CARD W7 Cookham to Maidenhead

Total Page:16

File Type:pdf, Size:1020Kb

CARD W7 Cookham to Maidenhead Cookham to CARD Maidenhead W7 Start Cookham— SL6 9SA Finish Maidenhead— SL6 1EW Distance 5.53km Duration 1 hour 8 minutes Ascent 32.4m Access Train 450m distant from start of section. Train and bus at end of section. Facilities All facilities at start and end of section. Connecting routes Thames Path, at Maidenhead Bridge, E of High Street (or at Cookham). near end of walk: Chiltern Way, at Pinkneys Green on the NW edge of Maidenhead. 7.1 Cookham, at the west end of The Causeway. 0m 7.2 S on the Green Way; after 1.3km, R across bridge then immediately L; at next jct R, 5530m then L before bridge; continue S, then L and R in parkland to Ray Mill Rd; cross road, cross stream; continue S to bridge; cross, turn R then L; under by-pass then up L to road level; R to High St where R; L on Queen St; L at end then cross to stn. © 2019-20 IG Liddell Cardinal route – W 7 – 1 This section starts in Cookham, at 7.1 the west end of The Causeway, at the far end of High Street from the Stanley Spencer Gallery. Cookham station, on the Marlow branch line from Maidenhead, is 450m to the west of this point. Cookham is the point where this radial route really connects with the national network. Here, the Thames Path may be followed upstream to the river’s source, through Henley, Reading, Oxford and Lechlade. We have already met Shakespeare’s Way and the Chiltern Way. However, it seems logical to run this route out to fi nish in Maidenhead, whose transport connections are more extensive. Walk southwards from the start, 7.2 and go through a gate. Follow the path along the right-hand side of the fi eld, and successive fi elds. Cross a minor lane and then another fi eld. At this point, turn right to cross a footbridge, then immediately turn left to continue in a south-south-westerly Green Way south of the start direction. at Cookham After about 370m, take the path to the right for about 200m, then turn left before reaching the litt le stream. Keep close to the stream, now on your right, for about 750m before crossing the stream (towards a cricket fi eld) and trending right onto a piece of common land, with the houses of North Maidenhead across the common. Green Way approaching Do not cross the common, but bear left alongside the stream on your left. North Maidenhead The path becomes more distinct, and you will pass a car park over to your right, while maintaining a southerly bearing on the path. After a bank of trees is passed on your left, cross an access road: the path now bends to the left and then to the right, passing wooden sculptures to reach Ray Mill Road West. Take the path opposite, now with Strand Water on your right, and follow it for about 430m to a footbridge. Cross the bridge, bear right, and pick up the southbound line of the stream on your right. Pass beneath the town centre by- pass, then ascend to street level. Turn your back on the car park entrance on your right. After a few metres with a building on your right, turn 7 – 2 Cardinal route – W © 2019-20 IG Liddell right at the mini-roundabout to follow the road out to High Street. High Street has numerous opportunities for refuelling or replenishment before the fi nal steps to the station. Turn right along High Street, and cross Strand Water. Continue westwards, and where the road narrows and the road surface changes to patt erned brick, advance to Queen Street. Ahead lies the pedestrianised stretch of High Street: turn left, though, down Queen Street. Where Broadway comes in from the left, continue ahead. Here, the standard High Street shops have been left behind for smaller, liminal businesses. Gradually, Queen Street curves to the right: eventually, you will reach a major junction with much more modern business buildings dominating the landscape. Bear round to the left, and just before reaching the budget hotel, cross the road at the lights to a traffi c island, then bear left to cross the next road. Sculpted wood You are now on the approach to the on the approach to railway station: follow it up to the Ray Mill Road West station building, and the end of the route from Trafalgar Square. Maidenhead station off ers train services to Slough, Iver, West Drayton, Hayes and Harlington, and Paddington: westwards, the line serves Reading and beyond to Oxford and Swindon. The branch line to Cookham and Marlow starts from Maidenhead. There are also bus services to Slough and Heathrow, plus local services. Left — Cloud-shrouded clock tower outside Maidenhead station © 2019-20 IG Liddell Cardinal route – W 7 – 3.
Recommended publications
  • Wickhams MAIDENHEAD • BERKSHIRE Wickhams MAIDENHEAD • BERKSHIRE
    wickhams MAIDENHEAD • BERKSHIRE wickhams MAIDENHEAD • BERKSHIRE Charming riverside home Maidenhead 2 miles (London Paddington from 26 minutes) Beaconsfield 7 miles (London Marylebone from 23 minutes) M4 (Jnc 8/9) 4 miles • M40 (Jnc 2) 7 miles • London Heathrow 15 miles Central London 27 miles (distances and time are approximate) Accommodation Reception hall • Drawing room • Dining room • Kitchen/breakfast room Sitting room • Orangery • Utility room Master bedroom with en suite bathroom • Lounge/bedroom with balcony Bedroom with en suite shower room • 3 further bedrooms Family bathroom Garaging • Garden stores • Summer house/office Tennis court • Landscaped gardens • Mooring In all about 0.6 acres These particulars are intended only as a guide and must not be relied upon as statements of fact. Your attention is drawn to the Important Notice on the last page of the text. Wickhams Wickhams stands in a delightful setting adjacent to the River Thames on perfectly to enjoy the fabulous views of the River Thames along with a the edge of the popular commuter town of Maidenhead. Close by are the pedestrian access to the towpath and the owners mooring. charming villages/market towns of Cookham and Marlow which offer a Internally Wickhams is in very good order with many original features picturesque setting for a good selection of restaurants and boutique shops. and has been a superb family home for many years. Of particular note is Approached over a long driveway the property is set well back from the the spectacular drawing room which features a large bay window and an road towards the eastern edge of its plot, this position places the property exceptionally high ceiling.
    [Show full text]
  • Item 6 Appendix 1 Composite Scheme Reports
    Report Date : 10 July 2019 2.01 Newbury: King's Road Link Road Current Project Status : Green West Berkshire Council Highlights since last report Contractor for the main works has been appointed by the Developer. A meeting between West Berkshire Council, Homes England and the Developer is due to take place in July to finalise the funding agreements. 1. Scheme The scheme is the delivery of the Kings Road Link Road in Newbury. It is a new direct link between the Hambridge Road industrial area and the A339 to support housing delivery and significantly improve access to a key employment area. 2. Progress with the scheme With the decontamination process complete, the Developer has appointed a contractor for the main works. It is a two stage tender so the contractor will be working with the Developer through stage 2 leading to a start on site of the main works in mid-August. Network Rail has completed the work to replace the rail bridge adjacent to the redevelopment site. The new bridge was open to traffic at the end of January 2017 following the 12 month replacement programme. Initially there is a traffic light controlled single lane system operating until the redevelopment of the industrial estate is complete and the northern approach to the bridge has been widened. Then the bridge will operate with two lanes and the traffic lights will be removed. This will have a great benefit to the transport network in this area. The Council and the Developer have established a funding agreement to ensure the correct governance of the public money contributing to this scheme.
    [Show full text]
  • An Updated Four Bedroom Family Home Located in the Picturesque Village of Frieth Offering Views to the Rear Oaklands Frieth, Henley-On-Thames, Oxfordshire, Rg9 6Pj
    AN UPDATED FOUR BEDROOM FAMILY HOME LOCATED IN THE PICTURESQUE VILLAGE OF FRIETH OFFERING VIEWS TO THE REAR OAKLANDS FRIETH, HENLEY-ON-THAMES, OXFORDSHIRE, RG9 6PJ Unfurnished, £2,995 pcm + £285 inc VAT tenancy paperwork fee and other charges apply.* Available from 07/08/2017 • Four Bedroom Detached Home • Three Bathrooms • Kitchen Diner • Annex to the front with Bathroom • Driveway parking • Views to rear • North of Marlow • EPC Rating = D • Council Tax = G Situation The property is located in the picturesque village of Frieth which is located just North West of Marlow and North East of Henley. The property offers a village location within easy reach of both Marlow and Henley with transport links of both on offer. The M40 and M4 are both accessible and Train links give multiple options for easy access into London: Marlow Railway Station (5 miles) is the terminus of the Marlow Branch Line Which leaves the Main line at Maidenhead (train from Maidenhead to Paddington); fast and frequent access into Marylebone via the Chiltern Line at High Wycombe (5.4 miles). Henley Train Station also offers easy access into London Paddington (7.9 miles). Marlow and Henley offers a vast variety of local amenities with a traditional High Street offering an array of both individual shops, chains of retail outlets and restaurants. Both offers a number of leisure activities with Marlow Rowing Clubs and riverside walks. Description This large and attractive family home includes extensive, well planned accommodation set over three floors and benefits from neutral decor, modern kitchen and bathrooms and excellent sized rooms through out.
    [Show full text]
  • Crossrail Act 2008 Crossrail Ltd Royal Borough of Windsor
    Crossrail Act 2008 Crossrail Ltd Royal Borough of Windsor & Maidenhead Maidenhead Sidings Drivers Accommodation Schedule 7 Plans & Specifications Written Statement for Information Submission Ref: WIN/5/12 Document Number: TTPP-6245-MAI-WS (Rev A) 1.1.1 -· Crossrail Act 2008 Schedule 7 Plans and Specifications Contents 1 Introduction ....................................................................................2 1.1 Background Information ....................................................2 1.2 Terms of Reference ............................................................2 1.3 Introduction to Crossrail ....................................................2 1.4 The Crossrail Act 2008 .......................................................3 1.5 Crossrail Construction Code .............................................4 2 Location & Characteristics ............................................................5 2.1 Description of the Site........................................................5 2.2 Highway Networks ..............................................................5 2.3 Adjacent Land Uses ...........................................................5 3 Description of Crossrail Works ....................................................6 3.1 Overview and Scope of Application ..................................6 3.2 New Building .......................................................................6 3.3 Vehicular & Cycle Parking .................................................7 3.3 Site Boundaries – Fencing & Gates ..................................7
    [Show full text]
  • South West Maidenhead
    Placemaking in the Royal Borough South West Maidenhead Report of Workshops held on 3 July 2019 2 Introduction The emerging Borough Local Plan identifies a number of large site allocations in the south west area of Maidenhead. The council considers that these need to be brought forward in a holistic comprehensive manner to create a very high quality new place in the town. Placemaking was seen as an essential requirement if this ambition was to be achieved. It was decided that one of the key first placemaking tasks must be to engage with landowners, key stakeholders and local community interests. This was commenced with two workshops in July 2019 that introduced various parties to the South West Maidenhead placemaking concept. The council engaged Hyas Associates to assist it with this engagement. The remainder of this document is a report on the workshops and their outcomes. The workshops Two workshops were held on the 3rd July 2019, the first took place with the landowners of the constituent sites; statutory consultees; RBWM officers and the Lead Member for Planning. The second workshop, brought together individuals and local interest groups from the local community, especially those who made representations on the submitted Borough Local Plan (BLP). Both workshops took place in the Desborough Theatre at Maidenhead Town Hall and a list of attendees is included at Appendix A to this report. Purpose of workshops The workshops provided an opportunity to bring together key stakeholders to update them on the placemaking work underway; share the results of the site and baseline analysis to facilitate a discussion to help to inform a vision and set of objectives.
    [Show full text]
  • Thames Valley Branch Lines – Notes of Meeting
    Thames Valley Branch Lines – Notes of Meeting Date: 05 December 2016 Time: 10.00am Venue: 4 Marlow Road, Maidenhead Attendees: Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes, Henley‐on‐Thames Council Martin Coker, Cookham Parish Council) Gerard Coll, Wycombe District Council Kevin Miller, Network Rail Philip Meadowcroft, Wargrave Users Group Gordon Oliver, Royal Borough of Windsor & Maidenhead Nigel Philips, Rail Futures / High Wycombe Society Tom Pierpoint, Great Western Railway Michael Porter, Henley Branch User Group Richard Porter, Maidenhead Marlow Passenger Association Cllr MJ Saunders, Cookham Parish Council / Richard Scarff, Cookham Society / Royal Borough of Windsor & Maidenhead Cllr David Sleight, Wokingham Borough Council Cllr Jocelyn Towns, Marlow Town Council David Wilby, Wokingham Borough Council ITEM NOTES ACTION 1.0 WELCOME AND INTRODUCTIONS Cllr Bicknell welcomed everyone to the meeting and invited attendees to introduce themselves. 2.0 NETWORK RAIL PRESENTATION Kevin Miller (KM) gave the presentation in place of Simon Maple who had been called away to an urgent meeting. He summed up progress on electrification to date: The 16 mile section between Didcot and Reading is complete and is being used for fleet testing. A link to Reading Depot has also been completed, so electric trains no longer need to be dragged in and out and can be moved within the depot, which is being used for training purposes. Changes at Old Oak Common will affect maintenance operations and some facilities are moving to Reading (e.g. wheel lathe). Some elements of the electrification programme have been deferred, in order to fund previously unfunded scope (e.g.
    [Show full text]
  • 0005-R-West.Pdf
    05 Baseline and Environmental Impacts: Maidenhead to Westbourne Park 5.1 Introduction 5.1.1 This chapter describes the western route section of Crossrail from Maidenhead Station to Portobello Junction (Westbourne Park), and the significant residual temporary and permanent environmental impacts that may arise from construction and operation. 5.1.2 Crossrail will use the existing Great Western relief lines (in normal operations) with additional new tracks at some locations. For example, a new line will be constructed over about 1 km between Langley and West Drayton, to link with existing (but upgraded) freight lines to east and west providing increased track capacity. 5.1.3 Major new structures or facilities include: a new dive-under (rail underpass) at Acton (W4), a new flyover at Stockley in Hillingdon (W11), a freight loop from Langley to West Drayton (W14, W15,W16); and new or remodelled sidings at Maidenhead (W25), West Drayton (W13) and Old Oak Common depot (W3). Crossrail will require, at several places, changes to the permanent way, such as new track or track realignment. It will also require new or extended station platforms to accommodate Crossrail’s 200 m long trains. At nine stations, improved facilities, including new or modified ticket halls, will be provided to accommodate Crossrail passengers. 5.1.4 The GWML between Paddington and the Stockley Road bridge is the only section that is electrified. The remainder of the route west of Stockley Road bridge will require the provision of new 25 kV AC overhead line equipment (OHLE). This will require the raising of some bridges or lowering of track beneath them.
    [Show full text]
  • Berkshire Record Office
    BERKSHIRE RECORD OFFICE MISCELLANEOUS UNOFFICIAL COLLECTIONS D/EX 1934 _______________________________________________________________ Photographs and negatives of Berkshire scenes, taken by Thomas A Wilkie of Guildford, Surrey, photographer, c.1950s-1980s. (12 bdls, 6 docs) Presented in July 2005 (acc. 7647) Cat: LS 1/2008 _______________________________________________________________ BERKSHIRE RECORD OFFICE MISCELLANEOUS UNOFFICIAL COLLECTIONS D/EX 1934 _______________________________________________________________ THOMAS A WILKIE'S BERKSHIRE PHOTOGRAPHS [Thomas A Wilkie was born in the Scottish Borders on 13 October 1920, and moved to Surrey as a gardener employed by the Duke of Northumberland. He learned photography while serving in the RAF during the Second World War, and in 1950 became a professional photographer specialising in commercial, agricultural and industrial photography. He was a member of the National Union of Journalists. He retired in 1989, and was still alive in 2005.] [Copyright in the photographs in this collection is vested in Berkshire Record Office.] 1/1-7 Photographs of Bracknell New Town new 1 bdl n.d. [1969] shopping centre (nos. BE/108-112) and industrial estate (nos. [BE/115 and 128]). 2 Photograph of the River Thames from 1 doc n.d. [1982] Caversham Bridge (no. BE/299). 3 Photograph of Compton Church (no. BE/100). 1 doc n.d. [1967] 4 Photograph of East Garston village, showing 1 doc n.d. [1963] the village cross and a group of women pushing prams (no. BE/15). 5 Photograph of houses and fields in Goosey 1 doc n.d. [1963] (no. BE/40). 6/1-2 Photographs of the Kennet and Avon Canal at 1 bdl n.d. [1983] Hungerford, one showing The Rose of Hungerford narrowboat (nos.
    [Show full text]
  • Cruising Guide for the River Thames
    Cruising Guide to The River Thames and Connecting Waterways 2012-2013 Supported by Introduction and Contents As Chairman of BMF Thames Valley, I am immensely Introduction 3 proud to introduce the 2012/13 Cruising Guide to The River Thames Management 4-5 the River Thames and its connecting waterways. The Non-tidal River Thames 7-13 Cruising Guide has been jointly produced with the Environment Agency and is supported by the Port Bridge Heights - Non-tidal River Thames 14 of London Authority - it provides all the relevant St John’s Lock - Shifford Lock 15 information anyone would need whilst boating on Shifford Lock - Sandford Lock 16-17 The River Thames and its connecting waterways. Sandford Lock - Benson Lock 18-19 BMF Thames Valley is a Regional Association of the Cleeve Lock - Sonning Lock 20-21 British Marine Federation, the National trade association for the leisure boating industry. BMF Thames Valley Sonning Lock - Boulter’s Locks 22-23 represents around 200 businesses that all share a Boulter’s Lock - Old Windsor Lock 24-25 passion for our inland waterways. 2012 is going to be Bell Weir Lock - Shepperton Lock 26-27 an exciting year on the River Thames with the London Shepperton Lock - Teddington Lock 28-29 2012 Olympics and the Diamond Jubilee celebrations. What’s new for 2012! The Tidal Thames 30 • New map design Tidal Thames Cruising Times 31 • Complete map of navigable River Thames from Lechlade Teddington Lock - Vauxhall Bridge 32-33 to the Thames Barrier • Information on the non-tidal Thames - Environment Agency Lambeth Bridge
    [Show full text]
  • River Thames Bathymetric Data Analysis
    DRAFT REPORT REV 3 River Thames Bathymetric Data Analysis Prepared for Environment Agency January 2016 Burderop Park Swindon SN4 0QD United Kingdom Contents Section Page Acronyms and Abbreviations ............................................................................................................ vii 1 Summary ............................................................................................................................ 1-1 2 Scope ................................................................................................................................. 2-1 2.1 Need for study ................................................................................................................. 2-1 2.2 Objectives ........................................................................................................................ 2-2 3 Data ................................................................................................................................... 3-1 3.1 Data sources .................................................................................................................... 3-1 3.2 Bathymetric surveys ........................................................................................................ 3-1 3.2.1 Available data ..................................................................................................... 3-1 3.2.2 Survey methods .................................................................................................. 3-3 3.2.3 Survey data resolution
    [Show full text]
  • Henley Lodge, Courtlands, Maidenhead, SL6 2PT Offers in Excess of £200,000 (Leasehold)
    Burnham Office: T: 01628 666632 E: [email protected] Henley Lodge, Courtlands, Maidenhead, SL6 2PT Offers In Excess Of £200,000 (Leasehold) • Stamp duty exempt for first time • 0.1 miles to Maidenhead Train Station buyers (CROSSRAIL) • 1.1 miles to M4 (Junction 9a) • 0.4 miles to shops and restaurants • No onward chain THE PROPERTY: The accommodation comprises an entrance hall, living room, kitchen, bedroom and bathroom. The property is accessed from the rear of the building by a communal terrace area. Permit parking is available to the front of the property. Offered for sale with no onward chain. STAMP DUTY EXEMPT FOR FIRST TIME BUYERS . SITUATION: Maidenhead is a large town in the Royal Borough of Windsor and Maidenhead, in Berkshire. It offers a good range of well known High Street retail names, complimented by a wide variety of independent and specialist stores. Maidenhead is a busy commuter town with excellent road and rail links making it a sought after location for business. The town boasts a thriving pharmaceutical and telecommunications presence with names such as 3 mobile, Glaxo Smith Kline and Adobe. Maidenhead train station is served by local services operated by First Great Western from London Paddington to Reading, and is also the junction for the Marlow Branch Line. Maidenhead is included within the Crossrail scheme which is scheduled for completion in 2019. EDUCATION/LEISURE FACILITIES: The surrounding area provides excellent schooling for children of all ages both in the private and state sector. Sporting/leisure facilities abound in the area with many notable golf courses, riding and walking in Burnham Beeches.
    [Show full text]
  • Crossrail Technical Assessment of Historic Railway Bridges
    Crossrail Technical Assessment of Historic Railway Bridges Prepared by: Rob Kinchin-Smith RPS Planning & Environment, Oxford in association with MoLAS 21st January 2005 RPS Planning & Environment Mallams Court 18 Milton Park Abingdon Oxon OX14 4RP Tel 01235 821888 Fax 01235 820351 Email [email protected] Contents Summary 1 Introduction 2 Methodology 3 Historical Background and Description 4 Description and Individual Assessments of Sites 15 to 29 5 Overbridges on the London to Bristol route 6 Cumulative Assessment of Sites 15 to 29 Bibliography Figures Appendices Appendix A Summary of historic features between Paddington and Bristol Appendix B Proposed World Heritage Site Description Appendix C Photographs of Selected Bridges between Paddington and Bristol Summary The purpose of this report is to assess the significance of nine historic bridges that would be affected by the Crossrail project. All nine of the bridges were constructed as part of the London & Bristol Railway, otherwise known as the Great Western Railway (GWR), engineered by Isambard Kingdom Brunel and built and opened in eight sections between 1835 and June 1841. They are all located on the first section of the railway to be completed (from Bishop’s Road, London to Maidenhead Riverside), opened on June 4th 1838. These nine overbridges were originally of a single span. Each has been extended at least once, but all retain significant elements of their original fabric, most notably their main 30ft span semi-elliptical arch over the railway. All of the bridges are examples of a single generic bridge type, constructed in the United Kingdom in thousands during the 18th and 19th Centuries, in order to carry lesser roads and lanes over canals and railways.
    [Show full text]