Sembcorp Marine Completes Two Offshore Wind Farm Substations for Ørsted Wind Power
Total Page:16
File Type:pdf, Size:1020Kb
AUGUST 2021 SEMBCORP MARINE COMPLETES TWO OFFSHORE WIND FARM SUBSTATIONS FOR ØRSTED WIND POWER SEMBCORP MARINE LEADS ASIA SEMBCORP MARINE DELIVERS SEMBCORP MARINE BAGS 24 IN CRUISE SHIP REPAIRS AND THREE WELLHEAD AND RISER WORKPLACE SAFETY AND UPGRADES TOPSIDES AND BRIDGES TO HEALTH AWARDS TOTALENERGIES EP DENMARK CONTENTS DOLPHIN is a publication of NEWS UPDATES Sembcorp Marine and is published by 03 Sembcorp Marine Completes Two Oshore Wind Farm Sembcorp Marine Investor Relations & Substations for Ørsted Wind Power Corporate Communications Department 04 Sembcorp Marine Delivers Three Wellhead and Riser Topsides and Bridges to TotalEnergies EP Denmark 05 Sembcorp Marine 1H2021 Results 06 Sembcorp Marine Leads Asia in Cruise Ship Repairs and Editorial Committee Upgrades Chua Mun Yuen Lin 07 Sembcorp Marine Strengthens LNG Market Position Lin Daoyi Serene Lam 08 Sembcorp Marine Successfully Delivers First of Five Boil-off Gas Reliquefaction Retrofits Joleen Seam 09 On-time Delivery of Major Upgrades for Heerema’s Heavy Lift Vessel Aegir 10 Sembcorp Marine’s Brazilian Yard to Undertake Contributors Modication Work on Tupi B.V. FPSO P-71 for Deployment Citra Dwinanda Nur Diyana Binte at Itapu Field Romawan Francisca Selidonha Pereira Da Silva Ong Mei Ting Alicia Ida Cia Ooi Yeong Lih SUSTAINABILITY Kiw Chee Siam Rosilah Binte Mosli 11 Sembcorp Marine Partners SP Group to Integrate Green Energy Tech at Tuas Boulevard Yard Nirmal Vineeth Tan Siak Kheng Menon Wang Hui Ping 12 Reflections: Maritime Sustainability Secretariat HEALTH & SAFETY CONTACT US 15 Sembcorp Marine Bags 24 Workplace Safety and Health Awards We would like to hear from you. If you have 16 Safe Boarding of Vessels Webinar any comments about the articles in this issue, ideas for future issues, or requests related to 16 PT SMOE Indonesia Receives Occupational Safety and DOLPHIN mailing list, please drop us a note at Health 2021 Award [email protected]. 17 Mozzie Wipeout Programme at Sembcorp Marine Sembcorp Marine Ltd Registration no. 196300098Z 80 Tuas South Boulevard Singapore 637051 Tel: (65) 6265 1766 No part of this newsletter may be reproduced or transmitted by any means or stored in any information storage or retrieval system without written permission from Sembcorp Marine Ltd. All rights reserved. Cover Image Hornsea 2’s Reactive Compensation Station and Offshore Substation ready to sail away to the UK North Sea NEWS UPDATES ACCELERATING STRATEGIC BUSINESS EXPANSION: SEMBCORP MARINE COMPLETES TWO OFFSHORE WIND FARM SUBSTATIONS FOR ØRSTED WIND POWER Delivery of Substations expands Sembcorp Marine’s footprint in renewable and clean energy sector; highlights the Group’s diversification endeavours Sembcorp Marine has successfully completed the fabrication of the Offshore Substation (OSS) and Reactive Compensation Station (RCS) (collectively, “Substations”) for Ørsted Wind Power subsidiary Optimus Wind Limited. The Substations set off on a voyage to the Hornsea 2 Offshore Wind Farm from Sembcorp Marine Admiralty Yard on 15 August 2021. Hornsea 2’s Reactive Compensation Station and Offshore Substation sailing away to the UK North Sea Constructed at Sembcorp Marine’s integrated facilities, the OSS is the Mr Patrick Harnett, Senior Programme Having identified this megatrend, largest AC offshore substation and Director, said, “With plans to have the Sembcorp Marine has since 2015 together with the RCS, they have a wind farm operational in 2022, this is a embarked on a strategic business combined weight of 10,200 tonnes. In very exciting milestone for Hornsea 2. transformation leveraging its integrated addition to fabrication, Sembcorp In 2019, Ørsted opened the UK’s largest offshore and marine (O&M) engineering Marine spearheaded the engineering, operations base for offshore wind at capabilities to proactively diversify its procurement, hook-up and Grimsby’s Royal Dock, providing a total business and product segments towards commissioning works for the of 400 jobs for local people. Hornsea 2 the provision of clean energy solutions. Substations. will be maintained and operated from this base, creating a long-term Sembcorp Marine President and CEO, Located in the North Sea some 89 km operations hub, meaning Ørsted will Mr Wong Weng Sun said, “The Group’s off the Yorkshire Coast, Hornsea 2 provide careers for years to come – diversiÿcation and expansion into clean spans an offshore area of 462 km2 and offshore wind farms last at least 25 energy solutions segments, including will be the world’s largest wind farm years.” renewable energy and gas value chain, when it goes into operation in 2022. serves to align its business with the With capacity of 1.4 GW, the farm will The Substations will reach their global shift towards environmentally- provide power to more than 1.3 destination at end-September 2021 for responsible solutions. This proactive million homes in the United Kingdom. integration with their jackets. diversification and expansion strategy is Installation of the OSS and RCS jacket bearing fruit. Green energy solutions “We thank Ørsted Wind Power and foundations was completed in October comprised approximately 34% of the Optimus Wind for their trust in 2020 by Sleipnir, the world’s strongest Group’s net order book of S$1.78 billion Sembcorp Marine’s capability to deliver semi-submersible crane vessel built by as at 30 June 2021. these functional engineering solutions Sembcorp Marine. to their desired quality,” said “As Sembcorp Marine accelerates its Sembcorp Marine Head of Offshore Seizing opportunities and accelerating transformation and positions itself for Platforms Mr Samuel Wong. “These expansion into renewable and clean the global shift towards a low carbon Substations, along with the OSS and energy economy, it will continue to harness RCS jacket foundations that were According to independent energy opportunities across the entire O&M and delivered by Sembcorp Marine in research firm, Rystad Energy, global renewable energy sectors, including August 2020, demonstrate the Group’s offshore wind expenditure is projected clean solutions such as electrification, gas commitment to meet the challenge of to grow at a compound annual growth value chain, ocean living, as well as delivering these structures safely amid rate of 11% this decade to reach carbon capture and storage solutions.” 1 this pandemic.” US$126 billion per year by 2030 . 1 Rystad Energy, ‘An expenditure splash of $810 billion is expected for the offshore wind industry this decade’, 29 April 2021. https://www.rystadenergy.com/newsevents/news/press-releases/an-expenditure-splash-of-$810-billion-is-expected-for-the-offshore-wind-industry-this-decade/ August 2021 03 NEWS UPDATES SEMBCORP MARINE DELIVERS THREE WELLHEAD AND RISER TOPSIDES AND BRIDGES TO TOTALENERGIES EP DENMARK Completed facilities highlight Sembcorp Marine’s resilience and capability to continue delivering projects despite COVID-19 challenges Sembcorp Marine has safely completed Tyra’s ageing facilities to support Denmark, Mr Morten Hesselager the fabrication of two wellhead TotalEnergies’ vision and pursuit of Pedersen, said, “Today we celebrate the topsides, one riser topside and two sustainable operations. sailaway of the first new Tyra topsides bridges for deployment to towards the Danish North Sea. The TotalEnergies’ redeveloped Tyra Field The redeveloped Tyra is envisioned to be sailaway is a result of the good located in the Danish North Sea. a high-tech production and natural gas collaboration between Sembcorp Marine, export centre over the next 25 years. It is and our site team at the yard in The COVID-19 pandemic has caused designed to reduce the environmental Singapore. The Tyra Redevelopment unprecedented challenges to the footprint and optimise the energy project reaches a key milestone as the completion of the modules and efficiency of its operations. topsides are installed later this summer, bridges. In spite of signficant supply and we will see the physical contours of chain disruptions and acute manpower Sembcorp Marine Head of Offshore Tyra II, which will be the new high tech shortages, the Group demonstrated its Platforms, Mr Samuel Wong, said, hub for Danish natural gas and reduce resilience in overcoming the challenges “Amid the multitude of challenges CO2 emissions by 30%.” through operational °exibility, close brought on by COVID-19, Sembcorp collaboration with its customer, and Marine is proud to have completed the In December 2019, Sembcorp Marine leveraging its global supply chain and structures safely for our customer. The secured the subcontract to construct six logistics capabilities, to deliver the topsides are delivered building on our topside modules and four bridges for the modules and bridges. This was extensive track record in constructing TotalEnergies EP Denmark’s Tyra achieved without compromise to safety topside modules and other facilities for Redevelopment Project. The remaining and quality. the offshore, marine and energy topside modules and bridges are industries.” projected to be delivered in January The topsides and bridges sailed away 2022. from Sembcorp Marine Admiralty Yard Vice President, Head of the Tyra on 25 July 2021. They will replace Redevelopment, TotalEnergies EP TotalEnergies' two wellhead topsides, one riser topside and two Successful sailaway of topsides and bridges for deployment to bridges ready to set off from Sembcorp Marine Admiralty Yard TotalEnergies' redeveloped Tyra Field located in the Danish North Sea 04 DOLPHIN NEWS UPDATES SEMBCORP MARINE 1H2021 RESULTS