Merici College Direct Bus Services South Canberra Morning Run

Total Page:16

File Type:pdf, Size:1020Kb

Merici College Direct Bus Services South Canberra Morning Run MERICI COLLEGE DIRECT BUS SERVICES SOUTH CANBERRA MORNING RUN ACTION Stop Time Direction Street/Location No. 7:15 Run Start ACTION BUS STOP - Tharwa Dr (North after Box Hill Ave) 2699 Continue Drakeford Dr 7:23 Pick Up ACTION BUS STOP - Drakeford Dr (after Erindale Dr) 1374 Right Taverner St Left Erindale Dr Left Ashley Dr Left McBryde Cres Right Comie St 7:30 Pick Up ACTION BUS STOP - Erindale Bus Station 1172 Left Sternberg Cres Left Wheeler Cres Right Fincham Cres Right Athllon Dr Left Melrose Dr 7:43 Pick Up ACTION BUS STOP - Melrose Dr (2nd after Hodgson Cres) 2085 Left Hindmarsh Dr Right Namatjira Dr 7:51 Pick up ACTION BUS STOP - Namatjira Dr (opp Mirinjani Village) 2690 Left Streeton Dr Right Darwinia Ter 7:55 Pick Up ACTION BUS STOP - Darwinia Ter (after Scully Pl) 2522 Left Hindmarsh Dr Right Eucumbene Dr 7:58 Pick Up ACTION BUS STOP - Eucumbene Dr (after Hindmarsh Dr) 2137 Right Cotter Rd Right John Gorton Dr 8:03 Pick up ACTION BUS STOP - John Gorton Dr (after Harold White Ave) 2812 Continue Cotter Rd Right McCulloch St Left Carruthers St 8:17 Pickup ACTION BUS STOP - Carruthers St (after Allan St) 2015 Left Yarra Glen Continue Adelaide Ave Left State Circle Left Kings Ave 8:25 Pick up ACTION BUS STOP - Kings Ave (Opp Edmund Barton Building) 3028 Left Parkes Way Right Anzac Pde Left Limestone Ave Left Ipima St 8:37 Set Down Merici College MERICI COLLEGE DIRECT BUS SERVICES SOUTH CANBERRA AFTERNOON RUN ACTION Stop Time Direction Street/Location No. 15:30 Run Start Merici College Continue Wise St Left Henty St Right Limestone Ave Right Anzac Pde Left Constitution Ave Right Kings Ave ACTION Bus Stop - Kings Ave (outside Edmund Barton 15:42 Set Down Building) 3012 Left State Circle Left Adelaide Ave Right Carruthers St 15:50 Set Down ACTION Bus Stop - Carruthers St (after Yarra Glen) 2017 Right McCulloch St Left Cotter Rd Continue John Gorton Dr Left Cotter Rd 16:04 Set Down Road side - (opp max Jacobs Ave) n/a Left Eucumbene Dr 16:09 Set down ACTION Bus Stop - Eucumbene Dr (after Renmark) 2138 Left Hindmarsh Dr Right Darwinia Terr 16:12 Set Down ACTION Bus Stop - Darwinia Dr (after Casuarina St) 2154 Left Streeton Dr Right Namatjira Dr 16:16 Set Down ACTION Bus Stp - Namatjira Dr (after MacNally St) 2200 Left Hindmarsh Dr Right Melrose Dr 16:24 Set Down ACTION Bus Stop - Melrose Dr (after Botany St) 2086 Right Athllon Dr Left Fincham Cres Right Sternberg Cres Right Comrie St 16:37 Set Down ACTION Bus Stop - Erindale Bus Station 1173 Left McBryde Cres Right Ashley Dr Right Erindale Dr Right Taverner Left Drakeford 16:44 Set Down ACTION Bus Stop - Drakeford Dr (after Taverner St) 1373 Continue Tharwa 16:52 Set Down ACTION Bus Stop Tharwa Dr (before Box Hill Av) 2697 .
Recommended publications
  • WCCC Letterhead Aug 2006
    www.wccc.com.au [email protected] PO Box 3701 Weston Creek ACT 2611 Telephone (02) 6288 8975 Minutes of the WCCC General Meeting Wednesday, 28 March 2012 1. Meeting opened Chair Tom Anderson opened the meeting at 7.35pm. About forty persons were present. Tom welcomed Mr David Dawes, Director General, Economic Development Directorate, ACT Government; Mr Hamish McNulty (Infrastructure and Capital Works); Mr Ivo Matesic (Land Development Agency); Ms Alison Abernathy and Ms Chantelle Lustri. He also welcomed Mr Mark Sawa of The Southside Chronicle. 2. Apologies: Tony Gill (Roads ACT), Tim Dalton, John Burke. 3. Presentations: What’s New with the Molonglo Development? Mr David Dawes introduced the presentations and said that if WCCC members had questions that he or others could not answer, he would undertake to take the questions on notice and get a response from the relevant part of the ACT Government. Roads Mr Hamish McNulty began with a presentation about what is happening with the Cotter Road and what other construction works are planned to follow. In relation to the roundabout on Cotter Road outside the Defence Staff College, he said that the utility adjustments had been done, and that works had started on Stage 1 of the new Cotter Road—constructing new lanes on the north side of the road. This work will take about twenty (20) weeks. Stage 2 will be similar construction on the lanes on the south side, and that should take about fifteen (15) weeks. Both Stages should be completed by the end of September 2012. Streeton Drive will become a T-intersection with Cotter Road, and will have traffic lights.
    [Show full text]
  • The Benefits of Long-Term Pavement Performance (LTPP) Research to Funders
    Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 14 ( 2016 ) 2477 – 2486 6th Transport Research Arena April 18-21, 2016 The benefits of Long-Term Pavement Performance (LTPP) research to funders Tim Martin a,*, Lith Choummanivong a aARRB Group Ltd, 500 Burwood Highway, Vermont South, Victora, 3133, Australia Abstract Long-term pavement performance (LTPP) monitoring has been conducted in Australia for over 20 years. This research was funded by Austroads (representing federal, state and territory road agencies, local government and the New Zealand road agency) to promote improved practice and capability for the road agencies. The LTPP monitoring program measured performance by rutting, roughness, cracking and deflection. Initially the program involved a range of designated flexible pavement sites under varying conditions of environment and traffic. Many of these LTPP sites were included in the Strategic Highway Research Program (SHRP) of the United States (US). All sites were monitored in accordance with the SHRP protocols. Later long-term pavement performance maintenance (LTPPM) sites were included in the program to: (i) assess the impact of surface maintenance treatments on changes to pavement conditions (works effects, WE); and, (ii) assess the impact of maintenance on road deterioration (RD). A range of RD and WE models were developed using the LTPP/LTPPM observational data in combination with experimental data collected from Australia's Accelerated Loading Facility (ALF) that separately investigated the impact on RD of increased axle load and various typical surface maintenance treatments. The RD models cover the deterministic prediction of functional surface distress (rutting, roughness and cracking) and the loss of traffic load capacity (strength).
    [Show full text]
  • The College Operates a Bus Service for Students Living in the Gungahlin, Belconnen and Inner North Areas
    The College operates a bus service for students living in the Gungahlin, Belconnen and Inner North areas. 3DVVHVDUHLVVXHGRQD¿UVWFRPHEDVLV )XUWKHULQIRUPDWLRQHQTXLULHV#PFFDFWHGXDX See over for College bus routes and timetables GungahlinGUNGHLIN MARCH Bus Route 21 r D r e tl u Jaba C Gungahlin Dr nun 1 en gg od a Av R N CASEY e M M i i r r rr ee aa Avv bb A Katherine Av ee eenn Wanganeen Ave ii vv Mulligans Flat Rd lhhaa Wanganeen Ave ooaal ShS h H 2 Mirrabei Dr o Barton Hwy r s FORDE AMAROO e P a r k D Gundaroo Dr r Gundaroo Dr The Valley Ave Gungahlin Pl H oo Gozzard rr ssee P Gungahlin Dr aa rrkk Gundaroo Dr Anthony D 4 rr Rolfe Ave MCKELLAR Interchange 3 PALMERSTON William Slim St Wimmera Mapleton Ave FRANKLIN GIRALANG Barton Hwy Flemington Rd Flemington Flemington Rd Flemington Well Station Dr Nullarb or Ave LAWSON G u Well Station Dr n g a h r l i D n n D li r h Hoskins St a MITCHELL KALEEN ng Gu Gin lin Dr Sandford St ni ungah nd G er ra D r BRUCE Flemington Rd Drr Barton Hwy lliin gah Gun Federal Hwy Marist Ginninderra Dr College Ellenborough St Gu ngah lin Dr DOWNER Pick up – AM Drop off – PM Stop Location Time Stop Location Time Ngunnawal – Wanganeen Ave Marist College – Bay 1 (front of College) 3.16pm 1 7.28am (Action Bus Stop #4694) Ngunnawal – Wanganeen Ave 1 3.44pm Amaroo/Forde – Horse Park Dr (Action Bus Stop #4694) 2 7.35am (Action Bus Stop #6127) Amaroo/Forde – Horse Park Dr 2 3.49pm Gungahlin – Anthony Rolfe Ave (Action Bus Stop #6127) 3 7.38am (After De Bortoli St)(Action Bus Shop #6069) Gungahlin – Anthony Rolfe Ave 3 3.52pm Gungahlin Interchange (After De Bortoli St)(Action Bus Shop #6069) 4 7.45am (Platform 3) Gungahlin Interchange 4 3.56pm Marist College 8.20am (Platform 3) NB: It is recommended that students arrive at the stop at least 10 mins NB: Adults picking up younger children should be at the bus stop prior to the scheduled time.
    [Show full text]
  • A National Capital, a Place to Live
    The Parliament of the Commonwealth of Australia a national capital, a place to live Inquiry into the Role of the National Capital Authority Joint Standing Committee on the National Capital and External Territories July 2004 Canberra © Commonwealth of Australia 2004 ISBN 0 642 78479 5 Cover – Marion and Walter Burley Griffin – Courtesy of the National Capital Authority Contents Foreword..................................................................................................................................................viii Membership of the Committee.................................................................................................................. x Terms of reference................................................................................................................................... xi List of abbreviations .................................................................................................................................xii List of recommendations........................................................................................................................ xiv 1 Introduction............................................................................................................. 1 Background.....................................................................................................................................2 The Griffin Legacy Project ............................................................................................................5 The Issues........................................................................................................................................6
    [Show full text]
  • News of Friends of Grasslands. Supporting Native Grassy Ecosystems
    NewsNews of Friends of Grasslands, Friends January-February of2012, pageGrasslands 1 . Supporting native grassy ecosystems January-February2012 ISSN 1832-6315 . Program - take the diary out now In this issue February Program SUN 5 FEBRUARY, 9.00-12.00 & 1.00-4.00. News roundup FOG/Fenner Working Bee, Scrivener's Hut, Capital Fourth Indigenous Values workshop Hill Cultivation corner - Blow-ins, volunteers, self sow- We'll need all the help we can get to rescue this neglected ers and weeds site in National Capital lands just a hop, step and jump New African lovegrass awareness campaign from the federal parliamentary zone! Lunch will be pro- vided. Please register with [email protected] and FOG advocacy bring drinking water, sun protection and sturdy footwear. Necklace fern and common maidenhair fern Photos: (by G Robertson - clockwise from above) a worked stone from the Cascades (see page 4), Greg Chatfield, Rod Mason & Adrian Brown at the Indigenous Values workshop (see page 8), and FOG volun- teers at Old Cooma Common Grassland Reserve. Over ten years of dedicated work has made an amazing difference at this grassland site (see page 5). News of Friends of Grasslands, January-February 2012, page 2 Upcoming FOG Events Other Events Indigenous Grass and Sedge Display Newport Lakes Native Nursery,VIC Please register for FOG activities with the FOG con- 15/12/11 to 29/02/12 tact person who can assist with directions and possibly 2 Lakes Drive, Newport, Victoria. car pooling. By registering, you assist FOG to organ- Over 45 species of local Indigenous Grasses, sedges ise any catering and to provide you with other infor- and threatened herbs in full seed/flower will be on dis- mation you may need.
    [Show full text]
  • Approved Routes for 14.50M Controlled Access
    National Class 3 Controlled Access Bus Exemption Notice 2019 Approved Roads Road From To Restrictions / Conditions (if applicable) Adelaide Avenue Cotter Rd Capital Circle Agar Street Ginninderra Dr Masterman St Aikman Drive Ginninderra Dr Emu Bank Ainslie Avenue Cooyong St Gooreen St Ainsworth Street Kitchener St Mawson Dr Akuna Street London Cct Cooyong St Albany Street Collie St Gladstone St Alderson Place Tralee St End Alfred Hill Drive Kingsford Smith Dr Alpen St Alinga Street East Row Marcus Clarke St Allsop Street Childers St Marcus Clarke St Alpen Street Alfred Hill Dr Copland Dr Anketell Street Athllon Dr (north intersection) Athllon Dr (south intersection) Anthony Rolfe Avenue Gundaroo Dr Horse Park Dr Antill Street (1) Northbourne Ave Madigan St Antill Street (2) Knox St Aspinall St Anzac Parade Limestone Ave/Fairbairn Ave Constitution Ave Archdall Street Osburn Dr Ginninderra Dr Arnott Street ACT/NSW Border End Ashkanasy Crescent Copland Dr Clancy St Ashley Drive Sternberg Cres Johnson Dr Aspinall Street Antill St Stirling Ave Athllon Drive Hindmarsh Dr Drakeford Dr (south intersection) Baddeley Crescent Kingsford Smith Dr Alpen St Badham Street Cape St Antill St Page 1 of 19 National Class 3 Controlled Access Bus Exemption Notice 2019 Approved Roads Baillieu Court Lysaght St Lysaght St Baillieu Lane Baillieu Court Heffernan St Balcombe Street Sidney Nolan St Box Hill Avenue Baldwin Drive Ginninderra Dr William Slim Dr Bandjalong Crescent Caswell Drive Bindubi St Bangalay Crescent Streeton Dr Carbeen St Barr Smith Avenue Hurtle Ave Athllon Dr Barraclough Crescent Clive Steele Ave Ashley Dr Barrier Street Ipswich St Newcastle St · No right turn permitted into Ipswich St.
    [Show full text]
  • 22. South Canberra Hydrogeological Landscape
    22. South Canberra Hydrogeological Landscape Tuggeranong, Kambah, Wanniassa, Theodore, Greenway Woden, Weston, Farrer, Isaacs, Low Moderate LOCALITIES Land Salt Load Duffy, Lyons, Curtin, Fisher Salinity (in-stream) Fyshwick, Kingston, Capital Hill, Yarralumla, Red Hill Low EC MAP SHEET Canberra 1:100 000 (in-stream) CONFIDENCE LEVEL Moderate OVERVIEW The South Canberra Hydrogeological Landscape (HGL) extends from the southern shoreline of Lake Burley Griffin to the southern edge of Tuggeranong, and from the Lower Molonglo Valley in the northwest to the Symonston HGL boundary on the east (Figure 1). The HGL covers an area of 146 km2 and receives 600 to 750 mm of rain per annum. Figure 1: South Canberra HGL distribution map. South Canberra HGL is characterised by sub-catchment based landscapes in Woden, Tuggeranong and around Capital Hill (Figure 2). Generally the ridgelines are heavily vegetated (Wanniassa Hills, Mt Taylor, Farrer Ridge Nature Reserves, Red Hill, Isaacs Ridge and Mt Stromlo) with little urban encroachment. The upper slope elements are cliff- forming in some areas and heavily vegetated with native forest and commercial forestry in some locations. The catchments are highly urbanised and there is rapid urban development in the north- western Weston Creek and Lower Molonglo Valley areas. Considerable areas of bare earth are in the urban development stage with massive earthworks and infrastructure installation. Appropriate sediment and erosion control works is necessary through this development stage. A feature of all landscapes is the waterways, concrete lined drainage channels and lakes constructed to handle large storm-water flows. These drainage reserves in the lower landscape are relatively wide and add to the green space of the area.
    [Show full text]
  • LAKE TUGGERANONG COLLEGE Plan Your Trip with the TC Journey Planner! Visit Transport.Act.Gov.Au for Details Effective 20 July 2020
    LAKE TUGGERANONG COLLEGE Plan your trip with the TC Journey planner! Visit transport.act.gov.au for details Effective 20 July 2020 Local area map School start 8:30 am School finish 3:30 pm Bus stop location 70 Regular route number R4 Cowlishaw St Lake Tuggeranong RAPID route number College Walking route Anketell St Cowlishaw St Tuggeranong Interchange Routes R4 , 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81 Pitman St Local area map provides indicative walking paths only. This map is designed to represent local public transport options in the area and is not to scale transport.act.gov.au LAKE TUGGERANONG COLLEGE Plan your trip with the TC Journey planner! Visit transport.act.gov.au for details Effective 20 July 2020 Summary of bus services Route AM PM Suburbs/Areas Serviced Other information R4 Belconnen Interchange, Bruce, City Interchange, Woden Interchange, Tuggeranong Interchange Woden Interchange, Phillip, Cooleman Court, 70 Namatjira Drive, Kambah West, Tuggeranong Interchange 71 Woden Interchange, Phillip, Cooleman Court, Namatjira Drive, Kambah, Tuggeranong Interchange 72 Tuggeranong Interchange, Oxley, Wanniassa, Erindale Interchange, Woden Interchange 73 Tuggeranong Interchange, Monash, Erindale Interchange, Wanniassa, Woden Interchange Tuggeranong Interchange, Wanniassa, Erindale 74 Interchange, Fadden, Macarthur, Chisholm, Gilmore, Richardson Tuggeranong Interchange, Richardson, Gilmore, 75 Chisholm, Macarthur, Fadden, Erindale Interchange, Fadden, Wanniassa Tuggeranong Interchange, Greenway, Calwell, 76 Richardson, Chisholm, Macarthur, Gowrie, Erindale Interchange, Woden Interchange 77 Tuggeranong Interchange, Monash, Gowrie, Erindale Interchange, Woden Interchange 78 Tuggeranong Interchange, Greenway, Bonython, Isabella Plains, Richardson, Chisholm 79 Tuggeranong Interchange, Isabella Plains, Theodore, Calwell 80 Tuggeranong Interchange, Lanyon Marketplace, Conder, Banks 81 Tuggeranong Interchange, Greenway, Bonython, Gordon, Banks, Conder, Lanyon Marketplace These services can be accessed from Tuggeranong Interchange.
    [Show full text]
  • Deakin Residents Association, Inc PO Box 3310, Manuka, ACT 2603
    Deakin Residents Association, Inc PO Box 3310, Manuka, ACT 2603 www.deakinresidents.asn.au Mr David Dawes CEO Land Development Agency ESDD Dear Mr Dawes, Comment on CB+E Development Strategy February 2015 Deakin Residents' Association appreciates the opportunity to comment on the above strategy. We note that the updated strategy has attempted to address some of the comments made on earlier versions of the strategy, but we regret that the current proposals remain far from acceptable in the context of good planning for the future of the immediate area (including Deakin) and the broader planning issues facing South Canberra. We have seen the comments submitted by the Yarralumla Residents Association and generally support the range of issues and arguments they have raised. Our own comments focus on the direct effects on current and future residents of Deakin, as well as the failure to address core planning principles that apply to Canberra and this precinct. We will continue to contribute actively to all consultation processes that are available to us as a residents' community association. The specifics of our comments follow below. Yours sincerely, Peter Wurfel President Deakin Residents' Association, Inc 4 April 2015 2 CB+E Planning and Development Strategy February 2015 Deakin Residents' Association comments to LDA. 1. Deakin Traffic Impacts DRA agrees that: an effective interchange between Cotter Road and Adelaide Avenue/Yarra Glen is overdue and needs to be implemented. Traffic flows in all directions are certain to increase, and better public transport on the Adelaide Avenue corridor must be accommodated. a bus stop on Adelaide Avenue, with proper pedestrian access, is also a priority and should be implemented as an early part of the project, allowing access by current residents (and employees in Deakin West) to the rapid public transport network along Adelaide Avenue We make the following points.
    [Show full text]
  • 2003 Competitor Information Guide
    RALLY GUIDE NETIER NATIONAL CAPITAL RALLY 21-22 MARCH 2020 netiernationalcapitalrally.com.au INTRODUCTION AND WELCOME Welcome to the 2020 Netier National Capital Rally. The rally is a compact event being Round 1 of the RSEA Safty Motorsport Australia Rally Championship® incorporating ARC2, ARC3, ARC4 J-ARC. M-ARC and Teams Cup. The rally is also Round 1 of the MTA Motorsport Australia New South Wales Rally Championship, the East Coast Classic Rally Series and the Techworkz Automotive ACT Regional Rally Series. Events of this magnitude cannot happen without the tireless work and assistance of key stakeholders and I would personally like to thank all officials for their efforts in the lead up and during the event. A special mention must go to the team at the Brindabella Motor Sport Club for their incredible support for this event. We acknowledge the support of Netier and Abode Hotels who have committed for a further 3 years and the ongoing support of the ACT Government. The Netier National Capital Rally has been designed with the competitor in mind utilising some of the best roads Canberra has to offer. The event has been set to be as compact as possible for the benefits of both crews, teams, media and other stakeholders. We look forward to receiving your entry for one of the most exciting and dynamic events of the year. The city of Canberra awaits you. Yours sincerely Adrian Dudok Clerk of Course Page: 2 RALLY COMMITTEE Position Name Contact Clerk of Course Adrian Dudok 0417 251 011 Deputy Clerk of Course Michael Wallace 0425 840 843 Assistant
    [Show full text]
  • Public Transport in the Federal Capital Territory in the 1920S & 1930S
    Public Transport in the Federal Capital Territory in the 1920s & 1930s. Construction work on the city of Canberra began in earnest in 1913. The nearest town was Queanbeyan and from 1916 a Co-operative Store was in operation near the Kingston Railway Station. The rail line between Queanbeyan and Canberra opened in 1914 and from this time some passenger travel for workmen was available. However the majority of people if they wished to visit the shopping centre at Queanbeyan had the choice of shank's pony (walking), push bike, horse & sulky, horse, or motorized vehicle. One enterprising man at Duntroon hired out horse and sulkies and Mrs Marion Stanley of the Engineers Mess in 1919 availed herself of this mode of transport. Her young daughter Cecilia walked across on Friday afternoons to Duntroon from the Mess (near the Power House in Kingston), picked up the horse and buggy and drove home. On the following Sunday repeated the process in reverse order. Anyone wanting to catch the train to Melbourne had to organise transport across to Yass and those wanting to go to Sydney had to join the train at Queanbeyan. The train journey between Queanbeyan and Canberra required another engine to be used and this practice continued as late as the 1950s and 1960s. The wait for another engine often added a few hours to the journey. A number of taxi owner drivers in the 1920s and 1930s advertised their services for runs to Yass and Queanbeyan Railway Stations. From 1921 some transport was supplied to a few officials and foremen but the majority still had to find their own way to and from work or shopping.
    [Show full text]
  • Investigating Interchange Traffic and Commercial Development at Rural Interstate Highway Exits
    Investigating Interchange Traffic and Commercial Development at Rural Interstate Highway Exits A thesis presented to the faculty of the Russ College of Engineering and Technology of Ohio University In partial fulfillment of the requirements for the degree Master of Science Shah Mahmood August 2016 © 2016 Shah Mahmood. All Rights Reserved. 2 This thesis titled Investigating Interchange Traffic and Commercial Development at Rural Interstate Highway Exits by SHAH MAHMOOD has been approved for the Department of Civil Engineering and the Russ College of Engineering and Technology by Benjamin R. Sperry Assistant Professor of Civil Engineering Dennis Irwin Dean, Russ College of Engineering and Technology 3 ABSTRACT MAHMOOD, SHAH., M.S., August 2016, Civil Engineering Investigating Interchange Traffic and Commercial Development at Rural Interstate Highway Exits Director of Thesis: Benjamin R. Sperry This thesis investigates interchange traffic and commercial development at 69 rural interstate highway exits in Ohio. According to the literature, the following factors influence commercial development growth at rural and small-town Interstate exits: motels, hotels, restaurants, gas stations and convenience stores, truck stops or truck parking lots, geography, access to firmer markets, traffic volume of the intersecting highway, intersecting highway types, site competition, and other developments. This study examined those factors which influence traffic volume at the interchange exit such as gas stations and convenience stores, fast food restaurants, hotels and motels, distance to the nearest rural city and town, distance to the nearest and furthest interchange, and intersecting highway. The geographic information system (GIS) is used to identify 69 Interstate exits and local trade area characteristics along Interstate 70 and Interstate 75 in Ohio.
    [Show full text]