Details of Tender Awarded for Thorough Repairing for Different Areas from CED HQ (31.05.2019)

Total Page:16

File Type:pdf, Size:1020Kb

Details of Tender Awarded for Thorough Repairing for Different Areas from CED HQ (31.05.2019) Details of Tender Awarded for Thorough repairing for Different Areas from CED HQ (31.05.2019) Sl. Award NO Name of the Work and WO ref. Location (As per No. of un- Date of Date of Total Value (in authorized Status No Agreement) quarters authorized Commencement Completion repaired lakhs) 1 BARORA Thorough Repairing Of 436 Units Barora Area Residential Quarters (300 Units a. MURAIDIH Nhs Quarters At Muraidih COLONY - 300 Colony, 52 Units Quarters At Rhb b. RHB COLONY - Colony & 84 Units Miners 52 Quarters At Dugdha & Damoda c. DUGDHA & 225.05 67 23.05.2013 22.05.2016 Completed Colony) On Non-Coal Bearing DAMODA COLONY Land In Barora Area, BCCL vide - 84 WO Ref. No.- BCCL/CED/GM(C)/WO- 07/2013-14/368 dated 1300 1233 879 14/18.06.2013 Thorough Repairing of 864 unit quarters situated over non-coal Barora Area bearing areas at different units of a. RHB Colony - 40 b. Dughda T/s - 108 In progress Barora Area, BCCL vide WO to be c. Albion & BJ Colony 474.38 08.11.2018 - (80% Ref. No.- BCCL/CED/TC/WO- determined 17/2018-19/829 dated 22.11.2018 - 85 d. Nehru completed) Chowk COlony - 63 e. Muraidih - 568 Sl. NO Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 2 BLOCK-II Thorough Repairing Of 1420 Nos. Residential Quarters (276 Block-II Units Quarters At Sector-I & Ii At a. SECTOR-I & II AT Dugdha Township, 482 Units DUGDHA Quarters From Sector - I To TOWNSHIP- 276 Sector - Vii At Matigarh b. SECTOR - I TO Township, 308 Units Quarters At SECTOR - VII AT Bhimkanali Township & 354 MATIGARH 942.05 514 10.05.2013 09.05.2016 Completed Units Quarters At Nehru Nagar TOWNSHIP - 482 (Harina Colony)) On Non-Coal c.BHIMKANALI Bearing Land In Block - Ii Area, TOWNSHIP - 308 3590 3076 1289 BCCL vide WO Ref. No.- d. NEHRU NAGAR BCCL/CED/GM(C)/WO- (HARINA COLONY) 10/2013-14/409 dated - 354 21/25.06.2013 Thorough Repairing of 2170 unit residential quarters under Block- Block-II a. Nehru Nagar- 78 In progress II Area, BCCL vide WO Ref. to be b. Bhimkanali - 636 1354.74 13.11.2018 - (50% No.-BCCL/CED/TC/WO- determined 18/2018-19/830 dated 22.11.2018 c. Dughda T/s - 528 completed) d. Matigarah - 928 Sl. NO Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 3 GOVINDPUR Thorough Repairing of 624 quarters (108 unit quarters at Adarsh Nagar Colony, 408 Govindpur quarters at Tilatand Colony and a.Adarsh Nagar- 108 108 quarters at Kolmurna 396.59 624 188 436 15.10.2018 31.03.2019 436 Completed b. Tilatand- 408 Colony) under non-coal bearing c. Kolmurna- 108 land of Govindpur Area vide WO Ref. No.- BCCL/CED/TC/WO- 13/2018-19/748 dated 30.10.2018 Sl. NO Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 4 SIJUA THOROUGH REPAIRING OF Sijua 540 UNITS RESIDENTIAL a. Nichitpur QUARTERS (444 UNITS Township- 444 MINERS QUARTERS AT b. Tetulmari NICHITPUR TOWNSHIP & 96 Township- 96 UNITS MINERS QUARTERS AT TETULMARI TOWNSHIP) 345.96 14.12.2012 13.12.2015 Completed ON NON-COAL BEARING LAND IN SIJUA AREA, BCCLvide WO Ref. No.- BCCL/CED/GM(C)/WO- 24/2012-13/1401 dated 1047 26.02.2013 1532 485 1047 Thorough Repairing of 992 Units Sijua Residential Qtrss and Roof a. Nichitpur- 804 Grading with PCC on Roof b. Tetulmari-188 Surface of 920 units Quarters (Triple storied, double storied MQ, C-Type and B-Type) at 814.85 16.07.2015 15.07.2017 Completed Nichitpur and Tetulmari Townships under Sijua Area, BCCL vide WO Ref. No.- BCCL/CED/GM(C)/WO- 16/2015-16/693 dated 06/07.10.2015 Sl. NO Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 5 KATRAS Thorough Repairing of 120 Nos. Katras Residential Quarters (48 Units a.Tilatand- 13 Miners Quarters at Coal Dump b. Gazlitand - 48 Colony & 72 Units Quarters at c. Coal dump colony - Regional Hospital Colony) on 108 30.28 15.01.2013 14.01.2016 Completed Non-Coal Bearing Land in Katras Area, BCCL vide WO Ref. NO.- BCCL/CED/GM(C)/WO- 26/2012-13/1426 dated 02/04.03.2013 Thorough Repairing of 169 Katras 289 0 289 289 Quarters (13 units old type a.Tilatand- 13 quarters at Tilatand Colony b. Gazlitand - 48 (Hospital), 48 units Miners c. Coal dump colony - Quarters at Gazlitand Colony and 108 108 units Miners Quarters (Triple 50.49 25.12.2015 24.06.2015 Completed Storeyed Building) at Coal Dump Colony) on Non-coal Bearing Land in Katras Area, BCCLL vide WO Ref. No.- BCCL/CED/GM(C)/WO- 30/2015-16/ dated 18.12.2015 Sl. NO Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 6 BASTACOLLA Thorough Repairing Of 150 Units Bastacolla Nhs Quarters (50 Units Quarters a. Bera Colony - 30 At Kuya Colony Of Kuya b. Kuya Colony- 25 Colliery, 40 Units Quarters At c. Chand Kuya Colony Chand Kuya Colony & 60 Units - 20 Quarters At Bera Colliery) On 46.44 02.05.2013 01.05.2016 Completed Non-Coal Bearing Land In Bastacolla Area, BCCL (Half Work) vide WO Ref. No.- BCCL/CED/GM(C)/WO- 06/2013-14/366 dated 14/18.06.2013 Thorough Repairing Of 150 Units Bastacolla Nhs Quarters (50 Units Quarters a. Bera Colony - 30 At Kuya Colony Of Kuya b. Kuya Colony- 25 430 Colliery, 40 Units Quarters At c. Chand Kuya Colony 486 56 430 Chand Kuya Colony & 60 Units - 20 Quarters At Bera Colliery) On 46.44 02.05.2013 01.05.2016 Completed Non-Coal Bearing Land In Bastacolla Area, BCCL (Half Work) vide WO Ref. No.- BCCL/CED/GM(C)/WO- 06/2013-14/366 dated 14/18.06.2013 Thorough Repairing of Miners Bastacolla Quarters under Bastacolla, Lodna, a. Bera Colony - 136 EWZ and WWZ Areas of BCCL, b. Kuya new & Chand Dhanbad, Jharkhand vide WO Kuya Colony - 151 2990.82 03.08.2015 02.08.2017 Completed Ref. No.- BCCL/CED/GM(C)/WO- 26/2015-16/ dated 12.11.2015 Sl. Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status NO No Agreement) Value quarters authorized Commencement Completion repaired 7 LODNA Thorough Repairing and Lodna maintenance of 144 unit miner a. Noonudih Work in quarters at Noonudih Township, Township- 144 progress Lodna Area of BCCL vide WO 96.80 20.02.2018 (90 % Ref. No.- BCCL/CED/TC/WO- Completed) 28/2017-18/1663 dated 15.03.2018 1026 79 947 904 Thorough Repairing of Miners Lodna Quarters under Bastacolla, Lodna, a. Noonidih EWZ and WWZ Areas of BCCL, b. Kendra Dhanbad, Jharkhand vide WO c. PG Pahari 2990.82 03.08.2015 02.08.2017 Completed Ref. No.- d. MOCP BCCL/CED/GM(C)/WO- 26/2015-16/ dated 12.11.2015 Sl. NO Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 8 EWZ AREA Thorough Repairing Of 410 Nos. EWZ Area Residential Quarters (132 Units a. PATHERDIH Quarters At Patherdih Washery & WASHERY- 66 b. 101 Units Quarters At Sudamdih SUDAMDIH Colony & 177 Units Quarters At COLONY- 51 202.05 01.11.2014 01.11.2017 Completed Bhojudih Washery) On Non-Coal c.BHOJUDIH Bearing Land In Ewz Area, Bccl WASHERY- 89 (Half Work) vide WO Ref. No.- BCCL/CED/GM(C)/WO- 21/2014-15/802 dated 18.09.2014 Thorough Repairing Of 410 Nos. EWZ Area Residential Quarters (132 Units a. PATHERDIH Quarters At Patherdih Washery & WASHERY- 66 b. 101 Units Quarters At Sudamdih SUDAMDIH 1409 299 1110 1110 Colony & 177 Units Quarters At COLONY- 50 Bhojudih Washery) On Non-Coal c.BHOJUDIH 202.05 03.11.2014 03.11.2017 Completed Bearing Land In Ewz Area, WASHERY- 88 BCCL (Half Work) vide WO Ref. No.-BCCL/CED/GM(C)/WO- 24/2014-15/824 Dated 22/23.09.2014 Thorough Repairing of Miners EWZ Area - 999 Quarters under Bastacolla, Lodna, a. Patherdih- 201 EWZ and WWZ Areas of BCCL, b. Bhojudih- 344 Dhanbad, Jharkhand vide WO c. Sudamdih- 151 2990.82 03.08.2015 02.08.2017 Completed Ref. No.- BCCL/CED/GM(C)/WO- 26/2015-16/ dated 12.11.2015 Sl. Name of the Work and WO ref. Location (As per Award No. of un- Date of Date of Total NO authorized Status No Agreement) Value quarters authorized Commencement Completion repaired 9 WWZ AREA Thorough Repairing of Miners WWZ Area Work in Quarters under Bastacolla, Lodna, a. Dughda- 1140 progress EWZ and WWZ Areas of BCCL, b. Mahuda-141 (77 Dhanbad, Jharkhand vide WO 2990.82 1266 254 1012 03.08.2015 02.08.2017 935 remaining) Ref. No.- Item as per BCCL/CED/GM(C)/WO- BOQ 26/2015-16/ dated 12.11.2015 exhausted) Sl.
Recommended publications
  • Scanned with Camscanner Scanned with Camscanner for Early Action
    Scanned with CamScanner Scanned with CamScanner for early action. Pot holes detected near Muchi Basti have been filled up by incombustible materials (sand & quarry OB). Fiery coal is being dugged out by OC method to control fire as well as environmental pollution. v All old dumps will be filled back in mine voids. At It shall be complied. Action is being taken as specified the end of mining there should not be any OBD in EMP. and should be only one void which shall not exceed 30 m deep. vi An increase in the CSR BCCL is taking up activities from the HQ level and through its administrative areas for the implementation of CSR activities. For this purpose a CSR cell is functioning which is headed by General Manger(CSR) under the direct control of Director(Personnel) of the company. A details of CSR activities at Kusunda Area is given in the CSR Booklet. vii Dhanbad Action Plan, as CEPI, be implanted where Dhanbad Action Plan has been prepared in ever is applicable. consultation with Jharkhand State Pollution Control Board for entire BCCL and not clusterwise. It is being implemented comprehensively for all the mines of BCCL including mines of Kusunda Area. Some of the salient actions of this cluster are enclosed as Annexure-D. viii Since the cluster is situated close to Dhanbad, It is being complied. Plantation at decoaled OB dump thick green belt and residential areas should be area is already being executed for development of done along the periphery of ML area. Avenue- green belts as directed in EC.
    [Show full text]
  • Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2Ggststs
    F. No.: 41912015- PMU(DASI Ministry of Informatlon and Broadeasting Shastri Bhawan, New Delhi **** Date: 2td November, 2015 hrblic Notice Reference list of urban areas to be covered in phase III of cable TV digitisation, which was issued by the Ministry on 30.4.2015. The updated list of urban areas for 16 States/UTs has been notified vide Rrblic Notice dated 16. 10.2015 Now, based on comments/data received from the State/UT Governments, the list of the following States/UTs has been updated; 1. Andhra Pradesh 2. Chhattisgarh 3. Jammu & Kashmir 4. Kerala 5. Madhya Pradesh 6. Manipur 7. Telengana 8. Daman & Diu 2. A copy of the updated list of these States/UTs is attached. Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2ggSTSTs 2ND UPDATED URBAN AREAS LIST FOR PHASE III OF CABLE TV DIGITISATION Andhra Pradesh S.No. Districts Urban Areas TV Households Remarks 1 Srikakulam Srikakulam (M + OG) 28,149 Palasa Kasibugga (M) 9,706 Ichchapuram (M) 6,242 Sompeta (CT) *Deleted Hiramandalam (CT) *Deleted Upgraded Palakonda 3,349 Tekkali (CT) *Deleted Rajam (NP) 7,367 Amadalavalasa (M) 6,844 Narasannapeta (CT) *Deleted Balaga (CT) *Deleted Ponduru (CT) *Deleted 2 Vizianagaram Parvathipuram (M) 9,382 Bobbili (M) 10,337 Salur (M) 8,644 Gajapathinagaram (CT) *Deleted Sriramnagar (CT) *Deleted Cheepurupalle (CT) *Deleted Tummikapalle (CT) *Deleted Kothavalasa (CT) *Deleted Vizianagaram (M + OG) 44,379 Kanapaka (CT) *Deleted Malicherla (CT) *Deleted Jarjapupeta (CT) *Deleted Upgraded Nellimarla 3,402 Chintalavalasa (CT) *Deleted Visakhapatnm All areas except Visakhapatnam 3 Greater Visakhapatnam (M. (MC)covered in Corp) ? Phase II Yelamanchali ? **Added Narsipatnam ? **Added 4 East Godavari Kakinada (M Corp.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]
  • Chapter Subject Page No No
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government. ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN (As per EIA Notification, 2006) For MADHUBAND NLW COAL WASHERY Normative Capacity: 5.0 MTPA Raw Coal Peak Capacity : 6.5 MPTA Raw Coal Land Requirement 23 Ha (Block II Area) Bharat Coking Coal Limited (February, 2011) Prepared at Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Regional Institute - II, Koyla Bhawan complex, Koyla Nagar, Dhanbad - 826005 (Jharkhand), India C O N T E N T S SL. CHAPTER SUBJECT PAGE NO NO. NO. 1 EXECUTIVE SUMMARY I- XIII 2 1 INTRODUCTION 1-7 3 2 PROJECT DESCRIPTION 8-30 4 3 DESCRIPTION OF THE ENVIRONMENT 31-74 ANTICIPATED ENVIRONMENTAL 5 4 75-128 IMPACTS & MITIGATION MEASURES ANALYSIS OF ALTERNATIVES 6 5 129 (TECHNOLOGY & SITE) ENVIRONMENTAL MONITORING 7 6 130-131 PROGRAMME 8 7 ADDITIONAL STUDIES 132-135 PROJECT BENEFITS IMPROVEMENTS 9 8 136-137 IN PHYSICAL INFRASTRUCTURE ENVIRONMENTAL COST BENEFIT 10 9 138-139 ANALYSIS 11 10 EMP 140-142 12 11 SUMMARY & CONCLUSION 143-146 DISCLOSURE OF CONSULTANTS 13 12 147 ENGAGED QUESTIONNAIRE FOR ENVIRONMENTAL APPRAISAL 14 148-172 FOR COAL WASHERY PROJECTS 15 ANNEXURE-I ORGANISATIONAL STRUCTURE C-1 to C-4 16 ANNEXURE-II PUBLIC HEARING PROCEEDINGS AII-1 to AII-23 17 ANNEXURE-III COPY OF APPROVED TOR AIII-1 to AIII-3 Proposed Madhuband NLW Washery EIA_EMP TEXT(FINAL) i JOB No.
    [Show full text]
  • Action Plan for Clusters of Dhanbad
    ACTION PLAN FOR CLUSTERS OF DHANBAD _________________________________________________ JHARKHAND STATE POLLUTION CONTROL BOARD T A BUILDING, HEC COMPLEX, RANCHI 834004 1 (1) 1.0 INTRODUCTION 1.1 The territorial area of Nirsa block , industrial area of Govindpur block, municipal area of Dhanbad Sadar block, municipal area of Jharia block and industrial area of Sindri are included in the cluster of Dhanbad 1.2 Location: Satellite imagery is as given below. SATELLITE IMAGERY OF INDUSTRIAL CLUSTER OF DHANBAD SATELLITE IMAGERY OF THE AREA OF NIRSA BLOCK 2 SATELLITE IMAGERY OF DHANBAD SADAR BLOCK SATELLITE IMAGERY OF INDUSTRIAL AREA OF SINDRI 3 SATELLITE IMAGERY OF JHARIA BLOCK SATELLITE IMAGERY OF THE AREA OF GOBINDPUR 1.3 Digital map with demarcation of geographical boundaries and impact zones is as given below. 4 1.4 CEPI Score: Air- 64.50, Water- 59.00, Land -65.50, Total- 78.63 1.5 Total populations and sensitive receptors Hospital – Patliputra Medical College & Hospital, Dhanbad;Central Hospital, Jagjivan Nagar; Jamadoba Hospital; Fertilizer Hospital, Sindri Educational Institution – BIT Sindri, ISM Dhanbad, Patliputra Medical College, Dhanbad, RS More College, Govindpur, Sindri College, RSP College, Jharia, PK Roy College, SSLNT Womens College, BS College, Govt. Polytechnic, Dhanbad, Mining Institute, Dhanbad, Govt. Polytechnic, Bhaga; Mining institute, Bhaga; and around ten other colleges. Besides, there are around 500 schools. Court - The court of District and Session Judge is there at Dhanbad. TABLE-1 Details of population, its density, major surface water bodies, tourist spots, schools and the health care units 5 Name of block areas Sadar Jharia Govindpur Nirsa T Area (Sq. Km) 128.82 90.77 334.44 416.85 a Population (2001) 564468 475341 201876 376843 b Densityl 4382 5224 604 904 Majore Surface water Damodar, Damodar, Damodar, Damodar, body Barakar Barakar Barakar Barakar Tourist1 Spot NA NA NA Panchet & Maithan Dam Primary & Middle 155 119 144 215 School Healthcare unit 93 44 4 22 1.6 SourceE -- Govt.
    [Show full text]
  • Directory Establishment
    DIRECTORY ESTABLISHMENT SECTOR :RURAL STATE : JHARKHAND DISTRICT : Bokaro Year of start of Employment Sl No Name of Establishment Address / Telephone / Fax / E-mail Operation Class (1) (2) (3) (4) (5) NIC 2004 : 1010-Mining and agglomeration of hard coal 1 PROJECT OFFICE POST OFFICE DISTRICT BOKARO, JHARKHAND , PIN CODE: 829144, STD CODE: NA , TEL NO: NA , FAX 1975 51 - 100 MAKOLI NO: NA, E-MAIL : N.A. 2 CENTRAL COAL FIELD LIMITED AMLO BERMO BOKARO , PIN CODE: 829104, STD CODE: NA , TEL NO: NA , FAX NO: NA, 1972 101 - 500 E-MAIL : N.A. 3 PROJECT OFFICER KHASMAHAL PROJECT VILL. KURPANIA POST SUNDAY BAZAR DISTRICT BOKARO PIN 1972 101 - 500 CODE: 829127, STD CODE: NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. 4 SRI I. D. PANDEY A T KARGAL POST . BERMO DISTRICT BOKARO STATE JHARKHAND , PIN CODE: NA , STD CODE: 06549, TEL NO: 1960 > 500 221580, FAX NO: NA, E-MAIL : N.A. 5 SRI S K. BALTHARE AT TARMI DAH DISTRICT BOKARO STATE - JHARKHAND , PIN CODE: NA , STD CODE: NA , TEL NO: NA 1973 > 500 P.O.BHANDARI , FAX NO: NA, E-MAIL : N.A. 6 PROJECT OFFICER CCL MAKOLI POST CE MAKOLI DISTRICT BOKARO STATE JAHARKHAND PIN CODE: 829144, STD CODE: NA , TEL 1975 > 500 OFFFI NO: NA , FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1410-Quarrying of stone, sand and clay 7 SANJAY SINGH VILL KHUTR PO ANTR PS JARIDIH DIST BOKARO JHARKHANDI PIN CODE: 829138, STD CODE: 1989 10 - 50 NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A.
    [Show full text]
  • Schools for Class-VIII in All Districts of Jharkhand State School CODE UDISE NAME of SCHOOL
    Schools for Class-VIII in All Districts of Jharkhand State School CODE UDISE NAME OF SCHOOL District: RANCHI 80100510 20140117617 A G CHURCH HIGH SCHOOL RANCHI 80100376 20140105605 A G CHURCH MIDDLE SCHOOL KANKE HUSIR 80100383 20140106203 A G CHURCH SCHOOL FURHURA TOLI 80100806 20140903803 A G CHURCH SCHOOL 80100917 20140207821 A P E G RESIDENTIAL SCHOOL RATU 80100808 20140904002 A Q ANSARI URDU MIDDLE SCHOOL IRBA 80100523 20140119912 A S PUBLIC SCHOOL 80100524 20140120009 A S T V S ZILA SCHOOL 80100411 20140109003 A V K S H S 80100299 20140306614 AADARSH GRAMIN PUBLIC SCHOOL TANGAR 80100824 20140906303 ADARSH BHARTI PUBLIC HIGH SCHOOL MANDRO 80100578 20142401811 ADARSH H S MCCLUSKIEGANJ 80100570 20142400503 ADARSH HIGH SCHOOL SANTI NAGAR KHALARI 80100682 20142203709 ADARSH HIGH SCHOOL KOLAMBI TUSMU 80100956 20141108209 ADARSH UCHCHA VIDYALAYA MURI 80100504 20140116916 ADARSHA VIDYA MANDIR 80100846 20140913601 ADARSHHIGH SCHOOL PANCHA 80100214 20140603012 ADIVASI BAL VIKAS VIDYALAYA JINJO THAKUR GAON 80100911 20140207814 ADIVASI BAL VIKAS VIDYALAYA RATU 80100894 20140202702 ADIVASI BAL VIKAS VIDYALAYA TIGRA GURU RATU 80100119 20140704204 ADIVASI BAL VIKAS VIDYALAYA TUTLO NARKOPI 80100647 20140404507 ADIWASI VIKAS HIGH SCHOOL BAJRA 80101106 20140113028 AFAQUE ACADEMY 80100352 20140100813 AHMAD ALI MORDEN HIGH SCHOOL 80100558 20140123620 AL-HERA PUBLIC SCHOOL 80100685 20142203716 AL-KAMAL PLAY HIGH SCHOOL 80100332 20142303514 ALKAUSAR GIRLS HIGH SCHOOL ITKI RANCHI 80100741 20140803807 AMAR JYOTI MIDDLE CUM HIGH SCHOOL HARDAG 80100651 20140404516
    [Show full text]
  • Cluster VI Shall Be Fire Affected Area Within Godhur Lease Hold Special Undertaken
    Scanned by CamScanner Scanned by CamScanner v All old dumps will be filled back in mine voids. At It shall be complied. Action is being taken as specified the end of mining there should not be any OBD in EMP. and should be only one void which shall not exceed 30 m deep. vi An increase in the CSR BCCL is taking up activities from the HQ level and through its administrative areas for the implementation of CSR activities. For this purpose A CSR cell is functioning which is headed by General Manger(CSR) under the direct control of Director(Personnel) of the company. A details of CSR activities at Kusunda Area is enclosed Annexure-A 3. vii Dhanbad Action Plan, as CEPI, be implanted where Dhanbad Action Plan has been prepared in ever is applicable. consultation with Jharkhand State Pollution Control Board for entire BCCL and not clusterwise. It is being implemented comprehensively for all the mines of BCCL including mines of Kusunda Area. Some of the salient actions of this cluster are enclosed as Annexure-E. viii Since the cluster is situated close to Dhanbad, It is being complied. Plantation at decoaled OB dump thick green belt and residential areas should be area is already being executed for development of done along the periphery of ML area. Avenue- green belts as per EC. Adequate water sprinkling is plantation should be done along the roads which being done at coal transportation road regularly by are used for coal transport and measures to arrest mobile water sprinklers, and coal transportation is coal dust while transporting by covering the being done by covering trucks by tarpaulin as trucks and water sprinkling measures etc.
    [Show full text]
  • Towns of India: Status of Demography, Economy, Social Structures, Housing and Basic Infrastructure
    Towns of India Status of Demography, Economy, Social Structures, Housing and Basic Infrastructure HSMI – HUDCO Chair – NIUA Collaborative Research 2016 Towns of India Status of Demography, Economy, Social Structures, Housing and Basic Infrastructure HSMI – HUDCO Chair – NIUA Collaborative Research 2016 Foreword An increasing number of people live in small and medium-sized towns in the periphery of large cities as the world completes its process of urban transition. India is no exception to this phenomenon. It is in these towns where national economies are to be built, solutions to global challenges such as inequality and the impacts of climate change are to be addressed, and future generations are to be educated. The reality in India, however, suggests that the small towns are not fully integrated in the urban fabric of the nation. They have enormous backlogs in economic infrastructure, weak human capacity, high levels of under unemployment and unemployment, and extremely weak local economies. However, with their growing numbers – there are more than 2,500 new towns added in the last Population Census– the role of small and medium-sized towns in the national economy will have a significant influence upon the future social and economic development of larger geographic regions. If these towns were better equipped to steer their economic assets and development, the national Gross Domestic Product (GDP) could be increased, with significant benefits reducing rural poverty in the hinterlands. This research on small towns, those below 100,000 population, was conducted at the National Institute of Urban Affairs (NIUA), New Delhi, under Phase III of the HUDCO Chair project during the period 2015-16.
    [Show full text]
  • 1 Contents Page No. 1. Notice 2. Management 3. Bankers & Auditors
    Contents Page No. 1. Notice 2. Management 3. Bankers & Auditors 4. Directors’ Report and Corporate Governance Report. 5. Comments of the Comptroller and Auditor General of India 6. Statutory Auditor’s Report and replies of Management. 7. Balance Sheet 8. Profit & Loss Account 9. Schedule to Balance Sheet 10. Schedule to Profit and Loss Account 11. Accounting Policy 12. Notes on Accounts 13. Particulars of Employee 1 BHARAT COKING COAL LIMITED (A subsidiary of coal India Ltd.) KOYLA BHAWAN, KOYLA NAGAR, DHANBAD Board Secretariat Ref.No.BCCL:CS: F-AGM/2013/ 389 Dated : 20.05.2013 NOTICE Notice is hereby given to all the Shareholders of Bharat Coking Coal Limited that the 42nd Annual General Meeting of Bharat Coking Coal Limited will be held on 27.05.2013(monday) at 11.00 AM at the Registered Office, Koyla Bhawan, P.O. Koyla Nagar, Dhanbad to transact the following businesses: ORDINARY BUSINESS 1) To receive, consider and adopt the audited Balance Sheet as at 31st March, 2013 and the Profit & Loss Account for the year ended on that date along with Auditor’s Report and Directors’ Report thereon. 2) To appoint a Director in place of Shri N. Kumar, who retires in terms of Article 34(i) (e) (iii) of the Articles of Association of the Company, and is eligible for re- appointment. 3) To appoint a Director in place of Shri Hemant Jain, who retires in terms of Article 34(i) (e) (iii) of the Articles of Association of the Company, and is eligible for re-appointment. By Order of the Board (K.N.
    [Show full text]
  • Annual Report 2019-20
    ANNUAL REPORT 2019-20 BHARAT COKING COAL LIMITED A MINI RATNA COMPANY CONTENT 005 006 008 009 Vision & Mission Management Notice Statement During the year Bankers & Auditors 011 012 015 Board of Directors Chairman’s Statement Operational Statistics 016 025 123 130 Financial R&D and Report on Directors’ Report CSR Report Statistics Corporate Governance 135 144 146 Management Discussion CEO And CFO Statutory Auditor’s Report and Analysis Report Certification and replies of Management 192 194 197 Comptroller & Auditor Secretarial General of India Report Auditor’s Report Balance Sheet 199 201 203 Profit & Loss Statement of flow of Cash Statement of Account and Cash Equivalent changes in equity 205 206 230 Corporate Significant Accounting Notes to Balance Information Policy Sheet 255 264 297 299 Notes to Profit &Loss Additional Notes Regulation 33 of Other Details Account on Accounts SEBI (Enclosures) BHARAT COKING COAL A MINI RATNA LIMITED COMPANY Vision The vision of Bharat Coking Coal Limited (BCCL) is to emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market. Mission The mission of Bharat Coking Coal Limited (BCCL) is to produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, conservation and quality. Annual Report 2019-20 5 A MINI RATNA BHARAT COKING COAL COMPANY LIMITED पं.का.:-कोयला भवन कोयला नगर, भारत कोककं ग कोल कलकिटेड धनबाद- 826005 BHARAT COKING COAL LIMITED Regd.
    [Show full text]
  • File for Website
    LIST OF SHAREHOLDERS WHOSE SHARES WERE TRANSFERRED TO IEPF FOR SHARES ALLOTTED DURING BONUS ISSUE NO. OF SHARES DATE OF TRANSFERRED TO TRANSFER TO Sl. No. ACCNO NAME ADD IEPF IEPF 1 109265 RACHNA SHARMA A ‐ 11/1 SECTOR 18 ROHINI NEW DELHI 42 31‐Jan‐19 2 1106403 GEETA RANI LONG STREET DHANAULA TEH BARNALA DISTT SANGRUR PUNJAB 20 31‐Jan‐19 3 1106582 ALOK SAXENA 104 PATEL NAGAR ALAMBAGH LUCKNOW 20 31‐Jan‐19 4 1107793 KADAR MIYAN A CHAND VI11&PO KOSAMDI TALUKA ANKLESHWAR BHARUCH 42 31‐Jan‐19 5 1108907 AMIT KAUR MARWAH F‐90 RAJOURI GARDEN NEW DELHI 42 31‐Jan‐19 6 1109271 UJWALA D KARNIK MUMBAI 26 31‐Jan‐19 7 1109427 MANISH KUMAR MISHRA E‐401 SECTOR 18 NEW PANVEL RAIGAD PANVEL 20 31‐Jan‐19 8 1109510 TRUPATI KAMLESH SHAH Address Not Available 26 31‐Jan‐19 9 1109811 P N K MOHAN P TULASI RAM 8‐3‐318‐6/3/34 ALINAGAR YELLAREDDY GUDA, 21 31‐Jan‐19 10 1109949 SHRIKRISHNA MANGESH NABAR MUMBAI 20 31‐Jan‐19 11 1110014 SEJAL JAY KRISHNA Address Not Available 42 31‐Jan‐19 12 1110068 GAURAV MEHTA 49/30 SECOND FLOOR EAST PATEL NAGAR NEW DELHI 26 31‐Jan‐19 13 1110093 SUDHIR VERMA 182 C 991 VIKAS PURI NEW DELHI 42 31‐Jan‐19 14 1110148 MRS VIJAYDAKSH S352 GREATER KAILASH PART I NEW DELHI 42 31‐Jan‐19 15 1110312 MADHU D V SINGH 1‐446‐C AMBEDKAR COLONY ALIGARH 20 31‐Jan‐19 16 1110609 SANJAY BANSAL HOLIKA CHOWK BADI BASTI PUSHKAR AJMER 42 31‐Jan‐19 17 1110712 BALAJI KUBER 104 SAMAY COMPLEX ANDMAHAL ROAD DADA AN SURAT 42 31‐Jan‐19 18 1111095 MRUGESH JAYA KRISHNA AHMEDABAD 42 31‐Jan‐19 19 1111364 JAYABEN T MADHAVANI 44 PAYAL COMPLEX SAYAJIGUNJ VADODARA 42 31‐Jan‐19
    [Show full text]