02 6248 7995 [email protected] GPO

Total Page:16

File Type:pdf, Size:1020Kb

02 6248 7995 Office@Pedalpower.Org.Au GPO Type of Project Description Location Missing Links Sulwood Dr east-west bike path connection Kambah / between Drakeford Dr and Athllon Dr. [Note: a bike Wanniassa path project of this nature was highlighted in the 2019 election campaign by the Federal ALP for joint funding with the ACT Government] Crossing Sulwood Dr & Athllon Dr roundabout - develop a Kambah / Upgrades safer crossing arrangement on this major Wanniassa north/south bike path into/out of Tuggeranong (location also borders Brindabella electorate). Missing Links Improve linkages between main paths and Woden / town/group centres: Cooleman Crt (for example, the new separated bike path in front of the Woden Hellenic Club does not connect to Woden Town Centre. The path terminates at Bowes St pedestrian crossing with no signage or path markings to indicate how to continue riding or walking to the Woden Town Centre). Crossing The main north-south path where it crosses Curtin Upgrades Theodore St at Melrose Dr. Separation Yarra Glen and Adelaide Ave: construct separated Civic to Projects cycleways within the road/rail corridor (undertake Woden early planning for active travel arrangements in the context of Light Rail Stage 2 – Civic to Woden). Missing Links Belconnen Bikeway: complete Hayden Dr works as East originally planned with connection via Battye St to Belconnen trunk path behind AIS stadium. And a link to Bruce from College St. [Note: a project of this nature was highlighted in the 2019 election campaign by the Federal ALP for joint funding with the ACT Government] [email protected] 02 6248 7995 GPO 581, CanberraACT 2601 Missing Links Benjamin Way Bikeway: funding has only been Belconnen provided for design work. A financial commitment is required for the construction phase. Missing Links Kuringa Drive Belconnen – completion of works to Belconnen deliver an off-road path between Barton Hwy and Owen Dixon Drive. Path Upgrades Sullivans Creek to Barry Dr crossing at Marcus Civic Clarke St: upgrade the path and improve the crossing to allow more room for bikes. Path Upgrades Sullivans Creek Path: complete the path widening Inner North, not undertaken during the recent upgrade. Civic Separation Walker/cyclist separation project along McCaughey Turner Projects St between Masson St and Barry Drive. [This project was highlighted in the 2019 election campaign by the Federal ALP for joint funding with the ACT Government.] Missing Links Improve connectivity to and around the Tuggeranong Tuggeranong Town Centre- including establish connections to Anketell Street bike path at the southern end. Crossing Improve crossing arrangement on the main north- Kambah / Upgrades south path at the Athllon Dr / Sulwood Dr Wanniassa roundabout (also borders the Murrumbidgee electorate) Missing Links Construct cycling links to get into and around the Gungahlin Gungahlin Town Centre. The town centre’s existing cycling infrastructure is poor. .
Recommended publications
  • WCCC Letterhead Aug 2006
    www.wccc.com.au [email protected] PO Box 3701 Weston Creek ACT 2611 Telephone (02) 6288 8975 Minutes of the WCCC General Meeting Wednesday, 28 March 2012 1. Meeting opened Chair Tom Anderson opened the meeting at 7.35pm. About forty persons were present. Tom welcomed Mr David Dawes, Director General, Economic Development Directorate, ACT Government; Mr Hamish McNulty (Infrastructure and Capital Works); Mr Ivo Matesic (Land Development Agency); Ms Alison Abernathy and Ms Chantelle Lustri. He also welcomed Mr Mark Sawa of The Southside Chronicle. 2. Apologies: Tony Gill (Roads ACT), Tim Dalton, John Burke. 3. Presentations: What’s New with the Molonglo Development? Mr David Dawes introduced the presentations and said that if WCCC members had questions that he or others could not answer, he would undertake to take the questions on notice and get a response from the relevant part of the ACT Government. Roads Mr Hamish McNulty began with a presentation about what is happening with the Cotter Road and what other construction works are planned to follow. In relation to the roundabout on Cotter Road outside the Defence Staff College, he said that the utility adjustments had been done, and that works had started on Stage 1 of the new Cotter Road—constructing new lanes on the north side of the road. This work will take about twenty (20) weeks. Stage 2 will be similar construction on the lanes on the south side, and that should take about fifteen (15) weeks. Both Stages should be completed by the end of September 2012. Streeton Drive will become a T-intersection with Cotter Road, and will have traffic lights.
    [Show full text]
  • The Benefits of Long-Term Pavement Performance (LTPP) Research to Funders
    Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 14 ( 2016 ) 2477 – 2486 6th Transport Research Arena April 18-21, 2016 The benefits of Long-Term Pavement Performance (LTPP) research to funders Tim Martin a,*, Lith Choummanivong a aARRB Group Ltd, 500 Burwood Highway, Vermont South, Victora, 3133, Australia Abstract Long-term pavement performance (LTPP) monitoring has been conducted in Australia for over 20 years. This research was funded by Austroads (representing federal, state and territory road agencies, local government and the New Zealand road agency) to promote improved practice and capability for the road agencies. The LTPP monitoring program measured performance by rutting, roughness, cracking and deflection. Initially the program involved a range of designated flexible pavement sites under varying conditions of environment and traffic. Many of these LTPP sites were included in the Strategic Highway Research Program (SHRP) of the United States (US). All sites were monitored in accordance with the SHRP protocols. Later long-term pavement performance maintenance (LTPPM) sites were included in the program to: (i) assess the impact of surface maintenance treatments on changes to pavement conditions (works effects, WE); and, (ii) assess the impact of maintenance on road deterioration (RD). A range of RD and WE models were developed using the LTPP/LTPPM observational data in combination with experimental data collected from Australia's Accelerated Loading Facility (ALF) that separately investigated the impact on RD of increased axle load and various typical surface maintenance treatments. The RD models cover the deterministic prediction of functional surface distress (rutting, roughness and cracking) and the loss of traffic load capacity (strength).
    [Show full text]
  • The College Operates a Bus Service for Students Living in the Gungahlin, Belconnen and Inner North Areas
    The College operates a bus service for students living in the Gungahlin, Belconnen and Inner North areas. 3DVVHVDUHLVVXHGRQD¿UVWFRPHEDVLV )XUWKHULQIRUPDWLRQHQTXLULHV#PFFDFWHGXDX See over for College bus routes and timetables GungahlinGUNGHLIN MARCH Bus Route 21 r D r e tl u Jaba C Gungahlin Dr nun 1 en gg od a Av R N CASEY e M M i i r r rr ee aa Avv bb A Katherine Av ee eenn Wanganeen Ave ii vv Mulligans Flat Rd lhhaa Wanganeen Ave ooaal ShS h H 2 Mirrabei Dr o Barton Hwy r s FORDE AMAROO e P a r k D Gundaroo Dr r Gundaroo Dr The Valley Ave Gungahlin Pl H oo Gozzard rr ssee P Gungahlin Dr aa rrkk Gundaroo Dr Anthony D 4 rr Rolfe Ave MCKELLAR Interchange 3 PALMERSTON William Slim St Wimmera Mapleton Ave FRANKLIN GIRALANG Barton Hwy Flemington Rd Flemington Flemington Rd Flemington Well Station Dr Nullarb or Ave LAWSON G u Well Station Dr n g a h r l i D n n D li r h Hoskins St a MITCHELL KALEEN ng Gu Gin lin Dr Sandford St ni ungah nd G er ra D r BRUCE Flemington Rd Drr Barton Hwy lliin gah Gun Federal Hwy Marist Ginninderra Dr College Ellenborough St Gu ngah lin Dr DOWNER Pick up – AM Drop off – PM Stop Location Time Stop Location Time Ngunnawal – Wanganeen Ave Marist College – Bay 1 (front of College) 3.16pm 1 7.28am (Action Bus Stop #4694) Ngunnawal – Wanganeen Ave 1 3.44pm Amaroo/Forde – Horse Park Dr (Action Bus Stop #4694) 2 7.35am (Action Bus Stop #6127) Amaroo/Forde – Horse Park Dr 2 3.49pm Gungahlin – Anthony Rolfe Ave (Action Bus Stop #6127) 3 7.38am (After De Bortoli St)(Action Bus Shop #6069) Gungahlin – Anthony Rolfe Ave 3 3.52pm Gungahlin Interchange (After De Bortoli St)(Action Bus Shop #6069) 4 7.45am (Platform 3) Gungahlin Interchange 4 3.56pm Marist College 8.20am (Platform 3) NB: It is recommended that students arrive at the stop at least 10 mins NB: Adults picking up younger children should be at the bus stop prior to the scheduled time.
    [Show full text]
  • LAKE TUGGERANONG COLLEGE Plan Your Trip with the TC Journey Planner! Visit Transport.Act.Gov.Au for Details Effective 20 July 2020
    LAKE TUGGERANONG COLLEGE Plan your trip with the TC Journey planner! Visit transport.act.gov.au for details Effective 20 July 2020 Local area map School start 8:30 am School finish 3:30 pm Bus stop location 70 Regular route number R4 Cowlishaw St Lake Tuggeranong RAPID route number College Walking route Anketell St Cowlishaw St Tuggeranong Interchange Routes R4 , 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81 Pitman St Local area map provides indicative walking paths only. This map is designed to represent local public transport options in the area and is not to scale transport.act.gov.au LAKE TUGGERANONG COLLEGE Plan your trip with the TC Journey planner! Visit transport.act.gov.au for details Effective 20 July 2020 Summary of bus services Route AM PM Suburbs/Areas Serviced Other information R4 Belconnen Interchange, Bruce, City Interchange, Woden Interchange, Tuggeranong Interchange Woden Interchange, Phillip, Cooleman Court, 70 Namatjira Drive, Kambah West, Tuggeranong Interchange 71 Woden Interchange, Phillip, Cooleman Court, Namatjira Drive, Kambah, Tuggeranong Interchange 72 Tuggeranong Interchange, Oxley, Wanniassa, Erindale Interchange, Woden Interchange 73 Tuggeranong Interchange, Monash, Erindale Interchange, Wanniassa, Woden Interchange Tuggeranong Interchange, Wanniassa, Erindale 74 Interchange, Fadden, Macarthur, Chisholm, Gilmore, Richardson Tuggeranong Interchange, Richardson, Gilmore, 75 Chisholm, Macarthur, Fadden, Erindale Interchange, Fadden, Wanniassa Tuggeranong Interchange, Greenway, Calwell, 76 Richardson, Chisholm, Macarthur, Gowrie, Erindale Interchange, Woden Interchange 77 Tuggeranong Interchange, Monash, Gowrie, Erindale Interchange, Woden Interchange 78 Tuggeranong Interchange, Greenway, Bonython, Isabella Plains, Richardson, Chisholm 79 Tuggeranong Interchange, Isabella Plains, Theodore, Calwell 80 Tuggeranong Interchange, Lanyon Marketplace, Conder, Banks 81 Tuggeranong Interchange, Greenway, Bonython, Gordon, Banks, Conder, Lanyon Marketplace These services can be accessed from Tuggeranong Interchange.
    [Show full text]
  • Deakin Residents Association, Inc PO Box 3310, Manuka, ACT 2603
    Deakin Residents Association, Inc PO Box 3310, Manuka, ACT 2603 www.deakinresidents.asn.au Mr David Dawes CEO Land Development Agency ESDD Dear Mr Dawes, Comment on CB+E Development Strategy February 2015 Deakin Residents' Association appreciates the opportunity to comment on the above strategy. We note that the updated strategy has attempted to address some of the comments made on earlier versions of the strategy, but we regret that the current proposals remain far from acceptable in the context of good planning for the future of the immediate area (including Deakin) and the broader planning issues facing South Canberra. We have seen the comments submitted by the Yarralumla Residents Association and generally support the range of issues and arguments they have raised. Our own comments focus on the direct effects on current and future residents of Deakin, as well as the failure to address core planning principles that apply to Canberra and this precinct. We will continue to contribute actively to all consultation processes that are available to us as a residents' community association. The specifics of our comments follow below. Yours sincerely, Peter Wurfel President Deakin Residents' Association, Inc 4 April 2015 2 CB+E Planning and Development Strategy February 2015 Deakin Residents' Association comments to LDA. 1. Deakin Traffic Impacts DRA agrees that: an effective interchange between Cotter Road and Adelaide Avenue/Yarra Glen is overdue and needs to be implemented. Traffic flows in all directions are certain to increase, and better public transport on the Adelaide Avenue corridor must be accommodated. a bus stop on Adelaide Avenue, with proper pedestrian access, is also a priority and should be implemented as an early part of the project, allowing access by current residents (and employees in Deakin West) to the rapid public transport network along Adelaide Avenue We make the following points.
    [Show full text]
  • 2003 Competitor Information Guide
    RALLY GUIDE NETIER NATIONAL CAPITAL RALLY 21-22 MARCH 2020 netiernationalcapitalrally.com.au INTRODUCTION AND WELCOME Welcome to the 2020 Netier National Capital Rally. The rally is a compact event being Round 1 of the RSEA Safty Motorsport Australia Rally Championship® incorporating ARC2, ARC3, ARC4 J-ARC. M-ARC and Teams Cup. The rally is also Round 1 of the MTA Motorsport Australia New South Wales Rally Championship, the East Coast Classic Rally Series and the Techworkz Automotive ACT Regional Rally Series. Events of this magnitude cannot happen without the tireless work and assistance of key stakeholders and I would personally like to thank all officials for their efforts in the lead up and during the event. A special mention must go to the team at the Brindabella Motor Sport Club for their incredible support for this event. We acknowledge the support of Netier and Abode Hotels who have committed for a further 3 years and the ongoing support of the ACT Government. The Netier National Capital Rally has been designed with the competitor in mind utilising some of the best roads Canberra has to offer. The event has been set to be as compact as possible for the benefits of both crews, teams, media and other stakeholders. We look forward to receiving your entry for one of the most exciting and dynamic events of the year. The city of Canberra awaits you. Yours sincerely Adrian Dudok Clerk of Course Page: 2 RALLY COMMITTEE Position Name Contact Clerk of Course Adrian Dudok 0417 251 011 Deputy Clerk of Course Michael Wallace 0425 840 843 Assistant
    [Show full text]
  • Light Rail Update
    Gungahlin to Woden (via Barton) Light Rail Update DATE: 15 June 2018 Artist impression Artist impression STATEMENT FROM THE MINISTER FOR TRANSPORT AND CITY SERVICES Canberra is one of the world’s most liveable cities – a destination of choice to live, work, visit and invest. As Australia grows, so too will Canberra. The ACT Government is planning for our city’s growth by ensuring we have sufficient transport infrastructure in place before increasing congestion critically impacts our highly regarded urban amenity and quality of life. Canberra’s light rail network is a transformational city-shaping project for the Territory, providing an attractive, reliable and convenient public transport choice that connects families, students, communities and cultures. The initial corridor between Gungahlin and Woden via the City and the Parliamentary Zone will form the backbone of the network, linking activity centres north and south of Lake Burley Griffin. In time it will be intersected by a future east-west corridor operating between Belconnen and the Canberra International Airport and other network extensions. This light rail update focusses on the development of the City to Woden (via Barton) portion of Canberra’s overall light rail network. Since the last light rail update, the ACT Government has reaffirmed its commitment to developing the project with $12.5 million to be invested in progressing the project throughout the 2018-19 financial year. The ACT Government also welcomes the upcoming inquiry into the project to be conducted by the Commonwealth’s Joint Standing Committee on the National Capital and External Territories. The ACT Government will continue to engage with the Canberra community as the City to Woden light rail project develops, and as the City to Gungahlin light rail alignment draws closer to completion.
    [Show full text]
  • Canberra Light Rail Master Plan Preliminary Options And
    Curtin Group Centre Draft Master Plan NOVEMBER 2015 HAVE YOUR SAY The Environment and Planning Directorate (EPD) welcomes comments on this draft master plan. You can make comments on the Curtin draft master plan: Visit: www.act.gov.au/curtin Email: [email protected] Post: Curtin Group Centre Master Plan, PO Box 158, Canberra ACT 2601 Comments can be made until 05 February 2016 All comments will be taken into consideration when revising the master plan. The master plan will be considered by the ACT Government in mid 2016. If adopted, implementation of the master plan can commence. © Australian Capital Territory, Canberra 2015 This work is copyright. Apart from any use as permitted under theCopyright Act 1968, no part may be reproduced by any process without written permission from: Director-General, Environment and Planning Directorate, ACT Government, GPO Box 158, Canberra ACT 2601. Telephone: 02 6207 1923 Website: www.environment.act.gov.au Printed on recycled paper Privacy Before making a submission to this discussion paper, please review the Environment and Planning Directorate’s privacy policy and annex at www.environment.act.gov.au/about/privacy . Any personal information received in the course of your submission will be used only for the purposes of this community engagement process. Names of organisations may be included in any subsequent consultation report, but all individuals will be de-identified unless prior approval is gained. Accessibility The ACT Government is committed to making its information, services, events and venues as accessible as possible. If you have difficulty reading a standard printed document and would like to receive this publication in an alternative format, such as large print, please phone Canberra Connect on 13 22 81 or email the Environment and Planning Directorate at [email protected] If English is not your first language and you require a translating and interpreting service, please phone 13 14 50.
    [Show full text]
  • The Canberra Times (ACT : 1926 - 1995), Wednesday 27 January 1971, Page 1, 3
    The Canberra Times (ACT : 1926 - 1995), Wednesday 27 January 1971, page 1, 3 SSING IN STORM Flash flood in Woden Valley By Staff Reporters A 12-year-old girl was drowned and at least four other people were missing early today after torrential rain caused flash in the Woden Valley. of cars were victims of the flash flood at the intersection of the Yarra Glen and Melrose Drive. — National Library of Australia http://nla.gov.au/nla.news-article110451414 A tow truck, left, stands by on the ramp leading from the Carruthers Street bridge'.while cars are swept down right, following the by flood waters on the Yarra Glen, flash flood in the Woden Valley last night. floodwaters, in the by deep mainly Police pulled about 60 cars from Yarra Glen-Cotter Road area, and flooded sections of road. is many were stranded. Several cars Among the people reported missing disappeared into stormwater drains an 18-year-old trainee nurse, is believed have been re and Yarralumla Creek after their who to turning to her home from Canberra owners had narrow from had escapes Hospital. being swept away with them. Early this morning 50 police, assisted Civil Defence volunteers, fire brigade, According to one report a car with by tow-truck operators and civiiians were five children was swept away when a for stranded motorists herself it, searching the area woman, able to free from had child and for bodies. been unable to do the same for the At that time the confirmed-missing list ren. stood at four people.
    [Show full text]
  • Transport Study Report Red Hill Reserve Surrounds Update
    Transport Study Report Red Hill Reserve Surrounds Update Reference No. A1896053 Prepared for EPSDD 10 September 2019 SMEC INTERNAL REF. 3002666.101 Document Control Document Control Document: Transport Study Report File Location: X:\Projects\3002666 Traffic Minor Projects 2019\101 Red Hill Reserve Surrounds Update\037 Reports (Outgoing)\3002666.101 Red Hill Reserve Surrounds Update Report Rev3a.docx Project Name: Red Hill Reserve Surrounds Update Project Number: 3002666.101 Revision Number: 3 Revision History REVISION NO. DATE PREPARED BY REVIEWED BY APPROVED FOR ISSUE BY 0 13 May 2019 Josh Everett Lindsay Jacobsen Josh Everett 1 28 June 2019 Josh Everett Lindsay Jacobsen Josh Everett 2 2 August 2019 Josh Everett For discussion 3 10 September 2019 Josh Everett Lindsay Jacobsen Josh Everett Issue Register NUMBER OF DISTRIBUTION LIST DATE ISSUED COPIES Environment, Planning and Sustainable Development Directorate 10 September Electronic (EPSDD) 2019 10 September SMEC Canberra Electronic 2019 SMEC Company Details Approved by: Josh Everett Address: Level 1, 243 Northbourne Avenue, Lyneham ACT 2602 Signature: Tel: (02) 6234 1960 Fax: (02) 6234 1966 Email: [email protected] Website: www.smec.com The information within this document is and shall remain the property of SMEC Australia Pty Ltd. TRANSPORT STUDY REPORT SMEC Internal Ref. 3002666.101 Red Hill Reserve Surrounds Update 10 September 2019 i Prepared for EPSDD Important Notice Important Notice This report is provided pursuant to a Consultancy Agreement between SMEC Australia Pty Limited (“SMEC”) and EPSDD, under which SMEC undertook to perform a specific and limited task for EPSDD. This report is strictly limited to the matters stated in it and subject to the various assumptions, qualifications and limitations in it and does not apply by implication to other matters.
    [Show full text]
  • Proposals for the Gungahlin Drive Extension (John Dedman Parkway)
    Legislative Assembly for the Australian Capital Territory STANDING COMMITTEE ON PLANNING AND URBAN SERVICES REPORT NO.67 FEBRUARY 2001 PROPOSALS FOR THE GUNGAHLIN DRIVE EXTENSION (JOHN DEDMAN PARKWAY) Executive summary and recommendations This report addresses each one of the terms of reference for the inquiry into ‘proposals for the Gungahlin Drive extension’ established by the Legislative Assembly on 21 April 1999 [the full terms of reference are reproduced after the Contents page of this report.] Information about the conduct of the inquiry is set out in chapter 1. Information about the first term of reference—which deals with the John Dedman Parkway Preliminary Assessment [or Maunsell Study] and the government’s response (set out in the Preliminary Assessment Evaluation for the JDP Proposal)—is set out in chapters 2-5. The Maunsell Study [MS] is described in chapter 2. The government’s view of the adequacy of the MS is set out in chapter 3. The view of submitters to this inquiry is shown in chapter 4. The conclusions reached by this committee are laid out in chapter 5. In essence, the committee finds that, despite some omissions and weaknesses (which are outlined in this report), the MS provides an appropriate basis for decisions about whether the John Dedman Parkway [JDP] is needed and about route options. Further, the committee considers that the government’s assessment of the MS is also ———————————————— Standing Committee on Planning and Urban Services The committee was established on 28/4/98 to inquire into and report on planning and lease management, road and transport services, infrastructure and asset management and public utilities purchasing, electricity industry and regulation, construction industry policy, parks and forests, private sector employment inspectorate, building services, environment, heritage and municipal services and any other related matter (resolution of appointment, as amended on 25/11/99, 7/12/00 and 15/2/01).
    [Show full text]
  • Section 1 - Summary of Your Proposed Action
    Submission #4301 - Commonwealth Park to Woden Light Rail Project, ACT Title of Proposal - Commonwealth Park to Woden Light Rail Project, ACT Section 1 - Summary of your proposed action Provide a summary of your proposed action, including any consultations undertaken. 1.1 Project Industry Type Transport - Land 1.2 Provide a detailed description of the proposed action, including all proposed activities. The proposed action (the Project) comprises the development of light rail between Commonwealth Park and Woden. The Project would require the construction of a new light rail bridge over Lake Burley Griffin, in between the existing road bridges. This would provide a light rail service across the lake and through the Parliamentary Zone. The Project is located on both Territory and National Land and crosses Designated Areas and the Parliamentary Zone as shown in Appendix A. The Project is being progressed as a separate and independent action from the City to Commonwealth Park light rail project as further discussed in section 1.16.1. KEY PROJECT FEATURES The key Project features are: •A nine kilometre light rail track from Commonwealth Park to Woden via State Circle (east) that would be mainly built within the existing road reserve. •Nine new light rail stops (Appendix A), which will be subject to further design development. They would form a combination of side and island platforms depending on the final design and existing constraints at each proposed stop location. Each stop would include a north and southbound platform that would be 33 metres long however it would include space to extend the platforms to 45 metres in the future depending on the expected patronage.
    [Show full text]