OPEN TENDER (For Civil Engg
Total Page:16
File Type:pdf, Size:1020Kb
Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month of APRIL 2013-MARCH 2014) Works Awarded : APRIL 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.11.2012 Supply of 01 No. IRCON/MECH/1029/ M/s Unitech (01 no.) (01 no.) `3,90,171/- 03-months from the MECH/102 9/ Induction Heating RCF.RBL- Instruments , Unit `4.45 Lacs `3,90,171/- date of issue of LOA RCF.RBL- Machine for mounting of II/Induction Heating No.: 24, Dewan & II/Induction Heating fork on anti-roll bar at Rail Machine/185 Shah, Industrial Machine/18 Coach Factory, Lalganj, dtd.01.04.13 Estate No.: 7, 5 dtd. Raebareli, UP-(INDIA) Navghar, Vasai East, 30.10.12 Thane - 401210 2 IRCON/ 10.01.2013 Supply of 01 No. Load IRCON/MECH/ M/s Vikrant 1 set (02 nos.) 1 set (02 nos.) `39,79,656/- 24-weeks from the MECH/102 9/ Lifting & Turning Device 1029/RCF-RBL- Special Machines `55.60 Lacs `39,79,656/- date of issue of LOA RCF.RBL- at Rail Coach Factory, II/Multiple Pvt. Ltd, 90, II/Load Lifting & Lalganj, Raebareli, UP- station/RET-I/119 Nayapatty Road, Turning (INDIA) dtd 05.04.13 Kolkata – 700055 Device/RE Tel.:033-2551-3070 T-I/119 Email: Dtd. [email protected] 30.10.12 3 IRCON/ 24.01.2013 Supply of (05 Nos.) 10/3 IRCON/MECH/ M/s Unique (05 nos.) (05 nos.) `8,62,46,984/- 180-days from the MECH/10 1029/RCF-RBL- Industrial Handlers 29/RCF.R Ton Electric Overhead `962.00 Lacs `8,62,46,984/- date of issue of LOA BL-II/EOT Travelling Cranes at Rail II/EOT Crane/44/2262 Pvt. Ltd., 206-207, Crane/44 Coach Factory, Lalganj, dtd 15.04.13 Nahar & Seth Ind. dtd. Raebareli, UP-(INDIA) Estate Chakala, 25.12.201 Andheri (East), 2 Mumbai-400 099 4 IRCON/ 08.02.2013 Supply of 01 No. IRCON/MECH/ M/s United (01 no.) (01 no.) `22,07,415/- 120-days from the MECH/ 1029/RCF.RBL- Engineering Corpn., 1029/ Multiple Station Machine `46.44 Lacs `22,07,415/- date of issue of LOA RCF.RBL- (Combined Shearing, II/Multiple B-96, Mayapur II/ Multiple Punching, Cropping & Station/RET/96 dtd. Industrial Area, Station/RE Notching Machine) at 23.04.2013 Phase-I, T/ 96 dtd. New Delhi-110 064 11.01.2013 Rail Coach Factory, Lalganj, Raebareli, UP Works Awarded : MAY 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 27.02.2013 Supply of Hand Tools at IRCON/MECH/ M/s Machinery `19.78 Lacs `17,56,630/- `17,56,630/- 30-days from the date MECH/ 1029/RCF.RBL- Marketing 1029/ Rail Coach Factory, of issue of PO RCF.RBL- Lalganj, Raebareli, UP- II/Hand Associates Pvt. Ltd, II/ Hand (INDIA) Tools/190/3000 dtd. 2E/24, Tools/190 02.05.2013 Jhandewalan dtd. Extension, New 31.01.2013 Delhi – 110 055, Fax: 011-23629909 2 IRCON/ME 05.02.2013 Pipelines for IRCON/MECH/ M/s Legris India `1607.00 Lacs `17,21,50,978/- `17,21,50,978/ 210-days from GAD CH/1029/R 1029/RCF-RBL-II/ Pvt. Ltd., Plot No.: CF-RBL-II/ Compressed Air, Argo - approval Pipelines/ mix, Nitrogen & Oxygen Pipelines/028B dtd 99, Pace City-1, + 028B dtd Gas Supply and Storage 10.05.2013 Sector-37, AMC for 5 30.10.2012 System in Shell & Bogie Gurgaon-122 001 years Shops Fax:0124- `2,59,91,027/- 66173708 3 IRCON/ME 25.02.2013 Supply of IRCON/MECH/ M/s Machinery `24.55 Lacs `15,64,900/- for `17,40,880/- 30-days from the date CH/1029/R CF. RBL-II/ Tapping/Drilling Machine, 1029/RCF.RBL- Marketing including Jig Saw (100 nos.) of issue of PO Tapping Jig Saw (100 nos.) & Hot II/Tapping Machine, Associates Pvt. Ltd, Tapping, Drilling & `1,75,980/- for Machine, Air Gun (20 nos.) at Rail Jig Saw Machine & 2E/24, Machines and Hot Air Gun (20 Jig Saw Machine & Coach Factory, Lalganj, Hot Air Welding Jhandewalan `17.80 Lacs nos.) & Tapping & Hot Air Raebareli, UP-(INDIA) Gun/192 dtd. Extension, New excluding Drilling not ordered Welding 13.05.2013 Delhi – 110 055, Tapping, Drilling Gun/192 dtd. Fax: 011-23629909 Machine 31.01.2013 4 IRCON/ME 18.03.2013 Supply of 02 Nos. Road IRCON/MECH/ M/s Escort Limited `18.00 Lacs (01 no.) (02 nos.) 03-months from the CH/ 1029/RCF.RBL- Construction 1029/RCF. Mobile Crane Capacity `10,34,274/- `20,68,548/- date of issue of LOA RBL- 10 MT at Rail Coach II/Road Mobile Equipment, 603, II/Road Factory, Lalganj, Crane/RET-I/53 dtd. 6th Floor, Mobile Raebareli, UP-(INDIA) 13.05.2013 Vishal Bhawan, Crane/RET 95 Nehru Place, -I/53 dtd. 22.02.2013 New Delhi-110 019 Tel.:011-26444821, Fax: 011-26444873 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 08.02.2013 Supply of Roof Bearer, IRCON/MECH/1029/ M/s Steel Craft `60.31 Lacs `75,55,311/- `75,55,311/- 180-days from the MECH/102 RCF.RBL-II/Carline (India), Vill.: Kutbi 9/RCF.RBL Side Wall & Carline date of issue of LOA -II/Carline Fabrication and Roof Fab & Roof Nangal Road, Fab & Roof Acceptance Fixtures For Acceptance Opp. 132 KV Acceptanc LHB Coach at Rail Fixtures/188/2809 Power House, e dated 14.05.2013 Batala-143 505 Fixtures/18 Coach Factory, Lalganj, 8/2809 Raebareli, UP-(INDIA) E-mail: dated [email protected] 25.12.2013 6 IRCON/ 18.01.2013 Supply of (03 Nos.) IRCON/MECH/ M/s Macro Tech. `9.90 Lacs `4,36,023/- `13,08,069/- 04-months from the MECH/10 1029/RCF.RBL-II/ Equipment Pvt. Ltd, 29/RCF.R Battery Operated date of issue of LOA BL-II/ Platform Truck at Rail Platform 64A Sadananda Platform Coach Factory, Lalganj, Truck/61/RET dtd. Road, Kolkata – Truck/61/ Raebareli, UP-(INDIA) 15.05.2013 700 026, FAX:033- RET 2463-4684, Email: dated: [email protected] 25.12.12 7 IRCON/J 02.04.2013 Construction of IRCON/J&K- M/s Zeal `211.06 Lacs 7.74% above `227.39 Lacs 06-months from the &K- Cell/JAT/14/7004/17 Construction Co., Cell/JAT/ Passenger Amenities date of issue of LOA 14/7004/1 Center and other allied Dtd.15.05.13 J&K Bank Building, 7 works including Pantha Chowk, Dtd.09.03 srinagar, Kashmir – .13 demolition of existing structures in connection 191 101 with Multi Functional Mob.:09419003883 Complex (MFC) at 09419060731 Jammu Railway Station, J&K 8 IRCON/J '03.05.2013 Hiring of Vehicles for IRCON/J&K- M/s Shabir `15.78 Lacs 33% above `20.92 Lacs 12-months from the &K- SGR/Hiring Vehicle- Transporters, Cell/JAT/ Officers and Staff of date of issue of LOA 14/1014/ Northern Railway Srinagar/VH- Sagina Shopping Q- associated with the 10/450/240 Complex, Gogli B/Hiring- Dtd.20.05.13 Bagh, Srinagar Veh- Project works in SINA- connection with NR/VH- construction of Q-B 10/256 Section of USBRL New Dtd.15.04 .13 Rail Link Project (J&K) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 9 IRCON/ME 15.03.2013 Supply of 03 Nos. IRCON/MECH/ M/s Emprise `11.89 Lacs `6,30,339/- `18,91,018/- 04-months from the CH/1029/R 1029/RCF.RBL- Marketing, B-1/31 CF. RBL-II/ Portable Air Compressor date of issue of LOA at Rail Coach Factory, II/Portable Air Sector-H, Aligarh, Portable Lucknow-226 024 Air Lalganj, Raebareli, UP- Compressor/118/RET Compresso Ph.:0522-3250618, dtd. 21.05.2013 Email: [email protected] r/ 118/RET (INDIA) 10 IRCON/M 21.01.2013 Supply of (01No.) IRCON/MECH/1029/ M/s Ensol Multiclean `12,96,000/- `23,59,090/- `23,59,090/- 03-months from the ECH/102 RCF.RBL-II/ Equipments Pvt. Ltd, 9/RCF.R Mechanized Refuse date of issue of LOA Collector at Rail Coach Mechanised Refuse 401, Neelkanth, 1, BL-II/ Bhawani Singh Road, Mechanis Collector/149 dtd. Factory, Lalganj, Opp. Sahakar ed 24.05.2013 Refuse Raebareli, UP-(INDIA) Bhawan, Jaipur-1, Collector/ FAX: +91-141- 149 2226934 dated: Email: [email protected] 25.12.12 11 IRCON/2 03.05.2013 Construction of Road IRCON/2049/ROB-II- M/s BSC-C&C JV `3044.70 Lacs 12.50% above `34,25,29,193/ 15-months including 049/ROB- BIHAR/LC- II- over Bridge both railway Plot No.:70, - the monsoon period BIHAR/T span and adjacent 3SPL/LOA/104/1239 Sector-32, from the date of issue ENDER/L approaches span Dtd.27.05.2013 Gurgaon – 122 001, of LOA C- Haryana 3SPL/I/20 including Reinforced 13/13 Earth wall/ Retaining Dtd.