International Bank for Reconstruction and Development International Development Association Public Disclosure Authorized SecM85-63 FROM: Vice President and Secretary January 18, 1985

Public Disclosure Authorized MONTHLY OPERATIONAL SUMMARY

OF BANK AND IDA PROPOSED PROJECTS (As of December 31, 1984) Public Disclosure Authorized

Distribution: Executive Directors and Alternates President Senior Vice Presidents Senior Management Council Vice Presidents, IFC

Public Disclosure Authorized Directors and Department Heads, Bank and IFC

TABLE OF CONTENTS

SECTION REGION PAGES

I. EASTERN AND SOUTHERN AFRICA 1 13 Botswana 1 Burundi 1 2 Djibouti 2 Ethiopia 2 Kenya 3 Lesotho 4 4 Malawi 5 Mauritius 6 Mozambique 6 Rwanda 6 7 Somalia 7 Sudan 7 Swaziland. 8 Tanzania .. 8 Uganda 9 Zaire 10 Zambia 11 Zimbabwe 12 Regional 13

II. WESTERN AFRICA 14 - 28 Benin 14 Burkina 14 Cameroon 15 Cape Verde 16 Central African Republic 17 Congo, People's Republic of the 17 Equatorial Guinea 17 The Gambia 17 Ghana 18 Guinea 19 Guinea-Bissau 20 Ivory Coast 20 Liberia 21 Mali 21 Mauritania 22 Niger 23 Nigeria 24 Sao Tome and Principe. 26 Senegal 27 Sierra Leone 27 Togo 27 Regional 28 - ii -

SECTION REGION PAGES

I1I. EAST ASIA AND PACIFIC 29 - 37 China 29 Fiji 30 Indonesia. 30 Korea 32 Lao People's Democratic Republic 33 Malaysia 33 Papua New Guinea 34 Philippines 35 Solomon Islands • '36 Thailand 36 Vanuatu 37 Western Samoa 37

IV. SOUTH ASIA 38 - 49 Bangladesh 38 Bhutan 39 Burma 39 India 41 Maldives 45 Nepal 45 Pakistan 46 Sri Lanka • 48 v. EUROPE, MIDDLE EAST AND NORTH AFRICA 50 - 62 Algeria 50 Cyprus 50 Egypt, Arab Republic of. 50 Hungary •. 51 Jordan 52 Morocco 52 Oman 54 Portugal 54 Romania 55 Syrian Arab Republic 56 Tunisia 56 Turkey 57 Yemen Arab Republic 59 Yemen, People's Democratic Republic of 60 Yugoslavia 61

VI. LATIN AMERICA AND CARIBBEAN 63 - 72 Argentina 63 Belize 63 Bolivia 63 Brazil .. 63 Central America Regional 66 Chile 66 Colombia 66 Costa Rica 67 Dominican Republic 68 - iii -

SECTION REGION PAGES

VI. LATIN AMERICA AND CARIBBEAN (Cont'd)

Ecuador· 68 El Salvador 68 Grenada 68 Guatemala 69 Guyana 69 Haiti 69 Honduras 69 Jamaica 69 Mexico 70 Nicaragua 71 Panama 71 Paraguay 71 Peru 71 St. Lucia. 72 Uruguay 72

VII. NEW PROJECTS 73 - 75

EASTERN AND SOUTHERN AFRICA 73 Botswana 73 Ethiopia 73 Kenya . . 73 Mozambique 73 Somalia 73 Tanzania 73 Uganda 73 Zambia 73

WESTERN AFRICA 73 Ivory Coast 73

EAST ASIA AND PACIFIC 74 Malaysia 74 Western Samoa 74

SOUTH ASIA 74 Pakistan 74

EUROPE, MIDDLE EAST AND NORTH AFRICA 74 Egypt, Arab Republic of 74 Morocco 74 Turkey 74 Yemen Arab Republic 74

LATIN AMERICA AND CARIBBEAN 75 Guyana 75 Peru 75

Secretary's Department

MembeT' Country, Amount & and Implementing Probable Stage of Processing and Agency J/ Lender 1/ Consulting Services Action on Procurement!!_/

I. EASTERN AND SOUTHERN AFRICA

Ministry of To be Livestock - Strengthening liVe­ No decision made whether Appraisal report under Agriculture deter­ stock marketing, and assisting consultants will be re­ preparation. mined Government in development of its quired. (Bank) land tenure program. Total project cost to be determined.

Ministry of 3.0 Selebi-Phikwe Supplement - Tech­ No decision made on ex­ Project under prepara­ Finahce and (Bank) nical assistance components to tent of consultant ser­ tion. Development be identified. vices required. Planning

Ministry of About (N) Education IV - Total project No dee is ion made on ex­ Project preparation under Education 20.0 cost to be determined. tent of consultant ser­ way. (Bank) vices required.

Ministry of About (R) Water Supply II - Rehabilitation Consultants have been re­ Appraisal report being Rural 9.0 and expansion of 48 rural cruited for project prep­ prepared. Development (IDA) aqueducts. Total project cost aration. estimated at $12.0 million. IDA Project Preparation Facility advance of $470,000 approved to com­ plete preparation.

Ministry of About Agriculture Muyinga - Pilot set­ FAO Cooperative Program Project under prepara­ Agriculture 10.0 tlement scheme and development is preparing project. tion. (IDA) of caffee and foodcrop produc­ tion in the Muyinga Province. Total project cost to be deter­ mined.

Ministry of About Agricultural Services. Total Consultants will be re­ Project preparation under Agriculture 12.0 project c9st to be determined. quired. way. (IDA)

Ministry of About (R) Highways IV - Continuation of Consultants will be re­ Negotiations tentatively Public Works, 15 .o the road improvement and mainte­ quired for maintenance scheduled for February/ Energy and Mines (IDA) nance program. Total project and for the labor-inten­ March. (Co-financing re­ cost estimated at $37.0 million. sive road construction quired.) IDA Project program. Consultants for Preparation Facility ad­ project preparation are vance of $900,000. financed under the Proj­ ect Preparation Facility advance.

Ministry of About Communications II - Improvement Consultants for project Appraisal report under Transport, Post s.o and extension of telecommuni­ preparation are financed preparation. (Co-fin­ and Telecommuni­ (IDA) cations network; improvement of under the Project Prepar­ ancing required.) cations postal operations. Total proj­ ation Facility advance. ect cost estimated at $14.3 mil­ IDA Project Preparation lion. Facility advance of $275,000.

Ministry of About (R) Transmission and Distribution Consultants for project Negotiations tentatively Pub lie Works, 12.0 System (formerly part of a Re­ preparation are financed scheduled for March. (Co­ Energy and Mines (IDA) gional Power Distribution Proj­ under Project Preparation financing with CCCE, Af­ ect) - Rehabilitation and exten­ Facility advance. rican Development Fund, sion of the transmission and and GTZ Germany prob­ distribution system. Total able.) project cost estimated at $27.1 million. IDA Project Preparation Facility advance of $400,000.

.Y Addresses of the Implementing Agencies will be provided in forthcoming issues of the Monthly Operational Summary. 2/ The amount is in millions of U.S. dollars and is approximate and tentative. "ii The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulation of the new projects listed in this issue. This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Ba~k or IDA. - 2 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender Y Consulting Services Action on Procurement 4/

BURUNDI (Cont'd)

Ministry of About (R) Forestry 11 - Integrated for­ Consultants will be re­ Appraisal report under Agriculture 12,0 estry project, Total project quired (silviculturist, preparation. (Co-fi­ (IDA) cost estimated at $20.0 million. livestock and agri­ nancing with FAC prob­ culture, agro-forestry), able; additional co­ financing required.)

COMOROS

Ministry of About Technical Assistance - To assist Consultants will be re­ Project under identifica­ Finance/Direc­ 2,5 Government in improving formula­ quired. tion. torate General (IDA) tion of economic policy, plan­ of Pl_anning ning, and management of key sec­ tors.

Ministry of About Education II - Educational plan­ No consultants required. Project under identifi­ National 4,5 ning and technical assistance; cation. Education, (IDA) vocational management and Culture and teacher training. Sports

DJIBOUTI

Ministry of 5,0 Urban Sites and Services - Hous­ Consultants will b~ re­ Approved by the Executive Pub lie Works/ (IDA) ing Development, urban facili­ quired. Directors on September District of ties, support for small-scale 11. (Co-financing with Djibouti industry, artisanal enterprise USAID for $5.5 million and training. Total project and CCCE for $1.0 million cost about $15.2 million, with probable.) $11.5 million in foreign ex­ change, IDA Project Preparation Facility advance of $500,000 approved to finance primarily con­ sultants' services.

Ministry of About {R) Education - Quality improvement Consultant services will Board presentation sched­ National Educa­ 5,0 and expansion of primary educa­ be recruited under the uled for January 22, tion, Youth and (IDA) tion. Total project cost esti­ Technical Assistance Sports mated at $7,2 million, project (Cr, 1232),

Ministry of To be Livestock Development and Mar­ No decision made whether Project being identified. Agriculture deter­ keting - To be defined. consultants will be re­ mined quired. (IDA)

Ethiopian About (R) Power ·III/Energy I - Electric Consultants will be re­ Appraisal report being Electric Light 60.0 transmission, rural electrifica­ quired for technical as­ prepared. and Power (IDA) tion, and household energy. sistance. Authority Total project cost estimated at IDA Project Preparation (EELPA) $218 million, Facility advances total­ ling $980,000 approved to finance consul ting ser­ vices.

Ministry of To be Peasant Agriculture Development Consultants will be re­ Preparation work under Agriculture deter­ I - Support for expansion and quired for technical as­ way. mined intensification of integrated sistance. (IDA) agricultural services, including construction of rural roads, seed multiplication programs; provision of training facilities in selected areas. Total proj­ ect cost to be determined.

Ministry of 22,0 (R) Agricultural Research - Streng­ Consultants will be re­ Credit signed on December Agricu 1 ture (IDA) thening of the research capacity quired: cryogenet1.c1.st, 14, of the Institute of Agricultural ?iometrician, architect, Research of Ethiopia. Total Ugronomist, coffee tax IDA Project Preparation project cost estimated at $32 economist, plant breeder, Facility advance of million. plant pathologist, live­ $300,000 has been stock specialist, weed approved to finance and other agricultural project start-·up. scientists.

Ethiopian 40,0 (R) Telecommunications VI - To im­ Consultants will be re­ Credit signed on December Telecommunica­ (IDA) prove and expand telecommunica­ quired for management in­ 14, tions Authority tions services. Total project formation systems, asset cost estimated $151.8 million. revaluation and tariff (Co-financing with Italy study, Bids are being for $25,0 million, Sweden evaluated. $12,0 million and AfDB $26.4 million probable.)

See Page 1 for footnotes. - 3 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender ]./ Consulting Services Action on Procurement !!._/

ETHIOPIA (Cont'd)

Ministry of 70.0 (R) Education VI - Basic education Consultants will be re­ Credit signed on December Education (IDA) and teJcher training. Total quired for management in­ 14. project cost estimated at $109.6 formation system engin­ million, with $55.7 million in eering, architectural, An IDA Project Prepara­ foreign exchange. and procurement informa­ tion Facility advance of tion system. $410,000 has been ap­ proved to support further detailed preparation and design work for the gen­ eral education components of the project.

National 4.0 (R) Technical Assistance - To Consultants will be re­ Credit signed December Commit tee for (IDA) strengthen macroeconomic man­ quired: computer spec­ 14. Central Planning agement, improve management in­ ialist, economic model­ formation systems, and formulate ling adviser, macro-econ­ programs to improve accounting omist and information and auditing capacity. Total system specialist. project cost estimated at $4.6 million.

Ministry of To be Gas Engineering - To be defined. No decision mad~ whether Project preparation under Mines and Energy deter­ consultants will be re­ way. mined quired. (IDA)

Ministry of To be Forestry - Farm forestry and No decision made whether Project preparation work Agriculture deter­ fuel wood plantations. Total consultants will be re­ under way. mined project cost to be determined. quired. (IDA)

Agricultural and To be DFC V - Fifth line of credit to No decision made whether Project identification Industrial deter­ agricultural and industrial de­ consul tan ts will be re­ work to begin in January. Development Bank mined velopment bank. Total project quired. (IDA) cost to be determined.

Ministry of About (N) Drought Emergency - Fertilizer Consultants will be re­ Appraisal report being Agriculture 25.0 and other emergency support-­ quired. prepared. (IDA) resuscitating drought stricken areas.

KENYA

Kenya Industrial 30.0 Small-scale Enterprises - Second No decision made whether Project under prepara­ Estates (KIE) (Bank) line of credit to KIE, and pos­ consultants will be re­ tion. 10.00 sibly other institutions. quired. (IDA)

Ministry of 15.0 (R) Smallholder Livestock - Compon­ No decision made whether Project prepa~ation under Agriculture and (IDA) ents to be identified. consu 1 tan ts wi 11 be re­ way. Livestock q~ired. Development

Kenya Post and About Telecommunications III - Expan­ No decision made whether Appraisal report under Telecommunica­ 40.0 sion of telecommunications ser­ consultants will be re­ preparation. tions (Bank) vices. Total project cost to be quired. determined.

Nairobi City About (R) Nairobi Water Engineering - Previously engaged con­ Appraisal report being Commission 6.0 Feasibility/engineering stud­ sul tan ts expected to con­ prepared. (IDA) ies. Total project cost about tinue. $7 .5 million. An IDA Project Prepara­ tion Facility advance of $1.0 million has been ap­ proved to help maintain preparation work already initiated by consultants and to meet the first year's foreign exchange costs of pre-investment studies.

Ministry of About Energy I - Policy-oriented sec­ No decision made whether Project at early stage of Energy and 50.0 tor operation with possible consu 1 tan ts wi 11 be re- preparation. Regional (Bank) technical assistance. quired; · Deveiopment

Ministry of About (R) Railways II - Track rehabili­ Consultants have been en­ Transport and 90.0 Appraisal mission sched­ tation, motive power, and rol­ gaged. uled for May. Communications (Bank) ling stock, workshops.

See Page 1 for footnotes. - 4 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Y Consulting Services Action on Procurement!!./

KENYA (Cont'd)

Ministry of About Agricultural Research - Support No decision made whether Project under prepara­ Agriculture and 20,0 for a national research program. consultants will be re­ tion. Livestock (IDA) quired, Development

Ministry of 6.0 (N) Public'Sector Management Assist­ Previously engaged con­ Appra isa 1 miss ion sched­ Agriculture and (IDA) ance - Phase II of agriculture sultants expected to uled for May. Livestock technical assistance. continue. Development

Ministry of About (N) Education VI - Primary teachers Consultants will be Project under prepara­ Agriculture and 30.0 and university staff training; needed for education tion. Livestock (Bank) agricultural training; secondary planning, teacher train­ Development 34.0 curriculum development. ing, management methods (IDA) and resource mobilization and use.

Ministry of About Health/Population - Technical Consultants will be re­ Appraisal report under Health and 2.5 assistance to strengthen plan­ quired to strengthen preparation. (Co-fi­ Social Welfare (IDA) ning, financial management, and planning/financial man­ nancing with DANIDA, manpower development in the sec­ agement and manpower dev­ USAID, Ireland, WHO, UNDP tor; provision of family plan­ elopment of Ministry of and EEC being explored.) ning services and staff train­ Health. ing, Total project cost esti­ mated at $7 .8 million.

Ministry of About (R) Highlands Water - Engineering Consultants will be re­ Project preparation under Water, Energy 4,0 and preliminary works for Phase quired for engineering way. Preparation mission and Mining (IDA) I of development of Lesotho's designs and tender docu­ tentatively scheduled for water resources for export and ments. Previously en­ February/March. (Co-fi­ hydro-electricity. Total proj­ gaged consultants likely nancing being explored.) ect cost estimated at $17.6 mil­ to continue. lion.

MADAGASCAR

Ministry of About (R) Irrigation Rehabilitation - Consultant will be re­ President's report being Agriculture 12,0 Strengthening of subsector op­ quired for engineering prepared, (Co-financing Production (IDA) erations; rehabilitation of studies and technical with CCCE and EDF prob­ existing schemes, maintenance, assistance to the Minis­ ab le,) crop production, feeder roads, try of Agriculture. storage facilities, training and establishment of central project management unit. Total project cost estimated at $31.8 million.

Ministry of About (R) Agricultural Sector - To provide Studies for Fisheries Appraisal mission sched­ Agriculture 25.0 inputs and technical assistance Sector will be carried uled for April. Production (IDA) for agricultural rehabilitation. out with support from the Total project cost to be deter­ FAQ, mined.

Ministry of In­ About (R) Industrial Sector - Credit to Consultants required for Board presentation on dustry and 40.0 the industrial sector for spare industrial services. January 15, Bankin' ny In­ (IDA) parts, raw materials and tech­ dostria (Nation­ nical assistance. Total project An IDA Project Prepara­ al Industrial cost estimated at $65 million, tion Facility advance of Development Bank including $10 million in foreign $500,000 has been ap­ (HNI)) exchange costs. proved to finance consul­ tants to help complete the evaluation of the 1984-86 Public Investment Program in Industry.

Ministry of About (R) Railways III - Renewal of rail­ Consultants will be Appraisal mission sched­ Transport/Reseau 7,0 way track; spare Parts; training required for technical uled for February. (Co­ National Chemin (IDA) and technical assistance. Total assistance, training and financing with CCCE and de Fer Malgache project cost estimated at $25,0 technical aspects. FAC being explored.) (RNCFM) million.

Malagasy Elec­ About Power II - Hydro-power develop­ Consultants will be re- Project under.prepar­ tricity and 20,0 ment, transmission, and trans­ quired. · ation. (Co-financing re­ Water Board (IDA) former substation. Total proj­ quired,) (JIRAMA) ect cost to be determined.

Ministry of About (R) Accounting & Auditing II - Fol­ Consultants were re­ Appraisal mission in mid­ Finance and a.a low-up to Accounting/Auditing I cruited to assist in the RINDRA, Malagasy January. (IDA) (1155-MAG). identification of the Auditing Firm project,

See Page 1 for footnotes. - 5 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender 1/ Consulting Services Action on Procurement!!,_/

MADAGASCAR (Cont'd)

Ministry of About (R) Agricultural Institutions Tech­ Consultants required to Appraisal mission sched­ Agricu 1 ture 5.0 nical Assistance II - Follow-up provide services. uled for June. Production (IDA) to ongoing agricultural institu­ tions technical assistance project, including policy analy­ sis, and general management support.

Ministry of About (R) Cyclone Rehabilitation - Recon­ Consultants will be re­ Credit signed on December Interior 15.0 struction and rehabilitation of quired. 12. (IDA) damage caused by Cyclone Kamisy. An IDA Project Prepar­ ation Facility advance of $1.0 million has been ap­ proved for consul tan ts services, equipment, ma­ terial, construction.ma­ terial, spare parts, and urgent civil works.

Office Militaire About Petroleum III - Oil field devel­ No decision made whether Project identification National des In­ 15.0 opment. consul tan ts will be re­ under way. dustries Strate­ (IDA) quired. giques (OMNIS)

Ministry of About (R) Fuelwood - To provide fuelwood Consultants likely to be Project under Agriculture 5.0 supplies (charcoal) t9 Antanan­ required. preparation. Production (IDA) arivo, Mahajanga and Toliary. Total project cost to be determined.

Ministry of About (R) Ports - Rehabilitation of some Consultants will be Pre-appraisal mission Transport 8.0 ports; equipment, navigation required. scheduled for May. (IDA) aids, dredging plant. Total project cost estimated at $3 .O million.

MALAWI

Ministry of 6.4 (R) Wood Industries Restructuring Consultants will be re­ Board presentation on Forestry and (Bank) Project - Technical assistance, quired for technical and January 15. Natural training and restructuring of training components. Resources. mills, and studies of alt~rna­ tive uses of the forestry re­ sources. Total project cost es­ timated at $8.6 million, includ­ ing $6.4 million in foreign ex­ change.

Ministry of 15.0 Urban I - Housing finance; in­ Consultants may be re­ Approved by the Executive Finance (IDA) stitutional support; training quired for housing, Directors on November 27. and studies. Total project cost subsidy study and estimated at $18.2 million. training.

Investment and About (R) DFC II - Second line of credit Consultants are carrying Appraisal mission sched­ Development Bank 13.6 to INDEBANK for industrial and out preparatory work. Not uled for February. of Malawi (Bank) possibly agricultural estate determined whether addi­ (INDEBANK) financing. Total project cost tional consultants to be determined. required.

Ministry of About (R) Agriculture Research - To Design and financial con­ Negotiations in January. Agriculture 23.8 strengthen central agricultural sultants will probably be (Co-financing with USAID (IDA) research institutions, adaptive required for preparatory for $8 million being ex­ research and provide needed work. plored.) infrastructure. Total project cost estimated at $48.6 million. IDA Project Preparation Facility advance of $583,500 approved to initiate key project activities.

Ministry of About (R) Agricultural Extension and Plan­ No decision made whether Appraisal report under Agriculture 25.0 ning Support - Consolidation of consultanto will be re­ preparation. · (Co-finan­ (IDA) programs started under NRDP I quired. cing with USAID for $7 (Ntcheu ~nd Mzuzu), extension of mil lion being explored. ) NRDP to Nkhata Bay; general sec­ toral and management support, including training and equipment for central extension services. Total project cost to be deter­ mined.

See Page 1 for footnotes. - 6 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender y Consulting Services Action on Procurement !!_/ MALAWI (Cont'd)

Ministry of About Heal th II - Expansion of health No decision made whether Project under prepara­ Health 25.0 care delivery and maternal and consultants will be re­ tion. (IDA) child health services. Total quired. project cost to be determined.

Lilongwe Water About Water II - Extension of water No decision made whether Project under prepara­ Board 25.0 supply to Lilongwe. Total proj­ consultants will be re­ tion. (IDA) ect cost to be determined. · quired.

MAURITIUS

Ministry of About Education III - Post-primary No consultants required. Project under prepara­ Education and 15.0 technical schools and vocational tion. Cultural Affairs (Bank) education. Total project cost to be determined.

Development Bank About (R) Industrial Sector - Seventh line No decision made \ffiether Identification mission of Mauritius 20.0 of credit to the Development consul tan ts wi 11 be re- end-January/early Febru­ (DBM) (Bank) Bank of Mauritius. Finance for quired. · ary. export industry and replenish­ ment of DBM resources.

Central About Power III - Bagasse fired power No consultants required. Project under prepara­ Electricity 15 .o plant, and transmission and dis­ tion. Board (Bank) tribution development.

Ministry of About Sugar I - To monitor implemen­ To be determined. Project under Agriculture 20.0 tation of the Sugar Industry identification. (Bank) Action Program and help improve productivity of land use among smallholders. Total project cost.to be determined.

MOZAMBIQUE

Bank of About (N) Emergency Rehabilitation. Consultants may be re­ Appraisal mission sched­ Mozambique 45.0 quired for procurement uled for early February. (IDA) and for project manage­ (Co-financing with other ment. agencies being explored.)

Ministry of About (R) First Agricultural Research - Consultants financed Negotiations substantial­ Agricu 1 ture 11.5 Implementation of an agricultur­ under Project Preparation ly completed. Board pres­ (IDA) al research program, including Facility. entation scheduled for institutional support, and tech­ February 12. nical assistance for agriculture policy analysis. Total project An IDA Project Prepara­ cost estimated at $14.2 million, tion Facility advance of including $7.2 million in for­ $687,000 approved for eign exchange. expenditures for techni­ cal assistance, equip­ ment, local and personnel costs, and to support final preparation and start-up activities.

Ministry of About (R) Health/Population/Nutrition - Consultants will be re­ Pre-appraisal mission Public Health 8.0 Strengthening the maternal/ quired for project prep­ scheduled for February/ (IDA) child health and family planning aration. March. services within the Ministry of Public Health, and reinforcing coordinating family planning­ related activities within the National Population Office (ONAPO). Total project cost to be determined.

Ministry of About Technical Assistance II - Assist Consultants will be re­ Report being prepared. Finance 5.0 Government in improving economic quired. (IDA) policy-making and strengthening of Finance Ministry. Total project cost to be determined.

Ministry of About (R) Highways VI - Upgrading of sec­ Consultants will be re­ Appraisal report being Transport and 20.0 ondary roads and road mainte­ quired. prepared. (Co-financing Communications (IDA) nance program. Total project with EEC and KfW Ger­ cost estimated at $90 .0 million. many probable. Addi­ tional co-financing required.

See Page 1 for footnotes. - 7 -

Member Country, AJllount & and Implementing Probable Stage of Processing and ~y Lender Jd Consulting Services Action on Procurement !!/ RWANDA (Cont'd)

Ministry of About (R) Fourth Line of Credit to Banque No consul tan ts required. Appraisal mission sched­ Finance 10,0 Rwandaise de Developpement uled for February, (IDA) (BRD), Total project cost to be determined.

Ministry of About (R) Education III - Technical and Consultants will be re­ Appraisal mission Education 15,0 Agricultural Training, quired for civil works scheduled for (IDA) and textbooks design, February/March,

Ministry of About GITARAMA/ Agriculture Services - Consultants will be Project preparation under Agriculture 20,0 Application of extension required. way, (IDA) services, financial, marketing and processing operations, and reinforcement of Ministry of Agriculture.

SEYCHELLES

Ministry of 6.2 (R) Transport - Highway rehabilita­ No consul tant:s required Board presentation sched­ Planning (Bank) tion; reclamation of land; im­ by the Bank but the Gov­ uled for February 12. provement of commercial ports; ernment intends to re­ (Co-financing with AfDB and technical assistance. Total cruit consul ta.its. and Norway agreed, ) project cost estimated at $16. 7 million, Bank Project Preparation Facility advance of $300,000 approved to com­ plete project prepara­ tion.

SOMALIA

Ministry of 3.0 (R) Technical Assistance - Second Consultants will be re­ Appraisal report under Planning (IDA) credit for technical assistance quired. preparation. studies and personnel.

Ministry of 10,6 (R) N,W, Agriculture II - Continua­ Consultants will be re­ Board presentation on Agriculture (IDA) tion of ongoing project which is quired. January 8, (Co-financing assisting in the development of arranged: IFAD, $7 mil­ the North-West Region through lion; EEC $5 :4 million), 1 soil and water conservation, and other measures to increase agri­ An IDA Project Prepara­ cultural production. Total proj­ tion Facility advance of ect cost estimated at $26,0 $500,000 approved to as­ million. sist the Government in completion of project preparation and detailed planning,

Ministry of About (R) Education V - To be defined. This project is no longer Education 15,0 in the lending program (IDA) and reporting will be discontinued.

Ministry of To be (R) Ports Rehabilitation - Mainte­ To be determined. Project preparation under Pub lie Works deter­ nance and rehabilitation of way. mined existing ports. Total project (IDA) cost to be determined.

Ministry of About (R) Shebelli Irrigation Rehabilita­ Consultants will be re­ Project identification Agriculture 10,0 tion - To be defined, quired. under way. (IDA) An IDA Project Prepara­ tion Facility advance of up to $1.0 million ap­ proved to engage consul­ tants,

Ministry of About (R) Afgoy Gas Power II - Gas devel­ No decision whether con­ Project preparation under Mineral and 10,0 opment, sultants will be re­ way. Water Resources (IDA) quired,

Ministry of About (N) Agricultural Inputs I - Provi­ To be determined, Project preparation under Agriculture 10,0 sion of agricultural inputs to way. (IDA) support crop production.

SUDAN

National 30,0 Power Rehabilitation - Rehabili­ Consultants will be re­ Electric Post-appraisal report (IDA) tation of power systems of Na­ quired for design and being reviewed. Corporation tional Electricity Corp, (NEC), preparation of bidding (NEC) . Total project cost estimated at packages, $38 million,

See Page 1 for footnotes, - 8 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender];_/ Consulting Services Action on Procurement!!_/

SUDAN (Cont'd)

Ministry of 38.5 (R) Cotton Processing and Marketing Consultants will be re­ Project financing plan Agricultural (IDA) - Rehabilitation of ginneries quired for telecommunica­ under review. Crop Parastatals and strengthening of cotton tions, training officer, production and marketing policy market analyst, cotton An IDA Project Prepara­ institutions. Total project trader technician, pro­ tion Facility advance of cost estimated at $55 mil lion. curement advisor, civil, up to $800,000 approved mechanical and electrical to help finance start-up engineers, and short-term of the project. technical assistance for evaluation, grading, and testing.

Agricultural 22.0 (R) Agricultural extension/research Consultants will be re­ Appraisal report being Research (IDA) and training in irrigated sec­ quired for technical as­ reviewed. Corporation tor. Total project cost estima­ sistance, for civil en­ (ARC) ted at $51 million, including gineering, agricultural $24 million in foreign exchange. research, agricultural extension system, train­ ing services and agricul­ tural economist.

Ministry of 47.5 Agriculture Rehabilitation No consultants ·required. Project issues under Finance and (IDA) Credit III - Support to their­ review. Economic rigation sub-sector for recur­ Planning rent inputs such as herbicides and pesticides.

Ministry of About Industrial Rehabilitation - To No decision made whether Sector mission cancelled. Industry 40.0 be defined. consultants will be re­ No new schedule yet. (!DA) quired,

Ministry of About Gas Engineering - To be defined. No decision made whether Project preparation under Mining and 5.0 consultants will be re­ way. Energy (IDA) quired.

Ministry of About Petroleum Gas Development - To No decision made whether Project preparation under Mining and 40.0 be determined. consultants will be way. Energy (Bank) required.

National To be (R) Power IV - Power generation and No decision made whether Appraisal miSsion to be Electric deter­ transmission distribution/expan­ consultants will be re­ scheduled. Corporation mined sion. Total project cost esti­ quired. (NEC) (IDA) mated at $105 million.

Ministry of To be (R) Western Savannah Phase II - Consultants will provide Appraisal mission sched­ Agriculture d·eter­ Pilot project to develop viable technical assistance to uled for April/May. mined technical packages for rainfed the Wes tern Savannah Dev­ (IDA) crop and livestock production in elopment Corporation to Western Sudan. ~arry out project.

SWAZILAND

Ministry of About (R) Transport Rehabilitation - Consultants will be re­ Negotiations substantial­ Works, Power and 8.6 Bridge and road reconstruction; quired for bridge, feasi­ ly completed. (Co-finan­ Communications (Bank) equipment and training. Total bility and detailed cing with USAID for $1 project cost estimated at $11.3 studies. million.) million, including $9.2 million in foreign exchange.

TANZANIA

Ministry of 27.0 (R) Harbours I - Improvements to Consultants will be re­ Approved by the Executive Communications (IDA) Dar-es-Salaam Port. Total quired for technical as­ Directors on December 13. and Works project cost estimated at $91 sistance and training for (Co-financing arranged million, with foreign exchange engineering maintenance, with Denmark-DAN IDA for component of about $59 million, operations and managerial $7,9 million, Finland­ information. Consultants FINNIDA for $6.8 million for civil works and su­ Italy for $3 .8 million, pervision already selec­ for $10,3 ted, million, Norway-NORAD for $2,8 million, U.K.-ODA for $0,3 mil.lion)

Ministry of About (R) Highways VI - Rehabilitation/ No decision made whether Project being prepared, Coumrunications 30.0 strengthening of the Tan Zam consultants will be re­ (Co-financing being ex­ and Works (IDA) Highway, and road maintenance. quired. plored.) Total project cost estimated at $79,5 million.

See Page 1 for footnotes, - 9 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender J:.l Consulting Services Action on Procurement 4/

TANZANIA (Cont ' d)

Ministry of About Agricultural Rehabilitation - No decision made whether Project preparation under Agricu 1 ture and 30.0 Rehabilitation of cotton sub­ consultants will be re­ way. (Co-financing being Livestock (IDA) sec tor or other crops yet to be quired. explored.) determined.

Ministry of 10.0 Technical Assistance IV - Assis­ Previously engaged con­ Approved by the Executive Planning and (IDA) tance to help carry out studies sul tan ts expected to con­ Directors on October 16. Economic and to improve project implemen­ tinue. Development tation, mainly focusing on agri­ culture sector. Total project cost estimated at $11.94 mil­ lion, including $10 .OJ million in foreign exchange.

Ministry of About Petroleum Sector Technical As­ Consultants will be Appraisal mission in the Water, Energy 8.0 sistance - Assistance for pro­ required for most field. and Minerals (IDA) tection of Songo-Songo reser­ components. voir, studies on marketing of liquified petroleum gas and im­ provement of product distribu­ tion, domestic natural gas util­ ization, as well as institution­ al and manpower training to Tan­ zania Petroleum Development Cor­ poration (TPDC). Total project cost estimated at $10.0 million, including foreign costs of $8.0 million. '

Ministry of 22.0 (N) Power Rehabilitation - Rehabili­ No decision made whether Project being prepared. Water, Energy (IDA) tation of power system, train­ consultants will be re­ and Minerals ing,· and technical assistance. quired.

Ministry of 35.0 (N) Industrial Rehabilitation - In­ No consultants required. Project being prepared. Industry and (IDA) dustrial Rehabilitation through Trade lines of credit to Tanzania In­ vestment Bank, Tanganyika Devel­ opment Finance Ltd. and National Bank of Commerce.

Ministry of 20,0 (N) Agricultural Research and Exten­ No decision made whether Project being prepared. Agriculture and (IDA) sion - Strengthening national consultants will be re­ Livestock agricultural rese.arch service. quired.

Ministry of 32.0 Tea Rehabilitation - Rehabilita­ Consultants will be re- Project preparation under Agriculture and (IDA) tion of tea plantatiOns and quired. way. Forestry processing facilities.

Uganda 32.0 Power II - Rehabilitation of Consultants will be re- Appraisal report being Electricity (IDA) Owen Falls hydropower station. quired. prepared. Board Total project cost estimated at $76 .4 mil lion.

Ministry of About Petroleum Exploration Promotion Consultants will be re- Appraisal report being Lands, Minerals 4.0 - Geophyaical surveys and tech­ quired. prepared. and Water (IDA) nical assistance. Resources

Ministry of 10.0 (R) Agricultural Rehabilitation/ Consultants will be re- Board presentation on Agriculture and (IDA) IFAD II - Co-financing of !FAD quired. January 8. Forestry project including financing of imported recurrent agricultural inputs. Total project cost estimated at $25.2 million.

Uganda Poets and 10.0 (N) Telecommunications II - Contin­ Consultants will be re- Project preparation under Telecommuni­ (IDA) uation of rehabilitation program quired. way. cations in posts and telecommunications Corporation sector.

Ministry of 27.0 (N) Transport - Comprehensive reha­ Consultants will be re- Project preparation under Works (IDA) bilitation program for transport quired. way. sector including road mainten­ ance and institutional assist­ ance for railway administration.

See Page 1 for footnotes. - 10 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender~/ Consulting Services Action on Procurement!±/ UGANDA (Cont'd)

Ministry of 28.0 (N) Sugar Rehabilitation - Rehabili­ Consul tan ts wi 11 be re­ Project preparation under Agricu 1 ture and (IDA) tation of Kakira and/or Kinyala quired. (Already con­ way. Fore'.stry sugar schemes. tracted).

Gecamines About Gecamines II - Rehabilitation, No consultants required Awaiting outcome of tech­ 50.0 maintenance and expansion of for project preparation. nical assistance project (IDA) existing mining facilities. and review of investment Total project cost to be deter­ program in light of in­ mined. stitutional changes in structure of company. Co­ financing meeting has been postponed pending review.

Department of About Kwango Kwilu - Integrated Rural No consultants required Identification under way. Agriculture 15.0 Development Project in Kivu for project preparation. (IDA) Region. Total project cost to be determined.

Department of 9.0 (R) Education Training/Technical As­ Consultants wil-1 be re­ Credit signed on December Primary and (IDA) sistance - Technical assistance quired to strengthen the 19. Secondary for training and improvement of Department's management Education planning; financial management and technical capabili­ An IDA Project Prepar­ and project implementation and ties. Consultants have ation Facility advance of pilot projects for quality im- been recruited for activ­ $473,000 approved to fi­ . provemen ts to the primary and ities financed by the nance consultants' ser­ secondary systems. Total proj­ Project Preparation Fa­ vices in preparing de­ ect cost estimated at $10.6 mil­ cility. tailed description and lion. cost estimates for each component, and for ini­ tial pre-implementation activities.

Department of About (R) Research/Seeds - Support for de­ Consultants will be re­ Appraisal report being Agriculture 16.0 velopment of priority agricul­ quired to assist in proj­ prepared. (Co-financing (IDA) ture research programs and seed ect implementation. (Spe­ with UNDP probable, and production capabilities~ Total cific needs being identi­ with IFAD and Italy being project cost estimated at $22 fied.) explored.) million, including foreign ex­ change cost of $21.4 million. An IDA Project Prepara­ tion Facility advance of $488,000 has been ap­ proved to finance, in a first tranche of $66,000, consulting services to finalize the proposed project, and in a second tranche of $422,000, the start-up activities of selected seed farms.

Department of About (R) Lulua Agriculture - Development Consultants will be re­ Board presentation on Agriculture 12 .5 of foodcrop production through quired to assist the January 8. (Co-financing (IDA) improved input supply systems project implementation with IFAD for $6.5 mil­ and infrastructure support. unit in technical and lion identified.) Total project cost estimated at financial aspects. $21.9 million, including $12.6 An IDA Project Prepara­ million in foreign exchange. tion Facility advance of $60,000 has been approved to finance the completion of research trials in a relatively small part of the project area.

See Page l for footnotes. - 11 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf ~1.l Consulting Services Action on Procurement!±./ ZAIRE (Cont'd)

Department of About (R) Petroleum Refinery Engineering - Consultants will be re­ Negotiations scheduled Mines and Energy 12.5 Technical and economic studies quired for studies and for February. (Co-finan­ (IDA) related to the SOZIR refinery. audits. cing with Italy for $3 Total project cost estimated at million probable.) $18.5 million. An IDA Project Prepara­ tion Facility advance of $900,000 has been ap­ proved to finance: ( a) techno-econcmic studies for energy conservation, secondary conversion, crude trans-shipments options, bitumen manu­ facture; ( ii) demand forecast for refined products; (iii) product pricing and audits.

Department of About (R) Highways VI - Road improvement Consultants will be re­ Appraisal report being Pub lie Works/ 55.0 and maintenance, and training of quired to assist with reviewed. Bureau of Roads (IDA) Office des Routes (OR) staff. project implementation. Total project cost estimated at $69.5 million, including $55 million in foreign exchange costs.

Societe About (R) Power II - Rehabilitation and Consultants will be re­ Appraisal report being Nationale 15.0 expansion of the Kiw region hy­ quired for training and prepared. (Co-financing d 'Electricite (IDA) draulic network, including the engineering services. with Belgium identified. (SNEL) Ruzizi I facility. Total proj­ Consultants have been Additional co-financing ect .cost estimated at.$28.3 mil­ recruited for studies required.) lion. financed under the Project Preparation An IDA Project Prepara­ Facility. tion Facility advance of $440,000 has been ap­ proved to finance cost and engineering studies.

Ministry of About Bateke. Fuelwood· development in Consultants for project Project prep.aration under Environment 15.0 Bateke Plateau. Total project preparation being fi­ way. (IDA) cost to be determined. nanced by EEC and already are appointed.

Department of About (R) Kabinda Agriculture - Develop­ No decision made whether Appraisal mission schedu­ Agricu 1 ture 10.0 ment of agriculture and live­ consultants will be re­ led for March. (IDA) s tock in the Kwang a Kwi lu sub­ quired. regions. Total project cost estimated at $15 .o million.

Societe About DFC VIII - Eighth line of credit No decision made whether Project identification Financiere de 40.0 to SOFIDE. consultants will be re­ under way. Developpement (IDA) quired. (SOFIDE)

Regie des Voies About Navigation Improvement - Streng­ Consultants to prepare Project preparation under Fluviales (RVF); 20.0 thening management of RVF and project financed under way. Regie des Voies (IDA) RVM; rehabilitation of existing Credit 1335-ZR. Maritimes (RVM) facilities and equipment.

Ministry of 7 .1 (R) Fisheries - Improvement of fish Consultants will be re­ Credit signing on January Agriculture and (IDA) production systems and marketing quired for fisheri2s 9. Water channels. Total project cost credit, administration, Development estimated at $10.6 million. project coordination, monitoring and evalua­ tion, fish stock assess­ ment.

Development Bank About Industrial Reorientation ( for­ No decision made whether Appraisal report under of Zambia 40.0 merly DFC III) - Investment re­ consul tan ts wi 11 be re­ preparation. (Bank) sources, inputs and spare parts quired. to rehabilitate, modernize and raise capacity utilization in the industrial sector. Total project cost to be determined.

See Page l for footnotes. - 12 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender Y Consulting Services Action on Procurement 4/ ZAMBIA (Cont'd)

Zambia Railways 20.0 (R) Railways IV - Training, tech­ Consultants will be re­ Negotiations in January. (IDA) nical assistance, track improve­ quired for review of com­ (Co-financing with Japan, ment, telecommunications, rol­ puter activities, manage­ KfW Germany, EEC, and ling stock, maintenance facili­ ment information systems. FINNIDA being explored.) ties. Total project cost esti­ mated at $85,1 million.

Ministry of About Agricultural Research and Exten­ No decision made whether Appraisal mission sched­ Agriculture and 15.0 sion - Agricultural research consul tan ts will be re­ uled for January. Water (IDA) and extension service support quired. Development for Ministry of Agriculture. Total project cost to be determined.

Ministry of About (R) Agricultural Rehabilitation · Consultants will be re­ Board presentation sched­ Agriculture and 25.0 Credit - Financing of critical quired to study parast­ uled for January 29, (Co­ Water Develop­ (IDA) imported inputs in agricultural atal efficiency, maize, financing with Swiss Aid ment sector. Total project cost es­ marketing and fertilizer Agency, CIDA, USAID and timated at $74.0 million, distribution. AfDB arranged. )

Ministry of About (R) Technical Assistance II - Tech­ Consultants will be re­ Appraisal mission sched­ Finance 1.0 nical assistance and training to quired but purpo·se still uled for February. (IDA) upgrade economic management not fully defined. capacity of key Government and parastatal agencies in policy analysis and implementation. Total project cost to be deter­ mined.

Ministry of About (R) Family Health - Objectives Sre No decision made whether Appra isa 1 miss ion sched­ Health s.o to improve primary health care consultants will be re­ uled for April. (IDA) services, expand family planning quired. activities, and introduce cost­ recovery in the health sector. Total project cost to be determined.

Ministry of About (R) Coffee II - To expand the pro­ No decision made whether Appraisal mission sched­ Agriculture 10.0 duction of coffee for export. consultants will be re­ uled for February, (IDA) Total project cost to be deter­ quired. mined.

Nitrogen Chemi­ About (R) Fertilizer Factory - Rehabilita­ Management consultants Appraisal report under cal Company of 10.0 tion and strengthening of man­ may be required. preparation (Co-financing Zambia (IDA) agement. Total project cost es­ with KfW (Germany) and timated at $69.5 million. OECF being explored.)

ZIMCO About (N) Refinery Conversion - Conversion Consultants will be re­ Preparation mission 10.0 of Indeni refinery by adding quired, but terms of ref­ scheduled for February. (IDA) mild hydrocracker to allow in­ e~ence still not fully (Co-financing being ex­ creased production of middle defined. plored.) distillates.

Ministry of About Small-scale Enterprise Assis­ No decision made whether Appraisal report under Industry and 10.0 tance to recently established consultants will be re­ preparation. Technology (Bank) Small Enterprises Development quired, Corporation (SEDCO). Total project cost to be determined.

Ministry of About Family Health - Provide rural No decision made whether Project preparation under Health 25.0 health services and preventive consultants will be re­ way. (Possibilities for (Bank) interventions; family planning quired, co-financing are being· activities. Total project cost explored.) to be determined.

Ministry of About (R) Petroleum Fuels II - Detailed Consul tan ts have been re­ Project preparation under Energy 25.0 cost and engineering package for cruited. way. (Bank) petroleum fuels supply, Total project cost to be determined,

Ministry of About (R) Power II - Power system rehabil­ No decision made whether Project preparation under Energy, Water 30.0 itation and manpower develop­ consultanta will be re­ way. ( Co-financing Resources and (Bank) ment, Total project cost to be quired, likely.) Development/ determined. Electric Supply Commission

See Page 1 for footnotes. - 13 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender?:/ Consulting Services Action on Procurement !if ZIMBABWE (Cont'd)

Ministry of Lan.d About Irrigation - Medium- and small­ No decision made whether Project under prepara­ Resettlement and 60.0 scale schemes in communal lands. consultants will be re­ tion. (Co-financing Rural Develop­ (Bank) quired. being explored.) ment (MLRRD)

East African About (R) DFC Ill - Continuation of sup­ No consultants required. Project under prepara­ Development Bank 10.0 port through a third line of tion. (IDA) credit, with on region- al projects.

See Page 1 for footnotes. - 14 -

Member Country 1 Amount & and Implementing Probable Stage of Processing and Agency }J Lender Y Consul ting Services Action on Procurement !!_/

II, WESTERN AFRICA

To be determined 5,0 (R) Technical assistance for econom­ Project includes resident Approved by the Executive (IDA) ic planning, financial manage­ technical assistance pos­ Directors on ml December ment and project preparation, ition and short-term con­ 13, (Co-financing has Total project cost about $8,5 sulting services. been agreed with UNDP for million, of which $6,6 million $1. 7 million, FAO $0, 7 in foreign exchange. million, EDF $0,6 million, and UNFPA $0,2 million,)

An IDA Project Prepara­ tion Facility Advance of

$450 1 000 approved to help finance project prepara­ tion.

To be determined 30,0 State Enterprises - Provide Consultants will be re­ Appraisal report being (IDA) studies, line of credit, techni­ quired for studies. prepared. cal assistance and training to certain key state enterprises. An IDA Project Prepara­ tion Facility advance of $500,000 has been ap­ proved to help finance project preparation.

Office des 15,0 Telecommunications - Rehabilita­ Consultants have been re­ Project under prepara­ Postes et des (IDA) tion and expansion of local tel­ cruited for studies. tion. Telecommunica­ ephone networks, and technical tions assistance to the Office des An IDA Project Prepara­ Pastes et Telecommunications du tion Facility advance of Benin. $500,000 has been ap­ proved to help finance project preparation.

To be determined 15 ,0 (R) Transport Infrastructure - Port Consultants• report on Project unde·r prepara­ (IDA) rehabilitation, road maintenance preliminary design com­ tion. and sector institution building. pleted, An IDA Project Prepara­ tion Facility advance of $500,000 has been ap­ proved to help finance project preparation.

Societe 10,0 (R) Expansion of water supply facil­ Consultants selected. Pre-appraisal mission in Beninoise (IDA) ities in Cotonou, and Porto Novo (Financed under ongoing end-January/early Febru­ d 'Electricite et rural water supply. Reinforce­ engineering credit), ary, d'Eau (SBEE); ment of SBEE' s managerial and Ministry of financial capabilities. Total Public Water project cost about $25 million, of which $20 million in foreign exchange.

BURKINA

Regie Abidjan­ 10,0 Railways II (Transport Sector Consultants will be re­ In a meeting with Burkin­ Niger (RAN)/ (IDA) Credit) - IDA funds would help quired for procurement of abe authorities, it was Ministere du finance (i) repayment of spare parts and for proj­ stated that IDA partici­ Transport et des Burkina's arrears to RAN as part ect preparation. pation would be condi­ Communications of a financial rehabilitation tional on simultaneously plan, (ii) Burkina's share of reaching agreement with railways project cost, and (iii) Government on transport other investments in transport sector credit which would sector. address, i.e., issues of investment priorities within transport, Some progress was made in this . direction in September, · but final agreement has not yet been reached,

Ministere de la 13,0 Technical Assistance - Estab­ Consultants will be re­ Further project prepara­ Planification et (IDA) lishment of Development Invest­ quired to help prepare tion activities will not du Developpement ment Budget to strengthen in­ and execute project. be scheduled until agree­ vestment budgeting and moni­ ment can be reached with toring development expenditures. Ministers of Plan and Fi­ Total project cost estimated at nance concerning project $13 ,0 million, organization.

See page 1 for footnote·•, - 15 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ ~?:.I Consulting Services Action on Procurement 4/

.!!!!!!!!!!! (Cont ' d)

Ministere de 13. 7 (R) Fertilizer Credit - Improve the Consultants will be re­ Negotiations completed. 1 1 Agriculture et (IDA) supply and pricing of cereal quired for strengthening (Co-financing with de l 'Elevage fertilizer; strengthen the Min­ the agricultural inputs (CCCE/FAC) for $4.9 mil­ istry of Rural Development and unit, and designing and lion, The Netherlands for develop its ability to better implementing a training $2.1 million, and Germany assist and super,rise the region­ program for accountants. (GTZ) for $2 .O million is al development organizations envisaged.) (ORDs). Studies to strengthen the ORDs, and to determine the IDA Project Preparation possibility of reducing fertili­ Facility advance of zer cost by introducing cheaper $500,000 approved for formulations, including greater field trials and feasi­ use of local rock phosphate, are bility study. also included. Total project cost estimated at $24.1 million, of which $17.1 million in for­ eign exchange.

Ministere de la 31.5 (R) Health I - Developing a primary Consultants were employed Appraisal report being Sante (IDA) health care network, and addres­ for the preparation and prepared. sing long-term issues such as appraisal of the project. implementation of an effective IDA Project Preparation and financially sustainable Facility (PPF) advance rural health care delivery sys­ totaling $820,000 ap­ tem, prov is ion of drugs, cost proved to help develop recovery measures. It would ex­ heal th care strategies tend immunization programs, pro­ and test cost recovery vide training and rehabilitate means. (Co-financing rural health care facilities. possibilities are being Total project cost estimated at pursued with Italy, the $33.2 million, of which $17.0 Federal Repub lie of Ger­ mill'ion in foreign exchange •. many, and the OPEC Fund.)

Ministere de 23.2 (R) Primary Education Development Consultants were employed Appraisal report being I 'Education (IDA) Provide support for ( a) reduc­ for the preparation and prepared. Nationale tion of primary education unit appraisal of the project. costs; (b) development of cen­ tral institutions' capabilities for planning, managing and con­ trolling education costs; and (c) establishing project prepar­ ation and implementatior1; capa­ bilities. Total project cost estimated at $24.4 million net of taxes, of which $16.! million in foreign exchange.

Ministere de 15 .o Highways V - Paving of the Consultants will be re­ Project processing await­ l'Equipement (IDA) Ouagadougou-Kaya road and im­ quired. ing discussion on a UNDP­ proving the Kaya-Dori road to financed study of the all weather standards. Total Tambao Project. (Co-fi­ costs are estimated at $59.5 nancing with Germany million. (KfW) and possibly with Saudi Fund and BADEA.)

Ministere de 11.6 (R) Livestock II - Improving ani­ Consultants will be re­ Appraisal mission sched­ !'Agriculture et (IDA) mal production and upgrading quired for the study on uled for November 1985. de l 'Elevage the institutions involved in integration. of livestock livestock development; estab­ and agriculture. IDA Project Preparation lishment of a livestock input Facility (PPF) advance of delivery service and a line of $55 , 000 approved to fi­ credit for livestock activities. nance the completion of preparation activities.

To be determined 25.0 Wood Processing Industries. No consultants required. Project concept being re­ (Bank) viewed.

Ministere de 25.0 (R) Education and Vocati.onal Train­ Consultants will be re­ Appraisal report being I 'Education (Bank) ing - Expansion of primary quired for education prepared. Nationale et teacher training colleges; reha­ planning, vocational Ministere du bilitation of technical second­ training and pre-invest­ Travail ary schools. Improvement of ment studies. vocational training capabili­ ty. Strengthening of key insti­ tutions responsible for educa­ tion and manpower planning. Total project cost about $60 million, of which $35 million in foreign exchange.

See page I for footnotes. - 16 -

Member Country, Amount t, and Implementing Probable Stage of Processing and Agency lJ ~:!,_/ Consulting Services Action on Procurement!±./

CAMEROON (Cont ' d)

FONADER 25 .o Second Special Rural Development Consultants will be re­ Negotiations substantial­ (Bank) Fund (FSAR II) - To extend Gov­ quired for supervision of ly completed. ernment's efforts to strengthen rural water component and institutions and implement pri­ project appraisal works ority small-scale projects. The with MINAGRI. proposals include: a village water supply component; a line of credit for small rural activ­ ities, studies, infrastructure, and specific production support. Total project cost about $50.0 million, of which $25.0 million in foreign exchange.

Ministere de 22.5 Agricultural Research - Improv­ Technical staff will be Date of negotiations to l 1 Enseignement (Bank) ing scope and application of required from ITTA for be determined. Superieur et de national agricultural research research positions and la Recherche through insti~ution building in­ ISNAR for research pro­ Scientifique volving The Ministry of Higher gramming and management. Education and Scientific Re­ search, and crop and livestock research institutes. Particular emphasis on training, organi­ zation, evaluation and building pre-extension linkages to re­ gional research and develop­ ment. Total project cost about $45.9 million, of which $2.3.4 million in foreign exchange.

HEVECAM 8.3 (R) HEVECAM Rubber III - Phase III Consultants required for Board presentation on (Bank) of the plantation established 6 man-months to carry January 15. (Co-finan­ under the Niete Rubber Estate out, jointly with HEVE­ cing agreed with CDC, and HEVECAM II Projects. In­ CAM' s staff, a study on CCCE and BEI for $11.8 vestment in maintenance of rub­ rubber development in the million each.) ber already planted but not yet Southeast. in production. Completion of the planting program. Expansion of processing facilities to ca­ ter for additional areas reach­ ing the production stage. Total project cost estimated at about $83.7 million, of which $29.3 million in foreign exchange.

Ministere de 100.0 Roads VI -Paving of two road Consultants will be re­ Appraisal report being l' Equipement (Bank) sections (150 km) and program of quired to supervise con­ prepared. (Co-financing pavement strengthening; techni­ ~truction, provide tech­ being sought.) cal assistance for planning and nic·a1 assistance, and program implementation, and carry out feasibility training. Total project cost studies and detailed en­ estimated at $240.0 million of gineering for the prepar­ which $164.0 million in foreign ation of a follow-up exchange. project.

Ministere de 30.0 (R) Center South Region Rural Dev­ Decision on use of con­ Appraisal mission in Jan­ 1 1 Agricu 1 ture & (Bank) elopment Project - Institution sultants, if any, will be uary. (Possible co-fi­ Societe de development project with focus made during appraisal of nancing with IFAD.) Developpement du on improving productivity from project. Cacao ( SODE CAO) existing areas of cocoa planta­ tion and emphasizing the inte­ gration and expansion of food­ crop production for the capital, Yaounde; through: organizing and strengthening of SODECAO and co­ operatives; better facilities for treatment, processing and marketing; essential feeder roads, and village water-points. Total project cost about $50.0 million.

CAPE VERDE

Banco de Cabo 4.0 Line of credit for assistance to Consultants required for Negotiations completed. Verde (IDA) small and medium-sized enter­ project implementation prises, and technical assis­ and technical assistance. tance.

See page 1 for footnotes. - 17 -

Member Country, Amount & and Implementing Probable Stage of Processing anl Agency J_/ Lender 1/ Consulting Services Action on Procurement 4/

CENTRAL AFRICAN REPUBLIC

Haut Commissari­ 8.0 Second Technical Assistance - Most of the experts have President's Report being at charge du (IDA) Resident experts, including been hired under the reviewed. Plan et de la project economist, macroecono­ First Technical Assis­ Cooperation mist, and diamond, forestry, tance Project and would Econom.ique et legal, external debt, budgetary, be continued under the Financiere public enterprises, and public second. Only the macro­ administration experts. Ve­ economist and the budget­ hicles and operating expendi­ ary expert would be new. tures to support work of ex­ Terms of reference may be perts. Total project cost esti­ obtained from the imple­ mated at $8.4 million, of which menting agency. $8 million in foreign exchange.

CONGO, PEOPLE'S REPUBLIC OF THE

Societe 30.0 Water Supply/Technical Assis­ Consultants have been re­ Documentation being pre­ Nationale de (Bank) tance and Rehabilitation Project cruited and financed by pared. Distribution - Rehabilitation of waterworks the Project Preparation d'Eau (SNDE) of Brazzaville, Pointe Noire, Facility. Two Bank Project Prepara­ Loubomo, Nkayi and Kinkala; and tion Facility (PPF) ad­ technical assistance to SNDE to vances totalling upgrade organization, staff $1,000,000 approved to skills and management systems. finance project design Total project cost estimated at and preparatory studies. $37.0 million, of which $26.7 ~illion in foreign exchange.

EQUATORIAL GUINEA

Ministerio de 11.0 (R) Rehabilitation of cocoa through Consultants have been re­ Negotiations completed. Agricultura, (IDA) ( i) establishment of an agricul­ cruited for 20 man-years. Ganaderia y tural credit program, and (ii) IDA Project Preparation Desarrollo Rural technical assistance to the Facility advances of (MOA) Banco de Credito y Desarrollo, $200,000 and $750,000 to the Camara de Comercio Agricola finance project prepara­ y Forestal and the MOA. Total tion and start-up activi­ project cost estimated at $16.0 ties. (Co-financing million, of which $12.6 million agreed with OPEC Fund for in foreign exchange. $1.0 million; EEC $0.9 million; and BADEA $2.8 million.) THE GAMBIA

The Gambia 5.0 (R) DFC II - Line of Credit for re­ Consultants for project Appraisal mission to be Commerc ia 1 and (IDA) structuring some existing enter­ preparation are expected scheduled at a later Development Bank prises, and new investments in t9 be financed by the date. (Co-financing will (GCDB) agro-business and manufacturing; Project Preparation Fa­ be required. AfDB has technical assistance for GCDB cility. expressed interest.) for improvement in both commer­ cial and development banking op­ erations and in accounting sys­ tems.

To be determined 5.0 (R) Highways II Maintenance Project Consultants will be re­ Appraisal mission sched­ (IDA) - Repaving and repairing of ex­ quired. uled for February. (Co­ isting roads. Total project financing will be re­ cost about $20.0 million. quired. AfDB, Italy and the Islamic Development Bank have expressed interest.)

The Gambia 5.0 (R) Water Supply/Electricity Project Consultants will be re­ Appraisal mission sched­ Utilities (IDA) - Rehabilitation and expansion quired. uled for February/March Corporation of water supply systems in 1985. (Co-financing (GUC) greater Banjul and provincial agreed with Islamic De­ urban areas. Electricity system velopment Bank for $5.3 rehabilitation, technical as­ million, EEC/EDF $2.6 sistance and training. million, and ODA (UK) $4.0 million. Saudi Fund has expressed interest.)

See page 1 for footnotes. - 18 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender Jj Consulting Services Action on Procurement~

Ministry of 20.0 Accra District Rehabilitation: Detailed design and en­ Appraisal report being Works & Housing, (IDA) Support to the Accra City Coun­ gineering under way by prepared. (Co-financing or a new agency cil for major road rehabilita­ consultants. wi 11 be required.) tion and maintenance, resource mobilization and a small upgrad­ IDA Project Preparation ing component. Total cost esti­ Facility advance of mated at $26.l million, of which $150,000 approved to about $19.3 million in foreign finance design and con­ exchange. sultant services required for pre-implementation activities.

To be determined 15.0 Cocoa III - Replanting and reha­ To be determined. Immediate needs for cocoa (IDA) bilitation of existing cocoa sector taken care of by areas; technical assistance for Export Rehabilitation training and institution build­ Project. Another cocoa ing. project may be formulated after completion of the agricultural sector study. (Co-financing will be required.)

Ghana Highway 40.0 Roads Rehabilitation and Mainte­ To be determined. Appraisal report being Authority (IDA) nance - Reh8.bilitation of prepared. bridges and main roads, mainten­ ance of feeder roads; and tech­ Feasibility and engineer­ nical assistance. Total cost ing studies completed estimated at $144.0 million, of under IDA Project Prepar­ which $103.0 million in foi-eign ation Facility advance of exchange. $LO million. (Co-finan­ cing will be required.)

To be determined To be Public Enterprises Technical As­ Consultants will be re­ Project scope to be qis­ deter­ sistance - To assist the Govern­ quired to analyze the re­ cussed with Government. mined ment of Ghana in improving its sults of the question­ (Co-financing will be re­ (IDA) strategy for the state enter­ naires distributed to 130 quired.) prises and increasing their ef­ public sector enter­ ficiency. Total cost to be prises. IDA Project Preparation determined. Facility adv~nce of $400,000 approved to finance consultant ser­ vices required to com­ plete preparation work. UNDP is also contributing $264,000 to finance their preparatory work.

Electricity 27 .5 Power VII - Rehabilitation of Consultants for utility Appraisal report being Corporation of (IDA) ECG's distribution network, sys­ Operations will be re­ prepared. Ghana (ECG) tem maintenance, technical as- quired. s is tance and training. Total IDA Project Preparation project cost about $36.0 mil­ Facility advance of lion, of which $32.0 million in $680,000 approved to as­ foreign exchange. s is t in the preparation of the project.

GHAIP 30.0 Petroleum Refinery - Oil refin­ Consultants have been re­ Appraisal mission tenta­ Oil Refinery (IDA) ery rehabilitation and installa­ cruited. tively scheduled for tion of secondary conversion fa­ February. cilities.

To be determined 60.0 Second Reconstruction Import No consultants required. President's Report being (IDA) Credit - To assist the Govern­ prepared. (Co-financing ment to import urgently required will be required.) spare parts and other essential items to rehabilitate agri­ culture, transport and manufacturing sectors.

Ghana Ports 24.5 Ports Rehabilitation and Mainte­ To be determined. Appraisal mission sched­ Authority (IDA) nance - Rehabilitation of Tema uled for May 1985. and Takoradi ports and mainte­ nance. IDA Project Preparation Facility advance of $510,000 approved for improvement of ports.

Ministries of 12.0 Population and Human Resources Appraisal mission sched­ Health and Edu­ To be determined. (IDA) Project - Rehabilitation of uled for March 1985. cation health and education services.

See page 1 for footnotes. - 19 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender?:/ Consulting Services Action on Procurement 4/'

Ministry of 3.0 (R) Mineral Development. Consulting services for Project scope to be de­ Mines and (IDA) project preparation to be termined. Geology determined. Engineering services for investment IDA Project Preparation studies already selected. Facility advance of $500,000 to examine op­ tions for development of Mifergui-Nimba Iron Ore project, and to review exsting practices for allocation of mining con­ cessions and for market­ ing of diamonds. (Co­ financing will be re­ quired. CIDA and EDF have expressed interest.)

Ministry of 5.4 Engineering Credit for prepara­ Consultants have been re­ President's report being Energy MINE/SNE (IDA) tion of Power Master Plan, fea­ cruited for the Master prepared. (Co-financing sibility and engineering for a Plan and Institutional expected to be provided hydro-electric plant to be iden­ Study. The feasibility by CCCE, CIDA and the tified by the Power Master Plan, study is expected to be Federal Republic of institution study, and spare co-financed bilaterally. Germany - KfW.) parts. Total project cost esti­ mated at $24.2 million, of which IDA Project Preparation 94% in foreign exchange. Facility advance of $680,000 to finance Mas­ ter Generation and Trans­ miss ion Plan and Organi­ zational Study for power sector.

Ministry of 19.0 (R) Rice Development II - Second Previously engaged con­ Appraisal report being Agricu 1 ture (IDA) phase of Rice Development Proj­ sultants expected to con­ prepared. (Co-financing ect to consolidate and expand tinue. agreed with FED for $6.0 first· phase rice project in million; AfDB and CIDA Forestry Region of Guinea; im­ have expressed interest.) prove planning and project preparation capacity of ONADER, IDA Project Preparation executing agency; start pilot Facility (PPF) advance of extension and research activi­ $800,000 to finance con­ ties in two new ecological zones sultant services to study of country. Emphasis will be on present state of agricul­ rice production but simple tech­ tural services provided nical packages for other crops by Ministry of Agricul­ such as coffee, manioc, maize, ture and various private/ etc., will also be provided. public organizations.

Ministry of 9.5 (R) Technical assistance for macro­ Consultants' proposals Negotiations in January. Planning and (IDA) economic management and statis­ have been requested. (Co-financing agreed with Statistics tics, and related training. FAC for $600,000 and UNDP Planning and investment program­ for $300,000.) ming; project identification, preparation and evaluation; IDA Project Preparation revision of accounting plans; Facility advances of external debt management; train­ $400,000 to finance proj­ ing. Total project cost about ect preparation. $10.0 million, of which $9.6 mi 1 lion in foreign exchange.

Ministry of 12.0 Second Livestock Development Consultants for project Project under prepara­ Livestock and (IDA) Project. Program to improve preparation being fi­ tion. Appraisal mission Fisheries animal health, veterinary ser­ nanced by Government. scheduled for March. vices and support to herders. Proposals from Government are expected.

Ministry of 12.0 Second Water Supply Project. Consultants selected. Precise project scope to Energy (IDA) Medium-term investment program (Financed under ongoing be determined. (Co-fi­ and support to operating entity. project.) nancing will be re­ quired.)

To be determined 29.4 (R) Rehabilitatio.:i Import Credit - No consultants required. Appraisal mission sched­ (IDA) To finance imports necessary to uled for February. Dis­ begin structural adjustment and cussions under way with rehabilitation of the economy. other donors for parallel operations.

See page 1 for footnotes. - 20 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender];_/ Consulting Services Action on Procurement 4/

GUINEA-BISSAU

Ministry of 3.0 (R) Agricultural Sector Credit - Two consultants for proj­ Project preparation under Rural (IDA) Program of selected sectoral ect preparation being re­ way. Development and policy changes aimed at struc­ cruited. Fisheries tural economic adjustment.

To be determined 10.0 (R) Emergency Reconstruction Import No consultants required. Approved by the Executive (IDA) Credit - Financing of imports of Directors on December 13 goods necessary for productive and signed December 14. . processes. (Co-financing by Switzer­ land for about $2.0 mil­ lion.)

IVORY COAST

Regie Abidjan­ 30.0 Railways II - Track renewal in Consultants will be re­ Appraisal mission to be Niger (Bank) Ivory Coast and Burkina; loco­ quired for spare parts scheduled as soon as (RAN) motive maintenance facilities; program, and for project Ivory Coast and Burkina railway equipment, consulting preparation. Borrower Governments finalize RAN services and training. will present shortlist to management changes. be financed from Bank Project PreparBtion Fa­ cility.

Ministry of 40.0 (R) Rural Development III (CIDT) - Consultants may be re­ Appraisal mission to be Agriculture (Bank) North and North-West Savannah quired for studies. scheduled after further and/ or Compagnie Rural Development project empha­ clarification by Govern­ Ivoirienne de sizing cotton and foodcrops, in­ ment of possible changes Developpement creased farm participation in in responsibilities of des Textiles marketing, input supply and CIDT and their policies (CIDT) credit. Complementary activi­ in Savannah. ties. include farm modernization, spread of animal traction, and project monitoring and evalua­ tion.

Government and 28.0 Forestry II - Land clearing, Previously engaged con­ Negotiations substantial­ SODEFOR (Bank) planting and maintenance of sultants expected to con­ ly completed. 20,000 ha; maintenance of 20,000 tinue with one additional ha planted under the first for­ recruitment for which estry project; research and proposals are being in­ pilot developments. Total proj­ vited. ect cost about $52.4 million, of which $29.4 million in foreign exchange.

Ministry of 10.0 (R) Health Project - Educational fa­ Consultants will be re­ Appraisal report being Health (Bank) cilities for training of para­ quired for project prep­ prepared. medical personnel; upgrading of aration and sector man­ rural health centers; technical agement. Bank Project Preparation assistance and management stud­ Facility advance of ies for the sector. $490,000 approved to fi­ nance preparation of architectural drawings and for other activities.

To be determined so.a Industrial Restructuring and De­ No consultants required Appraisal report being (Bank) velopment Project - To include a at this time. prepared. technical and financial assis­ tance package for the restruc­ turing of existing enterprises and the financing of new indus­ trial projects.

Ministry of 40.0 Oil Palm V Project - Replanting No decision made whether Appraisal report being Agriculture (Bank) of industrial and smallholder consultants will be re­ prepared. and/ or Palm­ oil palm plantations. Introduc­ quired. industrie tion and development of planta­ Bank Project Preparation tions in new areas; research in Facility advance of oil palm and coconut sectors; $365,000 approved to help pilot studies. finance project prepara­ tion.

SODESUCRE/Gov­ 30.0 Sugar Rehabilitation - Renewal Consultants may be re­ Appraisal report being ernment of Ivory (Bank) of agriculture and irrigation quired for management re­ prepared. Coast equipment; improvement in cane form. Shortlist being handling, energy generation and prepared by SODESUCRE. sugar processing; extension of Individual consultants in cane growing areas; and manage­ advisory positions are ment, marketing and pricing also being considered. reforms.

See page 1 for footnotes. - 21 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )j Lender !:J Consulting Services Action on Procurement!±_/

IVORY COAST (Cont ' d)

To be determined 37 .o Telecommunications - Rehabilita­ Additional consulting Appraisal report being (Bank) tion of National Te lecommunica­ wor.k required to be prepared. tions Office (ONT), following financed by UNDP. its reorganization, including improvement of its physical fa­ cilities and financing part of its investment program.

To be determined 50.0 (N) Highway Sector II - Construction To be determined. Appraisal mission sched­ (Bank) and strengthening of bitumen and uled for February. gravel roads; rehabilitation of feeder roads; road maintenance program; and technical assist­ ance and studies.

Ministry of 2.5 Petroleum II - Continuation of To be determined. Appraisal report being Lands, Mines and (IDA) activities under first project prepared. Energy for oil exploration promotion, and institutional support to Minis try of Lands, Mines and Energy.

Ministry of 25.0 (R) Structural Adjustment Credit to To be determined. President's Report being Finance (IDA) bring about an improvement of prepared. (Co-financing the Government's fiscal perform­ will be' sought.) ance, in the efficiency of pub­ lic enterprises, and in export performance.

Liberia Water 5.0 (R) Water Supply II - Rehabilitation To be determined. Negotiations substantial­ and Sewer (IDA) and improvement of operations ly completed. Awaiting Corporation through technical assistance. completion of conditi'ons Total project cost estimated at of Board Presentation. $12.2 million, of which $10.2 million in foreign exchange.

Ministry of To be (R) Technical Assistance in support Invitations for proposals President's Report being Planning and deter­ of structural adjustment pro­ on technical assistance prepared. Economic Affairs mined gram. to new Bureau of State (IDA) Enterprises and to review management of a group of state enterprises were sent out to shortlist of consultants in November 1984.

National Port 2.5 (R) Ports Rehabilitation II - Tech­ c·onsultant services will Preparation in progress. Authority (IDA) nical assistance to the National be required. (Co-financing will be re­ Port Authority to improve port quired.) management and operations; spare parts and limited amount of equipment; rehabilitation of existing quay structure, and deferred maintenance.

MALI

Ministere de 18.0 (R) Mopti Area Development - Im­ Consultants were employed Negotiations scheduled ! 'Agriculture; (IDA) provement in rice and livestock to assist Government for end-February. ( Co­ and Ministere du production through ( i) hydraulic under the Project Prepar­ financing with CCCE for Developpement works; (ii) agricultural credit; ation Facility; consult­ $10.3 million, DIGIS for Rural (iii) stock water development; ing services for finan­ $0.5 million, and AfDB (iv) animal health; (v) range cial management, train­ for $6.0 million envis­ and pasture management; (vi) ing, marketing, monitor­ aged.) strengthening of rural develop­ ing and evaluation, stock ment agencies. Total project water systems studies as IDA Project Preparation cost estimated at $41.8 million, well as detailed physical Facility advance of of which $26.4 million in for­ resource inventory (hy­ $631,000 approved to fi­ eign exchange. drology, soils, land use, nance detailed engineer­ aerial suryey) will be ing studies, bidding doc­ used. uments, urgent repairs of irrigation works, agri­ cultural studies, con­ sultant services and equipment purchases es­ sential to carry out work already under way. New advance of $217,000 ap­ proved to complete prep­ aration work.

See page 1 for footnotes. - 22 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender 2=_/ Consulting Services Action on Procurement!±_/

MALI (Cont'd) Appraisal report being Ministere des 45.0 (R) Highways V - (a) Reconstruction Consultants' services prepared. (Co-financing Transports et (IDA) of the Bamako-Bougouni Road; (b) will be required for with Swiss Government for des Ti:'avaux highway maintenance; and (c) in­ technical assistance for $5.0 million and AfDB for Publics stitutional strengthening. Total project implementation, $11.0 million is envis­ cost estimated at $74. 7 million, transport investment aged. Additional co-fi­ of which $56.3 million in for­ planning, rehabilitation nancing being sought from eign exchange.) of heavy equipment, pro­ OPEC Fund and FAC.) curement agent services, supervision of works and training.

Ministere de 15.0 Office du Niger II - Streng­ No decision made whether Project processing de­ !'Agriculture (IDA) thening and rehabilitation of consultants will be re­ ferred. (Co-financing Office du Niger. Total project quired. with KfW Germany for $5.9 cost estimated at $40 .8 million. million, CCCE for $2.5 million, and the Dutch Government for $7.4 million is envisaged.)

Ministere du 6.0 (R) Livestock Services - To streng­ No decision made whether Project concept being re­ Developpement (IDA) then the Livestock Services De­ consul tant·s wi11 be re­ viewed. Appraisal mis­ Rural partment, finance a revolving quired. sion tentatively sched­ fund and infrastructure for vet­ uled for March. (Co-fi­ erinary pharmacy, create a live­ nancing being sought.) s tock development fund and ex­ pand and strengthen pastoral services.

Ministere du 28.0 (R) Public Entreprises - Rationali­ Consultants will be re­ Appraisal report being Plan (IDA) zation of the size of the public quired. prepared. (Co-financing ente.rprise sector to reduce bur­ being sought.") den on Mali's economy; policy and institutional reforms to im­ prove the performance of the public enterprise sector; and rehabilitation of selected pub­ lic enterprise.

Ministere du 5.0 (R) Forestry II - Protection and de­ Consultants will be re­ Appraisal miSsion in Jan­ Developpement (IDA) velopment of forest reserves in quired. uary. (Co-financing with Rural the Bamako area. CCCE, FAC and the Nether­ lands being explored.)

Ministere de 10.0 (R) Urban II - Urban infrastructure Consultants will be re­ Appraisal mission tenta­ l'Interieur (IDA) and traffic management; resource quired for project imple­ tively scheduled for May mobilization through simplified mentation and technical 1985. (Co-financing cadastre and reform of land ten­ assistance. being sought.) ure law and strengthening of municipal finances; institu­ tional strengthening, in partic­ ular law development, technical assistance and training.

Energie du Mali 18.0 (R) Power II - Reinforcement and ex­ Consultants have been re­ Appraisal mission is (EDM) (IDA) tension of the services of EDM cruited to prepare the scheduled for September by constructing a transmission studies under ongoing 1985. (Co-financing line between Bamako and Segou; Power Project. Consul­ being sought with CIDA, implement the· first step in the tants will be required to KfW Germany, CCCE, and optimum development program provide technical assis­ OPEC Fund.) under preparation in the first tance. power project, reinforcement and extension of distribution sys­ tem, rehabilitation of Felou Hydro plant, technical assis­ tance training and spare parts. Total project cost about $79 million, of which $69 million in foreign exchange.

MAURITANIA

SONADER 7.5 (R) Small-Scale Irrigation Develop­ Consultants required for Negotiations tentatively (IDA) ment of about 1,600 ha of small irrigation· engineering. scheduled for January/ irrigated perimeters. Total February. (Co-financing cost estimated at $10.2 million, with IFAD agreed for $3 .2 of which $5.6 million in foreign million.) exchange.

See page 1 for footnotes. - 23 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency]) Lender Y Consulting Services Action on Procurement 4/

MAURITANIA (Cont'd)

Ministere du s.o (R) Livestock Development II - Es­ Consultants will be re­ Appraisal report being Developpement (IDA) tablishment of pastoral associa­ quired for financial man­ prepared. (Co-financing Rural tions, strengthening of live­ agement (long-term) and confirmed with The Neth­ stock services, vaccination, for pastoral organiza­ erlands and AfDB. Italy distribution of drugs, applied tion, preparation of le­ and OPEC Fund have ex­ research. Total cost about gislation, training and pressed interest.) $14.5 million, of which $11.6 civil works tenders million in foreign exchange. (short-term). IDA Project Preparation Facility advances of $415 , 000 approved for preparation of project.

Banque s.o (R) Industrial and Artisan Develop­ Consultants will be re­ Appraisal report being Mauritanienne (IDA) ment - Line of Credit for small­ quired for DFC carpet­ prepared. ) pour le Devel­ and medium-scale enterprise; weaving agency and train­ oppement et le technical assistance to BMDC, ing of accountants. IDA Project Preparation Commerce (BMDC) and financial and technical as­ Facility (PPF) advance of and Office de sistance to OTM for development $140,000 approved to help Tapis Mauri­ of carpet-weaving artisans; com­ Government finance con­ tanien (OTM) ponent for training accountants. sultant services. materi­ als, and local trainers needed to advance prepar­ ation of the training component.

Ministry of 12.0 (R) Public Enterprises Rehabilita­ Consultants required for Negotiations tentatively Planning (IDA) tion and Technical Assistance - start-up of project prep­ scheduled for January/ Strengthening of the capability aration are financed by February. (Co-financing of the Ministry of Planning to the Project Preparation with FAC for $0.9 mil­ carry out studies for the re­ Facility. lion, CCCE for $3 .O mil­ structuring and rehabilitation lion and FED for $1.3 of the parapublic sector. Emer­ million; other co-finan­ gency programs ( technical ass is­ ciers being sought. EIB tance and spare parts) to assist has agreed in principle two priority enterprises (Port to co-finance $4.8 mil­ Authority and Electrical and lion.) Water Supply Company); and tech­ nical assistance and studies for IDA Project Preparation Post & Telecommunication Com­ Facility advance of $1.0 pany. Total coat about $25.7 million approved to fi­ million, of which $21.6 million nance technical assis­ in foreign exchange. tance to enterprises and Ministry of Planning, equipment for project unit, studies and train­ ing, and spare parts and equipment for SONELEC and EMN.

Minis tere du 10.2 (R) Irrigation Rehabilitation Proj­ Consul tan ts/ advisers wi 11 Negotiations scheduled Developpement (IDA) ect - To rehabilitate existing be required to work for for February. (Co-finan­ Rural irrigation works; procure equip­ Force Accounts, Applied cing being sought with ment for maintenance and opera­ Research, Financial Plan­ CCCE for $8.9 million and tion of irrigation works; supply ning, Monitoring and KfW Germany for $4. 4 mil- agricultural inputs; train proj­ Evaluation, Drainage, and lion.) ect staff, cooperative managers Functional Literacy. and farmers. Total cost about Financing to help prepar­ $26 .5 million, of which $13.4 ation was provided for by million in foreign exchange. an advance of $1.0 mil­ lion from the IDA Project Preparation 'Facility.

Ministere du 10.0 (R) Small Rural Operations - Small­ No decision made whether Preparation under way. Plan (IDA) scale irrigation and bottom.land consultants will be re­ development schemes; cooperative quired. Financing to help prepar­ and group support activities; ation was provided for by medium term loans to farmers. an advance of $430,000 from the IDA Project Preparation Facility.

See page 1 for footnotes. - 24 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender y Consulting Services Action on Procurement!±._/

NIGER (Cont'd)

Ministere des 7.5 Power Engineering and Technical Consultants for Power Approved by the Executive Mines et de (IDA) Assistance - Study of develop­ Planning and sector or­ Directors on July 19, l 'Industrie ment of power system, technical gan.ization have been re­ Credit signing on January assistance and training. Total cruited. Consultants for 15, project cost about $7 ,9 million, management and manpower of which $7,5 million in foreign planning and tariffs will IDA Project Preparation exchange. be required. Facility advance of $1 mi 11 ion approved to ini­ tiate a power planning study and a study of power sector institu­ tions. Planning study has been awarded.

Ministere des 14.3 (R) Petroleum - Evaluation of an oil Consultants to evaluate Appraisal mission tenta­ Mines et de (IDA) discovery at Sukhor; development oil discovery (under tively scheduled for l'Industrie of a strategy for promoting and way), and to develop oil February, accelerating petroleum exploita­ exploration strategy. tion; and strengthening of the Two IDA Project Prepara­ Directorate of Energy through tion Facility advances the provision of experts, train­ totalling $500,000 have ing, equipment and other facili­ been approved to assist ties. in the preparation of the project.

Ministere des 18.0 Highway V - Road maintenance, To be determined. Project under prepara­ Travaux Publics (IDA) rural road improvements, work­ tion. shop rehabilitation, training.

Ministere de 15.0 (R) Education II - Expansion and To be determined. Appraisal mission sched­ l 'Education (IDA) strengthening of primary educa­ uled for April. tion; education planning.

Ministere du 45.0 (R) Structural Adjustment Credit in Consultants to assist in Pre-appraisal mission Plan (IDA) support of policy reforms in the preparation of parastatal tentatively scheduled for areas of public enterprise reha­ reform program. March, bilitation, public investment, and agriculture.

Federal Ministry 53.0 Second Urban Development - Imo Construction supervision Awaiting final approval of Works and (Bank) State. Total cost estimated at consultants expected to from the Government. Housing $85,0 million, of which $36,8 continue present assign­ million in foreign exchange. ment. Short-term consul­ ting services and train­ ing assistance will be ~ought for municipal as­ set maintenance, finan­ cial management and tax collection.

Federal Ministry 75.0 Southern Borno Agricultural Dev­ Short-term consultant Awaiting final approval of Agriculture, (Bank) elopment - Farm support services services would be re­ from the Government. Water Resources and general rural infrastructure quired in areas of inter­ and Rural Devel­ aimed at crop and livestock dev­ mediate technology, Procurement: Retroactive opment elopment. Total cost estimated small-scale irrigation, financing up to $1 mil­ at $117,4 million, of which land use planning, train­ lion recommended to cover $64,1 million in foreign ex­ ing, and maintenance of start-up activities. change. feeder roads and rural water supplies. Other consultant services to be determined.

Borno State 72.0 (R) Berno State Water Supply - Im­ Consultants have been re­ Awaiting final approval Water Board (Bank) provement and expansion of water cruited, and will be from the Government. supply facilities in Maiduguri, partly financed by the technical assistance and train­ Project Preparation Fa­ Request for Bank Project ing. Total cost estimated at cility, Preparation Facili~y $115.0 million, of which $60,0 advance awaited from Fed­ million in foreign exchange. eral Government of Nigeria to meet cost of designing water supply system in Maiduguri and to reinforce the manager­ ial capability of the Borno State Water Board.·

See page 1 for footnotes. - 25 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l_/ Lender]./ Consulting Services · Action on Procurement 4/

~(Cont'd)

Federal Ministry 34.0 Sokoto Health - Construction and Consultants will be hired Awaiting final approval of Health and (Bank) upgrading of about 180 rural for training, supervision from the Government. Sokoto State health clinics and dispensaries and program evaluation. in Sokoto State: expansion of Procurement: Retroactive i1111Dunization program (EPI); financing up to $0 .2 mil­ staff development, technical as­ lion recommended to cover sistance for project management start-up activities. in Sokoto State and to the Fed­ eral Ministry of Health. Total cost estimated at $61.6 million of which $20.7 million in for­ eign exchange.

Federal 13.0 (R) Technical Assistance for moni­ Consultants for project Approved by the Executive Ministries of (Bank) toring external debt, exchange preparation have been re­ Directors on December 20. Finance and control and plan implementation, cruited and are financed National and for strengthening the Feder­ by the Bank Project Prep­ Bank Project Preparation Planning al Office of Statistics. Total aration Facility. Facility advance of cost estimated at $1?,..0 million, $70,000 financed consult­ of which $9.0 million in foreign ant services to assist exchange. the Government with the review of the Public In­ vestment Program.

Procurement: Retroactive financing of up to $1.0 million to cover start-up activities.

Lagos State 12.0 Lagos Solid Waste Management and Consultants would be re­ Awaiting final approval Government Solid (Bank) Draip Rehabilitation Project - quired to strengthen man­ from the Government. Waste Disposal To upgrade and expand refuse agement and financial op­ Board collection/disposal and improve erations, and for prepar­ (Co-financing of $11_.6 the city-wide storm water drain­ ation of final engineer­ million with suppliers age system for Metropolitan ing designs . wil 1 be sought.) Lagos. Technical assistance to strengthen Local Government Procurement: Retroactive Council financial operations. financing totalling about Total cost estimated at $164.3 $4.0 million· is proposed million, of which $83.6 million for storm cleaning, and in foreign exchange. construction during the dry season. Also con­ struction of some depots, maintenance facilities and a transfer station.

Federal Ministry 50.0 Forestry II - The project will No decision made whether Appraisal timing being of Agriculture, (Bank) (1) support an afforestation consultants will be re­ discussed with Govern­ Water Resources program; (2) establish pulpwood quired; ment. and Rural Devel­ and timber plantations; and pro­ opment vide support to forest manage­ ment in three middle belt states.

Nigerian 25.0 Gas Technical Assistance Project Consultants may be re­ Approved by the Executive National (Bank) - Design engineering for a pro­ quired to carry out sup­ Directors on March 20. Petroleum posed Escravos-Lagos gas pipe­ ply and demand study and Corporation line (ELP) project. Preparation the LPG market study. (NNPC) of future natural gas and liqui­ fied petroleum gas projects. Technical assistance to NNPC. Total cost estimated at $33.0 million, of which $25,0 million in foreign exchange.

See page 1 for footnotes. - 26 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender J,_/ Consul ting Services Action on Procurement 4/

NIGERIA (Cont'd)

Nigerian 200,0 Escravos Beach-Lagos Gas Pipe­ Previously engaged con­ Date of negotiations to National (Bank) line (ELP) Project - Transmis­ sul tan ts expected to con­ be determined. (Co-fi­ Petroleum sion pipeline and gas gathering tinue to provide techni­ nancing with EIB for $50 Corporation system from the Western Niger cal assistance and train­ million, Export credits (NNPC) Delta area in Lagos. Total ing to the gas unit. for $312 million, and project cost estimated at $943 Shell for $35 million.) million, of which $744 million in foreign exchange. Procurement: Turnkey bids have been received and evaluated. Advance contracting up to the full amount of the loan and retroactive financing amounting to 10% of the loan are proposed to enable the award of the contracts and to cover other mobilization fees which are likely to occur before loan signing.

Federal Minis try 150,0 Agriculture Development Fund - No decision made whether Appraisal report being of Agriculture, (Bank) Phased financing of agriculture consultants will be prepared. Water Resources development projects, in eight needed. and Rural Devel­ southern s ta tee. opment

Federal Ministry 50,0 (R) Second Livestock Development - Consultants will be re­ Appraisal mission end­ of Agriculture, (Bank) National smallholder livestock quired for management and January/early February, Water Resources production project supported by technical support on and Rural Devel­ credit, extension research and project management unit. opment training services. Total cost estimated at $170 million,

To be determined 300,0 Structural Adjustment Loan - To To be determined. Loan negotiations pending (Bank) support a program of macro-eco­ Government I s agreement nomic and selected sectoral pol­ with the IMF on an Ex­ icy changes aimed at structural tended Fund Facility. economic adjustment.

Federal Ministry 100.0 Technical Teacher Training - To The Govermnent is finali­ Project under prepara­ of Education, (Bank) provide assistance in establish­ zing selection of local tion. Science and ing five federal/technical voca­ consulting architects and Technology tional teacher training colleges engineers. in various parts of the country and to strengthen National Board for Technical Education. Total project cost estimated at $228 million, of which $138 million in foreign exchange.

National 130,0 Power VII - Distribution system To be determined, Further processing of Electric Power (Bank) expansion to match ongoing gen­ Power VII is conditional Authority (NEPA) eration projects; spare part upon specific progress on purchases; and technical assis­ system rehabilitation tance to improve all aspects of under Power VI. NEPA's operations and systems facilities. Total project cost estimated at $590 million, of which $450 million in foreign exchange.

SAO TOME AND PRINCIPE

Ministry of 5,0 (R) Rehabilitation and Modernization No consultants required. Appraisal report being Planning (!DA) Project - Line of credit for prepared, small high priority investments needed to revitalize economic activity.

To be determined 5,0 Cocoa - Rehabilitation of cocoa Consultants have been Project under prepara­ (!DA) plantation through improved or­ identified to carry out tion. (Co-financing ten­ ganization and management, tech­ institutional study of tatively agreed with nical assistance, and provision state farms se lee ted for CCCE.) of inputs. project.

See page 1 for footnotes. - 27 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Y Lender Y Project 1/ Consulting Services AC:tion on Procurement !ii

Offices des 10.0 (R) Telecommunications II - Exten­ No decision made whether Preparation under way. Postes et des (IDA) sion of Dakar telephone ex­ consultants will be re­ ( Co-financing agreed in Telecommuni­ changes; extension of transmis­ quired. principle with BOAD for cations sion network to the South and $3.0 million and EID for East of country; technical as­ $5 .0 million.) sistance.

Societe 10.0 Irrigation IV - Rehabilitation No decision made whether Preparation under way. d 'Am.enagement et (IDA) of 5,870 ha of irrigation perim­ consultants will be re­ (Co-financing with CCCE d 'Exploitation eters in the Senegal River quired. for $2.5 million, !FAD du Iielta (SAED) delta; electrification of pump­ for $15 .0 million, Kuwait ing stations at Rong and Boun­ Fund for $7.7 million and down; construction of a power Saudi Fund for $13.0 mil­ line. Estimated total cost lion,) $72.0 million, of which $46.0 million in foreign exchange.

Ministry of 24.0 (R) Water Supply II - Rehabilitation Consultant will be re­ Negotiations completed. Hydraulics/ (IDA) and Extension of water supply in quired for rural water (Co-financing arranged SONEES eleven secondary centers. Tech­ and sewerage st-udies, and with CCCE for $7 .6 mil­ nical assistance, training, management assistance and lion,) working capital. Estimated to­ training. For information tal cost: $36 million, of which systems, reorganization, IDA Project Preparation $24.4 million in foreign ex­ proposals are currently Facility advance of change. invited from short-listed $750,000 has been ap­ firms. Consultant for proved to finance bore­ construction supervision hole drillings at four being selected. predetermined sites, con­ sultant services, audits, preparation of data processing system master plan, and services of two expatriate engineers •.

SENELEC 11.3 (R) Power I - Rehabilitation of Consultants will be re­ Project under prepara­ (IDAJ transmission and distribution quired. Details not yet tion. system and power plant. decided.

SIERRA LEONE

National Power 12 .o Power Rehabilitation V - Elec­ Some individual consult­ Appraisal report being Authority (IDA) tric System Rehabilitation Proj­ ants will be required. prepared. ect. Details not yet decided.

Ministry of 2,0 Population and Health - To Consultants may be re­ Appraisal mission tenta­ Health (IDA) strengthen health and family quired. Details not yet tively scheduled for May/ planning services. decided. June 1985, IDA Project Preparation Facility advance of $100,000 ap­ proved to complete proj­ ect preparation.

Office Togolaise 50,0 Phosphoric acid plant. Consul tan ts contracted Project under prepara­ des Phosphates (Bank) for project preparation. tion. (Co-financing will be needed,)

To be determined 8.0 Education Improvement Project - Consultants will be re­ Appraisal report being (IDA) Improvement of the quality of quired to assist in proj­ prepared. (AfDB has been education ( i) at the primary ect implementa'tion. approached to finance level through teachers' upgrad­ $5,0 million.) ing; and ( ii) at the lower sec­ ondary level through math and science teachers' upgrading, im­ provement of science facilities and provision of basic instruc­ tional materials. Improvement of the management of education through (i) strengthening of educational planning, (ii) oper­ ation of the School Construction and Maintenance Division and ( iii) operation of the Project Implementation Division. Total project cost (net-of-taxes) es­ timated at $14.2 million, of which $5.3 million in foreign exchange.

See page 1 for footnotes. - 28 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender];/ Consulting Services Action on Procurement !!./

TOGO (Cont'd)

To be determined 30.0 (R) Structural Adjustment II - Fol­ No consultants required. President 1 s Report being (IDA) low-up on first credit with em­ prepared. phasis on rural development, re­ habilitation and maintenance of existing infrastructure and pub­ lic enterprises reform.

To be determined 4.0 (R) Technical Assistance III - The Consultants will be re­ President's Report being (IDA) project would include further tained as part of proj­ prepared. consultant services a~d training ect. for macro-economic and sector management, and support Togo's structural adjustment program.

Ministry of 9.0 Rural Development - including Consultants may be re­ Project concept and de­ Rural (IDA) extension service and training; quired. sign under review. Development rural infrastructure; input sup­ ply, and reorganization of agri­ cultural services.

To be determined 5.4 Regional Management School - Consultants will be re­ Board presentation sched­ (IDA) Construction and equipment of quired for planning and uled for March, pending facilities and technical assis­ implementation of manage­ appointment of Director­ tance to facilitate the trans­ ment and organizational General. formation of Senegalese Manage­ systems. ment School into a Regional Man­ agement Training School for CEAO member states. Total project cost· estimated at $6.2 million.

See page l for footnotes. - 29 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~y Lender Y Consulting Services Action of Procurement !!J

III. EAST ASIA AND PACIFIC

Ministry of Coal 126,3 (R) Changcun (Luan) Coal Mining - Previously engaged con­ Negotiations in early Industry (Bank) First of a series of large­ sultants expected to con­ January. scale, fully mechanized coal tinue providing technical mining operations; construction assistance under a bilat­ of the Changcun mine, including eral grant. vertical shafts, underground roadways, and longwa 11 faces; construction of a coal prepar­ ation plant; equipment for coal extraction, washery and loadout operations; and surface infra­ structure including a railway spur line, an electrical sub­ station, water supply lines, workshops and warehouses; tech­ nical assistance and training for project implementation and development of technical and managerial skills of local staff,

Ministry of 150.0 (R) University Development II - During project implemen­ Negotiations in early Education (IDA) Strengthening selected technical tation consultants will January. universities to expand the.quan­ be required in fields of tity and improve the quality of science and engineering. science and technical graduates.

Ministry of 49,0 Forestry - Timber production in Consultants in the fol­ Appraisal report being Forestry (IDA) selected provinces, and forestry lowing fields have been prepared. research and extension. recruited: forest roads & logging; forest indus­ tries and forestry.

Ministry of 111 .a Power II - Transmission line Consultants have been ap­ Negotiations. in progress. Water Resources (Bank) from Xuzhou to Shanghai. pointed. and Electric Power (MWREP)

Ministry of 235,0 Railways II - Upgrading and No consultants required. Appraisal report being Railways (Bank) electrification of tracks; as­ prepared. sistance to electric locomotive factory and a passenger coach factory; and education, research and training.

Ministry of To be (R) Provincial Universities Develop­ No decision made whether Appraisal report being Education deter­ ment - Assistance to Provincial consultants will be re­ prepared, mined Universities: Pre-service edu­ quired, (IDA) cation and in-service training of secondary school teachers, and preparation of teacher edu­ cators.

National so.a Rural Water Supply - Village Short-term consultant to Appraisal, report being Patriotic Heal th (IDA) water schemes in several prov­ review waste water com­ reviewed. Campaign inces. ponent. Committee

Ministry of 100,0 Fertilizer Rationalization and Consultant services are Post-appraisal mission Chemical (Bank) Energy Saving - Nitrogenous fer­ required to assist in scheduled for January, Industry tilizer plants. selected areas of project implementation.

Ministry of 40.0 Seeds I - Seed's Centers in a Seeds specialist and ag­ Appraisal report being Agricu 1 ture, (IDA) number of provinces. ricultural economist have prepared. Animal Husbandry been recruited. and Fisheries

Ministry of Coal To be (R) Coal II Jincheng - Underground Consultants will be re­ Appraisal mission sched­ Industry deter­ mine in Shanxi Province; up to 4 quired for design and en­ uled for end-February, mined mtpa. gineering. Previously engaged consultants may continue.

See Page 1 for footnotes, - 30 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~y Lender Y Consulting Services Action of Procurement 4/

CHINA· (Cont'd)

Shanghai Machine To be Shanghai Machine Tools - Ration­ Evaluation of consult­ Preparation under way by Tool Works deter­ alization and product upgrading ants' proposals for feas­ SMTW and SMTC, with as­ (SMTW) and mined of the industry in Shanghai. ibility studies s is tance from consult­ Corporation completed. ants. (SMTC)

Ministry of To be Gas I - Upgrading the Sichuan Consultant services will A further project prepar­ Petroleum deter­ gas field development and be required. ation mission is schedul­ Industry mined technical assistance. ed for January.

Ministry of To be Pi Shi Hang Irrigation distribu­ No consultants 'required. Appraisal mission Water Resources deter­ tion networks and ancillary scheduled for March. and Electric mined s true tu res. Power

Ministry of To be Roads I - Key linkages in pro­ Limited consulting assis­ Appraisal report under Communications deter­ vincial road network and rural tance may be required. preparation. mined roads.

Ministry of 5.0 Fiji Development Bank (FOB) - No decision made whether Appraisal mission sched­ Finance (Bank) Line of credit to FDB. Total consultants will be uled for January. (ADB project cost about $62.0 mil­ required. is lead co-financing lion. agency.)

Ministry of 10.0 (R) Road Improvement Project - Up­ No decision yet made. Project preparation under Communications, (Bank) grading of selected road seg­ way. (Co-financing with Transport and ments in Government's deve~op­ ADB.) Works ment program.

INDONESIA

Ministry of 65.0 (R) First National Ports.Development Consultants will be re­ Appraisal report b_eing Communications (Bank) - To develop selected ports, and quired for consortium prepared. related infrastructure. Total management, and institu­ project estimated at $190 mil­ tional planning and man­ lion, of which $114 million in agement. foreign exchange.

Ministry of 100.0 Central Java Pulp and Paper - A Previously engaged con­ Project preparation under Industry (Bank) pulp and/or paper complex in sultants expected to con­ way. (Co-financing is Central Java. It will include tinue. envisaged.) construction of a pulp and/or paper plant and development of a wood supply system.

Ministry of 206.0 (R) Kedung Ombo Multipurpose Dam - Preyiously engaged con­ Negotiations scheduled Pub lie Works (Bank) An earth and rockfill dam, ir­ f!Ul tan ts expected to con­ for February. (Co-finan­ rigation works serving about tinue. cing envisaged for power 59 1 400 ha, and a 25 MW hydro­ plant.) power plant. Total project cost estimated at at $336 million, of which $165 million in foreign exchange.

Ministry of 43.0 (R) W. Tarum Canal Enlargement - Ex­ Consultants will be re­ Appraisal report being Pub lie Works (Bank) pansion of capacity of canal for quired for design and prepared. raw water supply to Jakarta and management, and land tax for irrigation. assessment studies.

Ministry of 42.0 (R) Health Manpower - Expansion of No decision made whether Appraisal report being Health (Bank) existing training facilities for consultants will be re­ prepared. nurses and other paramedical quired. personnel; improvement of cur­ riculum development and teacher training; and strengthening of agencies responsible for staff development and development in health sector.

Ministry of 100.0 (R) Second University Education - About 900 man-months for Negotiations scheduled Education and (Bank) Development of post-graduate specialist- services will for April. Culture centers to upgrade university be required for research, staff in key fields, including instrumentation, and in­ natural science and agriculture, structional materials de­ engineering, and economics. velopment. Total project cost estimated at $265.5 milliion, of which $141 million in foreign exchange.

See Page 1 for footnotes. - 31 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )J ~y Consulting Services Action of Procurement 4/

INDONESIA (Cont'd) Negotiations scheduled Ministry of 131.2 Smallholder Rubber Development Would include about 350 for January. Agriculture (Bank) II - To help expand and develop man-months of consult­ the rubber planting program for ant's services in rubber smallholders. Total project management, processing cost estimated at $200 million, and marketing, training of which $70 million in foreign and finance. exchange.

National Family 79.0 Population IV - Intensification Consultants will be re­ Appraisal report being Planning Coordi­ (Bank) of existing family planning pro­ quired for strengthening prepared. nating Board gram, with emphasis on mainten­ family planning service (NFPCB) ance of contraceptive use, and delivery and population possible provision of improved policy development. health and nutrition services to acceptors.

Ministry of 30.0 Nuss Tenggara Development - Pro­ Consultant requirements Project preparation under Agriculture (Bank) due tion in rain fed areas of not yet determined. way. Eastern Indonesia. Suport to animal redistribution, cotton research and seed production, and institutional development.

Ministry of 130.0 Transmigration V - Site screen­ Consultant services will Appraisal report being Transmigration (Bank) ing and evaluation studies for be required for the site prepared. 300,000 transmigrant families screening and evaluation based on advanced mapping sys­ studies. tems. Construction of pilot settlements for about 8,000 transmigrant families, involving new types of economic activities and the promotion of spontaneous trarismigrants.

Ministry of 70.0 Manpower Planning & Vocational Consulting services not Project under prepara­ Manpower (Bank) Training - Strengthening of man­ yet determined. tion, funded by advance power planning and training man­ of $383,000 from the Bank agement systems; establish na­ Project Preparation Fa­ tional standards j upgrade train­ cility. ing; extend and upgrade in-plant training and improve vocational guidance and job placement. Total cost not yet determined.

Ministry of 90.0 East Java Water Supply II - Consulting services not Project preparation under Pub lie Works (Bank) Water supply development for yet determined. way. about 50 cities and towns in about 15 kabupatens of East Java Province.

Ministry of 60.0 Nutrition/Community Health - To No decision made whether Project preparation under Health (Bank) include integrated family plan­ consultants will be re­ way. ning, health and nutrition ser­ quired. vices; food and nutrition surveillance; nutrition manpower developemnt; and establishment of media production centers.

Bank Tabungan 100.0 Housing Sector Loan - Provision Consul ting services not Project preparation under Negara (BTN) and (Bank) of finance for low-cost housing yet determined. way. P erum P erumnas and related institutional assistance.

Ministry of 75.0 Agricultural Extension III - To Extent of consultant ser­ Project preparation under Agriculture (Bank) intensify the unified extension vices required not yet way. services for food crops, estate determined. crops, livestock and fisheries in all provinces, including transmigration areas.

Ministry of 160.0 (R) Export Development - To support Consul ting services not Project preparation under Trade and (Bank) Indonesia's drive to increase yet determined. way. (Co-financing is Cooperatives non-oil exports including devel­ envisaged.) opment of an export estate, pro­ vision of investment credit for export industries, and technical assistance to improve export quality; to strengthen key ex­ port institutions and provide training in export-related topics.

See Page 1 for footnotes. - 32 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~ll Lender Y Consulting Services Action of Procurement !±./

INDONESIA (Cont' d)

Ministry of 60.0 (R) National Ports Development II - No decision made whether Appraisal report being Communications (Bank) Improvement of selected ports. consultants will be re­ prepared. ($25 million quired. is expected from bilat­ eral sources.)

Ministry of 120.0 (R) Central and West Java Provincial No decision made whether Project preparation under Pub lie Works (Bank) Irrigation - Rehabilitation and consultants will be re­ way. upgrading of small systems quired. (50,000 ha), operation and main­ tenance improvements, pilot scheme for pumping from surface water or shallow wells, and con­ struction of mid-Lusi irrigation system (14,000 ha).

Ministry of 98.0 Research & Technology Training - (a) Local consulting Appraisal report being State for (Bank) Provision of overseas and local agency employing some prepared. Research and training to staff of six scien­ foreign consultants will Technology - tific and technical research assist with project man­ Agency for the agencies, including the National agement. Assessment and Institute of Services, the Na­ Application of tional Mapping Agency (BAKO­ (b) "Educational Exchange Technology SURTANAL), the Central Bureau of Organizations•• abroad Statistics, and the National will assist in placing Atomic Supply Agency. and supervising overseas trainees.

National 179.5 (R) Power XV - Transmission and Engineering consultants Appraisal report being Electricity (Bank) distribution facilities in. Java. already in place. Other prepared. Authority (PLN) consultancy needs to be determined.

Seoul City Up to Seoul City Urban Transport Proj­ Consultants will be re­ Appraisal report being Government 69.0 ect - Construction of traffic quired for construction prepared. (Bank) engineering improvements and services. road sections in arterial system to increase efficiency of present road system.

Ministry of 121.0 Small/Medium Industries - Line Consultants may be re­ Appraisal report being Finance (Bank) of credit to selected financial quired for the technical prepared. institutions to support term assistance component. lending to small and medium in­ dustries; and technical assist­ ance to small and medium indus­ try development.

,Ministry of 120.0 (R) Agriculture Sector Loan - Sup­ c·onsultants will probably Negotiations tentatively Agriculture and (Bank) port for policy and institution­ be required for policy scheduled for March. Fisheries al adjustments in the agricul­ studies. ture sector, and to finance long-term credit institutions serving agricultural producers and processors. Total project cost estimated at $150 million, of which $120 million in foreign exchange.

Ministry of 95.0 Water Supply III - Construction Consultants will be re­ Negotiations substan­ Construction (Bank) of water treatment and distribu­ quired for construction tially completed. Board tion facilities for cities in supervision. presentation scheduled the Seoul Metropolitan region. for March 12, 1985. Total project cost estimated at $120 million, all of which is in foreign exchange.

Ministry of 225.0 (R) Industrial Finance Project II - Need for consultants to Appraisal report being Finance (Bank) Assistance to the Government in be determined. prepared. support of financial system re­ form; and provision of credit to major financial institutions for term lending to industrial en­ terprises. Assistance for training of financial sector staff also included.

See Pagel for footnotes. - 33 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender J:./ Consulting Services Action of Procurement !!_/

LAO PEOPLE'S DEMOCRATIC REPUBLIC

To be determined 35,0 Electrification of Southern Proposals already invited Discuss ions with Govern­ (Bank) Provinces - Transmission, and for preparatory engineer­ ment in progress. distribution of electricity in ing consultant services selected provinces. to be funded out of existing IDA credit.

To be determined 35,0 Agricultural Development - To Discuss ions with Govern­ (IDA) assist in developing agricul­ ment being scheduled. tural support services and the production of crops for export.

Ministry of 5.0 Telecommunications - Rehabilita­ Discussions with Govern­ Transport and (IDA) tion and re-equipping of exist­ ment in progress. Telecommuni­ ing telephone network. cations

Government/Bank 52,1 (R) Small-Scale Enterprise (Indus­ No consultants required. Loan signing on January Pembangunan (Bank) tries I) - Assistance ~or manu­ 11. Malaysia Berhad facturing and institutional de­ (BPMB); Malaysia velopment. Total project cost Industrial De­ $104,1 million, of which $25,7 velopment million in foreign exchange. Finance Berhad (MIDF)

Ministry of 70,0 Western Johore II - Integrated No decision made whether Project being prepared by Agriculture (Bank) Agricultural Development - consul tan ts will be re­ Government. Construction of farm roads and quired. drainage facilities, and pro­ vision of agricultural support services.

Ministry of 70,0 Industrial Training II - Im­ No consultants required. Appraisal report being Education/Min­ (Bank) provement of manpower planning prepared. (Co-financing istry of Labor and management by strengthening being considered.) and Manpower planning and management capabil­ ity and by financing staff training, advisory services of public institutions; construct­ ing and equipping two additional industrial training institutes and three additional polytech­ nics.

Federal Land 35,0 (R) Felda Palm Oil Mills - Construc­ Consultants will be re­ Negotiations in early Development (Bank) tion of 7 palm oil mills which quired to develop data February. Authority would serve 13,000 Felda settler bHsed computer system for (FELDA) families and provide some 810 FELDA, employment positions. Improve Fe lmi 11 management and opera­ tions. Total project cost esti­ mated at $61,3 million of which $33 .1 million in foreign ex­ change.

To be determined 70,0 ~ISDA I - Provision of rubber No decision made whether Project preparation pend­ (Bank) replanting and rehabilitation consultants will be re­ ing completion of finan­ program; rubber and palm oil quired. cial management study. processing facilities; develop­ ment of mini-estates and insti­ tutional support.

Malaysian High­ 50,0 (R) Highway V - construction of Previously engaged con­ Appraisal mission tenta­ way Authority (Bank) parts of North-South Expressway. sultants expected to con­ tively scheduled for May. (MHA) tinue. (Co-financing being con­ sidered,)

National 100,0 Power XII - Power transmission Consultants will be re­ Project preparation under Electricity (Bank) and distribution facilities. quired for feasibility way. (Co-financing may Board (NEB) study, be sought.)

Government/FELDA 40,0 FELDA/PWD Infrastructure - Con­ No decision made whether Project preparation under (Bank) struction of roads and water consultants will be re­ way. supply facilities for agricul­ quired. tural development projects,

See Page 1 for footnotes, - 34 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~l.l Lender];_/ Consulting Services Action of Procurement !!_/

MALAYSIA (Cont'd)

Ministry of 100.0 (R) School Development - Improvement No consultants required. Appraisal mission tenta­ Education (Bank) of primary and secondary school tively scheduled for system. March.

Pub lie Works 70.0 (R) Johore Water Supply - Construc­ Previously engaged con­ Appraisal report being Department, (Bank) tion of water supply facilities sultants expected to con­ prepared. Johore State at Johore Bahrat and Keluang tinue. (Kahang scheme).

To be determined 100.0 (R) Industrial Credit - Financing of No consultants required. Project being prepared by (Bank) medium- and large-scale enter­ Government. prises in the Industrial sector through participation of public and private financial institutions.

To be determined s.o (N) Sabah Forestry (Technical As­ Consultants will be re­ Appraisal report being (Bank) sistance) - Pilot forestry proj­ quired for feasibility prepared. ect in the Bengkoka area; and a studies in transport, series of studies for a forestry marketing, natural forest development program in the State management and· industrial of Sabah. processing.

PAPUA NEW GUINEA

Papua New Guinea 30.0 Agricultural Credit III - The No decision made whether Financial Sector Discus­ Development Bank (Bank) project will provide funds to consultants will be re­ sions being held with (PNGDB) the Development Bank for term quired. Govermnent. Project pro­ lending in tree crop develop­ cessing being deferred. ment, poultry and agro-proces­ sing. It will also provide training to strengthen the De­ velopment Bank and technical as­ sistance on the crop diversifi­ cation program.

Department of 30.0 (R) Milne Bay Nucleus Estate and Management services to be Appraisal report being Primary Industry (Bank) Smallholder Tree Crop Project I provided by CDC. prepared. (Commonwealth - To develop a combination of Development·Corporation several derelict cODDDercial es­ is expected to co-fi­ tates and vacant areas of Gov­ nance.) ernment land in the Milne Bay Province into a viable oil palm and cocoa nucleus estate, to­ gether with the peripheral de­ velopment and support of small­ scale smallholder plantings of these crops. Total project cost estimated at $60 million, of which $25 million in foreign ex­ change.

Department of 30.0 Rural Roads II - Scope of pro­ No decision made whether Scope of project under Transport and (Bank) ject to be determined. consultants will be re­ discussion with Govern­ Civil Aviation quired. ment. (DTCA) and De­ partment of Works and Supply (DWS)

Electricity 40.0 Third Power Project - Construc­ Consultants for project A $1.0 million advance CoDDDi s s ion (Bank) tion of dam at Yonki to firm up preparation are being fi­ from Bank Project Prepar­ (ELCOM) existing capacity at Ramu Power nanced by the Bank Proj­ ation Facility to finance Station and provision of two ad­ ect Preparation Facility. consultant services for ditional generating units (2xl5 Consultants also required preliminary design and MW), plus training and technical for supervision of proj­ detailed engineering. (To assistance for Rural Electrifi­ ect construction and to be co-financed with ADB/ cation Study. Total estimated review the design and OECF.) cost is $100 million. safety of the dam.

See Page 1 for footnotes. - 35 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y ~y Consulting Services Action of Procurement !±_/

PHILIPPINES

Ministry of 45.0 Rural Development IV (Land Set­ Consultants will be re­ Appraisal report being Agrarian Reform (Bank) tlement II) - Further assistance quired for project imple­ prepared. for planning and execution of mentation, particularly Government I s land settlement in surveys and mapping. program. The project would sup­ port a nationwide geodetic net­ work, aerial photography for surveying and land titling, roads, agroforestry, soil con­ servation, and technical assistance. Total project cost estimated at $85 million.

Central Bank 100.0 Agricultural Credit I (Previous­ Consultants have been re­ Appraisal report being (Bank) ly Loan Fund) - To help finance cruited. prepared (Co-financing part of the Government I s agri­ may be sought.) cultural credit program.

National Power 125.0 (R) Power VIII - Support for NPC's No decision made whether Project preparation under Corporation (Bank) program of rehabilitation and consultants will be re­ way. (Co-financing may (NPC) maintenance. quired. be sought.)

National 40.0 (R) Central Visayas Regional Project Consultants have been re­ Post-appraisal mission Economic and (Bank) II: Emphasis on urban develop­ cruited. scheduled for mid-1985. Dev~ lopment ment supporting upgrading of mu­ Authority (NEDA) nicipal infrastructure, manage­ ment of municipal enterprises, transportation, traffic manage­ ment; maintenance and training. Total project cost estim.at·ed at $70 million.

To be determined 40.0 National Forestry - Support for No decision made whether Project being prepared by (Bank) the development of industrial consultants will be re­ the Government. (Co-fi­ tree plantations and strengthen­ quired. nancing is envisaged·.) ing of the Bureau of Forest De­ velopment I s field capacity and services.

To be determined 60.0 {R) Rural ·Roads II - Further support Project postponed to (Bank) for the Government's program of FY88. Further reporting rural road construction, reha­ will be discontinued. bilitation and maintenance, and institutional strengthening of the Ministry of Local Govern­ ment.

Central Bank 105.0 (R) Export Development Fund - To Consultants have been re­ Pre-appraisal mission (Bank) support the Government's export cruited. scheduled for February. rehabilitation program, includ­ ing development of adequate ad­ ministrative arrangements for the present export financing system and designing appropriate supporting policies.

Philippine 34.0 Coconut Development -,To in­ Consultants will be re­ Appraisal report being Coconut Author­ (Bank) troduce new varieties and in­ quired for review of PCA prepared. ity (PCA) crease productivity and quality research program. including research and proces­ sing. Total project cost esti­ mated at $68.1 million, of which $24.5 million in foreign ex­ change.

Philippine 60.0 (R) Geothermal Development - Bacon­ Consultants will be re­ Project being prepared by National Oil (Bank) Manito I - To finance the drill­ quired for engineering the Government. (Co­ Company ing of about 17 additional studies and drilling man­ financing is envisaged.) wells, plus the installation of agement. 21 kilometers of steam-gathering and reinjection lines and 2 steam separator stations for a 110 MW power plant in Bacon-Man­ ito (Southern Luzon). Total cost estimated at $105 million, of which about $55 million in foreign exchange.

See Page 1 for footnotes. - 36 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender J,/ Consulting Services Action of Procurement!±_/

PHILIPPINES (Cont'd)

National 60.0 Irrigation Maintenance - Assist­ No decision made whether Project being prepared by Irrigation (Bank) ance to National Irrigation consultants will be re­ Government. Authority Authority for systems improve­ quired. ment and maintenance.

Ministry of 4.0 (R) Telecommunications-Technical As­ Consultants will be re­ Negotiations in progress. Transport and (Bank) sistance - Technical assistance quired for studies on in­ Telecommuni­ to promote and support the sound stitutional development, cations (MOTC) development of the institution­ tariffs, radio frequency al, regulatory a.spec ts of the management, network plan­ telecommunications sector. ning and reviewing of training needs.

Me tropo 1 i tan 50.0 Manila Water Mains Extension - No decision made whether Project being prepared by Waterworks and (Bank) Provision of distribution system consultants will be Government. Sewerage System and assistance to MWSS for sys­ required. (MWSS) tems improvement and mainte­ nance.

SOLOMON ISLANDS

Ministry of Energy, Works 2.0 (R) Guadalcanal Road - Improvement Consultant services will Negotiations completed. and Utilities (IDA) and rehabilitation of 90 km of be required for on-the­ Board presentation sched­ coastal road, construction of job training and project uled for January 22. three major bridges and procure­ implementation. ment of construction equipment; to enhance the capability of the Ministry of Energy, Works and Utilities in road design, con­ struction and maintenance. Total project cost estimated at $6 .5 million, of which $5.0 million in foreign exchange.

Ministry of 6.0 Expansion of junior secondary No decision whether con­ Appraisal report being Education and (IDA) education and strengthening and sultants will be re­ prepared. Training expansion of College of Higher quired. Education.

Petroleum 33.0 Energy III (Sirikit Oil Field Technical consultants Appraisal report being Authority of (Bank) Development) - Possible invest­ will be required. prepared. (Co-financing Thailand (PTr) ment related to onshore oil being explored.) field development.

The Bangchak 85.0 Bangchak Oil Refinery Restruc­ Consultants for assist­ Negotiations substan­ Petroleum Com­ (Bank) turing - Corporate/financial re­ ance under selection. tially completed. {Co­ pany, Limited structuring and physical reha­ Borrower to prepare financing being ex­ bilitation of Bangchak oil re­ shortlist for engineering plored.) finery. Total project cost es­ consultants shortly. timated at $187.9 million, of which $166.1 million in foreign ex(:hange.

Ministry of 27 .5 {R) Regional Cities - Urban services Consultants will be re­ Negotiations tentatively Finance (Bank) and infrastructure improvement quired for construction, scheduled for late Febru­ in four regional cities. Total supervision and future ary. (Co-financing with project cost $106.5 million, of project preparation. ADAB, Australia, for $4.5 which $30.2 million in foreign mi 11 ion approved. ) exchange.

Telephone 50.0 Telecommunications V - Expansion No decision made whether Project preparatio~ under Organization of (Bank) of telephone facilities, parti­ consultants will be re­ way. {Large amount of Thailand (TOT) cularly in rural and provincial quired. parallel co-financing areas. Total cost estimated at from ADB, OECF and var­ $1,630 million with a foreign ious other official and exchange component of $830 mil­ commercial sources to be lion. considered.)

Ministry of 175 .o Third Structural Adjustment Loan Consultants will be re­ Appraisal miss.ion sched­ Finance (Bank) - To help the Government imple­ quired for .public re­ uled for February. ment the next phase of its source management reform. structural adjustment policies Previously engaged con­ related to public resource, man­ sultants expected to con­ agement and export development. tinue.

See Page 1 for footnotes. - 37 -

Member Country, Amount & and Imple.menting Probable Stage of. Processing and Agency J_/ Lender ]J Consulting Services Action of Procurement !±/

~ (Cont'd)

Bangkok 51.9 (R) Bangkok Drainage/Flood Control - Consultants will be re­ Negotiations date to be Metropolitan (Bank) Project would consist of flood quired for construction determined. Administration protection and drainage, techni­ supervision and advisory cal assistance, and training. services for institution­ Total project cost estimated at al development, and for $90.8 million, of which foreign training in drainage man­ exchange component $26.6 mil­ agement, and corporate lion. management •

National Housing 40.0 Third Shelter - To support the No decision made whether Appraisal mission sched­ Authority (Bank) National Housing Authority's consul tan ts wi 11 be re­ uled for March. (NRA) low-income housing pro­ quired. grams in metrOpolitan Bangkok and regional cities, as well as NHA' s slum upgrading program in Bangkok.

Bank for 50.0 Agricultural Credit III - Finan­ No decision made whether Appraisal report being Agriculture & (Bank) cing of medium- and long-term consultants will be re­ prepared. Agricultural agricultural lending throughout quired. Cooperatives Thailand. Total project cost (BAAC) estimated at $148 million, of which $37 million in foreign ex­ change.

Electricity 90.0 Power XVI (Subsector) - To as­ No consultants required. Appraisal to be scheduled Generating (Bank) sist in financing EGAT's invest­ pending Government ap­ Authority of ment program for FY86-88 in proval of Borrower's in­ Thailand (EGAT) light of overall developments in vestment program. (Co­ the energy sec tor. financing being ex­ plored.)

Office of Rubber 70.0 Third Rubber Replanting - Rubber Previously engaged con­ Appraisal mission sched­ Replanting Aid (Bank) replanting, and possibly new sultant expected to con­ uled for February. (Co­ Fund (ORRAF) rubber and other tree crops. tinue. financing being ex­ plored.)

Bank of Thailand 100.0 Small and Medium Enterprises - Project processing in (Bank) Establishment of mechanisms to abeyance. provide credit and technical as­ sistance to small and medium en­ terprises.

To be determined 30.0 Land Policy/Rural L·and Use - Fi­ To be determined. Preliminary discussions (Bank) nancing of the Land Reclassifi­ with Government in cation and STK (Right-to-Farm) progress. programs of Government, together with related activities and in­ stitutional improvements.

Ministry of 3.0 (R) Multi-project loan including Consultants for project Appraisal mission, led by Agriculture, (IDA) forestry plantation development preparation are financed ADB, is scheduled for Forestry and on Efate and Espiritu Santo by ADB. February. Fisheries Islands. Technical assistance and training to strengthen for­ estry organization.

WESTERN SAMOA

Development Bank 2.0 (N) Line of Credit to DBWS to fi­ To be determined. Appraisal report being of Western Samoa (IDA) nance foreign exchange costs of prepared. (ADB is lead (DBWS) subproject&. Technical assist­ co-financing agency.) ance from ADB and UNDP to con­ duct an industrial sector survey and improve DBWS' s institutional capabilities.

See Page 1 for footnotes. - 38 -

Member Country, Amount & .and Implementing Probable Stage of Processing and ~y Lender JJ Consulting Services Action o.n Procurement !!,/

IV, SOUTH ASIA

BANGLADESH

Bangladesh Up to Inland Water Transport III - To Consultants will be re­ Project preparation under Inland Water 40,0 assist Bangladesh Inland Water quired to conduct feasi­ way. Transport (IDA) Transport Authority (BIWIA), bility study on movement Authority Bangladesh Inland Water Trans­ of containers by inland port Corporation (BIWIC) and waterways. Short-list Ministry of Ports, Shipping and completed. Inland Waterways (MPSI),

Dhaka Water and About (R) Dhaka WASA III - Extensions to Consultants for project Appraisal mission tenta­ Sewerage 34,0 water supply and sewerage sys­ preparation financed tively scheduled for Authority (WASA) (IDA) tems. under ongoing project, March,

Ministry of About (R) Fisheries 11 - To assist in the Consultants will be re­ Appraisal mission find­ Agricu 1 ture, 35.6 development of the brackish quired to assist in proj­ ings under review. Fisheries and (IDA) water shrimp culture industry ect implementa~ion. Livestock and provide foundation for ex­ panded future development of aquaculture.

Bangladesh Bank 25,0 Agricultural Credit II - To sup­ Consultants will be re­ Appraisal mission sched­ (IDA) port further reform of agricul­ quired to assist in proj­ uled for October 1985, tural credit system, strengthen ect implementation. agricultural financial institu­ tions and to provide credit to farmers for on-farm investments.

Bangladesh Bank 45.0 (R) Industrial Investment Project - As part of the project, Appraisal mission tenta­ (IDA) Provision of term finance to consultants will be re­ tively scheduled for.Feb­ private sector industry through quired for training in ruary/March, financial institutions to be the preparation of sub­ selected. sector studies.

Ministry of 130,0 (R) Import Program XIII - Provision No consultants required. Appraisal mi~sion tenta­ Finance (IDA) of foreign exchange for procure­ tively scheduled for Feb­ ment of essential imports. ruary.

Bangladesh Oil 70,0 (R) Gae Development II - To assist Consultants will be re­ Negotiations tentatively and Gas (IDA) in gas field development, and quired for project imple­ scheduled for February, Corporation appraisal and construction of mentation. (Co-financing with CIDA, gas pipeline, ODA, The Netherlands, and OECF being explored,)

Bangladesh 60.0 Petroleum Refinery - To estab­ Consultant for feasibili­ Consultants' report under Petroleum (IDA) lish a secondary conversion ty studY financed under review. Corporation capacity at facilities of ongoing project. Eastern Refinery Limited.

Bangladesh Water 35 .o Flood Control and Drainage III - Consultants will be re­ Appraisal mission find­ Development (IDA) To increase crop production quired to assist in proj­ ings under review. ( Co­ Board through improvements in the ect implementation. financing being ex­ water regime. plored.)

Ministry of 78,4 (R) Primary Education II - To im­ Consultants will be re­ Negotiations scheduled Education and (IDA) prove quality, reduce cost, and quired to assist in (a) for early February. Religious increase access to primary edu­ development of a new Affairs cation. teacher training program; (b) the reorganizing of the Directorate of Pri­ mary Education; (c) the strengthening of the National Curriculum and Textbook Board; and ( d) expansion of project IMPACT (Institutional Management by Parents, Community and Teachers).

Ministry of About Population III - To strengthen No consultants required. Appra isa 1 miss ion find­ Health and 60,0 and expand family planning and ings under review. (Co­ Population (IDA) associated maternal-child health financing with ADAB, Control service delivery. CIDA, KfW Germany, NORAD, SIDA, The Netherlands and ODA being explored,)

See page 1 for footnotes, - 39 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Y ~y Consulting Services Action on Procurement 4/

BANGLADESH (Cont'd)

Rural Electrifi­ 50.0 Rural Electrification II - To Consultants currently en­ Appraisal report being cation Board (IDA) provide a phase two transmission gaged by REB expected to prepared. (REB) and distribution program in continue. rural areas.

Ministry of 20.0 (R) Forestry II - To strengthen ad­ Consultants for project Appraisal mission find­ Agricu 1 ture (IDA) ministrative and institutional preparation financed by ings under review. capability within the Forestry FAO/CP. Consultants re­ Sector and to increase the cruited for appraisal. supply of forests products.

Ministry of 10.0 (R) Livestock - To increase produc­ Project dropped from Agriculture (IDA) tivity of farm animals, and fos­ lending program. Further ter development of institutions reporting will be discon­ and of national policies re­ tinued. quired for long-term development of livestock sector.

Bangladesh Bank 27.0 (R) Small Industries IV - To in­ Consultants will be re­ Poet-appraisal mission (IDA) crease productivity, employment quired for technical as­ scheduled for February. and exports of small-scale and sistance to th~ banks on rural industries. project-based lending, and for product-specific technical and marketing services.

Bangladesh Rural 15.0 Hand Tubewells II - To increase Consultants recruited for Project preparation under Development (IDA) agricultural production and em­ project preparation. way. Board ployment by providing low .cost manual irrigation facilities.

Bangladesh Power 30.0 (R) Power Transmission & Distribu­ Consultant will be re­ Appraisltl report being Development (IDA) tion - To increase capacity of quired for project design prepared. Board transmission system and to im­ supervision, for reduc­ prove operating efficiency and tion of system losses, financial viability of power and for assisting the sector. Board in financial and coDDD.erc ial matters.

Ministry of 50.0 (R) Roads Rehabilitation and Mainte­ Consultants will be re­ Project preParation under Communications (IDA) nance - To rehabilitate national quired to conduct feasi- . way. Consul tan ts I pro­ roads. bility and financial/en­ posals have been received gineering studies. Short­ and are being evaluated. list completed.

Roads and High­ 50.0 (R) Rehabilitation Credit - To re­ No consultants required. Project preparation under way Department; (IDA) pair and rehabilitate infra­ way. Bangladesh Water structure facilities including

Development roads I culverts, bridges, and Board; Bangla­ other water control and irriga­ desh Inland tion schemes. The project would Water Transport also replace inland water trans­ Authority port equipment. (BIWTA)

Ministry of About (R) Calcium Carbide - To utilize Consultants required for Appraisal report being Industry 9.0 Bhutan's high quality limestone project management and prepared. (Co-financing (IDA) deposits and forest resources to training. with Kuwait Fund and Nor­ enhance export earnings. The way being considered.) project would comprise a plant of 22,000 tons per annum capa­ city and would include technical assistance and training. Total project cost estimated at $22 .4 million, of which $18.6 million is in foreign exchange.

Ministry of 16.0 Arakan Pulp and Paper - To con­ Consultants will be re­ Consultants' report being Industry II (IDA) struct a pulp and paper mill quired. reviewed. Considerable with a capacity of 100 tons per delay likely in Govern­ day of printing and writing ment review of priori­ paper produced from a mixture of ties. bamboo and indigenous hardwoods. The project also includes asso­ ciated infrastructure facili­ ties.

See page l for footnotes. - 40 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender J;/ Consulting Services Action on Procurement !±/

BURMA (Cont'd)

Ministry of 20.0 (R) Irrigation Rehabilitation - To Consultants may be re­ Appraisal report being Agriculture and (IDA) rehabilitate existing gravity quired. prepared. Forests irrigation systems in the Cen­ tral Dry Zone of Burma. Main component would comprise: major civil work including repairs to and remodelling of major struc­ tures, canal desilting and land development; provision of equip­ ment and vehicles and agricul­ tural support services. Total project cost estimated at $26.6 million, of which $13.3 million is in foreign exchange.

Ministry of 20.0 Transport/Distribution - Mul­ Required for comprehen­ Appraisal report being Transport (IDA) timodal transport project to sive study of transport/ prepared. minimize bottlenecks in trans­ distribution system. porting timber and other key ex­ port products: includes pro­ vision of storage; telecommuni­ cations; navigational and other facilities. Total project cost estimated at $30 .0 million, of which $18.0 million is in for­ eign exchange.

Ministry of 20.0 Seeds - Develop viable seed pro­ Wi 11 be required for Appraisal report being Agricu 1 ture and (IDA) gram covering Burma's major training and technical prepared. Forests crops including seed multiplica­ assistance. tion· and distribution for paddy, cotton, and other crops. Streng­ then research, seed testing and quality control. Technical as­ sistance and training. Total project cost estimated at $28.0 million, of'which $12.7 million is in foreign exchange.

Ministry of 25.0 Pa~dy III - Follow-up to two on­ May be required. Project preparation under Agriculture and (IDA) goLng paddy development projects way. Forests to increase paddy production through the construction of flood protection and drainage facilities designed to ( i) ex­ clude tidal and river flow surges; (ii) improve and extend natural internal drainage; and ( iii) reclaim land that is cur­ rently deeply flooded or saline.

Ministry of 30.0 Grain Storage II - Follow-up of May be required. Appraisal report being Agriculture and (IDA) the first grain storage project prepared. Forests to rehabilitate existing storage and milling facilities; trans­ portation; technical assistance and staff training. Total proj­ ect cost estimated at $57 mil­ lion, of which $30 million will be in foreign exchange.

Posts and 25.0 Telecommunications III - Follow­ May be required. Project preparation by Telecommunica­ (IDA) up for expansion of domestic and Government under way. tions Corpor­ international services. Techni­ ation cal assistance and training would be provided.

Ministry of 75.0 Power II - Multi purpose irriga­ Consultants will be re­ Government assessing pri­ Industry (IDA) tion/power project comprising quired. orities because of very 100 m dam; power house with four large investment in­ 75 MW units, 40 km transmission volved. (Substantial co­ lines and irrigation works. financing needed.)

Ministry of 40.0 Forestry III - To rehabilitate Required for maintenance Project being prepared. Agriculture and (IDA) mechanical equipment and develop planning system. Forests a maintenance planning system to maintain present production lev­ els over the long term. To con­ tinue reforestation program with teak and hardwood plantations.

See page 1 for footnotes. - 41 -

Member Country, Amount t, and Implementing Probable Stage of Processing and Agency JJ ~l/ Consulting Services Action on Procurement 4/

Indian Petro­ 300.8 (R) Petrochemicals - Production of Consultants have been re­ Appraisal report being chemicals Corp. , (Bank) petrochemicals and production of cruited. prepared. (Co-financing Ltd. basic aromatics and selected expected.) derivatives based on Bombay High and South Bassein natural gas. Total project cost about $1. 7 billion, of which about $650 million in foreign exchange.

Haldia Water so.a Haldia Water Supply and Sewerage Consultants' services Project preparation under Development (IDA) Project - Construction of 225 likely to assess techni­ way. Authority, million liters/day treatment cal options for the proj­ Government of plant, 4 pumping stations and a ect. West Bengal 90 km long water transmission main to serve the Haldia Devel­ opment Authority, 2 towns and rural communities en route.

Bihar State so.o Bihar Water Supply - Provision No indications that expa­ Project preparation under Water and Sewage (IDA) of piped water supply to about 3 triate consultant ser­ way. Authority, towns in the State of Bihar. vices will be required. Government of Bihar

Narmada Develop­ 200.5 (R) Narmada River Development Tata Consultancy Ser­ Negotiations under way. ment Department, (Bank) (Gujarat) Sardar Sarovar Dam and vices, Bombay, has been (CODDD.ercial co-financing Government of 100.0 Power Project - Construction of commissioned by GOG to of foreign exchange cost Gujarat (IDA) Sardar Sarovar Dam and two design and implement a of the power generating hydro-electric power stations Management Information equipment is likely.) totalling 1,400 MW. Total proj­ System for project con­ ect ~oat about $1.8 billion, of struction and subsequent Procurement: Evaluation which about $560 million in for­ operation. of prequalification ap­ eign exchange. plications under way.

Narmada Devel op­ 150.4 Narmada River Development Maintenance of a Consult­ Negotiations under way. men t Department, (IDA) (Gujarat) Water Delivery and ancy Board for review of Government of Drainage Project - Construction and assistance with de­ Procurement: ICB pre­ Gujarat of main canal and network of sign and construction of qualification applica­ canal's minor channels to serve main canal and electronic tions have been reques­ about 2 million ha. Total proj­ control system to be ted. ect cost estimated at $480 mil­ agreed at negotiations. lion, of which about $125 mil­ Local consultants being lion in foreign exchange. selected.

Bombay Metropol­ 138.0 (R) Bombay Urban Development - Pro­ Local consulting services Board presentation sched­ itan Region De­ (IDA) gram of slum upgrading and shel­ proposed for organiza­ uled for January 29., velopment ter renovation and construction tion, management and Authority, for the Bombay Metropolitan Re­ finance systems; design Procurement: $7.0 mil Government of gion. Total project cost esti­ and implementation of lion of retroactive finan­ Maharashtra mated at $256. 7 million, includ­ improved management cing will be proposed for ing a foreign exchange component systems; review of build­ site filling and land in­ of about $19.5 million. ing regulations; aerial frastructure work, and for photograph for slum up­ technical assistance to grading program; and en­ two project authori,ties. gineering works.

Madhya Pradesh 157.4 Bodhghat Hydro-electric Project Consultants will be re­ Approved by the Executive Electricity (Bank) - Construction of a 500 MW quired for: (a) construc­ Di rec tors on May 17. Board, Govern­ 143.0 hydro-electric generating sta­ tion, supervision and ment of Madhya (IDA) tion together with associated management; (b) thermal Procurement: The IDA Pradesh dams, channels and tunnels in rehabilitation program; Component now comprises Madhya Pradesh State. Total and (c) data processing $130 million Special Fund project cost estimated at $723 expansion. Credit and $13 million million, including foreign ex~ IDA Credit. change component of $213 million.

Narmada Planning 200.0 (R) Narmada (Madhya Pradesh) I - Project preparation as­ Appraisal mission sched­ Agency, Govern­ (Bank) Construction of the Narmada sisted by mainly local uled for late February. ment of Madhya Sagar Dam, hydro power stations consultants financed from Pradesh and a large network of canals ~Project Preparation Fa­ covering about 130 1000 ha. cility advance included Total project cost about $1.4 in Credit 1332-IN. No billion, of which about $275 decision made whether million in foreign exchange. consul tan ts required during implementation.

See page l for footnotes. - 42 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l__/ Lender Y Consulting SeTVices Action on Procurement 4/

~ (Cont'd)

To be determined 100.0 Cement Energy Savings - Assis­ No decision on consul­ Appraisal issues under (Bank) tance, through a financial in­ tants. consideration. termediary, to several cement plants to convert from wet to dry process, Total project cost about $370 million, of which about $100 million in foreign exchange.

Gujarat Housing 54.0 (R) Gujarat Urban - Program of land No expatriate consul ting Appraisal report being Board, Govern­ (IDA) and infrastructure development; services required. prepared. ment of Gujarat slum improvement and municipal services, and small- and medium­ town development for selected cities and towns in Gujarat. Total project cost estimated at $104 million.

Kerala Water and 41.0 (R) Kerala Water Supply - (a) Aug­ Local consultant assist­ Appraisal report being Waste Water (IDA) mentation of water supply of ance required for devel­ prepared. Authority, piped water of Ouilon; (b) pro­ oping sector-wfde train­ Government of vision of piped water to seven ing and such centralized Kera la regional rural areas and (c) a services as leak detec­ pilot urban and 'rural low-cost tion, meter repairs, sanitation component to serve workshops, etc. Consult­ selected towns and villages. ants would also be needed Total project cost about $85 for implementation of fi­ million, of which about $19 mil­ nancial systems and a lion in foreign exchange. sector-wide tariff study.

Department of so.a (R) Maharashtra Composite Consultants required. Appraisal report being Irrigation, (Bank) (Majalgaon) Irrigation. The prepared, Ministry of project would complete Parthan Agricu 1 ture, Left Bank Command (31,000 ha), Government of construct Majalgaon Dam and Maharashtra Right Bank Canal (94,000 ha), field channels, drains, rural roads, etc. Total project cost estimated at $322.6 million.

To be determined 65.0 Fores try Education, Research and No decision on consul­ Project preparation under (IDA) Training - Manpower tra1n1ng at tants. way. all levels and support to the proposed Indian Council of For­ estry Research and Education.

Department of 75.0 (R) Andhra Pradesh Composite Irriga­ Consultants have been re­ Appraisal mission sched­ Irrigation, (Bank) tion - Construction of the Sri­ cruited. uled for March, Ministry of 75.0 salem Right Branch Canal; exten­ Agricu 1 ture, (IDA) sion of 77,000 ha of the irriga­ Government of tion service area of the main Andhra Pradesh canals of the Sriramsagar Dam.

Department of 85,0 (R) West Bengal Minor Irrigation - Local consultants assist­ Negotiations in mid­ Irrigation, (IDA) Construction of about 1,200 ance required for prepar­ January. Ministry of tubewells, 10,000 shallow tube­ ing design and Operation Agriculture, wells, and 10,000 open-dug and Maintenance manuals. Government of wells; and completion of the West Bengal distribution systems of about 600 existing river lift pumps, Total project cost estimated at $141 million,

Coal India Ltd, 186,0 (R) Jharia Coal Project - Assistance No decision on consul­ Appraisal report being (Bank) to Bharat Coking Coal Ltd. in tants. prepared. (Co-financing expanding production of coking with United Kingdom is coal. Total project cost about possible.) $670 million, of which $210 million in foreign exchange.

Roads Wing, 220,0 (R) National Highway II - Develop­ No consultants required. Appraisal report being Ministry of (Bank) ment of expressways, highway prepared. Shipping and upgrading and pavement streng­ Transport thening on selected high-capa­ city routes throughout India.

Kerala State 165 .o Kerala State Power Project - No decision on consul­ Appraisal mission in the Electricity (Bank) Construction of a 180 MW hydro­ tants, field. Board, Govern­ electric generating station to­ ment of Kerala gether with associated works and transmission lines in Kerala State, Total project cost esti­ mated at $337 million.

See oaa:e 1 for footnotes. - 43 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J/ ~y Consulting Services Action on Procurement!±/

INDIA (Cont'd)

Maharashtra 250,0 (R) Chandrapur Thermal Power Project Consul tan ts for engin­ Negotiations late Janu­ State Electri­ (Bank) - Installation of two 500 MW eering and design have ary/ early February. city Board, units, units 5 and 6, at the been recruited. Government of Chand.rapur plant in Maharashtra, Maharashtra Total project cost estimated at $1,116 million, including for­ eign exchange component of $415 million,

National Bank 150,0 NABARD I - Assistance, over a No decision on consul­ Project preparation under for ·Agriculture (Bank) three-year period, to National tants. way. (Co-financing ex­ and Rural Devel­ 150,0 Bank for Agricu 1 ture and Rura 1 pected.) opment (NABARD) (IDA) Development in providing rural credit to farmers. Total proj­ ect cost estimated at $2,0 bil­ lion, of which $28 million in foreign exchange.

Ministry of 250,0 Industrial Export Development No consultants required. Appraisal report being Finance and (Bank) Finance - Assistance to export­ prepared, (Co-financing Industrial oriented companies throughout possible,) Credit and India. Investment Corporation of India

Ministry of 70,0 Reservoir Fisheries - Introduc­ No decision on consul­ Project preparation under Agricu 1 ture, and (IDA) tion of improved aQuaculture tants. way. State Depart­ technologies in reservoir ·fish­ ments of Fish­ eries, including fish breeding, eries stocking, water productivity and fishing operations management, to increase inland fish produc­ tion.

Ministry of 40.0 (R) West Bengal Population Project - No expatriate consul tan ts Appraisal mission find­ Health and (IDA) Improvement of service delivery required. ings under review. Family Welfare and demand creation for family welfare in backward districts of West Bengal under GOI's "area" ( state) projects policy combined with a state-wide training component.

To be determined 100,0 Refinery Conversion and Expan­ No decision on consul­ Appraisal mission find­ (Bank) sion - Construction of new re­ tants. ings under review. finery at Karnal and expansion of Haldia refinery unit, Total project cost about $2,2 billion, of which about $450 million in foreign exchange.

Bombay Municipal 100,0 Bombay III Water Supply - Pro­ No decision on consul­ Project preparation under Corporation (Bank) duction of an additional 100 mgd tants. way. Appraisal mission of water for the Bombay Metro­ scheduled for March, politan area from the Bhatsai River, trunk distribution, dis­ tribution mains and sewage collectors, low-cost sanitation, and studies to determine the next incremental production of water required to serve the Bom­ bay area, Total project cost estimated at $365 million, in­ cluding a $50 million foreign exchange component.

Ministry of 25,0 (R) Himachal Pradesh Watershed - To No consultants required. Appraisal report being Agriculture (IDA) support soil conservation, live­ prepared, stock minor irrigation, horti­ culture and research in Himachal Pradesh,

Gas Authority of 167 .o Hazira/Bijaipur/Jagdishpur (HBJ) Back-up consultants to Appraisal report being India Limited (Bank) Gas Pipeline Project. Construc­ assist in project imple­ prepared, (Co-financing tion of a gas transmission pipe­ mentation have been ap­ expected,) line, including compressor sta­ pointed, tions, metering facilities, etc. Total project cost estima­ ted at $1.8 billion, including $865 million in foreign ex­ change,

See page l for footnotes, - 44 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender]/ Consulting Services Action on Procurement!±_/

INDIA (Cont'd)

Central Water 100.0 National Water Management. Sup­ No decision on consult­ Project preparation under Connnission, and (IDA) port for improved water manage­ ants. way. Irrigation ment activities in selected Departments of projects covering 2.75-1.00 ha participating in six core States (tentatively States Andhra Pradesh, Gujarat, Karna­ taka, Maharashtra and Tamil Nadu). Total project cost esti­ mated at $200 million.

GOI · Department 135.0 (R) Composite Social Forestry (For­ Short-term consultant Appraisal report being of Forestry, and (IDA) merly National Social Forestry). services will be required prepared. (Co-financing Forestry Increasing wood production to for project implementa­ with USAID expected.) Departments of satisfy demand. Total project tion. participating cost estimated at $350 million. States

Irrigation 50.0 Kerala/Kallada Irrigation II. No decision on consult­ Project preparation under Department, (IDA) Follow-up on Kallada Irrigation ants. way. Ministry of Project. The project will be a Agricu 1 ture, test of the potential of surface Government of irrigation on commercial tree Kerala crop production. Total project cost estimated at $100 million.

India Posts and 250.0 (R) Telecommunications IX. Provi­ No decision on consult­ Pre-appraisal Dlission Telegraphs (Bank) sion of imported equipment and ants. findings under review. Department raw materials to meet nationwide telecommunications requirements; support for expansion and mod­ emi_zation of existing factories and establishment of new manu­ facturing units. Total project cost estimated at $3 billion, of which $750 million in foreign exchange.

National Thermal 200.0 (R) Rihand Power Transmission - Con­ Consultants' services Appraisal report being Power Corpora­ (Bank) struction of 910 km of 500 kV DC will be needed for prep­ prepared. (Co-financing tion transmission lines and 1,500 km aration of long-term possible.) of 400 kV AC transmission lines transmission plan and connecting the Rihand and identification of related Singrauli power plants with projects. cities in the Northern Region, together with required convert­ ing stations and sub-stations. Total project cost estimated at $608 million, of which about $270 million in foreign ex­ change.

National Thermal 250.0 (R) Capital Region Thermal. Instal­ No decision on consult­ Appraisal mission sched­ Power (Bank) lation of four coal-fired 210 MW ants. uled for February. Corporation units of a new plant at Muradna­ gar in the State of Uttar Pra­ desh, together with associated 400 kV transmission lines. Total project cost about $1.l billion, of which $350 million in foreign exchange.

Ministry of 61.0 (R) National Agricultural Extension No decision on consult­ Appraisal report being Agriculture and (IDA) Project II. Assistance to: (a) ants. prepared. Governments of three States in expanding and Gujarat, Harya­ strengthening the training and na, Karnataka, visit (T&V) extension systems, and Himachal and (b) two States in the intro­ Pradesh duction of the training and visit system. Total project cost estimated at $104 million, of which about $5 million in for­ eign exchange.

Indian Council 56.0 (R) National Agricultural Research No decision on consult­ Appraisal mission find­ of Agricultural (IDA) II Project. Strengthening of ants. ings under review. Research capability of State Agricultural Universities to conduct loca­ tion-specific research. Total project cost estimated at $111 million, of which $8 million in foreign exchange.

See page l for footnotes. - 45 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }J Lender?:/ Consulting Services Action on Procurement!±_/

Bank of Maldives 5.2 Production Promotion and Credit Will be required for Project preparation under (BOM) (IDA) Project: To develop agricultur­ technical assistance way. al and agribusiness sectors component. through strengthening the devel­ opment banking functions of BOM. Key components financed under the project would be: vegetable, fruit, coconut, palm­ wood and firewood production, animal husbandry, cottage indus­ tries and transport vessels, along with technical assistance.

Ministry of 107 .o Marsyangdi Hydroelectric - Consultants have been re­ Approved by the Executive Water Resources (IDA) Hydro-electric power station in cruited. Directors on May 22. (Co­ Central Nepal with 69 MW in­ financing agreed in prin­ stalled capacity, transmission ciple with Federal Repub­ to central grid, and consultancy lic of Germany for $74.5 services. Total project cost million, Kuwait Fund for estimated at $323.3 million of $21 million, and Saudi which $248.4 million in foreign Fund for $25 million.) exchange.

Nepal About Telecommunications IV - Follow­ Required for financial Completion of negotia­ Telecommuni­ 22.0 up for expansion of local and and organizational re­ tions awaiting conclusion cations (IDA) international services. Total s tructuri~g of NTC. of co-financing arrange­ Corporation project cost estimated at $60 .1 ments. (NTC) million, of which $46 million in foreign exchange.

Ministry of About Babai Irrigation - Includes con­ No decision made whether Appraisal report under Water Resources 35.0 struction of weir and headworks consul tan ts will be re­ preparation. (Co-fi­ (IDA) on Babai River, construction of quired. nancing being sought.) irrigation and drainage facili­ ties on about 13,000 ha of land, and strengthening of agricul tur­ al extension services in the area. Total project cost esti­ mated at $64.5 million, of which $45.2 million in foreign ex­ change.

Ministry of 7 .5 (R) Industrial Development - To pro­ Not required. Approved by the Executive Industry (IDA) vide long term funds through the Directors on December 13. Nepal Industrial Development Corporation (NIDC) to industrial enterprises in the private sec­ tor and assist in the overall institutional development of NIDC; assist in the development of leather and leather goods, and provide assistance in devel­ oping the light engineering sec­ tor; address key problem areas in industrial and export poli­ cies, procedures and administra­ tion through technical assis­ tance. Total project cost esti­ mated at $12 million, of which $9 million in foreign exchange.

Ministry of About (R) Agricultural Manpower Training - May be required for Approved by the Executive Agriculture 8.4 To modify the existing middle training and technical Directors on December 13. (IDA) level agricultural training sys­ assistance. tem and tailor it to the skill requirements of field extension workers and general agricultural technicians; establish degree program in animal husbandry; and to initiate an extension program for farm women. Total project cost estimated at $14.3 million, of which $7.2 million in foreign exchange.

See page 1 for footnotes. - 46 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender Jj Consulting Services Action on Procurement !±J

NEPAL (Cont'd)

Ministry of About (R) Agricultural Extension II - To Will be required for Negotiations late Janu­ Agricu 1 ture 8.0 reorganize agricultural admini­ civil works. ary/early February. (IDA) stration in six new districts to permit the establishment of training and visit systems; strengthen existing extension systems in six districts where there are ongoing irrigation projects; strengthen two new ex­ tension training centers; and conduct a study of project mon­ itoring and evaluation capabil­ ity. Total project cost estima­ ted at $9.3 million of which $2.6 million in foreign ex­ change.

Ministry of About (R) Rasuwa-Nuwakot Rural Development No decision on consult­ Project preparation under Panchayat and 15 .o III - Follow-up on first credit ants. way. Local Develop­ (IDA) with emphasis on (i) achieving ment fuller use of the infrastructure created during the first phase; (ii) expanding and improving ag­ ricultural support services; ( iii) explf)iting the irrigation potential of the area by con­ structing additional gravity irrigation schemes; and (iv) developing additional infr8.­ structure including drinking water supply systems. Total project cost estimated at $20.0 million.

National 13.0 Population - Provide family Will be required. Project preparation under CoDDD.ission on (IDA) planning and mother and child way. (Co-financing with Population; health services; improve and ex­ UK and Federal Republic Ministry of pand training facilities and of Germany being con- Health programs for field workers, sidered.) · paramedics, doctors and nurses; develop a system of production, distribution and logistics for informational and educational materials; establish a national vital registration system. Total project cost estimated at $18 .o million.

Ministry of 10.0 Deep Aquifer Exploration - Iden­ Consultants recruited for Project preparation under Water Resources (IDA) tify new and untapped sources of project preparation. way. irrigation water supply from deep aquifers which would in­ crease cropping intensity in the Terai. This would include dril­ ling of exploratory boreholes; construction of wells; in-serv­ ice training; and preparation of reports. Total project cost estimated at $13 .0 million.

State Petroleum 30.0 Refinery (Secondary Conversion) Consultants have been re­ Government reviewing via­ Refining and (Bank) - To support the construction of cruited. bility of the project. Petrochemical a hydrocracker project in Paki­ Further processing de­ Corporation stan. Total project cost esti­ pendent on outcome of Limited mated at $426 million, of which review. $214 million in foreign ex­ change.

Water and Power 50.0 Power WAPDA V - Expansion of Consultants will be re­ Appraisal report being Deve 1 opmen t (Bank) power transmission systems. quired for_ engineering prepared. Authority purposes. (WAPDA)

Ministry of 150.0 SAL II - To support Government's No consultants required. Initiating memorandum Finance (Bank/ Structural Adjustment Programs under preparation. IDA) in the areas of Agriculture, In­ dustry and Energy.

See page 1 for footnotes. - 47 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender Y Consulting Services Action on Procurement 4/

PAKISTAN (Cont'd)

Department of 8.3 (R) Agricultural Extension Project Consultants to introduce Approved by the Executive Agriculture, (IDA) III - To improve agricultural the Training and Visit Directors on December 13. Government of extension services in Baluchi­ System have been re­ Baluchistan stan Province by applying the cruited. Training and Visit System; im­ proving training and adaptive research. Total project cost estimated at $11.6 million, of which $2.6 million in foreign exchange.

Water and Power 150.0 (R) Left Bank Outfall Drain - To Consultants have been Approved by the Executive Development (IDA) support the construction of a used for preparation. Directors on December 13. Authority comprehensive drainage system in Additional consultants (Co-financing will be (WAPDA); the lower Indus Basin in Sind will be required for provided by ADB, CIDA, Government of Province to relieve the exten­ technical and managerial swiss Government, ODA, Sind Province sive water-logging and salinity guidance. OPEC and Saudi Fund.) which have occurred as a result of irrigation. Total project cost estimated at $637 million, of which $316 million in foreign exchange.

Water and Power 100.0 (R) Power WAPDA IV - Expansion of Previously engaged con­ Board presentation sched­ Development (Bank) the power transmission and dis­ sultants expected to uled for February/March. Authority tribution system. Total project continue. (WAPDA) cost estimated at $631. 7 mil­ lion, of which $236 million in foreign exchange.

Provincial 55.2 (R) Prima_ry Education II. No consultants envisaged. Appraisal report being Education (IDA) prepared. Departments

State Cement 50.0 Cement Energy Saving - To sup­ Consultants selected. Project preparation under Corporation (Bank) port the rehabilitation and in­ way. (Co-financing en­ troduce energy efficiency meas­ visaged.) ures in six existing cement plants.

Oil and Gas 45.0 (R) Petroleum Resources Development No decision'·" made whether Project preparation under Development (Bank) - Appraisal and development of a consultantS-'will be re­ way. (Co-financing en­ Corporation number of dormant gas fields; quired. visaged.) infrastructure development for recent petroleum discoveries; and development of the Dhodak field.

Ministry of 30.0 Private Tubewells and Rural Consultants have been re­ Project preparation under Water and Power, (IDA) Electrification. cruited for project prep­ way, financed by UNDP. and Provincial aration. Additional con­ Departments of sul tan ts wi 11 be required Irrigation for project implementa­ and/ or Agri - tion. culture

Pakistan 100.0 (R) Telecommunications V. To sup­ No decision made whether Appraisal report being Telephone & (Bank) port the expansion and moderni­ consultants will be re­ prepared. (Co-financing Telegraph zation of Pakistan's telecoDDDUn­ quired. being sought with ADB, ications systems. OECF, KfW Germany, and comm.ere ial sources.)

National Highway 10.0 Highways IV. No decision on consul­ Project preparation under Board (Bank) tants. way.

Provincial 25.0 Water Management II - Renovation Consultants have been re­ Appraisal report being Depts. of (IDA) of water courses and improvement cruited for project prep­ prepared. (Co-financing Agriculture of water management. aration. Additional con­ being considered by sultants will be required IFAD). for project implementa­ tion.

Punjab & Sind 35.0 SCARP Transition and Improvement Consultants.have been re­ Project preparation under Provincial (IDA) - Transfer of responsibility for cruited for project prep­ way, financed by UNDP. Depts. of groundwater development in sel­ aration. Additional con­ Agriculture ected areas from public to pri­ sultants will be required vate sector; improvement of op­ for project implementa­ eration and maintenance of,tube­ tion. wells.

See page I for footnotes. - 48 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender Y Consulting Services Action on Procurement 4/

PAKISTAN (Cont'd)

Ministry of 100.0 (R) Energy Sector Loan - To support No consultants required. Appraisal report under Finance (Bank) important policy changes and preparation. priority investments in the energy sector.

Ministry of 75.0 (R) Agriculture Sector Loan - To Consultants have been re­ Project preparation under Food, Agricul­ (Bank) support program of structural cruited. Additional con­ way. ture and reforms to include setting of sultants may be required Cooperatives investmen~. priorities, rational­ for further preparation. ization of"incentives and strengthening of institutions.

Ministry of 50.0 Petroleum Exploration. Consultants may be re­ Project identification Petroleum and (Bank) quired to assist in prep­ under way. Natural aration. Resources

Ministry of 120.0 (R) Industrial Credit II. Consultants may be re­ Project identification Finance (Bank) quired for preparation. under way.

Agricultural 55.0 (R) Agricultural Credit VI. Consultants req~ired for Project preparation under Development Bank (Bank) preparation. way. of Pakistan

Municipality of ss.o (R) Karachi Urban - First phase of Consultants are being Appraisal report under Karachi (IDA) comprehensive and multisectoral used to assist in prepar­ preparation. 45.0 improvements for the Karachi ation. (Bank) metropolitan area (e.g. water supply, sewerage, transport, squatter upgrading, a number of studies and technical assis­ tance).

Ministry of 20.0 Primary Education III. No consultants required. Project identificatio'n Education (IDA) under way.

Ministry of 30.0 Irrigation Rehabilitation II. Consultants will be re­ Project preparation under Water and Power, (IDA) quired. way, financed by UNDP. and Provincial Departments of Irrigation

Ministry of 35.0 (R) Education VIII. No decision made whether Project identification Education (IDA) consultants will be re­ under way. quired.

Provincial 20.0 Agricultural Extension IV - No decision made whether Project preparation under Departments of (IDA) Follow on to ongoing extension consultants will be re­ way. Agriculture projects in Punjab and Sind q'uired. Provinces.

State 3.2 (R) Engineering Industry: Technical Consultants will be re­ Appraisal report under Engineering (IDA) Assistance - Techno-economic quired. preparation. Corporation studies for the restructuring of major public sector engineering enterprises.

Water and Power so.a (N) Power Generation (Qasim). Consultants will be re­ Project identification Development (Bank) quired. under way. Authority (WAPDA)

Ministry of 130.0 (N) Sector Loan (Industry). No consultants required. Project identification Finance (Bank) under way.

SRI LANKA

Department of 17 .o (R) Major Irrigation Rehabilitation Consultants required. Approved by the Executive Irrigation (IDA) Project - Rehabilitation and Directors on December 20. modernization of a number of major irrigation tanks. Total project cost estimated at $43.2 million, of which $18.2 million in foreign exchange.

Department of About (R) Second Road Maintenance Project Consultants required for Negotiations scheduled Highways 24.0 - Rehabilitation of road seg­ supervisory responsibi­ for mid-February. (Bank) ments and bridges, and improved lity. maintenance for road network. Total project cost estimated at $43.6 million, of which, $20.2 million in foreign exchange.

See page 1 for footnotes. - 49 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1_/ Lender 1/ Consulting Services Action on Procurement!!_/

SRI LANKA (Cont'd)

Ministries of 55.0 (R) Fourth Tree Crops Project - Re­ No decision made whether Negotiations scheduled State Planta- (IDA) habilitation of tree crops--tea consultants will be re­ for early February. tions, and and rubber--plantations iri the quired. Janatha Estate estate sector. Total project Development cost estimated at $203.2 mil­ lion, of which $58.0 million in foreign exchange.

Ministry of Up to Fifth Tree Crops Rehabilitation No decision made whether Project preparation under Plantation 22.0 - Replanting of over-aged, low­ consultant~ will be re­ way. Indus'triee (IDA) yielding smallholder rubber and quired. improvement in rubber processing standards.

Ministry of About (R) Dairy Development II - To No decision made whether Negotiations scheduled Rural Industrial 36.0 strengthen the existing Coopera­ consultants will be re­ for mid-February. Development (Bank) tive Organizations' milk produc­ quired. tion; to improve processing and marketing of milk, and to im­ prove transportation and chil­ ling facilities for milk, pro­ vide teaching, research training and consultancy and audit sup­ port to the dairy industry. · Total project cost estimated at $101.8 million, of which $48.3

million in foreign exchange. .ijr

Ministry of 45.0 Agricultural Research ProjeCt - No decisiOn on consul­ Project preparation under Agricultural (Bank/ Establishment of a national tants. way. Develoment and IDA) agency to ensure coordinated Research research planning, and· strength­ ening of the national agricul­ tural research institutions.

Ministry of 35.0 Third Water Supply Project - Re­ No decision on consul­ Project preparation under Local Govern­ (IDA) habilitation of existing assets, tants. way. ment, Housing particularly production facili­ and Irrigation; ties, improve operation and and National maintenance facilities, and up­ Water Supply and grade distribution work in Drainage Board se lee ted areas. (NWSDB)

Ministry of 60.0 Ninth Power Project (Distribu­ Consultants required. Project preparation under Power and Energy (Bank) tion Rehabilitation) - Rehabili­ way. tation of Ceylon Electricity Board's (CEB) power and trans­ mission system.

See page 1 for footnotes. - 50 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender?:_/ Consulting Services Action on Procurement 4/

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

ALGERIA

SONELGAZ To be Power III - Project would in­ No decision made whether Preparation under way by deter­ clude rural electrification. consultants will be re­ Government. mined quired. (Bank)

Ministry of To be Highways V - Road maintenance, No decision made. Preparation under way by Pub lie Works deter­ technical assistance and train­ Government. mined ing. (Bank)

Ministry of About Ports III - Construction of port Consultants will be re­ Discussion in progress Pub lie Works 100.0 at Djendjen in eastern Algeria. quired for construction, with Government on pos­ (Bank) supervision, tariff and ~ible project redesign. investment studies and training. Procurement: Project in­ volves advance contract­ ing, with award of a single contract for major civil works, and the pos­ sibility of retroactive financing of a small por­ tion.

Ministry of About (R) Agricultural Research - Str.eng­ Consultants will be re­ Appraisal report being Agricu 1 ture 6.0 thening of research and ext­ quired to help design and prepared. (Bank) ension services of Ministry of plan building program and Agriculture. prepare tender documents, as well as to provide as­ sistance in various fields (extension, veter­ inary, research, etc.)

Ministry of About (R) Krasokhoria Integrated Rural Government to decide Project prepa!ation under Agriculture 10.0 Development Project - Irriga­ about pos~ible recruit­ way. (Bank) tion, rural roads, social infra­ ment for feasibility structure. studies.

Sewerage Boards About Larnaca/Ayia Napa Sewerage Proj­ Consultants have been re­ Detailed environmental of Larnaca/ Ayia 15.0 ect - Provision of sewerage col­ cruited. and agricultural reuse Napa (Bank) lection, waste water treatment (of effluent) studies to systems to the major urban and be undertaken by Govern­ tourist centers. ment.

EGYPT, ARAB REPUBLIC OF

Egyptian Public To be Fifth Drainage Project - Contin­ No decision made. Appraisal report being Authority for deter­ ued support for Egypt's field prepared. Drainage Pro­ mined drainage and bilharzia control jects (EPADP) (Bank) program. and Ministry of Health

Egyptian To be Fourth Power Project -.Transmis­ No decision made. Project being prepared by Electricity deter­ sion, distribution and rural EEA. Authority (EEA) mined electrification. (Bank)

To be determined To be Gas Development V - Development No decision made. Project being prepared by deter­ and distribution of natural gas. Egyptian Genera_l Petro­ mined leum Corporation (EGPC). (Bank)

Development 100.0 Construction Industry Sector - Consultants will be re­ Approved by the Executive Industrial Bank (Bank) Assistance to Egypt's construc­ quired to the Joint Com­ Directors on June 28. tion industry through lines of mittee for Sectoral Stud­ credit and technical assist­ ies for the management ance. Total project cost esti­ development program and mated at $132.2 million, with to the participating $100 million in foreign ex­ banks for sub-project ap­ change. praisal.

See page 1 for footnotes. - 51 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~Jj Lender 1=/ Consulting Services Action on Procurement .!!/

EGYPT, ARAB REPUBLIC OF (Cont'd)

Ministry of 23. 7 (R) Vocational Training II - To in­ None required. Negotiations tentatively Industry (Bank) crease the supply and upgrade scheduled for February. the quality of skilled and semi­ skilled manpower in the indus­ trial sector and particularly in the automotive, eletrical, metals, mechanical, foundry, chemical and marine subsectors by establishing four new Voca­ tional Training Centers (VTCs) and extending the training fa­ cilities of six existing VTCs.

To be determined To be New Land Development II - Phase No decision made. Project processing in deter- II of the New Land Development abeyance pending determi­ mined Project (West Nubariya). nation of its economic (Bank) viability.

Ministry of To be Second Agricultural Development None required. Appraisal report being Agricti 1 ture deter- Project. prepared. mined (Bank)

Ministry of Land To be Lake Manzala Development - Re­ No decision made. Project being prepared by Reclamation deter- clamation and low cost settle­ Ministry of Land Reclam­ mined ment of about 60,000 feddans of ation. (Bank) uncultivated land.

Development 170.0 SM! - Small- and medium-scale Consultants will be re­ Approved by the Executive Industrial Bank (Bank) industry development. Credit quired for study of Directors on June 28. channelled through development small-scale industrial finance companies. sector.

Export Develop- 125.0 Export Promotion - Assistance Consultants will be re­ Approved by the Executive ment Bank (Bank) for development of manufacturing quired for various stud­ Directors on June 28. i~dustry exports. Total project ies and institutional cost estimated at $315.6 mil­ strengthening. Bank Project Preparation lion, with $158.9 million in Facility advance of foreign exchange. $565,000 appToved for technical assistance to the two principal insti­ tutions executing the technical assistance com­ ponent of the project~

Port Said Port About Port Said Expansion and Reha­ Consultants appointed Appraisal report being Authority 25.0 bilitation - Procurement of through Bank Project prepared. (Bank) equipment, civil works and/or Preparation Facility. other facilities. Bank Project Preparation Facility advance of $500,000 approved for soil investigation, pre­ liminary engineering de­ signs, and estimates of cost and of equipment requirements.

To be determined To be (R) Vocational Training III - Train­ None required. Appraisal report being deter­ ing of technicians and skilled prepared. mined workers for electrical and con­ (Bank) struction trades.

Executive Agency 56.0 (N) Solid Waste Project - Provision Consultants for prepara­ Project under preparation for Joint (Bank) of equipment, composting and in­ tion are being appointed. by JHP. Housing Projects cinerating plants and studies to Additional consultants (JHP) support solid waste management will be required for var­ in five cities. ious studies.

National Bank of 73.0 (R) Industry - Fine chemicals proj­ Consultants will be re­ Negotiations tentatively Hungary (Bank) ect with two components (MDI, quired to carry out scheduled for early Feb­ pharmaceuticals). studies. ruary. (Co-financing likely to be required.)

See page 1 for footnotes. - 52 -

Member Country , Amount & and Implementing Probable Stage of Processing and Agency }j ~y Consulting Services Action on Procurement !!/

HUNGARY (Cont'd)

National Banlc of so.a (R) Livestock Development and Agro­ Consultants will be re­ Negotiations in end-Janu­ Hungary (Bank) industry - To consist 9f five quired for export market­ ary. ( Co-financing like­ investment components: (a) ani­ ing studies. ly to be required.) mal feed and livestock input supply; (b) on-farm production; (c) agroindustrial processing; (d) research and training; and (e) export marketing services. Total financing required estima­ ted at $325.4 million, including foreign exchange requirements of $148.3 million.

National Bank of To be (R) Transport 1 - Railway improve­ Consultants will be re­ Appraisal report being Hungary deter­ ment; development of road trans­ quired for highway com­ prepared. mined port; related river port im­ ponent. (Bank) provement, and technical assist­ ance.

Water Authority 30.0 (R) Water Supply and Sewerage - To Consultants have been re­ Board presentation on (WA) (Bank) improve the water supply and cruited. January 8. sewerage services in the Greater Amman area and would include: Procurement: Retroactive ( i) extension and reh·abilitation financing of $30 million of water mains; (ii) construc­ recommended. tion of trunk and collection sewers; ( iii), cons true tion of two sewage treatment works; (iv) supply of operating and mainte­ nance equipment; and (v) consul­ tant services for engineering project management and construc­ tion supervision. Total project cost estimated at $47. 7 million, including $30.8 million in for­ eign exchange.

Ministry of About Construction and equipping of No decision made whether Appraisal ~ission prepar­ Health 15.0 primary health centers, and consultants will be re­ ing report. (Bank) technical assistance to the quired. Ministry of Health.

Pension Fund To be (R) Construction of a foundry. Candidates for technical Market issues under re­ deter- partners short-listed for view. mined operational assistance.

Amman Hun ic i - To be (R) Low income housing and Munici­ To be detetmined. Appraisal mission prepar­ pality deter- pality development. ing report. (Co-finan­ mined cing likely to be re­ quired.)

Cities and Vil- To be (R) Second Cities and Villages De­ Consultants likely to be Appraisal mission in Jan­ lages Develop- deter- velopment Bank Project - Line of required for operational uary. ment Banlc (CVDB) mined credit and further institutional assistance. (Bank) strengthening of CVDB.

Vocational To be (R) Manpower Development 1 - Assist­ To be determined. Appraisal mission in late Training deter- ance to Vocational Training Cor­ January/early February. Corporation mined poration (VTC) to expand and (VTC) (Bank) strengthen its training pro­ grams; support to Government to develop latest market informa­ tion system; strengthening of public management and admini­ stration training.

I To be determined To be Sewerage - Rehabilitation and To be determined. Further processing con­ deter­ extension of sewer network for tingent on Government's mined Casab lanca-Mohaumed ia region. actions on institutional (Bank) issues.

See page l for footnotes. - 53 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender Y Consulting Services Action on Procurement 4/

~ (Cont'd)

Ministry of About (R) Family Health Project including Consulting services will Appraisal report being Public Health 21.0 basic health services, training, be needed for management, prepared. (Bank) health education, environmental financial analysis, drug sanitation, and technical as­ supply, project monitor­ Bank Project Preparation sistance to Ministry of Public ing and evaluation sys­ Facility advance of Health, tems. $75,000 approved to fi­ nance consultant ser­ vices, logistical sup­ port, and additional sur­ veys for the preparation of the proposed heal th project, to test a new outreach system for the delivery of basic health services in Morocco.

To be determined To be Telecommunication Project - Ex­ Consul tan ts may be re­ Preparation under way by deter­ pansion of the existing telecom­ quired for project imple­ Government. mined munications systems. mentation. (Bank)

Selected 25, l (R) Electro-mechanical Industries Consultancy services Board presentation on Commercial Banks (Bank) Project - Line of credit to would be required for January 15, and Office pour Treasury, to be on-lent through technical assistance to le Developpement commercial banks to electrical, ODI. Industriel (OD!) mechanical, and metallurgical industries, as well as financing through Office pour le Devel­ oppement Industriel (OD!) of participations in such in­ dustries; institutional streng­ thentng, technical assistance.

Office Cherifien To be Establishment of about 10 fer­ No consultants required. Review of conclusions of des Phosphates deter­ tilizer blending and distribu­ pre-appraisal mission (OCP) mined tion centers. 1 under way. (Bank)

National Office 27, l Vocational Training I - Streng­ Consultancy services re­ Approved by the Executive for Vocational (Bank) thening of vocational training - quired for studies of co­ Directors on November 27. Planning first phase; and establishment ordination, financing, of training in project prepara­ on-the-job training, man­ tion and se lee tion techniques. agement train.ing, and Total project cost estimated at audiovisual methods. $44 million, with $27 million in foreign exchange.

Ministry of 7,0 (R) Casablanca Port - Rehabilitation Consultancy services Appraisal report being Pub lie Works (Bank) of Casablanca Port; technical would be required for prepared. assistance to improve efficiency studies and training. of port operations.

To be determined To be Fourth Water Supply - Rehab­ To be determined. Project preparation in deter­ ilitation of distribution sys­ progress. mined tems. (Bank)

Charbonnages du About (R) Jerada Coal - Modernizing and Consultancy services Negotiations in mid­ Maroc (CdM) 34,0 expanding the Jerada coal mine, would be required for January. (Bank) increasing its annual production mine planning and oper­ from 800,000 to 1 million tons; ations and equipment technical assistance for mine maintenance already con­ planning and project implementa­ tracted with Bank. tion.

Office National To be Petroleum Development - Follow­ To be determined. Scope and processing of de Recherches et deter­ up to ongoing gas exploration project will be deter­ d'Exploitation mined project, mined through ongoing Petrolieres (Bank) project (Loan 2271-MOR). (ONAREP)

To be determined 200,0 (N) Financial Industrial Trade Ad­ To be determined, Appraisal mission tenta­ (Bank) justment - Programs of reforms in tively scheduled for Feb­ financial and trade sectors. ruary.

Ministry of To be (N) Education Sector - Support for To be determined. Appraisal mission tenta­ Education deter­ policy reforms to promote basic tively scheduled for mined education and increase the effi­ April. (Bank) ciency of the education system at all levels,

See page I for footnotes. - 54 -

MembE!:r Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender Y Consulting Services Action on Procurement 4/

MOROCCO (Cont I d) To be (N) Agriculture Sector - Policy re­ To be determined. Appraisal mission tenta­ Ministry of deter- forms to improve investment tively scheduled for Feb­ Agriculture mined planning in agricultur~. ruary. (!lank)

To be determined About (N) Large Irrigation Improvement - To be determined. Appraisal mission tenta­ 45.0 Improvement of operation, main­ tively scheduled for (!lank) tenance and agricultural produc­ April. tion in large-scale irrigation areas and reform of public sec­ tor enterprises involved.

To be determined 25.0 (N) Land Use Planning - Land consol­ To be determined. Appraisal mission tenta­ (!lank) idation, cadastral survey and tively scheduled for No­ land registration. vember.

OMAN

General Tele- About (R) Telecommunications II - Expan­ Consultancy services Negotiations substantial­ communications 23.0 sion of network capacity, pro­ would be required for ly completed. Organization (!lank) vision of services to rural tariff study; planning or areas, training and insti­ forecasting; ti:aining; tutional development. development of computeri­ zation.

Ministry of About (R) Highways Maintenance III - High­ To be determined. Appraisal mission in the Communications 12.0 way maintenance, rehabilitation, field. (!lank) training and technica.l assist­ ance.

Ministry of About (R) Health - Strengthening heaith Consulting services to be Pre-appraisal mission Health 12.0 information system, planning, provided from UN sources scheduled for May. (!lank) heal~h education; construction and Bank for project of water facilities. preparation.

To be determined To be Mechanical Industries II - Sup­ To be determined. Preparation under way. deter­ port to enterprises in mechan­ mined ical and engineering industry (!lank) for rehabilitation and modern­ ization.

To be determined 15.0 Industrial Technology - Upgrad­ To be determined. Preparation under way. (!lank) ing of technological support fa­ cilities for industry in light of needs for EEC entry.

National Housing About (R) Housing - A general line of To be determined. Appraisal report being Institute 25.0 credit to provide housing fi­ prepared. (Co-financing (!lank) nance for construction of hous­ is expected from USAID.) ing for low-income groups through a housing development bank. Total project cost esti­ mated at $56 million, including $27 million in foreign exchange.

Gab ine te da Area About (R) Coal Handling Port - Construc­ Consultants will be re­ Negotiations in late Jan­ da Sines 71.0 tion of coal handling facilities quired to carry out stud­ uary/early February. (Co­ (!lank) at Sines. ies. Retroactive finan­ financing likely to be cing is likely to be rec­ required.) ommended for consultants to begin selected Procurement: A contract studies. has been awarded for the marine civil works. Retroactive financing likely to be recommended.

To be determined To be Regional Water Supply and Sewer­ To be determined. Preparation under way. deter­ age - Provision of water supply mined and sewerage facilities to muni""'.' (!lank) cipalities, under overall sector program.

Coordinating To be Entre Douro E Minho Region Agri­ Assistance being provided Preparation under way. Commission of deter­ cultural Development - Institu­ by FAO/CP. (Co-financing likely from the Northern mined tional improvement to extension .EEC.). Region (!lank) services and other agricultural support services in the North West Region for dairy produc­ tion.

See page 1 for footnotes. - 55 -

Member Country 1 Amount & and Implementing Probable Stage of Processing and Agency Jj Lender 1=_/ Consulting Services Action on Procurement 4/

~(Cont'd)

Ministry of 7.4 Agricultural Services - Provi­ Consultants will be re­ Approved by the Executive Food, Agri­ (Bank) sion of technical assistance to quired to carry out stud­ Directors on June 27. cultur~ and carry out studies and prepare ies, training and provide Forestry long-term plans for improvement technical assistance. Procurement: Retroactive of extension, research, seeds financing up to $200,000 and agricultural marketing as for expenditures incurred part of a strategy for agricul­ for consultants I services tural development. Total project after May I, 1984. cost estimated at $11.6 million, including $7.4 million in for­ eign exchange.

Investment Bank To be Industry XII (Galati Steel) - None required. Appraisal mission post­ deter­ Construction at Galati steel en­ poned at the Government's mined terprise of a cold reduction request, pending finali­ (Bank) mill and tinning line. zation of overall devel­ opment program.

Investment Bank To be Industry XI (Energy Saving Pro­ None required. Completion of techno-eco­ deter­ ject and Process Improvement in nom.ic studies delayed, mined Steel Subsector and/or coking pending finalization of (Bank) coal plant) - Project components overall development pro­ to be determined. gram. (Co-financing likely to be sought.)

Agricultural To be Agricultural Credit (Transylvan­ None required. Negotiations postponed at Bank deter­ ia) - Regional development {>rej­ the Government's request, mined ect, including financing of pending finalization of (Bank) agricultural and agroindustrial overall development pro­ investment in Transylvania gram. (Co-financing Region. likely to be sought.)

Agricultural To be Agricultural Credit (Oltania) - None required. Completion of techno-eco­ Bank deter­ A line of credit through BAFI nomic studies delayed, mined for agricultural development in pending finalization of (Bank) the Oltania Region. overall development pro­ gram. (Co-financing likely to be sought.)

Agricultural To be Irrigation IX - Drainage, land None required. Appraisal mission delayed Bank deter­ reclamation and other related at the Government's re­ mined works on a sectorwide basis quest, pending finali­ (Bank) within the context of the Five­ zation of overall devel­ Year Plan. opment program. (Co-fin­ ancing likely to be sought.)

Investment Bank To be Power V - Time slice investment None required. Appraisal mission post­ deter­ for second half of 1981-85 Plan. poned at the Government's mined request, pending finali­ (Bank) zation of overall devel­ opment program.

Investment Bank To be South Constanta - Agigea Port - None required. Appraisal mission post­ deter­ A deep sea port and inner barge poned at the Government's mined basin and other related struc­ request, pending finali­ (Bank) tures and equipment. zation of overall devel­ opment program. (Co-fin­ ancing likely to be sought.)

Agricultural To be National Grain Storage - A line None required. Appraisal mission post­ Bank deter­ of credit for expansion, rehab­ poned at the Government's mined ilitation and modernization of request pending finali .... (Bank) national grain storage facili­ zation of overall devel­ ties. opment program. (Co-fin­ ancing likely to be sought).

Investment Bank To be Highways I - Construction of 200 None required. Completion of project deter­ km of North-South TransEuropean studies delayed, pending mined Highway (Bucharest-Constanta finalization of overall (Bank) Section), and National Road Re­ development program. habilitation and Training.

Investment Bank To be Industry - Utilization of meth­ None required. Completion of techno-eco­ deter­ ane as chemical feedstock. nomic studies delayed, mined pending finalization of (Bank) overall development pro­ gram.

See page l for footnotes. - 56 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender y Consulting Services Action on Procurement !±/

~ (Cont'd)

Investment Bank To be Petroleum II - Onshore deep None required. Completion of techno-eco­ deter­ exploration and field devel­ nomic studies delayed·, mined opment. pending finalization of (Bank) overall development pro­ gram.

Agricultural To be Livestock V - Possible line of None required. Completion of project Bank deter­ credit for production, proces­ studies delayed, pending mined sing and storage of major live­ finalization of overall (Bank) stock products. development program.

SYRIAN ARAB REPUBLIC

Ministry of To be Highways IV - Maintenance opera­ No decision made whether Preparation under way. Communications deter­ tions and training. consultants are required. mined (Bank)

Ministry of To be (R) Sewerage II - Secondary treat­ Scope of work·of consult­ Project being prepared by Housing and deter­ ment works, main interceptors ants to be used.not yet the Government. (Co-fin­ Utilities mined and secondary collection system determined. ancing likely to be (Bank) for Aleppo. sought.)

Ministry of To be (R) Sewerage III - Secondary treat­ Scope of work of consult­ Project being prepared by Housing and deter­ ment works, main interceptors ants to be used to be de­ the Government. (Co-fi­ Utilities mined and secondary collection system termined. nancing likely to be (Bank) for Damascus. sought.)

To be determined To be Education III - Extension of No decision whether con­ Preparation under way. deter­ vocational education and sultants are required. mined training. (Bank)

Ministry of To be Agricultural Extension - Insti­ Scope of work of consult­ Appraisal report being Agriculture deter­ tutional framework for develop­ ants to be used not yet prepared. (co-financing mined ing country-wide ex tens ion ser­ defined. agreed with IFAD.) (Bank) vice.

Ministry of About National Irrigation Management Consultant services re­ Appraisal report being Agriculture and 21.0 Improvement - Improvement and quired: Management In­ prepared. Irrigation (Bank) rehabilitation of public irriga­ formation Systems and Offices tion schemes, including execu­ Institution Building. tion of works, provision of equipment, improvement of water management and institutional strengthening.

To be determined To be Energy Development - Focus on No decision made. Preparation by Government deter­ development of gas/oil field. under way. mined (Bank)

Ministry of To be Implementation of national ex­ No decision made. Preparation by Government Agriculture deter­ tension master plans, including under way. mined adaptive research. (Bank)

To be determined To be Small Scale Industry II - Line No decision made. Preparation by Govermnent deter­ of credit to Government to be un~er way. mined used by commercial banks for (Bank) lending to small-scale indus­ tries.

Ministry of To be Highways VI - Maintenance Pro­ No decision made. Project under preparation Pub lie Works deter­ ject (follow up to Highways IV). by Government and con­ mined sultants. (Bank)

Ministry of About Extension of integrated primary No decision made. Post-appraisal mission Health 23.0 health care system (follow-up to postponed at Government's (Bank) 1981 project.) request, pending review of recent institutional' changes and their impact on project design.

See page l for footnotes. )

- 57 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )j Lender?:/ Consulting Services Action on Procurement !±/

TUNISIA (Cont'd)

Banque d~ Devel­ About (R) Export Industries - Line of Consultants required for Negotiations end-Janu­ oppemen t Econo­ 40,0 credit for development of indus­ technical assistance to ary/ early February, (Co­ mique de Tunisie (Bank) tries mainly oriented towards COTUHACE, financing for the (BDET); Banque export markets: assistance to COTUHACE component is Tuniso-Koweiti­ Centre de Promotion des Exporta­ being considered by the enne de Devel­ tion (CEPEX) for financing of Government; Germany and oppement (BTKD); exporters' marketing studies, UNDP have expressed in­ Societe Tuniso­ and technical assistance to Com­ terest.) Seoudienne pagnie Tunisienne d'Assurance de d'Investissement Commerce Exterieur (COTUHACE), et de Developpe­ ment (STUSID)

SOGITEX Group To be (R) Rehabilitation and expansion of No decision made. Appraisal mission in late deter­ textile mills; phase II of on­ January. mined going project. (Bank)

To be determined To be Integrated regional development Consultants already re­ Preparation under way by deter­ in the Center-West region of the cruited. Government. mined country. (Bank)

Ministry of About (R) North West Agricultural Produc­ Consultants required for Negotiations in mid­ Agricu 1 ture 15.0 tion - Provision of research and extension management; re­ January, (Co-financing (Bank) extension, inputs, marketing search station develop­ likely from Belgian Gov­ services to medium size farmers ment; farm machinery ernment.) on about 200,000 ha of arable testing; accounting; land; construction of access treatment of animal feed. Procurement: Retroactive roads. financing of up to $100,000 proposed for ex­ penditures incurred for consultants' services after December I, 1984,

To be determined About (R) Urban Development IV - Upgrading One consultant required Appraisal report being 35.0 existing settlements and for in administration, ac­ prepared. (Bank) servicing/developing new ones. counting and economic data processing.

Office des To be Grain Storage II - Improvement No decision made. Preparation report being Cereales deter­ of storage and distribution of prepared, mined locally produced grain, (Bank)

To be determined To be Integrated regional development Consultants already re­ Preparation under way by deter­ in the North-West region of the cruited. Government. mined country. (Bank)

Office de Mise About (R) Gabes Irrigation - Rehabili­ Consulting services will Appraisal report being en Valeur des 30,0 tation of about 5 1 000 ha; exten­ be required in engineer­ prepared. Perimetres Ir­ (Bank) sion of about 2,000 ha through ing and marketing. rigues de Gabes provision of irrigation systems et Mederine and reconversion of cropping patterns; strengthening of ex­ ecuting agency and farmers' as­ sociations.

Banque de About (R) Electrical Mechanical Industries No decision made. Appraisal report being Developpement 35,0 II - Line of credit for finan­ prepared, Economique de (Bank) cing priority electrical and Tunisie (BDET) chemical industries.

Ministry of To be Agricultural Sector - Policy and No decision made. Preparation under way. Agriculture deter­ institutional reforms. mined (Bank)

Pulp and Paper About (R) Paper Rehabilitation: Phase I - Consul tan ts financed by Appraisal report being Enterprise 52,9 Rehabilitation of Aksu, Dalaman, Bank Project Preparation reviewed. (SEKA) (Bank) and Afyon Mills; technical as­ Facility advances total­ sistance to improve operations. ing $560,000 have pre­ Total project cost estimated at pared project. Consult­ $85,7 million including a for­ ants expected to be re­ eign exchange component of $52.9 quired for assistance in million. project implementation and in assistance to im­ prove efficiency of op­ erations.

See page I for footnotes., - ~<• ..:-'.: .. - 58 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency]) ~y Consulting Services Action on Procurement 4/

TURKEY (Cont'd)

Turkish Coal To be (R) Soma Isiklar Lignite - Develop­ Consultants would be re­ Appraisal report being Enterprise deter­ ment of selected lignite quired for mine opera­ prepared. Authority mined field(s) to expand production; tions management and (Bank) confirmation of lignite local project implementation. Bank Project Preparation deposits and related technical Facility advance of assistance. $950,000 provided to,help finance foreign exchange costs of preparation work.

Turkish Pipeline To be Thrace Gas Pipeline - Thrace gas Consultants financed by Govermnent has decided to CorpOration deter­ pipeline to lgsas fertilizer Bank Project Preparation use available gas for (BOTAS) mined plant, Facility advance of $1,0 power generation initial­ (Bank) million are preparing ly. Further processing project. of project postponed un­ til additional gas be­ comes available.

To be determined To be (R) Energy Conservation - Energy Studies being financed Studies/energy audits deter­ saving investments in selected under prior Bank loan. under review. mined industries in public and private (Bank) sectors.

Turkish State To be (R) Fourth Ports Project - Spec­ Specialist services would Appraisal report being Railways (TCDD) deter­ ialized container handling be required for container prepared. and Turkish mined equipment for four ports; civil handling and documenta­ Maritime Organi­ (Bank) works; equipment for port main­ tion maintenance and zation (TOI) tenance; technical assistance spares inventory. and training.

State Hydraulic To be Irrigation II - Completion of No decision yet on need Preparation under way. Works; and deter­ ongoing irrigation and on-farm for consultants. Ministry of mined works, and strengthening of Agriculture . (Bank) extension.

To be determined To be Gas-Based Fertilizer - Erection Consultants would be re­ Government has decided to deter­ of ammonia plant plus construc­ quired for implementation use available gas for mined tion of urea unit and pipeline assistance. power generation initial­ (Bank) spur. ly, Further project pro­ cessing postponed until additional gas becomes available.

To be determined To be Agriculture Credit III - Pos­ Consultants for studies Timing dependent upon deter­ sible inclusion of assistance to of credit cooperative progress under Agricul­ mined agricultural credit cooperatives system, financed by Bank tural Credit JI. (Bank) and lines of credit to the Agri­ Project Preparation Fa­ cultural Bank for supervised cility, to be recruited Bank Project Preparation credit, agroindustry loans, and by State Planning Organi­ Facility advance of technical assistance. zation. No decision yet $400,000 approved for on need for consul tan ts consultant services. for project implementa­ tion.

Ministry of To be (R) Agriculture Sector Policy - Fi- Proposed loan expected to Appraisal report being Agriculture; deter- nancing imported agricultural include services of com­ prepared. State Hydraulic mined inputs and investment goods. puterization consultants Works; and (Bank) and consu 1 tan ts for man­ Agricultural agement and organization­ Supply al studies. Organization

Ministry of About (R) Industrial Schools I - Upgrading No decision yet on need Appraisal report being Education 55.0 of industrial secondary educa- for consultants. prepared. (Bank) tion system.

Industrial To be (R) Small and Medium Industries - No decision yet on need Appraisal report being Investment and deter- Subloans for small industry for consultants. prepared. Credit Bank mined development; technical assis- (SYKB) and Halk (Bank) tance to sma 11 industry. Bank

Turkish Electri- To be Power Distribution - Urban dis- Consultants.preparing Project being prepared. city Authority deter- tribution/rehabilitation and ex- distribution master plan (TEK) mined tension. for selected urban areas. (Bank) Consultants would be re­ quired for project imple­ mentation.

See page 1 for footnotes. - 59 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agencyl_/ Lender J/ Consulting Services Action on Procurement 4/

TURKEY (Cont'd)

Cukurova To be Hydropower - Construction of the No decision yet on need Preparation under way. Electric deter­ Sir Dam, and associated Hydro­ for consultants. Company ( CEAS) mined power Plant. (Bank)

State Planning About (R) Cukurova Region Urban Develop­ Consul tan ts required for Bank Project Preparation Organization 10.0 ment Engineering Loan - Prepara­ preparation of fea­ Facility Advance of (SPO) (Bank) tion of feasibility and design sibility studies, en­ $600,000 approved for studies for urban growth gineering studies and feasibility and design management; infrastructure; and bidding documents. studies, and establish­ training. ment of a project coordi­ nation unit. Request for consultancy proposals issued December 1984.

Turkish State To be Railways II - Main line track No decision yet on need Project being prepared. Railways (TCDD) deter­ renewal; modernization of loco­ for consul tan ts. mined motive workshops; signalling and (Bank) telecommunication facility; staff training and technical as­ sistance.

State Hydraulic To be (R) Kayraktepe Hydro Power - Con­ Consultants have prep~red Appraisal mission Works (DSI) deter- struction of dam and 420 mw final project design and scheduled for April. mined power plant on Goksu River. specification. (Bank)

Turkish Electri- To be (N) Transmission IV - Completion of Consultants have prepared Appraisal mission late city Authority deter- national 400 kv grid; technical final project design and January/early February. (TEK) mined assistance to improve system specifications. (Bank) operations and maintenance.

Turkish Electri- To be (N) Elbistan Rehabilitation - Consultants have been Project being prepared. city Authority deter- Completion of Elbistan Power appointed. (TEK) mined Station (4 x 340 mw). (Bank)

YEMEN ARAB REPUBLIC

Ministry of About Wadi Al Jaw£ - Agriculture and Consultants to finalize Appraisal report being Agriculture 10.0 rural development, including ir­ and update designs and prepared. (Co-financing (IDA) rigation, credit, feeder roads, cost estimates are fi­ will be required: Saudi extension and livestock. nanced by IDA Project Fund and Islamic Bank Preparation Facility ad­ have expressed interest.) vance of $355,000. Con­ sultants will be required for studies for possible follow-up project and technical assistance.

Ministry of About (R) Supplemental Credit: Ibb and Consultants will be re­ Revised project design Electricity, 11.0 Dhamar Water Supply and Sewerage quired to supervise con­ and work specifications Water and (IDA) Project; and house connections struction. being reviewed by -Yemen Sewerage in project areas. Authorities. (Co­ financing will be required. Original cofinanciers: Germany, The Netherlands and Arab Fund have expressed interest.)

Ministry of 8.0 (R) Industrial Bank of Yemen (IBY) Retroactive financing of Negotiations subs tan­ Economy and (IDA) II - To strengthen IBY's insti­ up to $100,000 is recom­ tially completed. Industry tutional capacity to promote, mended for consultants' finance and supervise private costs to assist in sub­ industrial projects. The proj­ project identification ect consists of three compon­ and promotion. ents: (a) consultants services and training to improve IBY's capacity to prepare, promote, appraise and supervise indus­ trial projects, and to assist entrepreneurs during their im­ plementation; (b) a pilot com­ ponent for training of indus­ trial managers through overseas short-term and on-the-job train­ ing courses; and (c) a line of credit to IBY to provide part of its foreign exchange resource requirements during the 1985 and 1986 period.

See page 1 for footnotes. - 60 -

Member Country, Amount & and Implementing Probable Stage of PrOcessing and Agency J_/ Lender Y Consulting Services Action on Procurement 4/

YEMEN ARAB REPUBLIC (Cont' d)

Yemen Oil and About (R) Technical Assistance for Petro­ Consultants will be re­ Project scope being re­ Minerals 1'5.0 leum Products Supply Storage and quired to supervise con­ viewed following Govern­ Resources (IDA) Distribution: Receiving facili­ struction management, ment decision to imple­ Corporation ties at Salif Port, white oil prepare manpower planning ment the project in two (YOMINCO) product pipe-line from Salif to and training programs, phases. (Co-financing Baj il, and technical assistance. and other technical as­ will be required: the ,IDA financing to cover technical sistance. Islamic Development Bank, assistance component. Japan, France, Italy, the OPEC Fund and the UK have expressed interest.)

Procurement: The Govern­ ment is in the process of evaluating bids for the construction contract.

Central Planning 4.5 (R) Technical Assistance to the Cen­ Consultants will be re­ Negotiations scheduled Organization (IDA) tral Planning Organization - To quired to provide techni­ for mid-February. (CPO) strengthen the capabilities of cal assistance. the CPO in national economic planning and public investment programming, in project evaluation and monitoring, and in developing and maintaining a national data bank.

Yemen General To be Power IV - Phase III of regional Consultants will be re­ Preparation under way. Electricity deter­ electrification program, includ­ quired for construction (Co-financing will be re­ Corporation mined ing distribution, technical as­ supervision. quired; Islamic Develop­ (YGEC) (IDA) sistance and training. ment Bank and CIDA have expressed interest.)

Ministry of About (R) Southern Uplands Rural Develop­ Preparation assistance Preparation under way. Agriculture 8,1 ment III: Agriculture develop­ being provided by FAO­ (IDA) ment of areas in Southern Up­ CP, Consultants likely lands not covered under SURDP I to be required for proj­ and II. ect management.

Highway To be (N) Highways VI - Rehabilitation of Consultants will be Preparation ~nder way. Authority (HA) deter- Sanaa-Hodeidah Road; technical required to carry out mined assistance to Highway Authority; technical assistance, (IDA) assistance to the construction construction supervision, industry; and pre investment and studies. study,

Ministry of To be (N) Education VII - Technical Consultants will be Preparation under way. Education deter- education and vocational required to provide mined training. technical assistance and (IDA) -training.

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF

Ministry of About Highways IV - Alternatively road Consultants will be re­ Project composition under Construction 4.0 maintenance program or construc­ quired. Scope depends on review. (Co-financing (IDA) tion of Nissab-Beihan road and project composition. will be required,) start up of maintenance program.

Ministry of About (R) Agriculture Research and Exten­ Consultants will be em­ negotiations in progress. Agriculture and 5.0 sion - To strengthen national ployed to help in streng­ Agrarian Reform (IDA) agricultural research and ex­ thening the Department of An IDA Project Prepa­ tension. Research and Extension. ration Facility advance of $100,000 has been ap­ proved to finance the early appointment of the project manager.

Public Corpor- To be (R) Power III - Rehabilitation of Consultants required to Feasibility studies to be ation for Elec- deter- Aden system network. prepare feasibility prepared. tric Power mined study, detailed engineer­ (IDA) ing design, supervise construction management, and other· technical as­ sistance.

Pub lie Water To be Phase II of Greater Aden Water Consultants being em­ Feasibility studies being Corporation deter- Supply project. ployed to prepare feasi­ prepared. mined bility studies, (IDA)

See page 1 for footnotes. - 61 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender?:_/ Consulting Services Action on Procurement!±_/

YUGOSLAVIA

Investiciona 40.0 (R) Montenegro Regional Development Consultants will be re­ Loan signing on January Banka Titograd (Bank) - Regional development primarily quited for financial and 17. (IBT) focusing on primary production management studies of in agriculture and agroindus­ selected social sector tries rehabilitation and moder­ organizations. nization in lees-developed areas of Montenegro.

To be determined About (R) Highways Sector Project - To as­ Consultants will be re­ Negotiations scheduled 100.0 sist financing of construction quired for roads and for February, (Bank) of priority roads including sec­ bridges maintenance tions of the Trans-Yugoslav study. Highway. Total project cost estimated at $300 million, with $106 million in foreign ex­ change.

Privredna Banka About (R) Bosnia Forestry - Development of Consultants will be re­ Negotiations scheduled Sarajevo 40.0 forest roads and nurseries, and quired for review of ge­ for February. (Bank) provision of logging and debark­ netic research program. ing equipment, research equip­ ment, and training.

To be determined About Lonjsko Polje Drainage (Previ­ Consultants will be re­ Awaiting Government deci­ 75.0 ously reported as part of Sava quired for agro-socio­ sion on institutional ar­ (Bank) Drainage II) - Provision of economic study, and rangements, and financing drainage to about 49,-000 ha in review of annual produc­ plan. Croatia. Will include pumping tion plans. stations, on-farm development, construction and farm equipment.

Vojvodjanska 90.0 Fertilizer Sector - Financing Consultants will be re­ Approved by the Executive Banka, Novi Sad (Bank) inputs, raw materials, technical quired for technical and Directors on May a. and energy studies for Yugoslav energy studies of Yugo­ fertilizer industry, including slav fertilizer produ­ incremental fertilizer require­ cers. ments for 1984-85. Total for­ eign exchange costs estimated at $90.0 million.

To be determined About (R) Gas Exploration - Assistance to Consultant services for Negotiations scheduled 100.0 the association of gas indus­ exploration and produc­ for mid-March. (Substan­ (Bank) tries (INA); Naftaplin tion of oil and gas will tial suppliers/ export (Croatia), Naftagas (Vojvodina), be required commencing in credit co-financing and Energo-invest (Bosnia-Herze­ April. likely to be required.) govina) petroleum companies.

To be determined To be (R) Development of lignite mine and To be determined. Pending review of medium­ deter­ related power plant. term investment plans for mined the energy sector, Gov­ (Bank) ernment has decided not to proceed with the project at this time.

To be determined To be (R) Energy Efficiency I - Improve­ To be determined. Documentation for speci­ deter­ ment in energy efficiency in fic projects in the chem­ mined selected enterprises. ical, cement and steel (Bank) subsectors are being prepared.

Bosnia and About (R) Visegrad Hydropower Project - Local consultants already Appraisal report being Herzegovina 100.0 Construction of hydropower dam employed. prepared. (Co-financing Electric Power (Bank) and 300 MW hydropower plant on of about $36 million in Organization Drina river, and related trans­ the form of export/ sup­ mission facilities. pliers' credit required.)

Procurement: General procurement notice of contract packages suit­ able for international tendering published in Development F.orum No. 156, dated August 16, 1984.

To be determined To be Agricultural Input Loan - For­ To be determined. Preparation under way. deter­ eign exchange (working capital) mined for input manufacturing enter­ (Bank) prises and sectoral improve­ ments.

See page 1 for footnotes. - 62 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ ~]:_/ Consulting Services Action on Procurement 4/

YUGOSLAVIA (Cont'd)

Udruzena 10.0 (R) Serbia Regional Development No consultants required. Board presentation sche­ Beogradska Banka (Bank) Project: B-loan. duled for January 29,

To be determined To be Energy Efficiency Credit Line - To be determined. Preparation under way. deter­ Loans to medium-sized industries mined in Bosnia/Macedonia/Slovenia for (Bank) energy conservation investments.

See page l for footnotes. - 63 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency.!/ ~y Consulting Services Action on Procurement 4/

VI. LATIN AMERICA AND CARIBBEAN

ARGENTINA

Ministry of Pub­ Up to (R) Ports I - Improvements to Bahia To be determined. Appraisal report being lic Works and 20.0 Blanca port facilities for grain prepared. Services (Bank) exports. Total project cost estimated at $40 million, of which $20 million in foreign ex­ change.

Ministry of Pub­ Up to (R) Water Supply and Sewerage Engin­ To be determined. Appraisal mission planned lic Works, Min­ 60.0 eering - Technical assistance for February. istry of Hydra­ (Bank) for institutional improvement; ulic Resources, metering unaccounted for water Empresa Provin­ program; and pilot project in cial de Obras the province of Cordoba. Total Sanitarias de project cost estimated at $116 Cordoba (EPSO) million, of which $40 million in foreign exchange.

Yac imientos To be (R) Gas Development - Field develop­ To be determined. Awaiting Government deci­ Petroliferos deter­ ment, gas recycling and techni­ sion on priority of proj­ Fiscales (YPF) mined cal assistance. ect. (Bank)

Belize Electri­ 7 .5 (R) Power I - Generating sets, spare Services required for Appraisal report being city Board (Bank) parts, improvements and expan­ construction and supervi­ prepared. (Possibility sion of distribution syste·m, and sion of works, and for of co-financing with institutional strengthening. studies on future energy Caribbean Development Ban~ is expected to finance sources. Bank and Comnonweal th De­ equipment and materials, engin­ velopment Corporation.) eering studies and training. Total project cost estimated at $14 million of which $11.6 mil­ lion in foreign exchange.

Yacimientos 35.0 Oil and Gas Development - Liq­ To be determined. Appraisal report being Petroliferos (Bank) uids condensate extraction and revised. Fiscales gas recycling at Vuelta Grande Bolivianos gas condensate field and second­ Procurement: (a) Project (YPFB) ary oil recovery at Monteagudo Preparation Facility ad­ oil fields. Total project cost vance of $1 million ap­ estimated at $108.2 million of proved for gas recycling which $85.6 million in foreign simulation study, de­ exchange. tailed design and prepar­ ation of bidding docu­ ments; (b) advance con­ tracting under !CB satis­ factory to Bank for up to $24 is possible.

Project Manage­ 57 .5 (R) Second Health Project - Includes Consultants will be re­ Loan for basic health ment Unit (PMU) (Bank) two sub-projects: a) basic quired for the construc­ care sub-project signed and Federal health sub-project in State of tion and supervision of on December 10. Ministry of Sao Paulo supported by a loan of works; equipment, manage­ Health, Sao $55.5 million; and b) national ment, and health services Procurement: Interna­ Paulo health policy studies, supported organization and evalua­ tional competitive bid­ by a loan of $2.0 million. tion. ding for X-ray machines Total cost of both sub-projects and surgical equipment estimated at $123 .5 million, of for a total of $7 .o mil­ which $24 million in foreign lion. exchange.

Ministry of 12.0 (R) Education VII - Sector loan for Bank/UNDP consultants Negotiations completed. Planning (Bank) science and technology. Total prepared project. Board presentation sched­ project cost estimated at $210 uled for January 29. million, of which $72 million in foreign exchange.

Petroleo 200.0 Gas Pipeline - Construction of To be determined. Awaiting Government de­ Brasileiro (Bank) natural gas pipeline from Santa cision on priority of S .A. (PETRO­ Cruz, Bolivia, to Sao Paulo. project. BRAS)

See page l for footnotes. - 64 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~1./ Lender ]J Consulting Services Action on Procurement 4/

BRAZIL (Cont'd)

Com.panhia de Up to CODEVASF Irrigation - Follow-up To be determined. Project preparation under Desenvolvimento 30.0 irrigation development in the way. do Vale do San (Bank) Northeast (probably in Sao Fran­ Francisco cisco river valley); studies; (CODEVASF) institutional strengthening.

Petrobras Up to Fertilizer/Refinery - Energy To be determined. Further processing and Fertilizantes 100.0 Conservation - Energy conserva­ status of project depend­ S.A. (Bank) tion and plant rationalization ent on au tcome of energy (PETROFERTIL) in the refinery and fertilizer sector review and strate­ sectors. gy definitions presently under way.

Superintendency Up to (R) Rural Development - Northeast To be determined. Negotiations planned for for the so.a Region I - Support of selected February. Development of (Bank) rural development activities in the Northeast the state of Sergipe; regional (SUDENE) coordination and research activ­ ities. Total project cost esti­ mated at $103.8 million, of which $17.0 million in foreign exchange.

Superintendency Up to (R) Rural Development - Northeast To be determined. Negotiations planned for for the 54. 7 Region II - Support of selected February. Development of (Bank) rural development activities in the Northeast the State of Rio Grande do (SUDENE) Norte. Total project cost estimated at $113 million, of which $19 million in foreign exchange.

Superintendency Up to (R) Rural Development - Northeast To be determined. Appraisal report being for the 130.0 Region III - Support of selected prepared. Development of · (Bank) rural development activities in the Northeast the State of Bahia. (SUDENE)

Executive Up to Alcohol and Biomass Energy De­ To be determined. Appraisal report being Secretariat of 150.0 velopment II - Second phase sup­ prepared. the National (Bank) port for measures to improve op­ Alcohol erating efficiency and manage­ Connnission ment of alcohol production in (CENAL) Brazil.

To be determined Up to (R) Containerization Project - Ports To be determined. Feasibility studies to be 100.0 II - Re-development of port ac­ completed by March/April. (Bank) cess facilities; support meas­ ures to improve handling of con­ tainerized and other unitized cargoes.

National 300.0 (R) Development Banking III - Term Consultant has been Negotiations completed. Economic and (Bank) credit for exporters of manufac­ recruited. Board presentation sched­ Social Develop­ tures, for small- and medium­ uled for January 29. ment Bank scale enterprise, and possibly (BNDES) for financial restructuring op­ erations. Total project cost estimated at $970 million, of which $300 million in foreign exchange.

Central Bank of Up to (R) Agricultural Sector II - To No consultants required. Negotiations end-January/ Brazil 350.0 support changes in Government early February. (Bank) agricultural policies.

Central Bank of Up to Agricultural Sector III - To No consultants required. Project preparation to be Brazil 250.0 support changes in Government initiated in conjunction (Bank) agricultural policies as a fol­ with processing of Agri­ low-up to Agricultural Sector cultural Sector II. II.

Banco Nacional Up to Urban Management for Medium To be determined. Project preparation under de Habitacao so.o Cities~ Strengthening of muni­ way. (BNH) (Bank) cipal finance; maintenance and construction of infrastructure supporting economic activities.

See page 1 for footnotes. - 6.5 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj ~];/ Consul ting Services Action on Procurement !±/

BRAZIL (Cont'd)

National Up to (R) Northeast Region Land Tenure Consultants have been re­ Negotiations in mid-Janu­ Institute for 100.0 Improvement - Support of Govern­ cruited. ary. (IDB co-financing Colonization and (Bank) ment land tenure regularization of $30-$50 million pro­ Agrarian Reform and tit ling programs in the posed.) (INCRA) Northeast.

Banco do Brasil Up to Export Development II - Indus­ Consultant has been Project being reassessed. 250.0 trial export development. recruited. (Bank)

Centrais Up to (R) Energy Distribution/Conservation To be determined. Appraisal mission in Jan­ Eletricas 200.0 - Expansion of distribution net­ uary. Brasileiras S. (Bank) works and substitution of energy A. (ELETROBRAS) derived from oil; energy conser­ vation.

Banco Nacional Up to (R) Rural Water Supply and Sewerage PAHO consultant already Appraisal report being de Habitacao 20.0 - Technical assistance and pilot working on other Bank fi­ prepared. (BNH) (Bank) project for rural water supply nanced projects at BNH and sanitation. Total project would be engaged through cost estimated at $37 million of new contract for tech­ which $11 million in foreign ex­ nical assistance: change.

Centrais Up to Rural Electrification II - Elec­ To be determined. Project preparation mis­ Eletricas 150.0 trification in several states. sion dependent on assess­ Brasileiras S.A. (Bank) ment of investment pri­ (ELETROBRAS) orities in the sector.

Superintendency Up to (R) Rubber Development - Investment No consultants required. Appraisal report being for Rubber 60.0 credit, applied research, and prepared. Development (Bank) extension services to assist (SUDHEVEA) about"5,000 farmers plant 60,000 ha of rubber in six Center-South states.

Centrais Up to (R) Power Transmission - Financing No consultants required. Appraisal report being Eletricas 300.0 of priority transmission system prepared. Brasileiras, (Bank) works for FURNAS AND CHESF. S.A. (ELETRO­ BRAS)

Centrais Eletri­ To be (R) Power Sector Financial Rehabili­ No consultants required. Awaiting confirmation cas Brasileiras, deter­ tation - B Loan - Financing of from Government on pend­ S.A. (ELETRO­ mined 1985 slice of power sector in­ ing matters. BRAS) (Bank) vestment program through co-fi­ nancing.

Federal Railways Up to (R) Railway Export Corridor - Reha­ Consultants required for Appraisal report being (RFFSA) 187.0 bilitation and improvement of management development. prepared. (Bank) railway and interm.odal facili­ ties in two major export corri­ dors, and support to measures to improve the federal railways' operations and finances. Total project cost estimated at $405 million of which $246.8 million in foreign exchange.

Ministry of Up to Public Sector Management To be determined. Project preparation under ' Planning 20.0 Strengthening of Government ca­ way. (Bank) pacity for economic and finan­ cial management of the public sector, including state enter­ prise investment.

To be determined Up to (R) Financial Sector - To support To be determined. Reconnaissance mission in 350.0 implementation of broader based January. (Bank) financial sector reform under preparation by Government.

To be determined Up to Livestock Disease Control - Sup­ To be determined. Project preparation under 50.0 port of Government efforts to way with the assistance (Bank) improve livestock disease con­ of the Bank/FAO/CP. trol and production.

See page 1 for footnotes. - 66 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Y Consulting Services Action on Procurement 4/

CENTRAL AMERICA REGIONAL

Central American 65.0 Central American Regional Devel­ To be determined. Project preparation under Bank for (Bank) opment. way. Economic Integration

Ministry of 56.0 (R) Agricultural Services and Credit Consultants will be re­ Loan approved by the Ex­ Agri culture (Bank) - Line of credit to finance on­ quired for agricultural ecutive Directors on De­ farm investments and incremental technical assistance and cember 20 and signed on working capital, technical as- management improvement. December 21. s is tance and agricu 1 tura 1 infor­ mation services. Total project cost estimated at $157 .2 mil­ lion, of which $56.0 million in foreign exchange.

Ministry of 80.0 (R) Public Sector Housing Project. Consultants will be re­ Loan approved by the Ex­ Housing and (Bank) Total project cost estimated at quired for housing se·ctor ecutive ·Di rec tors on De­ Urbanism. $576.6 million, of which $79.8 and mortgage finance cember 20 and signed on million in foreign exchange. studies. December 21.

Procurement: Retro­ active financing for up to 10 percent of the loan amount.

Ministry of Up to Industrial Sector - Financial Consultants with special­ Appraisal mission find­ Finance 100.0 and institutional assistance to ization in financial sys­ ings being reviewed. (Bank) private industrial sector." tem and markets will be required.

Ministry of 11.0 (R) Public Sector Management Techni­ Consultants for project Negotiations in mid-Janu­ Economy (Bank) cal Assistance - Technical as­ preparation have been fi­ ary. sistance to public sector in nanced by UNDP. Consult­ form of studies/institution ants will be required for Procurement: Retroactive building, improvement of statis­ public enterprise manage­ financing will be propos­ tical information, and support ment and export market­ ed for up to $0.5 ll!il­ of Government assistance to ing. lion. small- and medium-sized export­ ers.

Ministry of 160.0 (R) Roads Ill Maintenance - Finan­ Not required. Appraisal mission find­ Pub lie Works (Bank) cing of highway maintenance ings being reviewed. program. (Suppliers' credits of about $20 million to be found.)

Empresa Metro- 40.0 (R) Water and Sewerage - Sewerage, To be determined. Appraisal mission sched­ politana de (Bank) drainage, and water supply de­ uled for February. Obras Sanitarias velopment in Santiago. (EMOS)

Ministry of Up to (R) Small and Medium Industry. Consultant for project Appraisal mission late Finance 30.0 preparation has been January/early February. (Bank) recruited.

COLOMBIA

Banco de la To be (R) Agriculture Credit IV - Agri­ Institutional/Credit con­ Preparation mission Republics deter- culture credit loan to effect sultants will be re­ scheduled for February. mined improvements in credit delivery quired. (Bank) system.

Empresas 15 .o (R) Barranquilla Technical Assise­ To be determined. Awaiting Borrower's ac­ Publicas (Bank) ance and Rehabilitation - Insti­ tion on financial recov­ Municipales De tutional development; Extension ery program prior to ini- Barranquilla of water supply and sewerage fa­ tiation of appraisal. cilities; improvement of solid waste operation and technical assistance.

Empresas Puertas .To be Ports - Rehabilitation of exist­ Consul tan ts required for Appraisal report being de Colombia deter- ing facilities and equipment. technical ·assistance, prepared. ( COLPUERTOS) mined Institution building, technical training and engineering (Bank) assistance and training. services.

See page i for footnotes. - 67 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1J ~l/ Consulting Services Action on Procurement !!J

~(Cont'd)

Interconexion To be Canafisto Hydropower - Construc­ To be determined. Project preparation under Electrics s.A. deter­ tion of 1800 MW hydroelectric way. (ISA) mined facility, including associated (Bank) substations and transmission.

To be determined To be (R) Agricultural Marketing - Improve To be determined. Project likely to be in­ deter­ efficiency of distribution of corporated into Agricul­ mined agricultural products from farm.­ tural Credit IV. (Bank) gate to the consumer.

Instituto de To be Ammonia Urea Fertilizer - Con­ To be determined. Awaiting Government Fomento Indus­ deter­ struction of fertilizer plant dee is ion to proceed. trial (IFI) mined and ancillary facilities. (Bank)

Institute To be (R) Irrigation Rehabilitaion II - Local consultants prepar­ Preparation mission end­ Colombiano de deter­ Rehabilitation of irrigation and ing project. January/early February. Hidrologia, mined drainage districts. Meterologia y (Bank) Adecuacion de Tierras (HIMAT)

Banco de la 90.0 (R) Development Banking - Financing Consultants will be re­ Loan signed on November Repub lica (BR) (Bank) industrial sub-projects through quired for technical as­ 27. Colombian financieras. sistance to the Superin­ tendency of Banks.

Empresas de 129.0 (R) Bogota Water Supply IV - Exten­ Proposals have been re­ Negotiations in January. Acueducio y (Bank) sion of water distribution sys­ viewed from short-listed (Co-financing of $50 mil­ Alcantarillado tem. Total project cost estima­ firms for emergency stor­ lion envisaged). de Bogota ted at $351.0 million of which age. Consultants will be $215 .O million in foreign ex­ required for water loss ProCurement: Preparation change. reduction, urban plan­ of bidding documents for ning, and construction pipe, pumps, tunnel and supervision. pipe installation va\ued at $99 million in pro­ gress.

To be determined To be (R) Agricultural Technology Transfer FAO/CP will provide prep­ Updated project brief deter­ - Project to accelerate diffu­ aration assistance. being prepared. mined sion and adoption of agricultur­ (Bank) al technology.

To be determined To be (R) Health Project - Improvement of To be determined. Appraisal report being deter­ National Health System in selec­ prepared. mined ted geographical areas, includ­ (Bank) ing primary health care, and hospital and equipment mainte­ nance.

ECOPETROL 130.0 (R) Oil Development - Secondary oil Consultant services for Loan signed on'November (Bank) recovery, field development, enhanced oil recovery pi­ 27. pipeline construction, technical lot studies, staff train­ assistance and studies. Total ing, and environmental project cost estimated at $980 policy formulation will million, of which $591 million be required. in foreign exchange.

Fonda Nacional To be (R) Feeder Roads - Cons true tion and Consultants for irriga­ Project preparation under de Caminos deter­ rehabilitation of rural roads; tion canals may be re­ way. Vecinales (FNCV) mined strengthening of road mainten­ quire6. (Bank) ance; technical assistance.

Banco de la 300.0 (R) Trade Policy and Export Diversi­ To be determined. Appraisal report being Republica (Bank) fication - Support of first prepared. phase of trade policy adjust­ ment.

Empresa de 130.0 Power - Participation in 1985- To be determined. Appraisal report being Energia Electri­ (Bank) 1990 Bogota sub-transmission and prepared. ca de Bogota distribution program. (EEEB)

COSTA RICA

Ministry of 80.0 Structural Adjustment Lending. Consultants will be re­ President• s Report being Planning (Bank) quired but exact services prepared. not yet determined.

See page 1 for footnotes. - 68 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender Y Consulting Services Action on Procurement 4/

COSTA RICA (Cont Id) Ministry of 25 .o (R) Atlantico Regional Development To be determined. Project preparation under Agriculture (Bank) (Formerly Agricultural Credit). way.

Central Bank 35.0 (R) Credit to small and medium To be determined. Project preparation under (Bank) enterprises through the Fund for way. Industrial Development (FODEIN) of the Central Bank.

DOMINICAN REPUBLIC

Ministry of 32.5 (R) Road Reconstruction - Road re­ No decision made whether Awaiting policy actions Pub lie Works (Bank) construction and rehabilitation consultants will be re­ by Government. works including maintenance quired. equipment, spare parts, and technical assistance. Total project cost estimated at $42 million, of which $32 million in foreign exchange. Previously reported as Highway Maintenance III.

Instituto 4.9 (R) Vocational Education - Institu­ Consultants will be Awaiting actions by Nacional de (Bank) tional building of principal vo­ required. Government. Formacion cational education institute. Tecnico Total project cost estimated at Profesional $9.6 million, of which $5.1 mil­ (INFOTEP) lion in foreign exchange.

Autoridad 20.0 (R) Third Ports - Improvement of Consultants have been en­ Hydraulic and economic Portuaria de (Bank) port.channel in Guayaquil. gaged. studies necessary for Guayaquil project preparation should be completed by March.

Corporacion Up to Oil exploration promotion, Consultants being selec­ Project preparation under Estatal so.a production and product ted. way. Petrol era (Bank) distribution. Ecuatoriana Bank Project·Preparation (CEPE) Facility advance for $1 million approved to fi­ nance preparatory stud­ ies.

Banco Central Up to (R) Industrial Credit VI - Term fi­ To be determined. Project preparation under 85.o nancing for medium-scale manu­ way. (Bank) facturing and service indus­ tries.

Banco Central 35.0 (R) Small Scale Industry Credit III Consultants have been Appraisal report being (Bank) - Term financing and technical engaged. prepared. assistance for small-scale manu­ facturing and service enter­ prises.

Ministry of 5.0 (R) Public Sector Management - Advi­ Consultants will be re­ Appraisal mission in mid­ Finance; and (Bank) sory services, training and quired. January. Consejo Nacional equipment related to improvement de Desarrollo of public sector management. (CONADE)

Ministry of · Up to (R) To support changes in Agricul­ To be determined. Preparation mission late Agriculture 100.0 ture Sector policies. January/early February. (Bank)

EL SALVADOR

Banco Central Up to Export sector - Provision of To be determined. Post-appraisal mission 40.0 working capital and investment postponed. (Bank) credit for export oriented en­ terprises.

Ministry of Up to (R) Agricultural Rehabilitation and Consultants will be re­ Negotiations end-Janu­ Agriculture 5.0 Crop Diversification - Farm quired for marketing, ary/early February. (IDA) credit, marketing facilities, management, agronomy, and technical assistance. Total agricultural education project cost estimated at $7 .9 and feeder road mainte­ million, of which $5.5 million nance. in foreign exchange.

See page 1 for footnotes. - 69 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y Lender];_/ Consulting Services Action on Procurement ~/

GUATEMALA

Banco Nacional 35.0 Urban Development - National No consultants required. Further preparation work de la Vivienda (Bank) shelter development project. awaiting response of Gov­ ernment on details of project.

Empress Elec­ 36.3 Power V - Distribution expansion No decision made whether Details and timing of trica de Guat­ (Bank) program of EEGSA, subtransmis­ consultants will be re­ project under discussion emala (EEG) and sion expansion and preinvestment quired. with Government• Instituto and training studies for INDE. Nacional de Total project cost estimated at Elect.rificacion $61.8 million of which $36.3 (INDE) million in foreign exchange.

Institute 29.0 Chixoy Power Supplement - Total No consultants required. Post-appraisal under way. Nacional de (Bank) financing needs estimated at $98 Electrificacion million, all of which is foreign (INDE) exchange.

To be determined 35.0 Agricultural Credit. To be determined. FAO/CP sector reconnais­ (Bank) sance mission reports have been received, and are being reviewed.

GUYANA

Demarara Woods 8.8 (N) Forestry - Supplemental finan­ To be determined. Negotiations in January. Ltd. (IDA) cing to complete all aspects of the Upper Demarara Fores try project and for technical as­ sistance.

Ministry of 10.0 (R) Fourth Education and Training - Consultants required for Appraisal report being Education, (IDA) Basic education and vocational/ architectural deSign, vo­ prepared. Presidency and technical education; inservice cational/technical pro­ Social Affairs training in public sector. gram. development, and public sector training.

Ministry of 9.7 Guayape Rural Development II - Consultants will be re­ Appraisal report being Natural (Bank) Credit for small scale farmers; quired for technical as­ prepared. Resources services including, agricultural s is tance, including mar­ extension, marketing, and land keting and credit. titling; and some road improve­ ment. Total project cost about $15 million, including $6 mil­ lion in foreign exchange.

Ministry of Up to Municipal Financial Management - Consultants will be President's Report under Finance; 10.0 Technical Assistance to support required for technical preparation. National (Bank) strengthening of BANMA' s assistance in the areas Autonomous capacity as financial and of municipal financial Municipal Bank technical intermediary for urban management, urban plan­ (BANMA) development and of financial ning and financial and progrananing and management cap­ technical management of acity of selected municipali­ BANMA. ties, and a line of credit to help finance municipal invest­ ments identified and prepared under the project.

Ministry of 9.0 Technical Assistance II - Sup­ Wide range of consultant Appra isa 1 report being Finance (Bank) port of structural adjustment services required. Scope prepared. program. to be determined.

To be determined Up to Sugar Rehabilitation II - Fac­ Needs to be identified Project preparation under 30.0 tory and field rehabilitation to during appraisal. way. (Bank) restore viability of public sugar sector and increase ex­ ports to fill export quotas.

Ministry of 9.0 (R) Population III - Continued Some consulting services Project· preparation under Health (Bank) strengthening of population and or technical assistance way. family planning services. to the Ministry to be identified.

\ See page l for footnotes. - 70 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J.! ~?:.I Consulting Services Action on Procurement !!./

Banco Nacional 25 .o Water Pollution Control - Pilot No decision made whether Project preparation under de Obras y (Bank) program aimed at abating and consultants will be re­ way. Servicios controlling of water pollution quired. Publicos in the Middle Lerma River basin. (BANOBRAS)

Nacional 23.5 Chiapas Rural Roads - Construc­ Consultants may be re­ Further processing depen­ Financiera (Bank) tion, improvement and mainten­ quired to assess rural dent upon confirmation of (NAFINSA) ance of rural roads to support road services and for Government decision on an integrated regional develop­ training. outstanding institutional ment program for the State of financial issues. Chiapas. Total project cost about $46.5 million, of which about $11. 7 million in foreign exchange.

Banco Nacional Up to (R) Railways Sector - Continuation No decision made whether Appraisal report being de Obras y Ser­ 300.0 of modernization efforts by Fer­ consultants will be re­ prepared. (Co-financing vicios Publicos (Bank) rocarriles Nacionales de Mexico quired. being considered.) (BANOBRAS) under previous loans and rail infrastructure improvements by sector.

Nacional Finan­ 100.0 Irrigation Rehabilitation - Re­ No decision ma.de whether Project preparation under c iera (NAFINSA) (Bank) habilitation of existing irriga­ consultants will be re­ way. tion investments. quired.

Nacional Finan­ 107.0 Chiapas Agricultural Development No decision made whether Further processing sub­ ciera (NAFINSA) (Bank) - Drainage and river control for consultants will be re­ ject to confirmation of agricultural production itt sel­ quired. Government decision on ected areas of the state of outstanding institutional Chiapas, coupled with environ­ financial issues. mental protection activities and measures. Total project cost about $215 million, of which $70 million in foreign exchange.

Banco Nacional 100.0 Housing Development - Line of No decision made whether Appraisal report being de Obras y Ser­ (Bank) credit for low income housing consultants will be re­ prepared. vicios Publicos schemes. quired. (BANOBRAS)

Nacional 115.0 (R) Vocational Education - Support One consultant has been Project preparation under Financiers (Bank) for vocational and technical recruited to advise on way. (NAFINSA) training. Total project cost project preparation. estimated at $225.0 million, of which $115.0 million in foreign exchange.

Nacional Up to Agricultural Extension and To be detennined. Project preparation under Financiers 150.0 Research. way. (NAFINSA) (Bank)

Banco Nacional 100.0 Municipal Development - Support No decision made whether Project preparation under de Obras y Ser­ (Bank) to the Government I s national consultants will be re­ way. vicios Pub licos program for improving pub lie quired. (BANOBRAS) sector management policies focused on the strenthening of municipalities; and capital works and technical assistance for Lazaro Cardenas Munici­ pality.

Banco Nacional 150.0 Small Cities and Rural Water - No decision made whether Project preparation under de Obras y Ser­ (Bank) Rehabilitation and expansion of consultants will be re­ way. vicios Pub licos water supply and sewerage sys­ quired. (BANOBRAS) tems in about 30 small cities.

Banco Nacional 20.0 Solid Waste Pilot Project - Consultants will be re­ Project preparation under de Obras (Bank) Technical assistance and engin­ quired for feasibility way. Servicios eering project to assist Govern­ studies and pi lot work. Publicos ment to define policies, provide (BANOBRAS) training, strengthen institu­ tions, and undertake studies in the subsector. Project will finance pilot works in five cities.

Nacional 120.0 (R) Small and Medium Mining 11. Consultants have been Appraisal report being Financiers (Bank) recruited. prepared. (NAFINSA).

See page 1 for footnotes. - 71 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }J Lender?:/ Consulting Services Action on Procurement .ii

NICARAGUA

Fondo Up to (R) Line of credit for agriculture - To be determined. Further processing de­ Nicaraguense de 15.0 Total project cost estimated at pends on the development Inversiones (Bank) $30.0 million of which about of a Bank assistance (FNI) $8.0 million in foreign ex­ strategy. change.

Instituto de 40.1 (R) Power VII - Fortuna Stage II. Consultants will be re­ Negotiations postponed Recursos (Bank) Elevation of the Fortuna dam, to quired for pre-feasibi­ upon request of Govern­ Hidraulicos y increase firm generation. Total lity studies· for medium ment. (co-financing will Electrificacion project cost estimated at $79 size hydro project. be required.) (IRHE) million of which $51 million in foreign exchange. Procurement: Single civil works contract to be awarded among prequal­ ified contractors. Bid­ ding documents are being prepared.

Ministry of 40.0 (R) Agricultural Development Alto Consultants for project Project preparation under Agriculture (Bank) Parana - Agricultural extension, preparation contracted way. credit, research, health facili­ under Second Pre-Invest­ ties, and rural roads in South­ ment Loan. eastern Paraguay.

Ministry of 14.0 Education V - Basic education To be determined. Project preparation under Education (Bank) for development and fronti"er way. zones, including improvements in the ~anagement of the education system.

Municipality of 20.0 Asuncion Municipal Development - Limited consultant Appraisal report bei~g Asuncion (Bank) Strengthening of city management services for project prepared. and planning; improvement of execution will be services in transportation, required. Bank Project Preparation waste management and food mar­ Facility (PPf) advance of keting; and to initiate urban $500,000 approved for upgrading. Total project cost preparation works; retro­ estimated at $40.6 million, of active financing of PPF which $20.8 million in foreign advance of $500,000 to be exchange. recounnended.

Ministry of 20.0 (R) Rural Roads - Civil works and Consultants will be re­ Appraisal report being Pub lie Works and (Bank) related supervision to upgrade quired for supervision of prepared. (Co-financing Communications and maintain 1,350 km of feeder road improvement works, being sought.) roads and have about 2,500 km road and equipment man­ under maintenance in productive a'.gemen t, and engineering areas of Eastern Paraguay. designs.

Ministry of 27 .o Education II - Primary education Consultants will be re­ Loan approved by the Ex­ Education (Bank) in urban and rural areas includ­ quired for management, ecutive Directors on July ing schoolroom construction, curriculum and textbook 10. textbook production and manage­ production. ment improvements. Total proj­ ect cost estimated at $46. 7 mil­ lion of which $9.0 million in foreign exchange.

Yuncan S.A. 140.0 Power VII - 126 MW Yuncan Hydro­ Consultants required for Post-appraisal mission to (Bank) electric plant. Total project engineering and super­ be scheduled. cost estimated at $497 million, vis ion. of which $285 million in foreign exchange.

Servicio Up to Provision of technical assist­ Consultants would be re­ Project being prepared, Nacional de 20.0 ance for institution building. quired for management of Abastecimiento (Bank) Water supply and sewerage in water systems. de Agua Po tab le several secondary-sized cities y Alcantarillado and towns with special emphasis (SENAPA) on rehabilitation, and technical assistance.

See page 1 · for footnotes. - 72 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )J Lender]/ Consulting Services Action on Procurement !!f

PERU (Cont I d)

Ministry of Up to Irrigation Rehabilitation III - Not dee ided. Project preparation under Agriculture 60.0 Rehabilitation of drainage and way. (Bank) irrigation systems in up to eight coastal valleys. Bank Project Preparation Facility advance of $500,000 approved to fi­ nance aerial mapping for pre-feasibility study.

To be determined To be Sugar Rehabilitation - Rehabili­ Not decided. Bank Project Preparation deter­ tation and improvement of man­ Facility advance of mined agement for sugar cooperatives. $500,000 to finance (Bank) feasiblity study.

Empresa Nacional 82.5 Metropolitan Development - Im­ Consultants will be re­ Approved by the Executive de Mercados (Bank) provement of Lima's urban trans­ quired in urban planning, Directors on June 21. Mayoritarios; port system, markets, solid financial management, and Municipali­ waste management, and related road engineering, pro­ Procurement: Up to $1.l dad de Lima institutional development. Total curement and wholesale million to cover final Metropolitans project cost estimated at $135.9 marketing. design, technical assis­ million, of which $75.2 million tance and some equipment in foreign exchange. expenses incurred during 1984 will be financed retroactively.

To be determined 100.0 Industrial Credit III - Credit To be determined. Project preparation under (Bank) to finance industry, tourism and way. agro-induetry sub-projects.

Ministry of Up to Public Sector Management II - To be determined. Project being prepared. Finance 15,0 Unidentified. (Bank)

PETRO PERU 60.0 (R) Petroleum III - Increase oil To be determined. Appraisal mission late (Bank) production through secondary re­ January/early February. covery; exploration promotion for private companies; and tech­ nical assistance.

To be determined 3.5 Energy Conservation - Establish­ Consultants will be re­ Appraisal report being (Bank) ment of national energy ration­ quired to assist with prepared. alization center to do energy energy audits and train­ audits and carry out other ing. energy saving activities.

To be determined 6.0 (N) Power Engineering - Institution­ Consultant will be re­ Appraisal mission late (Bank) al strengthening of regional quired to assist with January/early February. utilities, and evaluation of re­ studies. habilitation and development needs.

ST. LUCIA

To be determined Up to (R) Industrial Development - Credit To be determined. Project preparation under 5.0 project through commercial bank­ way. (IDA) ing system to benefit industry and tourism development.

Administracion 55.0 (R) Power - Rehabilitation of G. To be determined. Project preparation to Nacional de (Bank) Terra hydro-plant, continue; preparation Usinas y mission scheduled for Transmisiones March. Electricas (UTE)

Obras Sanitarias 9.0 (R) Water Supply Engineering - Tech­ No decision on consult­ Awaiting Government deci­ del Estado (Bank) nical assistance and studies, ants. sion on project priority. and related equipment and works.

Administracion 4.0 (R) Power Engineering Loan - Engin­ Consultant services will Board presentation on Nacional de (Bank) eering studies for rehabilita­ be required for all stud­ January 8. Usinss y tion of G. Terra hydroplant, ies. Consultants have Transmisiones distributi·on system planning and been recruited for G. Electricae (UTE) operation methodology and train­ Terra Study. ing program for managerial lev­ els. Project will also include purchase of electric meters. Total project cost estimated at $5,0 million, of which $4.0 mil­ lion in foreign exchange.

See page l for footnotes. - 73 -

Amount & Member Probable Country ~ Consulting Services Stage of Processing

VII. NEW PROJECTS ADDED IN THIS ISSUE

EASTERN AND SOUTHERN AFRICA

BOTSWANA About Education IV - Total project cost to No decision made on ex­ Project preparation under 20.0 be determined. tent of consultant ser­ way. (Bank) vices required.

ETHIOPIA About Drought Emergency - Fertilizer and Consultants will be re­ Appra isa 1 report being 25.0 other emergency support--resuscita­ quired. prepared. (IDA) ting drought stricken areas.

KENYA 6.0 Public Sector Management Assistance Previously engaged con­ Appraisal mission sched­ (IDA) - Phase II of agriculture technical sul tan ts expected to uled for May. assistance. continue.

About Education VI - Primary teachers and Consultants will be Project under prepara­ 30.0 university staff training; agricul­ needed for education tion. (Bank) tural training; secondary curriculum planning, teacher train­ 34.0 development. ing, management methods (IDA) and resource m~bilization and use.

MOZAMBIQUE About Emergency Rehabilitation. Consultants may be re­ Appraisal mission sched­ 45.0 quired for procurement uled for early February. (iDA) and for project manage­ (Co-financing with other ment. agencies being explored.)

SOMALIA About Agricultural Inputs 1 - Provision of To be determined. Project preparation under 10.0 agricultural inputs to support" crop way. (IDA) production.

TANZANIA 22.0 Power Rehabilitation - Rehabilita­ No decision made whether Project being prepared. (IDA) tion of power system, training, and consultants will be re­ technical assistance. quired.

35.0 Industrial Rehabilitation - Indus­ No consultants required. Project being prepared. (IDA) trial Rehabilitation through lines of credit to Tanzania Investment Bank, Tanganyika Development Finance Ltd. and National Bank of Commerce.

20.0 Agricultural Research and Extension No decision made whether Project being prepared. (IDA) - Strengthening national agricultur­ consultants will be re­ al research service. quired.

UGANDA 10.0 Telecommunications II - Continuation Consultants will be re­ Project preparation under (IDA) of rehabilitation program in posts quired. way. and telecommunications sector.

27.0 Transport - Comprehensive rehabili­ Consultants will be re­ Project preparation under (IDA) tation program for transport sector quired. way. including road maintenance and in­ stitutional assistance for railway administration. ·

28.0 Sugar Rehabilitation - Rehabilita­ Consultants will be re­ Project preparation under (IDA) tion of Kakira and/ or Kinyala sugar quired. (Already con­ way. sChemes. tracted).

ZAMBIA About Refinery Conversion - Conversion of Consultants will be re­ Preparation mission 10.0 Indeni refinery by adding mild hy­ quired, but terms of ref­ scheduled for February. (IDA) drocracker to allow increased pro­ erence still not fully (Co-financing being ex­ duction of middle distillates. defined. plored.)

WESTERN AFRICA

IVORY COAST so.o Highway Sector II - Construction and To be determined. Appraisal mission sched­ (Bank) strengthening of bitumen and gravel uled ·for February. roads; rehabilitation of feeder roads; road maintenance program; and technical assistance and studies. - 74 -

Amount & Meml>er Probable Country Lender Consulting Services Stage of Processing

EAST ASIA AND PACIFIC

MALAYSIA s.o Sabah Forestry (Technical Assist­ Consultants will be re­ Appraisal report being (Bank) ance) - Pilot forestry project in quired for feasibility prepared. the Bengkoka area; and a aeries of studies in transport, studies for a forestry development marketing, natural forest program in the State of Sabah. management and industrial processing,

WESTERN SAMOA 2.0 Line of Credit to Development Bank To be determine'd. · Appraisal report being (IDA) of Western Samoa (DBWS) to finance prepared. (ADB is lead foreign exchange costs of subproj­ co-financing agency.) ect&. Technical assistance from ADB and UNDP to conduct an industrial sector survey and improve DBWS' e institutional capabilities.

PAKISTAN 50.0 Power Generation (Qasim). Consultants wiil be re­ Project identification (Bank) quired. under way.

130.0 Sector Loan (Industry). No consultants required. Project identification (Bank) under way.

EUROPE, MIDDLE EAST AND NORTH AFRICA

EGYPT, ARAB REPUBLIC OF 56.0 Solid Waste Project - Provision of Consultants for prepara­ Project under preparation (Bank) equipment, composting and incin~ra­ tion are being appointed. by JHP. ting plants and studies to suppOrt Additional consultants solid waste management in five will be required for var­ cities. ious studies.

MOROCCO 200.0 Financial Industrial Trade Adjust­ To be determined. Appraisal mission tenta­ (Bank) ment - Programs of reforms in finan­ tively scheduled for Feb­ cial and trade sectors. ruary.

To be Education Sector - Support for poli­ To be determined. Appraisal mission tenta­ deter­ cy reforms to promote basic educa­ tively scheduled for mined tion and increase the efficiency of April. (Bank) the education system at all levels.

To be Agriculture Sector - Policy reforms To be determined. Appraisal mission tenta­ deter­ to improve investment planning in tively scheduled for Feb­ mined agriculture. ruary. (Bank)

About Large Irrigation Improvement - Im­ To be determined. Appraisal mission tenta­ 45.0 provement of operation, maintenance tively scheduled for (Bank) and agricultural production in April. large-scale irrigation areas and re­ form of public sector enterprises involved.

25.0 Land Use Planning - Land consoli­ To be determined. Appraisal mission tenta­ (Bank) dation, cadastral survey and land tively scheduled for No­ registration. vember.

TURKEY To be Transmission IV - Completion of Consultants have prepared· Appraisal mission late deter­ national 400 kv grid; technical final project design and January/early February. mined assistance to improve system op­ specifications. (Bank) erations and maintenance.

To be Elbietan Rehabilitation - Completion Consultants have been ap­ Project being prepared. deter­ of Elbietan Power Station (4 x 340 pointed. mined mw). (Bank)

YEMEN ARAB To be Highways VI - Rehabilitation of Consultants will be re­ Preparation under way. REPUBLIC deter­ Sanaa-Hodeidah Road; technical as­ quired to carry out tech­ mined sistance to Highway Authority; as­ nical assistance, con­ (IDA) sistance to the construction indus­ struction supervision, try; and preinvestment study. and studies. - 7S -

Amount 15, Member Probable Country Lender Consulting Services Stage of Processing

EUROPE, MIDDLE EAST AND NORTH AFRICA (Cont'd)

YEMEN ARAB To be Education VII - Technical education Consultants will be re­ Preparation under way. REPUBLIC (Cont I d) deter­ and vocational training. quited to provide techni­ mined cal assistance and train­ (IDA) ing.

LATIN AMERICA AND CARIBBEAN

GUYANA 8.8 Forestry - Supplemental financing to To be determined. Negotiations in January. (IDA) complete all aspects of the Upper Demarara Forestry project and for technical assistance.

PERU 6.0 Power Engineering - Institutional Consultant will be re­ Appraisal mission late (Bank) strengthening of regional utilities, quired to assist with January/early February. and evaluation of rehabilitation and studies. development needs.