Minister of Transportation and Infrastructure Notice

Total Page:16

File Type:pdf, Size:1020Kb

Minister of Transportation and Infrastructure Notice MINISTER OF TRANSPORTATION AND INFRASTRUCTURE NOTICE OF EXEMPTIONS PURSUANT TO SECTION 22 OF THE RAILWAY SAFETY ACT (CANADA) AS ADOPTED BY THE RAILWAY SAFETY ADOPTED PROVISIONS REGULATION B.C. REG. 210/2004 (M161/2004) (“RSA”) Pursuant to Section 22(2) of the Railway Safety Act (RSA) the Minister of Transportation and Infrastructure may, by notice, on any terms and conditions specified in the notice, exempt • a specified railway company, specified railway equipment or specified railway work from the application of a specified provision of regulations in respect of matters referred to in section 18(1) or (2.1) or of the rules in force under section 19 or 20 or • a specified person from the application of a specified provision of regulations in respect of matters referred to in section 18(2) if in the opinion of the Minister the exemption is in the public interest and is not likely to threaten safe railway operations. On March 11, 2020 the World Health Organization declared a pandemic outbreak of novel coronavirus (COVID – 19). On March 16, 2020 the Provincial Health Officer issued the Order of the Provincial Health Officer “Class Order (mass gatherings) re COVID -19. By cover letters dated March 20, 2020, the Director General, Railway Safety, on authority of the Minister of Transport, issued Notice of Exemption X-20 – 04 and Notice of Exemption X – 20 – 03, each dated March 20, 2020, in respect of the railway companies listed in each Notice (the “Federal Exemption Notices”). By letter dated April 2, 2020 Technical Safety BC advised me that Technical Safety BC (“TSBC”) supports the approach illustrated in the Federal Exemption Notices as further detailed in the TSBC letter. EXEMPTIONS Having taken the foregoing into consideration, I am of the opinion that exemptions, on an interim basis, from the application of the specified provisions of the following rules and regulations referenced in paragraphs 1 through to and including 3, below in this Notice, on the specified terms and conditions, set out in paragraphs A and B, are in the public interest and are not likely to threaten safe railway operations. THEREFORE, I hereby provide notice that: 1. each railway company, as defined in the Railway Safety Act S.BC.C 2004, c.8, holding an operating permit issued under section 11 of the Railway Safety Act (BC) including the railway companies listed in Appendix “A” to this Notice (collectively, the “Railway Companies”) are exempted from the application of the following specified provisions of the following listed rules and regulations: a. Section 10(1) of the Railway Employee Qualification Standards Regulations, Railway Safety Act Ministerial Notice of Exemptions b. That part of Paragraph 7.1 c) of the Rules Respecting Track Safety requiring that “Recertification must be completed at intervals not exceeding three years.”, c. Paragraph 7.3 d) of the Rules Respecting Track Safety, and d. save and except for the British Columbia Rapid Transit Company and Intransit BC Limited Partnership, Part A (vii) of the General Rules, of the Canadian Rail Operating Rules, and I hereby provide further notice that: 2. British Columbia Rapid Transit Company is exempted from the application of Section 2.4.1 of the SkyTrain Rule Book; and 3. Intransit BC Limited Partnership is exempted from the application of Section 4.1.1(e) of the Canada Line Rail Operating Rules, all, subject to the following terms and conditions: A. that each of the Railway Companies, British Columbia Rapid Transit Company and Intransit BC Limited Partnership, shall keep records of any person whose qualification period has been extended subject to and in accordance with this Notice, and B. that the exemptions set out in this Notice do not remove or qualify the obligation on the part of each of the Railway Companies, British Columbia Rapid Transit Company and Intransit BC Limited Partnership to ensure that persons have the necessary knowledge to safely undertake their duties. The exemptions set out in this Notice will be in effect until the earlier of November 1, 2020 or the effective date of a further notice by the Minister of Transportation and Infrastructure that these exemptions are revoked. THIS NOTICE is dated as of April 22, 2020. ____________________________ The Honourable Claire Trevena Minister of Transportation and Infrastructure 2 | P a g e Railway Safety Act Ministerial Notice of Exemptions APPENDIX “A” to Ministerial Railway Safety Act Exemptions Notice 1. A.B.C. Recycling (North) Ltd., Fort St. John 2. A.B.C. Recycling (North) Ltd., Prince George 3. A.B.C. Recycling (North) Ltd., Terrace 4. A.B.C. Recycling Ltd., Burnaby 5. A.B.C. Recycling Ltd., Surrey 6. A.J. Forsyth, Delta 7. A.J. Forsyth, Prince George 8. Agro Source Ltd. 9. Altagas Processing Partnership (North Pine Facility) 10. Apollo Forest Products Ltd. 11. Arrow Transportation Systems Inc. 12. Ashcroft Terminal Ltd 13. Babine Forest Products Limited 14. BCR Properties Ltd. 15. Billabong Road and Bridge 16. Billabong Road and Bridge 17. Blue Water Rail Services Limited Partnership 18. Brink Forest Products Ltd. 19. British Columbia Forest Museum 20. British Columbia Institute of Technology - BCIT Training Railway 21. CalPortland Canada Ltd. 22. Cameron River Logistics Inc. 23. Cando Rail Services (BC) Ltd. 24. Canfor Energy North Limited Partnership (Pacific Bio) - Chetwynd Operation 25. Canfor Energy North Limited Partnership (Pacific Bio) Fort St John Operation 26. Canfor Ltd., Canal Flats Div. 27. Canfor Ltd., Chetwynd 28. Canfor Ltd., Houston Sml Div 29. Canfor Ltd., Isle Pierre 30. Canfor Ltd., Plateau 31. Canfor Ltd., Pr George Saw Mill 32. Canfor Pulp LP - Northwood Mill 33. Canfor Pulp LP - Prince George Pulp & Paper Mills 34. Canfor Pulp LP - Taylor Pulp 35. Canron 36. Cariboo Central Railroad Contracting Ltd. 37. Carrier Lumber Ltd. 38. Catalyst Paper Corporation, Crofton Div. 39. Catalyst Paper Corporation, Powell R. Div. 40. Central Fraser Valley Transload & Sales Ltd. 3 | P a g e Railway Safety Act Ministerial Notice of Exemptions 41. Central Salvage Ltd (Kamloops) 42. Certainteed Gypsum Canada Inc. 43. CertainTeed Gypsum Canada Ltd - Invermere 44. Chemtrade Chemicals Canada Ltd. 45. Chemtrade Electrochem Ltd. 46. Chemtrade Pulp Chemicals 47. Chemtrade West GP Inc. 48. Chetwynd Mechanical Pulp 49. Christina Lake Reload 50. CIPA 51. Coast 2000 Terminals Ltd. 52. Conifex Inc. - Fort St. James 53. Conifex Inc. - Mackenzie Forest Products Inc. 54. Conuma Coal Resources - Willow Creek 55. Conuma Coal Resources - Wolverine Coal 56. Crop Production Services (Canada) Inc. 57. Decker Lake Lumber, Hampton Affiliates 58. Domtar Pulp & Paper Products Inc. 59. Downtown Historic Railway 60. Dunkley Lumber Ltd. 61. Dunkley Lumber Ltd. - Mackenzie Operation 62. Duz Cho Logging 63. Energetic Logistics Services Ltd 64. Enersul LP 65. ERCO Worldwide 66. Euro Asia Transload Inc. 67. Evergreen Line 68. Falcon Contracting Ltd. 69. Fort Steele Historical Park 70. Fraser - Fort George Museum Society 71. Fraser Valley Heritage Railway Society 72. Gibraltar Mines Ltd. 73. Gilbertson & Page (Canada) Inc. - (BSG) 74. Global Agricultural Trans-Loading 75. Goodrich Terminal 76. Grand Forks Railway Co. 77. Graymont Western Canada Inc. 78. HCA Mountain Minerals (Moberly) Ltd 79. Howe Sound Pulp & Paper Corporation 80. Interfor 81. International Raw Materials Ltd. 82. Intransit BC Limited Partnership - Canada Line 83. Kamloops Heritage Railway 84. Kettle Valley Steam Railway 85. Koppers Ashcroft Inc. 86. Lafarge Canada Inc., Castlegar 4 | P a g e Railway Safety Act Ministerial Notice of Exemptions 87. Lafarge Canada Inc., Fort St John 88. Lafarge Canada Inc., Kamloops 89. Lafarge Canada Inc., Richmond 90. Lakeland Mills Ltd. 91. Lakes District Maintenance Inc. 92. Lakeside Reload 93. LaPrairie Works Oilfields Services Inc. 94. Lavington Pellet Limited Partnership 95. Lehigh Hanson Materials Limited - Delta 96. Lehigh Hanson Materials Limited - Ft St John 97. Lehigh Northwest Cement Limited, Dan Gamache Trucking 98. Lhoist North America 99. LNG Canada Development Inc. 100. Louis Dreyfus Canada 101. Louisiana Pacific Canada Ltd. 102. LP Peace Valley 103. Mackenzie Pulp Mill Corporation 104. Mercer Celgar LP, Castlegar 105. Mitsui Homes Canada 106. Moly-Cop Canada 107. Nanaimo Forest Products Ltd - Harmac Pacific 108. Nechako Lumber 109. Nechako Northcoast Construction 110. Nelson and Fort Sheppard Railway 111. Nelson Electric Tramway Society 112. Neucel Specialty Cellulose Ltd. 113. North Coast Reload 114. North Thompson Rail Terminals Inc. 115. Northern Engineer Wood Products (NewPro) 116. Olympia Transportation Ltd. 117. Pacific Abrasives and Supply Inc. 118. Pacific Bio Energy Corporation 119. Parrish & Heimbecker Limited, Cloverdale 120. Peace Country Petroleum Sales Ltd., Fort Nelson 121. Peace Country Petroleum, Dawson Creek 122. Peace River Coal Inc. 123. Pembina Prince Rupert 124. Pembina, Younger Plant 125. Pinnacle Renewable Energy Armstrong 126. Pinnacle Renewable Energy Burns Lake 127. Pinnacle Renewable Energy Houston 128. Pinnacle Renewable Energy Meadowbank 129. Pinnacle Renewable Energy Williams Lake 130. Preferred Sands of Canada, Fort Nelson 131. Premium Pellet Ltd. 132. Prince George Railway & Forest Museum 5 | P a g e Railway Safety Act Ministerial Notice of Exemptions 133. Progressive Ventures 134. Progressive Ventures Group 135. Reagle Terminals Inc 136. Richmond Steel Recycling Limited (Fort St. John) 137. Richmond Steel Recycling Limited (Kamloops) 138. Richmond Steel Recycling Limited (Prince George) 139. Rio Tinto Alcan Inc. 140. Royal Group Inc. 141. Savona Specialty Plywood Co. Ltd. 142. Schlumberger 143. Skeena Sawmill 144. Skookumchuck Pulp Inc 145. SkyTrain (British Columbia Rapid Transit) 146. Smithers Pellet Inc. 147. Source Energy Services 148. Source Energy Services Canadian Logistics LP GP LTD. - Fort Nelson II 149. Source Energy Services, Chetwynd 150. Southern Railway of BC 151. Southern Railway of Vanc. Island 152. SSAB 153. Stella-Jones Inc. New Westminster 154. Stella-Jones Inc. Prince George 155. Sullivan Mine & Railway Historical Society 156. Supreme Animal Nutrition Inc. 157. Teck Coal Limited - Coal Mountain 158. Teck Coal Limited - Elkview 159.
Recommended publications
  • Reporting Marks
    Lettres d'appellation / Reporting Marks AA Ann Arbor Railroad AALX Advanced Aromatics LP AAMX ACFA Arrendadora de Carros de Ferrocarril S.A. AAPV American Association of Private RR Car Owners Inc. AAR Association of American Railroads AATX Ampacet Corporation AB Akron and Barberton Cluster Railway Company ABB Akron and Barberton Belt Railroad Company ABBX Abbott Labs ABIX Anheuser-Busch Incorporated ABL Alameda Belt Line ABOX TTX Company ABRX AB Rail Investments Incorporated ABWX Asea Brown Boveri Incorporated AC Algoma Central Railway Incorporated ACAX Honeywell International Incorporated ACBL American Commercial Barge Lines ACCX Consolidation Coal Company ACDX Honeywell International Incorporated ACEX Ace Cogeneration Company ACFX General Electric Rail Services Corporation ACGX Suburban Propane LP ACHX American Cyanamid Company ACIS Algoma Central Railway Incorporated ACIX Great Lakes Chemical Corporation ACJR Ashtabula Carson Jefferson Railroad Company ACJU American Coastal Lines Joint Venture Incorporated ACL CSX Transportation Incorporated ACLU Atlantic Container Line Limited ACLX American Car Line Company ACMX Voith Hydro Incorporated ACNU AKZO Chemie B V ACOU Associated Octel Company Limited ACPX Amoco Oil Company ACPZ American Concrete Products Company ACRX American Chrome and Chemicals Incorporated ACSU Atlantic Cargo Services AB ACSX Honeywell International Incorporated ACSZ American Carrier Equipment ACTU Associated Container Transport (Australia) Limited ACTX Honeywell International Incorporated ACUU Acugreen Limited ACWR
    [Show full text]
  • March 2007 News.Pub
    WCRA NEWS MARCH 2007 AGM FEB. 27, 2007 WESTERN RAILS SHOW MARCH 18, 2007 WCRA News, Page 2 ANNUAL GENERAL MEETING NOTICE Notice is given that the Annual General Meeting of the West Coast Railway Association will be held on Tuesday, February 27 at 1930 hours at Rainbow Creek Station. The February General Meeting of the WCRA will be held at Rainbow Creek Station in Confederation Park in Burnaby following the AGM. ON THE COVER Drake Street Roundhouse, Vancouver—taken November 1981 by Micah Gampe, and donated to the 374 Pavilion by Roundhouse Dental. Visible from left to right are British Columbia power car Prince George, Steam locomotive #1077 Herb Hawkins, Royal Hudson #2860’s tender, and CP Rail S-2 #7042 coming onto the turntable. In 1981, the roundhouse will soon be vacated by the railway, and the Provincial collection will move to BC Rail at North Vancouver. The Roundhouse will become a feature pavilion at Expo 86, and then be developed into today’s Roundhouse Community Centre and 374 Pavilion. Thanks to Len Brown for facilitating the donation of the picture to the Pavilion. MARCH CALENDAR • West Coast Railway Heritage Park Open daily 1000 through 1700k • Wednesday, March 7—deadline for items for the April 2007 WCRA News • Saturday, March 17 through Sunday, March 25—Spring Break Week celebrations at the Heritage Park, 1000—1700 daily • Tuesday, March 20—Tours Committee Meeting • Tuesday, March 27, 2007—WCRA General Meeting, Rainbow Creek Station in Confederation Park, Burnaby, 1930 hours. The West Coast Railway Association is an historical group dedicated to the preservation of British Columbia railway history.
    [Show full text]
  • No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx
    2020 No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx Top100 Projects 2020 One Man Changes the Face of 2020’s Top 10 Top100 Projects — 2020 f not for one individual, this year’s Top100 may have looked An annual report inserted in familiar. ReNew Canada’s I When this year’s research process began, there was little change within this year’s Top 10, as many of the nation’s January/February 2020 issue megaprojects were still in progress. Significant progress has been made on all of the projects we saw grace the Top 10 in our report last year, but completion dates extend beyond the end of the MANAGING Andrew Macklin 2019 calendar year. EDITOR [email protected] Enter Matt Clark, Metrolinx’s Chief Capital Officer, who took GROUP over the position from Peter Zuk. You see, when Zuk was in charge Todd Latham PUBLISHER of publicly expressing capital budgets, particularly in the context of the GO Expansion project, he had done so by breaking down PUBLISHER Nick Krukowski the $13.5 billion spend by corridor. That breakdown led to the full expansion represented by as many as nine projects in the content ART DIRECTOR AND Donna Endacott SENIORDESIGN of the Top100. Clark does it differently. In the quarterly reports made public ASSOCIATE following Metrolinx board meetings, the capital projects for the Simran Chattha EDITOR GO Expansion are broken down into three allotments (on corridor, off corridor, and early works). The result? Six less GO Expansion CONTENT AND MARKETING Todd Westcott projects in the Top100, but two new projects in our Top 10 MANAGER including a new number one.
    [Show full text]
  • CP's North American Rail
    2020_CP_NetworkMap_Large_Front_1.6_Final_LowRes.pdf 1 6/5/2020 8:24:47 AM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Lake CP Railway Mileage Between Cities Rail Industry Index Legend Athabasca AGR Alabama & Gulf Coast Railway ETR Essex Terminal Railway MNRR Minnesota Commercial Railway TCWR Twin Cities & Western Railroad CP Average scale y y y a AMTK Amtrak EXO EXO MRL Montana Rail Link Inc TPLC Toronto Port Lands Company t t y i i er e C on C r v APD Albany Port Railroad FEC Florida East Coast Railway NBR Northern & Bergen Railroad TPW Toledo, Peoria & Western Railway t oon y o ork éal t y t r 0 100 200 300 km r er Y a n t APM Montreal Port Authority FLR Fife Lake Railway NBSR New Brunswick Southern Railway TRR Torch River Rail CP trackage, haulage and commercial rights oit ago r k tland c ding on xico w r r r uébec innipeg Fort Nelson é APNC Appanoose County Community Railroad FMR Forty Mile Railroad NCR Nipissing Central Railway UP Union Pacic e ansas hi alga ancou egina as o dmon hunder B o o Q Det E F K M Minneapolis Mon Mont N Alba Buffalo C C P R Saint John S T T V W APR Alberta Prairie Railway Excursions GEXR Goderich-Exeter Railway NECR New England Central Railroad VAEX Vale Railway CP principal shortline connections Albany 689 2622 1092 792 2636 2702 1574 3518 1517 2965 234 147 3528 412 2150 691 2272 1373 552 3253 1792 BCR The British Columbia Railway Company GFR Grand Forks Railway NJT New Jersey Transit Rail Operations VIA Via Rail A BCRY Barrie-Collingwood Railway GJR Guelph Junction Railway NLR Northern Light Rail VTR
    [Show full text]
  • Stronger Ties: a Shared Commitment to Railway Safety
    STRONGER TIES: A S H A R E D C O M M I T M E N T TO RAILWAY SAFETY Review of the Railway Safety Act November 2007 Published by Railway Safety Act Review Secretariat Ottawa, Canada K1A 0N5 This report is available at: www.tc.gc.ca/tcss/RSA_Review-Examen_LSF Funding for this publication was provided by Transport Canada. The opinions expressed are those of the authors and do not necessarily reflect the views of the Department. ISBN 978-0-662-05408-5 Catalogue No. T33-16/2008 © Her Majesty the Queen in Right of Canada, represented by the Minister of Transport, 2007 This material may be freely reproduced for non-commercial purposes provided that the source is acknowledged. Photo Credits: Chapters 1-10: Transport Canada; Appendix B: CP Images TABLE OF CONTENTS 1. INTRODUCTION ...............................................................1 1.1 Rationale for the 2006 Railway Safety Act Review . .2 1.2 Scope . 2 1.3 Process ....................................................................................3 1.3.1 Stakeholder Consultations . .4 1.3.2 Research . 6 1.3.3 Development of Recommendations .......................................6 1.4 Key Challenges for the Railway Industry and the Regulator.................7 1.5 A Word of Thanks .................................................................... 10 2. STATE OF RAIL SAFETY IN CANADA ...................................11 2.1 Accidents 1989-2006 ................................................................. 12 2.2 Categories of Accidents . 13 2.2.1 Main Track Accidents...................................................... 14 2.2.2 Non-Main Track Accidents ............................................... 15 2.2.3 Crossing and Trespasser Accidents . 15 2.2.4 Transportation of Dangerous Goods Accidents and Incidents . 17 2.3 Normalizing Accidents . 18 2.4 Comparing Rail Safety in Canada and the U.S.
    [Show full text]
  • British Columbia Public Accounts
    Digitized by the Internet Archive in 2019 with funding from University of Alberta Libraries https://archive.org/details/britishcolumbiap02mini ublic Accounts Volume 2 1994-95 Province of British Columbia 3 9345 01116578 8 SIMON FRASER UNIVERSITY W.A.C. BENNETT LIBRARY fjj /a ublic Accounts olume 2 Financial Statements and Schedules of the Consolidated Revenue Fund For the Fiscal Year Ended March 31, 1995 Province of British Honourable Elizabeth Cull Columbia Minister of Finance & Corporate Relations Canadian Cataloguing in Publication Data 5': s~ Co umb a v ~ str\ o' F nance a~a Corporate Relat ons. P~b c accounts—*98~88- 0 ■Vnn^al. Eacr' rec n2to3\. Eac~ . nas also a distinct vet tie. Report vea' e~as Mar. 31. Con: ~_es E': s~ Co umb a. V ~ str\ or z ~ance a~d Corporate Se a:o~s c accounts o- 3't sb Columbia. 55\ 0352-2001 S5\ ’ 1 E'-8n5~ = r-0 c accocnts—Brit sh Columb a. - sr\ of r ~a"ce and Corporate Relat o-s 3m sh Co umb a — Appropr atlors and expenditures — 5tat st as — ra s E. Revenue— British Columbia — Statistics — Periodicals. 3. Finance, Public — British Ce _~e a —Account ng — Periodicals. T tie. 354 "• 1 ~2 CP92-890! 3-\ October 31, 1995 Victoria, British Columbia Lieutenant Governor of the Province of British Columbia. MAY IT PLEASE YOUR HONOUR: The undersigned has the honour to present the Public Accounts of the Province of British Columbia for the fiscal year ended March 31,1995. ELIZABETH CULL Minister of Finance . and Corporate Relations Ministry of Finance and Corporate Relations Victoria, British Columbia October 31, 1995 The Honourable ELIZABETH CULL Minister of Finance and Corporate Relations I have the honour to submit herewith the Public Accounts of the Province of British Columbia for the fiscal year ended March 31,1995.
    [Show full text]
  • Tourist Train Analysis
    BC Ministry of Transportation and Infrastructure E&N Railway Corridor Study: Analysis of Tourist Train Potential REPORT IBI GROUP REPORT TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................................... 1 1. INTRODUCTION ...................................................................................................................... 3 2. VANCOUVER ISLAND TOURIST TRAIN CONTEXT ............................................................. 3 2.1 Objectives of Tourist Train Analysis ................................................................................................... 3 2.2 Existing and Previous Vancouver Island Tourist Trains ................................................................... 5 2.3 Possible Tourist Train Concepts for Corridor .................................................................................... 7 3. ANALYSIS OF VANCOUVER ISLAND TOURISM MARKET ................................................. 9 3.1 Visitor Origins and Trip Purpose ......................................................................................................... 9 3.2 Trip Characteristics ............................................................................................................................. 10 3.3 Demographics of Visitors ................................................................................................................... 12 3.4 Visitor Expenditure Data ....................................................................................................................
    [Show full text]
  • Sept. / Oct. 2010 Olds Gas Engine Works Turntable on an S2 Slick
    The SETOFF The Official Publication of NARCOA North American Railcar Operators Association Sept. / Oct. 2010 Volume 24 No. 5 Turntable on an S2 Olds Gas Engine Works Slick Rails and Motorcar Traction The NNAARRCCOOAA OOffffiicciiaallss SETOFF President: Warren Froese Nominations, Elections Volume 24 - No 5 Vice-President: Mark Springer Carl Anderson Secretary: Mark Hudson 1330 Rosedale Lane Treasurer: Tom Norman Hoffman Estates, IL 60195 The SETOFF is the official publication of [email protected] the North American Railcar Operators Associ - Area 1 Director ation (NARCOA) and is published bimonthly (ME, NH, VT, NY, MA, CT, RI) NARCOA Insurance Administrator to promote safe legal operation of railroad mo - Warren Riccitelli (401) 232-0992 Tom Norman (406) 722-3012 torcars, and to encourage fellowship and ex - [email protected] 1047 Terrace View Drive change of information among motorcar Alberton, MT 59820 enthusiasts. Membership in NARCOA, which Area 2 Director [email protected] includes a subscription to The SETOFF, is $30 (NJ, PA, DE, MD) per year, and is available from Secretary Mark John Gonder (724) 244-7538 Rule Book CertificationTest Hudson. Please send your check made out to [email protected] Al McCracken 2916 Taper Avenue NARCOA to: Area 3 Director Santa Clara, CA 95051 Mark Hudson, Membership (IN, Lower MI, OH) [email protected] P.O. Box 321, Dry Ridge, KY 41035. Dave Verzi (216) 941-5273 [email protected] [email protected] The SETOFF Editor Brian Davis (330) 554-4480 Brian Davis, SETOFF Editor Area 4 Director
    [Show full text]
  • October 2017
    SPOT NEWS Western Vancouver Island Industrial heritage society Newstand price—$3.50 Issue 66 October 2017 2018 I.H.S. Calendars available soon A.P.R.’S WORKHORSE FOR 2017 - “MBL No. 11” at Port Alberni Station The “MBL No. 11” is a 1942 “General-Electric” diesel-electric locomotive that used to shunt railcars at the “Alberni Pulp & Paper” mill. The 1912 Lima “Shay” - “Two Spot” - sits on display on the Station spur. Photo: D. Hooper APR News The 2017 summer season was…. different. The “Number 7” ran very little, although it had been prepared and was certified to go. The ‘BC Safety Authority” put load restrictions on the Kitsuksis and Rogers Creek Trestles so the 45-ton “MBL No. 11” was pressed into service for the regular runs to the McLean Mill all summer. However, being a small yard engine, it only pulled three passenger coaches up the hill, as opposed to the normal five. The “Seven”, at 90 tons, was fired up on several occasions, such as for the July 1st “Triconic Challenge” but only rolled as far as Rogers Creek. Bridge ties have to be replaced and that has not happened yet. The “Comox Logging” crew speeder was in service more than a dozen times—Waterfront runs for “Port (Harbour) Day” and ‘shuttle service’ / excursions to the Mill. Pete Geddes was the Operator. Other APR personnel have now been certified to drive it, as well. Other regular railroad operations continued. Matt Gregory and Frank Holm kept the vege- tation down on the right-of-way and Railyard.
    [Show full text]
  • August 2008 News.Pub
    WCRA NEWS AUGUST 2008 COME TO STEAMFEST! SEP. 20 & 21, 2008 MINI RAIL DAYS AND MEMBER PICNIC AUGUST 17 WCRA News, Page 2 GENERAL MEETING NOTICE The General Meeting of the WCRA will be held on Tuesday, July 29, 2008 at 1930 hours at the Rainbow Creek Station in Burnaby, Willindon at Penzance. Entertainment will be a DVD “Gears In The Woods”. ON THE COVER Announcing SteamFest! Royal Hudson #2860 greets our 1934 Chrysler Airflow at the West Coast Railway Heritage Park—a pre view of just two of the many attractions planned for Steam Fest 2008, which will be held September 20 and 21, 2008. More inside—page 20. AUGUST CALENDAR • West Coast Railway Heritage Park open daily 1000 through 1700k • Wednesday, August 6—Deadline for items to be included in the September 2008 edition of WCRA News • Tuesday, August 12—WCRT’s “Vancouver Island’s West Coast” tour departs • Tuesday, August 19 —Tours Committee Meeting, call Bernie at 604-325-0923 • Sunday, August 17—Mini Rail Days all day at the Heritage Park, many guest engines will pull trains, everyone welcome 1000—1700. • Sunday, August 17—Members’ Picnic at the Heritage Park, come and enjoy a free dinner and the company of your fellow WCRA members, 1730—1900. • Saturday, August 23—Giant Garage Sale at West Coast Railway Heritage Park, 1000— 1400 • Tuesday, August 26 —WCRA General Meeting, 1930 hours, Rainbow Creek Station in Burnaby, BC The West Coast Railway Association is an historical group dedicated to the preservation of British Columbia railway history. Membership is open to all people with an interest in railways past and present.
    [Show full text]
  • April 2006 News.Pub
    WCRA NEWS APRIL 2006 INSTALLATION of TUBES UNDERWAY on HUDSON! WCRA News, Page 2 GENERAL MEETING NOTICE The March General Meeting of the WCRA will be held on Tuesday, March 28, 2006 at 1930 hours at the Rainbow Creek Station, Confederation Park in Burnaby. Entertainment will be a variety of slides from the 50’s and 60’s of Canadian National Railways construction projects and train operations (including the Super Continental and Continental of the era), presented by Bill Johnston. Bill worked on the railway at the time doing a variety of civil engineering type projects. ON THE COVER Working on the Hudson! A classic shot of work in a steam shop—in this self portrait we see our lead hand on the Royal Hudson #2860 restoration, Trevor Mills, taking a brief break from the dirty and hard work in the boiler of #2860. Trevor has just emerged from hours of removing boiler scale and takes a short break—with the oil can! This is the essence of the hard work that will soon see #2860 back in steam, making all the bull work and dirt worth the effort. A salute to Trevor and all the others who have been working tirelessly to get #2860 back out on the rails. APRIL CALENDAR • West Coast Railway Heritage Park Open daily 1000 through 1700k • Thursday, March 30—Deadline for items for the May 2006 WCRA News • Tuesday, April 14—Tours Committee meets, contact Bernie at 604-325-0923 • Sunday, April 16—6th Annual Easter Scavenger Hunt at the Heritage Park, 1200 to 1500 hours, fun for the whole family with treats • Saturday, April 22—WCRT’s Spirit of Washington / Amtrak Cascades tour operates • Tuesday, April 25—WCRA General Meeting, 1930 hours, Rainbow Creek Station The West Coast Railway Association is an historical group dedicated to the preservation of British Columbia railway history.
    [Show full text]
  • 1 Don Bellamy's Rapid Transit Solution (BC Electric Railway Motorman, Retired)
    Don Bellamy’s Rapid Transit Solution (BC Electric Railway Motorman, Retired) “Restore THE POWER OF streetcars NOW” Simple solutions that are based on common sense usually have the greatest impact on society. As is often the case, people with practical experience often have a better understanding of the problem, and can see the most efficient, cost effective solutions first. I spoke with Don Bellamy (former Vancouver City Councilor, Police Officer, and BC Electric Railway Motorman) in July 2008, and his solution is the most efficient and financially viable that I have heard, seen or read about. First let’s get a global perspective. In “The Power of Community – How Cuba Survived Peak Oil” viewers see Americans visiting Cuba in 2006 to learn what Peak Oil really means. When Russia fell in 1991, Cuba lost over 50% of its oil imports from 13-14 million tons down to 4 million tons. While cars produce pollution, buildings and homes consume 40% of world energy and produce 50% of all greenhouse gases. “OIL” Energy is needed for elevators, water supply, heating / cooling, lighting, cooking and food storage, making high rise residential buildings unsustainable. Oil is needed for computers, cosmetics, and plastics. Cubans call the transition to life without Oil the “Special Period”. It took 5 years before the pesticide contaminated soil could be brought back to life with composting. Without the OIL based fertilizers (21,000 tons in 1988 to 1,000 tons in 2006) that produced the 1920’s Green Revolution farm food production increase and oil based pesticides needed to reduce pests associated with mono-agriculture, Cuba had to choose Organic farming.
    [Show full text]