Calcutta University, 1976- 1st Class • Master of Civil Engineering (Geotechnical Engineering) Jadavpur Faculty of Engineering & Technology, 1982- 1st Class First • Doctor of Philosophy in Engineering (Dynamic Behavior of Piles and Pile Groups) Indian institute of Technology, Kharagpur, 1998

CAREER HISTORY

• Professional Career: Since September, 1976 to April, 1989 actively associated as Senior Executives of various National Important Premier Construction Company to execute a good number of National/International important projects all over the country and abroad.

• Teaching & Research: Since May, 1989 till date actively involved in teaching and research in the premier Institute of India viz. IIT Khargapur, NIT Jamshedpur. The specialized subject of interests is Geotechnical Engineering, Soil Dynamics, Environmental and Sustainable Development, Concrete Technology etc. Around twenty six under graduate project thesis, twenty Post Graduate project thesis supervised and Two PhD scholar research work under progress. Invited by a good no. of Institutes/organizations as Guest faculty for delivering lectures on current topics of interest in civil engineering. Associate in a Research & Development project – Building Centre, Sponsored by HUDCO, New Delhi.

• Administrative Experience: In addition to the teaching and research activities, administrative responsibilities in department, Institute level and outside institute also satisfactorily performed in the capacity of Chairman /member of various committees. Remarkable contribution is made in the year 2008 by supporting the higher administration of the Institute to overcome the stalemate condition of the Institute. (Appreciation letter enclosed for reference) Institute earns a good amount of revenue through testing and consultancy under my leadership as Head of the Department which crossed all the previous record in the institute.

ACADEMIC OR PROFESSIONAL AWARDS (HONOURS)

Dinesh Mohan Biennial Prize for best paper published through Indian Geotechnical journal on Pile Foundation, 1994. Appointed as reviewer of the book entitled- “Building Materials” by M.L. Gambhir through Tata Mac-Graw Hills, Publisher.

EXTERNAL EXAMINER/VISITING PROFESSOR FOR OTHER UNIVERSITY

Regularly appointed as External Examiner/Paper setter/Visiting Professor/Expert for NIT Silchar, Assam, BIT Mesra, Ranchi, Jharkhand, B.A.College of Engineering, Jamshedpur, Jharkhand, Integral University, Dasauli, Kursi Road, Lucknow , U.P. ,Merryland Institute of technology and management, Galudi, Jharkhand, Ramgarh Institute of technology, Ramgarh, Under techno India group, Jharkhand , and Engineering college, Chaibasa, under techno India group, Jharkhand.

MEMBER OF THE PROFESSIONAL BODIES

• Life Fellow Member of Institute of Engineers • Life Fellow Member of Indian Geotechnical Society • Member of the International Society of Soil Mechanics and Foundation Engineering • Life Member of Indian Road Congress • Member of the National Board of Accreditation Committee

PUBLICATIONS

Thirty Six numbers of technical research papers have been published in National/ International Journals and Conferences in the field of Geotechnical Engineering, Concrete Technology, Environmental Engineering and Traffic and Transportation Engineering

APPENDIX-1

University/ Designation From To Total Period Nature of Service Remarks (if any)

Organization

N.I.T., Professor June 2004 Still 13 Years plus Teaching Research and Administrative work of the Head of the Dept. Jamshedpur Continuing institute Dec.2010- May2013

N.I.T., Assistant May 1996 May 2004 08 Years Teaching Research and Administrative work of the Head of the dept. Jamshedpur Professor institute Feb,2003- March,2005

N.I.T., Lecturer November April 1996 05 Years Teaching Research and Administrative work of the Jamshedpur 1991 institute

I.I.T. Kharagpur Institute April 1989 October 1991 2.5 Years Research work and teaching on U.G. and P.G. Research Level Scholar

M/s Simplex Deputy Project September March 1989 07 Months Execution and construction of Concrete Piles Manager 1988 (I) Pvt. Ltd., Name of Project Name of Client Kolkata. 2x450 MW, Kahalgaon supur Thermal National Thermal Power Corporation Power Project, Kahalgaon, Bihar (NTPC), New Delhi.

Independent charge for:

a. Installation of 6000 nos. driven

cast in-situ piles and pile cap

for Chimney, E.S.P., I.D. Fan,

P.A. Fan and Bunker Bay etc.

b. Construction of 30 MGD water

treatment plant consists of :

i) 03 Nos. clarrifloculator each

resting on 783 nos. u/r piles.

ii) Filter House.

iii) Chemical House.

iv) Flush mixture and partial flume.

c. Construction of Track Hopper with well point dewatering systems:

d. OFF SITE CIVIL PART-1

i) D. M. Plant Building,

ii) Service Building,

iii) Switch yard control room building,

iv) D.G. set Building etc. M/s Oriental Resident July 1887 August 1988 14 Months Execution and construction of Electric and Manager Engineering Co. Name of Project Name of Project ,16, N. S. Road, Calcutta-1 1. Construction of pile foundation, pile C. P. W. D. Nizam Palace, Calcutta. caps and grid beam for Electronics Regional Testing Laboratory at Salt Lake, Calcutta.

2. Construction of pile foundation M/s Ghosh, Bose and Associates (P) basement slab and wall for multistoried Ltd., Harrington Mansion, 8 Hochi office building (Block-A) for State Bank Minh Sarani Calcutta-72 of India, 1 Strand Road, Calcutta.

M/s K. N. Resident Nov. 1982 June 1987 05 Years Execution and construction of Dadina (P) Manager Name of Project Name of Project Ltd. 7A Hospital Street, Calcutta- Soil investigation work foe Modi Cement Modi Rubber Bombay 72 Factory at Bhatapara, M.P.

Entire Geotechnical investigation for M/s Triveni Structural Ltd. Naini, project SKYLARK at Tirunelveli, Tamil Allahabad, U.P. Nadu

Determination of dynamic properties of Divapur Cement Plant soil for machine foundation at Divapur Cement Plant, Divapur. A. P.

Soil investigation for the entire foute of M/s Kamani Engg. Corpn., Bombay/ 300 k.m. i.e., from Hatauda to Biratnagar Tata Consultants, Bombay. 133 kv transmission line tower at Nepal. Marine Geotechnical investigation at M/s Essar Construction/O.N.G.C. Umrat for laying pipe line from Bombay High field to Umrat, Gujrat.

Soil investigation for the foundation of oil O.N.G.C. drilling rig at Hooghly Approach, Krishna- Godavari Delta and Pock Straight.

M/s K. N. Resident Nov. 1982 June 1987 05 Years Pile foundation work for I.P.I.-S.P. M/s Kothari and Dadina (P) Manager Cement Factory at Rajgangpur, Orissa Associate, Calcutta Ltd. 7A Hospital Street, Calcutta- 72

.

Design and construction of pile Indore Development Authority, foundation of main Administrative Indore. M/s Kanvinde, Rai and Building for Indore Development Chowdhary, New Delhi. Authority, Indore. M.P.

M/s Senior Nov. 1976 Oct. 1981 05 Years Execution and construction of Engineering Engineer Name of Project Name of Project Consultant (P) Ltd. 6/1 New Design and Construction of pile Head Wrightsoh, U. K. and India. Road Alipore, foundation for Air-conditioning and gas Calcutta-27 cleaning plant at Bokaro Steel Plant, Bihar.

Construction of bored pile for foundation C.M.P.D.I.L. Ranchi of Administrative building for C.M.P.D.I.L. at Asansol, West Bengal.

Construction of double u/r bored pile for Crompton Greaves/Fertiliser Corpn. the foundation of 11 kv D.C. transmission Of India, Haldia. line tower at Haldia, West Bengal.

Geotechnical Investigation for the Tripura P.W.D./ Ministry of foundation of 105 Nos. S.P.T. bridges at transport. whole Tripura.

Geotechnical Investigation for D.C.P.L./N.T.P.C. foundation of Korba Supper Thermal power Project, Korba, M. P.

Geotechnical investigation for the M.P.E.B. foundation of M.P.E.B. Phase-II power project, Korba, M.P.

Geotechnical Investigation for C.M.P.D.I.L. foundation of Kedla Coal Washery, Kedla, Bihar. Geotechnical Investigation for the Bridge and Roof, Calcutta/U.P.S.E.B. foundation of bridge over river Rihand at Obra, U.P.

Geotechnical Investigation work for C.P.W.D. residential complex for Central Excise and Income Tex Staff at Patna, Bihar.

Geotechnical Investigation for bucket, M/s M. N. Dastur, Clacutta/Himal nail and wire factory at Himal Iron and Iron and Steel Nepal. Steel, Birganj, Neptal.

Entire soil investigation work for India D.C.P.L. Farmers Fertilizer Corpn. (IFFCO), Phulpur, U.P.

APPENDIX-II

LIST OF PUBLICATION

1. Khan, A, K, (1991)- “ Geoelectric Sounding for Soil classificating”- Journal of the Civil Engineering Society, Indian Institute of Technology, Kharagpur Vol. XXVI, spring 91 pp 17-20. 2. Khan, A. K. and Pise. P. J. (1991) – “ Analysis of the piles under Longitudional Flexural modes of vibration”, IGC-91, Surat, INDIA pp 289-293. 3. Khan, A. K. and Pise P. J. (1992)- “ Dynamic Response of piles under vertical Load, Indian Geotechnical Journal, Vol. 22. Nos. (4) October, 92 pp 245-365. 4. Khan, A. K. and Purkayasth R. D. and Pise P. J. (1992)- “ Effect of Testing methods of Dynamic properties of Soil” IGC092, Geotechnical today, Dec, 92 Calcutta pp 279-382. 5. Khan, A.K. and Pise P. J. (1992)- “ Dynamic Response of Curved Piles” , IGC-92, Geotechnical today Dec, 92 Calcutta pp 383-387. 6. Khan, A. K. Pain P. K. and Singh K.K. (1993) “ Ground water Quality in , Bihar” short term Course, April, 14- 15, 1993, Bhopal, India. 7. Khan, A. K. and Pise P.J. (1993)- “ Pressurmeter Testing of Calcutta Soil” Indian Geotechnical Journal, Vol.24. Nos. (2) April 94 pp. 165-177. 8. Khan, A. K. (1994)- “ Rectification of jetty wall by Grouting and Anchor stressing” International conference on Rehabilition, Renovation and Repairs of Structure-94, CONF. PROC. Vol. I, January-11, 19944, VISIAKHAPATNAM, INDIA. 9. Khan, A. K. Pise P. J. and Kundu B. (1993) – “ Dynamic Analysis of curved piles under Longitudinal-Flexural modes of vibration” International Conference on vibration problems of Mathematical Elasticity and Physics-93, CONF, PROC. Vol. No. I, Nov. 4-7 1993, Jalpaiguri, India,pp 48-71. 10. Khan, A. K.and Pise P. J. (1993) – “ Dynamic Behavior of Piles- “ International poster session , organized by DAAD, German, Seminar on Feb. 18-21, 1993 at New Delhi. 11. Khan. A. K. and Singh S. C. (1993) –“ Traffic volume study and Design of different Road components for smooth and efficient traffic movement” – Third National Conference on Transportation system studies Analysis and Policy, Dec. 11-12, 1993, VISAKHAPATNAM, INDIA, pp 29-32. 12. Khan, A. K. and Pine, P. K. (1994) – “ Effect of drop size of water on Aeration”- Indian journal of Environmental Health, NEERI. 13. Khan, A. K. (1994) –“ Geotechnical Investigation over conventional soil exploration –A necessary” National conference on seismic Activity Indian scenario, organized by Andhra University, VISAKHAPATNAM, 09-10, April 1994 CONF. PROC. Pp 16-23. 14. Khan, A. K., Sharma R. P. and Chetterjee P. (1994)-“ Response of model piles under static and dynamic loading” Tenth symposium on earthquake engineering, organized by department of Earthquake Engineering, Roorkee, Nov. 16-28, 1994 CONF. PROC pp 693-699. 15. Khan, A. K. and Pise P. J. (1994) –“Effect of Liquid waste on the physio Chemical properties of lateritic soils” – IGC-94 “On Developments in Geotechnical Engineering”, 26-28 Dec. REC Warangal. CONF. PROC. pp 189-194. 16. Khan. A. K. and Ray, S. P. (1994)- ‘ Rational Approach of aggregate blending and characteristic strength of concrete” –All India seminar on Economics and Management of concrete construction and its; maintenance –Feb. 24-25, Organized by M.N.R.E.C., Allahabad. 17. Khan. A. K. (1995) – “Improved Bio Gas Plant-An Environment Friendly Renewable Energy System”, National Systems Conference-94, Jan 14016, 1995 organized by Dayalbagh Educational Institute, Dayalabagh, Agra. 18. Khan, A. K., Venkatnarayan P. and Pise P.J. (1995) – “ Behaviour of model screw pile in dry sand under oblique pull” – Indian Geotechnical Conference-95, 19-22 Dec. 1995. 19. Khan. A. K. (1995)-“ Application of Anchored screw piles in high rise building –A new technique” XI the National convention of Civil Engineers & Seminar on High Structures, Nov. 14-16, 1995. 20. Singh. A.K. and Khan A.K.(1998)- “Role of Fly ash and time in expansive soil stabilization” Proc. Indian national conference on Geoenvironment.MNREC, Allahabad, U.P.9-10 April,pp109-116 21. Khan A.K,. Roy S.P. and Prasad. B.K.(1999)- “Tensile strength of jute fibre Reinforced concrete” National Symposium on Recent trend in Concrete technology, KIT. Coimbatore, 7-8 May,1999,pp-203-207 22. Khan. A. K. and Prasad B. K. (2001) –“ Study of Steel fibre Reinforced concrete with over burnt brick khoa as coarse aggregate” National workshop and symposium on “ – Energy Thrift in Low cost smart Buildings” , Dec. 19-20, 2001, MACT, Bhopal pp 137- 144. 23. Khan Aritra,and Khan A.K.(2008) Use of Photo Radar – An Intelligent Traffick control system-National conference on Recent Advances in Civil Engineering, RACE2008, held at CUSAT, Kerala during December 4-6,2008 pp 223-226 24. Khan A.k.and Khan, A (2009)- Improved Bio-gas plant- An Environment friendly Renewable Energy ,Enviro Energy 2009 held at Taj Chandigarh, Chandigarh, India Onganised by National Institute of Technology Kurukskhetra, March,19-21 ,pp 123 127 25. Khan, A. K. and Khan A.(2009) –Reinforcement corrosion and durability of concrete structure, 5th International structural Engineering and construction conference held on September 21-27,2009, Las Vegas , USA 26. Khan,A..k. and Khan A.(2010)-A comprehensive study on use of Power plant waste and plastic waste as pavement sub-grade, International conference on the theme- mother Earth: Save it for future Generation, held at University of Burdwan India.,13-15 Feb,2010 pp 43-47 27. Khan Aritra, Paswan S. K. and Khan A.k.(2010)-An experimental study on reincement corrosion and durability of concrete structure, National conference on recent advances in civil engineering, RACE2010, during September16-18,2010, pp68-74 28. Aritra Khan, Srinivasan, Varun And Khan A.K. (2011)- Performance of concrete by replacing coarse aggregate with slag, The Indian Concrete Journal, April 2011 pp37-42 29. Khan. Ashok Kumar (2012)- Use of Re-cycled building materials- An Environment friendly Approach, ICER12, 5TH. International Congress of Environmental Research, held at Kuala Terengganu, Malasia during November 22-24, 2012 pp 27-31 30. Khan,A. , Yadav, R and Khan A.K.(2012)- The reinforcement of Fly Ash using Plastic Waste, International journal of Environmental Science and Engineering Reasearch (IJESER) Vol(1) pp10-18,2012. 31. Kotal A. and Khan A. K. (2015) – Pull out capacity of model pile group anchors embedded in cohesion-less soil, 50th Indian Geotechnical Conference Pune Maharashtra, India. 32. Kotal A. and Khan A. K. (2015) – Model test on uplift capacity of pile anchors in cohesionless soil., International Journal of Research in Engineering and Technology, Feb 2015, Vol 04, Special issue 01, Pp7 – 11. 33. Roy S and Khan A. K. (2015) – Model test on comprehensive load capacity of pile and pile groups in cohesion less soil. International Journal of Research in Engineering Social Sciences – Vol. 5, Issue 3, March 2015. Pp 9 – 20. 34. Nasreen, Neha and Khan A. k.(2017) Pullout Behavior of Model Helical Anchor in Cohesion less deposit, Indian geotechnical conference IGC-17 Geo NEst at IIT Guwahati,during December 13-15,2017 35. Mondal Arijit and khan A.k. (2017) Improvement of strength of lateritic soil treated with Ground Granulated Blast Furnace Slag, Indian eotechnical conference IGC-2017 Geo Nest at IIT Guwahati during December13-15,2017 36. Nasreen N.and Khan A.K.(2017) Performance Study of Single helix embedded in cohesionless soil under pullout load, International Journal of current Research(IJCR) 2017 accepted for publication in the next issue

APPENDIX-III

1.U.G PROJECT THESIS completed under my guidance

Sr. Title of the thesis Year of Name of the students No. presentation

1 Project report on seven storied R.C. framed 1992 i) Ashok Kumar Yadav office building ii) Ravish Kumar iii) Parbir kumar Das iv) Pravin kumar v) Phol singh Dhania vi) Binod Ram vii) Sushil Murmu 2 Project report on Steel mill Building 1993 i) Amit Pranav ii) Bheem Kumar iii) Manish Kumar iv) Rana Arun kumar v) Sanju kumara vi) Sunil kumar Rajak 3 Behaviour of model piles embedded in sand 1999 i) Alok Kumar ii) Arun kumar Prabhakar iii) Dilip Trivedi iv) Kunal Sutradhar v) Sumit Srivastav vi) Seema Kumari 4 A project report on multistoried car parking 2003 i) Kumar Manoj complex ii) Prasant kumar Sinha iii) Rajiv Kumar Upadhya iv) Shailesh jha iv) Vikash Kumar Rao v) Gajendra narayan gajkar 5 Performance study of initially bent Piles and 2004 i) A. Sivakumar pile groups under vertical load ii) Ravi Kumar iii) Amit Kumar iv) Ranjan Kumar v) Prasant Kar vi) Pankaj kumar Anand 6 Planning and design of peripheral road at 2009 i) Ajay Kumar Tiwary N.I.T. jamshedpur ii) Pratap Bhagat iii) Pradip Oraon iv) Pravin Kumar Singh v) Chitrita chatterjee vi) Ram Charan Pattem 7 Design, Analysis and Estimatation of G+3 2014 i) Abhisekh Tiwary storied commercial –cum –Residential ii) Niraj Sarogi complex iii) Ujjal Kumar iv) Abhinav Kumar v) Saurabh Kumar Rana vi) Thabisile Chirrime

8 A five storey R.C. framed office building 2017 i) Kumar Hemant ii) Vishal Kumar Mishra iii) Sumit Lal Meena iv) Shailesh Kumar v) Sneh Sparsh vi) Awanish Kumar

Note:-

A. Due to shifting of our chamber a good no of Project thesis are missing. Usually in every year all the faculty members were assigned to super vise TWO projects in 7Th. Sem and 8th Sem as Minor project and major projects respectively.

2. M. Tech Thesis Completed under guidance:

a) Behavior of Anchor Screw pile embedded in Sand- By Mr, Sanjay Pandey. b) Behavior of Screw Anchor pile under Oblique Pull- By Mr. Biswajit Debray. c) Dynamic Behaviour of Vertical Piles- By Mr. Binod Kumar. d) Dynamic Behaviour of curved Piles- By Mr. P. K. Mukherjee. e) Effect of Testing Method on Dynamic Behaviour of Soil Properties- By Mr. Gouri Shankar Sahu. f) Effect of Fly Ash on Cement Concrete – By Mr. A. P. Sinha. g) Rational Approach of aggregate Blending and characteristic strength of Concrete-By Mr. Partha Ojha. h) Behavior of Batter Piles and Pile groups – By Mr. H. K. Subedar. i) Behavior of stone colum embedded in sand- By Mr. L. K. Suman. j) Behavior of Flexible Piles under static load- By Mr. Ramadar Rai. k) Experimental study on Bent Piles- By Mr. K. P. Dash. l) Behavior of Vertical piles and pile group embedded in sand- By Mr. S. K. Paswan. m) Model test on Comprehensive load capacity of pile and pile groups in cohesionless soil – By Mr. Saptarshi Roy n) Pull out capacity of Pile group anchors embedded in cohesion less soil – By Mr, Amit Kotal o) Stabilization of soil by bottom ash – By Mr. Arjun J.S. p) Influence of bottom ash on stabilisation of expansive soil – By Mr. Venkatesh Rachapotu. q) Model Studies of Bent Pile ( Single and Group)and comparision with theoretical analysis By Sri Ravi Kumar r) Stress – strain behavior of multi layered geo-grid used in strip footing – By Mr. Chandrashekhar Mura s) Pull out behavior of helical pile embeded in cohesionless soil – By Miss Neha Nasreen. t) Stabilization of laterite soil using ground granulated blast furnace slag – By Mr. Arijit Mondal. Ongoing M-Tech Thesis

u) Stabilization of Expansive soil using Bio-Enzyme – By Akhilesh Kumar v) Soil-Structure Interaction on Soil-Pile –Soil interface By Sachidanand w) Improvement of multi-variate Regression Analysis of Expansive Soil By Debjyoti Pal

1. PhD thesis ongoing under my guidance: a) Behavior of piles in cohesionless soil – By Mr. Sajjan Paswan 2015 – Present

b) Influence of polymer on performance of concrete – By Mr. Abhishek Sarkar 2016 – Present

APPENDIX –IV

During stay at NIT, Jamshedpur I was involved the following work in addition to the Teaching and Research.

1.Laboratory in-charge of (i)Highway & Transportation Engg. Laboratory.(ii) Soil Mechanics Laboratory(iii) Surveying laboratory(iv) Departmental computer laboratory

2. Laboratory Development –to Assist for development and set up of the advanced foundation Engg. Lab., R. I. T. Jamshedpur.

3.Hostel Warden in Hostel- D and Hostel –F of R. I. T. Jamshedpur.

4. Professor in-charge Construction at R. I. T., Jamshedpur.as well as N.I.T. Jamshedpur

5. Teaching load of M. Tech Students ( Part- time)and Regular

6. Active member of Integrated Rural Energy Planning Programme (IREP)-A Technical Back up unit, State Level.

7. Technical Advisor to Prof. I/C Estate for Civil Maintenance at R.I.T., Jamshedpur.

8. Member of the Estimation cell at R.I.T., Jamshedpur.

9. Taking active part of departmental testing/consultancy work.

10. Seminar/Symposium Attended: i) Six weeks summer/winter school Attended. ii) Presented paper & delivered talk on National Conference. a) Around thirty papers presented in National/ International seminars/conferences. b) Invited talk in National Conference on – “ National Conference on Traffic System Students” at Visakhapatnam, A. P. in the year-1993 iii) Visiting Professor at R.E.C. Silchar, Assam. 11. External Examiner for other University/ Institute:

Regular appointed as external examiner for B.I.T., Mesra, Ranchi for:

(i) U. G. Project Thesis and 8th semester sessional viva voce examination. (ii) M. Tech Project Thesis work. of M-tech programmed (iii)

APPENDIX-V

Sl. Title of Project Funding Agency Financial Year of start Name of P.I. Name of Status Started or No. Outlay & total completed or period co-P.I in progress

1. Soil investigation for the proposed M/s Hindustan Copper Rs.38,000 July-Sept. Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed mining shaft at Krishnagaria Project, Ltd. Mosabani /- (Apprx.) 1996 Choudhary Mosaboni.

2. Soil Investigation for the proposed M/S Baynee Rs.36,000 Nov.-Dec. Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Factory site of M/S Baynee Engg. At Engg.,Kolkata /- (Apprx.) 1996 Choudhary Industrial Area.

2. Soil investigation for the proposed M/s Kanchan Bain Rs.31000/ Dec1996.- Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed multistory building complex at Bistupur. Adersara Bistupur, - (Apprx.) Jan.1997 Choudhary Jamshedpur.

3. Soil tests for proposed construction Executive Engineer, Rs.52,000 Feb.-May Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed under Bihar Plauto Development Minor Irrigation /- (Apprx.) 1997 Choudhary scheme. Division, Chaibasa.

Soil tests for proposed construction Executive Engineer, Rs.30,000 Feb.-May Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed under Bihar Plauto Development Minor Irrigation /- (Apprx.) 1997 Choudhary scheme. Division, Chaibasa.

5. Soil test for proposed Tailings Dams at M/S U.C.I.L., Rs.43,000 Feb.-May Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed U.C.I.L., Jadugoda Mines (First phase) Mines. /- (Apprx.) 1997 Choudhary

6. Soil test for proposed Minor Irrigation M/S Minor Irrigation Rs.32,000 March-May, Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed project under Bihar Pluto Development Divn., Chaibasa, W. /- (Apprx.) 1997 Choudhary Scheme Singhbhum

7. Soil investigation for the proposed M/S C.P.W.D., Ranchi Rs.43,000 March-May, Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Building Complex of custom and excise /- (Apprx.) 1997 Choudhary Deptt., near Bistupur, Jamshedpur

8. Soil investigation for the proposed M/S Man Singh Rs.25,000 July, 19997 Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed water tower at TELCO works, /- (Apprx.) Choudhary Jamshedpur

5 Soil investigation for the proposed M/S Perfect Rs.25,000 Sept., 1997 Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed multistoreyed apartments at Mango, Developers, Sonari, /- (Apprx.) Choudhary Jamshedpur Jamshedpur

6 Soil test for proposed Slime Dam at M/S TATA STEEL, Rs.81,000 Sept.-Dec. Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Judamines mines Divn. /- (Apprx.) 1997 Choudhary

7 Soil investigation for the proposed M/S I.O.C.L., Rs.31,000 Nov., 1997 Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Residential complex of IOCL at Jamshedpur, branch /- (Apprx.) Choudhary Adityapur, Jamshedpur

8 Soil test for proposed approach roads of M/S AIADA, Adityapur, Rs.33,000 Nov., 1997 Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Adityapur industrial area Jamshedpur /- (Apprx.) Choudhary

9 Soil investigation for the proposed M/S Tarapore & Co., Rs.52,000 Feb.-March, Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed foundation for Plano Miller Macine at Jamshedpur /- (Apprx.) 1997 Choudhary TELCO works

10 Soil test on Tisco soil samples proposed M/S KAMPSAX India Rs.12,000 Feb.-March, Dr. B P Verma, Dr. A.k.kan & Dr. A. K. completed to be used in approach roads for Ltd. Jamshedpur camp /- (Apprx.) 1997 Choudhary Adityapu bridge project office

11 Soil investigation for the proposed M/s Nalanda Rs.26,000 July-Oct. Dr. B P Verma , Dr. A.k.khan & Dr. A. K. completed Multistory Building Complex at Sonari. Promoters & /- (Apprx.) 1998 Choudhary Developers, Jamshedpur.

12 Soil test for tailings Dam at U.C.I.L., M/S U.C.I.L., Jadugora Rs.26,000 July-Oct. Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed Jadugora (second phase). Mines. /- (Apprx.) 1998 Choudhary

13 Soil investigation for proposed M/S Adarsh Grih Rs.34,000 May-July Dr. B P Verma, Dr. A.k.kan & Dr. A. K. completed Multistory Apartments at Adarshnagar, Nirman Samiti, Sonair. /- (Apprx.) 1998 Choudhary Sonari.

14 Soil investigation for the proposed site M/S Tarapore & Co. Rs.57,000 Nov. 1998- Dr. B P Verma , y Dr. A.k.khan & Dr. A. K. completed of Water Tanks for TCL project at Telco Jamshedpur camp. /- (Apprx.) Jan.1999 Choudhary works. office.

15 Soil investigation at centralized paint M/s Tarapore & Co., Rs.33,000 June-July, Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed shop at Telco works, Jamshedpur. Jamshedpur camp. /- (Apprx.) 1999 Choudhary office.

16 Investigation of building cracks and M/s U.C.I.L., Jadugoda Rs.29,000 Sept.-Oct., Dr. B P Verma Dr. A.k.kan & Shri Sri completed design of remedial measure for the Mines. /- (Apprx.) 1999 Shailendra Kumar proposed Health Physics Unit at U.C.I.L., Jadugoda.

17 Soil investigation for the proposed M/s Indu consltants, Rs.29,000 Sept. 1999 Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed multistory building complex at Bistupur. Jamshedpur. /- (Apprx.) Choudhary

18 Soil test for the proposed embankment M/s RITES, Tatanagar. Rs.7,000/- Jan. 2000 Dr. A. K. Khan Shri A.K. Sinha, Dr. A. K. completed for a private siding at Jamshedpur. (Apprx.) Choudhary

19 Soil test for the proposed multistory M/s Sahara Rs.21,000 Jan. 2000 Dr. A. K. Khan Shri A.K. Sinha, Dr. A. K. completed apartments at Ramnagar, Sonari. construction, /- (Apprx.) Choudhary Jamshedpur

20 Soil test for proposed I.C.D. of M/s M/s Container Rs.22,000 Feb-March Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Container Corporation of India at Corporation of India /- (Apprx.) 2000 Choudhary Jamshedpur. Ltd., Jamshedpur camp. office.

21 Investigation for the suspected yielding M/s U.C.I.L., Jadugoda Rs.20,700 Dec-99 Dr. B.P. Verma r Dr. A.k.khan & Shailendra completed in R.C.C. roof slab of the north cross cut Mines. /- Kuma at 555m level at U.C.I.L., Jadugoda. Feb-2K

22 Soil investigation for the construction of M/s Lafarz India Rs.33,000 May-June Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed proposed Silo at Lafarz India Ltd. Limited, Jamshedpur. /- (Apprx.) 2000 Choudhary

23 Soil investigation for proposed electric M/s L &T Jamshedpur Rs.37,000 July 2000 Dr. B P Verma Dr. Dr. A.k.khan & Dr. A. K. completed towers at Telcon, Jamshedpur. camp. office. /- (Apprx.) Choudhary

24 Design of remedial measures for the M/s U.C.I.L., Jadugoda Rs.26,000 April-Aug., Dr. B.P. Verma Dr. A.k.khan & Dr. A. K. completed deflected R.C.C. roof slab of the north Mines. /- 2000 Choudhary& Shailendra cross cut at 555m level at U.C.I.L. Kumar Jadugoda.

25 Soil test for the proposed Ash dike of M/s Tata Rs.62,000 April-Aug., Dr. B.P. Verma Dr. A.k.khan & Dr. A. K. completed Tata Hydroelectric Power Co. Ltd. Hydroelectric Power /- (Apprx.) 2000 Choudhary Jamshedpur. Company Ltd., Jamshedpur.

26 Soil investigation for proposed M/s Tarapore & Co., Rs.29,000 Nov., 2000 Dr. B P Verma, Dr. A.k.khan & Dr. A. K. completed Auditorium at D.B. M.S. School, Jamshedpur camp. /- (Apprx.) Choudhary Jamshedpur. office.

27 Soil test for Flyash and Bottom ash from M/s Usha Martin Ltd., Rs.19,000 Dec., 2000 Dr. A.k. khan Shri A.K. Sinha completed Usha Martin Ltd. Jamshedpur. Jamshedpur. /- (Apprx.) 28 Soil test for the proposed Slime Dam at Dy. Div. Manager, Rs.88,000 March 2001 Dr. B.P. Verma, Dr. A.k.khan & Dr. A. K. completed Noamundi. Mines Div., TISCO, /- (Apprx.) Choudhary Noamundi.

29 Design of remedial measures for Sump Adl. Supdt. (Civil), Rs.17,250 Nov-99 June- Dr. B.P. Verma Dr. A.k.khan & Shailendra completed Wall at 140m level at Narwapahar. U.C.I.L. Nawapahar. /- 2000 Kumar

30 Soil investigation and Design of twin U.C.I.L. Narwapahar Rs.55,568 March-2001 Dr. B.P. Verma Dr. A.k.khan & Shailendra completed Bunkers with connected retaining Walls /- Kumar at Nawapahar.

31 Soil investigation for Addl. District Judge M/s Executive Rs.32,000 Nov. 2000 Dr. B P Verma , Dr. A.k.khan & Dr. A. K. completed Court Complex at Seraikella. Engineer, PWD, /- (Apprx.) Choudhary Chaibasa.

32 Soil test for Raising of IIIrd Stage Tailing M/s G.M. (Mill), Rs.120,00 May-June, Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed Dam from R.L. 140 M to 145 M at U.C.I.L. Jadugoda 0/- 2001 Choudhary U.C.I.L., Jadugoda (Apprx.)

33 Soil test and Recommendation for M/s Tarapore & Co. Rs.57,000 May-Aug., Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed Alternative Sections of Proposed Ash Ltd. Jamshedpur Camp /- (Apprx.) 2001 Choudhary Pond Dyke for Jojobera Thermal Power Office Plant, Jamshedpur

34 Soil investigation for the Proposed M/s N.M.L., Rs.40,000 Jan- Dr. B P Verma , Dr. A.k.khan & Dr. A. K. completed Hostel Building in the Premise of Poilt Jamshedpur /- (Apprx.) March,2002 Choudhary Plant of NML, Jamshedpur

35 Soil test for Proposed Road M/s K.K. Builders, Rs.37,000 Aug.-Oct., Dr. A.k.khan Dr. AK Choudhary completed Construction Under PMGSY Scheme Jamshedpur /- (Apprx.) 2002 under R.E.O., Jamshedpur Division.

36 Soil test for Construction of Cricket Pitch M/s Bihar Cricket Rs.3,000/- Aug.-Sept, Dr. AK Khan Dr. AK Choudhary completed at Keenan Stadium, Jamshedpur. Association, (Apprx.) 2002 Jamshedpur

37 Soil investigation at the Proposed Site of M/s B.O.C. India Ltd., Rs.38,000 Nov.2002- Dr. B P Verma Dr. A.k.khan & Dr. A. K. completed Oxygen Plant of B.O.C. India Ltd. inside Calcutta. /- (Apprx.) Jan.2003 Choudhary Tata Steel Works (Near L-Town Gate)

38 Soil test for Proposed Road M/s Morwan Rs.24,000 Sept.2002- Dr. A.k.khan Dr. AK Choudhary completed Construction Under PMGSY Scheme Construction Pvt. Ltd. /- (Apprx.) Jan.2003 under R.E.O., Jamshedpur Division. Jamshedpur.

39 Soil test for Proposed Road M/s Triveni Rs.18,000 Sept.2002- Dr. A. K Khan Dr. AK Choudhary completed Construction Under PMGSY Scheme Enterprises, /- (Apprx.) Jan.2003 under R.E.O., Jamshedpur Division. .

40 Soil investigation at the Proposed Site of M/s ASL Iron & Steel Rs.44,000 March-April, Dr. B P Verma Dr. A.k.khan & Dr. A. K. completed 100 TPD Sponge Iron Plant of M/s ASL Co. Pvt. Ltd. /- (Apprx.) 2003 Choudhary Iron&SteelCo.Pvt.Ltd. Jsr. near Jamshedpur. Balrampur (W.B).

41 Soil investigation at the Proposed Site of M/s Sai Sponge Pvt. Rs.49,000 April-May, Dr. B P Verma Dr. A.k.khan & Dr. A. K. completed 100 TPD Sponge Iron Plant of M/s Sai Ltd. Patna /- (Apprx.) 2003 Choudhary Sponge Pvt. Ltd. Patna, at ,W.Singhbhum

42 Soil investigation at the proposed site of M/S Kewal Metaliks, Rs.36,000 Oct.-Nov, Dr. AK khan Dr. AK Choudhary completed 100 TPD Sponge Iron Plant of M/s Kewal Jamshedpur /- (Apprx.) 2003 Metaliks, at Chowaka, W. Singhbhum

43 Soil investigation for the proposed M/S Tarapore School, Rs.31,000 Jan 04 Dr. A K khan Dr. AK Choudhary completed School of M/S Tarapore & Co. at Jamshedpur /- (Apprx.) Bhalubasa, Jamshedpur

44 Soil investigation for the proposed Blast M/S Tayo Rolls Ltd. Rs.44,000 March 04 Dr. AK khan Dr. AK Choudhary completed funnace Plant under extension Gamaharia, /- (Apprx.) programme of M/S Tayo Rolls Ltd. Jamshedpur

45 Soil investigation for the proposed M/S Dilip Kumar Rs.44,000 May-June, Dr. AK khan Dr. AK Choudhary completed School Buildings at Kasidih, Jamshedpur Singh, Kasidih, /- (Apprx.) 2004 Jamshedpur

46 Soil investigation for the proposed M/S Balaji Rs.42,000 Oct.-Nov., Dr. A.k.khan Dr. AK Choudhary completed multistoreyed residential complex at Constructions, City /- (Apprx.) 2004 Shere Punjab Chowk, Adityapur Palace complex, Adityapur

47 Soil investigation work at proposed site M/s Vallabh Steels Rs.49,000 Oct.-Nov., Dr. A.k.khan Dr. AK Choudhary completed of 200 TPD Sponge Iron Plant of M/s Ltd. Ludhiana /- (Apprx.) 2004 Vallabh Steels Ltd. At Gamaharia

48 Soil Investigation for the Proposed M/s Dr. Arun Kumar Rs. Jan-Feb, Dr. A.k.khan Dr. AK Choudhary completed Multistoried Residential Complex at 31,000/- 2004 Kalpanapuri, Adityapuur, Jamshedpur 49 Soil Investigation for the Proposed M/s Nurbheram Rs. Nov-Dec., Dr. AK Khan Dr. AK Choudhary completed Extension of the School Building of Hansraj English 39,000/- 2004 Narbheram Hansraj English School, School, JSR Bistupur,jamshedpur

50 Sub Soil Investigation for the proposed M/s Tayo Rolls Ltd., Rs. May-June., Dr. AK Khan Dr. AK Choudhary completed TATA Growth Shop Expansion at Jamshedpur 1,05,000/- 2005 , Jamshedpur

51 Soil Investigation work for the Proposed M/s Roots Coporation Rs. May-June., Dr. AK Khan Dr. AK Choudhary completed Htel Indione at Bistupur, Jamhsedpur Ltd., Mumbai 49,000/- 2005

52 Soil Investigation for the Proposed M/s Trans Tech. Rs.25,000 June,2005 Dr. AK Khan Dr. AK Choudhary completed Factory Building of Solution Centre” at Turnkey Pvt. Ltd., /- Tinplate Company of India Ltd., Pune Jamshedpur

53 Soil Test for the proposed Tailing Dam M/s U.C.I.L. Jadugoda Rs. June- Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed at Turamdih Project of U.C.I.L., 1,27,500/- Sept,2005 Choudhary Jadugoda

54 Soil Test for the proposed Tailing Dam M/s U.C.I.L. Jadugoda Rs.1,03,50 Jan.-April Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed at Turamdih Project of U.C.I.L., 0/ 2006 Choudhary Jadugoda

55 Soil Test for the proposed Tailing Dam M/s U.C.I.L. Jadugoda Rs. Jan.-April Dr. BP Verma, Dr. A.k.khan & Dr. A. K. completed at Turamdih Project of U.C.I.L., 99280/- 2006 Choudhary Jadugoda 56 Evaluation of physical parameters of soil M/s RITES, Tatanagar. Rs.47495/ Jan.-April Dr. AK khan Dr. A.k.Chaudhary completed & aggregate samples and field CBR test - 2006 for the proposed C.C approach road and truck parking area at ICD, Jamshedpur.

57 Evaluation of physical parameters of soil M/s Sapoorji Paloonji Rs22450/- Jan.-April Dr. AK khan Dr. AK Choudhary completed & aggregate samples and field CBR test Tatanagar. 2006 for the proposed C.C approach road and truck parking area at ICD, Jamshedpur.

58. Soil Investigation work for the Proposed M/sAkriti Rs.2,32,53 June., 2006 Dr. AK khan Dr. AK Choudhary completed Expansion of HVAL plant of Tata Architects,Jsr. 0/- Motors,Jamhsedpur

59 Soil Investigation work for the Proposed M/s Sai Rs1,11,53 May-June., Dr. AK khan Dr. AK Choudhary completed Iron melting plant at phase VI construction,Jsr. 0/- 2006 Gamharia,Jsr.

60 Design of Foundation, Columns, Beams UCIL Jadugoda Rs. June-Oct., Dr. A.k.khan Shri Shailendra Kumar completed and Gantry Girder of Crane at Chemical 40250/- 2006 House of Mills, Jadugoda Mines, UCIL Jadugoda

61 Soil Investigation work for the Proposed M/s Executive Rs4,32,14 Dec. 2006 Dr. AK khan Dr. AK Choudhary completed (i) construction of foundation for Engineer, Subernrekha 6/- waterfall at 109.118 km at left Multipurpose Project. canal (ii) Railway Bridge No.86 at km 184/5-8 for the crossing of Chandil left canal .

62 Soil Test for the proposed Tailing Dam M/s U.C.I.L. Jadugoda Rs.2,41,24 Dec. 2006 Dr. AK khan Dr. AK Choudhary completed (2nd phase) at Turamdih Project of 3/- U.C.I.L., Jadugoda

63 Soil Investigation work for the Proposed M/s Gauri Rs95,877/ Feb., 2007 Dr. AK khan Dr. AK Choudhary completed Multistoried Apartments at Sonari,Jsr. Associates,Jsr. -

64 Soil Investigation work for the Proposed M/s ASL,Fortunes Pvt. Rs1,42,26 April, 2007 Dr. AK khan Dr. AK Choudhary completed Multistoried complex at MangoJsr. Ltd.Jsr. 5/-

65 Soil Investigation work for the Proposed M/s Executive Rs. July, 2007 Dr. AK khan Dr. AK Choudhary completed cross drainage work at chandil left bank Engineer Minor 4,32,146/- canal Division N0.-12 Mango Jsr.

66 Soil Investigation & survey work for the M/s Caparo Rs. Sept. 2007 Dr. AK khan Pror. S. K. Paswan completed Proposed plant at Adityapur Industrial Engineering India Pvt. 1,49,729.0 complex Ltd. Adityapur Jsr. 0

67 Soil Investigation & survey work for the M/s Tata Project Rs. Sept. 2007 Dr. AK khan Prof. V. Kumar & Prof. N. completed Proposed sub station building Adityapur Jsr. Prakash 1,25, 984.00 68 Soil Investigation work for the Proposed M/s Executive Rs. Sept. 2007 Dr. AK khan Prof. S. K. Paswan completed weir construction across the river SONA Engineer Water Ways 1,22,622.0 Div. Chaibasa 0

69 Checking/ vetting of D.P.R of R. O. B. at M/s Ganesh Ram Rs. Sept. 2007 Dr. AK khan Prof. B. K. Prasad completed B. R. P. N. N. Ltd. Bihar. Dokania, Banka Bihar. 2,91,410.0 0

70 Checking/ vetting of D.P.R of B. R. P. N. M/s K. C. Biswas Rs. Oct. 2007 Dr. AK khan Prof. B. K. Prasad & Prof. S. completed N. Ltd. Bihar. Bhagalpur, Bihar 3,25,000.0 Kumar 0

71 Checking/ vetting of D.P.R of B. R. P. N. Mrl. Vijay Kumar Rs. Oct. 2007 Dr. AK khan Prof. Sanjay Kumar completed N. Ltd. Bihar. Project Engg. work 2,25,000/- Div. Gaya

72 Checking/ vetting of D.P.R of B. R. P. N. Mr. A. K. Mishra Rs, Oct. 2007 Dr. AK khan Prof. B. K. Prasad completed N. Ltd. Bihar. Project Engg. Katihar 4,00,000/-

73 Checking/ vetting of D.P.R of B. R. P. N. Mr. Ashok Kumar Rs. Oct. 2007 Dr. AK khan Prof. B. K. Prasad completed N. Ltd. Bihar. Project Engg. 75,000/- Muzaffarpur

74 Checking/ vetting of D.P.R of B. R. P. N. Mr. H. P. Choudhary, Rs. Oct. 2007 Dr. AK khan Prof. S. K. Paswan completed N. Ltd. Bihar. Project Engg. Nalanda 2,50,000/-

75 Checking/ vetting of D.P.R of B. R. P. N. M/s Ganesh Ram Rs. Oct. 2007 Dr. AK khan Prof. S. K. Paswan completed N. Ltd. Bihar. Dokania, Banka Bihar. 1,32,000/-

76 Soil Investigation work for the proposed M/s Vineet Sinha, Rs. Feb. 2008 Dr. AK khan Dr. A. K. Choudhary completed for shopping mall at near Slag Architects Bistupur 3,25,167/- Dam Jsr. Jsr. 77 Soil Investigation work for the proposed M/s K. K. Awas Rs. Feb. 2008 Prof. S. K. Paswan completed multistoried residential complex at Bistupur Jsr. 62,669/- Dr. AK khan Mango Jsr.

78 Soil Investigation work for the proposed M/s Kaushal Kanchan , Rs. Feb. 2008 Dr. AK khan Prof. S. K. Paswan completed multistoried residential complex at Bisupur Jsr. Sonari Jsr. 1,37, 986/-

79 Soil Investigation work for the proposed M/s Kritika Homes Rs. Feb. 2008 Dr. AK khan Prof. S. K. Paswan completed multistoried residential complex at Pvt. Ltd. Bistupur jsr. 1,37,986/- Mango Jsr.

80 Soil Investigation work for the proposed M/s Pioneer Builders, Rs. Feb. 2008 Dr. AK khan Prof. S. K. Paswan completed multistoried residential complex at Bistupur Jsr. 1,13,579/- Adityapur Jsr.

81 Mix Design of Concrete M/S Tisco Growth 47,437/- 2.11.2005 Dr. AK khan Prof. Virendra Kumar completed Shop (P) JSR

82 Mix Design of M25 grade of Concrete M/s Seth & 50,598/- 14.11.2006 Prof. Virendra Kumar Associates, Kolkata-19 Dr. AK khan

83 Some Physical Properties Test of M/s Indian Concrete 15,640/- 05.6.2006 Dr. AK khan --- completed Concrete Cube for Cube Competition Institute and The 2006 Associated Cement Companies Ltd. S.P. Verma road, Patna- 800001.

84 Physical Properties of Cement Testing M/s Executive 7993/- 26.6.2006 Dr. AK khan ---- completed Engineer, Minor Distribution Division No-12, Mango, Jamshedpur.

85 Mix Design of M25 grade of Concrete M/s Mackintosh Burn 50,598/- 18.1.2007 Dr. AK khan Prof. Virendra Kumar completed Ltd, MBL House Kolkata-4

86 Testing of Materials M/s Tata Project 1,25,984/- 5.9.2007 Dr. AK khan Prof. Virendra Kr. & completed Adityapur, JSR. N.Prakash

87 Mix Design of M25 grade of Concrete M/s Paresh 63,444/- 8.6.2007 Dr. AK khan Prof. Virendra Kumar completed Construction, Kolkata.

88 Redesign and Detailing of Steel Silo. M/s Adhunik Alloys & 91,473/- 25.5.2007 Dr. AK khan Prof. Virendra Kumar completed Power Ltd, Kanda Chowk, .

89 Rennovation of Concrete Over-head M/s Sandeep Ghosh, 70,929/- 02.3.2007 Dr. AK khan Prof. Virendra Kr. & completed Water tank through Non-Destructive Deputy Project N.Prakash Testing Manager, NBCC Ltd, Hinoo, Ranchi.

90 Material Testing M/s Nav-Nirman 37,432/- 24.1.2007 Dr. AK khan Prof. Virendra Kumar completed Builders, Adityapur, JSR.

91 Concrete Core Cutting And Testing M/s Praxiar India Pvt 15,489/- 08.02.2007 Dr. AK khan Prof. Virendra Kumar Ltd, Gamharia.

92 Non-Destructive Testing of M/s Praxiar India Pvt. 20,189/- 22.3.2007 Prof. Virendra Kumar completed Foundation of Oxygen Plant in Usha Ltd, UPSA Oxygen Martin Company. Plant II, C/O Usha Martin, Gamharia. Dr. AK khan

93 Proposed Bridge over Kenduer river M/s Managing 3,09,000/- 24.4.2007 Dr. AK khan Prof. Virendra Kumar completed on Dhahara-Kenduar road, Chandan, Director, Bihar Rajya Banka, Bihar Pul Nigam Ltd., 7- And sardar Patel Marg, 2,25,317 23.7.2007 Patna-800015

94 Proposed Bridge at 1.5K.M. from N.H. M/s Managing Dr. AK khan Prof. Virendra Kumar completed on Hemazapur-Maharna road, Director, Bihar Rajya Munger, Bihar Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

95 Proposed Bridge at 2.5K.M. from N.H. M/s Managing Dr. AK khan Prof. Virendra Kumar completed on Hemazapur-Maharna road, Director, Bihar Rajya Munger, Bihar Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

96 Proposed Bridge at 6.00 K.M. from M/s Managing Dr. AK khan Prof. Virendra Kumar completed N.H. on Hemazapur-Maharna road, Director, Bihar Rajya Munger, Bihar Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015 97 Proposed H.L. Bridge (7x18.75M) over M/s Managing Dr. AK khan Prof. Virendra Kumar completed Dakra-Nala, Munger, Bihar Director, Bihar Rajya Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

98 Proposed Bridge over Badua river on M/s Managing Dr. AK khan Prof. Virendra Kumar completed Ghasi Telwa to Ghasi Tari road, Jamui, Director, Bihar Rajya Bihar Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

99 H.L.Bridge 3x18.75M at Dargah Ghat- M/s Managing 1,50,000/- 05.09. Dr. AK khan Prof. Virendra Kumar completed Pirpaiti, Bhagalpur Director, Bihar Rajya Pul Nigam Ltd., 7- And 2007 sardar Patel Marg, 5,50,000/-

Patna-800015

100 Proposed Bridge over local river on M/s Managing Dr. AK khan Prof. Virendra Kumar completed Saidpur-Sikatia road, Sikatia, Director, Bihar Rajya Bhagalpur Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

101 Proposed P.M.G.S.Y. H.L. Bridge M/s Managing Dr. AK khan Prof. Virendra Kumar completed 7x18.75M at 3rd KM of Shahpur- Director, Bihar Rajya shahjadpur road, Narayanpur Pul Nigam Ltd., 7- Bhagalpur, Bihar sardar Patel Marg, Patna-800015

102 Proposed Bridge 5x12.50M over Bilari M/s Managing Prof. Virendra Kumar completed river on Gorgama Kenduar road, Director, Bihar Rajya Banka, Bihar. Pul Nigam Ltd., 7- Dr. AK khan sardar Patel Marg, Patna-800015

103 Proposed Bridge 5x12.50M over M/s Managing Dr. AK khan Prof. Virendra Kumar completed Mirchaini river near Gorabathan, Director, Bihar Rajya Banka, Bihar Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

104 Proposed Bridge over Dharba river on M/s Managing Dr. AK khan Prof. Virendra Kumar completed Dholdih-Makwadih, Katiyari, Banka, Director, Bihar Rajya Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

105 Proposed Bridge 4x18.750M over M/s Managing Dr. AK khan Prof. Virendra Kumar completed Lohagrah river on Shaktighat Director, Bihar Rajya Khesharpur to Dhamrahigawn road, Pul Nigam Ltd., 7- Banka, Bihar. sardar Patel Marg, Patna-800015

106 Proposed Bridge 5x12.50M over M/s Managing Dr. AK khan Prof. Virendra Kumar completed Gobra river Dhanochi to Pindra road, Director, Bihar Rajya Chandan, Banka, Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

107 Proposed Bridge 5x12.50M over M/s Managing Dr. AK khan Prof. Virendra Kumar completed Darbhashan river (Revised) on Shwri to Director, Bihar Rajya Hirna road, Katiria, anka, Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015 108 Proposed bridge over Ashnaha river M/s Managing Dr. AK khan Prof. Virendra Kumar completed on Ashnaha to Kerwar road, (Revised) Director, Bihar Rajya Katoriay, Banka, Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

109 Proposed Bridge 3x12.50M over Bilasi M/s Managing Dr. AK khan Prof. Virendra Kumar completed river on Goda to Bilasi road, Banka, Director, Bihar Rajya Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

110 Proposed Bridge over Bahuara river M/s Managing Dr. AK khan Prof. Virendra Kumar completed on Lahila to Akauni road, Sikanadra, Director, Bihar Rajya Jamui, Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

111 Proposed H.L. Bridge 4x17.74M on M/s Managing Dr. AK khan Prof. Virendra Kumar Completed Jamui to Kharagpur road, Munger, Director, Bihar Rajya Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

112 Proposed Bridge on N.H.-80 Shivpur M/s Managing Dr. AK khan Prof. Virendra Kumar completed Mangrah Sindhiya road, Munger, Director, Bihar Rajya Bihar Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

113 Proposed Bridge at 3.50KM from NH M/s Managing Dr. AK khan Prof. Virendra Kumar completed on Hemazapur to Maharna road, Director, Bihar Rajya Munger, Bihar. Pul Nigam Ltd., 7- sardar Patel Marg, Patna-800015

114 Soil investigation work for the M/S Vineet Sinha & 78,000/- 2007-2008 Dr. AK khan Dr. A.k. Chaudhary Completed proposed multistoried complex at 5, J Architects road, Bistupur, Jamshedpur

115 Soil Bearing Capacity for foundation M/S Bindal buildcon 89,800/- 2010 Dr. AK khan Dr. A.K. Singh Completed of commercial complex at Marine Pvt. Ltd.Bistupur drive Sonari jamshedpur Jamshedpur

116 Soil Bearing capacity for construction Executive Engineer , 2,90,000/- 2011 Dr. AK khan Dr. A.K. Singh Completed of elephant pass at 26KM of left main canal, Subarnarekha project Chandil MDD No.-12 Mango, Jamshedpur

117 Rock core testing for Tunnel M/S WPCL Principal 79,000/- 2016 Dr. AK khan Dr. A.K. Singh Completed construction consortium Pune.

118 IVA Work of water supply Scheme of Depttmt. Of Water 2.0Crores 2016 Dr. R.p.singh Dr. A.k.khan, Chota Govindpur & Bagberra, Supply & Sanitory Jamshedpur, Govt. of Jharkhand Dr.A.k.Singh,

WORLD BANK PROJECT Dr. B.K.Prasad & Others

119 Soil investigation work at Teachers M/S Shree Housing 1,53,000/- 2017 Dr. AK khan Dr. A.K. Singh Completed Trainning More, Gamharia, Developers, Bistupur Jamshedpur for the proposed Jamshedpur Commercial Complex ( Mahabir Tower

120 Checking & Vetting of the drawing M/S Project 75,000/- 2017 Dr. AK khan Dr.R.P.Singh completed and design of slope protection work Director(Technical) of Hermu river at Ranchi Dr. A.k.l.Srivastava JUIDO LTD. RANCHI