OPEN TENDER (For Civil Engg

OPEN TENDER (For Civil Engg

Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month of APRIL 2013-MARCH 2014) Works Awarded : APRIL 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 23.11.2012 Supply of 01 No. IRCON/MECH/1029/ M/s Unitech (01 no.) (01 no.) `3,90,171/- 03-months from the MECH/102 9/ Induction Heating RCF.RBL- Instruments , Unit `4.45 Lacs `3,90,171/- date of issue of LOA RCF.RBL- Machine for mounting of II/Induction Heating No.: 24, Dewan & II/Induction Heating fork on anti-roll bar at Rail Machine/185 Shah, Industrial Machine/18 Coach Factory, Lalganj, dtd.01.04.13 Estate No.: 7, 5 dtd. Raebareli, UP-(INDIA) Navghar, Vasai East, 30.10.12 Thane - 401210 2 IRCON/ 10.01.2013 Supply of 01 No. Load IRCON/MECH/ M/s Vikrant 1 set (02 nos.) 1 set (02 nos.) `39,79,656/- 24-weeks from the MECH/102 9/ Lifting & Turning Device 1029/RCF-RBL- Special Machines `55.60 Lacs `39,79,656/- date of issue of LOA RCF.RBL- at Rail Coach Factory, II/Multiple Pvt. Ltd, 90, II/Load Lifting & Lalganj, Raebareli, UP- station/RET-I/119 Nayapatty Road, Turning (INDIA) dtd 05.04.13 Kolkata – 700055 Device/RE Tel.:033-2551-3070 T-I/119 Email: Dtd. [email protected] 30.10.12 3 IRCON/ 24.01.2013 Supply of (05 Nos.) 10/3 IRCON/MECH/ M/s Unique (05 nos.) (05 nos.) `8,62,46,984/- 180-days from the MECH/10 1029/RCF-RBL- Industrial Handlers 29/RCF.R Ton Electric Overhead `962.00 Lacs `8,62,46,984/- date of issue of LOA BL-II/EOT Travelling Cranes at Rail II/EOT Crane/44/2262 Pvt. Ltd., 206-207, Crane/44 Coach Factory, Lalganj, dtd 15.04.13 Nahar & Seth Ind. dtd. Raebareli, UP-(INDIA) Estate Chakala, 25.12.201 Andheri (East), 2 Mumbai-400 099 4 IRCON/ 08.02.2013 Supply of 01 No. IRCON/MECH/ M/s United (01 no.) (01 no.) `22,07,415/- 120-days from the MECH/ 1029/RCF.RBL- Engineering Corpn., 1029/ Multiple Station Machine `46.44 Lacs `22,07,415/- date of issue of LOA RCF.RBL- (Combined Shearing, II/Multiple B-96, Mayapur II/ Multiple Punching, Cropping & Station/RET/96 dtd. Industrial Area, Station/RE Notching Machine) at 23.04.2013 Phase-I, T/ 96 dtd. New Delhi-110 064 11.01.2013 Rail Coach Factory, Lalganj, Raebareli, UP Works Awarded : MAY 2013 Quantity Rate Contractor’s Scheduled S. Tende Date of Description of Item/ LOA No. (for supply contract)/ (for supply contract)/ Value of Name and Estimated Cost (For Tendered Cost (For completion N. r No. opening Work and date Contract address Engg./Elect. /S&T/ Engg./Elect./S&T/Mec date Mech. etc Works) h. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ 27.02.2013 Supply of Hand Tools at IRCON/MECH/ M/s Machinery `19.78 Lacs `17,56,630/- `17,56,630/- 30-days from the date MECH/ 1029/RCF.RBL- Marketing 1029/ Rail Coach Factory, of issue of PO RCF.RBL- Lalganj, Raebareli, UP- II/Hand Associates Pvt. Ltd, II/ Hand (INDIA) Tools/190/3000 dtd. 2E/24, Tools/190 02.05.2013 Jhandewalan dtd. Extension, New 31.01.2013 Delhi – 110 055, Fax: 011-23629909 2 IRCON/ME 05.02.2013 Pipelines for IRCON/MECH/ M/s Legris India `1607.00 Lacs `17,21,50,978/- `17,21,50,978/ 210-days from GAD CH/1029/R 1029/RCF-RBL-II/ Pvt. Ltd., Plot No.: CF-RBL-II/ Compressed Air, Argo - approval Pipelines/ mix, Nitrogen & Oxygen Pipelines/028B dtd 99, Pace City-1, + 028B dtd Gas Supply and Storage 10.05.2013 Sector-37, AMC for 5 30.10.2012 System in Shell & Bogie Gurgaon-122 001 years Shops Fax:0124- `2,59,91,027/- 66173708 3 IRCON/ME 25.02.2013 Supply of IRCON/MECH/ M/s Machinery `24.55 Lacs `15,64,900/- for `17,40,880/- 30-days from the date CH/1029/R CF. RBL-II/ Tapping/Drilling Machine, 1029/RCF.RBL- Marketing including Jig Saw (100 nos.) of issue of PO Tapping Jig Saw (100 nos.) & Hot II/Tapping Machine, Associates Pvt. Ltd, Tapping, Drilling & `1,75,980/- for Machine, Air Gun (20 nos.) at Rail Jig Saw Machine & 2E/24, Machines and Hot Air Gun (20 Jig Saw Machine & Coach Factory, Lalganj, Hot Air Welding Jhandewalan `17.80 Lacs nos.) & Tapping & Hot Air Raebareli, UP-(INDIA) Gun/192 dtd. Extension, New excluding Drilling not ordered Welding 13.05.2013 Delhi – 110 055, Tapping, Drilling Gun/192 dtd. Fax: 011-23629909 Machine 31.01.2013 4 IRCON/ME 18.03.2013 Supply of 02 Nos. Road IRCON/MECH/ M/s Escort Limited `18.00 Lacs (01 no.) (02 nos.) 03-months from the CH/ 1029/RCF.RBL- Construction 1029/RCF. Mobile Crane Capacity `10,34,274/- `20,68,548/- date of issue of LOA RBL- 10 MT at Rail Coach II/Road Mobile Equipment, 603, II/Road Factory, Lalganj, Crane/RET-I/53 dtd. 6th Floor, Mobile Raebareli, UP-(INDIA) 13.05.2013 Vishal Bhawan, Crane/RET 95 Nehru Place, -I/53 dtd. 22.02.2013 New Delhi-110 019 Tel.:011-26444821, Fax: 011-26444873 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 5 IRCON/ 08.02.2013 Supply of Roof Bearer, IRCON/MECH/1029/ M/s Steel Craft `60.31 Lacs `75,55,311/- `75,55,311/- 180-days from the MECH/102 RCF.RBL-II/Carline (India), Vill.: Kutbi 9/RCF.RBL Side Wall & Carline date of issue of LOA -II/Carline Fabrication and Roof Fab & Roof Nangal Road, Fab & Roof Acceptance Fixtures For Acceptance Opp. 132 KV Acceptanc LHB Coach at Rail Fixtures/188/2809 Power House, e dated 14.05.2013 Batala-143 505 Fixtures/18 Coach Factory, Lalganj, 8/2809 Raebareli, UP-(INDIA) E-mail: dated [email protected] 25.12.2013 6 IRCON/ 18.01.2013 Supply of (03 Nos.) IRCON/MECH/ M/s Macro Tech. `9.90 Lacs `4,36,023/- `13,08,069/- 04-months from the MECH/10 1029/RCF.RBL-II/ Equipment Pvt. Ltd, 29/RCF.R Battery Operated date of issue of LOA BL-II/ Platform Truck at Rail Platform 64A Sadananda Platform Coach Factory, Lalganj, Truck/61/RET dtd. Road, Kolkata – Truck/61/ Raebareli, UP-(INDIA) 15.05.2013 700 026, FAX:033- RET 2463-4684, Email: dated: [email protected] 25.12.12 7 IRCON/J 02.04.2013 Construction of IRCON/J&K- M/s Zeal `211.06 Lacs 7.74% above `227.39 Lacs 06-months from the &K- Cell/JAT/14/7004/17 Construction Co., Cell/JAT/ Passenger Amenities date of issue of LOA 14/7004/1 Center and other allied Dtd.15.05.13 J&K Bank Building, 7 works including Pantha Chowk, Dtd.09.03 srinagar, Kashmir – .13 demolition of existing structures in connection 191 101 with Multi Functional Mob.:09419003883 Complex (MFC) at 09419060731 Jammu Railway Station, J&K 8 IRCON/J '03.05.2013 Hiring of Vehicles for IRCON/J&K- M/s Shabir `15.78 Lacs 33% above `20.92 Lacs 12-months from the &K- SGR/Hiring Vehicle- Transporters, Cell/JAT/ Officers and Staff of date of issue of LOA 14/1014/ Northern Railway Srinagar/VH- Sagina Shopping Q- associated with the 10/450/240 Complex, Gogli B/Hiring- Dtd.20.05.13 Bagh, Srinagar Veh- Project works in SINA- connection with NR/VH- construction of Q-B 10/256 Section of USBRL New Dtd.15.04 .13 Rail Link Project (J&K) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 9 IRCON/ME 15.03.2013 Supply of 03 Nos. IRCON/MECH/ M/s Emprise `11.89 Lacs `6,30,339/- `18,91,018/- 04-months from the CH/1029/R 1029/RCF.RBL- Marketing, B-1/31 CF. RBL-II/ Portable Air Compressor date of issue of LOA at Rail Coach Factory, II/Portable Air Sector-H, Aligarh, Portable Lucknow-226 024 Air Lalganj, Raebareli, UP- Compressor/118/RET Compresso Ph.:0522-3250618, dtd. 21.05.2013 Email: [email protected] r/ 118/RET (INDIA) 10 IRCON/M 21.01.2013 Supply of (01No.) IRCON/MECH/1029/ M/s Ensol Multiclean `12,96,000/- `23,59,090/- `23,59,090/- 03-months from the ECH/102 RCF.RBL-II/ Equipments Pvt. Ltd, 9/RCF.R Mechanized Refuse date of issue of LOA Collector at Rail Coach Mechanised Refuse 401, Neelkanth, 1, BL-II/ Bhawani Singh Road, Mechanis Collector/149 dtd. Factory, Lalganj, Opp. Sahakar ed 24.05.2013 Refuse Raebareli, UP-(INDIA) Bhawan, Jaipur-1, Collector/ FAX: +91-141- 149 2226934 dated: Email: [email protected] 25.12.12 11 IRCON/2 03.05.2013 Construction of Road IRCON/2049/ROB-II- M/s BSC-C&C JV `3044.70 Lacs 12.50% above `34,25,29,193/ 15-months including 049/ROB- BIHAR/LC- II- over Bridge both railway Plot No.:70, - the monsoon period BIHAR/T span and adjacent 3SPL/LOA/104/1239 Sector-32, from the date of issue ENDER/L approaches span Dtd.27.05.2013 Gurgaon – 122 001, of LOA C- Haryana 3SPL/I/20 including Reinforced 13/13 Earth wall/ Retaining Dtd.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    47 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us