v. International Bank for Reconstruction and Development International Development Association Public Disclosure Authorized SecM84-1035 FROM: Vice President and Secretary December 14, 1984 J

Public Disclosure Authorized MONTHLY OPERATIONAL S'[JMMARY

OF BANK AND IDA PROPOSED PROJECTS (As of November 30, 1984) Public Disclosure Authorized

Distribution: Executive Directors and Alternates President Senior Vice Presidents Senior Management Council Vice Presidents, IFC Public Disclosure Authorized Directors and Department Heads, Bank and IFC ( TABLE OF CONTENTS

SECTION REGION PAGES

I. EASTERN AND SOUTHERN AFRICA 1 12 Botswana 1 Burundi 1 2 Djibouti 2 Ethiopia 2 Kenya 3 Lesotho 4 4 Malawi 5 Mauritius 6 Rwanda 6 7 Somalia 7 Sudan 7 Swaziland 8 Tanzania 8 Uganda 9 Zaire 9 Zambia 11 Zimbabwe 12 Regional 12

II. WESTERN AFRICA 13 26 Benin 13 Burkina 13 Cameroon 14 Cape Verde 15 Central African Republic 16 Congo, People's Republic of the 16 Equatorial Guinea 16 The Gambia 16 Ghana 16 Guinea 17 Guinea-Bissau 18 Ivory Coast 18 Liberia 19 Mali 20 Mauritania 21 Niger 22 Nigeria 23 Sao Tome and Principe 25 Senegal 25 Sierra Leone 26 Togo 26 Regional 26 . I - 1. l _..

SECTION REGION PAGES

III. EAST ASIA AND PACIFIC 27 - 35 China 27 Fiji· 28 Indonesia. 28 Korea 30 Lao People's Democratic Republic 31 Malaysia 31 Papua New Guinea 32 Philippines 33 Solomon Islands • 34 Thailand 34 Vanuatu 35

IV. SOUTH ASIA 36 - 47 - - Bangladesh 36 Bhutan 37 Burma 37 India 39 Maldives 43 Nepal 43 Pakistan 45 Sri Lanka. 47 v. EUROPE, MIDDLE EAST AND NORTH AFRICA 48 - 59 Algeria 48 Cyprus 48 Egypt, Arab Republic of 48 Hungary • 49 Jordan 50 Morocco so Oman 51 Portugal 51 Romania 52 Syrian Arab Republic 53 Tunisia 54 Turkey •. 55 Yemen Arab Republic 56 Yemen, People's Democratic Republic of .. 57 Yugoslavia 58

VI. LATIN AMERICA AND CARIBBEAN 60 - 70

Argentina .• 60 Belize 60 :Bolivia 60 Brazil 60 Central America Regional 62 Chile .• 62 Colombia 63 Costa Rica 64 Dominican Republic 65 Ecuador 65 El Salvador 65

- 1.11 -

SECTION REGION PAGES VI. LATIN AMERICA AND CARIBBEAN (Cont'd)

Grenada 65 Guatemala 66 Guyana 66 Haiti 66 Honduras 66 Jamaica 67 Mexico 67 Nicaragua 68 Panama 68 Paraguay 69 Peru 69 St. Lucia • 70 Uruguay 70

VII. NEW PROJECTS 71 - 73

EASTERN AND SOUTHERN AFRICA 71 Madagascar .. 71 Mauritius 71 Sudan 71 Tanzania 71 Zambia 71

EAST ASIA AND PACIFIC 71 Philippines 71

SOUTH ASIA 71 Bangladesh 71 Nepal 71 Pakistan 72 Sri Lanka 72

EUROPE, MIDDLE EAST AND NORTH AFRICA 72 Egypt, Arab Republic of 72 Jordan 72 Syrian Arab Republic 72 , Tunisia 72 Turkey 72 Yugoslavia 72

LATIN AMERICA AND CARIBBEAN 73 Dominican Republic • 73 Ecuador 73 Jamaica 73

Secretary's Department

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Y Lender Y Consulting Services Action on Procurement!!_/

I. EASTERN AND SOUTHERN AFRICA

Ministry of To be Livestock - Strengthening live­ No decision made whether Appraisal report under Agriculture deter­ stock marketing, and assisting consultants idll be re­ preparation. mined Government in development of its quired. (Bank) land tenure program. Total project cost to be determined.

Ministry of 3,0 Selebi-Phikwe Supplement - Tech­ No decision made on ex­ Project under prepara­ Finance and (Bank) nical assistance components to tent of consultant ser­ tion. 1 Development be identifie( • vices required. Planning

Ministry of About {R) Water Supply II - Rehabilitation Consultants have been re­ Appraisal report being Rural 9,0 and expansion of 48 rural cruited for project prep­ prepared. (Co-financing Development (IDA) aqueducts. Total project cost aration. required.) estimated at $12.0 million. IDA Project Preparation Facility advance of $470,000 approved to com­ plete preparation.

Ministry of About (R) Agriculture Muyinga - Pilot set­ FAD Cooperative Program Project under prepara­ Agriculture 10.0 tlement scheme and development is preparing project. tion. (IDA) of coffee and foodcrop produc­ tion in the Muyinga Province. Total project cost to be deter­ mined.

Ministry of About Agricultural Services. Total Consultants will be re­ Project preparation under Agricu 1 ture 12 .o project cost to be determined. quired. way. (IDA)

Ministry of About Highways IV - Continuation of Consultants will be re­ Appraisal report being Public Worko, 15 .0 the road improvement and mainte­ quired for maintenance prepared. (Co-financing Energy and Mines (IDA) nance program. Total project and for the labor-inten­ required.) IDA Project cost estimated at $37.0 million. sive road construction Preparation Facility ad­ program. Consultants for vance of $900,000. project preparation are financed under the Proj­ ect Preparation Facility advance.

Mi.nistry of About (R) Communications II - Improvement Consultants for project Appraisal report under Transport, Post 5.0 and extension of telecommuni­ preparation are financed preparation. (Co-fin­ ;1nd Telecommuni­ (IDA) cations network; improvement of under the Project Prepar­ ancing required.) cations postal operations. Total proj­ ation Facility advance. ect cost estimated at $14.3 mil­ IDA Project Preparation lion. Facility advance of $275,000.

Ministry of About Transmission and Distribution Consultants for project Appraisal report being Public Works, 12.0 System (formerly part of a Re­ preparation are financed prepared (Co-financing Energy and Mines (IDA) gional Power Distribution Proj­ under Project Preparation required.) ect) - Rehabilitation and exten­ Facility advance. sion of the transmission and IDA Project Preparation distribution system. Total Facility advance of project cost estimated at $26.5 $400,000. million.

1./ Addresses of the Implementing Agencies will be provided in forthcoming issues of the Monthly Operational Summary. 2/ The amount is in millions of U.S. dollars and is approximate and tentative. l/ The letter (N) befor~ the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulation of the new projects listed in this issue. !!_/ This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. - 2 -

Member Country, Amount & and Implementing Probable Stage of Processing and Afency 1./ Lender Y Consulting Services Action on Procurement!±/ BURUNDI (Cont'd)

Ministry of About (R) Forestry II - Integrated for­ Consultants will be re­ Appraisal report under Agriculture 12 .o estry project. Total project quired (silviculturist, prepar~tion. (IDA) cost estimated at $20.0 million. livestock and agri­ culture, agro-forestry).

COMOROS

Ministry of About Technical Assistance - To assist Consultants will be re­ Project under identifica­ Finance/Direc­ 2.5 Government in improving formula­ quired. tion. torat~ General (IDA) tion of economic policy, pian­ of Planning ning, and management of key sec­ tors.

Ministry of About (R) Education II - Educational plan­ No consultants requir~d. Project under identifi­ National 4.5 ning and technical assistance; cation. Education, (IDA) vocational management and Culture and teacher training. Sports

Ministry of 5.0 Urban Sites and Services.- Hous­ Consultants will be re­ Approved by the Executive Pub lie Works/ (IDA) ing Development, urban facili­ quired. Directors on S~ptember District of ties, support for small-scale 11. (Co-financing with Djibouti industry, artisanal enterprise USAID for $5.5 million and training. Total project and CCCE for $1.0 million cost about $15.2 million, with probable.) $11.5 million in foreign ·ex­ change. IDA Project Preparation Facility advance of $500,000 approved to finance primarily con­ sul tan ts' services.

Ministry of About (R) Education - Quality improvement Consultant services will Negotiations substan­ National Educa­ 5.0 and expansion of primary educa­ be recruited under the tially completed. Board tion, Yquth and (IDA) tion. Total project cost esti­ Technical Assistance presentation tentatively ~ports mated at $7.2 million. project (Cr. 1232). scheduled for January 31.

Ministry of To be Livestock Development and Mar­ No decision made whether Project being identified. Agriculture deter­ keting - To be defined. consultants will be re­ mined quired. (IDA)

Ethiopian To be (R) Power III/Energy I - Electric Consultants will be re­ Appraisal report being Electric Light deter­ transmission, rural electrifica­ quired for technical as­ prepared. and Power mined ti~n, and household energy. sistance. Authority (IDA) Total project cos~ estimated at IDA Project Preparation '(EELPA) $189 million. Facility advances total­ ling $980,000 approved to finance consu+ting ser­ vices.

Ministry of To be Peasant Agriculture Development Consultants will be re­ Preparation work under Agricu 1 ture deter­ I - Support for expansion and quired for technical as­ way. mined intensification of integrated sistance. (IDA) agricultural services, including construction of rural roads, seed multiplication programs; provision of training facilities in selected areas. Total proj­ ect cost to be determined.

Ministry of 22.0 Agricultural Research - Streng­ Consultants will be re­ Approved by the Executive Agriculture (IDA) thening of the research capacity quired: cryogenet1cist, Directors on September of the Institute of Agricultural biometrician, architect, 11. Research of Ethiopia. Total agronomist, coffee tax project cost estimated at $32 economist, plant breeder, IDA Project Preparation million. plant pathologist, live­ Facility advance of stock specialist, weed $300,000 has been and other agricultural approved to finance scientists. project start-up.

Ethiopian 40.0 Telecommunications VI - To im­ Consultants will be re­ Approved by the Executive Telecommunica­ (IDA) prove and expand te lecommun ica­ quired for management in­ Directors on July 19. tions 'Authority tions services. Total project formation systems, asset (Co-financing with Italy cost estimated $151.8 million. revaluation and tariff for $25.0 million, Sweden study. Bids are being $12.0 million and AfDB evaluated. $26.4 million probable.)

See page 1 for footnotes. - 3 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf ~y Consulting Services Action on Procurement 4/ ETHIOPIA (Cont'd)

Ministry of 70.0 Education VI - Basic education Consultants will be re­ Approved by the Executive Education (IDA) and teacher training. Total quired for management in­ Directors on September project cost estimated at $109,6 formation system engin­ 11. million, with $55,7 million in eering, architectural, foreign exchange. and procurement informa­ An IDA Project Prepara-. tion system. tion Facility advance of $410,000 has been ap­ proved to support further detailed preparation and design work for the gen­ eral education components of the project. ·

Central Planning 4.0 Technical Assistance - To Consultants will be re­ Approved by the Executive National Com­ (IDA) strengthen macroeconomic man­ quired: computer spec­ Directors on September mittee agement, improve management in­ ialist, economic model­ 11. formation systems, and formulate ling adviser, macro-econ­ programs to improve accounting omist ~nd information and auditing capacity. Total system specialist. project cost estimated at $4,6 million.

Ministry of To be Gas Engineering - To be defined. No decision made whether Project preparation under Mines and Energy deter­ consul tan ts will be re- way. mined quired. (IDA)

Ministry of To be Forestry - Farm forestry and No decision made whether Project preparation work Agricu 1 ture deter­ fuelwood plantations. Total consul tan ts will be re- under way. mined project cost to ~e determined. quired. (IDA)

Agricultural and To be (R) DFC V - Fifth line of credit to No decision made whether Project identification Industrial deter­ agricultuial and industrial de­ consul tan ts will be re- work to begin in January. Development Bank miried velopment bank. Total project quired. (IDA) cost' to be determined.

KENYA

Kenya Industrial 1 30,0 (R) Small-scale Enterprises - Second No decision made whether Project under prepara­ Estates (KIE) (Bank) line of credit to KIE, and pos­ consultants will be re­ tion. 10,00 si9ly other institutions. quired. (IDA)

Ministry of 15,0 (R) Dairy - Cqmponents to be iden­ No decision made whether Project preparation under Agriculture and (IDA) tified, consul.tan ts wi 11 be re­ way. Livestock quired. Development

Kenya Post and About Telecommunications III - Expan­ No decision made whether Appraisal report under Telecommunica­ 40.0 sion of telecommunications ser­ consultants will be re­ preparation. tions (Bank) vices. Total project cost to be quired. determined.

Nairobi City About (R) Nairobi Water Engineering - Previously engaged con­ Appraisal report being Commission 5.0 Feasibility/engineering stud­ sultants expected to con­ , prepared. (IDA) ies. Total project cost about tinue. $7,5 million, An IDA Project Prepara­ tion Facility advance pf $1,0 million has been ap­ proved to help maintain preparation work already initiated by consultants and to meet the first year's foreign exchang~ costs of pre-investment studies.

Ministry of About Energy I - Policy-oriented sec­ No decision made whether Project at early stage of Energy and 50.0 tor operation with possible consultants will be re­ preparation. Regional (Bank) techqical assistance. quired. Development

Ministry of About (R) Railways II - Tra~k rehabili­ Consultants have been en­ Appraisal mission sched­ Transport and 60.0 tation, motive power, and rol­ gaged. uled for May 1985. Communications (Bank) ling stock, workshops.

Ministry of About (R) Agricultural Research - Support Agriculture and No decision made whether Project under Prepara­ 20.0· for a national research program. consultants will be re­ Livestock (IDA) tion. DevelopUlent quired.

See page l for footnotes. - 4 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj ].ender 1./ Consulting Services Action on Procurement 4/

Ministry of About (R) Health/Population - Technical Consultants will be re­ Appraisal report under Health and 2.5 assistance to strengthen plan­ quired to strengthen preparation. (Co-fi­ Social Welfare (IDA) ning, financial management, and planning/financial man­ nancing with DANIDA, manpower development in the sec­ agement and manpower dev­ USAID, Ireland, WHO, UNDP tor; provision of family plan­ elopment of Ministry of and EEC being explored.) ning services and staff train­ Health. ing. Total project cost esti­ mated at $7.8 million.

Ministry of About Education IV - Provision of pri­ Consultants will be re­ Credit signing Decem­ Education 10.0 mary and secondary school class­ quired for specialized ber 13. (IDA) rooms, equipment and facilities; studies. teacher and vocational train­ IDA Project Prepar~tion ing, Total project cost estima­ Facility advance of ted at $13.0 million. $440,000 approved for building designs, site surveys and studies.

Ministry of About Highlands Water - Engineering Consultants will be re­ Project preparation under Water, Energy 4.0 and preliminary works for Phase quired for engineering way. (Co-financing being and Mining (IDA) I of development of Lesotho's designs and tenPer docu­ explored.) water resources for export and ments. Previously en­ hydro-electricity. Total proj­ gaged consultants likely ect cost estimated at $17.6 mil­ to continue. lion.

MADAGASCAR

Ministry of About (R) Irrigation Rehabilitation~ Consultant will be re­ Appraisal report being Agriculture 12.0 Strengthening of subsector op­ quired for engineering prepared. ( Co-financing Production (IDA) erations; rehabilitation of studies and technical with CCCE $29.0 million existing schemes, maintenance, assistance to the Minis­ and EDF $16.5 million crop production, feeder roads, try of Agriculture. probable.) storage facilities, training and . establishment of central project management unit. Total project cost estimated at $68.3 million.

Ministry of About Agricultural Sector - To provide Studies for Fisheries Appraisal mission sched­ Agriculture 25.0 inputs and technical assistance sector will be carried uled for February. Production (IDA) for agricultural rehabilitation. out with support from the Total project cost to be deter­ FAO. mined.

Ministry of In­ About (R) Industrial Sector - Credit to Consultants required for Negotiations substan­ dustry and 40.0 the industrial sector for spare industrial services. tially completed. Board Bankin' ny In­ (IDA) parts, raw materials and tech­ presentation tentatively dostria (Nation­ nical assistance. Total project scheduled for January 15. al Industrial cost estimated at $65 million, Development Bank including $10 million in foreign An IDA Project Prepara­ (BNI)) exchange costs. tion Facility advance of $500,000 has been ap­ proved to finance consul­ tants to help complete the evaluation of the 1984-86 Public Investment Program in Industry.

Ministry of About (R) Railways - Renewal of railway Consultants will be Appraisal mission sched­ Transport/Reseau 7.0 track; spare parts; training and required for technical uled for February. (C~­ National Chemin (IDA) technical assistance. Total assistance, training and financing with CCCE and de Fer Malgache project cost to be determined. technical aspects. FAC being explored.) (RNCFM)

Malagasy Elec­ About Power II - Hydro-power develop­ Consultants will be re­ Project.under prepar­ tricity and 20.0 ment, transmission, and trans­ quired. ation. (Co-financing re­ Water Board (IDA) former substation. Total proj­ quired.) (JIRAMA) ect cost to be determined.

Ministry of About (R) Accounting & Auditing II - Fol­ Consultants were re­ Appraisal mission Finance and 8.0 low-up to Accounting/Auditing I cruited to assist in the scheduled for February. RINDRA, Malagasy (IDA) (1!55-MAG). identification of the Auditing Firm project.

Ministry of About (R) Agricultural Institutions Tech­ Consultants required to Appraisal mission Agriculture 5.0 nical Assistance II - Follow-up provide services. scheduled for February. Production (IDA) to ongoing agricultural institu­ tions technical assistance project, including policy analy­ sis, and general management support.

See page 1 for footnotes. - 5 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender J:/ Consulting Services Action on Procurement !!I

MADAGASCAR (Cont'd)

Ministry of About Cyclone Rehabilitation - Recon­ Consultants will be re­ Approved by the Executive Interior 15.0 struction and rehabilitation of quired. Directors on October 30. (IDA) damage caused by Cyclone Kamisy. An IDA Project Prepar­ ation Facility advance of $1.0 million has been ap­ proved for consultants services, equipment, ma­ terial, construction ma­ terial, spare parts, and urgent civil works.

Office Militaire About Petroleum III - Oil field devel­ No decision made whether Project identification National des In­ 15.0 opment. consultants will be re­ under way. dustries Strate­ (IDA) quired. giques (OMNIS)

Ministry of About (N) Fuelwood - To provide fuelwood To be determined Project under Agriculture 5.0 supplies (charcoal) to Antanan­ pl"eparation. Production (IDA) arivo, Mahajanga and Toliary. Total project cost to be determined.

Ministry of About (~) Ports - Rehabilitation of some Consultants will be Pre-appraisal mission Transport 8.0 ports; equipment, navigation required. scheduled for May. (IDA) aids, dredging plant. Total project cost to be determined.

Ministry of 6.4 (R) Wood Industries Restructuring Consultants will be re­ Negotiations substan­ Forestry and (Bank) Project - Technical assistance, quired for technical and tially .completed. (Wood Natural training and restructuring of training components. industries component of Resources. mills, and studies of alterna­ project is now being. fi­ tive uses of the forestry re­ nanced separately by IFC, sources. Total project cost es­ EIB, KfW Germany, and timated at $8.6 million. private equity partner.)

Ministry of 15 .o (R) Urban I - Housing finance; in­ Consultants may be re­ Approved by -the Executive Finance (IDA) stitutional support; training quired for housing, Directors on November 27. and studies. Total project cost subsidy study and estimated at $18.2 million. training.

Investment and About (R) DFC II - Second line of credit Consultants have been re­ Appraisal mission sched­ Development Bank 13 .6 to INDEBANK for industrial and cruited for preparatory uled for Januarya of Malawi (Bank) possibly agricultural estate work. Not determined (INDEBANK) financing. Total project cost whether additional con­ to be determined. sultants required.

Ministry of About (R) Agriculture Research - To Design and financial con­ Negotiations scheduled Agriculture 20.0 strengthen central agricultural sultants will probably be for January. (Co-finan­ (IDA) research institutions, adaptive required for preparatory cing with USAID for $10 research and provide needed work. million being explored.) infrastructure. Total project cost estimated at $48.7 million. IDA Project Preparation Facility advance of $583,500 approved to initiate key project activities.

Ministry of About (R) National Rural Development Pro­ No decision made whether Appraisal report under Agriculture 25 .o gram V - Consolidation 'of pro­ consultants will be re­ preparation. (IDA) grams started under NRDP I quired. (Ntcheu and Mzuzu), extension of NRDP to Nkhata Bay; general sec­ toral and management·support, including training and equipment for central extension services. Total project cost to be deter­ mined.

Ministry of About (R) Health II - Expansion of health No decision made whether Project under prepara­ Health 25 .0 care delivery and maternal and consultants will be re­ tion. (IDA) child health services. Total quired. project cost to be determined.

Lilongwe Water About (R) Water II - Extension of water No decision made whether Project under prepara­ Board 25.0 supply to Lilongwe. Total proj­ consultants will be re­ tion. (IDA) ect cost to be determined. quired.

See page 1 for footnotes. _ - 6 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency ll Lender 3/ Consulting Services Action on Procurement fl_/

MAURITIUS

Ministry of About Education III - Post-primary No consultants required. Project under prepara­ Education and 15.0 technical schools and vocational tion. Cultural Affairs (Bank) education. Total project cost to be determined.

Development Bank About (R) Industrial Sector - Seventh line No decision made whether Identification mission of Mauritius 20.0 of credit to the Development consultants will be re­ tentatively scheduled for (DBM) (Bank) Bank of Mauritius. Finance for quired. end-January. export industry and replenish­ ment of DBM resources.

Central About Power III - Bagasse fired power No consultants required. Project under prepara­ Electricity 15.0 plant, and transmission and dis­ tion. Board (Bank) tribution development.

Ministry of About (N) Sugar I - To monitor implemen­ To be determined Project under Agriculture 20.0 tation of the Sugar Industry identification. (Bank) Action Program and help improve productivity of land use among / smallholders. Total project / cost to be determined.

Ministry of About (R) First Agricultural Research - Consultants financed Negotiations in mid­ Agriculture 11.5 Implementation of an agricultur­ under Project Preparation December. (IDA) al research program, including Facility. institutional support, and tech­ An IDA Project Prepara­ nical assistance for agriculture tion Facility advance of policy analysis. Total project $687,000 approved for cost estimated at $14.2 million, expenditures for techni­ including $7.2 million in for­ cal assistance, equip­ eign. exchange. ment, local and personnel costs, and to support final preparation and start-up activities.

Ministry of About (R) Health/Population/Nutrition - Consultants will be re­ Pre-apprEisal mission Pub lie Heal th 8.0 Strengthening the maternal/ quired for project prep­ scheduled for (IDA) child health and family planning aration. February/March. services within the Ministry of Public Health, and reinforcing coordinating family planning­ related activities within the National Population Office (ONAPO). Total project cost to be determined.

Ministry of About (R) Technical Assistance II - Assist Consultants will be re­ Report being prepared. Finance 5.0 Government in improving economic quired. (IDA) policy-making ·and strengthening of Finance Ministry. Total project cost to be determined.

Ministry of About (R) Highways VI -.Upgrading of sec­ Consultants will be re­ Project preparation under Transport and 20.0 ondary roads and road mainte­ quired. way. Communications (IDA) nance program. Total project cost estimated at $90.0 million.

Ministry of About (R) Fourth Line of Credit to Banque No consultants required. Project identification Finance 10.0 RwHndaise de Developpement under way, (IDA) (BRO). Total project cost to be determined.

Ministry of About Education III - Technical and Consultants will be re­ Appraisal mission Education 15 .o - Agricultural Training. quired for civll works scheduled for (IDA) and textbooks design. February/March.

Ministry of About (R) GITARANA/Agriculture Services - Consultants will be Project preparation under Agriculture 20.0 Application of extension required. way. (IDA) services, financial, marketing and prOcesaing operations, and reinforcement of Ministry of Agriculture.

See page l for footnotes. - 7 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender Y ConsUlting ServiCes Action on Procurement!±/

SEYCHELLES

Ministry of 6.0 (R) Ports/Land Reclamation - Recla­ No consultants required Negotiations substantial­ Planning (Bank) mation of land, improvement of by the Bank but the Gov­ ly completed. Board pre­ fishing and commercial ports, ernment intends to re­ sentation scheduled for and development of industrial cruit consultants. February/March. (~o­ site. Total project cost esti­ financing with AfDB, mated at $25.0 million. BADEA, CCCE and Kuwait Fund being explored.)

Bank Project Preparation Facility advance of $300,000 approved to com­ plete project prepara­ tion.

Ministry of 3.0 Technical Assistance - Second Consultants will be re­ Appraisal report under Planning (IDA) credit for technical assistance quired. Preparation. studies and personnel. Total project cost estimated at $8.0 million, mostly in foreign ex­ change.

Ministry of 10.6 (K) N.W. Agriculture II - Continua­ Consultants will be re­ Negotiations substantial­ Agriculture (IDA) tion of ongoing project which is quired. ly completed. (Co- assisting in the development of f inancing with IFAD and the North-West Region through EEC arranged.) soil -and water conservation, and other measures to increase agri­ An IDA Project Prepara­ cultural production. Total proj­ tion Facility advance of ect cost estimated at $26.0 $500,000 approved to as­ million. sist the Government in completion of project preparation and detailed planning.

Ministry of About Education V - To be defined. To be determined. Project identification Education 15.0 under way. (IDA)

Ministry of About Ports Rehabilitation - Mainte­ To be determined. Project preparation under Pub lie Works 10.0 nance and rehabilitatiOn of way. (WA) existing ports. Total project cost to be determined.

Ministry of About Shebelli Irrigation Rehabilita­ Consultants will be re­ Project identification Agr icu 1 ture 10.0 tion - To be defined. quired. under way. (IDA) An IDA Project Prepara­ tion Facility advance of up ·to $1.0 millio~ ap­ proved to engage consul­ tants.

Ministry of About Afgoy Gas Power II - Gas devel­ No decision whether con­ Project preparation under Mineral and 10.0 opment. sultants will be re­ way. Water Resources (IDA) quired.

SUDAN

National 30.0 (R) Power Rehabilitation - Rehabili­ Consultants will be re­ Post-appraisal report Electric (IDA) tation of power systems of Na­ quired for design and being reviewed. Corporation tional Ele·ctricity Corp. (NEC). preparation of bidding (NEC) Total project cost estimated at packages. $38 million.

Ministry of 38.5 (R) Cotton Processing and Marketing Consultants will be re­ Negotiations tentatively Agricu ltura 1 (IDA) - Rehabilitation of ginneriea qtiired for telecommunica­ scheduled for January. Crop Parastatals and strengthenirig of cotton tions, training officer, production and marketing policy market analyst, cotton An IDA Project Prepara­ institutions. Total project trader technician, pro­ tion Fa~ility ~dvarice of cost estimated at $55 million. curement advisor, civil, up to $800,000 approved mechanical and electrical to help finance start-up engineers, and short-term of the prOject. technical assistance for evaluation, gr~ding, and testing.·

See page 1 for footnotes. - 8 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender Jj Consulting Services Action on Procurement!±_/ SUDAN (Cont'd)

Agricultural 24.0 (R) Agricultural extension/research Consultants will be re­ Appraisal report being Research. (IDA) and training in irrigated sec­ quired for technical as­ reviewed. Corporation tor. Total project cost estima­ sistance, for civil en­ (ARC) ted at $51 million, including gineering, agricultural $24 million in foreign exchange. research, agricultural extension system, train­ ing services and agricul­ tural economist.

Ministry of 12.0 Petroleum Technical Assistance - Consultants will be re­ Credit signed December 7. Energy and Mines (IDA) Technical assistance; including quired for petroleum geo­ seismic interpretation, gravity logical exploration, surveys, geological field work, energy economist and man­ Landsat studies and other stud­ agement. ies, and provision of training. Total project cost estimated at $13.3 million, including $12 million in foreign exchange costs.

Ministry of 47.5 (R) Agriculture Rehabilitation No consultants.required. Project issues under Finance and (IDA) Credit III - Support to their­ review. Economic rigation sub-sector for recur­ Planning rent inputs such as herbicides and pesticides.

Ministry of 5.5 Stockroute - Improved water sup­ Consultants will be re­ Credit approved by the Agriculture (IDA) ply and veterinary services for quired for chief hydro­ Executive Directors on the movement of livestock .from geologist, chief engin­ October 16 and signed on producing areas to markets. eer, design and supervis­ December 7. (Co-finan­ Total project cost estimated at ing engineers, range man­ cing arranged with IFAD $19.·6 million, with foreign ex­ agement, livestock pro­ for $6.0 million.) change component of $11.2 mil­ duction specialist, econ­ lion. omist/marketing special­ ist.

Ministry of About Industrial Rehabilitation - To No decision made whether Sector mission cancelled. Industry 40.0 be defined. consultants will be re­ No new schedule yet. (IDA) quired.

Ministry of About Gas Engineering - To be defined. No decision made whether Project preparation under Mining and 5,0 consultants will be re­ way. Energy (IDA) quired.

Ministry of About Petroleum Gas Development - To No decision made whether Project preparation under Mining and 40.0 be determined. consultants will be way. Energy (Bank) required.

National About (R) Power IV - Power generation and No decision made whether Post-appraisal mission to Electric 35.0 transmission distribution/expan­ consultants will be re­ be scheduled. Corporation (IDA) sion. Total project cost esti­ quired. (NEC) mated at $105 million.

Ministry of 10.0 (N) Western Savannah Phase II - Consultants will provide Appraisal mission Agriculture (IDA) Pilot project to develop viable technical assistance to scheduled for April/May, technical packages for rainfed the Western Savannah Dev­ 1985. crop and livestock production in elopment Corporation to Western Sudan. carry out project objectives.

SWAZILAND

Ministry of About (R) Transport Rehabilitation - Consultants will be re­ Negotiations in mid­ Works, Power and 8.6 Bridge and road reconstruction; quired for bridge, feasi­ December. {Co-financing Communications (Bank) equipment and- training. Total bility and detailed with USAID for $1 mil­ project cost estimated at $11.3 studies. lion.) million, including $9.2 million in foreign exchange.

TANZANIA

Ministry of 21.0 (R) Harbours I - Improvements to Consultants will be re­ Board presentation on Communications (IDA) Dar-es-Salaam Port. Total quired for. technical as­ December 11. (Co-financ­ and Transport project cost estimated at $91 s is tance and training for ing arranged with million, with foreign exchange engineering maintenance, Denmark-DANIDA for $7 .9 component of about $59 million. operations and managerial million, Finland-FINNIDA information. Consultants for $6.8 million Italy for civil works and su­ for $3.8 million, Nether­ pervision already selec­ lands for $10.3 million, ted. Norway-NORAD for $2.8 million, U.K.-ODA for $0.3 million)

See page 1 for footnotes. - 9 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Y Consulting Services Action on Procurement!±_/

~(Cont'd)

Ministry of About Highways VI - Rehabilitation/ No decision made whether Project being prepared. Communications 30.0 strengthening of the Tan Zam consultants will be re­ and Transport (IDA) Highway, and road maintenance. quired. Total project cost estimated at $79.5 million.

Ministry of About (R) Agricultural Rehabilitation - No decision made whether Project preparation under Agriculture 30.0 Rehabilitation of cotton sub­ consultants will be re­ way. (Co-financing being (IDA) sector or other crops yet to be quired. explored.) determined.

Ministry of 10.0 Technical Assistance IV - Assis­ Previously engaged con­ Approved by the Executive Planning and (IDA) tance to help carry out studies sultants·expected to con­ Directors on October 16. Ec_onomic and to improve project implemen­ tinue. Deve 1 opmen t tation, mainly focusing on agri­ culture sector. Total project cost estimated at $11.94 mil­ lion, including $10.03 million in foreign exchange.

Ministry of About (N) Petroleum Sector Technical Consultants will be Appraisal mission in the Water, Energy 8.0 Assistance - Assistance for required for most field. and Minerals (IDA) protection of Songo-Songo components. reservoir studies1 on marketing of liquified petroleum gas and improvement of product distri­ bution, domestic: natural gas utilization, as well as institu­ tional and manpower training to Tanzania Petroleum Development Corporation (TPDC). Total project cost estimated at $10.0 million, including foreign costs of $8 .a million.

Ministry of 28.0 (R) Water Supply - Continuation of Consultants will be re­ Credit signed on Nov.ember Lands, Minerals (IDA) Water Supply Engineering Proj­ quired. 28. and Natural ect. Total project cost estima­ Resources ted at $31.0 million, with $22.74 million in foreign ex­ change.

Ministry of 32.0 (R) Tea Rehabilitation - Rehabilita­ Consultants will be re­ Project preparation under Agriculture and (IDA) tion of tea plantations and quired. way. Forestry processing facilities.

Uganda 32.0 {R) Power II - Rehabilitation of Consultants will be re­ Appraisal report being Electricity (IDA) Owen Falls hydropower station. quired. prepared. Board Total project cost estimated at $76.4 million.

Ministry of About (R) Petroleum Exploration Promotion Consultants will be re­ Appraisal report being Lands, Minerals 4.0 - Geophysical surveys and tech­ quired. prepared. and Water (IDA) nical assistance. Resources

Ministry of 10.0 (R) Agricultural Rehabilitation/ Consultants will be re­ Negotiations sub­ Agriculture and (IDA) IFAD II - Co-financing of IFAD quired. stantially completed. Forestry project including financing of imported recurrent agricultural inputs. Total project cost estimated at $25.2 million.

Gec:amines About (R) Gecamines II - Rehabilitation, No consultants required Awaiting outcome of tech­ 50.0 maintenance and expansion of for project preparation. nical assistance project (IDA) existing mining facilities. and review of investment Total project cost to be deter­ program in light of in­ mined. stitutional changes in structure of company. Co­ financing meeting has been postponed pending review.

See page I for footnotes. - 10 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender:!:._/ Consulting Services Action on Procurement!±./

ZAIRE (Cont'd)

Department of About (R) Kwango Kwilu - Integrated Rural No consultants required Identification under way. Agriculture 15.0 ~evelopment ~roject in Kivu for project preparation. (IDA) Region. Total project cost to be determined.

Department of 9.0 Education Training/Technical As­ Consultants will be re­ Approved by the Executive Primary and .(I~A) sistance - Technical assistance quired to strengthen the Directors on September Secondary for training and i~provement of Department I s management· 11. Education planning; financial management and technical capabili­ and project implementation and ties. Consultants have An IDA Project Prepar­ pilot. projects for quality im­ been recruited for activ­ ation Facility advance of provements to the primary and ities financed by the. $473,000 approved to fi­ secondary systems. Total proj­ Project Preparation Fa­ .nance consultants'· ser­ ect cost estimated at $10.6 mil- cility. vices in preparing de­ lion·. · tailed description and cost estimates for each component, and for ini­ tial pre-implementation activities.

Department of About (R) Research/Seeds - Support for de­ Consultants will be re­ Appraisal report being Agric~ 1 ture 16.0 velopment of priority agricul­ quired to assiSt in proj­ prepared. (Co-financing (IDA) ture research programs and seed ect implementation. (Spe­ with IFAD and Italy being production capabilities. Total cific needs being identi­ explored.) project cost estimated at $22 fied.) million, including foreign ex­ An IDA Project Prepara­ change cost of $21.4 million. tion Facility advance of $488,000 has been ap­ proved to finance, in a first tranche of $66,000, consulting services to finalize the proposed project, and in a second tranche of $422,000, the start-up activities ·of selected seed farms.

Department of About (R) Lulua Agriculture - Development Consultants will be re­ Board presentation ten­ Agriculture 12 .5 of foodcrop production through quired to assist the tatively scheduled for (IDA) improved input supply systems project implementation January 11. · (Co-finan­ and infrastructurelsupport. unit in technical and cing with IFAD for $6.5 Total project cost estimated at financial aspects. million identified.) $21.9 million. An IDA Project Prepara­ tion Facility advance of $60,000 has been approved to finance the completion of research trials in a relatively small part of the project area.

Department of About (R) Railways III - Track Rehabilita­ No decision made whether Project processing has Transportation 60.0 tion, additional wagons, tel~­ consultants will be re­ been postponed to FY88. (IDA) communications and technical quired. Further reporting will be assistance training. Total discontinued. project cost to be determined.

Department of About (R) Petroleum Refinery Engineering - Consultants will be re­ Negotiations scheduled Mines and Energy 12 .5 Technical and economic studies quired for studies and for January. (Co-finan­ (IDA) related to the SOZIR refinery. audits. cing with Italy for $3 Total project cost estimated at million probable.) $18.5 million. An IDA Project Prepara­ tion Facility advance of $900,000 has been ap­ proved to finance: ( a) techno-economic studies for energy conservation, secondary conversion, crude trans-shipments options, bitumen manu­ facture; (ii) demand forecast for refined products; (iii) product pricing and audits.

See page 1 for footnotes. - 11 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agenc7 }j ~y Consulting Services Action on Procurement!!._/ ZAIRE (Cont'd)

Department of About Highways VI - Road improvement Consultants will be re­ Appraisal report being Public Works/ 55.0 and maintenance, and training of quired to assist with prepared. Bureau of Roads (IDA) Office des Routes (OR) staff. project implementation. Total project cost estimated at $69.5 million, including $55 million·in foreign exchange costs.. (

Societe About (R) Power II.- Rehabilitation and Consultants will be re­ Appraisal mission in the Nationale 15.0 expansion of the Kivu region hy­ quired for training and field. d'Electricite (IDA) draulic network, including the engineering services. (SNEL) Ruzizi I facility. Total proj­ Consultants have been An IDA Project Pr~para­ ect cost estimated at $62.0 mil­ recruited for studies tion Facility advance of lion. financed under the $440,000 has been·ap­ Project Preparation proved to finance cost Facility. and engjneering studies.

Ministry of About (R) Bateke. Fuelwood development in Consultants for project Project preparation under Environment 15.0 Bateke Plateau. Total project preparation being fi­ way. (IDA) cost to, be determined. nanced by EEC and already ~re appointed.

Department of About (R) Kabinda Agriculture - Develop­ No decision made whether Appraisal mission schedu­ Agricu 1 ture 10.0 ment of agriculture and live­ consultants will be re­ led for March. (IDA) Stock in the Kwango Kwilu sub­ quired. regions. Total project cost estimated at $25.0 million.

Societe About DFC VIII - Eighth line o~ credit No decision made whether Project identification Financiere de 40.0 to SOFIDE. consul tan ts will be re­ under way. Developpement (IDA) quired. (SOFIDE)

Regie des Voies About (R) Navigation Improvement ·· Streng­ Consultants to prepare Project preparation. under Fluviales (RVF); 20.0 thening management of RVF and project financed under way. Regie des Voies (IDA) RVM; rehabilitation of existing Credit 1335-ZR. Maritimes (RVM) facilities and equipment.

Ministry of 7.1 (R) Fisheries - Improvement of fish Consultants will be re­ Approved by the Executive Agriculture and (IDA) production systems and marketing quired for fisheries Directors on November Water ch~nnels. Total project cost credit, administration, 27. Development estimated at $10.6 million. project coordination, monitoring and evalua­ tion, fish stock assess­ ment.

Development Bank About (R) Industrial Reorientation (for­ No decision made whether Appraisal report under of Zambia 40.0 merly DFC III) - Investment re­ consultants will be re­ preparation. (Bank) sources', inputs and spare parts quired. to rehabilitate, modernize and raise capacity utilization in the industrial sector. Total project cost to be determined.

Zambia Railways 20.0 Railways IV - Training, tech­ Consultants will be re­ Negotiations tentatively (IDA) nical ass~stance, track improve­ quired for review of com­ scheduled for January. ment, telecommunications, rol­ puter activities, manage­ (Co-financing with Japan, ling stock, maintenance facili­ ment information systems. KfW Gennany, EEC, and' ties. Total project cost esti­ FINNIDA being explored.) mated at $85.1 million.

Ministry of About Agricultural Research and Exten­ No decision made whether Appraisal mission sched­ Agriculture and 15 .o sion - Agricultural research consultants will be re­ uled for January. Water (IDA) and extension service support quired. Development for Ministry of Agriculture. Total project cost to be determined.

Ministry of About (R) Agricultural Rehabilitation Consultants will be re­ Board presentation sched­ Agriculture and 25.0 Credtt - Financing of critical quired to study parast­ uled for January 15. (Co­ Water Develop­ (IDA) import.ed inputs in agricultural atal eff~ciehcy, maize, financing with Swiss Aid ment sector. Total project cost es­ marketing and fertilizer Agency, CIDA, USAID and timated at $74.0 million. distribution. ADB arranged.)

See page 1 for fo9tnotes. - 12 -

Member Country, Amount & and Implementing Probable Stag·e of Processing and Agency J) Lender?:_/ Consulting Services Action on Procurement~/

ZAMB.IA (Cont'd)

Ministry of About Technical Assistance II - Tech­ Consultants will be re­ Project preparation under Fit?,ance 1.0 nical assistance and training to quired but purpose still way. (IDA) upgrade economic management not fully defined. capacity of key Government and parastatal agencieS in policy analysis and implementation. Total project cost to be deter­ mined.

Ministry .of About (R) Family Health - Objectives are No decision made whether Project preparation under Health 8.0 to improve primary health care consultants will be re­ way. (IDA) services, expand family planning quired. activities, and introduce cost­ recovery in the health aector. Total project cost to be determined.

Ministry of About Coffee II - To expand the pro­ No decision made whether "Project preparation under Agriculture 10.0 duction of c0ffee for export. consultants will be re­ way. (IDA) Total project cost to be deter­ quired. mined.

Nitrogen' Chemi­ About (N) Fertilizer Factory - Rehabilita­ Management consultants Appraisal report under cal Company of 10.0 tion and strengthening of may be required.· preparation. (Co-financing Za~bia. (Bank) management. Total project cost with KfW (Germany) and estimated at $69.5 million. OECF being explored.)

,Ministry of About Small-scale Enterprise Assis­ No decision made whether Appraisal report under Industry and 10.0 tance to recently established consultants will be re­ preparation. Technology (Bank) Small Enterprises Development quired. Corporation (SEDCO). Total project cost to be determined.

Ministry of About Family Health - Provide rural No decision made whether Project preparation under ljealth 25.0 health services and preventive consultants will be re­ way. (Possibilities for (Bank) int"erventions; family planning quired. co-financing are being activities. Total project ·cost explored.) to be determined.

Mini'stry of About Petroleum Fuels II - Detailed Consultants have been re­ Project preparation under Enerf:y s.o. cost and engineering package for cruited. way. (Bank) petroleum fuels supply. Total project cost to be determined.

Mihistry of About Power II. - Equipment for the No decision made whether Project preparation under E,11ergy, Water 30.0 generation, transmission and consultants will be re­ way. (Co-financing Resources and (Bank) distribution of power. Total quired. likely.) Develorment/ project cost to be determined. Elec~ric Supply Commiss"ion

Ministry of Land About Irrigation - Medium- and Small­ No decision made whether Project under prepara­ Resettlement and 60.0 scale schemes in communal liinds. consultants will be re­ tion. (Co-financing Rural Develop­ (Bank) quired. being explored.) me* t (MLRRD)

F;ast African About (R) DFC III - Continuation of sup­ No consultants required. Project postponed to Development Bank 10.0 port through a third line of FY88. Further reporting (Bank/ credit. will be discontinued. IDA)

See page 1 for footnotes. - 13 ""'.

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender Y Consulting Services Action on Procurement!:!_/

II. WESTERN AFRICA

To be determined 5.o (R) Technical assistance for econom­ Project includes resident Board presentation on (IDA) ic planning, financial manage­ technical assistance pos­ December 11. (Co-finan­ ment and project preparation. ition and short-term con­ cing has been agteed with Total project cost about $8.5 sulting services. UNDP for $1. 7 million,, million, of which $6.6 million FAO $0.7,million, EDF in foreign exchange. $0.6 million, and· UNFPA $0.2 million.) '

An IDA Project Prepara­ tion Facility Advance of $450,000 approved to help finance pr~ject prepara­ tion.

To be determined 30.0 State Enterprises - Provide Consul tan ts· wi 11 . be re­ Appraisal report being (IDA) studies, line of credit, techni­ quired for sttidies. prepare~. cal assistance and training to certain key state enterprises. An IDA Project Prepara~ tion Facility advance of $500; 000 has been ap-· proved to help finance project preparation.

Office des 15.0 (R) Te lecoDDD.unica t ions - Rehabilita- Consultants have been .re- Project under prepara­ Pastes et des (IDA) tion and expansion of local tel- Cruited for studies. tion. Telecommunica- ephone networks, and technical tions assistance to the Office des An IDA Project Prepara­ Pastes et Telecommunications du tion Facility advance of Benin. $500,000 has been ap~ proved to help finance project preparation.

To be determined 10.0 (R) Transport Infrastructure - Port Consultants' report on Project under prepara~ (IDA) rehabilitation, road maintenance preliminary design com- tion. and sector institution building. pleted. An.IDA Project Prepara­ tion Facility advance of $500,000 has been ap­ proved to h~lp finance project preparation.

Societe 7.0 (R) Expansion of water supply facil­ Consultants selected. Pre-appraisal mission Beninoise (IDA) ities in Cotonou, and Porto Novo (Financed under ongoing scheduled for January. d'Electricite et rural water supply. Reinforce­ engineering credit). d'Eau (SBEE); ment of SBEE's managerial and Ministry of financial capabilities. Total Public Water project cost about "$25 million, of which $20 million in foreign exchange. ·

BURKINA

Regie Abidjan­ 10.0 Railways II (Transport Sector Consultants will be re­ In a meeting with Burkin­ Niger (RAN)/ (IDA) Credit) - IDA funds would help quired for procurement of abe .authorities, it ws.~: Ministere du finance ( i) repayment of spare parts and f~r proj­ stated that IDA partici­ Transport et des Burkina 1 s arrears to RAN as part ect·preparation. pation would be condi­ Communications of a financial rehabilitation tional on simultaneously plan, (ii) Burkina's share of reaching agreement with railways project cost, and (iii) Government on transport other investments in transp_ort sector credit which,would sector. address, i.e., issues of investment priorities within transport. Some progre~s w~s made in this direction in September, but final agreement has not· yet been reached.

Ministere de la 13 .o Technical Assistance - Estab­ Consultants will be re­ Further project prepara• Planification et (IDA) lishment of Development Invest­ quired to help prepare tion activities will not du Developpement ment Budget to strengthen in­ and execute project. be scheduled until agree­ vestment budgeting and moni­ ment can be r'eached with toring development expenditures. Ministers of Plan and Fi­ Total project cost estimated at ·nance concerning project $13 .0 million. organization.

See page 1 for footnotes. - 14 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender Y Consulting Services Action on Procurement 4/

BURKINA (Cont'd)

Ministere de 13.7 (R) Fertilizer Credit - Improve the Consultants will be re­ Negotiations completed. l 1 Agriculture et (IDA) supply and pricing of cereal quired for strengthening (Co-financing with de 1 'Elevage fertilizer; strengthen the Min­ the agricultural inpu·ts (CCCE/FAC) for $5.0 mil­ istry of Rural Development and Unit, and designing and lion, The Netherland~ for develop its ability tO better implementing a training $2.2 million, and Germany assist and supervise the region­ program for 'acc.ountants. (GTZ) for $2.0 million is al development organizations envisaged.) (ORDs). Studies to strengthen the ORDs, and to determine the IDA Project Preparation possibility of reducing fertili­ Facility advance of zer cost by introducing cheaper $500,000 approved for formulations, including greater field trials and feasi­ use of local rock phosphate, are bility study. also included. Total prqject cost estimated at $24.3 million, of which $17.4 million in for­ eign exchange.

Ministere de la 31.4 Health I - Developing a primary Consultants were employed Appraisal report being Sante (IDA) health care network, and addres­ for the preparation·and prepared. sing long-term issues such as appraisal of the project. implementation of an effective IDA Project Preparation and financially sustainable Facility (PPF) advance of rural health care delivery sys­ $490,000 approved to help tem, provision of drugs, cost develop health care stra­ recovery measures. It would ex­ tegies. A further PPF tend immunization programs, pro­ advance is under prepara­ vide training and rehabilitate tion to test.cost recov­ rural health care facilities. ery means. (Co-financing Total project cost estimated at possibilities are being $33.2 million, of which $17.0 pursued with Italy and million in foreign exchange. the Federal Republic of Germany.)

Ministere de 23.6 (R) Education III - Provide support Consultants were employed Appraisal report being 1 1 Educati0n (IDA) for (a) reduction of primary for the preparation and prepared. Nationale education unit costs; (b) appraisal of the project. development of central institu­ tions' capabilities for plan­ ning, managing and controlling education costs; and (c) estab­ lishing project preparation and implementation capabilities. Total project cost estimated at $29.8 million, of which $16.2 million in foreign exchange.

Ministere de 15 .o (R) Highways V - Paving of the Consultants will be re­ Project processing await­ l'Equipement (IDA) Ouagadougou-Kaya road and im­ quired. ing discussion on a UNDP­ proving the Kaya-Dori road to fin~nced study of the all weather standards. Total Tambao Project. (Co-fi­ cos ts are estimated at $59. 5 nancing with Germany million. (KfW) and possibly with Saudi Fund and BADEA.)

Ministere de 15 .o (R) Livestock II - Improving ani­ Consultants will be re­ Appraisal mission sched­ l 'Agriculture et (IDA) mal production.and Upgrading quired for the study on uled for November 1985. de l 'Elevage the institlltions involved in iritegration of livestock livestOck development; est~b­ and agriculture. lishment of a livestock input delivery service and a line of credit foi- livestock activities.

To be determined 25 .o (R) Wood Processing Industries. No consultants required. Project concept being re­ (Bank) viewed.

Ministere de 25.0 (R) PrOfessional Training and Insti­ Consultants will be.re­ Appraisal report being l'Educ.ition (Bank) tutional Development - Expansion quired for education prepared. Nationale et of primary teacher training· col­ planning, vocational Minis tei"e du leges; rehabilitation of techni­ training and pre-invest­ Travail cal seCondai"y schciols. Improve­ merit studies. · ment of vocational training ca­ pability. Strengthening of key institutions responsible for ed­ ucation and manpower planning. Total project cost about $70 million, of which $35 million in foreign exchange.

See page 1 for footnotes. - 15 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender]_/ Consulting Services Action on Procurement !ii

~(Cont'd)

FONADER 25 .o Second Special Rural Development Consultants will be re­ Negotiations substantial­ (Bank) Fund (FSAR II) - To extend Gov­ quired for supervisioO of ly completed. ernment's efforts to strengthen rural water component and institutions and implement pri­ project appraisal works ority small-scale projects. The with MINAGRI. P.roposals include: a village water supply component; a line of credit for small rural activ­ ities, studies, infrastructure, and specific production support. Total project cost about $50.0 million, of which $25.0 million in foreign exchange.

Ministere de 22.5 Agricultural Research - Improv­ Technical staff will be Date.of negotiations to 1 'Enseignement (Bank) ing scope and application of requi~ed from ITTA for be determined. Superieur, et de national agricultural research research positions and la Recherche through institution building in­ ISNAR for research pro­ Scientifique volving The Ministry of Higher gramming and management. Education and Scientific Re­ search, and crop and livestock. research institutes. Particular emph8sis on training, organi­ zation, evaluation and building pre-extension linkag~s to re­ gional research and develop- 1:11ent. Total project cost about. $45;9 million, of which $2~.4 million in foreign exchange.

HEVECAM 8.3 (R) HEVECAM Rubber III - Phase III Co_ns'ultants requ~red. for Negotiations substan~ial­ (Bank) of the plant'ation established 6 man-months to carry ly completed. (Co-finan­ under the Niete Rubber Estate out, ,jointly with HEVE­ cing agreed with CDC, and HEVECAM II Projects. In­ CAM' s staff, a study on CCCE and BEI for $11.8 vestment in maintenance of rub­ rubber development in the million each.) ber already planted but not yet Southeast. in production. Completion of the planting program. Expans.ion of processing facilities to ca­ ter for additional areas reach­ ing the production stage. Total project cost estimated at about $83.7 million, of which $29.3 million in.foreign exchange.

Ministere de 100.0 Rciads VI -Paving of two.road Consultants will.be re­ Appraisal report being l'Equipement (Bank) sections (150 km) and program of quired to supervise con­ prepared. (Co-financing pavement strengthening; techni­ ~truction, provide tech­ being sought.) cal assistance for planning and nical assistance, and program implementation, and carry out feasibility training. Total project cost studies and detailed en­ estimated at $240.0 million of gineering for the Prepar­ which $164.0 million in foreign ation of a follow-up exchange. project.

Ministere de 30.0 (R) Center South Region Rural Dev­ Decision on use of con­ Appraisal mission tenta­ ! 'Agriculture & (Bank) elopment ProjeCt - Institution sultants, if any, will be tively scheduled for Jan­ Societe de development project with focus made during appraisal of uar)T. (Possible co-fi­ Developpement du on improving productivity from project.· nancing with IFAD.) Cacao (SODECAO) existing areas of cocoa planta­ tion and emphasizing the inte­ gration and expansion of food­ crop production for the capital, Yaounde; through: organizing and strengthening of SODECAO and co­ operatives; better facilities for treatment, processing and marketing; essential feeder roads, and village water-points. Total project cost about $50.0 million.

CAPE VERDE

Banco de cabo 4.0 (R) Line of credit for assistance to Consultants required for Negotiations completed. Verde (IDA) small and medium-Sized enter­ project implementation prises, and technical assiS­ and teChnica1 assistance. tance.

See page 1 for footnotes. - 16 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender 1._/ Consulting Services Action on Procurement!!_/

CENTRAL AFRICAN REPUBLIC·

Haut Connnissari­ 8.0 Second Technical Assistance - Most of the experts have President's Report being at charge du (IDA) Resident experts, including been hired under the reviewed. Plan et de la project economist, macroecono­ first Technical Assis­ Cooperation mist, and diamond, forestry, tance Project and would Economique et legal, external debt, budgetary, be continued under the Financiere public enterprises, and public second. Only the macro­ administration experts. Ve­ economist and the budget­ hicles and operating expendi­ ary expert would be new. tures to support work of ex­ Terms of reference may be perts. Total project cost esti­ obtained from the imple­ mated at $8.4 million, of which menting agency. $8 million in foreign exchange.

CONGO, PEOPLE'S REPUBLIC OF THE

Societe 30.0 (R) Water Supply/Technical Assis­ Consultants have been re­ Documentation being pre­ Nationale de (Bank) tance and Rehabilitation Project cruited and financed by pared. Distribution - Rehabilitation of waterworks the Project Preparation d'Eau (SNDE) of Brazzaville, Pointe Noire, Facility. Two Bank Project Prepara­ Loubomo, Nkayi and Kinkala; and tion Facility (PPF) ad­ technical assistance to. SNDE to vances totalling upgrade organization, staff $1;000,000 approved to skills and management systems. finance project design Total project cost estimated at and preparatory studies. $37.0 million, of which $26.7 million in foreign exchange.

EQUATORIAL GUINEA

Ministerio de 11.0 Rehabilitation of cocoa through Consultants have been re­ Negotiations completed. Agricultura, (IDA) (i) establishment of an agricul­ cruited for 20 man-years. Ganaderia y tural credit program, and (ii) IDA Project Prepara~ion Desarrollo Rural technical assistance to the Fac"ility advances of (MOA) Banco de Credito y Desarrollo, $200,000 and $750,000 to the Camara de Comercio Agricola finance projeCt prepara­ y Forestal and the MOA. Total tion and start-up activi­ project cost estimated at $16.0 ties. (Co-financing million, of which $12.6 million agreed with OPEC Fund for in foreign exchange. $1.0 million; EEC $1.0 million; and BADEA $2.8 million.)

THE GAMBIA

The Gainbia 5.0 DFC II - Line of Credit for re­ Consultants for project Appraisal mission to be Co1IDI1erc ia 1 ·and (IDA) structuring some existing enter­ preparation are expected scheduled at a later Development Bank prises, and new investments in robe financed by the date. (GCDB) agro-business and manufacturing; Project Preparation Fa­ technical assistance for GCDB cility. for improvement in both commer­ cial and development banking op­ erations and in accounting sys­ tems.

To be determined 5.0 Highways II Maintenance Project Consultants will be re­ Appraisal mission sched­ (IDA) - Repaving and repairing of ex­ quired. uled for February. (Co­ isting roads. Total project financing will be re­ cost about $20.0 million. quired.)

The Gambia 5.0 Water Supply/Electricity Project Consultants will be re­ Appraisal mission sched­ Utilities (IDA) - Rehabilitation and expansion quired. uled for February/March Corporation of water supply systems in 1985. (Co-financing will (GUC) greater Banjul and provincial be required; KfW Germany, urban areas. Electricity system ODA UK, Islamic Develop­ rehabilitation, technical as­ ment Bank and EEC have sistance and training. expressed interest.)

Ministry of 20.0 (R) Accra District Rehabilitation: Detailed design and en­ Appraisal report being Works & Housing, (IDA) Support to the Accra City Coun­ gineering ·under way by prepared. (Co-financing or a new agency cil for major road rehabilita­ consultants. will be required.) tion and maintenance, resource mobilization and a small upgrad­ IDA Project Preparation ing component. Total cost esti­ Facility advance of mated at $26.1 million, of which $150,000 approved to about $19.3 million in foreign finance design and con­ exchange. sultant services required for pre-implementation activities.

See page 1 for footnotes. - 17 -

Member Country, Amount & and Implementing Probable Stage of Processing arid Agency 1./ ~1=_/ Consul ting Services Action on Procurement !!,_/

GHANA (Cont'd)

T~ be determined 15 .o Cocoa III - Replanting and reha­ To be determined. Immediate needs for cocoa (IDA) bilitation of existing cocoa sec tor taken care of by areas; technical assistance for Export Rehabilitation training and institution build­ Project. Another cocoa ing. project may be formulated after completion of the agricultural sector study. (Co-financing will be required.)

Ghana Highway 40.0 (R) Roads Rehabilitation and Mainte­ To be determined. Appraisal report being Authority (IDA) nance - Rehabilitation of prepared. bridges and main roads, mainten­ ance of feeder roads j and tech­ Feasibility and engineer­ nical assistance. Total cost ing studies completed estimated at $144.0 million, of under IDA Project Prepar­ which $103 .o million in foreign ation Facility advance of exchange. $1.0 million. (Co-finan­ cing will be required.)

To be determined To be Public Enterprises Technical As­ Consultants will be re­ Project scope to be dis­ deter­ sistance - To assist the Govern­ quired to analyze the re­ cussed with Government. mined ment of Ghana in improving its sults of the question­ (Co-financing will be re­ (IDA) strategy for the state enter­ naires distributed to 130 quired.) prises and increasing their ef­ public sector enter­ ficiency. Total cost to be prises. IDA Project Preparation determined. Facility advance of $400,000 approved to finance consultant ser­ vices required to com­ plete preparation work. UNDP is also contributing $264,000 to finance their preparatory work.

Electricity 27 .5 (R) Power VII - Rehabilitation of Consultants for utility Appraisal report being Corporation of (IDA) ECG' s distribution network, sys­ operations will be re­ prepared. Ghana (ECG) tem maintenance, technical as­ quired. sistance and training. Total IDA Project Preparation project cost about $36.0 mil­ Facility advance of lion, of which $32.0 million in $680,000 approved to as­ foreign exchange. sist in the preparation of the project.

GHAIP 30.0 (R) Petroleum Refinery - Oil refin­ Consultants have been re­ Appraisal mission tenta­ Oil Refinery (IDA) ery rehabilitation and installa­ cruited. tively scheduled for tion of secondary conversion fa­ February. cilities.

To be determined 60.0 (R) Second Reconstruction Import No consultants required. President I s Report being (IDA) Credit - To assist the Govern­ prepared. (Co-financing ment to import urgently required will be required.) spare parts and other essential items to rehabilitate agri­ culture, transport and manufacturing sec tors.

Ghana Ports 24.5 (R) Ports Rehabilitation and Mainte­ To be determined. Appraisal mission sched­ Authority (IDA) nance - Rehabilitation of Tema uled for May 1985. and Takoradi ports and mainte­ nance. IDA Project Preparation Facility advance of $510,000 approved for improvement of ports.

Ministries of 12.0 Population and Human Resources To be determined. Appraisal mission sched­ Rea 1th and Edu­ (IDA) Project - Rehabilitation of uled for March 1985. cat ion health and education services.

Ministry of 3.0 Mineral Development. Consul ting services for Project scope to be de­ Mines and (IDA) project preparation to be termined. Geology determined. Engineering services for investment IDA Project Preparation studies already selected. Facility advance of $500,000 to examine op­ tions for development of Mifergui-Nimba Iron Ore project, and to review exs ting practices for allocation of mining con­ cessions and for market­ ing of diamonds.

See page 1 for footnotes. - 18 -

Member Country, Amount & an~ Implementi~g Probable Stage of Processing and Agency }:j' ~:!) Consulting Services Action on Procurement 4/

GUINEA (Cont'd)

Ministry of 5.4 (R) Engineering Credit for prepara­ Consultants have been re­ President's report being Energy MINE/SNE (IDA) tion of Power Master Plan, fea­ crUited for the M~ster prepared. (Co-financing sibility and engineering for ·a Plan and Institutional expected to be provided hydro-electric plant to be iden­ Study. The feasibility by CCCE, CIDA and the tified by the Power Master Plan, study is expected to be Federal Republic of institution study, and spare co-financed bila_terally. Germany - KfW. ) parts. Total project cost esti­ mated at $24.2 million, of which IDA Project Preparation 94% in foreign exchange. Facility advance of $680,000 to finance Mas­ ter Generation and Trans­ mission Plan and Organi­ zational Study for. po~er sec~or.

Ministry of 19 .o (R) Rice Development II - Second Previous~y engaged con­ Appraisal report being Agricu 1 ture (IDA) phase of Rice Development Proj­ sul tan ts expected to con­ prepared. (Co-financing ect to consolidate and expand tinue. under discussion.) first phase rice project in Forestry Region of Guinea; im­ prove planning and project preparation capacity of ONADER, exectiting agency; start pilot extension and' research activi­ ties in ·two new ecological zones of country. Emphasis will be on rice production but simple tech­ nical packages for other crops s~ch as coffee, manioc, maize, etc., Will also be provide_d.

Ministry of 8.9 (R) Technical assistance for macro­ Consultants 1 proposals President's Report being Planning and (IDA) economic management and statis­ have been requested. prepared. ( Co-financing Statistics tics, and related training. under discussion with Planning.and investment program­ France and UNDP.) ming; project identification, preparation and evaluation; IDA Project Preparation revision of accounting plans; Facility advances of external debt m~nagement; train­ $400,000 to finance proj­ ing. Total project cost about· ect preparat.ion •. $10.0 million, of which $9.6 million in foreign exchange.

Ministry of 12 .o (R) Second Livestock Development Consul tan ts for project Project under prepara­ Livestock and (IDA) Project. Program to improve preparation being fi­ tion. Appraisal mission Fish~ries animal health, veterinary se~­ nanced by Government. scheduled for March. vices and support to herders. Proposals from Government are expected.

Ministry of 12 .o (R) Second Water Supply Project. Consultants selected. Precise project scope to Energy (IDA) Medium-term investment program {Financed under ongoing be determined. (Co-fi­ and support to operating entity. project.) nancing will be re­ quired.)

To be determined 30.0 (R) Rehabilitation Import Credit - No consultants required. Appraisal mission sched­ (IDA) To finance imports necessary to uled for January. Dis­ begin structural adjustment and cussions under way with rehabilitation of the economy. other donors for parallel operations.

GUINEA-BISSAU

To be determined 3.0 (R) Agricultural Sector Credit - Two consu~tants for proj­ Identification mission .(IDA) Program of selected sectoral ect preparation being re­ report being prepared. polic}' changes aimed at struc­ cruited. tural economic adjustment.

To be determined 10.0 (R) Emergency Reconstruction Import No consultants requireq. Board presentation on (IDA) Credit - Financing of imports of December 11. (Co-finan­ goods necessary for productive cing by Switzerland for processes. about $2.0 million,)

IVORY COAST

Regie Abidjan­ 30.0 (R) Railways II - Track renewal in Consultants will be re­ Appraisal mission to be Niger (Bank) Ivory Coast and Burkina; loco­ quired for spare parts scheduled once Ivory (RAN) motive maintenance facilities; program, and for project Coast and Burkina Govern­ railway equipment, consulting preparation. Borrower ments finalize RAN man- · services and training. will present shortlist to agement changes. be financed from Bank Project Preparation Fa­ cility.

See pag~ 1 for footnotes. - 19 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender 1-_/ Consulting Services Action on Procurement!±../

IVORY COAST (Cont'd)

Ministry of 40.0 Rural Development III (CIDT) - Consultants may be re­ Appraisal mission to be Agriculture (Bank) North and North-West Savannah quired for studies. scheduled. and/or CIDT Rural Development project empha­ sizing cotton and foodcrops, in­ creased f8rm participation in marketing, input supply and credit. Complementary activi­ ties include· farm modernization, spread of animal traction, and project monit9ring and evalua­ tion.

Government and 28.6 (R) Forestry II - Land clearing, Previously engaged con­ Negotiations substantial­ SODEFOR (Bank) planting and maintenance of sultants expected to con­ ly completed. 20,000 ha; maintenance of 20,000 tinue with· one additional ha pla~ted under the first for­ recruitment for which estry project; research and proposals are' being in­ pilot developments. Total proj-· vited. ect cost about $52.4 million, of which $29.4 million in foreign exchang~.

Ministry of 10.0 (R) Health Project - Educational fa­ Consultants will be re­ Appraisal mission in the Health (Bank) cilities for training of para­ quired for project prep­ field. medical personnel; upgrading of aration and sector man­ rural health centers;· technical age~ent. Bank Project Preparation assistance and management stud­ Facility advance of ies for the sector. $490,000 approved to fi­ nance preparation of architectural drawings and for other activities.

To be determined 50.0 Industrial Restructuring and De­ No consultants requi~ed Appraisal report being (Bank) velopment Project - To include a at this time. prepared. technical and financial assis­ tance package for the res trµc• turing of existing enterprises and the financing of new indus­ trial pr~jects.

Ministry of 40.0 (R) Oil Palm V Project - Replanting No decision made whether Appraisal report being Agriculture (Bank) of industrial and smallholder consultants will be re­ prepared. and/ or Palm­ oil palm plantations. Introduc­ quired. industrie tion and development of planta­ Bank Project Preparation tions in new areas; research in Facility advance of oil palm and coconut sectors; $365,000 approved to help pilot studi~s. finance project prepara­ tion.

SODE SUCRE/ Gov­ 30.0 Sugar Rehabilitation - Renewal Consultants may be re­ Appraisal report being ernment of Ivory (Bank). of agriculture and i-;-rigation quired for management re­ prepared. Coast equipment; improvement in cane form.· Shortlist being_ handling, energy genera~ion and prepared by SODESUCRE. sugar processing; extension of Individual consultants in cane growing areas; and manage­ advisory positions are ment, marketing and pricing also being considered. reforms.

To be determined 37 .o (R) Telecommunications - Rehabilita­ Additional consulting Appraisal report being (Bank) tion of National Telecommunica­ work required to be prepared. tions Office (ONT), following financed by UNDP. its reorganization, including improvement of it~ physical fa­ cilities and financing part of its investment program.

LIBERIA

Ministry of 2.5 Petroleum II - Continuation of To be determined. Appraisal report being Lands, Mines and (IDA) activities under fir.St project prepared. Energy for oil exploration promotion, and institutional support to · Ministry of Lands, Mines and Energy.

To be deteruiined 25 .o (R) Structu~al Adjust~ent Credit to To be determined. President's Report being (IDA) bring about an improvement of prepared. (Co-financing the Government I s fiscal perform­ will be required.) ance, in the efficiency of pub­ lic enterprises, and in export performance.

See page l for footnotes. - 20 -

Membei Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender Y Consulting Services Action on Procurement!±/

LIBERIA (Cont'd)

Liberia Water 5.0 (R) Water Supply II - Rehabilitation To be determined. Negotiations scheduled and Sewer (IDA) and improvement of operations for late December/ Corporation through technical assistance. January. (Co-financing Total project cost estimated at being sought.) $12.2 million, of which $10.2 million in foreign exchange.

To be determined To be (R) Technical Assistance in support Invitations for proposals President's Report being deter­ of structural adjustment pro­ on technical assistance prepared. mined gram. to new Bureau of State (IDA) Enterprises and to review management of a group of state enterprises were sent out to shortlist of consultants in November 1984.

National Port 2.s (R) Ports Rehabilitation 11 - Tech­ Consultant services will Preparation mission in Authority (IDA) nical assistance to the National be required. early December. (Co­ Port Authority to improve port financing will be re­ management and operations; spare quired.) parts and limited amount of equipment; rehabilitation of existing quay structure, and deferr.ed maintenance.

MALI

Ministere de 18.0 (R) Mopti Area Development - Im­ Consultants for project Negotiations scheduled 1 'Agricu 1 ture j (IDA) provement in rice and livestock preparation are financed for mid-January. (Co-fi­ and Minis tere du production through ( i) hyd.raulic by the IDA Project Prep­ nanc ing with CCCE for Developpement works; (ii) agricultural credit; aration Facility. $10.3 million, DIGIS for Rural (iii) stock water development; $0.5 million, and AfDB (iv) animal health; (v) range for $6.0 million envis­ and pasture management; (vi) aged.) strengthening of rural develop­ ment agencies. Total project IDA Project Preparation cost estimated at $41.8 million. Facility advance of $631,000 approved to fi­ nance detail.ed engineer­ ing studies, bidding doc­ uments, u~gent repairs of irrigation works, agri­ cultural studies, con­ sultant services and equipment pur~hases es­ sential to carry out work already under way. New advance of $217,000 ap­ proved to complete prep­ aration work.

Ministere des 45.0 (R) Highways V - (a) Reconstruction Consultants were employed Appraisal report being Transports et (IDA) of the Bamako-Bougouni Road; (b) to assist Government prepared. (Co-financing des Travaux highway maintenance; and (c) in­ under the Project Prepar­ with Swiss Government for Pub lies stitutional strengthening. Total ation Facility; consult­ $5.0 million and AfDF for cost estimated at $74.7 million, ing services for finan­ $8.0 million is being of which $56.3 million in for­ cial management, train­ considered; add it iona 1 eign exchange.) ing, marketing, monitor­ co-financing being ing and evaluation, stock sought.) water systems studies as well as detailed physical resource inventory (hy­ drology, soils, land use, aerial survey) will be used.

Ministere de 15 .o (R) Office du Niger II - Streng­ No decision made whether Project processing de­ I 'Agriculture (IDA) thening and rehabilitation of consultants will be re­ ferred. (Co-financing Office du Niger. Total project quired. with KfW Germany for $5.9 cost estimated at $40.8 million. million, CCCE for $2. 5 million, and the l)utch Government for $7.4 million is envisaged.)

Ministere du 6.0 (R) Livestock Services - To streng­ No decision made whether Project concept being re­ Developpement (IDA) then the Livestock Services De­ consul tan ts will be re­ viewed. (Co-financing Rural partment, .finance a revolving quired. being sought.)· fund and infrastructure for vet­ erinary pharmacy, create a live­ s tock dev_e lopment fund and ex­ pand and strengthen pastoral services.

See page 1 for footnotes. - 21 -

Member Country, Amount & and Implementing Probable Stage of Proce~sing :and ~Jj Lender Jj Consulting Services Action on Procurement!:±_/

MALI (Cont'd)

Ministere du 28.0 (R) Public Entreprises - Rationali~ Consultants will be re­ Appraisal mission in the Plan (IDA) zation of the size of the public quired. field. (Co-financing enterprise sector to reduce bur­ be:i.ng sought.) den on Mali's economy; policy and institutional reforms to im­ prove the performance of the public enterprise sector; and rehabilitation of selected pub­ lic enterprise.

Ministere. du 5.0 {R) Forestry II - Protection and de­ Consultants will be re­ Appraisal mission sched­ Developpement (IDA) velopment of forest reserves in quired. uled for January. ·cco­ Rural the Bamako area. Total cost es­ financing with CCCE, FAC timated at $12.2 million. and CIDA being explored.)

Ministere de 10.0 (R) Urban II - To include: urban Consultants will be re­ Appraisal mission tenta­ 1 1 Interieur (IDA) infrastructure and traffic man­ quired for project imple­ tively scheduled for May agement; resource mobilization mentation and technical 1985. through simplified cadastre and assistance. reform of land tenure law and strengthening of municipal finances; institutional streng­ thening, in particular law de­ velopment, technical assistance and training.

Energie du Mali 18.0 (R) Power II - Reinforcement and ex­ Consultants have been re­ Appraisal mission is (EDM) (IDA) tension of the services of EDM cruited to prepare the scheduled for September by constructing a transmission studies under ongoing 1985. (Co-financing line between Bamako and Segou; Power Project. Consul­ being sought with CIDA, implement the first step in the tants will be required to KfW Germany, CCCE, and optimum development program provide technical assis­ OPEC Fund.) under preparation in the first tance. power project, reinforcement and extension of distribution sys­ tem, rehabilitation of Felou Hydro plant, technical assis­ tance training and spare parts. Total project cost about $69.0 mil lion in foreign exchange.

MAURITANIA

SONADER 7 .5 (R) Small-Scale Irrigation Develop­ Consultants required for Negotiations tentatively (IDA) ment of about 1,600 ha of small irrigation engineering. scheduled for January/ irrigated perimeters. Total February. (AfDB, the

cost estimated at $10.2 million, I and Italy of which $5.6 million in foreign have expressed interest exchange. in co-financing for amounts to be deter­ mined.)

Ministere du 5.0 Livestock Development II - Es­ Consultants will be re­ Appraisal report being Developpement (IDA) tablishment of pastoral associa­ quired for financial man­ prepared. (Co-financing Rural tions, strengthening of live­ agement (long-term) and being sought.) stock services, vaccination, for pastoral organiza­ distribution of drugs, applied tion, preparation of le­ IDA Project Preparation research. Total cost about gislation, training and Facility advances of $14.5 million, of which $11.6 civil works tenders $415,000 approved for million in foreign exchange. (short-term). preparation of project.

Banque 5.0 Line of Credit for small- and Consultants will be re­ Appraisal report being Mauritanienne (IDA) medium-scale enterprise; techni­ quired for DFC carpet­ prepared. pour le Devel­ cal assistance to BMDC, and fin­ weaving agency and train­ oppement et le ancial and technical assistance ing of accountants. Commerce (BMDC) to OTM for development of car­ and Office de pet-weaving artisans; component Tapis Mauri­ for training accountants. tanien (OTM)

See page 1 for footnotes. - 22 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender l/ Consulting Services Action on Procurement.!!:_/

MAURITANIA (Cont'd)

Ministry of 12.0 (R) Public Enterprises Rehabilita­ Consultants required for Negotiations tentatively Planning (IDA) tion and Technical Assistance - start-up of project prep­ scheduled for January/ Strengthening of the capability aration are financed by February. (Co-financing of the Ministry of Planning to the Project Preparation with FAC for $0.9 mil­ carry out studies for the re­ Facility. lion, CCCE for $3.0 mil­ structuring and rehabilitation lion and FED for $1. 3 of the paraPublic sector. Emer­ million; other co-finan­ gency prpgrams ( technical assis­ ciers being sought. EIB tance and spare parts) to assist has expressed interest to two priority enterprises (Port co-finance for an amount Authority and Electrical and to be determined.). Water Supply Company); and tech­ nical assistance and studies for IDA Project Preparation Post & TelecoDDI1unication Com­ Facility advance of $1.0 pany. Total cost about $20.3 million approved to fi­ million, of which $17.0 million nance technical 'assis­ in foreign exchange. tance to enterprises and Ministry of Planning, equipment for project unit, studies and train­ ing, a~d spare parts and equipment for SONELEC and EMN.

Ministere du 8.9 (R) I~rigatfon Rehabilitation Proj­ Consultants/advisers will Appraisal report being Developpement (IDA) ect - To rehabilitate existing be required to work £Or prepared. ( Co-financing Rural irrigation works; procure equip­ Force Accounts, Applied being sought with CCCE ment for maintenance and opera­ Research, Financial Plan­ for $8.9 million and KfW tion of irrigation works; ~upply ning, Monitoring and Germany for $4.4 mil­ agricultural inputs; train proj­ Evaluation, Drainage, and lion.) ect staff, cooperative managers Functional Literacy. and farmers. Total cost about Financing to help Pr~par­ $25.2 million, of which $13.4 ation was provided fo~ by million in foreign exchange. an advance of $1.0 mil­ lion from the IDA Project Preparation facility.

Min is tere du 10.0 Small Rural Operations - Small­ No decision made whether Preparation under way. Developpement (IDA) scale irrigation and bottomland consultants will be re­ Rural development schemes; cooperative. quired. Financing to help prepar­ and gt'oup support activities; ation was provided for by medium term loans. to farmers. an advance of $430,000 from the IDA Project Preparation Facility.

Ministei"e des 7 .5 Power Engineering and Technical Consultants for Power Approved by the Executive Mines et de (IDA) Assistance - Study of develop­ Planning and sector or­ Directors on July 19. 1 'Industrie ment of power system, technical ganization. have been re­ assistance and training. Total cruited. Consultants for IDA Project Preparati~n project cost about $7.9 million, management 8nd manpower Facility advance of $1 of which $7 .5 million in foreign planning and tariffs will million approved to ini­ exchange. be required. tiate a power planning study and a study o~ power sector institu­ tions. Planning study has been awarded.

Ministere des 14.3 (R) Petroleum - Evaluation.of an oil Consultants to evaluate Appraisal mission tenta­ Mines et de (IDA) discovery at Sukhor; development oil discovery (under tively scheduled for 1 'Industrie of a strategy for promoting and way), and to deve.lop oil January. accelerating petroleum exploita­ exploration strategy. tion; and strengthening. of the Two IDA Project Prepar8- Directorate of Energy, through tion Facility advances. the provision of experts, train­ totalling $500,000 have ing, equipment and other facili­ been approved to assist ties~ in the preparation of the project.

Ministere des 18.0 (R) Highway V - Road maintenance, Travaux t'ublics (IDA) rural road improvements, work­ To be determined. Project under prepara­ shop rehabilitation, training. tion.

Ministere de 15 .o (R) Education II - Expansion and To be determined. Preparation mission in I 'Education (IDA) strengthening of primary educa­ the field. tion; teacher training.

See page l for foo tno tea. - 23 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender J_/ Consulting Services Action on Procurement!!./

NIGER (Cont'd)

Ministere du 45.0 (R) Structural Adjustment Credit in Consultants to aSsist in Pre-appraisal mission Plan (IDA) support of policy reforms in the preparation of parastatal tentatively scheduled for areas of public enterprise reha­ re form program. March. bilitatiOn, public investment, agriculture and energy.

Federal M_inistry 122.0 (R) Kaduna State Agricultural Devel­ Consultants will be re­ Loan signing on December Of Agriculture, (Bank) opment - Would include a state­ quired for management and 7. Water Resources wide package of basic agricul­ technical support to and Rural Devel­ tural services to farmers, and a projeCt unit. opment feeder road progi:am. Tota 1 cost e.stimated at $i94 million, of which $81.0 million in foreign exchange.

Federal Ministry 53 .o (R) Second Urban Development - Imo Construction supervision Awaiting final approval of Works and (Bank) State. Total cost estimated at consultants .eXpected to from the Government. Housing $85.0 million, of which $36.8 continue presen-t assign­ million in foreign exchange. ment. Short-term consul­ ting services and train­ ing assistance will be sought for municipal as­ set maintena.nce, finan­ cial management and tax collection.

Federal Ministry 75.0 Southern Borno Agricultural Dev­ Short-term consultant Awaiting final approval of Agriculture, (Bank) elopment - Farm support services services would be re­ from the Government. Water Resources and general rural infrastructure· quired in areas of inter­ and Rural Devel­ aimed at crop and livestock dev­ mediate technolcigy, Procurement: Retroactive opment elopment. Total cost estimated small-scale irrigation, financ~ng up to .$1 mil­ at $117.4 million, of which land uSe planning, train­ lion recommended to cover $64. I mi 11 ion in foreign ex­ ing, ·and maintenance of start-up activities. change. feeder roads and rural. water suppli.es. Other c·onsul tant services to be determined.

Borno State 72.0 (R) Borno State Water Supply - Im­ Consultants have been re­ Awaiting final ·approval Water Board (Bank) provement and expansion of water cruited, and will be from the Government. supply facilities in Maiduguri, partly financed by the technical assistance and train­ Project Preparation Fa­ Bank Project Preparation ing. Total cost estimated at cility. Facility advance of $115.0 million, of which $60.0 $500,000 recommended to million in foreign exchange. expand arid imp rove the water supply system in Maiduguri and to rein­ fo!ce the ma~agerial capability of the Barno State Water Board.

Federal Ministry 34.0 (R) Sokoto Health - Construction and Consultants will be hired Awaiting final approval of Health and (Bank) upgrading of about 180 rural for trainillg, supervision from the Government. Sokoto State health clinics and dispensaries and program evaluation. in Sokc;,to State: exJ)ansion of Procurement: Retroactive immunization program (EPI); financing up to $0.2 mil­ staff development, technical as-. lion recommended to cover sistance for project management start-up activities. in Sokoto.State.and to the Fed­ eral Ministry of Health. Total cost estimated at $61.6 million of which $20.7 million in for­ eign ~xchange.

Federal 13.0 (R} Technical Assistance for moni­ Consultants for project Board presentation sched­ Ministries of (Bank) toring external debt, exchange preparation have been re­ uled for December 18. Finance and control and plan implementation, cruited and are financed National and for strengthening the Feder­ by the Bank Project Prep­ Ba~k PrOject Preparation Planning al Office of Statistics. Total aration Facility. Facility advance of cost estimated at $17.0 million, $70,000 financed .consult­ of which $9.0 million in foreign ant services to assist exchange. the Gbvernineht with the review of the Public In­ vestment Program.

Procurement: Retroactive financing of up to $1.0 million is proposed to cover start-up activities.

See page 1 for footnotes. - 24 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender 1/ Consulting Services Action on Procurement !±._/

NIGERIA (Cont'd)

Lagos State 72.0 (R) Lagos Solid Waste Management and Consultants would be re­ Awaiting final approval Government Solid (Bank) Drain Rehabilitation Project - quired to strengthen man­ from the Government. Waste Disposal To upgrade and expand refuse agement and financial op­ Board collection/disposal and improve erations, and for prepar­ (Co-financing of $11.6 the city-wide storm water drain­ ation of final engineer­ million with suppliers age system for Metropolitan ing designs. will be sought.) Lagos. Technical,assistance to strengthen Local Government Procurement: Retroactive Council financial operations. financing totalling about Total cost estimated at $164.3 $4.0 million is proposed million, of which $83 ,6 million for storm cleaning1 and in foreign exchange. construction during the dry season. Also con­ struction of some depots, maintenance facilities and a transfer station.

Federal Ministry so.o Forestry II - The project will No decision made \ffiether Appraisal timing being of Agriculture, (Bank) (1) support an afforestation consultants will be re­ discussed with Govern­ Water Resources program; (2) establish pulpwood quited. ment. and Rural Devel­ and timber plantations; and pro­ opment vide support to forest manage­ ment in three middle belt states.

Nigerian 25 .o Gas Technical Assistance Project Consultants may be re­ Approved by the Executive National (Bank) - Design engineering for a pro­ quired to carry out sup­ Directors on March 20. Petroleum posed Escravos-Lagos gas pipe­ ply and demand study and Corporation line (ELP) project. Preparation the LPG market study. (NNPC) of future natural gas and liqui­ fied petroleum gas projects. Technical assistance to NNPC. Total cost estimated at $33.0 million, of which $25.0 million in foreign exchange.

Nigerian 200.0 Escravos Beach-Lagos Gas Pipe­ Previously engaged con­ Date of negotiations to National (Bank) line (ELP) Project - Transmis­ sultants expected to con­ be determined. (Co-fi­ Petroleum sion pipeline and gas gathering tinue to provide techni­ nancing with.EIB for $50 Corporation system from the Western Niger cal assistance and train­ million, Export credits (NNPC) Delta area in Lagos. Total ing to the gas unit. for $312 million, and project cost estimated at $943 Shell for $35 million.) million, of which $744 million in foreign exchange. Procurement: Turnkey bids have been received and evaluated. Advance contracting up to the full amount of the loan and retroactive financing amounting to 10% of the loan are proposed to enable the award of the contracts and to cover other mobilization fees "fflich are likely to occur before loan signing.

Federal Ministry 150.0 Agriculture Development Fund - No decision made \ffiether Appraisal report being of Agriculture, (Bank) Phased financing of agriculture consu 1 tan ts wi 11 be prepared. Water Resources development projects, in eight needed. and Rural Devel­ southern states. opment

Federal Ministry so.a Second Livestock Development - Consultants will be re­ Appraisal mission tenta­ of Agriculture, (Bank) National smallholder livestock quired for management and tively scheduled for Water Resources production project supported by technical support on January. and Rural Devel­ credit, extension research and project management unit. opment training services. Total cost estimated at $170 million.

To be determined 300.0 Structural Adjustment Loan - To To be determined. Loan negotiations pending (Bank) support a program of macro-eco­ Government's agreement nomic and selected sectoral pol­ with the IMF on an Ex­ icy changes aimed at structural tended Fund Facility. economic adjustment.

See page 1 for footnotes. - 25 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y Lender Y Consul ting Services Action on Procurement i/

NIGERIA (Cont'd)

Federal Ministry 100.0 Technical Teacher Training - To The Government is finali­ Project under prepara­ of Education, (Bank) provide assistance in establish­ zing selection of local tion. Science and ing five federal/technical voca­ consulting architects and Technology tional teacher training colleges engineers. in various parts of the country and to strengthen National Board for Technical Education. Total project cost estimated at $228 million, of which $138 million in foreign exchange.

National 130.0 (R) Power VII - Distribution system To be determined. Further processing ·of Electric Power (Bank) expansion to match ongoing gen­ Power VII is conditional Authority (NEPA) eration projects; spare part upon specific progress on purchases; and technical assis­ system rehabilitation tance to improve all aspects of under Power VI. NEPA's operations and systems facilities. Total project cost estimated at $590 million, of which $450 million in foreign exchange.

SAO TOME AND PRINCIPE

To be determined 5 .o Rehabilitation and Modernization No consultants required. Appraisal report being (IDA) Project - Line of credit for prepared. small high priority investments needed to revitalize economic activity.

To be determined 5.0 (R) Cocoa - Rehabilitation of cocoa Consultants have been Project under prepara­ (IDA) plantation through improved or­ identified to carry out tion. (Co-financing ten­ ganization and management, tech­ ~nstitutional study of tatively agreed with nical assistance, and provision state farms selected for CCCE.) of inputs. projec.t.

Offices des 10.0 Telecommunications II - Exten­ No decision made whether Preparation under way. Postes et des (IDA) sion of Dakar telephone ex­ consultants will be re­ Telecommuni­ changes; extension of transmis­ quired. cations sion network to the South and East of country; technical as­ sistance.

Societe 10.0 (R) Irrigation IV - Rehabilitation No decision made whether Preparation under way. d'Amenagement et (IDA) of 5,870 ha of irrigation perim­ consul tan ts will be re­ (Co-financing with CCCE d 'Exploitation eters in the Senegal River quired. for $2.5 ,:nillion, IFAD du Delta (SAED) delta; electrification of pump­ for $15 .0 million, Kuwait ing stations at Rong and Boun­ Fund for $7.7 million and doum; construction of a pqwer Saudi Fund for $13.0 mil­ line. Estimated total cost lion.) $72.0 million, of which $46.0 million in foreign exchange.

Ministry of 24.7 (R) Water Supply II - Rehabilitation Consultant will be re­ Negotiations completed. Hydraulics/ (IDA) and Extension of water supply in quired for rural water (Co-financing arranged SONEES eleven secondary centers. Tech­ and sewerage studies, and with CCCE for $7 .6 mil­ nical assistance, training, management assistance and lion.) working capital. Estimated to­ training. For infonuation tal cost: $33 million, of which systems, reorganization, IDA Project Preparation $22. 5 mi 11 ion in foreign proposals are currently Facility advance of exchange. invited from short-listed $750,000 has been ap­ firms. Consultant for proved to finance bore­ cons true tion supervision hole drillings at four being selected. predetermined sites, con­ sultant services, audits, preparation of data processing system master plan, and services of two expatriate engineers.

SENELEC 10.6 (R) Power I - Rehabilitation of Consultants will be re­ Project under prepara­ (IDA) transmission and distribution quired. Details not yet tion. system and power plant. decided.

See page l for footnotes. - 26 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1J Lender ?J Consulting Services Action on Procurement i/

SIERRA LEONE

National Power 12.

Ministry of 2.0 (R) Population and Health - To Consultants may be re­ Appraisal mission tenta­ Health (IDA) strengthen heal th and family quired. Details not yet tively scheduled for planning.services. decided. May/June 1985.

Office TogOlaise so.a Phosphoric acid plant. Consultants contracted Project under prepara­ des Phosphates (Bank) for project preparation. tion. (Co-financing will be needed.)

To be determined a.a (R) Education I~provement Project - Consultants will be re­ Appraisal report being (IDA) Improvement of the quality of quired to assiSt' in p~oj­ prepared. (AfDB has been education ( i) at the primary ect impl~meQta~ion. approached to finance level through teachers' upgrad­ $5 .O million.) ing; and (ii) at the lower sec­ ondary level through math and science teachers' upgrading, im­ provement of ~cience facilities and provision of'basic instruc­ tional·materials. Improvement of the management of education through ('i) strengthening of educational planning, (ii) oper­ ation of the School Construction and Maintenance Division and (iii) operation of the Project Implementation Division. Total project cost (net-of-taxes) es­ timated at $14.2 million, of which $5.3 mi~lion in··foreign exchange.

To be determiiled 30.0 (R) Structural Adjus'tment II - Fol­ No consultants req~ired. Appraisal mission in (IDA) low-up· on first credit with· em­ earlr Decemb~r. phasis on rural development, re­ habilitation and maintenance of existing infrastructure and pub­ lic· enterprises !eform.

To be determined 4.0 (R) Technical.Assistance III - The Consultants will be re­ Appraisal mission in (IDA) project would include further tained as part of proj­ early December. consultant services and trainirig ect. for macro-economic and sector management, ·and suppoit Togo's structural adjustment program.

Ministry of 9.0 (R) Rural Development - including Consul tan ts may be re­ Project concept and de­ Rural (IDA) extension service and training; quir:ed. sign under review. Development rural infra~tructure, input sup­ ply, and reorg8nization of agri­ cultural services.

To be determined 5 .4 Regional ~~agement School - Consul tB.n ts wi 11 be re­ Board presentation sched­ (IDA) Construction and equipment of quired for pl~nning and uled for March, pending facilities and technical assis­ implementation of manage­ appointment of Director­ tance to facilitate the trans­ ment and organizational General. formation of Senegalese Manage­ s}'stems. ment School into a Regional ·Man­ agement Training School for CEAO member states. Total project cost estimated at $6.2 million.

See page 1 for footnotes. - 27 -

Memb~r Country, Amount & and ImplE!menting Probable Stage of Processing and Agency lJ · Lender Y Consulting Services Action of Procurement 4/

III, EAST ASIA AND PACIFIC

Ministry of Coal 126 ,3 (R) Changcun (Luan) Coal Mining - Previously engaged con­ Negotiations tentatively Industry (Bank) First of a series of large­ sultants expected· to con­ scheduled for january. scale, fully mechanized coal tinue providing technical mining operations; construction assistance under a bilat­ of the Changcun mine, including eral grant. , vertical shafts, underground· roadways, and longwall faces; constru~tion of a coal prepar­ ation plant; equipment for coal extraction, washery and loadout operations; and surface infra­ structure including a railway spur line, an electrical sub­ station, water supply lines, workshops and warehouses; tech­ nical assistance and training for project implementation and development of technical and managerial skills of local staff,

Ministry of 150 .o (R) University Devel'opment II - During project implemen­ Negotiations expected· in Education (IDA) Strengthening selected technical tation consultants will January. uniV'ersities to expand the quan­ be required in fields of tity and improve the quality of science and engineering. science and techniCal graduates.

Ministry of 50,0 (R) Ports II Project - Modernizing Project deferred indef­ Connnunications (Bank) and improving cargo handling initely at request of facilities in Dalian. Government. Furthe~ re­ porting will be discon­ timied.

Ministry of 49,0 Forestry - Timber production in Consul tan ts in the fol­ Appraisal r~port being Forestry (IDA) selected provinces, and fores try lowing fields have been prepared. research and extension. recruited: forest roads & logging; forest indus­ tries and for~s try.

Ministry of 25 .o (R) Agricultural Research II - Up­ No consultants required. Credit signing on Agriculture, (IDA) grading of selected crop-specif­ December 3. Anifflal Husbandry, ic and regional research insti­ and Fisheries tutes and extension stations.

Ministry of 117 .o (R) Power II - Transmission line Consul tan ts have been ap­ Negotiations in progress. Water Resources (B~nk) from Xuzhou to Shanghai. pointed. arid Electric · Power (MWREP)

Ministry of 235,0 (R) Railways II - Upgrading and No consultants required. Appraisal report being ~ail ways (Bank) electrification of tracks; as­ prepared. sistance to electric locomotive factory and a passenger coach factory; and education, research and training.

Ministry of To be (R) Provincial Universities Develop­ No decision made whether Appraisal mission in the Education deter­ ment - Assistance to Provincial consultants will be re­ field, mined Universities: Pre-service edu­ quired. (IDA) cation and in-service training of secondary school teachers, and preparation of teaCher edu­ cators.

National 80,0 Rural Water Supply - Village Short-term consultant to Appraisal .report! being Patriotic Health (IDA) water schemes in several prov­ review waste water com­ reviewed. Campaign inces. ponent." Comniittee

Ministry of 100.0 Fertilizer Rationalization and Consultant services are Post-appraisal mission Chemical (Bank) Energy Saving - Nitrogenous fer­ required to assist in scheduled for January. Industry tilizer plants. selected areas of project implemeritation.

See Page 1 for footnotes. - 28 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }J Lender ?J Consul ting Services Action of Procurement 4/

CHINA (Cont'd)

Ministry of 40.0 Seeds I - Seeds Centers in a Seeds specialist and ag­ Appraisal report being Agricu 1 ture, (IDA) number of·provinces. ricultural economist have prepared. Animal Husbandry been recruited. and Fisheries

Ministry of Coal To be Coal II Jincheng - Underground Consultants will be re­ Appraisal mission tenta­ Industry deter­ mine in Shanxi Province; up to 4 quired for design and en­ tively scheduled for mined mtpa. gineering. Previously January. engaged consu 1 tan ts may continue.

Shanghai Machine To be Shanghai Machine Tools - Ration­ Evaluation of consult­ Preparation under way by Tool Works deter­ alization and product upgrading ants' proposals for feas­ SMTW and SMTC, with as­ (SMTW) and mined of the industry in Shanghai. ibility studies s is tance from consult­ Corporation completed. an ts. (SMTC)

Ministry of To be (R) Gas I - Upgrading the Sichuan Consultant services will A further project prepar­ Petroleum deter­ gas field development and be required. ation mission is schedul­ Industry mined technical assistance. ed for Janauary.

Ministry of To be (R) Pi Shi Hang Irrigation distribu­ No consul tan ts ·required. Appraisal mission Water Resources deter­ tion networks and ancillary scheduled for March. and Electric mined structures. Power

Ministry of To be (R) Roads I - Key linkages in Limited consulting assis­ Appraisal report under Conunun ica ti ons deter­ provincial road network and tance may be required. preparation. mined rural roads.

FIJI

Ministry of 5.0 (R) Fiji Development Bank (FDB) - No decision made whether Appraisal mission sched­ Finance (Bank) Line of credit to FDB. Total consul tan ts will be uled for January. (ADB project cost about $62.0 mil­ required. is lead co-financing· lion. agency.)

Ministry of 10.0 (R) Road Improvement Project - Up­ No decision yet made. Preparation mission in Communications, (Bank) grading of selected road seg­ December. (~a-financing Transport and ments in Government's develop­ with ADB.) Works ment program.

INDONESIA

Ministry of 65.0 (R) First National Ports Development Consultants will be re­ Appraisal report being Communications (Bank) - To develop selected ports, and quired for consortium prepared. related infrastructure. Total management, and institu­ project estimated at $242 mil­ tional planning and lion, of which $117 million in management. foreign exchange.

Ministry of Home 11.3 (R) Upland Agriculture and Conserva­ Consultants will be re­ Loan signed on November Affairs (Bank) tion - IBRD to co-finance a quired for institutional 26. USAID project to improve manage­ and human resource devel­ ment of soil and water resources opment. in Java 1 s uplands. Total proj­ ect cost estimated at $50 mil­ lion, of which $14 million in foreign exchange.

Ministry of 100.0 Central Java Pulp and Paper - A Previously engaged con­ Project preparation under Industry (Bank) pulp and/or paper complex in sul tan ts expected to con­ way. (Co-financing is Central Java. It will include tinue. envisaged.) construction of a pulp and/or paper plant and development of a wood supply system.

Ministry of 206 .o (R) Kedung Ombo Multipurpose Dam - Previously engaged con­ Appraisal report being Pub lie Works (Bank) An earth and rockfill dam, ir­ sultants expected to con­ prepared. (Co-financing rigation works serving about tinue. envisaged for power 59,400 ha, and a 25 MW hydro­ plant.) power plant. Total project cost estimated at at $336 million, of which $165 million in foreign exchange.

Ministry of 45 .o (R) W. Tarum Canal Enlargement - Ex­ Consultant requirements Appraisal report being Public Works (Bank) pansion of capacity of canal for not yet determined. prepared. raw water supply to Jakarta and for irrigation.

See Pagel for footnotes. - 29 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Y Lender Y Consul ting Services Action of Procurement 4/

INDONESIA (Cont'd)

Ministry of 50.0 (R) Health Manpower - Expansion of No decision made whether Appraisal report being Health (Bank) existing training facilities for consultants will be re­ prepared. nurses and other paramedical quired. personnel; improvement of cur­ riculum development and teacher training; and strengthening of agencies responsible for staff development and development in health sector.

Ministry of 100.0 Second University Education - To be determined. Appraisal report being Education and (Bank) Development of post-graduate prepared. Culture centers to upgrade university staff in key fields, including natural science and agriculture, engineering, and economics. Total project cost estimated at $225 milliion, of which $130 mi 11 ion in foreign exchange.

Ministry of 131.2 Smallholder Rubber Development Would include about 350 Negotiations scheduled. Agriculture (Bank) II - To help expand and develop man-months of consult­ for January. the rubber planting program for ant's services in rubber smallholders. Total project management, processing cost estimated at $200 million, and marketing, training of which $70 million in foreign and finance. exchange.

National Family 79.0 (R) Population IV - Intensification Consultants will be re­ Appraisal report being Planning Coordi­ (Bank) of existing family planning pro­ quired for strengthening prepared. nating Board gram, with emphasis on mainten­ family planning service (NFPCB) ance of contraceptive use, and delivery and population possible provision of improved policy development. health and nutrition services to acceptors.

Ministry of 30.0 Nusa Tenggara Development - Pro­ Consultant requirements Project preparation under Agriculture (Bank) duction in rainfed areas of not yet determined. way. Eastern Indonesia. Suport to animal redistribution, cotton research and seed production, and institutional development.

Ministry of 130.0 (R) Transmigration V - Site screen­ Consultant services will Appraisal report being Transmigration (Bank) ing and evaluation studies for be required for the site prepared. 300,000 transmigrant fami 1 ies screening and evaluation based on advanced mapping sys­ studies. tems. Construction of pilot settlements for about 8,000

transmigrant families I involving new types of economic activities and the promotion of spontaneous transmigrants.

Ministry of 10.0 (R) Manpower Planning & Vocational Consulting services not Project under prepara­ Manpower (Bank) Training - Strengthening of man­ yet determined. tion, funded by advance power planning and training man­ of $383,000 from the Bank agement sys terns; es tab 1 ish na­ Project Preparation Fa­ tional standards; upgrade train­ cility. ing; extend and upgrade in-plant training and improve vocational guidance and job placement. Total cost not yet determined.

Ministry of 90.0 (R) East Java Water Supply II - Consul ting services not Project preparation under Pub 1 ic Works (Bank) Water supply development for yet determined. way. about 50 cities and towns in about 15 kabupatens of East Java Province.

Ministry of 60.0 Nutrition/Comm.unity Health - To No decision made whether Project preparation under Health (Bank) include integrated family plan­ consultants will be re­ way. ning, health and nutrition ser­ quired. vices; food and nutrition surveillance; nutrition manpower developemnt; and establishment of media production centers.

See Page 1 for footnotes. - 30 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender 1/ Consulting Services Action of Procurement 4/

IND ONES IA (Cont'd)

Bank Tabungan 100.0 Housing Sector Loan - Provision Consul ting services not Project preparation under Negara (BTN) and (Bank) of finance for low-cost housirig yet determined. way. Perum Perumnas and related institutional assistance.

Ministry of 75 .o Agricultural Extension III - To Extent of consultant ser­ Project preparation under Agricu 1 ture (Bank) intensify the unified extension vices required not yet· way. services for food Crops, estate determined. crops, livestock and fisheries in all provinces, including transmigration areas.

Ministry of 150.0 (R) Export Development - To support Consulting services not Project preparatiort under Trade and (Bank) Indonesia I s drive to increase yet determined. way. Cooperatives non-oil exports including devel­ opment of an export estate, pro­ vision of investment credit for export, industries, and technical assistance to improve export quality; to strengthen key ex­ port institutions and provide training in export-related topics.

Ministry of 60.0 (R) National Ports Development II - No decision made whether Project preparation under Commun ica ti ans (Bank) Improvement of selected ports. consultants will be re­ way. ($25 million is ex­ quired. pected from bilateral sources.)

Ministry of 120.0 Central Java Provincial Irriga­ No decision made whether Project preparation under Public Works (Bank) tion - Reh8.bilitation and up­ consultants will be re­ way. grading of small systems (50,000 quired. ha), operation and maintenance improvements, pilot scheme for pumping from surface water or shallow_ welis, and construction of mid-Lusi irrigation system 04 ,000 ha).

"Ministry of 98.0 (R) Research & Technology Training - (a") Local consulting Appraisal report being State for (Bank) Provision of overseas and local agency employing some prepared. Research and training to staff of six scien­ foreign consultants will Technology - tific and technical research assist With project man­ Agency for the agencies, including the National agemet'lt. Assessment and Institute of Services, the Application of Na.tfonal Mapping Agency (BAICO­ (b) "Educational Exchange Technology SURTANAL), the Central Bureau of Organizations" abroad Statistics, and the National will assist in placing Atomic Supply Agency. an~ supervising overseas trainees.

~ational 179. 5 (R) Power XV - Transmission and Engineering consultants Appraisal mission in the Electricity (Bank) distribution facilities in Java. already in place. Other field. Authority (PLN) corisultancy needs to be determined.

Seoul City Up to (R) Seoul City Urban Transport Proj­ Consultants will be re­ Appraisal report being Government 69.0 ect - Construction of traffic quired for cons·truction prepared. (Bank) engineering improvements and services. road sections in arterial system to increase efficiency of pi:,-esent road system.

Ministry of 121.0 small/Medium Industries - Line Consul tan ts may be re­ Appraisal report being Finance (Bank) of cre?it to selected financial quired for the technical prepared. institutions to support term assistance component. lending to small and medium in­ dustries; and technical assist­ ailce to small and medium indus­ try development.

Ministry of 120 .o (R) Agriculture Sector Loan - sup­ Consul tan ts wi 11 probably Negotiations tentatively Agriculture and (Bank) port for policy and institution­ be required for policy scheduled for January. Fisheries al adjustments in the agricul­ studies. ture sector, and ·to finance long-term credit institutions serving agricultural producers and processors. Total project cost estimated at $150 million, of which $120 million in foreign exchange.

See Page 1 for footnotes. - 31 -

Me'Dlber Country, Amount & and Implementing Probable Stage of Processing and Agency J./ Lender 1=./ Consulting Services Action of Procurement 4/

KOREA (Cont'd)

Ministry of 95 .o WS.i:er Supply III - Constructio_n Consu~tants will be re­ Negotia.tions substan­ Cons tI'uc tion (Bank) of water treatment and distribu­ quired for construction tially completed. Board tion facilities for cities in supervision. presentatiori scheduled the Seoul Metropolitan region. for March 12, 1985. Total project cost estimated at $120 million, all of which is in foreign exchange.

Ministry of 300.0 Financial Sector Loan II - As- Need for consult.ints to Appraisal report being Finance (B"ank) s is tance to the GOvernment in be determined. · prepared. support of financial system re­ form; and provision of credit to major financial institutions for term lending to industrial en­ terprises. Assistance for tr.-iining of financial sector staff also included.

LAO PEOPLE'S DEMOCRATIC REPUBLIC

To be determined 35.0. Electrificatioil of Southern Proposals. already invited Discussions with Govern­ (Bank) Provinces - Tr~nsmission, and for preparatory engineer­ ment in progress. distribution of electricity "in ing consultant services selected provinces. to be funded out of . · exist'ing IDA <;redit.

To be determined Agricultural Development - To Discussi~ns with Govern­ assist in develoPing agricul­ ment being scheduled·. tural support services and the production of crops for export.

Ministry of 5.0 Teleconnnunications - Rehabilita­ Discussions with Govern­ Transport and (IDA) tion and re-equipping of exist­ ment in progress. Teleconununi­ ing telephone network. cations

Government/Bank 52 .1 Small-Scale· Enterpri_se (Indus­ No consultants ·required. Approved by the Executive Pembangunan (Bank) tries I) - Assistance. for manu­ Directors on October 16. Malaysia Berhad facturing and institutional de­ (BPMB); Malaysia velopment. Total project cost Industrial De­ $104.1 million, of which $25.7" velopment mi 11 ion in foreign eXchange. Finance Berhad (MIDF)

Ministry of 70.0 Western Johore II - Integrated No decision made whether Project being prepared by Agriculture (Bank) Development - Construction of consultants will be re­ Government. farm roads and drainage facili­ quired. ties, and provision of agricul­ tural support services~

Ministry Of 70.0 (R) Industrial Training· II - Im­ No consultants required. Appraisal report being Education/Min­ (Bank) provement of manpower planning prepared. (Co-financing is try of Labor and management by strengthening being considered.) and Manpower planning and management capa­ bility and Dy financing staff training, advisory services of public instit1:1tions; construct­ ing and equipping two additional industrial training institutes and three additional polytech­ nics.

Federal Land 33.1 (R) Felda Palm Oil Mills - Construc­ Consultants will be re­ Negotiations tentatively Development (Bank) tion of 7 palm oil mills which quired to develop data scheduled for end­ Authority would serve 13,000 Felda settler based computer system for January. (FELDA) families and provide some 810 FELDA. emp~oymerit positions. Improve Felmill management and opera­ tions. Tot81 project cost esti­ mated at $61.3 million of which $33.1 million in foreign ex­ change.

See Page 1 for footnotes. - 32 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1_/ Lender :!:./ Consulting Services Action of Procurement!±_/

MALAYSIA (Cont'd)

To be determined 70.0 RISDA I - Provis ion of rubber No decision made whether Project preparation pend­ (Bank) replanting and rehabilitation consultants will be re­ ing completion of finan­ program; rubber and palm oil quired. cial management study. processing facilities; develop­ ment of mini-estates and insti­ tutional support.

Malaysian High- so.a Highway V - construction of Previously engaged con­ Project being prepared. way Authority (Bank) parts of North-South Expressway. sultants expected to con­ (Co-financing may be (MHA) tinue. sought.)

National 100.0 Power XII - Power transmission Consultants will be re­ Project preparation under Electricity (Bank) and distribution facilities. quired for feasibility way. (Co-financing may Board (NEB) study. be sought.)

Government/FELDA 40.0 FELDA/PWD Infrastructure - Con­ No decision made whether Project preparation under (Bank) struction of roads and water consultants will be re­ way. supply facilities for agricul­ quired. tural development projects.

Ministry of 90.0 (R) School Development - Improvement No consultants required. Pre-appraisal mission in Education (Bank) of primary and secondary school the field. system.

Pub lie Works 65.0 (R) Johore Water Supply - Construc­ PreViously engaged con­ Appraisal mission in the Department, (Bank) tion of water supply facilities sultants expected to con­ field. Joh ore State at Johore Bahrat and Keluang tinue. (Kahang scheme).

To be determined 80.0 (R) Industrial Credit - Financing of No consultants required. Project being prepared by (Bank) medium- and large-scale enter­ the Government. prises in the Industrial sector through participation of public and private financial institutions.

PAPUA NEW GUINEA

Papua New Guinea 30.0 Agricultural Credit III - The No decision made whether Financial Sector Discus­ Development Bank (Bank) project will provide funds to consul tan ts will be re­ sions being held with (PNGDB) the Development Bank for term quired. Government. Project pro­ lending in tree crop develop­ cessing being deferred. ment, poultry and agro-proces­ sing. It will also provide training to strengthen the De­ velopment Bank and technical as­ sistance on the crop diversifi­ cation program.

Department of 26.0 Milne Bay Nucleus Estate and Management services to be Appraisal report being Primary Industry (Bank) Smallholder Tree Crop Project I provided by CDC. prepared. (Commonwealth - To develop a combination of Development Corporation several derelict commercial es­ is expected to co-fi­ t~tes and vacant areas of Gov­ nance.) ernment land in the Milne Bay Province into a viable oil palm and cocoa nucleus estate, to­ gether with the peripheral de­ velopment and support of small­ scale smallholder plantings of these crops. Total project cost estimated at $69 million, of which $35 million in foreign ex­ hange.

West Sepik Pro­ 9.7 (R) West Sepik Provincial Develop­ No major consulting firm Loan signing scheduled vincial Govern­ (Bank) ment Project - Improvement of is required. for January 7. ment agricultural practices and tech­ nology; staff development, in­ frastructure and institutional development. Total project cost estimated at $16.6 million, of which $8.4 million in foreign exchange.

Department of 30.0 Rural Roads II - Scope of pro­ No decision made whether Scope of project under Transport and (Bank) ject to be determined. consul tan ts will be re­ discussion with Govern­ Civil Aviation quired. ment. (DTCA) and De­ partment of Works and Supply (DWS)

See Page I for footnotes. - 33 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender 1/ Consul ting Services Action of Procurement!!_/

PAPUA NEW GUINEA (Cont'd)

Electricity 40.0 Third Power Project - Construc­ Consultants for project A $1.0 million advance Commission (Bank) tion of dam at Yonki to firm up preparation are being fi­ from Bank Project Prepar­ (ELCOM) existing capacity at Ramu Power nanced by the Bank Proj­ ation Facility to finance Station and provision of two ad­ ect Preparation Facility. consultant services for ditional generating units (2xl5 Consultants also required preliminary design and MW), plus training and technical for supervision of proj­ detailed engineering. (To assistance for Rural Electrifi­ ect construction and to be co-financed with ADB/ cation Study. Total estimated review the design·and OECF,) cost is $100 mi I lion. safety of the dam.

PHILIPPINES

Ministry of 45.0 Rural Development IV (Land Set­ Consultants will be re­ Appraisal report being Agrarian Reform (Bank) tlement II) - Further assistance quired for project imple­ prepared. for planning and execution of mentation, particularly Government's land settlement in surveys and mapping. program. The project would sup­ port a nationwide geodetic net­ work, aerial photography for surveying and land titling, roads, agroforestry, soil con­ servation, and technical assistance. Total project cost estimated at $85 million.

Central Bank 100.0 (R) Agricultural Credit I (Previous­ Consultants have been re­ Appraisal report being (Bank) ly Loan Fund) - To help finance cruited. prepared (Co-financing part of the Government's may be sought.) agricultural credit program.

National Power 130,0 Power VIII - Support for NPC's No decision made whether Project preparation under Corporation (Bank) program of rehabilitation and consultants will be re­ way. (Co-financing may (NPC) maintenance. quired. be sought.)

National 40.0 (R) Central Visayas Regional Project Consultants have been re­ Pos t-appraisa 1 miss ion Economic and (Bank) II: Emphasis on urban develop­ cruited. scheduled for mid-1985. Development ment supporting upgrading of Authority (NEDA) municipal infras true ture, man­ agement of municipal enter­ prises, transportation, traffic management, maintenance and training. Total project cost estimated at $80 million.

To be determined 40.0 National Forestry - Support for No decision made whether Project being prepared by (Bank) the development of industrial consultants will be re­ the Government. (Co-fi­ tree plantations and strengthen­ quired. nanc ing is envisaged.) ing of the Bureau of Forest De­ velopment's field capacity and services.

To be determined 60.0 Rural Roads II - Further support Consultants required to Project being prepared by (Bank) for the Government's program of update feasibility stud­ Government. rural road construction, reha­ ies. bilitation and maintenance, and institutional strengthening of the Ministry of Local Govern­ ment.

Central Bank 105.0 (R) Export Development Fund - To Consultants have been re­ Pos t-appraisa 1 miss ion (Bank) support the Government's export cruited. scheduled for January. rehabi 1 i ta tion program, inc lud­ ing development of adequate ad­ ministrative arrangements for the present export financing system and designing appropriate supporting policies.

Philippine 34.0 ·Coconut Development - To in­ Consultants will be re­ Appraisal report being Coconut Author­ (Bank) troduce new varieties and in­ quired for review of PCA prepared. ity (PCA) crease productivity and quality research program. including research and proces­ sing. Total project cost esti­ mated at $68.! million, of which $24. 5 mi 11 ion in foreign ex­ change.

See Page 1 for footnotes. - 34 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Y Lender 1/ Consulting Services Action of Procurement 4/

PHILIPPINES (Cont'd)

Philippine 70.0 (R) Geothermal Development - Bacon­ Consultants will be re­ Project being prepared by National Oil (Bank) Manito I - To finance the drill­ quired for engineering the Government. (Co­ Company ing of about 17 additional studies and drilling· financing is envisaged.) wells, pluB the installation of forecasts. 21 kilometers of steam-gathering and reinjection lines and 2 steam separator stations. for a 110 MW power plant in Bacon-Man­ ito (Southern Luzon). Total cost estimated at $105 ID.illion, of which about $55 million in f0reign exchange.

National 60.0 (R) Irrigation Maintenance - Assist­ No decision made whether Project being prepared by Irrigation (Bank) ance to National Irrigation consultants wiil be re-· Government. Authority Authority· for systems i~prove­ quired. ment and maintenance.

Central Bank 150.0 (R) DFC - Industrial Finance II. To No -consultants will be Project postp9µed to (Bank) sustain progress made under the r~quired. FY88. Further reporting Industrial Finance I Project, to will be diScontinued. support the Government's finan~ cial and indust'rial reform pro­ gram and to assist a wider number of financial institutions to participate in development projects.

Ministry of 4.0 (R) Telecounnunications-Technical As­ Consultants will be re­ Negotia~ions in early Transport and (Bank) sistance - Technical assistance quired for studies on in­ December. Telecommuni­ to promote and support the sound stitutional development, cations (MOTC) development of the institution­ tariffs, radio frequency al, ·regulatory aspects of the management, network plan­ telecommunications sector. niµg· and reviewing of training needs.

Metropolitan 50.0 (N) Manila Water Mains Extension - No decision made whether Project being prepared by Waterworks · and (Bank) Provision of distribution consultants will b~ Government. Sewerage System system ~nd assistance to MWSS required. (MWSS) for systems improvement and maintenance.

SOLOMON ISLANDS

Ministry of 2.0 (R) Guadalcanal Road - Rehabilita~ Consultant services will Negotiations in Communications (IDA) tion and improvement of roads. be required.for on-the­ December. (ADB is-the and Public Total proj~ct cost estimated at job training and project lead cO-financing Utilities $6.5 million, of which $5.0 mil­ implementation. 'agency.) lion in foreign exchange.

Ministry of 6.0 Expansion of junior secondary No decision whether con­ Appraisal report being Education, (IDA) educatiOn and strengthening and sultimts ~ill be re­ prepllred. Training and expansion of College of Higher quire~. Cultural Affairs ~ducat ion.

THAILAND

Petroleum 33.0 (R) Energy III (Sirikit Oil Field Technical consultants Appraisal report being Authority of (Bank) Development) - Possible invest­ will- be required·. prepared. (Co-financing Thaila!'d (PTT) ment related to onshore oil being explored.) field development.

The Bangchak 85.0 (R) Bangchak Oil Refinery Restruc­ Consultants for Negotiations substan­ Petroleum Com­ (Bank) turing - Corporate/financial re­ assistance under tially completed. (Co­ pany, Limited structuring and physical reha­ selection. Borrower to financing being ex­ bilitation of Bangchak oil re­ prepare shortlist for plored.) finery. Total project cost es­ engineering consultants timated at $187 .9 million, of shortly. which $166 .1 mi 11 ion in foreign exchange.

Ministry of 27 .5 (R) Regional Cities - Urban services consultants will be re.:. Negotiations tentatively Finance (Bank) and infrastructure improvement qtiired for construction; scheduled for late Janu­ in four regional cities. Total supervision and future ary. (Co-finaricing with project cost $i06.5 million, of project preparation. ADAB, Australia, for $4.5 which $30.2 million in foreign mi 11 ion approved.) exchange.

See Page 1 for footncites. - 35 -

Member Country, Amount & and Implementip.g Probable Stage of Processing ~nd Agency l_/ ~II Consulting Services Action of Procurement!±_/

~!LAND (Cont'd)

Ministry of 38.0 (R) Agricultural Support Services - Project dropped from Agriculture & (Bank) StrengtheniTig the Ministry's lending program.· Cooperat~ves overall capabilities, focusing Reporting will be particularly on improving three q-iscontinued. of its departments (land devel­ opment:, fisheries and live-· stock). TOtal project cost es­ timated at $84.5 million, of which foreign exchange component $28.2 million, ·

Telephone 50.0 (R) Teleco~unications V - Expansion No decision made whether Project preparation under Organization of · (Bank) of telephone facilities, parti­ consultants will be re­ way. (Large amount of 0 Thailand (TOT) cularly in rural and provincial quired. parallel co-financing areas. Total cost estimated at from ADB, OECF and var­ $1,630 million with a foreign ious other official and exchaµge coinponen't of $830 mil­ cormnercial sources to be lion. considered.)

Ministry of 175 .o (R) Third Structural Adjustment Loan Consultants will be re­ Appraisal mission sched­ Finance (Bank) - To help the Government imple­ quired for pub 1 ic re­ uled for February. ment the next phase of its source management reform. structural adjustment policies Previoµsly eng~ged con­ related to public resource, man­ sultants e~pecte4 ta c~n­ age~ent and export development. tinue.

Bangkok 51.9 (R) Bangkok Drainage/Flood Control - Consultants will be re­ Negotiations tentatively ?,letropolitan (Bank) Project ~ould consist 'of flood quired for construction scheduled for February. Administra~ion protection and drainage, techni­ supervision and advisory cal assistance, and training. services for· institutl.on­ Total project cast estimated at· al development, and for $90.8 million, of which foreign training in drainage man­ exchange component $26.6 mil­ agement, and corp·orate liOn. management,.·

National Housing 40.0 Third Shelter - To support the No decision made whether Appraisal mission scbed- · Authority (Bank) National Housing Authority's consultant& will be re­ uled for March. (NHA) low-income housing pro­ quired. grams in metropolitan Bangkok ~nd regional cities, ·as well as NHA's slum upgrading program in Bangkok,

Bank for 50.0 Agricultural Credit III - Finan­ No decision made whether Appraisal report being Agricu 1 ture & (Bank) cing of medium- an4 long-term consultants will be re­ prepared. Agricultural agricultural lending throughout quired. Cooperatives Thailand. Total project cost (BAAC) estimated at $148 million, of which $37 million in foreign ex­ change.

Electricity 90.0 (R) Power XVI (Subsector) - To as­ No consultants required. Appraisal to be scheduled Generating (Bank) sist in financing EGAT's invest­ pending Government ap­ Authority of ment program for FY86-88 in proval· of ·Borrower's in-· Thailand (EGAT) light of overall developments in vestment program. (Co­ the energy sector. financing b~ing ex­ plored.)

Office of Rubber 70.0 Third Rubber Replanting - Rubber Previously engaged con­ Appraisal mission sched­ Replanting Aid (Bank) rE!planting, and possibly new sultant expected to con­ uled for February. (Co­ Fund (ORRAF) rubber and other tree crops. tinue. financing being ex­ plored.)

Bank of Thailand 100.0 Small and Medium Enterprises - Project processing in (Bank) Establishment of mechanisms to· abeyance. provide credit and technical as­ sistance to ~mall and.medium en­ terprises.

To be determined 30.0 Land Policy/Rural Land Use - Fi­ To be determined. Preliminary discussions (Bank) nancing of the Land Reclassifi­ with Government in cation and STK (Right-to-Farm) progress. programs of Government,· together with related activities and in­ stitutional improvements.

Ministry of 3.0 Forestry plantation development Consultants for project ADB project })repar~tion Agriculture, (IDA) on Efate and Espiritu Santo prepara'tion are financed in j,rogl'ess. · (ADB is Forestry and Islands. Technical assistance by ADB. lead co-financing Fisheries and training to strengthen for­ agency.) estry organization.

See Page 1 for footnotes. - 36 -

Me,qber Country, Amount & and Implementing Probable Stage of Processing and Agency _)j Lender ]:./ Consulting Services Action on Procurement !!_I

IV. SOUTH ASIA

BANGLADESH

Bangladesh Up to Inland Water Transport III - To Consultants will be re­ Project preparation under Inland Water 40.0 assist Bangladesh Inland Water quired to conduct feasi­ way. Transport (IDA) Transport Authority (BIWTA), bility study on movement Authority Bangladesh Inland Water Trans­ of containers by inland port Corporation (BIWTC) and waterways. Short-list Ministry of Ports, Shipping and completed •. Inland Waterways (MPSI),

Dhaka Water and About (R) Dhaka WASA III - Extensions to Consultants for project Appraisal mission tenta­ Sewerage 34.0 water supply and sewerage sys­ preparation financed tively scheduled for Authority (WASA) (IDA) tems. under ongoing project. January.

Ministry of About (R) Fisheries II - To assist in the Consultants will be re­ Appraisal mission find­ Agricu 1 ture, 20.0 development of the brackish quired to assist in proj­ ings under review. Fisheries and (IDA) water shrimp culture industry ect implementation. Livestock and provide foundation for ex­ panded future development of aquaculture.

Bangladesh Bank 25 .o (R) Agricultural Credit II - To sup­ Consultants will be re­ Appraisal mission sched­ (IDA) port further reform of agricul­ quired to assist in proj­ uled for October 1985. tural credit system, strengthen ect implementation. agricultural financial institu­ tions and to provide credit to farmers for on-farm investments.

Bang lade sh Bank. 50.0 · (R). Industrial Investment Project - As part of the project, Appraisal mission tenta­ ·(IDA) Provision of term finance to consultants will be re­ tively scheduled for. private sector industry through quired for training in July/August 1985. finanCial institutions to be the preparation of sub­ selected. sector studies.

Ministry of 130.0 (R) Import Program XIII - Provision No consultants required. Appraisal mission tenta­ Finance and (IDA) of foreign exchange for procure­ tively scheduled for Planning ment of essential imports. January.

Bangladesh Oil 80.0 (R) Gas Development II - To assist Consultants will be re­ Post-appraisal mission and Gas (IDA) in gas field development, and quired for project imple­ findings under review. Corporatio~ appraisal and construction of mentation. (Co-financing with CIDA, gas pipeline. ODA, The Netherlands, OECF and Kuwait Fund being explored.)

Bangladesh 60.0 Petroleum Refinery - To estab­ Consultant for feasibili­ Consultants' report under Petroleum (IDA) lish a secondary conversion ty study financed under review. Corporatiop capacity at facilities of ongoing project. Eastern Refinery Limited.

Bang lade sh Water 35.0 (R) Flood Control and Drainage III - Consultants will be re­ Appraisal mission find­ Development (IDA) To increase crop production quired to assist in proj­ ings under review. (Co­ .Bop rd · through improvemen~s in the ect implementation. financing being ex­ water regime. plored.)

Ministry of 45.0 (R) Primary Education II - To Consultants will he re­ Appraisal mission find­ Education and (IDA) improve quality, reduce cost, quired to assist in (a) ings .under review. Nego­ Religious and increase access to primary development of a new tiations tentatively Affairs. education. teacher training program; scheduled for late (b) the reorganizing of January. the Directorate of Pri­ mary Education; (c) the strengthening of the National Curriculum and Textbook Board; and (d) expansion of project IMPACT (Institutional Management by Parents, Community and Teachers).

Ministry of About Population III - To strengthen No consultants required. Appraisal mission find­ Health and 60.0 and expand family planning and ings under review. (Co­ Popul~tion (IDA) associated maternal-child health financing with ADAB, Co~trol service delivery. CIDA, Kfli' Germany, NORAD, SIDA, The Netherlands and ODA being explored.)

See page 1 for footnotes. - 37 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y Lender Y Consulting Services Action on Procurement!±_/

BANGLADESH (Cont'd)

Rural Elec trifi­ so.o Rural Electrification II - To Consultants currently en­ Appraisal repo~t being cation Board (IDA) provide a phase two transmission gaged by REB expec t.ed to prepared. (REB) and distribution program in continue. rural areas.

Ministry of 20.0 (R) Forestry II - To strengthen ad­ Consultants for -project Appraisal mission in th.e' Agriculture (IDA) ministrative and institutional preparation financed by field. capability within the Forestry FAO/CP. Consultants re­ Sector and to increase the cruited for appraisal. supply of forests products.

Ministry of 10.0 Livestock - To increase produc­ Consultants to be deter­ Project prOcessing ·in Agricu 1 ture (IDA) tivity of farm animals, and fos­ mined. abeyance, pen.ding GOB ap­ ter development of institutions proval of project scope and of national policies re­ and content and resolu­ quired for long-term development tion _of institutional a·nd of livestock sector. policy issues related to dairy sector.

Bangladesh Bank 35.0 (R) Small Industries IV - To in­ Consultants will be. re­ Appiaisal report being ' (IDA) crease productivity, employment quired for techllical as­ prepared. and exports of small-scale and sistance to the banks on rural industries. project-based lending, and for product-specific technical and marketing services.

Bangladesh Rural 15 .o Hand Tubewells II - To increase Consul tan ts recruited for Project preparation under Development (IDA) agricultural production and em­ project preparation. way. Board ployment by providing low cost manual irrigation facilities.

Bangladesh Power 30.0 Power Transmission & Distribu­ Consultant will be re­ Appraisal report bei~g Development (IDA) tion - To increase capacity of quired to assist in re­ prepared. Bdard transmission system and to im­ duction of system loSses. prove operating efficiency and financial viability of power sector.

Ministry of so.o (R) Roads Rehabilitation and Mainte­ Consultants will be Project preparation under Communications (IDA) nance - To rehabilitate national required to conduct way. roads. feasibility study. Short-list completed.·

Roads and High­ 30.0 (N) Rehabilitation Credit - To re­ No consultants required. Project preparation under­ way Department; (IDA) pair and rehabilitate infra­ way. Bangladesh Water structure facilities including Development roads, culverts, bridges, and Board; Bangla­ other water control and irriga­ desh Inland tion schemes. The project would Water Transport also replace inland w~ter trans­ Authority port equipment. (BIWTA)

Ministry of About Calcium Carbide - To utilize Consul tan ts required for Appraisal report being Industry 9.0 Bhutan's high quality limestone project management and prepared. (IDA) deposits and forest resources to training. enhance export earnings. The prOject would comprise a plant of 22,000 tons per annum capa­ city and would include technical assistance and training. Total project cost estimated at $20.4 million, of which $14.4 million is in foreign exchange.

Ministry of 16.0 Arakan Pulp and Paper - To con­ Consultants will be re­ ·consultants' report belng Industry II (IDA) struct a pulp and paper mill quired. reviewed. Considerable with a capacity of 100 tons per delay likely in Govern­ day of printing and writing ment review of priori­ paper produced from a mixture of ties. bamboo and indigenous hardwoods. The project also includes asso­ ciated infrastructure facili­ ties.

See page 1 for footnotes. - 38 -

Member Count~y, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender :l;_/ Consulting Services Action on Procurement 4/

~ (Cont'd)

Ministry of 20.0 Irrigation Rehabilitation - To consultants ~ay be re­ Project preparation under Agricu 1 ture and (IDA) rehabi li~ate existing gi-avity ciuire~. way. Forests i~rigatiOn systems in the Cen­ tral Dry Zone of Burma. Main component would comprise: major civil work including repairs to and remodelling of major struc­ tures, canal desil ting and land development; provision of equip­ ment and vehicles and agri­ cultural support services.

Ministry of 20·.o Transport/Distribution - Mul­ R~quired for cOmprehen­ Appraisal report being Transpo~t (IDA) timodal transPort. pI'oject to sive study of transport/ prepared. minimize bottlenecks in.trans­ distribution syst'em. porting timber and other key ex­ port products: includes pro­ vision of storage; telecommt.ini­ cations; navigational and other facilities. Total project cost estimated at $30.0 million, of which $18.0 million is in for­ eign exchange.

Ministry of 20.0 Seeds - Develop viable seed pro­ ·will be required for Appraisal report being Agriculture and (IDA) gram covering Burma 1 s major training and· technical prepared. Forests crops including se~d multiplica­ assistance. tion and distribution for paddy, cotton, and other crops. Streng­ then research, seed testing and quality control. Technical as­ sistance and training. Totcll project cost estimated at $28.0 million, of which $12.7 million is in foreign exchange.

Ministry of 25 .o Paddy III - Follow-up to two on­ May be required. Project preparation under Agriculture and (IDA) going paddy development projects way. Forests to increase paddy production thr9ugh the construction of flood protection and drainage facili.ties designed to (i) ex­ clude tidal and river flow surges; (ii) impr~ve and extend natural internal drainage; and (iii) reclaim land that is cur­ rently deeply flooded or saline·.

M.inistry Of 30.0 (R) G,ain Stor~ge.II - Follow-up of May be required. Appraisal report being Agriculture and (IDA) the first grain storage project prepared. Forests to rehabilitate existing storage and mi 1 iing f~ci l i ties; trans­ portation; technical assistance and staff training. Total proj­ ect cost estimated at $57 mil­ lion, of which $30 million will be in foreign exchange.

Posts and 25 •.0 Telecommunications III - FolloW­ May be required. Project preparation by Telecommunica­ (IDA) up for expansion of domestic and Government unde~ Way. tions Corpor­ i~ternational services. Techni­ ation cal assistance and training would be provided.

Ministry of 75 .o Power II - Multipurpose irriga­ ConSultants will be re~ Government assessing pri­ Industry (IDA) tion/power project comprising quired. orities because of very 100 m dam; power house with four large in~estment in­ 75 MW units; 40 km transmission volved. (Substantial co­ lines and irriS:ation works. financing needed.)

Hi~istry of 40,0 Forestry III - To rehabilitate R~quired for maintenance Project. being prepared. Agriculture arid (IDA) mechanical equipment and develop plannirig sys.tern. Forests a maintenance planning system to maintai~ present production lev­ els over the long term. To con­ tinue reforestation program with teak and hardwood plantations.

see page 1 for footnotes. - 39 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l_/ Lender Y Consulting Services Action on Procurement i/

Indian Petro­ 300,7 (R) Petl"ochemicals - Production of Consultants ha~e been re­ Appraisal report being chemicals Corp., (Bank) petrochemicals an4 production of cruited. Prepared. ( Co-financing Ltd. basic aromatics and selected expected.) derivatives based on Bombay High and Sou th Basse in natural gas. Total Project cost about $1,7 billion, of which about $650 million in foreign exchange.

Haldia Water 50.0 Haldia Water Supply and Sewerage Conslll tan ts' services Project j,reparatio1:1 under Development (IDA) Project - Cons true tion of 225 likely to assess· techni- way. Authority, million liters/day treatment cal options for the proj- Government of plant, 4 pumping stations and a ect. West Bengal 90 km long water transmission main to serve the Haldia Devel- opment Authority, 2 towns and rural communities en route.

Bihar State 50.0 Bihar . Water Supply - Provision No indications that expa- Project preparatiqn under Water and Sewage (IDA) of piped water supply to about .triate co·nsulto3nt ser- way. Authority, towns in the State of Bihar. vices will be required. Government of Bihar

Narmada Develop­ 200 .5 (R) Narmada River Development Tata Consultancy Ser­ Negotiations under way. ment Department, (Bank) (Gujarat) Sardar Sarovar Dam and vices, Bombay, has been (Commercial co-financing Government of 100.0 Power Project - Construction of co~issioned by GOG to of foreign exchange coS t Gujarat (IDA) Sardar Sarovar Dam and two des.ign and. implement a of the power generating · hydro-electric power stations Management Information equipment, totalling totalling 1,400 MW •. Total proj­ System for project con­ approximately $175 ect cost about $1.8 billion, of struction and subsequent million, is likely.) which about $560 million in for­ operation. eign exchange. PrOcurement: Evaluation of prequalification ap­ plications under way.

Narmada Develop­ 150.4 (R) Narmada River Development M~int:enance of a Consult­ Negotiations. under way. ment Department, (IDA) (Gujarat) Water Delivery and ancy Board for review of Government of Drainage Project - Construction and ass'istance with de­ Procurefflent: !CB pre­ Gujarat of main canal aild network of sign and construction of qualification applica­ canal's minor chB.nnels to sei-ve main canal and electronic tions have been reques­ abollt 2 million ha. Total proj­ control system to be ted. ect cost estimated at $480 mil­ agreed at nego~iations. lion, of ;,i,ich about $125 mil­ Loca:J. ·consul tan ts being lion in foreign exchange. selected.

Bombay Metropol­ 105,0 (R) Bombay Urban Development - Pro­ Local conslllting services Negotiations in progress. itan_ Region De­ (IDA) gram of slum upgrading and shel­ Proposed for organiza­ velopment ter renovation and. cons·truction tion, manageuient and Procurement: $7 .o mil­ Authorit'y, fo~ the Bombay Metropolitan Re­ finance systems;_. design lion of retroactive finan­ Government of gion. Total p·roject co'.st esti­ and implementation of cing will be proposed for Maharashtra mated at $263.2 million, includ­ improved management site filling and lartd in­ ing a foreign exchange component systems; review of build­ frastructure work, and for of about $19.6 million. ing regulations; aerial technical assistance to photograph for slum up­ two project authorities. grading program; and en­ gineering works.

Madhya Pradesh 157 .4 Bodhghat Hydro-electric Project Consultants will be re­ Approved by the Executive Electricity (Bank) - Construction of a 500 MW

Tata Electric 135 .4 (R) Trombay IV (Thermal Power) - In­ PreviouslY engaged ~on­ Loan signing on December Company · (Bank) stallation of 500 MW sixth unit sultants ~xpected to. con­ i2. (co-financing of at Tata Electric Company's Trom­ timie, but additional about $55 mi i lion through bay (Maharashtra) plant. The consu 1 tancy suppOrt may suppliers' credits and unit will replace four existing be needed. commerciai bank 108.ns.) units, totalling 337.5 MW, which are to be retired in 1987-88. Total project cost estimated at $361 million, including foreign exchange component of about $100 million.

See page 1 fol" footnotes. - 40 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency ]J Lender JJ Consulting Services Action on Procurement!!_/

INDIA (Cont'd)

Ministry of 39, l (R) National Agricultural Extension No consul tan ts required. Credit signing on Decem­ Agriculture (IDA) Project - Assistance to the Gov­ ber 12, ernment of India Directorate of Extension and three states in strengthening extension systems in various states through the introduction of the training and visit system. Total project cost estimated at $65.6 million, of which about $3.3 million in foreign exchange.

Narmada Planning 200.0 (R) Narmada (Madhya Pradesh) I - Project preparation as­ Appraisal mission sched­ Agency, Govern­ (Bank) Construction of the Narmada sisted by mainly local uled for January. ment of Madhya Sagar Dam, hydro power stations consultants financed from Pradesh and a large network of canals Project Preparation Fa­ covering about 130,000 ha. cility advance included Total project cost about $1.4 in Credit 1332-IN, No billion, of which about $275 decision made whether million in foreign exchange. consultants required during implementation.

To be determined 100.0 Cement Energy Savings - Assis­ No decision on consul­ Appraisal issues under (Bank) tance, through a financial in­ tants. consideration. termediary, to several cement plants to convert from wet to dry process. Total project cost about $370 million, of which about $100 mi 11 ion in foreign exchange.

Gujarat Housing 54,0 (R) Gujarat Urban - Program of land No expatriate consulting Appraisal report being Board, Govern­ (IDA) and infrastructure development; services required. prepared. ment of Gujarat slum improvement and municipal services, and small- and medium­ town development for selected cities and towns in Gujarat.

Kerala Water and 41.0 Kerala Water Supply - (a) Aug­ Local consultant assist­ Appraisal report being Waste Water (IDA) mentation of water supply of ance required for devel­ prepared. Authority, piped water of Ouilon; (b) pro­ oping sector-wide train­ Government of vision of piped water to seven ing and such centralized Kerala regional rural areas and (c) a services as leak detec­ pilot urban and rural low-cost tion, meter repairs, sanitation component to serve workshops, etc. Consult­ se lee ted towns and vi 1 lages. ants would also be needed Total project cost about $85 for implementation of fi­ million, of which $19,4 million nancial systems and a in foreign exchange. sector-wide tariff study.

Department of 80,0 (R) Maharashtra Composite Consultants required. Appraisal report being Irrigation, (Bank) (Majalgaon) Irrigation. The prepared. Ministry of project would complete Parthan Agricu 1 ture, Left Bank Command (31,000 ha), Government of construct Majalgaon Dam and Maharashtra Right Bank Canal (94,000 ha), field channels, drains, rural roads, etc. Total project cost estimated at $400 million.

To be determined 65.0 (R) Forestry Education, Research and No decision on consul- Project preparation under (IDA) Training - Manpower training at tan ts. way. all levels and support to the proposed Indian Council of For­ estry Research and Education.

Department of 75 .o Andhra Pradesh Composite Irriga­ Consultants have been re- Project preparation under Irrigation, (Bank) tion - Construction of the Sri­ cruited. way. Ministry of 75,0 salem Right Branch Canal; exten­ Agricu 1 ture, (IDA) sion of 77,000 ha of the irriga­ Government of tion service area of the main Andhra Pradesh canals of the Sriramsagar Dam.

Department of 45,0 (R) West Bengal Minor Irrigation - No consultants required. Appraisal report being Irrigation, (Bank) Construction of about 1,200 Ministry of prepared. tubewells, 10 1 000 shallow tube­ Agriculture, wells, and 10,000 open-dug Government of wells; and completion of the West Bengal distribution systems of about 600 existing river lift pumps. Total project cost estimated at $141 million.

See page I for footnotes. - 41 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )J Lender 1_/ Consul ting Services Action on Procurement !!J

~ (Cont'd)

Coal India Ltd. 200.0 Jharia Coal Project - Assistance No decision on consul­ Appraisal report being (Bank) to Bharat Coking Coal Ltd. in tants. prepared. (Co-financing expanding production of coking with United Kingdom is coal. Total project cost about possible,) $670 million, of which $210 million in foreign exchange.

Roads Wing, 275.0 (R) National Highway II - Develop­ No consultants required. Appraisal report being Ministry of (Bank) ment of expressways, highway prepared. Shipping and upgrading and pavement streng­ Transport thening on selected high-capa­ city routes throughout India.

Kerala State 165 .0 (R) Kerala State Power Project - No decision on consul­ Appraisal mission in the Electricity (Bank) Construction of a 180 MW hydro­ tants. field, Board, Govern­ electric generating station to­ ment of Kerala gether with associated works and transmission lines in Kerala State. Total project cost esti­ mated at $337 mill ion,

Maharashtra 250.0 Chandrapur Thermal Power Project Consul tan ts for engin­ Appraisal report being State Electri­ (Bank) - Installation of two 500 MW eering and design have prepared. city Board, units, units 5 and 6, at the been recruited. Government of Chandrapur plant in Maharashtra. Maharashtra Total project cost estimated at $1,116 million, including for­ eign exchange component of $415 million.

Department a f 31.8 (R) Kerala Social Forestry - Affor­ No expatriate consultants Credit signed on December Forestry, (IDA) estation on government and pri­ required. 12, Ministry of vate land primarily for fuel­ Agricu 1 ture, wood, poles, timber, fodder and Government of environmental conservation. Kerala Total project cost estimated at $54,5 million, of which $3.7 million is foreign exchange.

National Bank 150.0 (R) NABARD I - Assistance, over a No decision on consul­ Project preparation under for Agriculture (Bank) three-year period, to National tants. way. (Co-financing ex­ and Rural Devel­ 150.0 Bank for Agriculture and Rural pected,) opment (NABARD) (IDA) Development in providing rural credit to farmers. Total proj­ ect cost estimated at $2,0 bil­ lion, of which $28 million in I foreign exchange.

Ministry of 250.0 (R) Industrial Export Development No consultants required. Appraisal report being Finance and (Bank) Finance - Assistance to export­ prepared. (Co-financing Industrial oriented companies throughout possible,) Credit and India. Investment Corporation of India

Ministry of 70,0 (R) Reservoir Fisheries - Introduc­ No decision on consul­ Project preparation under Agriculture, and (IDA) tion of improved aquaculture tants. way. State Depart­ technologies in reservoir fish­ ments of Fish­ eries, including fish breeding, eries stocking, water productivity and fishing operations management, to increase inland fish produc­ tion.

Ministry of 70,0 (R) Fourth Population Project - Im­ No expatriate consultants Appraisal mission find­ Health and (IDA) provement of service delivery required. ings under review. Family Welfare and demand creation for family welfare in backward districts of West Bengal under GOI' s "area" (state) projects policy combined with a state-wide training component.

To be determined 100.0 Refinery Conversion and Expan­ No decision on consul­ Appraisal mission find­ (Bank) sion - Construction of new re­ tants. ings under review. finery at Karnal and expansion of Haldia refinery unit. Total project cost about $2.2 billion, of which about $450 mi I lion in foreign exchange.

See page I for footnotes. - 42 -

Member Country, Amount & ~qd Implementing Probable Stage of Processing and Agency 1./ Lender Jj Consul ting Services Action ·on Procurement !±/

INDIA (Cont'd)

Bombay Municipal 100.0 (R) Bombay III Water Supply - Pro­ No decision on consul­ Project preparation under Corporation (Bank) duction of an additional 100 mgd tants. way.· Appraisal mission of water for the Bombay Metro­ scheduled for March. politan area from the Bhatsai River, trunk distribution, dis­ tribution mains and sewage collectors, low-cost sanitation, and studies to determine the next incremental production of water required to s~rve the Bom­ bay area. Total project cost estimated at $365 million, in­ cluding a $50 million foreign exchange component.

Ministry of 30.0 Himachal Pradesh Watershed - To No consultants required~ Appraisal report being Agricu 1 ture (IDA) support soil conservation, live­ prepared. stock minor' irrigation, horti­ culture and research in Himachal Pradesh.

Gas Authority of 167 .o (R) Hazira/Bijaipur/Jagdishpur (HBJ) Back-up consultants to Appraisal report bei~g India Limited (Bank) Gas Pipeline Project. Construc­ assist in project imple­ prepared. (Co-financi~g tion of a gas transmission pipe­ mentation have been ap­ expected.) line, including compreS~or sta­ point~d. tions, metering facilities, etc. Total project cost estima­ ted at $1.8 billion, including $865 million in foreign ex­ change.

Central Water 100.0 National Water Management. Sup­ No decision on consult­ Project preparation under Conn:nission, and (IDA) port for·improved water manage­ ants. way. Irrigation ment activities in' selected Departments of projects covering 2. 75-1.00 ha participating in six core States (tentatively States Andhra Pradesh, Gujarat, Karna­ taka, Maharashtra and=·Tamil Nadu). Total project cost estimated at $200 million.

GO! Department 100.0 (R) Composite Social Forestry (For­ No decision on consult­ Appraisal report being of Forestry, and (IDA) merly National Social· Forestry). ants. prep8r~d. (Co-financing Forestt'y Increasing wood production to expected.) DepartmE!nts·of­ satisfy ·demand. Tota~ project participating cost estimated at $~00 million. States

Irrigation 50.0 Kerala/Kallada Irrigation II. No decision on consult­ Project preparation under Department, (IDA) Follow-up on Kallada Irrigation ants. way. Ministry of Project. The project will be a Agriculture, ·test of the potential of surface Government of irrigation on commercial tree Kerala crop production. Total, project cost estimated at $100 million.

India Posts and 250.0 (R) Telecommunications IX. Provi­ · No decision on consult­ Pre-appraisal mission in Telegraphs (Bank) sion of imported equipment and ants. the field. Department raw materials to meet nationwide telecomID.unications requirements; support for expansion and mod­ ernizatioii of existing factories and establishment of new manu­ facturing units. Total project cost estimated at $3 billion,° of which $750 million in foreign exchange.

National Thermal 200.0 (R) Rihand Power Transmission - Con­ Consul tan ts' services Appraisal report being Power Corpora­ (Bank) ~truction of 910 km of 500 kV DC wi 11 be· needed for prep­ prepared. tion transmission lines and 1,500 km aration of long-term of 400 kV AC transmission lines trallsmission plan and connecting the Rihand and identification ·of related Singrauli.power plants.with projects. cities in the Northern Region, together with required convert­ ing stations and sub-stations. Total project ·cost estiniated at $608 million, of which about $270 million in foreign ex­ change.

~ee page 1 for footnotes. - 43 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1) Lender 1/ Consultin~ Services ActiOn on Procurement 4/

INDIA (Cont'd)

National Thermal 250.0 (R) Capital Region Thermal, Instal­ No decision on consult­ Pre-apprai~al mission ~n Power (Bank) lation of four coal-fired 210 MW ant&. the field, Corporation units of a new plant at Muradna­ gar in the State of Uttar Pra­ desh, ·together with associated 400 kV transmission lines. Total project cost about $1.1 billion, of which $350 million in foreign e~change.

Ministry of 65.6 (R) National Agricultural Extension No·decision on corisult­ Appraisal report being Agriculture and (IDA) Project II. Assistance to four a"nts.: prepared. Governments of States in strengthening exten­ Gujarat, Harya­ sion systems in various States na; Karnataka, through tQe introduction of the and H~machal training and visit system. To~al Pradesh prOjec·t cost estimated at $60 million, of which $5 million in foreign exchange.

Indian Council 90.0 (R) National Agricultural Research No decision on consult­ Appraisal mission find- · of Agricultural (IDA) II Project. Strengthening of ants. ings under review. Research capability of State Agricultural Universities to conduct loca­ tion-specific research. Total project cost· estimated at $83 million, of which $8 million in foreign exchange.

Bank of Maldives 5.2 Production Promotion a~d Credit Will be required for Project ·preparation· under (BOM) (IDA) Project: To develop agricultur­ technical assistance w~y. al and agribusiness sectors component. through strengthening the devel­ opment banking functions of BOM~ Key components financed under the project would be: vegetable, fruit, coconut, palm­ wood and firewood production; a_nimal husbandry, cottage indus­ tries and transport vessels, along with technical assistance.

Ministry of 107.0 Marsyangdi Hydroelectric - Consultants have been re­ Approved by the Executive Water Resources (IPA) Hydro-electric ·power station in cruited. Directors on May·22. (Co­ Central Nepal with 69 MW in­ financing agreed in prin­ stalled capacity, transmission ciple with Federal Repub­ to central grid, and consultancy lic of Germany for.$74,5 services. Total project cost ·million, Kuwait Fund for estimated at $323.3 million of $21 million, and Saudi which $248.4 million in foreign Fund· for $25 million,) exchange. . . Ministry of 47.5 Highways III - Completion of the Consultants will be re­ Credit signing Decem­ Works and (IDA) East/West Highway; road mainten­ quired for civil works, ber 17. Transport ance; and technical assistance. technical as~ is tance and (Co-financing with Saudi Total project cost estimated at training. Fund and UK (ODA) being $116.0 million, of which $86.9 considered.) ' million in.foreign exchange.

Nepal About Telecommunications IV - Follow-. Required for financial Completion of negotia­ Telecommuni­ 22.0 up for expansion of local and and organizational re­ tions awaiting conclusion cations (IDA) international services. Total structuring of NTC. of co-financing arrang~- · Corporation project cost estimated at $60.l men ts. (NTC) million, of which $46 million in foreign exchange. ·

~inistry of About (R) Babai Irrigation. - Includes con­ No decision made whether Appraisal report urider Water Respurces 35.0 struction of weir and headworks 1 consul tan ts . wi 11 be re­ preparation. (Co­ (IDA) on Babai River, construction of quired. financing being ·•ought,) irrigation and drainage' facili­ ties on about 13,000 ha of land, and strengthening of agricultur­ al ex tens ion services in the area. Total project cost es ti..:. mated at $64.5 mit"lion, of which $45.2 million in foreign ex­ change.

See page 1 for fo"otnotes. - 44 -

MetQber Country, Amount & and I1Dpl~menting Probable Stage of Processing and . A~ency l/ Lender·?:/ Consulting Services Action on Procurement !!,,/

~ (Cont'd)

Ministry ·of 7 .5. (R) Industrial Development - To pro­ Not required. Negotiations completed. · Industry (IDA) vide long term funds through the Board presentati9n on Nepal Industrial Development December 11. Corporation (NIDC) to industrial enterprises in the private sec­ tor and assist in the overall institutional development of NIDC; assist in the development of leather and leather goods, and provide assistance in devel­ oping the light engineering sec­ tor; address key problem areas in industrial and export poli­ cies, procedures and administra­ tion through technical assis­ tance. Total project cost esti­ mated at $12 million, of which $9" million in foreign exchange.

Ministry of About (R) Agricultural Manpower Training - May be required for Negotiations completed. Agriculture 8.4 To modify the existing middle training and technical Board presentation on (IDA) level agricultural training sys­ assistance. December 11. tem and tailor it to the skill requirements of field extension workers and general agricultural technicians; establish degree program in animal husbandry; and to initiate an extension program for farm women. Total project cost estimated at $14.3 million, of which $7.2 million in fore~gn exchange.

, Minist.ry of About (R) Agricultural Extension II - To Will be required for Negotiations tentatiVely Agriculture 8.0 reorganize agricultural admini­ civil works. scheduled for late Decem­ (IDA) stration in six new districts to ber/January. permit the establishment of training and visi~ systems; s~rengthen existing extension systems in six districts where there are ongoing irrigation projects; strengthen two new ex­ tension training centers; and conduct a study of project mon­ itoring and evaluation capabil­ ity. Total project cost estima­ ted at $9.3 million of which $2.6 million in foreign ex­ change.

Ministry of About (R) Rasuwa-Nuwakot Rural Development No decision on consult­ Project preparation under Panchayat and 17 .o III - Follow-up on first credit ants. way. Local Develop­ (IDA) with emphasis on (i) achieving ment fuller use of the infrastructure created during the first phase; (ii) expanding and improving ag­ ricultural support services; ( iii) exploiting the irrigation potential of the area by con­ structing additional gravity irrigation schemes; and (iv) developing additional infra­ structure including drinking water supply systems. Total project cost estimated at $13.4 million.

National 13.0 (N) Population - Provide family Will be required. Project preparation under CommisftiOn on (IDA) planning and mother and child way. (Co-financing with fopula_tion; health services; improve and ex­ UK and Federal Republic Ministry ·of pand training facilities and of Germany being con­ l!ealth programs for field workers, sidered.) paramedics, doctors and nurses; develop a system of production, distribution and logistics for informational and educational materials; establish a national vital registration system. Total project cost estmated at $18.0 million.

See page 1 for footnotes. - 45 -

Member Country, Atnount & and Implementing Probable Stage o"f Processing and Agency Jj Lender :Y Consulting Services Action on Procuremerit .4/

NEPAL (Cont'd)

Ministry of 10.0 (N) Deep Aquifer Exploration - Iden­ Consultants recruited for Project preparation_unde~. Water Resources (IDA) tify new and untap'ped · sources of project preparation. way. irrigation water supply from deep aquifers which would in­ crease cropping intensity in the Terai. This would include dril­ ling of exploratory boreholes; construction of wells; in-serv­ ice training; and preparation of reports. Total project cost estimated at $13.0 million.

State Petroleum 30.0 (R) Refinery (Secondary Conversion) Consultants have been re­ Government reviewing via­ Refining and (Bank) - To support the construction of cruited. bility of the project. Petrochemical a hydrocracker project in Paki­ Further processing de­ Corporation stan. Total project cost esti­ pendent on outcome of Limited mated at $426 million, of which review. $214 million in foreign ex­ change.

Water and Power 50.0 (~) Power WAPDA V - Expansion of Consultants will be re­ Appraisal report being Development (Bank) power transmission systems. quired for engineering prepared. Authority purposes. (WAPDA)

Ministry of 150.0 SAL II - To support Government's No consul tan ts required. Initiating memoran4um Finance (Bank/ Structural Adjustment Programs und_er preparation. IDA) in the areas of Agricu 1 ture, In­ dus ~ry and Energy.

Department of 8.3 {R) Agricultural Extension Project Consultants to introduce Board presentation on. Agriculture, (IDA) III - To improve agricultural the Training and Visit December 11 • Government of extension services in Baluchi­ System have been re­ Ba luch is tan stan Province by applying the cruited. Training and Visit System; im­ proving training B.nd adaptive research. Total project cost estimated at $11.6 million, of which $2.6 million in foreign exchange.

Water and Power 150.0 (R) Left Bank Outfall Drain - To Consultants have been Board presentation on Development (IDA) support the construction of a used for preparation. December 11. (Additional Authority comprehensive drainage system in Additional consultants co-financing will be (WAPDA); the lower Indus Basin in Sind will be required for needed. ADB, CIDA, Swiss Government of Province to relieve the exten­ technical and managerial Government, ODA, OPl!C and Sind Province sive water-logging and salinity guidance. Saudi Fund considering which have occurred as a result co-financing.) of irrigation. Total project cost estimated at $637 million, of which $316 million in foreign exchange.

Water and Power 100.0 Power WAPDA IV - Expansion of Previously engaged con­ Board presentation tenta­ Development (Bank) the power transmission and dis­ sultants expected to tively scheduled for Authority tribution system. Total project continue. January 29. (WAPDA) cost estimated at $631. 7 mil­ lion, of which $236 million in foreign exchange.

Provincial 30.0 (R) Primary Education II. No consultants envisaged. Appraisal repo1:t being Education (IDA) prepared. Departments

State Cement 50.0 (R) Cement Energy Saving - To sup­ Consultants selected. Project preparation under Corporation (Bank) port the rehabilitation and in­ way~ (Co-financing en­ troduce energy efficiency meas­ visaged,) ures in six existing cement plants.

Oil and Gas 50.0 (R) Petroleum Resources Development No decision made whether Project preparation under Development (Bank) - Appraisal and development of a consultants will be re­ way. (Co-financing en­ Corporation number of dormant gas fields; quired. visaged.) infrastructure development for recent petroleum discoveries; and development of the Dhodak field.

See page 1 for footnotes .. - 46 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender J:./ Consufting Services Action on Procurement!±_/

PAKISTAN (Cont'd)

Ministry of ·i 30.0 Private Tubewells and Rural Consultants have been.re­ Project preparation .under Water and Power, (IDA) E lee trification. cruited for pr~ject prep­ way, financed by UNDP. and Provincial aration. Additional con­ Departm~nts of sultants will be required Irrigation for project implementa- and/or Agri­ . tion. culture

PakiStan 75.0 (R) Telecommunications V. To sup­ No decision made whether Appraisal report .being· Telephone & (Bank) port the expansion and moderni­ consultants will be re­ prepared. (Co-financing Telegraph zation of Pakistan's telecommun­ quired. being sought with .ADB, ications systems. OECF, KfW Germany, and commercial sources.)

National Highway 70.0 (R) Highways IV. No decision on consul­ Project preparation under Board (Bank) tants. way.

ProvinciB.l 25.0 (R) Water Management II - Renovation Consultants have been re­ Appraisal report being Depts. of (IDA) of water courses and improvement cruited for project prep­ prepared. (Co-financing Agriculture of water management. aration. Additional con­ beiqg considered by sultants will be required IFAD), for Project implemerit.i­ tion·.

Punjab & Sind 35.0 (R) SCARP Transition.and Improvement Consultants have been re­ Project preparation under Provincial (IDA) - Tl;'ansfer of responsibility for cruited for project prep­ way, financed by UNDP. Depts. of ground~ater development in sel­ aration. Additional cOn­ Agriculture ected areas from public to pri­ sultants will be required vate sector; improvement of op­ for project implementa­ eration and maintenance of tube­ tion. wells.

To be determined 100.0 (R) Energy Sector Loan. No consultants required. Appraisal mission iq the (Bank) field.

To be determined 75.0 Agriculture Sector Loan - To Consultants have been re­ Project preParation under (Bank) support program of structural cruited. Acid·itional con­ way. reforms to include setting of sultants may be required investment priorities, rational­ for further Preparation. izati~n of incentive·s and strengthening of institutions.

Ministry of 50.0 (R) Petroleum Exploration. Consultants may be re­ Project identi fiCation PetroleulD and (Bank) quired to assist in prep- under way. Natural 8.ration. Resources

Miltistry of 100.0 (R) Industrial Credit II. No consultants required. Pr~ject identification Finance (Bank) under way.

Agricultural 75.0 Agricultural Credit VI. No decision made whether Project· preparation under De"'elopment Bank (Bank) consultants will be re­ way. of Pakistan quired.

Municipality of 55.0 (R) Karachi Urban - First phase of Consultants are being Appraisal mission in the Karachi (IDA) comprehensive and multisectoral used to assist in prepar­ field. improvements for the. Karachi ation. metropolitan area (e.g. water supply, sewerage, transport, squatter upgrading, a number of studies and technical assis­ tance).

Ministry of 20.0 (R) Primary Education III. No consultants required. Project identification Education (IDA) under way.

Ministry of 30.0 (R) Irrigation Rehabilitation II. Consuitants· will be re­ Project preparation under Water and PoWer, (IDA) quired. way, financed by UNDP. and ProVincial Dej,al:'tments of Irrigation

M~Jlistry of 30.0 (R) Education VIII. No decision made whether P~oject identification Education (IDA) coilsul tantS will be re­ under way. quired.

See page 1 for footnotes. - 47 -

Member Country, Amount & and lmpleDlenting Probable Stage of Processing and Agency}) Lender y Consulting ServiceS Action on Procurement 4/

PAKISTAN (Cont'd)

Provincial 20.0 Agricultural Extension·rv - No decision made whether Project preparation under Departments of (IDA) FolloW on to ongoing extension consultants will be re­ way. Agriculture projects in Punjab and Sind quired. Provinces.

State 3.2 (N) Engineering Industry: Technical Consultants will be re­ Appraisal mission in the Engineeriilg (IDA) Assistance - Techno-economic quired. field. Corporation studies for the restructuring of major public sector engineering enterprises.

SRI LANKA

Department'of 17 .o (R) Major Irrigation Rehabilitation Consul tan ts requir"ed. Board presentation sched­ irrigation (IDA) Project - Rehabilitation 3.nd uled for December 18. modernization of a number of major irrigation tanks. Total project cost estima~ea at $43.2_ million, of which $18.2 million in foreign exchange.

Department of About Second Road Maintenance Project con~ultants required· for Appraisal report being Highways 24.0 - Rehabilitation of road seg­ supervisory responsibi­ prepared. (Bank) ments and bridges, and improved lity. maintenance for road network.

Ministries. of 43.0 (R) Fourth Tree Crops Project - Re­ No deciSiorl made whether Appraisal report under State Planta­ (IDA) habilitation of tree crops--tea cotisultants will be re­ preparation. tiofls, and and rubber--plantations in the quired. Janatha Estate estate sector. Development

Ministry of Up to Fifth Tree Crops Rehabilitation No de~ision made whether Project preparation under Plantation 22.0 - Replanting of over-aged, low­ consul tan ts wi 11 be re­ way. Industries (IDA) yielding smallholder rubber and quired. improvement in rubber processing standards.

Ministry of About (R) Dairy Development II - To No d"eciSion made ~ether Appraisal report being Rural Indu~trial 36.0 strengthen the existing Coopera­ consultants will be re­ prepared. DevE':lopment (Bank) tiv:e Or"ganizations' milk produc­ quired. tion; to improve processing and marketing of milk, and to im­ prOve transportation and chil­ ling facilities for miik, pro­ vide teaching, research training and consultancy and audit sup­ port tO the dairy industry.

Ministry of 45.0 (N) Agi-icultural Research ~roject - No decision on consul­ Project preparation under Agricu 1 tura 1 (Bank/ Establishmeht of a national tants. way. Develoment and IDA) agency to enSure coordinated Research research planning, and strength­ ening of the national agricul­ tural research institutions.

Ministry of. 35.0 (N) Third Watei Supply Project - Re- No dE!cision on consul- Project preparation under Local Govern­ (IDA) habilitation of existing assets, tants. way. ment, Housing particularly production facili- and Irrigation; ties, improve operation and and National maintenance facilities, and up- Water Supply and grade distribution work in Drainage Board selected areas. (NWSDB)

Mii:iistry of 60.0 (N) Ninth Power Project (Distribu- Consul tan ts required. Project preparation under Power and Energy (Bank) tion Rehabilitation) - Rehabili- way. tat ion of Ceylon Electricity Board's (CEB) power and trans- mission System.

See page I for footnotes. - 48 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender 1/ Consulting Services Action on Procurement 4/

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

ALGERIA

SONELGAZ To be Power III - Project would in­ No decision made whether Preparation under way by deter­ clude rural electrification. consultants will be re­ Government. , mined quired. (Bank)

Ministry of To be Highways V - Road maintenance, No decision made. Preparation under way by Pub lie Works deter­ technical assistance and train­ Government. mined ing. (Bank)

Ministry of About Ports III - Construe tion of port ConSultants will be re­ Discuss ion in progress Public Works 100.0 at Djendjen in eastern Algeria. quired for construction, with Government on pos­ (Bank) supervision, tariff and sible project redesign. investment studies and training. Procurement: Project in­ volves advance contract­ ing, with award of a single contract for major civil works, and the pos­ sibility of retroactive financing of a small por­ tion.

Ministry of About Agricultural Research - Streng­ Consultants wil 1 be re­ Appraisal report being Agricu 1 ture 10.0 thening of research and ext­ quired to help design and prepared. (Bank) ension services of Ministry of plan building program and Agriculture. prepare tender documents, as well as to provide as­ sistance in various fields (extension, veter­ inary, research, etc.)

Ministry of About Krasokhoria Integrated Rural No decision made whether Project preparation under Agricu 1 ture 10.0 Development Project - Irriga­ consultants will be re­ way. (Bank) tion, rural roads, social infra­ quired. structure.

Sewerage Boards About Larnaca/Ayia Napa Sewerage Proj­ Consultants have been re­ Detailed environmental of Larnaca/Ayia 15.0 ect - Provision of sewerage col­ cruited. and agricultural reuse Napa (Bank) lection, waste water treatment (of effluent) studies to systems to the major urban and be undertaken by Govern­ tourist centers. ment.

EGYPT, ARAB REPUBLIC OF

Egyptian Public To be Fifth.Drainage Project - Contin­ No decision made. Appraisal report being Authority for deter­ ued support for Egypt's field prepared. Drainage Pro­ mined drainage and bilharzia control jects (EPADP) (Bank) program. and Ministry of. Health

Egyptian To be Fourth Power Project - Transmis­ No decision made. Project being prepared by Electricity deter­ sion, distribution and rural EEA. Authority (EEA) mined electrification. (Bank)

To be determined To be Gas Development V - Development No decision made. Project being prepared by deter­ and distribution of natural gas. Egyptian General Petro­ mined leum Corporation (EGPC). (Bank)

Development 100.0 Construction Industry Sector - Consultants will be re­ Approved by the Executive Industrial Bank (Bank) Assistance to Egypt's construc­ quired to the Joint Com­ Directors on June 28. tion industry through lines of mittee for Sectoral Stud­ credit and technical assist­ ies for the management ance. Total project cost esti­ development program and mated at $132.2 million, with to the participating $100 million in foreign ex­ banks for sub-project ap­ change. praisal.

See page 1 for footnotes. - 49 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Y Consul ting Services Action on Procurement 4/

EGYPT, ARAB REPUBLIC OF (Cont ' d)

Ministry of 23.7 (R) Vocational Training II - To in­ None required. Negotiations tentatively Industry (Bank) crease the supply and upgrade scheduled for January/ the quality of skilled and semi­ February. skilled manpower in the indus­ trial sector and particularly in the automotive, eletrical, metals, mechanical, foundry, chemical and marine subsectors by establishing four new Voca­ tional Training Centers (VTCs) and extending the training fa­ cilities of six existing VTCs.

To be determined To be (R) New Land Development II - Phase No decision made. Project processing in deter- II of the New Land Development abeyance pending determi­ mined Project (West Nubariya). nation of its economic (Bank) viability.

Ministry of To be Second Agricultural Development None required. Appraisal report being Agriculture deter- Project. prepared. mined (Bank)

Ministry of Land To be (R) Lake Manzala Development - Re­ No decision made. Project being prepared by Reclamation deter- clamation and low cost settle­ Ministry of Land Reclam­ mined ment of about 60,000 feddans of ation. (Bank) uncultivated land.

Development 170.0 SMI - Small- and medium-scale Consultants will be re­ Approved by the Executive Industrial Bank (Bank) industry development. Credit quired for study of Directors on June 28. channelled through development small-scale industrial finance companies. sector.

Export Develop- 125.0 Export Promotion - Assistance Consul tan ts wil 1 be re­ Approved by the Exec~tive ment Bank (Bank) for development of manufacturing quired for various stud­ Directors on June 28. industry exports. Tota 1 project ies and institutional cost estimated at $315.6 mil­ a trengthening. Bank Project Preparation lion, with $158.9 million in Facility ad~ance of foreign exchange. $565,000 approved for technical assistance to the two principal insti­ tutions executing the technical assistance com­ .,.., ponent of the project. Port Said Port About (R) Port Said Expansion and Reha­ Consultants appointed Appraisal report being Authority 25.0 bilitation - Procurement of through Bank Project prepared. (Bank) equipment, civil works and/or Preparation Facility. other facilities. Bank Project Preparation Facility advance of $500,000 approved for soil investigation, pre­ liminary engineering de­ signs, and estimates of cost and of equipment requirements.

To be determined To be (N) Vocational Training III - Train­ None required. Appraisal mission in the deter­ ing of technicians and skilled field. mined workers for electrical and con­ (Bank) struction trades.

HUNGARY

National Bank of 73.0 (R) Industry - Fine chemicals proj­ Consul tan ts wi 11 be re­ Appraisal report being Hungary (Bank) ect with two components (MDI, quired to carry out prepared. (Co-financing pharmaceuticals). studies. likely to be required.)

National Bank of 80.0 (R) Livestock Development and Agro­ Consultants will be re­ Appraisal report being Hungary (Bank) industry - Rendering, feed mills quired for export market­ prepared. (Co-financing and meat and dairy processing. ing studies. likely to be required.)

National Bank of To be (R) Transport I - Railway improve­ Consul tan ts will be re­ Appraisal mission in the Hungary deter­ ment; development of road trans­ quired for highway com­ field. mined port; related river port im­ ponent. (Bank) provement, and technical assist­ ance.

See page 1 for footnotes. - 50 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender];_/ Consulting Services Action on Procurement~/

Water Authority 30.0 (R) Water Supply and Sewerage - To Consultants have been re­ Negotiations substantial­ (WA) (Bank) improve the water supply and cruited. ly completed. sewerage services in the Greater Procurement: Retroactive Amman area and would include: financing of $30 million (i) extension and rehabilitation recommended. of water tnains; ( ii) construc­ tion of trunk and colleCtion sewers; (iii) construction of two sewage treatment works; (iv) suppiy of operating and mainte­ nance equipment; an~ (v) consul­ tant services for engineering project management and construc­ tion supeJ.""vision.

Ministry of. About (R) Construction and equipping of No decision made whether Appraisal mission prepar­ Health 1s·.o primary health cent~rS, and consultants will be re­ ing report. (Bank) technical assistance to the quired. Ministry of Health.

Pension Fund To be (R) Construction of a foundry. Candidates for ·technical Preparation mission in deter- partners short-1 is ted for the field. mined operational assistance.

Amman Munici- To be (R) Low income housing and Munici­ To be determined. Appraisal mission in the pality deter- pality development. field. (Co-financing mined likely to be required.)

Cities and Vil- To be (R) Second Cities and Villages De­ Consultants likely to be Appraisal mission tenta­ lages Develop- deter- velopment Bank Project - Line of required for operational tively scheduled for menl: Bank (CVDB) mined credit and further institutional assistance. March. (Bank) strengthening of CVDB. ·

Vocational To be (N) Manpower Development I - Assist­ To be dete~ined. Appraisal mission i~·the Training deter- ance to Vocational Training Cor~ field. Corporation mined poration (VTC) to expand and (VTC) (Bank) strengthen its training pro­ grams; support to Government to develop latest market informa­ tion system; strengthening of public management and admini­ stration training.

To be determined To be Sewerage - Rehabilitation and To be determined. Further processing con­ deter­ extension of sewer·network for tingent on Governmerit's mined Casab l~nca-Mohanmed ia ~egion. actions on inStitutional (Bank) issues.

Mini~try of About Family Health Project including Consul ting services will Apprais~l report being Public Health 20.0 basic· health service&, training, be needed for management, prepared. (Bank). heaith education, environmental financial analysis,· drug sanitation, and t~chnical as­ supply, project. monitor­ Bank Project Preparation sistance to Ministry of Pu,:,lic ing and evaluation sys- Facility advance of Health. . tems. $75,000 approved to fi­ nance consultant ser­

vices I logistical sup­ port·, and additional sur­ veys for the preparation of the proposed health projec~, to test a new. outreach system for the delivery of basic health services in Morocco.

To be determined To be Telecommunication Project - Ex­ Consul tan ts may be re­ Preparation under way. by deter­ pansion of the existi~g telecom­ .quired for project. imple­ Gover~ent. mined munications systems. mentation. (Bank)

Selected 25 .1 (R) Electro-mechanical Industries Consultancy services Negotiations substantial­ Commercial Banks (Bank) Project - Line of credit to would be required for ly completed. Board cind Office pour Treasury, to be on-lent through technical &ssist.ince to presen~ation scheduled ie Developpenient commercial banks to electrical, OD!. . for Jitnuary. Industriel (OD!) mechanical, and metallurgical industries, aS well ~s financing thr~ugh Office pour le Devel­ bppement Industriel (OD!) of participations in such in­ dustries; institutional streng­ thening, technical '.3SSistance.

See page 1 for footnotes. - 51 -

Member Coq.ntry, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender y Consulting Services Action on Procurement !!_/

MOROCCO (Cont' d)

Office Cher.ifien To be Establishment of about 10 fer­ No consultants reqU:ired~ Review of cone lusions of des Phosphates deter­ tilizer blending and distribu­ Pre-appraisal mission (OCP) mined tion centers. under way. (Bank)

National Office 27 .1 (R) Vocational Training I - Streng­ Consultancy services re­ Approved by the Executive for Vocational (Bank) thening of vocational training - quired for studies of co­ Directors on November 27. Planning first phase; and establishment ordination, financing, of training in pt'oje'ct prepara- · on-the-job training,, man­ tion and selection techniques. agement training., and·· Total project cost estimBted'at audiovisual· methods. $44 million, with $27 million in foreign exChange.

Ministry of To be (R) Casablanca Port - Rehabilitation Consultancy services Appraisal mission in mid­ Pub lie Works deter­ of CasSblanca Port; technical would be required for December. mined assistance to improve efficiency studies and training. (Bank) of port op~rations.

To be determined To be (R) Fourth Water Supply - Rehab­ To be determined. Project prepa7ation in deter­ ilitation of distribution sys­ progress. miried tems. (Bank)

To be determined About (~) Jerada Coal - Modernization of Consultancy services Negotiations schedule~· 30.0 mining techniques for Jerada would be required for for January. (Bank) coal mine. mine planning and oper­ ations and equipment maintenance.

Office National To be Petroleum Development - Follow­ To be determined. Scope and processing Of de Recherches et deter­ up to ongoing gas exploration project will be deter­ d'Exploitation mined project. mined throug~ ongoing Pet:roliereS: (Bank) project (Loan 2271-MOR), (ONAREP)

General Tele­ About (R) Telecommunications II - Expan­ Consultancy services Negotiations in December. communications 10.0 sion of network capacity, pro­ would be r~quired for Organization (Bank) vision of services to rural tariff study; planning or areas, training and ins ti-. forecasting; training; tutional development. development of co~puteri­ zation.

Ministry of About (R) Highways Maintenance III - High­ To be determined. Appraisal mission in mid­ Communications 12.0· way maintenance, rehabilitation, December. (Bank) training and technical assist­ ance.

Ministry of About Health - Strengthening health Consulting services to be Pre-appraisal mission Health 12.0 information system, planning, provided from UN sources scheduled for early 1985. (Bank) health education; constt'uction and Bank for project of water facilities. preparation.

PORTUGAL

Ministry of 34. 7 (R) Textiles - Line of credit to fi­ Consultants will be en­ Loan signed on Novemb~r Industry (Bank) nance modernization and restruc­ gaged· under the pr~ject 29. turing of textiles· enterprises. by the individual textile Total project cost estimated at enterprises to assist in $69,6 million, including $34.7 the preparation of their n:i,illio~ in foreign exchange. individual res truc·turing and market~ng plans.

To be determined To be Mechanical Industries II - Sup­ To be determined. Preparation under way. de~er­ port to enterprises in mechan­ mined ical and engineering industry (Bank) for rehabilitation and modern­ ization.

To be determined 15.0 Industrial· Technology - Upgrad­ To be determined. Prep~ration under way. (Bank) ing of tE!chnological support fa­ cilities for industry in light of needs for EEC entry,

National Housing About Housing - A general line of To be determined. Appraisal report being Institute 25.0 credit to provide housing pr~pared. (Co-financing . (Bank) finanCe for cons true tion of is expected from USAID.) housing for low-income groups through a ho~sing development bank,

~ee page 1 for ~ootnotes. - 52 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Y Consulting Services Action on Procurement.!!_/

PORTUGAL (Cont'd)

Gabinete da Area About (R) Coal Handling Port - Construc­ Consultants will be re­ Negotiations tentatively da Sines 71.0 tion of coal handling facilities quired to carry out stud­ scheduled for mid-Janu­ (Bank) at Sines. ies. Retroactive finan-, ary. (Co-financing like­ cing is likely to be rec­ ly to be required.) ommended for consultants to begin selected Procurement: A contract studies. has been awarded for the marine civil works. Retroactive financing likely to be recollllllended.

To be determined; To be (R) Regional Water Supply and Sewer­ To be determined. Preparation under way. deter­ age - Provision of water supply mined and sewerage facilities to muni­ (Bank) cipalities, under overall sector program.

Coordinating To be Entre Douro E Minho Region Agri­ Assistance being provided Preparation under way. Connnission of deter­ cultural Development - Institu­ by FAO/CP. (Co-financing likely from the Northern mined tional improvement to extension EEC.) Region (Bank) services and other agricultural support services in the North West Region for dairy produc­ tion.

N"ational 30.5 (R) Manpower Training and Develop­ Consultants will be re­ Loan signed on November Institute of (Bank) ment - Establishment of vocat­ quired to help develop 29. Administration; ional training centers to meet training courses and to Secretary of needs of industry and tourism; provide technical assist­ State for strengthening public admin­ ance for institutional Tourism; and istration and management with development. Ministry of re lated technica 1 assistance. Labor Total project cost estimated at $54.9 million, including $30.5 million in foreign exchange.

Ministry of 7.4 Agricultural Services - Provi­ Consultants will be re­ Approved by the Executive Food, Agri­ (Bank) sion of technical assistance to quired to carry out stud­ Directors on June 27. culture and carry out studies and prepare ies, training and provide Forestry long-term plans for improvement technical assistance. Procurement: Retroactive of extension, research, seeds financing up to $200,000 and agricultural marketing as for expenditures ~ncurred part of a strategy for agricul­ for consul tan ts' services tural development. Total project after May 1, 1984. cost estimated at $11.6 million, including $7.4 million in for­ eign exchange.

Investment Bank To be Industry XII (Galati Steel) - None required. Appraisal mission post­ deter­ Construction at Galati steel en­ poned at the Government's mined terprise of a cold reduction request, pending finali­ (Bank) mill and tinning line. zation of overall devel­ opment program.

Investment Bank To be Industry XI (Energy Saving Pro­ None required. Completion of techno-eco­ deter­ ject and Process Improvement in nomic studies delayed, mined Steel Subsector and/or coking pending finalization of (Bank) coal plant) - Project components overall development pro­ to be determined. gram. (Co-financing · likely to be sought.)

Agricultural To be Agricultural Credit (Transylvan­ None required. Negotiations postponed at Bank deter­ ia) - Regional development proj­ the Government's request, mined ect, including financing of pending finalization of (Bank) agricultural and agroindustrial overall development pro­ investment in Transylvania gram. (Co-financing Region. likely to be sought.)

Agricultural To be Agricultural Credit (Oltania) - None required. Completio~ of techno-eco­ Bank deter­ A line of credit through BAFI nomic studies delayed, mined for agricultural development in pending finalization of (Bank) the Oltania Region. overall development pro­ gram. (Co-financing likely to be sought.)

See page 1 for footnotes. - 53 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender y Consul ting Services Action on Procurement!!_/

ROMANIA (Cont'd)

Agricultural To be Irrigation IX - Drainage, land None required. Appraisal mission delayed· Bank deter­ reclamation and other related at the Government's re- ~ mined works on a sectorwide basis quest, pending finali­ (Bank) within the context of the Five­ zation of overall devel­ Year Plan. opment program. (Co-fin­ ancing likely to be sought.)'

Investment Bank To be Power V - Time slice investment None required. Appraisal mission post­ deter- for second half of 1981-85 Plan. poned at the Government's mined request, pending finali­ (Bank) zation of overall devel­ opment. program.

Investment Bank To be South Constanta - Agigea Port - None required. Appraisal mission post­ deter- A deep sea port and inner barge poned at the Government's mined basin and other related struc­ request, pending finali­ (Bank) tures and equipment. zation of overall devel­ opment program. (Co-fin~ ancing likely to be sought.)

Agricultural To be National Grain Storage - A line None required. Appraisal mission post­ Bank deter- of credit for expansion, rehab­ poned at the Government's mined ilitation and modernization of request pending finali­ (Bank) national grain storage facili­ zation of overall devel­ ties. opment program. (Co-fin­ ancing likely to be sought).

I nve s tmen t Bank To be Highways I - Construction of 200 None required. C6mpletion of project deter- km of North-South TransEuropean studies delayed, pending mined Highway (Bucharest-Constanta finalization of overall (Bank) Section), and National Road Re­ development program. habilitation and Training.

Investment Bank To be Industry - Utilization of meth­ None required. Completion of techno-eco­ deter- ane as chemical feedstock. nomic studie.s delayed, mined pending finalization of (Bank) overall development pro­ gram.

Investment Bank To be Petroleum II - Onshore deep None required. Completion of techno-eco­ deter- exploration and field devel­ nomic studies delayed, mined opment. pending finalization of I (Bank) overall development pro­ gram.

Agricultural To be Livestock V - Possible line of None required. Completion of project Bank deter- credit for production, proces­ studies delayed, pending mined sing and storage of major live­ finalization of overall (Bank) stock products. development program. lSYRIAN ARAB REPUBLIC Ministry of To be (R) Highways IV - Maintenance opera­ No decision made whether Preparation under way. Communications deter- tions and training. consultants are required. mined (Bank)

Ministry of To be (R) Sewerage II - Secondary treat­ Scope of work of consult­ Project being prepared by Housing and deter- ment works, main interceptors ants to be used not yet the Government. (Co-fin­ Utilities mined and secondary collection system determined. ancing will be sought.) (Bank) for Aleppo.

Ministry of To be (N) Sewerage III - Secondary treat­ Scope of work of consult­ Project being prpared by Housing and deter- ment works, main interceptors ants to be used to be de­ the Government. .(Co­ Utilities mined and secondary collection system termined. financing will be (Bank) for Damascus. sought.)

To be determined To be Education III - Extension of No decision whether con­ Preparation under way • deter- vocational education and . sultants are required. mined training. (Bank)

Ministry of To be (R) Agricultural Extension - Insti­ Scope of work of consult­ Appraisal report being deter- Agriculture tutional framework for develop­ ants to be used not yet prepared. (Co-financing mined ing country-wide ex tens ion ser­ defined. agreed with !FAD.) (Bank) vice.

See page 1 for footnotes. - 54 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender 1._/ ·consul ting Service$ Action on Procurement !!_I

MillistrY of About N~tional Irrigation Management Consultant services re­ Appraisal report be~ng Agriculture and 21.0 Improvement - Improvement and quired: Management In­ prepared. Irrigation (Bank) rehabilitation of public irriga­ fOrmation Systems and Offices tion schemes, including execu­ Institution. Building.· tion of works, provision of equipment, improvement of water manag~ment and institutional strengthening.

To be deteruiined To be Energy DeVelo.pmetlt - Focus on No decision made. Preparation bY Government deter­ development of gas/oil field. under way. mined· (Bank)

Ministry of To be Implementation of natiorial ex­ No decision ma.de. PreparatiOn by Government Agriculture deter­ tension master plans, including under way. mined adaptive research. (Bank)

To be determined To be Small Sea.le Industry II - Line No decision made. Prepa;ation by Governm.ent deter-, of credit to.Government to be under way. mined used bY commercial banks for (Bank) lending to small-scale indus­ tries.

Ministry of To be Highways.VI - Maintenance Pro­ No decision made. Project under preparation Public Works deter­ ject ( follow _up to Highways IV). by GoV'e.rnment and c~n­ mined sul tants. (Bank)

Ministry of About Extension of integ~ated primary No decision made. Post-appraisal mission Health 23.0 health care system ( follow-up to postponed at Governinent's (Bank) 1981 project.) requeSt., pending rev;ew of recent institutional changes and their impact on project design.

B,nque ~e Devel­ About Export Industries - Line of No consultants required. Appraisal repoI't being oppement ~cono­ 40.0 credit for development of indus­ prepared. ri:J.ique de Tunisie (Bank) tries mainly oriented towards (BDET); Banque export markets. Tuniso-Kowe it i­ enne de Devel.:.. ~ppement (BTKD); Societe Tunisi­ enne Seoudienne d'Investissement et de oe'!'eloppe­ ment (STUSID')

SOGITEX Group To be (R) Rehabilitation and expansion of No decision made. Appraisal mission in mid­ deter­ textile mills; phase II of on­ Decembei:. mined going project. (Bank)

To be determined To be Integ~ated regional development Consultants a'iready re...: Prepl.lration under way by deter­ in the Center-West region of tlie crllited. GoverilUlent. mined country. (Bank)

Ministry of About (R) North West Agricultural Produc­ Consultants required for Negotiations in early Agriculture 7.0 tion - Provision of research and extension mall.agement; re­ December. (Co-financing (Bank) extension, inputs, marketing searcti station develoP­ likely from Belgian Gov­ services to medium size farmers ment; farm machinery ernment.) ·on about 200,000 ha of arable testing; accounting; land; Construction of access treatment of animal feed. Procurement: Retroactive roa'ds. financing of up to $100,000 proposed for ex­ penditures incurred for consul tan ts I services after December 1, 1984,

To be determined To be (R) Orb.an Development IV - Upgrading One consultant reqUired Appraisal report being deter­ existing settlements and for in administration, ac­ prepared. mined servicing/developing new ones. counting and economic (Bank) data processing.

See page 1 for footnotes. - 55 -

Member Country, Amount & and Imp 1 emen ting Probable Stage of Processing and Agency J_/ ~II Consulting Services Action on Procurement !ii

~ (Cont'd)

Office des To be Grain.Storage II - Improvement No decision made. Preparation report being Cereal es deter- of storage and distribution of prepared. mined locally produced grain. (Bank)

To be determined To be Integrated regional development Consultants already re­ Preparation under way by d'etef- in the North-West region of the cruited. Government. Dlined couritry. (Bank)

Office de Mise AbOut (R) Gabes Irrigation - Rehabili­ Consulting services will Pre-appraisal mis~ion .in en Valeur des 30:0 tation of about 5,000 ha; exten­ be required in engineer­ the field; may be trans­

Perimetres Ir- (Bank) sion of about 2 1 000 ha .. through ing and mark.etin;g. formed into appraisal. gues de GabeS proV'ision of irrigatioll. systems et Mederine and reconversion of cropping patterns; strengthening of ex­ ecuting agency and farmers I as­ sociations.

To be determined To be (R) Electrical Mechanical Industries , No decision ina_de'. Appraisal mission in mid­ deter­ II - Line of credit for finan­ December. mined cing priority electrical .ind (Bank) chemical industries.

Ministry of To be (N) Agricultural Sector ..: Policy and· No deci~iori made. Preparation under way. Agriculture deter­ institutional reforms .. mined (Bank)

Pulp and P~per About (R) Paper Rehabilitation: Phase I - Consultants financed .by Appraisal report being Enterprise 55.0 Rehab'ilitation of Aksu, Dalaman, Bank Project-Preparation reviewed. (SEKA) (Bank) and Afyon Mills; technical as­ Facility advances total­ sistance to improve operations. ing $560,000 have pre­ Total project coSt estimated at pared Project. Consult­ $85.7 million including a for­ an ts exl)ec te4 to be re­ eign exchange component of $52.9 quired for assistance in million. project implementation and in assistance t'o im­ prove efficiency of op­ erations.

Turkish Coal To be (R) Soma Isiklar Lignite - Develop­ Consultants would be re­ Appraisal mission in the Enterprise deter­ meni;: of selected ligni.te quired for mine opera­ field. Authority mined field{s) to expand production; tions mB.nagement _an·d (Bank) confirmation of lignite local project implementatiOn. Bank Project Preparation deposits Snd related technical Facility advance of . assistance. $950,000 provided to help finance foreign exchange cos ts of preparation work.

Turkish Pipeline To be (R) Thrace Gas Pipeline - Thrace gas Consultant.a financed by Government has decided to CorpOration deter­ pipeline to Igsas fertilizer Bank Project Preparation use available gas for (BOTAS) mined plant. Facility advance· of $1.0 poWer· generation initial­ (Bank) · million are preparing ly; .Further processing project. of prqjE!c t pas tponed un­ til additional gas be - comes available.

To be determined To be Energy saving - Energy·saving Studies being financed Studies/energy ~udits deter.:. investments in selected indus­ under prior Bank loan~ unde~ way. mined tries. in publi'c and private (Bank) sectoi-s.

To be de term.i ned To be Port Modernization - Expansion Specialis~ services would Preparation mission in deter­ of port capacity, mcidernization be required for container tlie field.

mined of existing facilities I training handling and documenta­ (Bank) and s tuci ieS. tion maintenance and spares _inventory.

State Hydraulic Tei be Irrigation II - Completion of No decisi"on yet on need Prepar~tion t.i~der way •. Works; and deter­ ongOing irrigation arid on-farm for C!)nsultants. Ministry of mined works, and strengthening of Agriculture (Bank) extension.

See page 1 for footnotes. - 56 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )J Lender y Consulting Services Action on Procurement!!._/

TURKEY (Cont'd)

To be determined To be Gas-Based Fertilizer - Erection Consultants would be re­ Government has decided to deter­ of ammonia plant plus cons truc­ quired for implementation use available gas for mined tion of urea unit and pipeline assistance. power generation initial­ (Bank) spur. ly. Further project pro­ cessing postponed until additional gas becomes available.

To be determined To be Agriculture Credit III - Pos­ Consultants for studies Timing dependent upon deter­ sible inclusion of assistance to of credit cooperative progress under Agricul­ mined agricultural credit cooperatives system, financed by Bank tural Credit II. (Bank) and lines of credit to the Agri­ Project Preparation Fa­ cultural Bank for supervised cility, to be recruited Bank Project Preparation credit, agroindustry loans, and by State Planning Organi­ Facility advance of technical assistance. zation. No decision yet $400,000 approved for on need for consul tan ts consultant services. for project implementa­ tion.

Ministry of To be (R) Agriculture Sector Policy - Fi­ No decision yet on need Appraisal mission in the Agriculture; deter­ nancing imported agricultural for consul tan ts. field. State Hydraulic mined inputs and investment goods. Works; and (Bank) Agricultural Supply Organization

Ministry of About (R) Industrial Schools I - Upgrading No decision yet on need Appraisal mission in the Education 55.0 of industrial secondary educa­ for consultants. field. (Bank) tion system.

Industrial To be (R) Small and Medium Industries No decision yet on need Appraisal mission in the Investment and deter­ (SYKB) - Subloans for small in­ for consultants. field. Credit Bank mined dustry development. (SYKB) (Bank)

Turkish Electri­ To be Power Distribution - Urban dis­ Consultants preparing Project being prepared. city Authority deter­ tribution/rehabilitation and ex­ distribution master plan (TEK) mined tension. for selected urban areas. (Bank) Consul tan ts would be re­ quired for project imple­ mentation.

Cukurova To be (R) Hydropower - Construction of the No decision yet on need Preparation under way. Electric deter­ Sir Dam, and associated Hydro­ for consul tan ts. Company ( CEAS) mined power Plant. (Bank)

To be determined About (R) Cukurova Region Urban Develop­ No decision yet on need Bank Project Preparation 10.0 ment: Engineering Loan - Prep­ for consul tan ts. Facility Advance of (Bank) aration of feasibility and $600,000 approved for design studies for urban growth feasibility and design management; infrastructure; and studies, and establish­ training. ment of a project coordi­ nation unit.

Turkish State To be Railways II - Main line track No decision yet on need Project being prepared. Railways (TCDD) deter­ renewal; modernization of loco­ for consultants. mined motive workshops; signalling and (Bank) telecommunication facility; staff training and technical as­ sistance.

State Hydraulic About (N) Kayraktepe Hydro Power - Con­ No decision yet on need Preparation under way. Works (DSI) 100.0 struction of Kayraktepe dam and for consultants. (Bank) Hydro Power Station on Goksu River.

YEMEN ARAB REPUBLIC

Ministry of About (R) Wadi Al Jawf - Agriculture and Consul tan ts to finalize Appraisal report being Agriculture 10.0 rural development, including ir­ and updat~ designs and prepared. (Co-financing (IDA) rigation, credit, feeder roads, cost estimates are fi­ will be required: Saudi extension and livestock. nanced by IDA Project Fund and Islamic Bank Preparation Facility ad­ have expressed inter­ vance of $355,000. Con­ est.) sultants will be required for studies for possible follow-up project and technical assistance.

See page I for footnotes. - 57 -

Member Country, Amount & and Implementing Probable Stage of Processing and I Agency J./ Lender Y Consulting Services Action on Procurement!±_/

(Cont'd) \I YEMEN ARAB REPUBLIC Ministry of About Supplemental Credit: Ibb and Consultants will be re­ Project design and work Electricity, 11.0 Dhamar Water Supply and Sewerage quired to supervise con­ specifications being re­ Water and (IDA) Project; and house connections struction. viewed by Yemen Author­ I Sewerage in project areas. ities. (Co-financing will be required. Origi­ nal cofinanciers: Ger­ many, The Netherlands and Arab Fund have expressed interest.)

Ministry of About (R) Industrial Bank of Yemen (IBY) Retroactive financing of Negotiations under way. Economy and 8.0 II - To strengthen IBY's insti­ up to $100,000 is recom­ Industry (IDA) tutional capacity to promote, mended for consultants' finance and supervise private costs to assist in sub­ industrial projects. The proj­ project identification ect consists of three compon­ and promotion. ents: (a) consultants services and training to improve IBY's capacity to prepare, promote, appraise and supervise indus­ trial projects, and to assist entrepreneurs during their im­ plementation; (b) a pilot com­ ponent for training of indus­ trial managers through overseas short-term and on-the-job train­ ing courses; and ( c) a line of credit to IBY to provide part of its foreign exchange resource requirements during the 1985 and 1986 period.

Yemen Oil and About (R) Technical Assistance for Petro­ Consultants will be re­ Project scope being re­ Minerals 15.0 leum Products Supply Storage and quired to supervise con­ viewed following Govern­ Resources (IDA) Distribution: Receiving facili­ struction management, ment decision to reduce Corporation ties at Sali'f Port, white oil prepare manpower planning length of pipeline. (Co­ (YOMINCO) product pipe-line from Salif to and training programs, financing will be re­ Bajil, and technical assistance. and other technical as­ quired: the Islamic De­ IDA financing to cover technical sistance. velopment Bank, Japan, assistance component. France, Italy, the OPEC Fund and the UK have ex­ pressed interest.)

Procurement: The Govern­ ment is in the process of evaluating bids for the construction contract.

Central Planning 3.0 (R) Technical Assistance to the Cen­ Consultants will be re­ President's Report being Organization (IDA) tral Planning Organization. quired to provide techni­ prepared. cal assistance.

Yemen General To be Power IV - Phase III of regional Consul tan ts wil 1 be re­ Preparation under way. Electricity deter­ e lee tri fication program, inc lud­ quired for construction (Co-financing will be re­ Corporation mined ing distribution, technical as­ supervision. quired; Islamic Develop­ (YGEC) (IDA) sistance and training. ment Bank and CIDA have expressed interest.)

Ministry of About Southern Uplands Rural Develop­ Preparation assistance Preparation under way. Agriculture 10.0 ment III: Agriculture develop­ being provided by FAO­ (IDA) ment of areas in Southern Up­ CP. Consultants likely lands not covered under SURDP I to be required for proj­ and II. ect management.

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF

Ministry of About (R) Highways IV - Alternatively road Consultants will be re­ Project composition under Construction 4.0 maintenance program or construc­ quired. Scope depends on review. (Co-financing (IDA) tion of Nissab-Beihan road and project composition. will be required.) start up of maintenance program.

Ministry of About (R) Agriculture Research and Exten­ Consultants will be em­ Negotiations in mid­ Agriculture and 5.0 sion - To strengthen national ployed to help in streng­ December. Agrarian Reform (IDA) agricu I tural research and ex­ thening the Department of tension. Research and Extension.

See page 1 for footnotes. - 58 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency 1./ Lender]:_/ Consulting Services Action on Procurement 4/

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF (Cont'd)

Pub lie Corpor­ To be (R) Power III - To be identified. Consultants required to Project identified. ation for Elec­ deter­ prepare feasibility Feasibility studies being tric Power mined study, detailed engineer­ prepared. (IDA) ing design, supervise constn.iction management, and ·other technical as­ sistance.

Pub 1 ic Water To be Phase II of Greater Aden Water Consultants being em­ Feasibility studies being Corporation deter­ Supply project. ployed to ~repare feasi­ prepared. mined bility stud~eS •.. (IDA)

YUGOSLAVIA

Investiciona 40.0 Montenegro Region~l Development Consultants will be re­ Approved by the Executive Banka Titograd .(Bank) - Regio~al develop~ent,primarily quired for financial and Directors on July 31. (!BT) focusing on primary production management studies of "in agriculture and agroindus­ selected ·socia~ sector. tries rehabilitation· and moder­ organiza~ions. nization in less-developed areas of MOntenegro. ·

To be determined About (R) Highways Sector Project - To as­ Consultants will be re­ Negotiations planned for 100.0 sist financing of construction quired for roads and January. (Bank) of priority.roads including se~­ bridges maintenance tions of the Trans-Yugoslav study. Highway. Total Project cost estimated at $300 million, with $106. million in foreign ex­ change.

Privredna Banka About {R) Bosnia Forestry~ Development of Consultants will be re­ Negotiations planned for Sarajevo 40.0 fo-r:eSt roads and nurseries, and quired for review of ge­ December/January. (Bank) provision of logging and debark­ netic research progi;-am. ing equipment, research equip­ ment, and traini"n~.

To be determined About Lonjsko Polje Drainage (Previ­ Consultants will be re­ Awaiting Government deci­ 75 .o ously reported as part of Sava quired fOr agro-socio­ sion on institutional ar­ (Bank) Drainage II) - Provision of economic study, and rangements, and financi~g drainage to about 49,000 ha in review of annual produc- plan: Croatia. Will Include pumping tion plans. · stations, on-farm development, construction and farm equipment.

Vojvodjans~a 90.0 Fertilizer Sector - Financing Consultants will. be re­ Approved by the Executive Banka, Novi Sad (Bank) inputs, raw ~ateri:als, technical qUired £Or technical and Directors on May 8. and energy stu~iE!s for Yugoslav energy studies of Yugo­ fertilizer industry, including slav fertilizer produ­ incremental fertilizer require­ cers. ments for 1984-85. Total for­ eign exchange costs .estimated at $90.0 million.

To be determined About (R) Gas Exploration - Assistance to Follow-up appraisal mis­ Second stage of ~ppraisal 100.0 the association of gas indus- · sion will identify re­ mission in mid-December. (Bank) tries (INA); Naftaplin quired consulting (Substantial suppliers/ (Croatia); Naftagas (Vojvodina), services. export credit co-finan.;. and Energo-invest (Bosnia-Herze­ cing· likely to be re­ govina). petrol~um companies. quired.)

To be determined To be Development of lignite mine and To be determined. Due to heavy landslides, deter­ related power plant. the development of the mined Kosovo ( formerly S ibovac (Bank) Coal) p,oject is likely to be delayed by two.to three years. Government iS considering al terna­ tive least cost options. (Substantial co-financing likely to be required.)

See pag~ 1 for footnotes. - 59 -

Member Country, Amount & and Implementing Probable Stage of Processing a~d Agency y ~1/ Consulting Services ACtion on Procurement !!I

YUGOSLAVIA (Cont'd)

To be determined To be (R) Energy Efficiency I - Improve­ To be determined, Project wil 1 focus on en­ deter­ ment in energy efficiency in ergy-related rehabilita­ mined selected enterprises. tion in the steel, cement, (Bank) and chemic81 subsector, involving both investments an4 studies.

Bosnia and About Visegrad Hydropower Project - Local consul tan ts already Appraisal report being Herzegovina 100,0 Construction of hydropower dam employed, prepared; (co~financing Electric Power (Bank) and 300 MW hydropower plant on of about $36 mil lion in Organization Drina river, and related trans­ i:he form of export/ sup­ mission facilities. pliers'· credit, and pos­ sibly Type "B" loari re­ quired.)

Procurement: General procurement notice of conttact packages suit­ able for international tendering published in Development Forum No. i56, dated August 16, 1984,

To be determined To be Agricultural Input Loan - For­ To be determined. Preparation under way. deter­ eign exchange (working capital) mined for input' manufacturing enter­ (Bank) prises and sectoral improve­ ments.

Udruzena 10,0 Serbia Regional Development No consul tan ts required. Negotiations in progress. Beogradska Banka (Bank) Project: B-loan.

To be determined To be (N) Energy Efficiency Credit Line - To be determined. Preparation under wa}:'• deter­ Loaris to medium-sized industries mined i~ Bosnia/M8cedonia/Slovenia for (Bank) energy conServation investments.

See page I for footnotes. - 60 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 'y Lender?:._/ Consulting Services Action on Procurement!!/

VI. LATIN AMERICA AND CARIBBEAN

ARGENTINA

Ministry of Pub­ Up to (R) Ports I - Expansion and moderni­ To be determined. Pre-appraisal mission in lic Works and 100.0 zation of Bahia Blanca port early December. Services (Bank) facilities for grain exports.

Ministry of Pub­ Up to (R) Water Supply and Sewerage Engin­ To be determined. Project preparation under lic Works, Min­ 75.0 eering - Technical assistance way. istry of Hydra­ (Bank) for institutional improvement; ulic Resources, metering unaccounted for water Empresa Provin­ program; and pilot project in cial de Obras the province of Cordoba. Total Sanitarias de project cost estimated at $125 .O Cordoba (EPSO) million, of which $45 .O million in foreign exchange.

Yacimientos To be (R) Gas Development - Field develop­ To be determined. Pre-appraisal mission in Petroliferos deter­ ment, gas recycling and techni­ the field. Fiscales (YPF) mined cal assistance. (Bank)

Belize Electri­ To be (R) Power I - Generating sets, spare Services required for Appraisal mission in the city Board deter­ parts, improvements and expan­ construction and supervi­ field. mined sion of distribution system, and sion of works, and for (Bank) institutional strengthening. studies on future energy sources.

Yacimientos 35.0 Oil and Gas Development - Liq­ To be determined. Appraisal report being Petroli feros (Bank) uids condensate extraction and revised. Fiscales gas recycling at Vuelta Grande Bolivianos gas condensate field and second­ Procurement: (a) Project (YPFB) ary oil recovery at Monteagudo Preparation Facility ad­ oil fields. Total project cost vance of $1 million ap­ estimated at $108.2 million of proved for gas recycling which $85.6 million in foreign simulation study, de­ exchange. tailed design and prepar­ ation of bidding docu­ ments; (b) advance con­ tracting under ICB satis­ factory to Bank for up to $24 is possible.

BRAZIL

Project Manage­ 57 .5 Second Health Project - Includes Consultants will be re­ Loan approved by the Ex­ ment Unit (PMU) (Bank) two sub-projects: a) basic quired for the construc­ ecutive Directors on June and Federal health sub-project in State of tion and supervision of 21. Ministry of Sao Paulo supported by a loan of works; equipment, manage­ Health, Sao $55.5 million; and b) national ment, and health services Ptocurement: Interna­ Paulo health policy studies, supported organization and evalua­ tional competitive bid­ by a loan of $2.0 million. tion. ding for X-ray machines Total cost of both sub-projects and surgical equipment estimated at $123.5 million, of for a total of $7 .O mil­ which $24 million in foreign lion. exchange.

Ministry of 70.0 (R) Education VII - Sector loan for Bank/UNDP consultants Negotiations in mid­ Planning (Bank) science and technology. Total prepared project. December. project cost estimated at $210.0 million, of which $70.0 million in foreign exchange.

Petroleo 200.0 Gas Pipeline - Construction of To be determined. Awaiting Government de­ Brasileiro (Bank) natural gas pipeline from Santa cision on priority of S.A. (PETRO­ Cruz, Bolivia, to Sao Paulo. project. BRAS)

Companhia de Up to CODEVASF Irrigation - Follow-up To be determined. Project preparation under Desenvolvimento 30.0 irrigation development in the way. do Vale do San (Bank) Northeast (probably in Sao Fran­ Francisco cisco river valley); studies; (CODEVASF) institutional strengthening.

See page 1 for footnotes. - 61 -

Member Country, Amount & and Implementing Probable Stage of Processing an_d · Agency J./ Lender Jj Consulting Services Action on Procurement !!_/

BRAZIL (Cont'd)

Petrobras Up to Fertilizer/Refinery - Energy To be determined. Further processing and Fertilizantes 100.0 Conservation - Energy conserva­ status of project depend­ S.A. (Bank) tion and plant rationalization ent on outcome of energy (PETROFERTIL) in the refinery and fertilizer sector review and strate­ sectors. gy definitions presently under way.

Superintendency Up to (R) Rural Development - Northeast To be determined. Appraisal report being for the 53.0 Region I - Support of selected prepared. Development of (Bank) rural development activities in the Northeast the state of Sergipe; regional (SUDENE) coordination and research activ­ it1es. Total project cost estimated at $106.5 million, of which $17.6 million in foreign exchange.

Superintendency Up to (R) Rural Development - Northeast To be determined. Appraisal report being for the 57.0 Region II - Support of selected prepared. Development of (Bank) rural development activities in the Northeast the State of Rio Grande do (SUDENE) Norte. Total project cost estimated at $114 million, of which $19 million in foreign exchange.

Superintendency Up to (R) Rural Development - Northeast To be determined. Appraisal mission in the for the 130.0 Region III - Support of selected field. Development of (Bank) rural development activities in the Northeast the State of Bahia. (SUDENE)

0 Executive Up to (R) Alcohol and Biomass Energy De­ To be determined. Appraisal report being Secretariat of 150.0 velopment II - Second phase sup­ prepared. the Nat iona 1 (Bank) port for measures to improve op­ Alcohol erating efficiency and manage­ Commission ment of alcohol production in (CENAL) Brazil.

To be determined Up to Containerization Project - Ports To be determined. Feasibility studies to be 100.0 II - Re-development of port ac­ completed in February. (Bank) cess facilities; support meas­ ures to improve handling of con­ tainerized and other unitized cargoes.

National Up to (R) Development Banking III - Term Consultant has been Negotiations in mid­ Economic and 300.0 credit for exporters of manufac­ recruited. December. Social Develop­ (Bank) tures, for small- and medium­ ment Bank scale enterprise, and possibly (BNDES) for financial restructuring op­ erations. Total project cost estimated at $970 million, of which $300 million in foreign exchange.

Central Bank of Up to (R) Agricultural Sector II - To No consultants required. Negotiations planned for Brazil 350.Q support changes in Government Januaryo (Bank) agricultural policies.

Central Bank of Up to Agricultural Sector III - To No consultants required. Project preparation to be Brazil 250.0 support changes in Government initiated in conjunction (Bank) agricultural policies_ as a fol­ with processing of Agri­ low-up to Agricultural Sector cultural Sec tor II. II.

Banco Nacional Up to Urban Management for Medium To be determined. Project preparation under de Habitacao 50.0 Cities - Strengthening of muni­ way. (BNH) (Bank) cipal finance; maintenance and construction of infrastructure supporting economic activities.

National Up to (R) Northeast Region Land Tenure Consultants have been re­ Appraisal report being Institute for 100.0 Improvement - Support of Govern­ cruited. prepared. (IDB co-finan- . Colonization and (Bank) ment land tenure regularization cing of $30-$50 mi 11 ion Agrarian Reform and titling programs in the proposed.) (INGRA) Northeast.

Banco do Brasil Up to Export Development II - Indus­ Consultant has been Project being reassessed. 250.0 trial export development: recruited. (Bank)

See page 1 for footnotes. - 62 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency];_/ ~:l_/ Consulting Services Action on Procurement 4/

BRAZIL (Cont'di

CentrS.is Up to (R) Energy Distribution/Conservation No consultants required. Appraisal mission planned Eletricas 200.0 - Rehabilitation of distribution for January. Brasileiras S. (Bank) networks and substitution of A. (ELETROBRAS) energy deriVed from oil; energy conservation.

Banco Nacional Up to. (R) Rural Water Supply and Sewerage PAHO consultant already Appraisal mission in the de Habitacao 20.0 - Technical assistance and pilot working on other Bank fi­ field; (BNH) (Bank) project for rural water supply nanced projects at BNH and sanitation. would be engaged through new contract for tech­ nical assiStance.

Centrais Up to (R) Rural Electrification II - Elec­ To be determined. Project pr~para~ion mis­ Eletricas 150.0 trification in several state&. sion dependent on assess­ Brasileiras s.A. (Bank) ment of investment pri­ (ELETROBRAS) orities in the sector.

Superintendency Up to (R) Rubber Development - Investment No consultants required. Appraisal mission in the for Rubber 60.Q credit, applied research, and field. Development (Bank) extension services to assist (SUDHEVEA) about 5,000 farmers plant 60,000 ha of rubber in six Center-South states.

Centrais Up to (R) Power Transmission - Financing NO consultants requii-ed. Appraisal mission in the Eletricas 250.0 of priority transmission system field. Brasileiras, (Bank) works. S.A. (ELETRO- BRAS)

Centrais Eletri- To be (R) Power Sector Financial Rehabili­ No consultants required. Awaiting confirmation cas Brasileiras, deter- tation - B Loan - Financing of from Government on pend­ S.A. (ELETRO- mined 1985 slice of power s~ctor in­ ing matters. BRAS) (Bank) vestment p1·ogram through co-fi­ nancing. Bank participation through contingent obligation option.

Federal Railways Up to (R) Railway Export Corridor - Reha­ To be determined. Appraisal mission in the (RFFSA) 100.0 bilitation and improvement of field. (Bank) railway and intermodal facili­ ties in· two major export corri­ dors, and support to measures to improve the federal railways' operations and finances.

Ministry of Up to Public Sector Management - To be determined. Project preparatioh under Planning 20.ci Strengthening of Government ca­ way. (Bank) pacity for economic and finan­ cial management of the public sector, including state enter­ prise investment.

To be deterniined Up to (R) Financial Sector - To support To be determined. Reconnaissance mission 350.0 implementation of broader based planned for January. (Bank) financial sector reform under preparation by Government.

To be determined Up to Livestock Disease Control - Sup­ To be determined. Project preparation ,.mder so.a port of Government efforts to way with the assistance (Bank) improve livestock disease con­ of the Bank/FAO/CP. trol and production.

CENTRAL AMERICA REGIONAL

Central American 65.0 Central American Regional Devel­ To be determined. Project preparation under Bank for (Bank) opment. way. Economic Integration

-,--CHILE Ministry of 56.0 (R) Agricultural Services and Credit Corisultants will be re­ Negoti~tions completed. Agriculture (Bank) - Line of credit to.finance on~ quired for agricultural Board presentation sCh­ farm investments a~d incremental technical aSsistance and eduled for December 18. working capital, technical as­ management improvement. sistance and agricultural infor­ matiori services. Total prciject cost estimated at $157 .2 million, of which $56.0 million in foreign exchSnge.

see page 1 for footnotes. - 63 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J/ ~?:.I Consulting ServiCes Action ort Procurement !:!J

CHILE (Cont'd)

Ministry of so.a (R) Public Sector Housing Project. Consultants will be re­ Board presentation sch­ Housing and (Bank) Total project cost estimated at quired for housing sector eduled for December 18. Urbanism $576.6 million, of which $79,8 and moi-tgage finance million in foreign exchange. Studies. Procurement: Retroactive financing will be pro­ posed for up to l O per­ cent of the loan amount.

Ministry of Up to (R) Industrial Sector - Financial Consultants with special­ Appraisal mission find­ Finance 100.0 and institutional assistance to ization in financial sys­ ings beirig reviewed. (Bank) private industrial sector. tem and markets will be required.

Ministry of 10.0 (R) Public Sector Management Techni­ Consultants for project Project preparation under Economy (Banki cal Assista:nce - Technical as­ preparation have been fi­ way. sistance to public· sector in minced. by UNDP, Consult­ form of. studies/institution an ts will be required for Procurement: Retroactive build:ing, imprOvement of statis­ public enterprise manage­ financing. wi 11 be propos­ tical inforination, and support ment and export market­ ed for up to $o;s mil­ of Government assistance to ing, lion. small- and meO.iuril-size~ export­ ers.

Ministry of 160.0 (a) Roads III Maintenance - Finan­ Not required. Appraisal mission find...' Pub lie Works (Bank) cing of highway maintenance ings being reviewed. program. (Suppliers' credits of about $20 million to be approved.)

Empresa Metro­ 40.0 Water and Sewerage - Sewerage, To be determined. Project preparation under po li ta:na de (Bank) drainage, and water supply de­ way. Obras Sanitarias velopment in Santiago. (EMOS)

Ministry of Up to (R) Sma11· and Medium Industry, Consultant for project Appraisal mission Finance 30,0 preparation has been scheduled for January, (Bank) recruited·.

Banco de la To be (R) Agriculture Credit IV - Agri­ Institutional/Credit con­ Preparation mission in Republica deter­ culture credit loan to effect sultants will be re­ the field. Dlined improvements in credit delivery quired. (Bank) system.

Empresas 15,0 (R) Barranquilla Technical Ass is t­ To be determined. Appra is.a 1 miss ion p limned Publicas (Bank) ahce and Rehabilitation - Insti­ for Janu~ry; awaiting · Municipales De tutional development; Extension Borrower's action on· Barranquilla of. water supply and sewerage fa­ financial recovery cilities; improvement of solid program. waste operation and technical assistance.

Ein.presas Puertos To be (R) Ports - Rehabilitation of exist­ Consultants required for Appraisal report being de Colombia deter­ ing facilities arid equipment. technical assistance,· prepared. (COLPUERTOS) mined Institution building; technical training and engineering (Bank) assistance and .training. services.

Interconexion To be Canafisto Hydropower - Construc­ To be determined. Project preparation under Electrica S.A. deter­ tion of 1800 MW hydroelectric way. (ISA) mined facility, including associated (Bank) substS.tions and transmission.

Corporacion 300,0 (R) Urra Hydroelectric, To be determined. Government has deCided tO Electrica de la (Bank) delay financing, Further Costa Atlantica reporting'. will be· (CORELGA) discontinued.

To be determined To be (R) Agricultural Marketing - Improve To be determined. Awaiting Government deter­ efficie~cy Of distribution of deC is iori to proceed. mined agricultural products from farm­ (Bank) gate to the CC?nsumet.

Instituto de To be Ammonia Urea Fertilizer - Con­ To be determined. Awaiting cOverIIID.ent Fomento Indus­ deter­ structiOn of fertilizer plant decisiOn to proceed. trial (IFI) mined and Snciilary facilities. (Bank)

See page l for footnotes,

·'( - 64 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1J Lender:!:._/ Consulting Services Action on Procurement!!._/

COLOMBIA (Cont'd)

Institute To be (R) Irrigation Rehabilitaion II - Local consultants prepar­ Proje~t preparation under Colomb iano de deter­ Rehabilitation of irrigation and ing project. way. Hidrologia, mined drainage districts. Meterologia y (Bank) Adecuacion de Tierras (HIMAT)

Banco de la 90.0 (R) Development Banking - Financing Consultants will be re­ Loan approved by the Repub lica (BR) (Bank) industrial sub-projects through quired for technical as­ Executive Directors on Colombian financieras. sistance to the Superin­ November 6. tendency of Banks.

Empresas de 129,0 Bogota Water Supply IV - Exten­ Proposals have been re­ Appra isa 1 report being Acueducio y (Bank) sion of water distribution sys­ viewed from short-listed prepared. (Co-financing Alcantarillado tem. Total project cost estima­ firms for emergency stor­ of $50 million envi­ de Bogota ted at $351.0 million of which age. Consultants will be saged), $215 .0 million in foreign ex­ required for water loss change. reduction, urban plan­ Procurement: Preparation ning, and construction of bidding documents for supervision. pipe, pumps, tunnel and pipe installation valued at $99 million in pro­ gress.

To be determined To be (R) Agricultural Technology Transfer FAO/CP will provide prep­ Second preparation mis­ deter­ - Project to accelerate diffu­ aration assistance. s ion in the field. mined sion and adoption of agricultur­ (Bank) al technology.

To be determined To be (R) Health Project - Improvement of To be determined. Post-appraisal mission in deter­ National Health System in selec­ the field. mined ted geograph ica 1 areas, inc lud­ (Bank) ing primary health care, and hospital and equipment mainte­ nance.

ECOPETROL 130.0 (R) Oil Development - Secondary oil Consultant services for Loan approved by the (Bank) recovery, field development, enhanced oil recovery pi­ Executive Directors on pipeline construction, technical lot studies, staff train­ November 6. (Approximate­ assistance and studies. Total ing, and environmental ly $187 million in co-fi­ project cost estimated at $980 policy formulation will nancing is planned for million, of which $591 million be required. 1985,) in foreign exchange.

Fondo Nacional To be Feeder Roads - Construction and No consultants required. Project preparation under de Caminos deter­ rehabilitation of rural roads; way. Vecinales (FNCV) mined strengthening of road mainten­ (Bank) ance; technical assistance.

Banco de la 300.0 (R) Trade Policy and Export Diversi­ To be determined. Appraisal mission in the Republica (Bank) fication - Supj,ort of first field, phase of trade policy adjust­ ment.

Empresa de 130.0 (R) Power - Participation in 1985- To be determined. Appraisal report being Energia Electri­ (Bank) 1990 Bogota sub-transmission and prepared. ca de Bogota distribution program. (EEEB)

COSTA RICA

Ministry of 80._0 Structural Adjustment Lending. Consultants will be re­ President's Report being Planning (Bank) quired but exact services prepared. not yet determined.

Ministry of 25 .o Atlantico Regional Development To be determined, Initial Preparation Re­ Agriculture (Bank) (Formerly Agricultural Credit), port under preparation.

Central Bank 20.0 Credit to small and medium To be determined. Project preparation under (Bank) enterprises through the Fund for way. Industrial Development (FODEIN) of the Central Bank.

See page 1 for footnotes. - 65 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender Y Consulting Services Action on Procurement 4/

DOMINICAN REPUBLIC

Ministry of 12.0 (R) Education III - Support and ex­ This project is no longer Education (Bank) pansion of rural primary educa­ in the lending program tion facilities. Total project and reporting will be cost estimated at $20 million of discontinued. which $12 million in foreign ex­ change.

Ministry of 21.0 Road Recons true tion - Road re­ No decision made whether Awaiting policy actions Pub 1 ic Works (Bank) construction and rehabilitation consultants will be re­ by Government. works including maintenance quired. equipment, spare parts, and technical assistance. Total project cost estimated at $31.l million, of which $21.4 million in foreign exchange. Previously reported as Highway Maintenance III.

Ministry of s.o (N) Education IV - Vocational Consultants will be Awaiting actions by Education (Bank) Education. required. Government.

Autoridad 20.0 Ports III - Improvement of port Consultants have been en­ Hydraulic and economic Portuaria de (Bank) channel in Guayaquil. gaged. studies necessary for Guayaquil project preparation are under way.

Corporac ion Up to Oil exploration promotion, Consultants being selec­ Project preparation under Estatal 80.0 production and product ted. way. Petrolera (Bank) distribution. Ecuatoriana Bank Project Preparation (CEPE) Facility advance for $1 million approved to fi­ nance preparatory stud­ ies.

Banco Central Up to (R) Industrial Credit VI - Term fi­ To be determined. Project preparation under 80.0 nancing for medium-scale manu­ way. (Bank) facturing and service indus­ tries.

Banco Central 35 .o (R) Small Scale Industry Credit III Consultants have been Appraisal mission in the (Bank) - Term financing and technical engaged. field. l,, assistance for small-scale manu­ facturing and service enter­ prises.

Ministry of s.o (R) Public Sector Management - Consultants will be Appraisal mission sche­ Finance; and (Bank) Advisory services, training and required. duled for January. Consejo Nacional equipment related to improvement de Desarrollo of public sector management. (CONADE)

Ministry of Up to (N) To support changes in To be determined. Preparation under way. Agriculture 100.0 Agricu 1 ture Sec tor policies. (Bank)

EL SALVADOR

Banco Central Up to Export sector - Provisi'on of To be determined. Post-appraisal mission 40.0 working capital and investment postponed. (Bank) credit for export oriented en­ terprises.

Ministry of Up to (R) Agricultural Rehabilitation and Consultants will be re­ Appraisal report being Agriculture s.o Crop Diversification - Farm quired for marketing, prepared. (IDA) credit, marketing facilities, management, agronomy, and technical assistance. Total agricultural education project cost estimated at $7. 9 and feeder road main­ million, of which $5.5 million tenance. in foreign exchange.

See page 1 for footnotes.

( - 66 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ ~ll Consul ting Services Action on Procurement 4/

GUATEMALA

Banco Nacional 35.0 Urban Development - National No consultants required. Further preparation work de la Vivienda (Ba~k) shelter development project. awaiting resv.onse of Gov­ ermnent on details of project.

Empresa Elec­ 36.3 Power V ·- Distribution expansion No decision made whether Details and timing of trica de Guat­ (Bank) . program of EEGSA, subtransmis­ consultants will be re­ project µnder discussion emala (EEG) and sion expansion and preinvestment quired. with Government. lnstituto· and training studies for INDE. Nacionai de Total project cost estimated at Elec trif icac:ion $61.8 million of which $36.3 (INDE) million in foreign exchange.

Instituto 29.0 Chixoy Power Supplement - Total­ No consultants required. Pos t-appra isa l under way~ Nacional de (Bank) financing needs estimated at $98 Elec trificacion million; all of which is foreign (INDE) exchange.

To be determined 35.0 Agricultural Credit-. To be determined .. FAO/CP sector reconnais­ (B·ank) sance mission reports have been received, and are being reviewed.

Guyana Electri­ 15.0 (R) Power II - Rehabilitation of No consul.tants· required. Govermnent securing cit)" Corporation '(Bank) generation and distribution financing from other (GEC) - plant. Management, technical sources. Reporting to and training assistance. Total be discontinued. project cost $32.2 million, of which $25 million in foreign exchange.•

Electricite 22 .1 (R) Power IV - Two diesel generating Consultants required for Approved by the Executive d'Haiti (EDH) (IDA) units, distribution exterision, supervision of works and Directors on November repair of. units at Peligre Hy­ design of a hydroeiectric 20. Credit signing on droelectric plant and -training. power project. December 12; Total project cost estimated at $33.8 million, of which $30.5 mi 11 ion i.n foreign exchange.

Ministry of 10.0 Education IV - Basic education Consultants required for Appraisal ~eport being Education, (IDA) and vocational/technical educ­ architectural design,· prepared. Presidency and ation; inservice training in vocational/technical pro­ Social Affairs pub 1 ic sec tor. gram development, and pub~ic sector· training.

San Pedro Sula 19 .6 (R) Water Supply and Drainage for Consultants will be re­ Loan signed on December Municipal Corp. (Bank) San Pedro Sula and technical quired ,for: (1) leak de~ 7.. (Co-financing of $11 Water Division assistance to DIMA and SANAA. ~ection and mapping of m'illion from Commonwealth (DIMA) and A.;to­ Total project cost estimated at San Pedro Sul~ City; (2) Development Corporation nomous National $42.2 million of which $30.4 ins.titutional development and of $0.5 million in Water Company· million in foreign exchange. of SANAA; (3) Pollution grant financing from (SANAA) control of River Sauce. Directorate for External Economic Relations - under ·French Ministry of Finance has been arranged.)

Procurement: Project cost includes retroactive financing to cover costs incurred since May 1983 under contracts valued at $400,000 for consultants and wells construction. Prequalification of civil wcirks ·contractors ·is iri progress.

See page 1. for footnotes. - 67 -

Member Country, Amount & and Implementing. Probable Stage of Processing and Agency J./ Lender Jj Consulting Services Action on Procurement 4/

HONDURAS (Cont'd)

Ministry of 9.7 Guayape Rural Development II - Consultants will be re­ Appraisal report being Natural (Bank) Credit for Small scale farmers; quire~ for technical as­ prepared. Resources services including, agricultural s is tance, including mar­ extension, marketing, and land keting and credit. titling; and some road improve­ ment. Total proj~ct cost about $15 million, including $6 mil- l ion in foi-e~gn exchange •.

Ministry of Up to (R) ~unicipal Financial Management - Consultants will be President's report under Finance; 10.0 Technical Assistance to support required for· technical preparation. National (Bank) strengthening of BANMA' s assistance in· the areas Autonomous capacity as financial and of municipal financial Municipal Bank technical intermediary for urban management, urban plan­ (BANMA) development and of.financial ning and financial and programming and management cap­ technical management of acity of selected municipali­ BANMA. ties, and a line'of'credit to help finance municipal invest­ ments identified and prepared under the project.

Ministry of 55.0 (R) Structural Adjustment Ill - Sup­ No consultants required. Loan approved by the Finance (Bank) port of Government's structural Executive Directors on adjustment program. November 20 and signed on November 30.

Ministry of 9.0 (R) Technical Assistance II - Sup­ Wide range of consultant Appraisal report being Finance (Bank) port of structural adjustment services required. Scope prepared. program. to be determined.

To be determined Up to (N) Sugar Rehabilitation II - Needs to be identified Project preparation ~nder 30.0 Factory ·and field rehabilitation during appraisal. way. (Bank) to res tore viab~ 1 ity o~ pub lie sugar sector and increase exports to fill expoI't quotas.

Ministry of Up to (N) Population Ill - Continued Some consulting services Project preParation under Health 10.0 strengthening of population and or technical assistance way. (Bank) family planning services. to the Ministry. to be identified. ·

(;, MEXICO

Secretaria de Up to (R) Rural development. This project is no longer Programacion y 200.0 in the lending program Presupuesto (Bank) and reporting will be (SPP) d iscoritinued.

Banco Nacional 25.0 Water Pollution Control - Pilot No decision made whether Project preparation under de Obras y (Bank) program aimed at abating and consultants will be re­ way. Servicios controlling of water pollution quired. Publicos in the Middle Lerma River basin. (BANOBRAS)

Nacional 23.5 Chiapas Rural Roads - ,Construc­ Consultants may be re­ Further processing depen­ Financiera (Bank) tion, improvement and mainten­ quired to assess rural dent upon confirmation of (NAFINSA) ance of rural road~ tO support road services and for Government decision at~ an integrated regional develop­ training. outstanding institutional ment program for the State of financial issues. Chiapas. Total project cost about $46.5 million, of which about $11.7 million in foreign exchange.

Banco Nacional Up to Railways Sector - Continuation No decision made whether Appraisal report being de Obras y Ser­ 250.0 of modernization efforts by Fer­ Consul tan ts will be re­ prepared. (Co-financing vicios Publicos (Bank) rocarriles Nacionales de Mexico quired. being considered.) (BANOBRAS) under previous loans and rail infrastructure improvements by sector.

See page 1 for foOtnates. - 68 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l_/ Lender Y Consulting Services Action on Procurement !!_/

MEXICO (Cont'd)

Nacional Finan­ 100.0 Irrigation Rehabilitation - Re­ No decision made whether Project preparation under ciera (NAFINSA) (Bank) habilitation of existing irriga­ consultants will be re­ way. tion investments. quired.

Nacional Finan­ 107 .o Chiapas Agricultural Development No decision made whether Further processing sub­ c'iera (NAFINSA) (Bank) - Drainage and river control for consultants wili be re­ ject to confirmation of agricultural production in sel­ quired. Government decision on ected areas of the state of outstanding institutional Chiapas, coupled with environ­ financial issues. mental protection activities and measures. Total project cost about $215 million, of which $70 million in foreign exchange.

Banco Nacional 100,0 (R) Housing Development - Line of No decision made whether Appraisal report being de Obras y Ser- (Bank) credit for low income housing consultants will be re­ prepared. vicios Publicos schemes. quired. (BANOBRAS)

Nacional 45.0 Vocational Education - Support One consultant has been Project preparation under Financiera (Bank) for vocational and technical recruited to advise on way. (NAFINSA) training. project preparation.

Nacional Up to Agricultural Extension and To be determined. Project preparation under Financiera 150.0 Research. way. (NAFINSA) (Bank)

Banco Nacional 100.0 (R) Municipal Development - Support No decision made whether Project preparation under de Obras y Ser- (Bank) to the Government's national consul tan ts will be re­ way. vicioS Publicos program for improving public quired. (BANOBRAS) sector management policies focused on the strenthening of municipalities; and capital works and technica 1 assistance for Lazaro Cardenas Munici­ pality.

Banco Nacional 150.0 Small Cities and Rural Water - No decision made whether Project preparation under de Obras y Ser­ (Bank) Rehabilitation and expansion of consultants will be re­ way. vie ios Pub licos water supply and sewerage sys­ quired. (BANOBRAS) tems in about 30 small cities.

Banco Nacional 20.0 Solid Waste Pilot Project - Consultants will be re­ Project preparation under de Obras (Bank) Technical assistance and ·engin­ quired for feasibility way. Servicios eering project to assist Govern­ studies and pilot work. Publicos ment to define policies, provide (BANOBRAS) training, strengthen institu­ tions, and undertake studies in the subsector. Project will finance pilot works in five cities.

Nacional 120.0 (R) Small and Medium Mining IL Consultants have been Appraisal mission in mid­ Financiera (Bank) recruited. January. (NAFINSA)

NICARAGUA

Fonda Especial Up to Line of credit for agriculture - To be determined. Further processing de­ de Desarrollo 15.0 Total project cost estimated at pends on the developm~nt (FED) (Bank) $30.0 million of which about of a Bank assistance $8.0 million in foreign ex­ strategy. change.

Institute de 40,0 (R) Power VII - Fortuna Stage II, Consultants will be re­ Negotiations expected to Recurses (Bank) Elevation of the Fortuna dam, to quired for pre-feasibi­ be completed before the Hidraulicos y increase firm generation. Total lity studies for medium end of December, (Co­ Elec tri ficacion project cost estimated at $79 size hydro project. financing will be (IRHE) million of which $51 million in required.) foreign exchange. Procurement: Single civil works contract to be awarded among prequal­ ified contractors. Bid­ ding documents are being prepared.

See page 1 for footnotes. - 69 -

Member Country 1 Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender Y Consulting Services Action on Procurement 4/

Ministry of 40,0 (R) Agricultural Development Alto Consultants for project Project preparation mis­ Agricu 1 ture (Bank) Parana - Agricultural extension, preparation contracted sion in the field. credit, research, health facili­ under Second Pre-Invest­ ties, and rural roads in South­ ment Loan. eastern Paraguay.

Ministry of 14.0 Education V - Basic education To be determined. Project preparation under Education (Bank) for development and frontier way. zones, including improvements in the management of the education system.

Municipality of 20,0 (R) Asuncion Municipal Development - Limited consultant Appraisal report being Asuncion (Bank) Strengthening of city management services for project prepared. and planning; improvement of execution will be services in transportation, required. Bank Project Preparation waste management and food mar­ Facility (PPF) advance of keting; and to initiate urban $500,000 approved for upgrading. Total project cost preparation works; retro­ estimated at $40.6 million, of active financing of PPF which $20,8 million in ,foreign advance of $500,000 to be exchange. recommended.

Ministry of 20,0 Feeder Roads - Civil works and Consultants will be re­ Appraisal report being Public ·Works and (Bank) related supervision to upgrade quired for supervision of prepared. (Co-financing

Communications and maintain 11 350 km of feeder road improvement works, being sought,) roads and have about 2,500 km road and equipment man­ under maintenance in productive agement, and engineering areas of Eastern Paraguay. designs.

Ministry of 27 .o (R) Education II - Primary education Consultants will be re­ Loan approved by the Ex­ Education (Bank) in urban and rural areas includ­ quired for management, ecutive Directors on July ing schoolroom construction, curriculum and textbook 10. textbook production and manage­ production. ment improvements. Total proj­ ect cost estimated at $46.7 mil­ lion of which $9 ,0 million in foreign exchange.

Yuncan S.A. 140.0 Power VII - 126 MW Yuncan Hydro­ Consul tan ts required for Post-appraisal mission to (Bank) electric plant. Total project engineering and super­ be scheduled. cost estimated at $497 million, vis ion. of which $285 million in foreign exchange.

Servicio Up to Provision of technical assist­ Consultants would be re­ Project being prepared. Nacional de 20.0 ance for institution building. quired for management of Abastecimiento (Bank) Water supply and sewerage in water systems. de Agua Potable several secondary-sized cities y Alcantarillado and towns with special emphasis (SENAPA) on rehabilitation, and technical assistance.

Ministry of Up to Irrigation Rehabilitation III - Not decided, Project preparation under Agriculture 60,0 Rehabilitation of drainage and way. (Bank) irrigation systems in up to eight coastal valleys. Bank Project Preparation Facility advance of $500,000 approved to fi­ nance aerial mapping for pre-feasibility study,

To be determined To be Sugar Rehabilitation - Rehabili­ Not decided. Bank Project Preparation deter­ tation and improvement of man­ Facility advance of mined agement for sugar cooperatives. $500,000 to finance (Bank) feasiblity study.

Empresa Nacional 82,5 Metropolitan Development - Im­ Consultants will be re­ Approved by the Executive de Mercados (Bank) provement of Lima's urban trans­ quired in urban planning, Directors on June 21. Mayoritarios; port system, markets, solid financial management, and Municipali­ waste management, and related road engineering, pro­ Procurement: Up to $1,l dad de Lima institutional development. Total curement and wholesale million to cover final Metropolitana project cost estimated at $135.9 marketing. design, technical assis­ million, of which $75.2 million tance and some equipment in foreign exchange. expenses incurred during 1984 will be financed retroactively.

See page l for footnotes, - 70 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1J Lender];_/ Consulting Services Action on Procurement!!_/

PERU (Cont'd)

To be determined 100,0 Industrial Credit III - Credit To be determined. Project preparation under (Bank) to finance industry, touriSm and way. agro-industry sub-projects.

Ministry of Up to (R) Public·Sector Management II - To be determined. Project being prepared. Finance 15.0 Unide,,:tified. (Bank)

PETRO PERU 60,0 Petroleum III - Increase oil To· be determined. Project preparation under (Bank) production through secondary re­ way. covery; exploration promotion f0r private companies; and tech­ nical assistance.

To be determ~ned 3,5 (R) Energy Conservation - Establish­ Coii.sultants Will. be re­ Appraisal report being (Bank) ment of nai:ional energy ration­ quired to assist with prepared. alization center to do energy energy audits and train­ audits and carry out other ing. energy savillg activities.

ST, LUCIA

To be determined Up to Industrial Development - Credit, No decision made on Project preparation under 5.0 factory shell construction and consultants. way. (IDA) supporting infrastructure for expansion of export-oriented industries.

URUGUAY

Administracion 55,0 (R) Power VI - Rehabilitation of G. Project postponed. Nacional de (Bank) Terra hydro~plant, Reporting to be Usinas y discontinued. Transmisiones Electricas (UTE)

Ministry of 60.0 (R) Agricultural Sector - Finance ConSultants will bE! re­ Loan .signed on November Finance (Bank) for imported inputs and liber­ quired for Banco de la 13, alization of agricultural trade. RePubli9a and Instituto Nacional de Carne. ·

Obras Sanitarias 9,0 Water Supply.Engineering - Tech~ NO decision on consult­ Project preparation under del Estado (Bank) nical assistance and studies, ants. way. a~d related equiPment and works.

Administracion 4,0 (R) Power.Engineering Loan - Engin­ Consultant services will Negotiations substan­ Nacional·de (Bank) eering Studies for rehabilita­ be required for all Stu­ tially completed. Board Usinas y tion of G. Terra hydroplant, dies. Consultants have presentation scheduled Transmisiones distributfon system planning and been recruited for G. for January 8. Electricas (UTE) operation methodology and train­ Terra Study, ing program for managerial lev­ els. Project will also include purchase of electric meters. Total project cost estimated at $5,0 million, of which $4.0 mil­ lion in foreign exchange.

See page 1 for f~otnotes. - 71 -

~ount & Member Probable Country ~ ConSulting Services Stage of Processing

VII. NEW PROJECTS ADDED IN THIS ISSUE

EASTERN AND SOUTHERN AFRICA

MADAGASCAR About Fuelwood - To provid~ fuelwood sup­ To be determined. Project-under 5.0 plies (charcoal) to Antananarivo, prepar~tion. (IDA) Mahajanga and Toliary. Total proj­ ect cost to be determined.

About Ports - Rehabilitation of some Consultants will be Pie-appraiSal mission 8.0 ports; equipment, 11.avigation aids, required. scheduled for May. (IDA) dredging plant. Total project cost to be determined.

MAURITIUS About Sugar' I - To monitor implementatiori To be determined. Projeci: ut'lder 20.0 of the Sugar Industry Action Program identification. (Bank) and help improve productivity of land use among smallholders. Total project cost to be determined.

SUDAN 10.0 Western Savannah Phase II - Pilot Consui tarits will provide Apprais~l mission sched­ (IDA) project to develop viable technical technical ass iStahce to uled for April/May, 1985. packages for rainfed crop and live­ the Western Savannah Dev­ stock production in Western Sudan. elopment Corporation to carry out project objec­ tives.

TANZANIA About Petroleum Sector Technical Assis­ Consultants will be re­ Appraisal mission in the 8.0 tance - Assistance for protection of quired for most compon­ field. (IDA) Songo-Songo reservoir studies,on ents. marketing of liquified petroleum gas and improvement of product distri­ bution, doiuestic natural gas utili­ zation, as well as institutional and manpower training to Tanzania Petro­ leum Development Corporation (TPDC). Total project cost estimated at $10.0 million, including foreign costs of $8.0 million.

ZAMBIA About Fertilizer Factory - Rehabilitation Management consUltants Appraisal report under 10.0 and strengthening of management. may be required. prepai-ation. (Co-firiaricing (Bank) Total projE!ct cost estimated at with KfW (Germany) and $69.5 million. OECF being explored.)

EAST ASIA AND PACIFIC

PHILIPPINES 50.0 Manila Water Mains Extension - Pro­ No decision made whether Project being pr.epared by (Bank) vision of distribution system and consultants will be Government. assistance to MWSS for systems im­ required. provement and maintenance.

SOUTH ASIA

BANGLADESH 30.0 Rehabilitation Credit - To repair No consultants required. Project preparation under (IDA) and rehabilitate infrastI'ucture way. facilities including roads, cul­ verts, bridges, and other water con­ trol and irrigation schemes. The project would also replace inland water transport equipment.

NEPAL 13.0 Population - Provide family planning Will be required. Project Preparation under (IDA) and mother and child health ser­ way. (Co-financing with vices; improve arid eXpand training UK and Federal Republic facilities and p~~grams for field of Germany beirig con~ workers, paramedics, doctors and sidered.) nurses; deve~op a sYste~ a~ produc­ tion; distribution and lbgistics for informational and educational niai:er­ ials; establish a natiorial vital registration system. Total project cost estimated at $18.0 million. - 72 -

Alnount & Member Probable Country Lender Consulting Services Stage of Processing

SOUTH ASIA (Cont'd)

NEPAL (Cont'd) 10.0 Deep Aquifer Exploration - Identify Consultants recruited for Project preparation under (IDA) new and untapped sources of irriga­ project preparation. way. tion water supply from deep aquifers which would increase cropping inten­ sity in the Terai. This would in­ clude drilling of exploratory bore­ holes; construction of wells; in­ service training; and preparation of reports. Total project cost estima­ ted at $13.0 million.

PAKISTAN 3.2 Engineering Industry: Technical As­ Consultants will be re­ Appraisal mission ·in the (IDA) sistance - Techno-economic studies quired. field. for the restructuring of major pub­ lic sector engineering enterprises.

SRI LANKA 45.0 Agricultural.Research Project - Es­ No decision on consul­ Project preparation under (Bank/ tablishment of a national agency to tants. way. IDA) ensure coordinated research plan­ ning, and strengthening of the national agricultural research institutions.

35.0 Third Water Supply Project - Reha­ No decision on consul­ Project preparation under (IDA) bilitation of existing assets, par­ tants. way. ticularly production facilities, im­ prove operation and maintenance fa­ cilities, and upgrade distribution work in selected areas.

60.0 Ninth Power Project (Distribution Consultants required. Project preparation under (Bank) Rehabilitation) - Rehabilitation of way. Ceylon Electricity Board's (CEB) power and transmission system.

EUROPE, MIDDLE EAST AND NORTH AFRICA

EGYPT, ARAB To be Vocational Training III - Training None required. Appraisal mission in the REPUBLIC OF deter­ of technicians and skilled workers field. mined for electrical and construction (Bank) trades.

JORDAN To be Manpower Development I - Assistance To be determined. Appraisal mission in the deter­ to Vocational Training Corporation field. mined (VTC) to expand and strengthen its (Bank) training programs; support to Gov­ ernment to develop latest market in­ formation system; strengthening of public management and administration training.

SYRIAN ARAB To be Sewerage III - Secondary treatment Scope of work of consult­ Project being prepared by REPUBLIC deter­ works, main interceptors and second­ ants to be used to be de­ the Government. (Co-fi­ mined ary collection system for Damascus. termined. nancing will be sought.) (Bank)

TUNISIA To be Agricultural Sector - Policy and in­ No decision made. Preparation under way. deter­ .stitutional reforms. mined (Bank)

TURKEY About Kayraktepe Hydro Power - Construc­ No decision yet on need Preparation under way. 100.0 tion of Kayraktepe dam and Hydro for consultants. (Bank) Power Station on Goksu River.

YUGOSLAVIA To be Energy Efficiency Credit Line - To be determined. Preparation under way. deter­ Loans to medium-sized industries in mined Bosnia/Macedonia/Slovenia for energy (Bank) conservation investments. - 73 -

Amount & Member Probable Country Lender Consulting Services Stage of Processing

LATIN AMERICA AND CARIBBEAN

DOMINICAN 5.0 Education IV - Vocational Education. Consultants will be re­ Awaiting actions by REPUBLIC (Bank) quired. Government.

ECUADOR Up to To support changes in Agriculture To be determined. Preparation under way. 100.0 Sector policies. (Bank)

JAMAICA Up to Sugar Rehabilitation II - Factory Needs to be identified Project preparation under 30.0 and field rehabilitation to restore during appraisal. way. (Bank) viability of public sugar sector and increase exports to fill export quotas.

Up to Population III - Continued strength­ Some consulting services Project preparation under 10.0 ening of population and family plan­ or technical assistance way. (Bank) ning services. to the Ministry to be identified.

' ( \