Kushinagar (UTTAR PRADESH)
Total Page:16
File Type:pdf, Size:1020Kb
PURVANCHAL VIDYUT VITARAN NIGAM LTD. SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Kushinagar (UTTAR PRADESH) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 A(VII) Financial Bankability 15 9 B Electrification of UE villages 17 10 B(I) Block-wise coverage of villages 18 11 B(II) Villagewise/Habitation wise coverage 19 12 B(III) Existing Habitation Wise Infrastructure 19 13 B(IV) Village Wise/Habitation Proposed Works 19 14 B(V) Existing REDB Infrastructure 19 15 B(VI) Block-Wise Substation 21 16 B(VII) Feederwise DTs 22 17 C Feeder Segregation 25 18 D Connecting unconnected RHHs 26 19 D(I) Block-wise coverage of villages 27 20 D(II) Villagewise/Habitation wise coverage 28 21 D(III) Existing Habitation Wise Infrastructure 34 22 D(IV) Village Wise/Habitation Proposed Works 40 23 D(V) Existing REDB Infrastructure 56 24 D(VI) Block-Wise Substation 58 25 D(VII) Eligibility for Augmentation of Existing 33/11 KV Substations 59 26 D(VIII) Feederwise DTs 68 27 E Metering 71 28 E(I) DTR Metering 72 29 E(II) Consumer Metering 96 30 E(III) Feeder Metering 100 31 F System Strengthening and Augmentation 102 32 F(I) Block-Wise Substation 103 33 F(II) New 33 (or 66) KV REDB Works Proposed 104 34 F(III) Proposed Augumentation of Existing Sub-station 105 35 F(IV) EHV Substation Feeding the District 106 36 F(V) Districtwise Details of Existing 66 KV or 33 KV Lines 107 37 F(VI) Districtwise Details of Existing 11 KV or 22 KV Lines 108 38 F(VII) Details of New 66 KV or 33 KV Lines 110 39 F(VIII) Details of New 11 KV or 22 KV Lines 111 40 G SAGY 112 41 G(I) Block-wise coverage of villages 113 42 G(II) Villagewise/Habitation wise coverage 114 43 G(III) Existing Habitation Wise Infrastructure 115 44 G(IV) Village Wise/Habitation Proposed Works 116 Section -A Basic Details of District State : UTTAR PRADESH District : Kushinagar Page 1 of 116 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Kushinagar Name of Project Implementing Agency Purvanchal Vidyut Vitaran Nigam Ltd. Name of DISCOM Purvanchal Vidyut Vitaran Nigam Ltd. Name of State UTTAR PRADESH Name of District Kushinagar Total Population of district 3564544 Total Geographical Area(SqKm) 2905 Percentage of Hilly area 0 Total Block in the district 16 Total Urban Town in the district 7 Total Urban Population in the district 168107 Population Of Urban Area 168107 Total Census Revenue Villages in the district 1640 Total Habitations in the district 0 Total Rural Population in the district 3396437 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 454060 558626 2.45 687273 845546 Rural HH in the district 432359 531928 1.23 654427 805137 Urban HH in the district 21701 26698 1.22 32846 40409 Total Energised HH in the district 103496 127331 1.22 156655 192732 Urban HH electrified in the district 14060 17298 1.23 21282 26183 Rural HH electrified in the district 89436 110033 1.2 135373 166549 Balance Un-electrified Rural HH 342923 421895 0.03 519054 638588 Page 2 of 116 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Kushinagar Balance Un-electrified Urban HH 7641 9400 -0.01 11564 14226 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 528 443 0 0 0 0 71139 31834 71139 31834 11th 0 0 0 0 0 0 0 0 0 0 12th 0 0 904 0 3196 0 147201 0 85086 0 Page 3 of 116 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Kushinagar S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) C.Sansad Adarsh Gram Yozna BPL Hhs 1 Kasiya Total BPL Hhs proposed to be electrified Nos. 45 0.03 1.35 Sub-Total (BPL Hhs) 45 1.35 New 11 KV Line DTR 2 Kasiya 25 KVA (3 Ph) Nos. 6 2.64 15.84 Sub-Total (New 11 KV Line DTR) 6 15.84 New 11 KV Spur Line 3 Kasiya 11 KV Weasel Conductor Kms. 1.25 6.19 7.7375 Sub-Total (New 11 KV Spur Line) 1.25 7.7375 New LT AB Cable 4 Kasiya 2X25+1X16 Kms. 1.39 3.72 5.1708 3X50+1X35+1X16 Kms. 0.5 5.14 2.57 Sub-Total (New LT AB Cable) 1.89 7.7408 Total (C.Sansad Adarsh Gram Yozna) 32.6683 D.Connecting / UnConnecting HHs BPL Hhs 1 Dudhahi Total BPL Hhs proposed to be electrified Nos. 578 0.03 17.34 2 Fazilnagar Total BPL Hhs proposed to be electrified Nos. 13 0.03 0.39 3 Hata Total BPL Hhs proposed to be electrified Nos. 22 0.03 0.66 4 Khadda Total BPL Hhs proposed to be electrified Nos. 17 0.03 0.51 5 Nebua Naurangiya Total BPL Hhs proposed to be electrified Nos. 24 0.03 0.72 6 Ramkola Total BPL Hhs proposed to be electrified Nos. 19 0.03 0.57 Page 4 of 116 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Kushinagar S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 7 Sevarhi Total BPL Hhs proposed to be electrified Nos. 4 0.03 0.12 8 Sukrauli Total BPL Hhs proposed to be electrified Nos. 345 0.03 10.35 9 Tamkuhi Raj Total BPL Hhs proposed to be electrified Nos. 4 0.03 0.12 10 Vishunpura Total BPL Hhs proposed to be electrified Nos. 6 0.03 0.18 Sub-Total (BPL Hhs) 1032 30.96 New 11 KV Line DTR 11 Dudhahi 25 KVA (3 Ph) Nos. 58 2.64 153.12 12 Fazilnagar 25 KVA (3 Ph) Nos. 3 2.64 7.92 13 Hata 25 KVA (3 Ph) Nos. 5 2.64 13.2 14 Khadda 25 KVA (3 Ph) Nos. 4 2.64 10.56 15 Nebua Naurangiya 25 KVA (3 Ph) Nos. 3 2.64 7.92 16 Ramkola 25 KVA (3 Ph) Nos. 5 2.64 13.2 17 Sevarhi 25 KVA (3 Ph) Nos. 1 2.64 2.64 18 Sukrauli 25 KVA (3 Ph) Nos. 59 2.64 155.76 19 Tamkuhi Raj 25 KVA (3 Ph) Nos. 1 2.64 2.64 20 Vishunpura 25 KVA (3 Ph) Nos. 1 2.64 2.64 Sub-Total (New 11 KV Line DTR) 140 369.6 New 11 KV Spur Line 21 Dudhahi 11 KV Weasel Conductor Kms. 13.5 6.19 83.565 22 Fazilnagar 11 KV Weasel Conductor Kms. 0.71 6.19 4.3949 23 Hata 11 KV Weasel Conductor Kms. 1.17 6.19 7.2423 24 Khadda 11 KV Weasel Conductor Kms. 0.94 6.19 5.8186 25 Nebua Naurangiya 11 KV Weasel Conductor Kms. 0.77 6.19 4.7663 Page 5 of 116 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Kushinagar S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 26 Ramkola 11 KV Weasel Conductor Kms. 1.16 6.19 7.1804 27 Sevarhi 11 KV Weasel Conductor Kms. 0.21 6.19 1.2999 28 Sukrauli 11 KV Weasel Conductor Kms. 13.79 6.19 85.3601 29 Tamkuhi Raj 11 KV Weasel Conductor Kms. 0.23 6.19 1.4237 30 Vishunpura 11 KV Weasel Conductor Kms. 0.22 6.19 1.3618 Sub-Total (New 11 KV Spur Line) 32.7 202.413 New LT AB Cable 31 Dudhahi 2X25+1X16 Kms. 10.61 3.72 39.4692 3X50+1X35+1X16 Kms. 4.55 5.14 23.387 32 Fazilnagar 2X25+1X16 Kms. 0.55 3.72 2.046 3X50+1X35+1X16 Kms. 0.24 5.14 1.2336 33 Hata 2X25+1X16 Kms. 0.92 3.72 3.4224 3X50+1X35+1X16 Kms. 0.4 5.14 2.056 34 Khadda 2X25+1X16 Kms. 0.74 3.72 2.7528 3X50+1X35+1X16 Kms. 0.32 5.14 1.6448 35 Nebua Naurangiya 2X25+1X16 Kms. 0.6 3.72 2.232 3X50+1X35+1X16 Kms. 0.26 5.14 1.3364 36 Ramkola 2X25+1X16 Kms. 0.91 3.72 3.3852 3X50+1X35+1X16 Kms. 0.39 5.14 2.0046 37 Sevarhi 2X25+1X16 Kms. 0.17 3.72 0.6324 3X50+1X35+1X16 Kms. 0.07 5.14 0.3598 38 Sukrauli 2X25+1X16 Kms. 10.77 3.72 40.0644 3X50+1X35+1X16 Kms. 4.63 5.14 23.7982 Page 6 of 116 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Kushinagar S.No.