120-kV Grand-Brûlé – Saint-Sauveur Supply Line

GENERAL INFORMATION • Summer 2012

Municipality of Saint-Sauveur

Hydro-Québec must increase the transit and transformer capacity of certain substations that currently supply the heart of the Laurentides region to better meet the increase in electricity demand.

Many 120-kV substations can no longer handle the load. The same is true of some 120-kV transmission lines in the area; their capacity will be exceeded in the short term.

Hydro-Québec Équipement et services partagés will conduct the draft-design studies to build a new 120-kV line in the Laurentides area. Present situation Preferred solution Study area For the past few years, demand for To meet the expected growth in The study area of the 120-kV line electricity in the Laurentides region demand in Saint-Jérôme and the ­covers about 1,000 km2 and includes has continued to increase. Adding surrounding municipalities, Hydro- parts of 12 municipalities in the MRCs transformers at some substations Québec TransÉnergie will build a of Laurentides and Pays-d’en-Haut. and reorganizing the distribution new substation in Saint-Jérôme in The affected municipalities are: system lines has helped delay the 2016. This substation is part of a construction of new transmission separate project. Electricity at the MRC des Laurentides facilities in this area. Today, many planned 120/25-kV substation will • Mont-Tremblant satellite substations1 and transmis- be supplied by Lafontaine source • Saint-Faustin–Lac-Carré sion lines that supply the heart of substation.2 • Arundel the Laurentides have reached their • Barkmere capacity, including Rolland and To be able to supply the planned • Montcalm Arthur-Buies substations, in Saint- Saint-Jérôme substation, Lafontaine • Sainte-Agathe-des-Monts Jérôme, Saint-Sauveur substation substation must stop supplying • Val-David and, in the short term, the 120-kV Saint-Sauveur and Doc-Grignon (in • Val-Morin transmission system for Lafontaine Sainte-Adèle) substations. These MRC des Pays-d’en-Haut substation, located in Mirabel. two substations will be supplied by • Saint-Adolphe-d’Howard another source substation. • Morin-Heights • Sainte-Adèle To move power from Lafontaine • Saint-Sauveur substation to the planned Saint- Jérôme substation, Hydro-Québec To the west of the study area is Grand- will build, also in 2016, a new Brûlé substation, in Mont-Tremblant, 120‑kV transmission line in the and the 735-kV transmission lines, to regional county municipalities the south are the municipalities of (MRCs) of Laurentides and Pays- Saint-Adolphe-d’Howard and Morin- d’en-Haut. This line, approximately Heights, to the east we find Saint- 40-km long, will connect Grand- Sauveur and Doc-Grignon (in Sainte- Brûlé source substation, in Mont- Adèle) substations, and to the north is Tremblant, to an existing 120-kV the town of Sainte-Agathe-des-Monts. line, running between Saint- Sauveur and Doc-Grignon The study area includes many small substations. valleys and woodlands and is scattered with lakes and rivers that This new 120-kV double-circuit line, are used for recreation, tourism and to be built on steel towers, will vacationing. It is made up of both increase the security of power public and private lands. ­supply for Saint-Sauveur and ­Doc-Grignon substations, as well as supplying a third satellite ­substation, if necessary.

1 Satellite substation: 120/25-kV transmission substation that supplies electricity to the distribution system. 2 Source substation: 315/120-kV transmission substation that supplies electricity to satellite substations. Val-des-Lacs, M Notre-Dame- 74°30' de-la-Merci, 74°0' Lantier, M Lac-Supérieur, M M Ouimet substation Sainte-Lucie-des- # Laurentides, M Doncaster, R  Entrelacs, M 117 Mont-Tremblant, V Sainte-Lucie-des- Laurentides, M

Ivry-sur-le-Lac, M Sainte-Agathe-des-Monts Huberdeau, # substation M # Sainte-Marguerite- Grand-Brûlé substation du-Lac-Masson, V Estérel, V Sainte-Agathe- Val-David, VL Chertsey, M Saint-Faustin– des-Monts, V Lac-Carré, M Val-des-Lacs, M Notre-Dame- 74°30' Le de-la-Merci, 74°0' Lantier, M s Lau ) Lac-Supérieur, M rentid M C es (M R Le RC) M Sainte-Lucie-des- s Pay ( Ouimet substation s-d'e e Laurentides, M Doncaster,n- HRau i # 46°0' Montcalm, M t (M in Barkmere, V RC) w  ta lm 46°0' a a M tc ) Entrelacs, M - n C Lac e C) o R ièr M M Saint-Joseph MR ( 117 Val-Morin, M (  a Riv Mont-Tremblant, V Sainte-Lucie-des- L Saint-Adolphe- Nord Laurentides, M u- Arundel, CT d'Howard, M # d Sainte-Adèle, V Ivry-sur-le-Lac, M 329 Doc-Grignon substation Sainte-Agathe-des-Monts  Saint-Hippolyte, M Huberdeau, # substation M # 364 Sainte-Marguerite- Arge du-Lac-Masson, V Morin-Heights, M Grand-Brûlé substation nteuil (  Estérel, V MRC)Sainte-Agathe- Val-David, VL Chertsey, M Saint-Faustin– des-Monts, V Piedmont, M Lac-Carré, M Saint-Sauveur substation # Le s Laur ) 15 entide M s (RC C Le M) R s Pay ( Prévost, V s-d'e e n-Hau Wentworth-Nord, M Saint-Sauveur,i V 46°0' Montcalm, M t (R in Barkmere, V CM) w Lac-des- a m 46°0' at al Seize-Îles, M A M tc ) rg e- n M Sainte-Anne- Lac en M) o C ièr te M R des-Lacs, P Saint-Joseph RC uil ( Val-Morin, M ( (M a Riv R L C) Sainte- Saint-Adolphe-Harrington, CT Nord # u- Paquin substation Sophie, M Arundel, CT d'Howard, M d Mille-Isles, M # Saint-Jérôme, V Sainte-Adèle, V 329 Doc-Grignon substation #  Wentworth, CT # Saint-Hippolyte, M Planned Saint-Jérôme substation Arthur-Buies substation Arg 364 enteui  Morin-Heights, M Study area l (MRC) Saint-Jérôme Piedmont, M # Gore, CT Saint- Saint-Sauveur substation Colomban, V Substations and power transmission lines # Rolland substation 15 # 120 kV Grenville-sur-la-Rouge, M # Prévost, V Mirabel (MRC) 315 kV Saint-Sauveur, V Wentworth-Nord, M Mirabel, V Brownsburg- # 735 kV Lac-des- Chatham, V Seize-Îles, M A rge Sainte-Anne- # nt des-Lacs, P Lafontaine substation Regional county municipality eui 0 3 6 km l (R CM (MRC) boundary ) Sainte- , V 158 Harrington, CT MTM, Zone 8, NAD83 Paquin substation # Sophie, M 50 Municipal boundary 5453_bu_geq_004_121219a.mxd 74°30' Mille-Isles, M  74°0' Saint-Jérôme, V Information document for consultation by parties concerned. For any other use, contact: Géomatique, Hydro-Québec# Équipement et services partagés. Wentworth, CT # Planned Saint-Jérôme substation Arthur-Buies substation

Environmental issues Studies Saint-Jérôme Study area

Gore, CT Saint- Based on a summary review of region- Colomban,In the V coming months, Hydro-Québec Substations and power transmission lines # Rolland substation al characteristics, the main environ- will carry out environmental invento­ # 120 kV Grenville-sur-la-Rouge, M mental components that are sensitive ries and technical surveys in the studyMirabel (RCM) # 315 kV Mirabel, V Brownsburg-to the installation of equipment are: area to better understand the host # 735 kV Chatham, V environment of the planned line. • Land use # Lafontaine substation These inventories will allow Hydro- Regional county municipality 0 3 6 km • Landscape (RCM) boundary Québec to develop route variants. The MTM, Zone 8, NAD83 • Forest Lachute, V 158 50 Municipal boundary 5453_bu_geq_004_120829a.mxd 74°30' company will then determine74°0' the most • Water bodies Information document for consultation by parties concerned. For any other use, contact: Géomatique, Hydro-Québec Équipement et servicesadvantageous partagés. route from a technical, • Wetlands economic, environmental and social standpoint. 120-kV line in the Saint-Sauveur area

Public Tangible support for participation community development Hydro-Québec has implemented a public participation Hydro-Québec wants its facilities to blend harmoniously program to establish a dialogue while the studies are into the host environment. It sees its projects as oppor- being carried out. The company will thus be able to take tunities to actively participate in the development of host into account the concerns and expectations expressed by communities and has set up the Integrated Enhancement the public and by key stakeholders so as to best adapt Program (IEP) with this intent. For each new power trans- the project to local realities. mission project covered by this program, Hydro-Québec grants eligible organizations funding equivalent to 1% of the initially authorized value of the facilities covered by the IEP.

www.hydroquebec.com

Project schedule

DRAFT DESIGN Info-project line General information Summer 2012 Laurentides Information and consultation 1 800 465-1521, ext. 6022 on line routes Fall 2012 Information on solution selected Winter – spring 2013

PERMITTING For more information Government authorizations Spring 2013 – summer 2014 Sophie Lamoureux Advisor – Community Relations PROJECT Direction – Affaires régionales et collectivités 333, boul. Jean-Paul-Hogue, 1er étage Construction Summer 2015 – fall 2016 Saint-Jérôme (Québec) J7Z 6Y3 Commissioning Fall 2016 E-mail: [email protected]

Ce document est également publié en français. This is a translation of the original French text. Printed on paper made in Québec from 100% 2012E1105-A postconsumer recycled fibre.