Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month of APRIL 2013-MARCH 2014) Works Awarded : APRIL 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.11.2012 Supply of 01 No. IRCON/MECH/1029/ M/s Unitech (01 no.) (01 no.) `3,90,171/- 03-months from the MECH/102 9/ Induction Heating RCF.RBL- Instruments , Unit `4.45 Lacs `3,90,171/- date of issue of LOA RCF.RBL- Machine for mounting of II/Induction Heating No.: 24, Dewan & II/Induction Heating fork on anti-roll bar at Rail Machine/185 Shah, Industrial Machine/18 Coach Factory, Lalganj, dtd.01.04.13 Estate No.: 7, 5 dtd. Raebareli, UP-() Navghar, Vasai East, 30.10.12 Thane - 401210 2 IRCON/ 10.01.2013 Supply of 01 No. Load IRCON/MECH/ M/s Vikrant 1 set (02 nos.) 1 set (02 nos.) `39,79,656/- 24-weeks from the MECH/102 9/ Lifting & Turning Device 1029/RCF-RBL- Special Machines `55.60 Lacs `39,79,656/- date of issue of LOA RCF.RBL- at Rail Coach Factory, II/Multiple Pvt. Ltd, 90, II/Load Lifting & Lalganj, Raebareli, UP- station/RET-I/119 Nayapatty Road, Turning (INDIA) dtd 05.04.13 Kolkata – 700055 Device/RE Tel.:033-2551-3070 T-I/119 Email: Dtd. [email protected] 30.10.12 3 IRCON/ 24.01.2013 Supply of (05 Nos.) 10/3 IRCON/MECH/ M/s Unique (05 nos.) (05 nos.) `8,62,46,984/- 180-days from the MECH/10 1029/RCF-RBL- Industrial Handlers 29/RCF.R Ton Electric Overhead `962.00 Lacs `8,62,46,984/- date of issue of LOA BL-II/EOT Travelling Cranes at Rail II/EOT Crane/44/2262 Pvt. Ltd., 206-207, Crane/44 Coach Factory, Lalganj, dtd 15.04.13 Nahar & Seth Ind. dtd. Raebareli, UP-(INDIA) Estate Chakala, 25.12.201 Andheri (East), 2 Mumbai-400 099 4 IRCON/ 08.02.2013 Supply of 01 No. IRCON/MECH/ M/s United (01 no.) (01 no.) `22,07,415/- 120-days from the MECH/ 1029/RCF.RBL- Engineering Corpn., 1029/ Multiple Station Machine `46.44 Lacs `22,07,415/- date of issue of LOA RCF.RBL- (Combined Shearing, II/Multiple B-96, Mayapur II/ Multiple Punching, Cropping & Station/RET/96 dtd. Industrial Area, Station/RE Notching Machine) at 23.04.2013 Phase-I, T/ 96 dtd. New Delhi-110 064 11.01.2013 Rail Coach Factory, Lalganj, Raebareli, UP Works Awarded : MAY 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 27.02.2013 Supply of Hand Tools at IRCON/MECH/ M/s Machinery `19.78 Lacs `17,56,630/- `17,56,630/- 30-days from the date MECH/ 1029/RCF.RBL- Marketing 1029/ Rail Coach Factory, of issue of PO RCF.RBL- Lalganj, Raebareli, UP- II/Hand Associates Pvt. Ltd, II/ Hand (INDIA) Tools/190/3000 dtd. 2E/24, Tools/190 02.05.2013 Jhandewalan dtd. Extension, New 31.01.2013 Delhi – 110 055, Fax: 011-23629909 2 IRCON/ME 05.02.2013 Pipelines for IRCON/MECH/ M/s Legris India `1607.00 Lacs `17,21,50,978/- `17,21,50,978/ 210-days from GAD CH/1029/R 1029/RCF-RBL-II/ Pvt. Ltd., Plot No.: CF-RBL-II/ Compressed Air, Argo - approval Pipelines/ mix, Nitrogen & Oxygen Pipelines/028B dtd 99, Pace City-1, + 028B dtd Gas Supply and Storage 10.05.2013 Sector-37, AMC for 5 30.10.2012 System in Shell & Bogie Gurgaon-122 001 years Shops Fax:0124- `2,59,91,027/- 66173708 3 IRCON/ME 25.02.2013 Supply of IRCON/MECH/ M/s Machinery `24.55 Lacs `15,64,900/- for `17,40,880/- 30-days from the date CH/1029/R CF. RBL-II/ Tapping/Drilling Machine, 1029/RCF.RBL- Marketing including Jig Saw (100 nos.) of issue of PO Tapping Jig Saw (100 nos.) & Hot II/Tapping Machine, Associates Pvt. Ltd, Tapping, Drilling & `1,75,980/- for Machine, Air Gun (20 nos.) at Rail Jig Saw Machine & 2E/24, Machines and Hot Air Gun (20 Jig Saw Machine & Coach Factory, Lalganj, Hot Air Welding Jhandewalan `17.80 Lacs nos.) & Tapping & Hot Air Raebareli, UP-(INDIA) Gun/192 dtd. Extension, New excluding Drilling not ordered Welding 13.05.2013 Delhi – 110 055, Tapping, Drilling Gun/192 dtd. Fax: 011-23629909 Machine 31.01.2013 4 IRCON/ME 18.03.2013 Supply of 02 Nos. Road IRCON/MECH/ M/s Escort Limited `18.00 Lacs (01 no.) (02 nos.) 03-months from the CH/ 1029/RCF.RBL- Construction 1029/RCF. Mobile Crane Capacity `10,34,274/- `20,68,548/- date of issue of LOA RBL- 10 MT at Rail Coach II/Road Mobile Equipment, 603, II/Road Factory, Lalganj, Crane/RET-I/53 dtd. 6th Floor, Mobile Raebareli, UP-(INDIA) 13.05.2013 Vishal Bhawan, Crane/RET 95 Nehru Place, -I/53 dtd. 22.02.2013 New Delhi-110 019 Tel.:011-26444821, Fax: 011-26444873 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 08.02.2013 Supply of Roof Bearer, IRCON/MECH/1029/ M/s Steel Craft `60.31 Lacs `75,55,311/- `75,55,311/- 180-days from the MECH/102 RCF.RBL-II/Carline (India), Vill.: Kutbi 9/RCF.RBL Side Wall & Carline date of issue of LOA -II/Carline Fabrication and Roof Fab & Roof Nangal Road, Fab & Roof Acceptance Fixtures For Acceptance Opp. 132 KV Acceptanc LHB Coach at Rail Fixtures/188/2809 Power House, e dated 14.05.2013 Batala-143 505 Fixtures/18 Coach Factory, Lalganj, 8/2809 Raebareli, UP-(INDIA) E-mail: dated [email protected] 25.12.2013 6 IRCON/ 18.01.2013 Supply of (03 Nos.) IRCON/MECH/ M/s Macro Tech. `9.90 Lacs `4,36,023/- `13,08,069/- 04-months from the MECH/10 1029/RCF.RBL-II/ Equipment Pvt. Ltd, 29/RCF.R Battery Operated date of issue of LOA BL-II/ Platform Truck at Rail Platform 64A Sadananda Platform Coach Factory, Lalganj, Truck/61/RET dtd. Road, Kolkata – Truck/61/ Raebareli, UP-(INDIA) 15.05.2013 700 026, FAX:033- RET 2463-4684, Email: dated: [email protected] 25.12.12 7 IRCON/J 02.04.2013 Construction of IRCON/J&K- M/s Zeal `211.06 Lacs 7.74% above `227.39 Lacs 06-months from the &K- Cell/JAT/14/7004/17 Construction Co., Cell/JAT/ Passenger Amenities date of issue of LOA 14/7004/1 Center and other allied Dtd.15.05.13 J&K Bank Building, 7 works including Pantha Chowk, Dtd.09.03 srinagar, Kashmir – .13 demolition of existing structures in connection 191 101 with Multi Functional Mob.:09419003883 Complex (MFC) at 09419060731 Jammu Railway Station, J&K 8 IRCON/J '03.05.2013 Hiring of Vehicles for IRCON/J&K- M/s Shabir `15.78 Lacs 33% above `20.92 Lacs 12-months from the &K- SGR/Hiring Vehicle- Transporters, Cell/JAT/ Officers and Staff of date of issue of LOA 14/1014/ Northern Railway Srinagar/VH- Sagina Shopping Q- associated with the 10/450/240 Complex, Gogli B/Hiring- Dtd.20.05.13 Bagh, Srinagar Veh- Project works in SINA- connection with NR/VH- construction of Q-B 10/256 Section of USBRL New Dtd.15.04 .13 Rail Link Project (J&K) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 9 IRCON/ME 15.03.2013 Supply of 03 Nos. IRCON/MECH/ M/s Emprise `11.89 Lacs `6,30,339/- `18,91,018/- 04-months from the CH/1029/R 1029/RCF.RBL- Marketing, B-1/31 CF. RBL-II/ Portable Air Compressor date of issue of LOA at Rail Coach Factory, II/Portable Air Sector-H, Aligarh, Portable Lucknow-226 024 Air Lalganj, Raebareli, UP- Compressor/118/RET Compresso Ph.:0522-3250618, dtd. 21.05.2013 Email: [email protected] r/ 118/RET (INDIA) 10 IRCON/M 21.01.2013 Supply of (01No.) IRCON/MECH/1029/ M/s Ensol Multiclean `12,96,000/- `23,59,090/- `23,59,090/- 03-months from the ECH/102 RCF.RBL-II/ Equipments Pvt. Ltd, 9/RCF.R Mechanized Refuse date of issue of LOA Collector at Rail Coach Mechanised Refuse 401, Neelkanth, 1, BL-II/ Bhawani Singh Road, Mechanis Collector/149 dtd. Factory, Lalganj, Opp. Sahakar ed 24.05.2013 Refuse Raebareli, UP-(INDIA) Bhawan, Jaipur-1, Collector/ FAX: +91-141- 149 2226934 dated: Email: [email protected] 25.12.12 11 IRCON/2 03.05.2013 Construction of Road IRCON/2049/ROB-II- M/s BSC-C&C JV `3044.70 Lacs 12.50% above `34,25,29,193/ 15-months including 049/ROB- BIHAR/LC- II- over Bridge both railway Plot No.:70, - the monsoon period BIHAR/T span and adjacent 3SPL/LOA/104/1239 Sector-32, from the date of issue ENDER/L approaches span Dtd.27.05.2013 Gurgaon – 122 001, of LOA C- Haryana 3SPL/I/20 including Reinforced 13/13 Earth wall/ Retaining Dtd. wall in lieu of LC No 12.04.201 3SPL at Km. 51/09-10 3 between Hajipur- Muzaffarpur section on Barauni-Gorakphur Route in Sonepur Division of East Central Railway,Bihar 12 IRCON/ME 18.02.2013 Supply of 01 No. IRCON/MECH/ M/s Vikrant `6.30 Lacs `5,90,357/- `5,90,357/- 16-weeks from the CH/ 1029/RCF. Hydraulic Platform with 3 1029/RCF.RBL-II/ Special Machines date of issue of LOA RBL-II/ Axis movement at Rail Hyd. Platform (3 Pvt. Ltd, 90, Hyd. Platform (3 Coach Factory, Lalganj, Axis)/RET/83/2893 Nayapatty Road, Axis)/RET/ Raebareli, UP-(INDIA) dated 28.05.2013 Kolkata – 700055 83 Tel.:033-2551-3070 Email: vikrantspecial@ rediffmail.com Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 13 IRCON/Civil/ 09.04.2013 Construction of two nos. IRCON/Civil/1029/RC M/s Hi-Tech `650.97 Lacs Schedule A DSR `722.57 Lacs 12-months from the 1029/RCF- RBL/10/Ten Road Under Bridges F-RBL/10/Tender/3/ Competent Builders 12 items: date of issue of LOA der/3/OT/28 (RUB) by Cut & Cover OT/28/3383 Pvt. Ltd, G-17, RIICO 11%(+) i.e. 28.05.2014 Dtd.12.03.20 technique comprising box Dtd.28.05.2013 Industrial Area, 13 Phase-I, Bhiwadi – & of approximate opening 301019 Schedule B sixe 7.0 x 3.65 m and 20 Distt.- Alwar (Raj.) (NS Items):- m length along with its Ph.: 01493-512248, 11%(+) approaches, drainage 226343, and allied road works etc. Mob.: 09314234530 complete for RCF, Email: Raebareli at Lalganj [email protected] 14 IRCON/C 10.04.2013 Construction/ IRCON/CC/TR/RSV M/s Brajendra `3803.86 Lacs 5.11% Below `3609.48 06-months from the C/TR/RS Upgradation of Bheldi – Y-BIHAR/13/685/576 Kumar Builders date of issue of LOA VY- Amanaur – Pachraur – dated 28.05.2013 Pvt. Ltd., Achuara, i.e. 28.05.2013 BIHAR/13 /685 Taraiya – Pokharia Barh, Patna dated Road of SH104 in Saran (Bihar), PIN- 20.03.201 district under RSVY 803213 3 15 IRCON/MEC 02.04.2013 Supply of 02 Nos. IRCON/MECH/ M/s Vikrant `21,20,233/- `11,30,622/- `22,61,245/- 16-weeks from the H/ 1029/RCF.R Manipulator - 10 MT at 1029/RCF.RBL- Special Machines date of issue of LOA BL- Rail Coach Factory, II/Manipulator/196 Pvt. Ltd, 90, II/Manipulato r/ 196 dtd. Lalganj, Raebareli, UP- dtd. 29.05.2013 Nayapatty Road, 07.03.2013 (INDIA) Kolkata – 700055 Tel.:033-2551-3070 Email: [email protected] 16 IRCON/ 19.02.2013 Supply of 01 No. 80 T IRCON/MECH/ M/s Mono-Tech `7.40 Lacs `14,93,545 `14,93,545/- 03-months from the MECH/102 9/RCF.RBL Mechanical Press Brake 1029/RCF.RBL-II/148 Engineers Pvt. Ltd, date of issue of LOA -II/80T at Rail Coach Factory, Station/RET/96/ dtd. S-16, South Side Mechanical Press Lalganj, Raebareli, UP- 30.05.2013 GT. Road Indl. Brake/148 (INDIA) Area, Ghaziabad – dated Email: 24.01.2013 201 009 [email protected] 17 IRCON/ME 05.02.2013 Supply of 04 Nos. IRCON/MECH/ M/s Marwaha `82.52 Lacs `29,61,163/- `1,18,44,654/- 06-months from the CH/1029/R 1029/RCF-RBL-II/ Manufacturing Co., CF-RBL-II/ Electrically Operated date of issue of LOA Lifting Synchronized Screw Lifting Jack/124/2913 Near Association Jack/124 Jacks at Rail Coach dtd 30.05.2013 Office, Anand Parbat dtd Industrial Area, New 11.01.2013 Factory, Lalganj, Delhi – 110 005 Raebareli, UP-(INDIA) Email: [email protected] Works Awarded : JUNE 2013 Quantity Rate Contractor’s (for supply contract)/ Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ Tendered Value of Name and Estimated Cost (For completion Cost (For Engg./Elect./S&T/Mech. N. No. opening Work and date Engg./Elect. /S&T/ Contract address etc Works) date Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/2034/ 30.04.2013 Construction of Road IRCON/2049/ ROB-II- M/s Tribeni `2430.44 Lacs Schedule-A : 3.00% above Schedule-A : 15-months ROB-II- BIHAR/ over Bridge both railway BIHAR/LC-45AB/LOA/ Construction Ltd., `2,04,81,796/- including the TENDER/LC- span and adjacent 105/1316 Dtd. New Town Schedule-B : 3.00% above monsoon 45AB/I/2013/ 12/ approaches span 07.06.2013 Square, Schedule-B : period from dtd.08.04.201 including Reinforced Office No.: 4M, Total amount: `22,98,53,968/- the date of 3 Earth wall/ Retaining Chinar Park, issue of LOA wall in lieu of LC No 45 New Town, `25,03,35,764/- AB at Km. 324/13-14 Rajarhat, Kolkata between Chapra – 700 136 Kacheri-Goldengunj section in Varanasi Division of North Eastern Railway,Bihar 2 IRCON/20 30.04.2013 Casting RCC road deck LOA No.: M/s BSC-C&C `2665.00 Lacs `30,49,93,362.70 `30,49,93,362.70 16-months 44/GANG from the date A BRIDGE on erected steel truss of IRCON/2044/ Ganga (JV), PATNA/ rail cum road bridge Bridge/Patna/16/ Plot No.: 70, of issue of 16/24 Dtd. across river ganga at 24/2213/DIGHA Dtd. Sector-32, LOA. 27.04.13 Patna, for span 1 to 19 13/14.06.2013 Gurgaon PIN:122001 from Dighaghat end Fax: 0124-4536799 (1no.x64m + 18nos.X123m) E-mail: candc@candcinfra structure.com 3 RCON/20 21.05.2013 Casting RCC road deck LOA No.: M/s BSC-C&C `2665.00 Lacs Schedule Quoted Amount `30,49,93,362.70 16-months 44/ Rate from the date GANGA on erected steel truss of IRCON/2044/ Ganga (JV), BRIDGE rail cum road bridge Bridge/Patna/16/ Plot No.: 70, A 16.75 `28,41,53,682.70 of issue of PATNA/ across river Ganga at 18/2214/DIGHA Dtd. Sector-32, % LOA. 16/25 Patna, for span 20 to 38 15.06.2013 Gurgaon above Dtd. PIN:122001 27.04.13 from Pahleja Ghat end Fax: 0124-4536799 B 10% `2,08,39,680.00 (1no.x64m + 18nos.x123m). E-mail: below candc@candcinfrastr ucture.com Total `30,49,93,362.70 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/MEC 04.02.2013 M/s Electronic & `12,96,000/- `2,00,563/- `4,01,126/- 02-months H/1029/RCF. 02 Nos. Portable IRCON/MECH/10 RBL- Ultrasonic Testing 29/RCF.RBL-II/ Engineering Co. from the date II/Ultrasonic (I) Pvt. Ltd., 8, 2nd of issue of Tester/128 Machine Ultrasonic Floor, Jyoti Wire dtd.11.01.13 LOA Tester/128/3038 House Near Kolsite, Off Veera Desai dtd.18.06.13 Road, Andheri (W), Mumbai-400053 Ph. No.:022-26735050 Email- [email protected] 5 IRCON/2034/ 21.05.2013 M/s Mehar `2502.93 Lacs 8.50% above `27,15,67,756/- 15-months ROB-BIHAR/ Construction of Balance IRCON/2034/ TENDER/LC- Work (Balance Portion ROB-I-BIHAR/LC- Foundations & including the 79/Mithapur/ Civil Engineers monsoon Tender/2013/ of Railway Triangular 79/LOA/ 110/1408 14 Pvt. Ltd., period from Portion, Pun-Pun Arm Date:21.06.13 Date:30.04.1 31, Dun Shoping the date of 3 & Mithapur Arm) For Centre, issue of LOA Road Over Bridge in Lallubhai Lieu of LC- 79 At Amichand Mithapur, Patna (Bihar) Compound, Including Railway Span Tardeo Road, of Mithapur Arm, Mumbai – 400 Reinforced Earth Wall/ 007 Retaining Wall 6 IRCON/MEC 22.04.2013 M/s Vikrant `19,00,000/- `13,32,927/- `13,32,927/- 04-months H/1029/RCF. Pressing Fixture for IRCON/MECH/10 RBL-II/Fixture Anti Roll bar, Bogie 29/RCF.RBL- Special Machines including the for Bogie/198 Pvt. Ltd, 90, monsoon dtd.:22.03.20 Frame Lifting Tackle II/Fixture for 13 Nayapatty Road, period from cum Bolster Fixing Bogie/198/3071 Kolkata – 700055 the date of Fixture dtd.:21.06.2013 Tel.:033-2551- issue of LOA 3070 Email: vikrantspecial@r ediffmail.com

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/2034/ 28.05.2013 Construction of Third leg IRCON/2049/ ROB-II- M/s Naraindas `893.39 Lacs 8.96% above `9,73,43,754/- 15-months ROB-BIHAR/ TENDER/LC- of Road over Bridge BIHAR/LC-72 Construction Pvt. including the 72 including foundation, (3leg)/LOA/109/1400 Ltd., 14/441, monsoon (3leg)/2013/1 5 substructure, Dtd.21.06.2013 Vinodpur, Katihar period from Date:07.05.1 superstructure, slip road, (Bihar) the date of 3 Reinforced Earth wall, PIN-854105 issue of LOA Retaining wall etc. in lieu of LC- 72 at Km 536 between Gulzarbagh and Patna Saheb Section in Danapur Division of E C Railway , Bihar 8 IRCON/2049/ 01.02.2013 Construction of Road IRCON/2049/ROB-II- M/s TRG `5112.03 Lacs Schedule-A : 8.80% above Schedule-A : 15-months ROB-II- BIHAR/TEND over Bridge both railway BIHAR/LC- Industries Pvt. `2,37,86,997/- including the ER /LC- span and adjacent 159A/LOA/112/1422 Ltd., Schedule-B : 8.80% above monsoon 159/I/2013/2 Date:11.01.1 approaches span Date:24.06.2013 E-461, Greater Schedule-B : period from 3 including Reinforced Kailash-II, Delhi- Total amount: `53,24,01,511/- the date of Earth wall/ Retaining 110 048 issue of LOA wall in lieu of LC No:159 `55,61,88,508/- A/SPL at Km.164/15-16 between Jivdhara- Motihari Section on Barauni-Gorakhpur Route in Samastipur Division of East Central Railway – New ROB 9 IRCON/MEC 20.02.2013 01 No. Electrical Pre IRCON/MECH/1029/ M/s Kashyap `10,80,000/- `8,74,502/- `8,74,502/- 03-months H/ 1029/RCF.RB Heat Treatment RCF.RBL-II/Electrical Brothers, Pratap including the L-II/Electrical Tempering Furnace Tempering Ganj, Kalpi road, monsoon Tampering Furnace/RET/ Furnace/RET/99/2955 Kanpur – 208012 period from 99 Dtd dtd.:25.06.2013 Ph.:0512-2237897 the date of 24.01.2013 Email:kashyapbros issue of LOA @gmail.com Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 10 IRCON/MEC 09.05.2013 (02 nos.) 20 MT IRCON/MECH/ M/s Pioneer `2,11,56,0000/- `1,30,43,043/- `1,30,43,043/- 02-months H/ 1029/RCF.RB Mounded Underground 1029/RCF.RBL-II/20 Fabricators (P) including L-II/20 MT LPG storage bullet & MT LPG Storage Ltd., B/2, the LPG Storage Bullet & pipeline Bullet & Saraswati monsoon Pipeline/200 Pipeline/200/3099 Industrial Estate, period from Dtd 17.04.2013 Dtd 26.06.2013 Partapur, the date of Meerut-250103, issue of Ph.:0121- LOA 2441853, 2441509 Email:pioneer@pioengg. com 11 IRCON/J& 06.05.2013 Providing services for IRCON/J&K M/s Star `172.23 Lacs 5.45% below `162.83 Lacs 12-months K maintenance of Cell/JAT/14/1014/ Constructions, from the date Cell/JAT/1 1st Floor, AI-Noor of issue of 4/1014/DQ IRCON's DQ/Support- /Support- establishments and Complex, LOA Services-DQ- Hyderpora, Services- also providing services Section/M- DQ- by way of assisting Bypass (West), 19R/252 Kashmir, Section/M- IRCON's Engineers 19R/252 dtd.27.06.2013 Srinagar – dtd. during supervision of 190014 (J&K) 24.04.201 work and services for Mob.:094190011 3 office up-keep and 45 other miscellaneous 09419006074 work as required at Email: mail@ various locations along starconstructions. the project alignment com from Dharam to Banihal covering Ramban, Sangaldhan, Khari, Sumber, Kholi, Dharam, etc. in connection with Dharam Qazigund section of USBRL Project Contd.../- Works Awarded : JULY 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 Pkg. Construction of Balance LOA No.: M/s Trishul `106.12 Lacs 15.4% above `1,22,46,807.00 07.07.2014 No.: SB- work of Station Building IRCON/2050/BGL.JB Engicon Pvt. Ltd. , estimated cost 01 & other associated B/Tender/Pkg-01 Shyam Savitri (India), NIT No.: miscellaneous work at (India)/255 Dtd. Enclave, 683 Dt. Jaynagar Railway 08.07.2013 Main Road, 15.04.13 Station Yard in Rajiv Nagar, connection with Gauge Post-Kesari Nagar, conversion & Patna-24 construction of new B.G. Railway Line from Jaynagar (India) to Bardibas (Nepal) 2 IRCON/M 16.04.2013 Supply and Erection, LOA No.: M/s Innovative `23.19 Lacs Cost of Deep `13,95,500/- 20 weeks from the ECH/102 Installation & IRCON/MECH/1029/ Electronics & Freezer is date of issue of PO 9/RCF.R Commissioning of Shore RCF/RBL-II/Lab Systems, Lucknow `3,93,250/- + BL-II/lab Equipme A&D Testing Equipment, Equipments/ Cost of Digital nts/105 Multy Cell Ageing Oven, 105/3230 Dtd. Melting Point dtd Digital Melting Point 10.07.2013 Aparatus is 22.03.13 Apparatus & Deep `10,02,250/- Freezer (04 nos.) 01-no. Each at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA) 3 IRCON/ME 22.04.2013 Supply and Erection, LOA No.: M/s Shin Nippon `6325.00 Lacs Cost of Machine is JPY 240 days from the CH/1029/ Installation & JPY RCF.RBL- IRCON/MECH/1029/ Koki Co. Ltd., 490,000,000.00 date of opening of II/Bogie Commissioning of Bogie RCF/ RBL-II/Bogie Tokyo, Japan 245,000,000.00(E LC Frame Frame Machining Centre Frame Machining XCLUDING Machining (02 nos.) at Rail Coach Centre/73/RET- Custom duty) + Centre/73 Factory at Lalganj, AMC for 5 years is /RET-II dtd II/3286 Dtd. 16.07.13 22.03.13 Raebareli, UP-(INDIA) JPY 10,000,000.00 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/M 24.05.2013 Supply and Erection, LOA No.: M/s Godrej Efacec `2678.40 Lacs `.27,00,68,311/- `27,00,68,311/- 180 to 240 days ECH/1029 Installation & IRCON/MECH/1029/ Automation & from LOA /RCF.RBL Commissioning of ASRS RCF.RBL- Robotics Ltd, - (06 nos.) at Rail Coach I/ASRS/8 I/ASRS/86/RET- Mumbai Factory at Lalganj, 6/RET-1 1/3300 Dtd. dtd Raebareli, UP-(INDIA) 17.07.2013 17.04.13 5 IRCON/J 06.06.13 Providing housekeeping IRCON/J&K- M/s Wani `37.96 Lacs 20.20% below `30.29 Lacs 12 Months from &K- Cell/JAT/ services for up keeping, Cell/JAT/14/1014/Q- Construction, 20.07.2013 14/Q-B watch & ward and B/Housekeeping- Kursoo Padahahi Housekee maintenance of Officers SINA ORH/M- Bagh, Srinagar, ping- SINA- Rest House (ORH) at 23/Dtd. 18.07.2013 Kashmir, J&K ORH/M- Srinagar on Q-B New 23/Dtd. BG Rail Line Project 16.05.13 6 IRCON/CC 24.06.2013 Assembly, erection/ LOA No.: M/s BEBL-ROYAL `4530.00 Lacs `43,32,18,000/- 450-days (including /TN/GBSS- Patna/13/ launching of (7x123m) IRCON/2044/Ganga (JV), monsoon) from the 686 Dated span from pier No.-19 to Bridge/Patna/16/18/ Godrerj Waterside date of issue of Letter 03/06/2013 pier No.-26 and 2975A/Digha/1633 Building, Tower of Acceptance (1x64m)span between pier Dtd. 18.07.2013 No. 1, 4th Floor, No.-37 to abutment A2, No. 401, Plot No.: triangulated steel girders 5, DP Block, Salt for new rail-cum-road bridge across river Ganga Lake Sector-V, at Patna from Pahlejaghat Kolkata (North island End) PIN-700 091 including transportation of Fax No.: +91-33- fabricated components of 40188237 (7x123m) span from Email: fabrication workshop at [email protected] Pahlejaghat end and (1x64m) span from fabrication workshop at Dighaghat End of river Ganga to launching site including casting of bed blocks and final coat of painting Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 7 IRCON/M 01.04.2013 Supply and Erection, LOA No.: M/s Innotech `20.00 Lacs `11,24,040/- `11,24,040/- 03 months from the ECH/1029 Installation & IRCON/MECH/ Engineering date of issue of /RCF.RBL Commissioning of 1029/RCF.RBL- Devices Pvt. Ltd., LOA - Universal testing Machine II/UTM/15 II/UTM/15/ 3358 Dtd. Bahadurgarh (03 nos.) at Rail Coach 9 dtd 29.07.2013 07.03.13 Factory at Lalganj, Raebareli, UP-(INDIA) Works Awarded : AUGUST 2013 Contractor’s Quantity Rate Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mech. date Mech. etc Works) etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 NIT- 21.06.2013 Disposal of 40mm size LOA M/s Azad 35740 MT 350.00 per MT `1,31,86,950/- 18.08.2013 221 Aggregates and Boulder No.IRCON/1020/NHAI/ Earthmovers, Jhansi from Pirauna Camp at UP- Km. 175+000 and 40mm 05/NIT/221/LOA/644 Aggregate from Dtd 03.08.2013 Badagaon Camp at km.203+600 UP-05 Road Project 2 NIT- 21.06.2013 Dismantling and/or LOA M/s Mahendra Pal `20.50 Lacs `19.5 Lacs for `29.85 Lacs 03.10.2013 222 removal of temporary No.IRCON/1020/NHAI/ Singh, Orai dismantling and structures at Badagaon, UP- `10.35 Lacs for Orai & reclamation of the 05/NIT/222/LOA/642 reclamation area of Badagaon Camp Dtd 03.08.2013 and Office by excavating unsuitable soil and filling suitable soil for cultivation purpose 3 NIT- 21.06.2013 Dismantling and/or LOA M/s Malkhan Singh, `13.50 Lacs `4.00 Lacs for `12.02 Lacs 03.10.2013 223 removal of Temporary No.IRCON/1020/NHAI/ Orai dismantling and structures at Badagaon, UP- `8.02 Lacs for Orai & reclamation of the 05/NIT/223/LOA/643 reclamation area of Badagaon Dtd 03.08.2013 Workshop and plant by excavating unsuitable soil and filling suitable soil for cultivation purpose (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 e- 03.07.2013 Construction & LOA No.: M/s Altima (Cost put to `1843.30 Lacs `18,43,29,618.79 05.02.2015 Tender Maintenance of Road IRCON/2054/PMGS Infrastructure Pvt. tender=1653+ JH-18- (1) Chiur To Hesla-3.971 Y-JKR/JH-18-XI-WB- Ltd.(AIPL), First 190 XI-WB- Km IRCON-05/66 Date Floor, 351 A, Road =`1843Lacs IRCON (2) Cherwadag To 05.08.2013 No.5, Ashok Nagar -05 Erahatu – 2.771 Km , (3) Tungaon To Bartoli - 3.124 Km. (4) Burka To Jabra- 3.957Km (5) Sotiya To Hutub- 5.503Km (6) Jamhar To Kasira- 5.112 Km (7) Sardula To Kasira- 3.669 Km (8) Burhiroma To Jhapra - 3.393 Km. (9) Kurse To Kedli - 6.012 Km (10) Kedli To Bargani - 2.974 Km. (11) Padampur To Ronhe - 4.456 Km. (Total Length: 44.942 Km, Block: Karra, District: Khunti, Jharkhand)

5 IRCON/JK 05.07.2013 Hiring vehicles for IRCON/JK- M/s Fair Deal Tour 20.16 Lacs 10.2% above 22.21 Lacs 12 Months from Cell/JAT/14 /1014/D- IRCON Officers & Staff Cell/JAT/14/1014/DQ & Travels, 75-A, the date of issue Q/Hiring- for J&K cell, Jammu in /Hiring-Veh- Last Morh, Gandhi of LOA Veh- Jammu/VH connection with USBRL Jammu/VH-07/3463/ Nagar, Jammu -07/254 Project work (J&K) dtd. 14.08.2013 J&K dtd. 17.06.13

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 6 e- 03.07.2013 Construction & LOA No.: M/s Vijay Kumar (Cost put to `1979.06 Lacs `19,79,00,001.00 17.02.2015 Tender Maintenance of Road (1) IRCON/2054/PMGS Sahu, Parmath tender JH-18- Hakaduba To Bundu Sima via Y-JKR/JH-18-XI-WB- Nagar, Tupudana, =1779+200 Buruhatu - 3.834 Km. XI-WB- (2) Landup To Bandi - 4.299 IRCON-06/82 Date Ranchi 834003 = `1979 Lacs) IRCON Km. (3) Landup To Buruhatu - 17.08.2013 -06 1.573 Km. (4) Landup To kera - 6.786 Km. (5) Jojohatu To pirihtu - 2.003 Km. (6)Suukriserang To Budhudih- 3.36 Km (7) Tirla To Budhudih - 2.562 Km. (8) Rewa To Manhu - 3.052 Km. (9) Aani dih To Takra - 1.67 Km. (10) Chukru To Namkom Block Sima via Karge - 3.492 Km. (11) Potamgara To Chitramu - 2.678 Km. (12) Siladon To Dasgaua - 3.75 Km. (13) Ganeor To Remta - 1.774 Km. (14) T09 To Dokar - 3.373 Km. Km. (15) Chikor To Somatoli - 1.099 Km. Km. (16) Taro To Barbanda - 3.023 Km. Km. (17) Sarasom To Putidag - 1.046 Km. (Total Length : 49.374 Km, Block: Khunti, District: Khunti, Jharkhand) 7 e- 06.07.2013 Construction & LOA No.: M/s Sambhu (Cost put to Rs.982.42 Lacs `9,31,68,433.01 17.02.2015 Tender Maintenance of Road : IRCON/2054/PMGS Singh, Aryapuri, tender JH-18- 1) Dumbatoli Pitch Road to Y-JKR/JH-18-XI-WB- Ratu Road, = 882+100 XI-WB- Chete via Jogitoli, 3.13Km IRCON-29/82 Date Ranchi, Jharkhand = Rs.982.00 IRCON- 2) Tongritoli to Bhandratoli 29 3.08Km 3) Kumbatoli More to 17.08.2013 Lacs) Dumertoli, 4.735Km., 4) Katcrpa More to Chhota Khunta, 2.80Km., 5) Piska Railway Station Bhagalpur to Tusmu, 2.30Km 6) Daladali Bagichatoli to Satish Chowk NH23, 2.77Km 7) Bandhya to Badka Khunta Road, 3.27Km., (Total Length: 22.085 Kms, Block: Ratu-II, District: Ranchi, Jahrkhand) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 8 IRCON/ME 06.06.2013 Supply and Erection, LOA No. M/s Sahil Alloy & `170.00 Lacs `1,00,00,000/- `2,00,00,000/- 04 months from CH/1029/R CF.RBL- Installation & IRCON/MECH/1029/ Machine Tools (P) the date of issue II/Heavy Commissioning of RCF. RBL-II/Heavy Limited, Batala of LOA. Duty Turret Lathe/RET- Heavy Duty Turret Duty Turret Lathe/ 1/3502 dtd Lathe Machines – 02 RET-1/3502 dated 14.05.2013 no. at Rail Coach 19.08.2013 Factory at Lalganj, Raebareli, UP-(INDIA)

9 IRCON/E 31.05.2013 Supply of 200W, 230V LOA No. M/s Crompton Greaves `388.00 Lacs Supply only at `1,89,14,094.60 3 months LECT/102 AC, 50Hz, highway IRCON/ELECT/1029 Ltd., 3rd Floor, Express unit rate of 9/RCF- induction light fittings for /RCF-RBL/ Ind. Building, 9-10, Bahadur `10092.90 each RBL/Ind. Shah Zafar Marg, Near Lights/49 new Rail Coach Factory, Lights/49 dtd ITO Crossing, New Rae Bareli (U.P.) 27.08.2013 Delhi-110002

10 e- 22.07.2013 Construction of Bridge LOA No.: M/s Aman Raj `219.00 Lacs `215.70 Lacs `2,01,95,538.12 28.02.2015 Tender over Goitha River on IRCON/2054/PMGS Construction , JH-15- T03 to Kadwa Y-JKR/JH-15-XI-WB- Garhwa, XI-WB- IRCON- road,Block: Dhurki, IRCON-39/126 Date Jharkhand 39 District: Garhwa, 29.08.2013 Jharkhand 11 IRCON/3025.06.2013 Design, Supply, LOA No. M/s System `161.29 Lacs `128.79 Lacs Three Month from 14/RRVU Installation, Testing, IRCON/3014/RRVU Electric Works, date of Issue of LOA NL.RS/TE Commissioning and NL.RS/SS/System 244, Shopping i.e. 30.11.2013 NDER/SS /02 Dt. Handing Over of 2 x 750 Electric/02/1241 Centre, Kota – 7 04.06.201 KVA 11/0.433 KV Sub- dated 31.08.2013 Tel:0744-2363804 3 station for KaTPS Email: Railway Siding at systemselectricals@g Jhalawar mail.com 12IRCON/3019.07.2013 Design, Supply, LOA No. M/s REW `162.66 Lacs `147.14 Lacs Four Month from 14/RRVU Installation, Testing, IRCON/3014/RRVU Constructions Pvt. date of issue of NL.RS/Te Commissioning and NL.RS/SS/High Rise Ltd, D-5, Industrial LOA i.e. nder/High Rise Handing Over of High Mast/REW/03/1238 Area Site-A, 31.12.2013 Mast/03 Rise Mast for KaTPS dated 31.08.2013 Mathura (U.P) - Dated Railway Siding at 281004 28.06.201 Jhalawar 3 Works Awarded : SEPTEMBER 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ME 03.06.2013 Supply and Erection, LOA No. M/s Geeta `30.78 Lacs `25,46,962/- `25,46,962/- 90 days from LOA CH/1029/R CF.RBL- Installation & IRCON/MECH/1029/ Machine Tools Pvt. II/Universal Commissioning of RCF. RBL- Ltd., Jamnagar Milling Machine/20 Universal Milling II/Universal Milling 5 dated Machine (01 no.) at Machine/ 205/3562 14.05.2013 Rail Coach Factory at dated 02.09.2013 Lalganj, Raebareli, UP- (INDIA) 2 IRCON/ME 05.04.2013 Supply and Erection, LOA No. M/s A.S.I Sales `18.36 Lacs (01 NO.) `8,05,800/- 2 months from CH/1029/R CF.RBL- Installation & CON/MECH/1029/R Pvt. Ltd., New Accelerated LOA/PO for II/Lab Commissioning of (01 CF .RBL-II/Lab Delhi Weathering Accelerated Equipment s/111 No.) Accelerated Equipments/111/ Tester Weathering Tester dated Weathering Tester, 3889 dated `6,06,900/- and 3 months from 07.03.2013 Toxcity Tester & (01 04.09.2013 + LOA for Motorized No.) Motorized Digital (01 No.) Digital Rockwell Rockwell Hardness Motorised Digital Hardness Tester Tester at Rail Coach Rockwell Factory at Lalganj, Hardness Tester Raebareli, UP-(INDIA) `1,98,900/- 3 IRCON/ME 09.03.2013 Supply and Erection, LOA No. M/s SIS `20000.00 Lacs Cost of Full USD 365 days from LC CH/1029/R CF.RBL- Installation & IRCON/MECH/1029/ Corporation, Korea System: USD 26,999,240.00 + II/Shell Commissioning of RCF. RBL-II/Shell 26,999,240.00 + `2,39,36.491.25 Assembly line/117/RE Integrated Shell Assembly INR T dated Assemblies and line/117/RET/ 3624 2,39,36,491.25/- 31.01.2013 Assembly Lines -01 no. dated 16.09.2013 at Rail Coach Factory at Lalganj, Raebareli, UP- (INDIA) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/3 03.5.2013 Construction of four lane IRCON/3015/ROB- M/s Gannon `2719.88 Lacs `2719.88 Lacs `3,362.41 Lacs 20 months 015/TN/R Road over Bridge (ROB) OB- RAJ/GDLC/LC- Dunkerley & Co. (including RAJ/SGN with approaches as per 119/98/3757 dated Ltd. monsoon) from R- specifications & Quality 17.09.2013 B-228, Okhla the date of LOA 119/RT- Control Standards etc. 2/13/44 Industrial Area, complete including Phase-I, New detailed design & Delhi-110 020 drawings in Lieu of LC- 119 at Sri Ganganagar in Rajasthan State. 5 No. 29.11.2012 Design, Supply, No. IRCON/ M/s Tata Power `22.40 Cr SITC Contract `15.60Cr. 8 months IRCON/ Installation, testing & ELECT/ ELECT/1029/RCF- Solar Systems 1029/R commissioning of Grid RBL/ SOLAR Ltd., 78, CF- connected Solar power PLANT/ 44B dated Electronics City, RBL/ plant of 2MW capacity 20.09.2013 Phase I, Hosur SOLAR with all the electrical and PLANT/ Road, Bangalore 44B associated equipments - 560 100 including civil works at New Rail Coach Factory, Rae Bareli (U.P.) 6 IRCON/M 23.04.2012 Supply and Erection, LOA No. M/s Danobat `15657.00 Lacs Cost of Imported Euro 15,899,584 300 days from ECH/102 Installation & 9/RCF.R IRCON/MECH/1029/ Group, Spain supply portion of + `68,503,496/- approval of GADs BL- Commissioning of RCF.RBL-II/WHEEL machines with II/WHEEL Integrated Wheel & Axle AXLE ASSLY concomitant AXLE Machining and Assembly LINE/95/RET-I/3673 accessories Euro ASSLY Line with Synchronized LINE/RET dtd 25.09.2013 15,664,299/- -I Dtd. and Automated Material + Cost of 27.03.13 Handling System for Indigenous supply Wheel Shop at Rail Rs.68,503,496/- + Coach Factory at Cost of Spares Lalganj, Raebareli, UP- (INDIA) Euro 235,285 7 NIT- 28.06.2013 Disposal of laboratory LOA M/s Shyam Babu, `4.21 Lacs Quoted only for `1,63,800.00 25.10.2013 225 equipments, survey No.IRCON/1020/NH Kanpur Laboratory instruments and Hydraulic AI/UP- equipment jacks from IRCON's 05/NIT/225/LOA/721 163800 (L.S) laboratory/store situated Dtd 25.09.2013 at Badagaon Camp at km 203+600 UP-05 Road Project Works Awarded : OCTOBER 2013 Contractor’s Quantity Rate Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mech. date Mech. etc Works) etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/J 23.08.13 Supply of component IRCON/J&KI/14/101 M/s Khanday 46.49 Lacs 21% below 36.72 Lacs 45 days from the &K- Cell/JAT/ materials for Metal 4/DQ/Supply-Crash Construction Co., date of LOA 14/1014/ Crash Barriers for Barriers/M-28/5262, South City, DQ/Suppl Access Roads of Zone-I dtd.03.10.2013 Nowgam, by- y-Crash Barriers/ in connection with the pass, Srinagar, M-28/265, construction of the D-Q Kashmir-190015 dtd. Section of J&K Rail Link J&K 06.08.13 Project (M-28) 2 e- 22.07.2013 Construction of Bridge LOA No.: M/s Nawal Kishor `128.56 Lacs `126.45 Lacs `1,20,97,864.00 04.04.2015 Tender over Kasheya Nallah on IRCON/2054/LOA/P Roy, 208 T, JH-07- Karmat to Jatarbhajarni KG-37/243 dated Dhanauti, Chhoti XI-WB- IRCON- road, Block: Majhigawn, 04.10.2013 Marai, Hajipur, 37 District: Garhwa, Vaishali, Bihar Jharkhand

3 e- 05.08.2013 Construction of Bridge LOA No.: M/s Baba `178.98 Lacs `177.17 Lacs `1,59,45,306.00 04.04.2015 Tender over Khutisruti River on IRCON/2054/LOA/P Vishwanath JH-17- Sulumdag to Ursela KG-60/244 dated Construction, XI-WB- IRCON- road, Package: 04.10.2013 Sudna Dalton 60 JH18JB006A, Block: Ganj-822101 Bishrampur, District: Palamau Palamau, Jharkhand

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 e- 16.08.2013 Construction & LOA No.: M/s Raja =864.94+102.65 `967.04 Lacs `9,64,91,389.00 04.10.2014 Tender Maintenance of Road : IRCON/2054/LOA/P Construction, Taj = `967.59 Lacs JH-05- (1) REO Road To KG-63/233 dated Colony, XI-WB- Kanaidih- 3.288 Km (2) IRCON- 04.10.2013 Panchayati REO Road To Kairasol - 63 Akhara, Gaya, 2.091 Km (3) REO Road Bihar – 823001 To Chirudih - 1.33 Km. (4) REO Road To Kumirkatta-2.57 Km (5) REO road To Taldih - 2.516 Km. (6) REO Road To Musabil - 2.483 Km. REO Road To Jangla - 3.845 Km. (Total Length: 18.123 Kms, Block: Kathikund-I, Dist- Dumka, Jharkhand). 5 e- 16.08.2013 Construction & LOA No.: M/s Raja =675.14+85.3 `759.24 Lacs `7,57,57,041.00 04.10.2014 Tender Maintenance of Road : IRCON/2054/LOA/P Construction, Taj = `760.44 Lacs JH-05- (1) REO Road To Ledapathar- KG-64/237 dated Colony, XI-WB- 3.144 Km (2) Nayadih To IRCON- 04.10.2013 Panchayati Makrachattar- 2.75 Km Akhara, Gaya, 64 (3)REO Road To Phitkoria- 3.214 Km (4) REO Road To Bihar – 823001 Kulkat - 4.527 Km. (Total Length: 13.635 Kms, Block: Kathikund-II, Dist- Dumka, Jharkhand). 6 e- 16.08.2013 Construction & LOA No.: M/s Raja =698.99+76.38 `774.90 Lacs `7,73,35,854.00 04.10.2014 Tender Maintenance of Road : IRCON/2054/LOA/P Construction, Taj = `775.37 Lacs JH-05- (1) Asanpahari R To KG-65/242 dated Colony, XI-WB- Gamrah-2.929Km (2) REO IRCON- 04.10.2013 Panchayati Road to ERO - 4.781 Km. Akhara, Gaya, 65 (3) Nargang REO Road to Balidih - 7.842 Km (Total Bihar – 823001 Length: 15.552 Kms, Block: Kathikund III, Dist- Dumka, Jharkhand). Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 7 e- 16.08.2013 Construction & LOA No.: M/s Raja =995.62+139.48 `1134.15 Lacs `11,32,19,287.0 04.10.2014 Tender Maintenance of Road (1) IRCON/2054/LOA/P Construction, Taj = `1135.10 Lacs 0 JH-05- Par Paisa more To Pakuriya KG-66/240 dated Colony, XI-WB- via Par Paisa - 0.952 Km. (2) IRCON- 04.10.2013 Panchayati Jiwanpur To Bhorebadi - Akhara, Gaya, 66 1.313 Km (3) Jitara to Patusala - 1.129 Km. (4) Bihar – 823001 Pakuriya To Kalakata - 4.357 Km. (5) REO Road 8th KM To Belbuni- 3.005 Km (6) Bisundiha To Bagedar - 2.219 Km. (7) Chapuria To Sulanga - 1.164 Km. (8) REO Road Dhangara More To Dhangara - 2.912 Km. (9) Palopisa To Bhuskipahari - 3.946 Km. (Total Length: 20.997 Kms, Block: Raneshwar-I, Dist- Dumka, Jharkhand). 8 e- 16.08.2013 Construction & LOA No.: M/s Raja =1334.24+194.08 `1527.38 Lacs `15,24,49,213.0 04.10.2014 Tender Maintenance of Road : IRCON/2054/LOA/P Construction, Taj = `1528.32 Lacs 0 JH-05- (1) Karikader To Kathalia - KG-67/239 dated Colony, XI-WB- 2.475 Km. (2) Mohanpur To IRCON- 04.10.2013 Panchayati Leya - 2.658 Km. (3) PWD Akhara, Gaya, 67 Road Sangrampur More To Sangrampur - 3.353 Km. Bihar – 823001 (4) Patjora Road To Navgram- 1.743 Km (5) Jaitara To Menhdipur - 1.6 Km. (6) Dumra Road To Harjora- 2.395 Km (7) Chotta Harkhi To Bara Harkhi - 2.345 Km (8) Manikdih To Murguni - 1.78 Km. (9) Tarni To Sunderdiha - 8.072 Km. (10) REO Road 9th KM To Bhitra - 3.361 Km. (Total Length: 29.782 Kms, Block: Raneshwar-II, Dist- Dumka, Jharkhand). Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 9 e- 16.08.2013 Construction & LOA No.: M/s Raja =604.9+78.43 `682.43 Lacs `6,81,27,302.00 04.10.2014 Tender Maintenance of Road : IRCON/2054/LOA/P Construction, Taj = `683.33 Lacs JH-05- (1) Hathwari To Shankarpur- KG-68/238 dated Colony, XI-WB- 3.195 Km (2) REO Road To IRCON- 04.10.2013 Panchayati Patranga- 3.265 Km (3) Akhara, Gaya, 68 Sharpur To Porabansari - 2.15 Km. (4) Chukapari To Bihar – 823001 Goradangal-1.631 Km (5) PWD Road To Makarapahari - 2.465 Km. (Total Length - 12.706 Km. Block: Shikaripara-I, Dist: Dumka).

10 e- 16.08.2013 Construction & LOA No.: M/s Adarsh =1326.16+180.21 `1505.95 Lacs `14,93,82,930.0 04.10.2014 Tender Maintenance of Road : IRCON/2054/LOA/P Construction, Lal = `1506.37 Lacs 0 JH-05- (1)Matyajori More To Matyajori- KG-69/234 dated Kothi, Main Road, XI-WB- 2.861 Km (2) Banspahari To IRCON- 04.10.2013 Mairwa, Siwan, Katpahari-3.659 Km Bihar 69 (3)Sidhachatar More To Dhobaghat- 9.567Km (4) REO Road Birajpur To Barmasi-11.323 Km (Total Length - 27.41Km., Block: Shikaripara-II, Dist: Dumka.)

11 IRCON/ 14.06.2013 Supply and Erection, LOA No. M/s ABL Machine 3 nos. `18.71 Lacs `40,34,300/- 90 days from LOA MECH/ Installation & RCON/MECH/1029/ Tools, Nagpur 1029/RC Commissioning of 03 RCF. RBL-II/ Lathe F.RBL-II/ Lathe Nos. Lathe Machines Machines/62/RET-II Machines (i.e. 01 no. for Tool dtd.07.10.2013 /62/RET- Room & 02 Nos. for Mill- II dtd Wright Shop) at Rail 14.05.201 Coach Factory at 3 Lalganj, Raebareli, UP- (INDIA)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 12 IRCON/ 12.06.2013 Construction of Civil work LOA No. M/s Nayak `5787.00 Lacs Above 5% over `60,76,32,746.7 18 months CC/TN/J including Embankment, IRCON/2050/BJL.JB Infrastructure Pvt. estimated cost 0 excluding monsoon BRLP- Blanketing, major & minor B/Embkt/Km 2+97 to Ltd , period from 1st July 2050/13/ Bridges and other nd th 685 Dt. - km 27+77/14/1547 2 Floor, to 30 Sept. from ancillary works from 20.05.20 dt: 08.10.2013 Kamakhaya the date of issue of 13 International Boundary Commercial, LOA i.e. (near AKAUNNHA C.K. Road, 07.07.2015 Village) OSRAHI Section Pan Bazar, Km 2+975 to Km 27+775 Guwahati – (near Kapileshwar 781001 Mahuwa Village) of Nepal side alignment portion in Ph.: 0361 – connection with Gauge 2733782 Conversion & FAX: 0361 – Construction of New 2733784 Broad Gauge Railway Line from JAYNAGAR(INDIA) To BARDIBAS(NEPAL) 13 IRCON/M 08.08.2013 Supply and Erection, IRCON/MECH/1029/ M/s Diya `87.66 Lacs `81,15,058/- `81,15,058/- 90 days from ECH/102 Installation & RCF.RBL- Technologies, LOA 9/RCF.R Commissioning of II/Overhead Tool Lucknow BL- II/Overhe Overhead Friction free rails/22/3740 dtd ad Tool Monorail System with 08.10.13 rails/222 Pneumatic Balancers, dtd provision for Pneumatic 29.06.13 & Electrical Tools and Work Lighting for seat and berth assembly station at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA) 14 IRCON/ 04.10.2013 Quotation for: Hiring of IRCON/J&K- M/s Dreamland `4.30 Lacs 17.4% above `5.05 Lacs 3 months from the J&K-Cell/ vehicles for Officers and Cell/JAT/14/1014/D- Travels, Shop JAT/14/10 date of 14/D-Q/ Staff working in the office Q/Hiring Veh-CAO- No.9, Bus Stand, deployment. Hiring Veh of the CAO, Northern NR/271/3805, Jammu-180001 -CAO- Railway, USBRL Project, dtd.09.10.2013 NR/271 Jammu (J&K) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 15 IRCON/ 04.04.2013 Supply and Erection, IRCON/MECH/1029/ M/s Banbros 1 no. `30.00 Lacs `16,89,795/- 3 months from MECH/ Installation & RCF.RBL-II/Inverted Engineering Pvt. LOA 1029/R Commissioning of Metallurgical Ltd, New Delhi CF.RBL - Inverted Metallurgical Microscope/RET- II/Invert Microscope with Image I/112/3778 dtd ed Analyser (01 no.) at Rail 17.10.13 Metallur Coach Factory at gical Lalganj, Raebareli, UP- Microsc (INDIA) ope/RE T-I/112 dtd 07.03.1 3 16 e- 16.08.2013 Construction & LOA No.: M/s SK =658.42+59.83 `718.24 Lacs `7,07,24,933.17 21.04.2015 Tender Maintenance of Road : IRCON/2054/PMGS Construction, Devi =`718.25 Lacs JH-21- (1) Ambatoli Dhorhi Road to Y-LOA/JH-21-XI- Mandap Road, XI-WB- Chapabari – 5.100 Km IRCON- WB-IRCON-71/280 Ratu Road, Ranchi (2)REO Main Road to Date 21.10.2013 (Jharkhand) 71 Pakritoli Nawatoli Road - 1.424 Km (3) REO Main Road Kutmakachhar to Murambatoli via Jhimari - 4.600 Km (4) Gariajor Barkibiura Road To Urumkela - 6.005 Km (Total Length: 17.13 Kms, Block: Kurdeg, District: , Jharkhand) 17 e- 16.09.2013 Construction & Maintenance LOA No.: M/s Raja =539.44+57.81 `598.56 Lacs `5,95,27,226.33 21.10.2014 Tender of Road : IRCON/2054/PMGS Construction, Taj = `597.25 Lacs JH-05- (1) Pipra To Amjhari - 1.89 Y-LOA/JH-05-XI- Colony, XI-WB- Km. IRCON- (2) Karudih To Parbatpur - WB-IRCON-01A/278 Panchayati 01A 2.207 Km. (3) PWD ROAD Date 21.10.2013 Akhara, Gaya, RANGA To PAHARPUR- Bihar – 823001 1.718 Km (4) Tenijor To Duaria - 2.979 Km. (Total Length: 8.800 Kms, Block: Gopikander-I, District: Dumka, Jharkhand) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 18 e- 16.09.2013 Construction & Maintenance LOA No.: M/s Raja `593.34 Lacs `(512.1+79.96) `5,88,80,743.48 21.10.2014 Tender of Road IRCON/2054/PMGS Construction, =`592.06 Lacs JH-05- (1) Rangamora To Kulaipura Y-LOA/JH-05-XI- Taj Colony, XI-WB- more-3.15 Km (2) IRCON- Kundapahari To Mahulda WB-IRCON-01C/279 Panchayati 01C bari - 6.046 Km. (Total Date 21.10.2013 Akhara, Gaya, Length: 9.20 Kms, Block: Bihar – 823001 Gopikander-III, District: Dumka, Jharkhand) 19 e- 07.10.2013 Supply, fabrication, IRCON/2049/ S.P. `928.88 Lacs 8.25% above `1005.51 Lacs 15 Months from tender.: assembly , erection and ROB-II-BIHAR/LC- DEVELOPRS & the date of issue IRCON/2 painting of Bowstring 35B/Steel/LOA / DECORATORS, of LOA 049/ girder in Railway portion, 126/2270, #3195,Paradise ROB-II- steel stair case in BIHAR/e- dt.21.10.2013 Enclave, Sector- connection to Tender/2 50 D, 013/23 Construction of ROB at Date:14- LC-35B at Danapur in Chandigarh 09-2013 state of Bihar 20 IRCON/Civi 19,07.2013 Construction of 3 Nos. IRCON/1029/RCF- M/s Central India `154 Lakhs Schedule-A-1%(-) `15,211,163.88 6(Six) months from l/1029/RCF /RBL/10/Te borewell and related work RBL/Tender/Borewel Tubewell the date of issue of nder/3/OT/ including materials as Rail l/OT/03/10/29/4053 Corporation , 13 C , LOA 29 dated. Coach Factory , Raebareli . 17.06.13 dt. 22.10.2013 Sringar Nagar , (UP) . Alambagh , Lucknow. 21 e- 05.08.2013 Construction of Bridge LOA No.: M/s Bechu `151.83 Lacs `151.83 Lacs `1,36,64,344.59 23.04.2015 Tender across Batare River on IRCON/2054/PMGS Construction Pvt. JH-17- P.W.D. Road to Gahwara Y-LOA/JH-17-XI- Ltd. Kund Mahalla, XI-WB- in 1st Km. Road, Package IRCON- WB-IRCON-56/294 Ward No.9, No. - JH 1714, Length - 52.1 56 Date 23.10.2013 Daltonganj, m. (District - Palamau, Block - Hariharganj) Palamau 22 e- 05.08.2013 Construction of A) Bridge LOA No.: M/s Krishna `216.34 Lacs `212.84 Lacs `2,07,48,029.48 23.04.2015 Tender over Nimia Nallah on PWD IRCON/2054/PMGS Deepak JH-17- Road (Bara) Sighna to Y-LOA/JH-17-XI- Construction Pvt. XI-WB- Lalgarwa road WB-IRCON-59/292 Ltd, Indrapuri IRCON- (JH18JB002A) and B) Bridge 59 over Douwarpar Nallah on Date 23.10.2013 Road, PWD Road (Bara) Sighna to Sukhdeonagar, Lalgarwa road Ratu Road, Ranchi (JH18JB002B), Block: Nodiha/Chattarpur, District: Palamau, Jharkhand Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 23 e- 16.08.2013 Construction & LOA No.: M/s LavKush =214.48+24.61 `239.07 Lacs `2,37,59,044.85 23.04.2015 Tender Maintenance of Road : IRCON/2054/PMGS Kumar Singh, = `239.09 Lacs JH-18- (1) Bijupara Khelari to Y-LOA/JH-18-XI- Lalitgram, Ratu, XI-WB- Khashshitoli - 1.503 Km. And IRCON- WB-IRCON-80/291 Ranchi (2) Choriya Road to Date 23.10.2013 80 Madhukam - 3.126 Km. ( Total Length: 4.63Kms, Block: Chanho, District: Ranchi, Jharkhand) 24 e- 16.09.2013 Construction & LOA No.: M/s Raja `(425.01+47.1) `472.12 Lacs `4,69,52,214.70 23.10.2014 Tender Maintenance of Road : IRCON/2054/PMGS Construction, Taj = `472.11 Lacs JH-05- (1) Paharpur I To Paharpur Y-LOA/JH-05-XI- Colony, XI-WB- I-1.907 Km (2) Burhichhapar IRCON- WB-IRCON-01B/293 Panchayati To Burhichhapar - 2.165 Km. Date 23.10.2013 Akhara, Gaya, 01B (3) Purnakhor To Purnakhora - 3.4 Km. (Total Bihar – 823001 Length: 7.480 Kms, Block: Gopikander-II, District: Dumka, Jharkhand) 25 e- 16.09.2013 Construction & LOA No.: M/s Sanjay Singh, `(377.53+41.33) `418.87 Lacs `4,08,92,129.27 23.04.2015 Tender Maintenance of Road IRCON/2054/PMGS Harmu Road, = `418.86 Lacs JH-18- (1) HUMTA To Y-LOA/JH-18-XI- Gadi Khana, XI-WB- IRCON- MOISODIH-6.40 Kms, WB-IRCON-13B/289 Ranchi 13B (2) NAWADIH To Date 23.10.2013 KUCHIDIH- 3.20 Kms, (Total Length: 9.60 Kms, Block: Bundu-II, District: Khunti, Jharkhand) 26 e- 16.09.2013 Construction & LOA No.: M/s Asit Kumar, `52.10 Lacs `51.58 Lacs `51,05,568.00 23.10.2014 Tender Maintenance of Bridge: IRCON/2054/PMGS New Babupara, JH-05- 1) Tarni To Sunderdiha Y-LOA/JH-05-XI- Post+ Thana- XI-WB- IRCON- at Km. 7+612, (L078- WB-IRCON-30B/288 Dumka, 30B Raneshwar), Date 23.10.2013 Jharkhand-814101 (Total No. of Bridges: 01 nos, Block:Raneshwar, Dist: Dumka, Jharkhand)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 27 e- 16.09.2013 Construction of Bridge LOA No.: M/s Sahay `304.97 Lacs `297.16 Lacs `2,97,01,566.00 23.04.2015 Tender over: A) Jharna Nallah IRCON/2054/PMGS Construction, JH-02- on Holamgadha Khurd Y-LOA/JH-02-XI- Awall Mohalla, XI-WB- IRCON- to Kari road (Package: WB-IRCON-49A/287 Court Road, 49A JH02JB004A, Block: Date 23.10.2013 Chatra-825401 Chatra Sadar), B) Karam Bahua River on Holamgadha Khurd to Kari road (Package: JH02JB004B, Block: Chatra Sadar), (No. of Bridges-02, Block: Chatra sadar District: Chatra, State: Jharkhand) 28 IRCON/3 03.05.2013 Design & Construction IRCON/3015/TN/RO M/s Gannon `1097.56 Lacs `1097.56 Lacs `1366.35 Lacs 14 months 015/TN/R OB- of Two Lane Rail under B-RAJ/SGNR- Dunkerley & Co. (including RAJ/SGN Bridge (RUB) by Cut & RUB/13/45 /3849 Ltd. monsoon) from the R- cover Technique Dated : 24.10.2013 B-228, Okhla date of LOA RUB/13/4 5 comprising two boxes, Industrial Area, i.e One for each lane Phase-I, New including it’s Delhi-110 020 approaches, all Design, Casting & Placing box segments under traffic block, Drainage, Allied Road works & Junction Development etc. complete, as per Specifications & Drawings, Maintaining all Quality Control Standards complete near LC-119 at Sriganganagar in Rajasthan State Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 29 IRCON/M 17.07.2013 Supply and Erection, LOA M/s Parishudh `162.00 Lacs `163.56 Lacs `1,63,56,646/- 180 days from ECH/102 9/RCF.R Installation & IRCON/MECH/1029/ Machines Pvt. Ltd., LOA BL- Commissioning of 01 RCF.RBL-II/Surface C-26, Industrial II/Surface No. CNC Surface Grinding/RET/89/RE Area, Merut Road, Grinding/ RET/89 Grinding Machine at Rail T-II/3803 Dtd Ghaziabad dated Coach Factory at 24.10.2013 -201003 07.06.201 Lalganj, Raebareli, UP- Ph.: 0120- 3 (INDIA) 2712268, Fax: 0120-2714111 30 e- 16.09.2013 Construction of Bridge LOA No.: M/s Nawal Kishor `158.36 Lacs `1,55,67,066.40 `1,55,67,066.40 24.04.2015 Tender over Kansi Sot River on IRCON/2054/PMGS Roy, 208 T, JH-07- T04 to Kari road, Block: Y-LOA/JH-07-XI- Dhanauti, Chhoti XI-WB- IRCON- Ranka, District: Garhwa, WB-IRCON-42A/298 Marai, Hajipur, 42A Jharkhand Date 24.10.2013 Vaishali, Bihar

31 e- 05.08.2013 Construction of 1) Bridge LOA No.: M/s Tiwari & `264.63 Lacs `264.63 Lacs `2,48,48,502.00 25.04.2015 Tender across Kawal Nala on IRCON/2054/PMGS Addi JH-17- B.T. Road to kawal in 1st Y-JKR/JH-17-XI-WB- Construction, XI-WB- km Road, Package No. - IRCON-55/306 Date Baratola, IRCON JH 1714A, Length - 39.14 25.10.2013 -55 m., 2) Bridge across Daltonganj, Hariya Nala on T04 to Palamau Dagara in 2nd Km Road, Package No. - JH 1714, Length - 58.7 m., (District - Palamau, Block - Chhattarpur) 32 IRCON/M 03.07.2013 Supply and Erection, IRCON/MECH/1029/ M/s Matrix Eco 1 no. `1.00 Lac `15,900/- 3 months from ECH/1029 Installation & RCF.RBL-II/Heavy Solutions Pvt. Ltd., LOA /RCF.RBL Commissioning of Heavy Duty Sewing New Delhi -II/Heavy Duty Sewing Machine, Duty Machine & Lab Water Bath Equipment, Sewing Equipment/145/3830 Machine Low & High Impedence dated 28.10.13 & Lab Analyser, Chemical Equipmen Balance & DFT meter (01 t/145 no.) at Rail Coach dated Factory at Lalganj, 07.06.13 Raebareli, UP-(INDIA) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 33 NIT- 01.10.2013 Transportation of Plant LOA No.IRCON/1020/ M/s Anil Cargo Pvt. `25.94 Lacs The rate of `14,31,600/- 30.11.2013 230 & Equipments from NHAI/UP-05/NIT/230 Ltd, New Delhi transportation of IRCON's UP-05 Road Dtd 30.10.2013 different Project situated at equipment was Badagaon camp at Km `32100/-, 203+600 to CIC Noida/ `102000/-, Greater Noida including `135200, loading/ unloading of `32800/-, `48500, plant & equipments from `46100, `35900 UP-05 Road Project & `487700/-. Works Awarded : NOVEMBER 2013

S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled N. No. opening Work and date Name and (for supply contract)/ (for supply contract)/ Contract completion Estimated Cost (For Tendered Cost (For address Engg./Elect. /S&T/ Engg./Elect./S&T/Mech. date Mech. etc Works) etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/M 23.07.2013 (03 Nos.) Portable IRCON/MECH/102 M/s. Jamson Estimated of `9,10,564/- `11,41,600/- 3 months from ECH/102 9/RCF.RBL-II/Pin & Machine Tools, `12,66,564/- for Welding Sets. (04 Nos.) Pin LOA 9/RCF.R Portable 1878, HSIDC Welding and (03 BL-II/Pin Welding/104/3854 Indl.Area, Rai, Nos) Portable & dtd 01.11.13 Sonipat-131029, Welding Set & Portable Haryana order placed for only (04 Nos.) Pin Welding/1 Welding Machine 04 dtd their estimate is 29.06.13 `9,10,564/- 2 IRCON/ 30.07.2013 11 Nos. Motorised Turn IRCON/MECH/102 M/s Vikrant `1,06,08,243/- `9,38,768/- `1,03,26,448/- 180 days from MECH/1 Table 9/RCF.RBL- Special Machines LOA 029/RCF. II/Motorized Turn Pvt Limited, RBL-II/ Table/157/3850 90, Nayapatty Road Motorize Kolkatta-700055 d Turn dtd 01.11.13 Ph:2251-3070, 2550- Table/15 3070; Email: 7 dtd vikrantspecial@rediff 29.06.13 mail.com

3 IRCON/ 08.08.2013 (01 No.) Computerized IRCON/MECH/102 M/s Balancing Estimate of `2,42,352 /- `2,42,352 /- 3 – 4 months MECH/1 `10,80,000/- is for Automatic Optical 9/RCF.RBL-II/lab Instruments & (01 No.) from LOA 029/RC Brinell hardness Tester Equipments/47/RE F.RBL- Equipments Computerized Automatic Optical II/lab & (01 No.) Vicker T/3846 (Miraj) Pvt.Ltd. Hardness Tester Dtd.01.11.13 Brinell hardness Equipme C-45/1, MIDC Tester & (01 No.) nts/47/R Area, Miraj- Vicker Hardness ET 416410 Tester order placed dtd for only one item (i.e Emal:san_finetest@s 27.08.13 01 No.) Vicker ancharnet.com Hardness Tester) their estimate is `5,40,000/-

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/ 08.08.2013 (01 No.) IRCON/MECH/ M/s Balancing Estimate of `2,42,352 /- `2,42,352 /- 3 – 4 months MECH/1 Computerized 1029/RCF.RBL- Instruments & `10,80,000/- is for from LOA 029/RC II/lab (01 No.) F.RBL- Automatic Optical Equipments Computerized Equipments/47/RE II/lab Brinell hardness (Miraj) Pvt.Ltd. Automatic Optical T/3846 Equipme Tester & (01 No.) C-45/1, MIDC Brinell hardness nts/47/R Dtd.01.11.13 Area, Miraj- Tester & (01 No.) Vicker Hardness ET 416410 Vicker Hardness dtd Tester order Tester Emal:san_finetest@s 27.08.13 ancharnet.com placed for only one item (i.e 01 No.) Vicker Hardness Tester) their estimate is `5,40,000/- 5 e-Tender 14.10.2013 Supply, Installation, LOA M/s K V Prateek `815.39 Lacs SITC Contract `7.64 Crore 6 Months IRCON/EL Testing & IRCON/ELECT/1029 ECT/1029/ Enterprises, 301, RCF- Commissioning of /RCF-RBL/BAL.EL. Suneja Tower-I, RBL External Lighting & Works/51 dtd District Centre, /BAL.EL. Power Supply System to 01.11.2013 Works/51 Janakpuri, New dated Misc. Buildings at New Delhi-110058 16.09.2013 Rail Coach Factory, Rae Bareli (U.P.) 6 IRCON/ 04.07.2013 Physical Analytical IRCON/MECH/102 M/s Banbros Estimate of Cost of Physical `5,41,118/- 3 months from MECH/1 Balance, Low Load 9/RCF.RBL-II/lab Engineering Pvt Physical Analytical Analytical LOA 029/RC Portable Hardness Equipment/162/ Ltd, 49/39, Site IV Balance is Balance is F.RBL- `1,08,000/-, Cost `53,339/-, Cost of II/lab Tester & Digital Hot 3861 Dtd.05.11.13 Industrial Area, of Portable Portable Equipme Plate Sahibabad, Hardness Tester nt/162 Ghaziabad; Email: is `1,08,000/- & Hardness Tester dtd. [email protected] Digital Hot Plate is is `4,55,039/- & 07.06.13 `1,00,000/- Digital Hot Plate is `32,739/- 7 IRCON/ME 29.08.2013 Furniture for TTC IRCON/MECH/102 M/s Durian `20,80,000/- `13,49,969 `13,49,969 30 days from PO CH/ 1029/ RCF.RBL-II/ Hostel 9/RCF.RBL- Industries Limited, Furniture II/Furniture (TTC 1/20, W.H.S, Kirti (TTC Hostel)/237/3863 Nagar New Delhi- Hostel)/237 dtd: Dtd: 05.11.13 110015; 08.08.13 Email:delhidurian@ gmail.com Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/ME 04.07.13 01 No. CNC Training IRCON/MECH/1029/ LOA for 02 Nos. Estimate of Cost of 02 Nos. Cost of 02 Nos. 02 Nos. Center CH/1029/R Lathe Machine RCF.RBL-II/CNC Centre Lathe `8,10,000/- (i.e Center Lathe Center Lathe Lathe Machines CF.RBL- & Trainer Machines issued to `3.66 Lacs for for Machines is Machines is (06 months from II/CNC 02 Nos. Centre Lathe lathe/169/3866 M/S ABL Machine 01 No. CNC `27,29,000/- `27,29,000/- the date of issue Trainer Tools, Lathe/ 169 machine dated 06.11.13 Training Lathe & Cost & of PO) dtd: & 46,Chandrashekh Machine of 01 No. CNC Cost of 01 No. & 07.06.13 IRCON/MECH/1029/ ar Azad Square, & Training lathe is CNC Training CNC Training RCF.RBL-II/CNC C.A. Road, `4.44 Lacs `17,68,000/- lathe is lathe (3 months Trainer Nagpur-440032 (02 Nos. Centre `17,68,000 from LOA). lathe/169/3894 & Lathe machine) Dated 11.11.13 LOA for 01 No. CNC Training lathe issued to M/s Royal Machine Tools, 13/10, Punjabi Bagh West (Extension) New Delhi-1100276, Tel: 011-25223472; Email: royalmachinery @gmail.com 9 IRCON/ME 14.06.13 02 Nos. Salt Spray IRCON/MECH/1029/ M/s Innotech `29,00,000/- `10,20,000/- `20,40,000/- 120 days from CH/1029/R Chamber RCF.RBL-II/Salt Engineering PO / LOA CF.RBL- Spray II/Salt Devices Pvt Ltd, Spray Chamber/171/RET- RZ-D-1/6, Vashist Chamber/1 I/3904 Dtd.12.11.13 Park, Opp. Janak 71/RET-I Cinema, Pankha dtd. Road, New Delhi- 14.05.13 110046, Tel: 011- 25393122; Email: info@innotech- test.com

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 10 e- 30.10.2013 Design, Supply, LOA No. ??? M/s Synergy `215.39 Lacs `2.21 Crores `1.98 Crore 4 months tender Installation, Testing, issued on Systems & (NIT Commissioning & AMC 12.11.2013 Solutions, No.No. of SCADA System for Faridabad IRCON/ display and controls of ELECT/ 1029/R power supplies and CF- distribution networks at RBL/ New Rail Coach SCADA/ Factory, Rae Bareli 52 dtd (U.P.) 23.09.1 3

11 e- 17.09.13 Construction of GRP IRCON/J&K- M/s Inam & Co., `65.33 Lacs 10.5% above `72.16 Lacs 4 months from the tender Post, electric Gazette Cell/JAT/14/1014/ Kaka Road, Nai date of issue of No.IRCO (x-ray) Shed, 2 Nos. D-Q/GRP Post etc. Sarak, Srinagar, LOA. N/J&K- Morchas,Chain Link – Halt Station/M- J&K-190001 Cell/JAT/ 14/1014/ Fencing and other 29/268/5512, D-Q/GRP allied works at Hillar dtd.13.11.13 Post etc. Shahabad Station KM – halt Station/M- 164/708 of Qazigund- 29/268/55 Banihal Section of J&K 12, dtd. rail Link Project (M-29) 29.0813 12 IRCON/M 30.08.13 02 Nos. Shaper IRCON/MECH/102 M/s Quality `14,75,000/- ` 6,56,500/- for `7,11,500/- 3 months from ECH/102 9/RCF.R Machine & (01 No.) 9/RCF.RBL- Machine Tools (i.e Shaper Machine LOA BL- Pedestal Grinder II/Shaper machine Corporation G.T `10,80,000/- for & `.54,900 for II/Shaper and Pedestal Road Batala 02 Nos. Shaper Pedestal machine and Grinder 143505, Machine & Grinder. Pedestal Machine/3997 Email:qualitymact `.2,95,000/- for Grinder Dated 19.11.13 [email protected] Pedestal Machine/ 236 Grinder) dated 08.08.13

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 13 e- 28.10.2013 Construction & IRCON/2054/PMG M/s Arbind `1213.48 Lacs `1213.46 Lacs `1213.12 Lacs 20.05.2015 Tende Maintenance Works SY/LOA/JH-18-XI- Kumar Singh r JH- of - (1) Anidih To Udbury - WB-IRCON- 18-XI- 1.39Km. (2) Dekadih To 07A/406 Dtd. Sirkapirhi Road - 5.715 Km. WB- (3) Sahelda–Gutigara-1.933 Km 21.11.2013 IRCON (4) Ghansar-Tengaria Road- -07A 3.87Km (5) Bande To Kurki - 1.031 Km. (6) Dudri - Tumbokel Road- 1.117 Km (7) Balo To Ghaghari Road - 3.43 Km. (8) Oskeya - Gangira Road - 3.559Km (9) Darla - Biramkel Road- 1.355 Km (10) Gamhariya To Bhonda Road - 1.958 Km. (11) Kujala To Suti Road - 3.214 Km. (Total Length : 28.58 Kms, Block; Murhu-I, District: Khunti, Jharkhand) 14 e- 28.10.2013 Construction & IRCON/2054/PMG M/s Krishna `440.40 Lacs `440.41 Lacs `439.41 Lacs 20.05.2015 Tende Maintenance of Road SY-JKR/JH-21-XI- Construction r JH- (1) Pandripani Jaldega to WB-IRCON- Banmali Road - 4.00 km 21-XI- (2) NH Joram to Kahupani 09A1/410 Dtd. WB- Pahantoli Road - 4.57 km 21.11.2013 IRCON (3)Pandripani Jaldega to Pandripani - 1.970 km (Total -09A1 Length: 10.540 Kms, Block: Thethaitanger-IA, District: Simdega, Jharkhand) 15 e- 28.10.2013 Construction & IRCON/2054/PMG M/s Mahamaya `281.13 Lacs `278.36 Lacs `278.36 Lacs 20.05.2015 Tende Maintenance of Road – SY/LOA/JH-18-XI- Enterprises r JH- Phase XI : WB-IRCON- 18-XI- (1) Chiur To Hesla at km. 31A/405 Dtd. 2+060 (L025-Karra), WB- (2) Burka To Jabra at km. 21.11.2013 IRCON 2+760 (L035-Karra), -31A (3) Burhiroma To Jhapra at km.2+460 (L053-Karra), (4) Taro To Barbanda at Km.1+575 (L045-Khunti), (Total No. Of Bridges: 04, Block: Karra & Khunti, District: Khunti, State: Jharkhand) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 16 e- 28.10.2013 Construction & IRCON/2054/PMG M/s Mahamaya `203.91 Lacs `201.91 Lacs `199.89 Lacs 21.05.2015 Tende Maintenance of Road – SY/LOA/JH-18-XI- Enterprises r JH- Phase XI : WB-IRCON- 05-XI- 1) Asanpahari R To 30A1/416 Dtd. WB- Gamrah at Km.1+402, 22.11.2013 IRCON (L022-Kathikund), 2) Narganj REO Road to -30A1 Balidih at Km.7+050,(L054- Katikund), 3) Banspahari To Katpahari at Km.1+456, (L034- Shikaripara), 4) Sidhachatar To Dobhaghat at Km. 7+892, (L036-Shikaripara), (Total No. of Bridges: 04 nos, Dist: Dumka, Jharkhand) 17 IRCON/C 05.07.2013 Internal finishing work, IRCON/CGRLP/L M/s VAS Nirman, `35.85 Lacs `35.85 Lacs `31,87 Lacs 3 months C/TN/ partitions, false ceiling, OA/13/ JVC’s 22 Maulshree CGRLP/JV modification of toilets, office/13/687 Vihar, V.I.P. Road, Cs Office/ 13/687, Dt. plumbing, electrical and DT.26.11.2013 Puraina, Raipur, 03.06.201 sanitary works etc. in CG 3 connection with Setting up new office for JVCs at Raipur (Chhattisgarh) 18 e- 28.10.2013 Construction & IRCON/2054/PMG Md. Yasin `693.69 Lacs 692.34 ` 692.34 Lacs 25.05.2015 Tende Maintenance of Road- SY-JKR/JH-21-XI- Construction r JH- 1). Arani to Purnadih WB-IRCON- Pvt. Ltd 21-XI- 0.500 Km. 2). Biru to 20A1/423 Dtd. WB- pataratoli 2.1 Km. , 3). 26.11.2013 Harijantoli to telitoli 3.4km IRCON 4). Belgarh to bhnwarpani -20A1 3.90 Km. ,5). Kudrum to Bhandartoli 1.6 Km. 6). Khuntitoli to Ghosra 4.2 Km, (Total length 15.7 Km, Block- Simdega Sadar-I, District :Simdega)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 19 e- 28.10.2013 Construction & IRCON/2054/PMG Md. Yasin `724.61 Lacs `724.62 Lacs `724.62Lacs 25.05.2015 Tende Maintenance of SY-JKR/JH-21-XI- Construction r JH- Road : Jarket to WB-IRCON- Pvt. Ltd 21-XI- Badomda 17.50 km. 75A/424 Dtd. WB- (Total 26.11.2013 IRCO Length:17.50Km, N-75A Block :Bano-III, District Simdega

20 e- 19.11.2013 Supply, fabrication, IRCON/2049/RO M/s. SSG `365.69 Lacs 0.10% below `365.32 Lacs 06 Months from the Tender. assembly , erection B-II-Bihar/LC- Techno date of issue of LOA : IRCON/ and painting of 47B/Steel/LOA/13 Services Pvt. 2049/ Bowstring girder in 1/2534, Limited, 29, ROB-II- connection to Dtd.30.11.13 Ashutosh Pally, BIHAR/ Construction of ROB P.O: Garia, e- at LC-47B at Kolkata-700084 Tender/ 2013/24 Begusarai in state of Date:31 Bihar -10- 2013 Works Awarded : DECEMBER 2013

Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/J 02.07.13 Hiring of Survey teams IRCON/J&K/JAT/1 M/s Skylark `60.12 Lacs 23% above `73.94 Lacs 12 months from &K/JAT/1 for survey works of D-Q 4/1014/D- Designer & the date of issue 4/1014/D- Section in connection Q/Survey Team/S- Engineers Pvt. of LOA. Q/Survey Team/S- with construction of D- 1/258/5657, dtd. Ltd., B-48, IInd 1/258/565 Q Section of J&K Rail 05.12.13 Floor, Sector-63, 7, dtd. Line Project (S-1) Noida-201302 17.06.13 (U.P) 2 IRCON/Civ 22.11.13 Construction of INDOOR IRCON/Civil/e- M/s. Chinmay `1670.78 Lakhs Schedule-A-1% Rs. 1685.52 18 Months from LOA il/e- Tender/10 SPORTS COMPLEX Tender/1029/RCF- Construction , A-1 , (+) Schedule-B-At Lakhs 29/RCF- AND AUDITORIUM RBL/OT/01/4398 Vibhuti Khand , par RBL/OT/01 BUILDING in township Dt. 16.12.13 Gomati Nagar, Dt. 23.10.2013 for Rail Coach Factory at Lucknow Lalganj , Raebareli, (UP). 3 IRCON/J 30.08.1 Construction of Tunnels IRCON/J&K- M/s Hindustan `35685 Lacs 24.1% above `44251 Lacs 48 months from &K- 3 T-49 (Part Tunnel), Cell/JAT/14/1014/ Construction Co. the date of issue Cell/JAT/ Bridge 2, Bridge 3 and D-Q/T- Ltd. (HCC), of LOA. 14/1014/ D-Q/T- Earthworks at Sumber 49A/295/3934, Hincon house, 49A/295, yard (between Km Dtd. 31.12.13 Lal Bahadur Dtd. 110.200 to Km 116.600 Shastri Marg, 19.06.13 approx) on D-Q Section Vikhroli (West), of USBRL Project. Mumbai-400083, (T-49A)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/M 25.10.1 Dead Weight LOAD IRCON/MECH/102 M/s Aggarwal `22.05 Lacs `22.58 Lacs `22.58 Lacs 3 months from ECH/ 3 for EOT cranes 9/RCF.RBL- Foundry& LOA 1029/ II/Dead EngineeringWor RCF.RBL- II/Dead weight/241/4105 ks, Plot No.12, weight/24 dtd 18.12.13 Sector- 1 dtd 24,Faridabad- 27.09.13 121005;Tel: 0129-2234232; email:[email protected]

5 IRCON/ 24.07.1 HAND TOOLS & TAPPING / IRCON/MECH/102 LOA for Hand Estimate of Cost of Hand Cost of Hand 30 days from PO MECH/1 3 DRILLING MACHINE 9/RCF.RBL- Tools issued to `11,51,000/- Tools is Tools is 029/RC II/Hand Tools & M/S Emprise (i.e `4.76 Lacs `7,16,027/-& `7,16,027/-& F.RBL- Tapping Drilling Marketing, is for Hand Cost of Tapping Cost of II/Hand Machine/190/4105 Lucknow- Tools & Drilling Machine Tapping Tools & dtd 20.12.13 226024;email:e Machine & `17,68,000/- Drilling Tapping & [email protected] `6.75 Lacs for Machine Drilling IRCON/MECH/102 m TAPPING / `17,68,000/- Machine 9/RCF.RBL- & DRILLING /190 dtd II/Hand Tools & LOA for Tapping MACHINE Tapping Drilling Drilling Machine 29.06.1 Machine/190/4107 issued to 3 dtd 20.12.13 M/s Diya Technologies 118, Cant Road Near Odeon Cinema Lucknow- 226001,UP,India Mob: 9935025285 Email: ak@ diyatechnologies.co.in

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 6 IRCON/M 24.10.201 Furniture for TTC IRCON/MECH/102 M/s BHARGAVA `37,45,389/- `.37,03,835/- `37,03,835/- 6-8 weeks from ECH/1029 3 9/RCF-RBL-II/r & ASSOCIATES PO /RCF- Furniture for Authorised RBL- II/Enquiry TTC/190A Wholesale for Dtd : 23.12.2013 Dealer Furniture/ Godrej & Boyce 3759 Mfg. Co.Ltd dated : 14A/44, 11.10.13 PragNaraine Road, Lucknow-226 001 Telefax: 0522- 3012048; email: rbhargavas4@g mail.com 7 IRCON/M 29.11.1 Furniture for ORH IRCON/MECH/102 M/s Durian `17,84,532/- `14,64,169/- `14,64,169/- 30 days from PO ECH/1029 3 9/RCF.RBL- Industries ltd, /RCF.RBL II/Furniture for 1/20, W.H.S., - II/Furnitur ORH/242/RET/ Kirti Nagar, New e for 4129 Delhi-110015, ORH/242/ Dtd 23.12.13 Tel:011-47140200, RET dtd Email:delhidurian@g 09.11.13 mail.com 8 IRCON/ 12.11.201 Hiring of vehicles for IRCON/J&K- M/s Friends `43 Lacs 15.33% above `49.59 Lacs 12 months from J&K-Cell/ 3 Officers and Staff Cell/JAT/14/1014/ Sumo Taxi the date of issue JAT/14/ associated with the D-Q/HIRING/VEH- Owners Union, of LOA. 1014/D-Q/ Hiring project works in NBL-NR/VH- Chareel, The. Veh-Bnhl- Connection with the 09/269/4069, Bnaihal, Distt. NR/VH- construction of dtd.27.12.13 Ramban, J&K- 09/269, Dharam-Qazigund 182146 dtd. Section of USBRL New 28.10.13 Rail Link Project (J&K) (VH-09) Works Awarded : JANUARY 2014

Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 31.07.2013 Racks for storage of IRCON/MECH/1029/ M/s Godrej & `142.00Lacs `76.65 Lacs `76.65 Lacs 90 days from the MECH/1029 materials Boyce Mfg. Co. date of issue of /RCF.RBL- RCF.RBL- II/RACKS/ II/RACKS/224/4264 Ltd, Godrej LOA 224 Dated Dated 13.01.2014 Bhawan, Sher 29.06.2013 Shah Suri Marg, New Delhi-65 Ph: 011-66507070 FAX: 011-66507056 2 IRCON/J 13.09.13 Construction of tunnel T- IRCON/J&K- M/s AFCONS `36234.75 Lacs Overall 23.70% `44823.42 Lacs Within 33 Months &K- 74R balance work from Cell/JAT/14/1014/D Infrastructure above from the date of Cell/JAT/ 14/1014/ Adit between KM Q/T-74R-A/300/75, Limited, Afcons issue of LOA DQ/T- 127/660 to KM 130/950 Dtd. 20.01.14 House, 16 Shah 74R- (Length 3290m) on DQ Industrial Estate, A/300, Section of USBRL Veera Desai Dtd.25.07 .13 Project (Package: T- Road,Azad Nagar 74R-A) P.O, Post Box No.11978, Andheri (W), Mumbai-400053 3 IRCON/ 03.12.2013 200 Locker Cabinets IRCON/MECH/1029/ M/s Delite Kom `33.42 Lacs `28.52 Lacs `28.52 Lacs (i) 100 nos within MECH/1029 Ltd., Kukreja 30 days from the /RCF.RBL- RCF.RBL-II/Locker II/Locker Cabinet/110/RET- House, IInd Floor, issue of P.O. Cabinet/110 II/4300 Dated 46 Rani Jhansi (ii) 100 nos. within /RET- 21.01.2014 Road, New Delhi 60 days from the II/Dated Ph: 011-46287777 date of issue of 09.11.2013 FAX: 011-23620502 P.O. Email: [email protected] Works Awarded : FEBRUARY 2014

Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON 13-12-13 Supply of Power Supply IRCON/9038/SLR. M/s. Statcon 50 USD 3955.69 USD 6 months from /9038/S System for Minor Gates S&T/PSL MX/122- Power Controls 19,997,784.50 date of issue of LR.S& for Sri Lanka Railways 1053 dt. 04.02.14 Ltd. Gautam LOA T/ PSL Budh Nagar, MX/122 NOIDA 2 e- 22.01.14 Construction & LOA No.: M/s Krishna 540.11 Lac 540.22Lac 539.67 Lac 03.09.2015 Tende Maintenance Works of IRCON/2054/PMG Construction r JH- (1)Pandripani Jaldega to SY-JKR/JH-21-XI- 21-XI- Gandatoli - 4.748 km (2) WB-IRCON- WB- NH 23 Kereya to 09B2/598 Date IRCO Dangtoli - 2.250 km 07.02.2014 N- (3)NH 23 to Kurpani via 09B2 Kundpani - 2.775 km (4)NH 23 Kereyadangtoli Road to Panginpahar Road - 0.825 km (5) Jogbahar Ambapani to Changurbera - 2.100 km (Total Length: 12.698 Kms, Block: Thethaitanger-IB, District: Simdega, Jharkhand)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 3 e- 22.01.14 Construction & LOA No.: M/s Krishna 600.22 Lac 599.62 Lac 599.62 Lac 03.09.2015 Tende Maintenance Works of (1) IRCON/2054/PMG Construction r JH- Aurwrabahar Dumki Road SY-JKR/JH-21-XI- 21-XI- To Ambatoli - 1.865 Km WB-IRCON- WB- (2) Royantoli to 10A2/596 Date IRCO Bhawandipa Road - 2.215 07.02.2014 Km (3) Thethaitanger N- Bolba Road to Auwrabahar 10A2 Chhuria Dumki Oriss - 10.435 Km (Total Length: 14.515 Km, Block: Thethaitanger-II A, District: Simdega, Jharkhand) 4 e- 22.01.20 Construction & LOA No.: M/s Md. Yasin 665.89Lac 665.89Lac 665.83Lac 19.08.2015 Tende 14 Maintenance Works of IRCON/2054/PMG Construction Pvt. r JH- (1)Gobardhabasa at NH- SY-JKR/JH-21-XI- Ltd 21-XI- 23 to Manjhartoli 6.0 WB-IRCON- WB- km, (2) Karmatoli SH to 77A1/596 Date IRCO Karkotoli 3.30 km., 07.02.2014 (3)Pahantoli at Kolebira- N- 1 Manoharpur to 77A1 Rabutoli 4.20 km, (Total Length 13.50 km., Block Kolebira-1 , Dist. Simdega.) 5 e- 22.01.20 Construction & LOA No.: M/s Adarsh `586.13Lac `586.13 Lac `575.50 Lac 03.09.2015 Tende 14 Maintenance Works of (1) IRCON/2054/PMG Construction r JH- BAGHADIH TO SY/LOA/JH-18-XI- 18-XI- CHOTODIH - 3.60 Kms, WB-IRCON- (2) BICHKATOLI TO WB- 13A1/602 Date PAWADHI-1.30 Kms, (3) 12.02.2014 IRCO DAMI TO KOLENGHATU- N- 3.20 Kms, (4) EDAIHATU 13A1 TO PANDRA VIA BANABURA-4.60 Kms, (Total Length: 12.70 Kms, Block: Bundu-I, District: Khunti, Jharkhand)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 6 e- 22.01.20 Construction & LOA No.: M/s Adarsh 822.14 Lac 822.14 Lac 804.89 Lac 03.09.2015 Tende 14 Maintenance Works of 1) IRCON/2054/PMG Construction r JH- Bajpur to Chaulli via Hisir , SY/LOA/JH-18-XI- 1.25Km., 2) Dahutoli Road WB-IRCON- 18-XI- to Doriyatoli ,3.03Km., 3) 28A/603 Date WB- Sarnatoli to Siramtoli, IRCO 1.62Km, 4) REO Hochar to 12.02.2014 N-28A Patratoli, 1.755 Km., 5) Nawatoli More to Gangatoli, 1.60Km., 6) Tiputoli to Childag, 2.51Km., 7) REO Road Ekkaguri to Ekkaguri, 0.99Km., 8) Reo Road To Gariyatoli,, 1.56Km., 9) NH23 Satish Chowk to Nagri Bandhya, 4.97Km., (Total Length: 19.285 Kms, Block: Ratu-I, District: Ranchi, Jharkhand) 7 e- 22.01.2014 Construction & LOA No.: M/s Md. Yasin 488.13 Lac 488.14 Lac 488.14 Lac 19.08.2015 Tende Maintenance Works of (1) IRCON/2054/PMG Construction Pvt. r JH- NH 23 to Ghattari Road - SY-JKR/LOA/JH- Ltd. 3.500 km (2) Pandripani 21-XI- Jaldega to Pahartoli - 21-XI-WB-IRCON- WB- 8.300 km (Total Length: 09C2/609 Date IRCO 11.80 Kms, Block: 13.02.2014 N- Thethaitanger-IC, District: 09C2 Simdega, Jharkhand) 8 e- 22.01.2014 Construction & LOA No.: M/s Md. Yasin 444.76 Lac 444.83 Lac 444.83 Lac 19.08.2015 Tende Maintenance of Road- IRCON/2054/PMG Construction Pvt. r JH- (1) Reo Road Garja to SY-JKR/LOA/JH- Ltd Kharwagarha 3.5km 21-XI- (2).Garja road to bhagalata 21-XI-WB-IRCON- WB- 5.0 km (3) Nawatoli to 21A2/608 Date IRCO meromloya 2.075 km . 13.02.2014 N- (Total Length 10.575 km, 21A2 Block : Simdega Sadar-IIA District : Simdega.)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

9 e- 22.01.2014 Construction & LOA No.: M/s Md. Yasin 788.44 Lac 788.44 Lac 788.44 Lac 12.08.2015 Tender Maintenance Works of IRCON/2054/PMG Construction Pvt. JH- (1) Thethaitangar Bolba SY-JKR/LOA/JH- Ltd 21-XI- Road to Jillinga 21-XI-WB-IRCON- WB- Karapani - 2.59 km (2) 72A1/607 Date IRCO Bolba Road To 13.02.2014 N- Royantoli -1.815 km (3) 72A1 Asanbera to Tukupani Road - 4.453 km (4) Thethaitangar Kurpani Road to Dumbertoli Asenbera Road - 3.600 km (5) Kurpani Road to Panripani Tukupani Road - 4.575 (Total Length: 17.033 Kms, Block: Thethaitanger- IIIA, District: Simdega, Jharkhand)

10 e- 22.01.2014 Construction & LOA No.: M/s Md. Yasin 621.72 Lac 621.71 Lac 621.71 Lac 19.08.2015 Tender Maintenance Works of (1) IRCON/2054/PMG Construction Pvt. JH- Rengari Road to Poraha SY-JKR/LOA/JH- Ltd 21-XI- Toli- 2.850 km (2) Shankh 21-XI-WB-IRCON- River to Kongsera Basartoli WB- 72A2/606 Date IRCO Road -4.15 km (3) Konpala Road to Lurkutoli -1.900 13.02.2014 N- km (4)Konpala to Patra toli 72A2 - 2.000 km(5) Lathkhamhan Rengari Road to Sarplata via Bhawarkhol - 5.100 km (Total Length: 16.00Kms, Block: Thethaitanger-IIIB, District: Simdega, Jharkhand)

Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

11 e- 22.01.2014 Construction & IRCON/2054/PMG M/s Md. Yasin 978.37 Lac 977.63 Lac 977.63 Lac 19.08.2015 Tende Maintenance Works of (1) SY-JKR/LOA/JH- Construction Pvt. r JH- Kevgutu to Kodhipat 1.53 21-XI-WB-IRCON- Ltd Km, (2) Tembaro to 21-XI- Marani(5.80 Km) , (3) 73A1/604 Date WB- Borsotta to Borbera 5.6 Km 13.02.2014 IRCO (4) Paro Rajmal Path to N- Kawalbera 2.6 Km, (5) 73A1 Kansoda Ella to Mahabang Path 4.7 Km (Total length 20.23 Km, Block: Bano-I, District : Simdega)

12 e- 22.01.2014 Construction & LOA No.: M/s Md. Yasin 919.11Lac 918.82 Lac 918.82 Lac 19.08.2015 Tende Maintenance Works of (1) IRCON/2054/PMG Construction Pvt. r JH- PWD Road to Nawagaon SY-JKR/LOA/JH- Ltd via Chatuora Kusum 1.4 21-XI- Km, (2) Bintuka to Tudeue 21-XI-WB-IRCON- WB- 2.6 Km (3) Pangur To 74A1/605 Date IRCO Khujurbahar via Jumarsoya 13.02.2014 N- 3.0 Km (4) Rubbai to Parro 74A1 via Ramjal Sumirbora 4.4 Km. (5) Bano PWD road to Ganmer Path via Pabura nimtur Bintuka Pangur Tonia 7.25 Km. , (Total length 18.65 Km, Block: Bano-II, District : Simdega)

13 e- 22.01.2014 Construction & Maintenance LOA No.: M/s Krishna 662.08 Lac 662.09 Lac 661.79 Lac 03.09.2015 Tende Works of (1) NH 23 Joram IRCON/2054/PMG Construction r JH- to Masania via Sudapahar - SY-JKR/JH-21-XI- 5.950 Km (2) NH 23 21-XI- Jampani Tojoram Ambapani WB-IRCON- WB- Deobahar Road - 2.775 Km 10B2/614 Date IRCO (3) Thethaitangar Bolba 14.02.2014 N- Road to Dhorthibahar - 10B2 7.000 Km (Total Length: 15.725 Km, Block: Thethaitanger-II B, District: Simdega, Jharkhand) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 14 IRCON/ 28.02.14 Construction of Super IRCON/J&K- M/s Inam & Co, `55.84 Lacs Overall 2% `54.73 Lacs Within Four (4) JK- Passage at Cut & cover DQ/1014/Superpas Engineers & below Months from the Cell/JAT /14/1014 No.77A-1 between KM sage-77A-1/BR- Contractors, Kaka date of issue of /DQ/Sup 146.191 and KM 12/6/27, Road, Nai Sarak, LOA erpassa 146.2265 under Dtd.15.02.2014 Srinagar, J&K- ge 77A- Dharam-Qazigund 190001 1/BR- 12, Section of USBRL New Dtd:21.1 Rail Link Project 2.13 (Jammu & Kashmir) (Package: BR-12) 15 e- 22.01.20 Construction & LOA No.: M/s Lions 1072.88 Lac 1072.87 Lac 1048.52 Lac 27.08.2015 Tende 14 Maintenance Works of IRCON/2054/PMG Construction r JH- (1) Padriya to SY-JKR/LOA/JH- 18-XI- Loharakochha - 3.077 18-XI-WB-IRCON- WB- Km., (2) Tangritola to 26A/618 Date IRCO Chotkalowagarha - 2.514 18.02.2014 N-26A Km., (3) Chaingara to Mahadeotola - 2.949 Km., (4) Baraoudi to Semratola - 1.741 Km., (5) Nawatoli to Ojhasaram - 1.700 Km., (6) Patkoi to Saram - 5.174 Km. and (7) Cholebera to Aradewar - 2.740 Km. (Total Length:19.89Kms, Block: Burmu, District: Ranchi, Jharkhand) 16 e- 16.12.20 Design, Supply, IRCON/ELECT/30 M/s Kailash `878 lacs `902.12 Lacs 30.08.2014 Tender 13 Installation,Testing, 14/OHE Electricals, S-I, IRCON Comissioning of ERECTION/04 Bishambhar Dham, /Elect/3 (Opp. Suraj 014/OH Railway Electrification Dated 28.02.2014 Hospital), 117/N/52, E Works Comprising of Kakadeo, Kanpur Erectio 25 KV Overhead Line (U.P.), TELE FAX n/01 Equipment (OHE) from No. 0512-2502400, Dtd. Jhalawar City station to 2502409, email: 22.11.2 Kalisindh Thermal [email protected] 013 om Power Plant Works Awarded : MARCH 2014

Quantity Rate Contractor’s Scheduled S. Tender Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ Technical Construction of IRCON/2051/JBN M/s Bagmati `1981.42 8% Above `1491.94 Lacs 15 months from CC/ Bid on Station Buildings, RL/ Stn. Construction Lacs the date of issue TN/JBN 27.01.201 Passenger & Goods Bldg/Nepal Company, of LOA RL/ 4 and Platform, PF Custom Yard/19/ Subash 2051/14 Financial Shelter/sheds, FOB, 1818 dt.31.03.14 Chowk, /704 Bid on tea stall, goods Forbesganj Dtd. 18.03.14 circulating PIN: 854 318 03.01.1 area/roads works, Araria, Bihar 4 staff quarters, guest Ph: 06455-225451 house, Pump House, over head water tank, trolley shed & miscellaneous anciliary works for Nepal Custom Yard. Works Awarded : APRIL 2014

Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 21.03.14 Providing Support IRCON/JK M/s Gh. Nabi Giri `24.04 Lacs 0.02% below `29.42 Lacs 12 months from JK Cell Services dor IRCON's /JAT/1014 Cell/JAT/1014/17/ & Sons, Main the date of issue /17/G/ office and Guest Houses G/Support Bazar, Banihal, of LOA Support and other locations at Services/SS- Distt. Ramban Services/ USBRL Project office and 3R/344 (A), (J&K). SS-3R/ establishments at Jammu. 344 (A), Dated:01.04.2014 28.02.14 (Package: SS-3R) 2 Consultanc 21.02.14 Consultancy Works for 21.04.2014 `10.26 Lacs y-02 Architectural and structural (Nepal), design and Other Services NIT No.- Related to the Construction 706 Dtd. 30.01.2014 of Station Building, Staff Quarters, OH Water Tank and miscellaneous works in connection with Construction of New Broad Gauge Rail Line From Jaynagar (India) to Bardibas (Nepal). PKG: Consultancy – 02 (Nepal) 3 Consultanc 21.02.14 Consultancy Works for 24.04.2014 `6.17 Lacs y-03 Preparation of GAD, Detailed (Nepal), Design & Drawing including NIT No.- Proof Checking of foundation, 707 Dtd. 30.01.2014 sub-structure and superstructure of Major Bridges from Km 27+775 to Km 52+336 in connection with Construction of New Broad Gauge Rail Line From Jaynagar (India) to Bardibas (Nepal). PKG: Consultancy – 03 (Nepal)