INFRASTRUCTURE GAP 2016-2025
GAP BY INDUSTRY THROUGH 2025
Other
28% Transport 36% Strategic pillar:
Telecoms 17%
Energy 19%
Total gap: US$ 159,6 billion
Source: AFIN NATIONAL INFRASTRUCTURE PLAN
STATE MINISTRY OF ECONOMY AND FINANCE o REGIONAL GOVERNMENT PROPOSES o LOCAL GOVERNMENT o MINISTRIES
APPROVES
PREPARES COMPILED BY
MULTIANNUAL INVESTMENT PLAN MINISTERS CABINET MULTIANNUAL INVESTMEN REPORT
Strategic planning: Choose right projects OBJECTIVES Promotion: One stop shop for potential investors Follow up: Follow up and accountability GOVERNMENT INITIATIVES
Proposals from ministries, regional governments or local governments to build infrstructure or public service projects
PLANNING AND Multiannual Investment Plan prepared PROGRAMMING Three year time horizon
FORMULATION Determine if technically, financially and legally feasible as PPP project
Draft bid documents and project contract STRUCTURING Comments and suggestions period
Call for bids Short listing TRANSACTION Proposal filing and assessment Award Contract signed
CONTRACT Project built EXECUTION Follow up and oversight
4 UNSOLICITED PROPOSALS
Projects filed by the private sector
CO-FINANCED SELF-FINANCED
1.- Filed with Pro Inversión on a fixed 1.- Filed with PROINVERSIÓN,ministries, date regional or local governments at any time 2.- Accepted for procesing 2.- Accepted for procesing 3.- Statement of relevance 3.- Statement of relevance
4.- Pre-investment studies prepared 4.- Evaluation report drafted 5.- Viability statement 5.- Project evaluation
6.- Evaluation report prepared 6.- Project structuring
7.- Statement of Interest published (within 7.- Statement of Interest published (within 90 days) 90 days)
Have third parties sent expressions of Have third parties sent expressions of interest? interest?
NO YES NO YES Direct award Selection process Direct award Selection process PORTFOLIO 2017-2020
54 projects Estimated investment: US$ 20.226 billion
Real Estate US$ 500 Irrigation US$ 1,018
Mining US$ 1,950 Energy US$ 1,407
Education US$ 331
Water & 54 sanitation US$ 1,082 Transport US$ 12,176
Telecom US$ 299 Health US$ 1,463 ACCOMPLISHMENTS 2017 11 PROJECTS - US$ 971 BILLION US$ 3,065 MM
TRANSPORT o Amazon waterways AMOUNT: US$ 95 MM / #:1
o Junín wide band TELECOMMUNICATIONS o Amazonas wide band o Puno wide band AMOUNT: US$299 MM / # 7 o Ica wide band o Lima wide band o Tacna wide band o Moquegua wide band
ENERGY o TL Aguaytía-Pucallpa AMOUNT: US$603 MM / # 3 o TL Tintaya – Azángaro o Mantaro and Nueva Yanango links
Awarded CHALLENGES 2018
24 PROJECTS - US$ 7,305 BILLION¹ 1418 proyectos proyectos - -US$ US$ 1,206 4,560 MMMM US$ 3,065 MM • Salaverry Port Terminal (UP) • Ringroad(UP) TRANSPORT • Huancayo Huancavelica railway • Longitudinal Sierra Highway - Segment 4 AMOUNT: US$2,976 / #: 5 • National navigation aids (PI)
WATER AND SANITATION • Tambo and Chilca – Junín Waste Water Treatment Plant (UP) AMOUNT: US$994 MM / #: 3 • Titicaca WWTP (UP) • Headwater works REAL ESTATE • Ancón Industrial Park AMOUNT: US$500 MM / #: 2 • Lima Convention Center
MINING • Colca mining project * AMOUNT: US$1,950 MM / #: 3 • Michiquillay Copper Deposits Feb18 • Jalaoca mining project *
ENERGY / HYDROCARBONS • Mass use of natural gas • New Planicie substation AMOUNT: US$ 596 MM / #: 8 • Gas transport grid – South Peru* • Compensador MVAR San Juan • Carabayllo TL and Trujillo substation • Modernization of ENOSA (IP) * • Carhuaquero* substation • Street Lighting in Arequipa
• ESSALUD-Piura HEALTH • ESSALUD- Áncash AMOUNT: US$289 MM / #: 3 • Hospital waste management (UP)
*Amount to be defined ¹Not including unsolicited proposals worth US$863 million. CHALLENGES 2019- 2020
19 PROJECTS - US$ 11,811 BILLION¹ 1418 proyectos proyectos - -US$ US$ 1,206 4,560 MMMM US$ 3,065 MM • Line 3 of Metro of Lima TRANSPORT • Line 4 of Metro of Lima • Longitudinal Sierra Highway - Segment 4 AMOUNT: US$ 9,200/ #: 3
WATER AND SANITATION • Sullana WWTP (UP) AMOUNT: US$88 MM / #: 3 • Puerto Maldonado (UP) • North (UP)
HEALTH • Sullana Hospital – Piura (UP) • Cayetano Heredia Hospital –(UP) AMOUNT: US$1,174 MM / #: 6 • Hipolito Unanue Hospital (UP) • Militar Central Hospital (UP) • Huaycan Hospital (UP) • ESSALUD Lima
EDUCATION • CER Ate – San Juan de Lurigancho (UP) • CER Comas – San Martin de Porras (UP) AMOUNT: US$ 331 MM/ #: 5 • CER Villa Maria del Triunfo (UP) • CER Lima Metropolitana • COAR Centro (UP)
IRRIGATION • Valley Chanchay – Lambayeque (UP) AMOUNT: US$ 1,018 MM / #: 2 • Ica Valley (UP)
*Amount to be defined ¹Not including unsolicited proposals worth US$1,100 million. 10 UNDER STRUCTURING
UPGRADE OF THE Objective. To design, finance, build, operate and maintain the 500 kV transmission line in Peru’s middle north region and provide a Reactive CARABAYLLO - Variable Compensation equipment for the Trujillo SS. These projects will CHIMBOTE - strengthen the 500 kV transmission system comprised in the National Interconnected Electric System (SEIN). TRUJILLO 500 KV, TRANSMISSION LINE Responsible body : Ministry of Energy and Mines . 1000 MVA. Modality: Self-financed government initiative VARIABLE REACTIVE Investment amount (w/o VAT): USD 64.4 million
COMPENSATOR Term: 30 years plus construction time (33 months). (SVC OR SIMILAR) +400/-150 MVAR FOR Area of influence: Lima, Ancash and La Libertad THE TRUJILLO 500 Estimated award time: Second half 2018 KV SS
11 PREPARATION STAGE
REACTIVE VARIABLE Objective: Improve the reliability of power supply to Lima region. COMPENSATOR Responsible body : Ministry of Energy and Mines
(SVC OR SIMILAR) Modality: Self-financed government project +400/-100 MVAR FOR Investment amount (w/o VAT): USD 24.8 million THE SAN JUAN 220 KV SS Term: 30 years plus construction time (24 months). Area of influence: Lima
Estimated award time: 2018
12 UNDER STRUCTURING
NEW LA PLANICIE Objective: Provide electric power to Lima’s urban área 500/220 KV SS Responsible body : Ministry of Energy and Mines Type of project: Self-financed government initiative
Investment amount (w/o VAT): USD 20 million
Term: To be determined
Area of influence: Lima
Estimated award time: 2018
13 PREPARATION STAGE
NEW Objective. To design, finance, build, operate and maintain a SS (switch CARHUAQUERO 220 yard) for easier line handling in Chiclayo and Cajamarca, in Peru’s north KV SS region. Responsible body : Ministry of Energy and Mines
Type of project:: Self-financed government initiative
Investment amount (w/o VAT): USD 9.5 million
Term: 30 years plus construction time (30 months)
Area of influence: Cajamarca
Estimated award time: First semester 2018
14 UNDER STRUCTURING
MODERNIZING THE Purchase through a new Special Purpose Corporation (EPE in Spanish) the right to subscribe new shares in ELECTRO NOROESTE S.A. ELECTRO (ENOSA) accounting for at least 50% of stock. FONAFE would cede its NOROESTE S.A. subscription rights to the EPE over at least 217,972,175 new Class E shares for a total value of S/. 1,.536,893, with face value of S/.1.00 each POWER UTILITY plus a S/. 0.50 subscription premium.
Responsible body : Ministry of Economy and Finance, Ministry of Energy and Mines, FONAFE
Modality: Unsolicited proposal in Assets projects
Investment amount (w/o VAT): USD 101 million
Area of influence: Piura and Tumbes
Estimated award time: Second half 2018
15 16 TRANSACTION OPEN
MASSIVE USE OF Objective: To design, finance, build, operate and maintain natural gas distribution pipeline networks in seven (7) regions of Peru´s NATURAL GAS. Center and South, and their transfer to the Peruvian State at the CENTRAL AND end of the concession period. SOUTHERN PERU Responsible body: Ministry of Energy and MInes Modality : Self-financed government initiative
Investment (exc. VAT): USD 350 million
Concession term: 32 years
Influence area: Ucayali, Junín, Huancavelica Ayacucho, Apurímac, Cusco and Puno
Estimated award date: First half 2018
17 18 UNDER STRUCTURING
MICHIQUILLAY Objective: Developing Michiquillay, a porphyry copper and molybdenum deposit over 1 billion MT, with 0.63% Cu and 0.014% Mo grades, and a MINING PROJECT potential production rate of 80 thousand tons of ore per day.
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 1.95 billion
Area of influence: Cajamarca, La Encañada district, at 3 950 masl
Estimated award date: First Half 2017
19 PREPARATION STAGE
COLCA MINING Objective: Developing a copper - gold porphyry project spanning 14,100 hectares. Two important mineralized zones have been identified, PROJECT surrounded by other important properties with clear mining potential. Further drilling would define the deposit´s potential and size.
Responsible body: Ministry of Energy and Mines
Investment amount (w/o. VAT): ): To be determined
Concession term: To be determined
Area of influence : Cotabambas and Tambobamba distrricts, Cotabambas province, Apurímac department.
Estimated award date: 2018
20 PREPARATION STAGE
JALAOCA MINING Objective: Developing two of the four identified targets: Pucasalla, a Cu- Au porphyry-skarn deposit, and Llamoja, a Cu-Mo porphyry deposit. PROJECT Further drilling would help determine the deposit´s potential and size.
Responsible body: : Ministry of Energy and Mines
Modality : Self-financed government initiative
Investment amount (w/o. VAT): To be determined
Concession term: To be determined
Area of influence : Apurímac department Aymaraes and Antabamba provinces, at 4 500 masl.
Estimated award date: 2018
21 22 TRANSACTION OPEN
LONGITUDINAL DE LA Objective: To provide for improvement and rehabilitation works (117 km), initial periodic maintenance (503 km) and maintenance and operation of SIERRA HIGHWAY. approximately 970 km of the Longitudinal Andean Highway, a major SECTION 4 national road connecting 12 departments across the entire Andes. Responsible body: Ministry of Transportation and Communications
Modality : Co-financed government initiative
Investment amount (w/o. VAT): USD 464 MILLION
Concession term: 25 years
Area of influence: Junín, Huancavelica, Ayacucho, Apurímac and Ica.
Estimated award date: Second half 2018
23 TRANSACTION OPEN
MULTIPURPOSE Objective: Design, finance, build, conserve, operate and transfer Salaverry port´s infrastructure. SALAVERRY PORT. Responsible body: Ministry of Transportation and Communications – UPGRADING AND National Port Authority (APN) DEVELOPMENT Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 215 million
Concession term: 30 years
Area of influence: : La Libertad, Cajamarca and Ancash.
Estimated award date: First half 2018
24 TRANSACTION OPEN
HUANCAYO – Objective: Integral rehabilitation of the Huancayo-Huancavelica railroad HUANCAVELICA Responsible body: Ministry of Transportation and Communications
RAILWAY Modality: Co-financed government initiative
Investment amount (w/o. VAT): USD 235 million
Concession term: 30 years
Area of influence: Junín and Huancavelica.
Estimated award date: First half 2018
25 UNDER STRUCTURING
PERIPHERAL Objective: To build a 33.2-km long beltway from “200 miles Circle” to “Circunvalación Avenue”. RING ROAD Responsible body: Ministry of Transportation and Communications
Modality: Co-financed government initiative.
Investment amount (w/o. VAT): USD 2 049 million.
Concession term: 30 years
Area of influence: Lima and Callao
Estimated award date: Second half 2018
26 PREPARATION STAGE
LIMA AND CALLAO Objective: Line 3 (North - South axis) of the Lima and Callao Subway will run approximately 38 kilometers long. The project will franchise Line 3's SUBWAY. LINE 3. design, financing, construction, provision of electromechanical equipment, acquisition of rolling stock, and operation and maintenance.
Responsible body: Ministry of Transportation and Communications
Modality: Co-financed government initiative
Investment amount (w/o VAT): USD 5.6 billion
Concession term: 30 years.
Area of influence: Lima and Callao
Estimated award date: 2019-2020
27 PREPARATION STAGE
LIMA AND CALLAO Objective: Line 4 (East - West axis) will have a length of approximately 23.2km/1 The Line´s franchise comprises the design, financing, building, SUBWAY. LINE 4. acquisition of rolling stock, and operation and maintenance.
1/ (plus a 7.9 km branch concessioned to Responsible body: Ministry of Transportation and Communications Lima Subway´s Line 2 concessionaire). Modality: Co-financed government initiative
Estimated investment (exc. VAT): USD 3.6 billion
Concession term: To be determined
Area of influence: Lima and Callao
Estimated award date: 2019 - 2020
28 29 TRANSACTION OPEN
Objective: To increase access to telecommunications services, through: (i) the expansion of broadband BROADBAND FOR THE carrier networks to district capitals, and (ii) providing access networks to services for the benefit of 845 rural COMPREHENSIVE CONNECTIVITY AND areas. SOCIAL DEVELOPMENT IN JUNÍN, Responsible body: Ministry of Transportation and Communications PUNO, MOQUEGUA AND TACNA Modality: Asset transfer project.
Investment amount (w/o. VAT): USD 173 million
Area of influence: : Junín, Puno, Moquegua and Tacna.
Estimated award date: Second half 2017.
30 TRANSACTION OPEN
BROADBAND FOR THE Objective: to increase access to telecommunications services, through: COMPREHENSIVE o The expansion of broadband carrier networks to district capitals, and
CONNECTIVITY AND SOCIAL o Access networks for the provision of services for the benefit of 586 rural areas. DEVELOPMENT IN AMAZONAS, Responsible body: Ministry of Transportation and Communications ICA AND LIMA. Modality : Asset transfer project.
Investment amount (w/o. VAT): USD 142 million
Area of influence: Amazonas, Ica and Lima.
Estimated award date: Second half 2017
31 32 UNDER STRUCTURING
WASTEWATER TREATMENT Objective: To design a solution for the treatment and final disposal of municipal wastewater in the Lake Titicaca basin, in Puno. SYSTEM. LAKE TITICACA BASIN Responsible body: Ministry of Housing, Construction and Sanitation.
Modality : Self-financed unsolicited proposal.
Investment amount (w/o VAT): USD 304 million
Concession term: 30 years
Area of influence: Puno
Estimated award date: First half 2018
33 UNDER REVIEW
IMPROVEMENT AND EXPANSION OF THE Objective: To design, finance, build and operate six new main collector pipelines, four wastewater pumping WASTEWATER SEWERAGE AND TREATMENT stations and one wastewater treatment plant, 80,700 m3 / d capacity. SYSTEM FOR HUANCAYO, TAMBO AND CHILCA Responsible body: Ministry of Housing, Construction and Sanitation Modality : Co-financed unsolicited proposal
Investment (w/o. VAT): USD 90 million
Concession term: 20 years.
Area of influence: Junín
Estimated award date: Second half 2018
34 TRANSACTION OPEN
HEADWATERS AND PIPELINE Objective: Design, financing, construction, operation and maintenance of: WORKS FOR LIMA´S POTABLE o Expansion of Pomacocha and Huallacocha Bajo dams (approx. 100 MMC); o Pomacocha - Río Blanco diversion works (approx. 10 km trans-Andean tunnel); WATER SUPPLY o Potable water plant (5 m3 / s); o South Branch pipeline, approx. 25.6 km; o O&M of PTAP Huachipa I (Potable Water Treatment Plant); and o O&M of North Branch. Estimated investment: USD 600 million Modality : Self-financed government initiative Concession term: 20 to 30 years Area of influence: Junín and Lima Estimated award date: Second half 2018
35 PREPARATION STAGE
SULLANA WASTEWATER Objective: Design, finance, build, operate and maintain the wastewater piping, treatment and disposal system in the cities of Sullana and Bellavista. TREATMENT PLANT Responsible body: Ministry of Housing, Construction and Sanitation
Modality : Co-financed government initiative
Investment amount (w/o. VAT): USD 68 million
Concession term: To be determined
Area of influence: Sullana and Bellavista
Estimated award date: Second half 2019
36 PREPARATION STAGE
PUERTO MALDONADO Objective: To design, finance, build, operate and maintain piping, treatment and disposal of wastewater system in the city of Puerto Maldonado. WASTEWATER TREATMENT PLANT Responsible body: Ministry of Housing, Construction and Sanitation Modality : Co-financed government initiative Investment amount (w/o. VAT): USD 21 million
Concession term: To be determined
Area of influence: Puerto Maldonado
Estimated award date: Second half 2019
37 38 PREPARATION STAGE
Objective: Design, construction, equipment, operation and maintenance of complementary services (gray THREE HIGH COMPLEXITY gown) of high complexity hospitals for the (Health) Social Security System of Peru (ESSALUD). One will be located in the city of Lima (New Children and Adolescents´ Health Institute), and two in northern provinces HOSPITALS. HEALTH SOCIAL (Piura and Ancash). SECURITY SYSTEM (ESSALUD). Responsible body: ESSALUD Modality : Co-financed government initiative Investment amount (exc. VAT): USD 254 million / USD 170 million Concession term: 20 years (three years for building and equipment; 17 years´ operation and maintenance) Area of influence: Chimbote, Piura and Lima Estimated award date:Second half 2018/ 2018 - 2019
39 PREPARATION STAGE
SOLID HOSPITAL WASTE Objective: Build, operate and maintain facilities for, and comprehensive management of, solid hospital waste generated in the health facilities of the Ministry of Health - MINSA in Metropolitan Lima. MANAGEMENT. MINISTRY OF HEALTH Responsible body: Ministry of Health Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 35 million.
Concession term: 20 years
Area of influence: Lima
Estimated award date: Second half 2018
40 PREPARATION STAGE
SPECIALIZED HEALTH SERVICES IN PIURA DISTRICT HOSPITAL. RESIZING OF Objective: Build, equip, finance, maintain, and manage (gray gown) the Piura Hospital and Sullana Level III HEALTH SERVICES AT SULLANA LEVEL Hospital, in the provinces of Piura and Sullana, respectively, in the department of Piura. III SUPPORT HOSPITAL Responsible body: Regional Government of Piura
Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 160 million
Concession term: 18 years (including building, equipment, O&M )
Area of influence: Piura
Estimated award date: Second half 2019
41 PREPARATION STAGE
HIPÓLITO UNÁNUE NATIONAL Objective: Design, build, equip, finance, maintain, and provide non-hospital management (gray gown) services for Hipólito Unánue Hospital, district of El Agustino, province and department of Lima. HOSPITAL Responsible body: Ministry of Health
Modality : Co-financed unsolicited proposal
Investment amount (w/o VAT): USD 213 million
Concession term: 18 years (including building, equipment, O&M)
Area of influence: Lima
Estimated award date: Second half 2019
42 PREPARATION STAGE
HUAYCÁN HOSPITAL Objective: Design, construction, equipment, financing, maintenance, non-hospital management (gray gown) of Huaycán Hospital in Ate district, province and department of Lima.
Responsible body: Ministry of Health
Modality : Co-financed unsolicited proposal
Investment amount (w/o VAT): USD 76 million
Concession term: 20 years (including building, equipment, O&M)
Area of influence: Lima
Estimated award date: Second half 2019
43 PREPARATION STAGE
CAYETANO Objective: Design, construction, equipment, financing, maintenance and non-hospital management of HEREDIA HOSPITAL Cayetano Heredia hospital located in San Martin de Porras district, province and department of Lima.
Responsible body: Ministry of Health
Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 186 million
Concession term: 25 years (including building, equipment, O&M)
Area of influence: Lima
Estimated award date: Second half 2019
44 PREPARATION STAGE
NEW ARMY HOSPITAL Objective: Building, equipment, financing, maintenance, non-hospital management of the New Central Army Hospital located in the province of Lima.
Responsible body: Ministry of Defense
Modality Co-financed unsolicited proposal
Investment amount (w/o VAT): USD 123 million
Concession term: 30 years (including building, equipment, O&M)
Area of influence: Lima
Estimated award date: Second half 2019
45 46 PREPARATION STAGE
SCHOOL FACILITIES AT RISK. Objective: Building, equipment, operation of complementary services and maintenance of infrastructure, furniture and equipment of 14 educational institutions. ATE – SAN JUAN DE LURIGANCHO Responsible body: Ministry of Education Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 85 million
Concession term: 25 years
Area of influence: Ate and San Juan de Lurigancho districts, Lima
Estimated award date: Second half 2019
47 PREPARATION STAGE
SCHOOL FACILITIES AT RISK. Objective: Building, equipment, operation of complementary services and maintenance of infrastructure, furniture and equipment of nine educational institutions. COMAS – SAN MARTÍN DE PORRES Responsible body: Ministry of Education Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 60 million
Concession term: 25 years
Area of influence: Comas and San Martín de Porres districts, Lima
Estimated award date: Second half 2019
48 PREPARATION STAGE
SCHOOL FACILITIES AT RISK. Objective: Building, equipment, operation of complementary services and maintenance of infrastructure, furniture and equipment of five educational institutions. VILLA MARÍA DEL TRIUNFO Responsible body: Ministry of Education
Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 17 million
Concession term: 19 years
Area of influence: Villa María del Triunfo district, Lima
Estimated award date: Second half 2019
49 PREPARATION STAGE
SCHOOL FACILITIES AT RISK. Objective: Building, equipment, complementary services and maintenance of infrastructure, furniture and equipment of 13 educational institutions. METROPOLITAN LIMA Responsible body: Ministry of Education
Modality : Co-financed unsolicited proposal
Investment amount (w/o VAT): USD 80 million
Concession term: 20 years
Area of influence: Villa El Salvador and San Juan de Miraflores districts, Lima
Estimated award date: Second half 2019
50 PREPARATION STAGE
HIGH PERFORMANCE Objective: 21-year concession to build, equip, maintain and operate four high-performance schools (COARs) in the regions of Junín, Pasco, Huancavelica and Cusco. SCHOOLS. CENTER REGION Responsible body: Ministry of Education
Modality : Co-financed unsolicited proposal
Investment amount (w/o. VAT): USD 86 million.
Concession term: 21 years
Area of influence: Junín, Pasco, Huancavelica and Cusco.
Estimated award date: Second half 2019
51 52 PREPARATION STAGE
ANCÓN INDUSTRIAL PARK Objective: Creating a modern space in line with international standards for industrial companies of all sizes operating in Metropolitan Lima,.
Responsible body: Ministry of Production
Modality : Public initiative – Asset transfer project (Asset transfer subject to investment commitment).
Investment amount (w/o. VAT): approximately USD 500 million
Concession term: 15 years
Area of influence: Lima
Estimated award date: First half 2018
53 TRANSACTION OPEN
Objective: Operation and maintenance of facilities and equipment of the Lima Convention Center. OPERATION AND MAINTENANCE OF FACILITIES Characteristics: AND EQUIPMENT. LIMA o Under roof area: 85,441.39 m2 CONVENTION CENTER. o Conference halls: 17 o Total capacity: 9,950 persons o Conference halls total area: 14,925 m2
Modality : Co-financed governement initiative
Concession term: 15 years
Estimated award date: 2018
54 55 PREPARATION STAGE
COMPREHENSIVE WATER SYSTEM Objective: 25-year concession to expand hydraulic infrastructure capacity of the Chancay - Lambayeque WORKS. CHANCAY- LAMBAYEQUE basin through the construction of primary dams in La Monteria and Sican, and ancillary pipelines; O&M of existing infrastructure (Tinajones System) presently managed by Olmos Tinajones Special Project (PEOT). RIVERS PROJECT. LAMBAYEQUE REGION Responsible body: Ministry of Agriculture Modality : Co-financed private initiative
Investment amount (w/o VAT): Approximately USD 619 million.
Area of influence: Lambayeque
Estimated award date: 2020
56 PREPARATION STAGE
WATERWORKS. ICA VALLEY Objective: Concession for a period of 20 years, including building a dam on the Carhuancho River, the Carhuancho-Choclococha canal, a dam on the Ica River, and the Pisco-Pampas River to Villacurí diversion to irrigate the Ica Valley, and the Lanchas and Villacurí pampas.
Responsible body : Ministry of Agriculture
Modality : Co-financed unsolicited proposal
Investment amount (w/o VAT): Approximately USD 400 million
Area of influence: Ica
Estimated award date: 2020
57